Guide to Replacing Home Siding
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Framing a New Wall
FRAMING A NEW WALL Turn large, unusable spaces into more functional ones by adding walls. Framing a new wall is not extremely difficult, but it does require accuracy and attention to detail. STEP ONE Overview: Temporarily lay out the new wall. Run a stud SKILL SCALE finder along the ceiling to locate the joists. If Medium the joists are parallel to the new wall, adjust the layout so that the wall is directly under TIME REQUIRED a joist. If they run perpendicular to the wall, To frame an 8x10-foot wall. put the wall where you want it. Beginner: 2.5 hr. Intermediate: 2 hr. Advanced: 1.5 hr. (It’s a good idea to ask someone to help you with this project.) STEP TWO Measure from a corner and mark where What You’ll Need: the new wall will meet the existing wall. Measure from the opposite corner and lay TOOLS out the other end of the new wall. Snap a stud finder chalk line between the marks. This marks hammer one edge of the top plate. Measure handsaw diagonally between opposite corners. If the tape measure measurements are the same, the new wall chalk line is square. If they’re not, adjust the layout so plumb bob they’re equal. combination square level single-edge razor STEP THREE safety goggles To lay out the sole plate, drive a nail into the ceiling close to one end of the chalk MATERIALS line. Hang a plumb bob from the nail and 2x4s mark the floor at the point. Repeat at the 16d common nails other end of the ceiling chalk line. -
078400S02 FIRESTOPPING – Mechanical Room Floor Penetrations
078400S02 FIRESTOPPING – Mechanical Room Floor Penetrations The following standard applies to all added floor penetrations in any existing mechanical room, electrical room or penthouse mechanical area above slab level in all facilities maintained by the University of Kentucky. Affected penetrations include, but are not limited to, the following: conduit, pipes, and ductwork. For new facilities, housekeeping curbs should be constructed during the initial building construction which would eliminate the need for this standard. 1.0 All penetrations must be fire stopped per the applicable NFPA (National Fire Protection Association) and State of Kentucky Building Codes with the appropriate UL listed fire stop assembly being utilized. The UL listing documentation must be available for the installed assembly upon request by the inspecting authority or by the University representative. 2.0 In addition to the required fire stopping outlined in section 1.0 above, all penetrations are to be protected by materials meeting an UL Tested Class 1 W-rating to restrict the flow of water. 3.0 For pipes and conduits, a curb is to be installed around the opening with a self leveling, single- component, silicone-based firestop sealant used in the slab and the curb. The installation is to consist of a steel angle mechanically fastened to the floor to create a curb with the firestop sealant installed in the curb and slab sealing up to the penetrating item. The sealant is to be white in color. See drawing 1 below for better clarification. 4.0 For ductwork, a curb is to be installed around the opening with a self leveling, single-component, silicone-based firestop sealant used in the slab and the curb. -
The Fireplace, Rekindled
The fireplace, rekindled. PRECISION-ENGINEERED MASONRY FIREPLACES FireRock offers a simple way to build a high-end, all-masonry fireplace and chimney. This smartly designed system installs in a matter of hours for less than half the cost of a traditional brick & mortar fireplace. Not only does it look great, it lasts forever. Why FireRock? Installs Fast. Installs in less than a day compared to 1 to 2 weeks for traditional brick & mortar. Strong. 3000 PSI compressive strength. The strongest on the market. Smart. Costs 50% less than traditional brick & mortar, and is precision-engineered to draw correctly. Stunning. Looks better and lasts longer than a “metal box” fireplace. Long Lasting. All models come with a 20 year warranty and a 100 year life expectancy. You could spend twice as much building a traditional brick & mortar fireplace, but the only person that would know would be your accountant. CONVENTIONAL RUMFORD OUTDOOR • FireRock’s traditional model • Taller opening allows for a larger • FireRock’s solution for use in outdoor • Angled back wall for better heat reflection fire and greater heat reflection living spaces • Can be installed on a combustible floor using • Great for homes with high ceilings • Firebox and chimney deliver on LiteRock installation application • Accommodates FireRock masonry or a single pallet • Accommodates FireRock masonry or approved metal chimney system Available in three sizes: 30”, 36”, and 42” approved metal chimney system Available in four sizes: 30”, 36”, 42”, and 48” Available in six sizes: 30”, 36”, -
Bilco Floor, Vault and Sidewalk Doors Provide Reliable Access to Equipment Stored Underground Or Below/Between Building Floors
Floor & Vault Doors Bilco Floor, Vault and Sidewalk Doors provide reliable access to equipment stored underground or below/between building floors. Commonly used by gas, electric and water utilities for frequent access by service personnel, Bilco doors are available in many different sizes and configurations to suit any application. Floor & Vault Doors Advantages of Floor, Vault and Sidewalk Doors Bilco Floor, Vault and Sidewalk Doors are ruggedly constructed to provide many years of dependable service. Doors are available in a wide range of sizes and configurations, and all models offer the following standard features and benefits: • Engineered lift assistance for smooth, easy door operation, regardless of cover size and weight • Automatic holdopen arm that locks the cover in the open position to ensure safe egress • Type 316 stainless steel slam lock to prevent unauthorized access • Constructed with corrosion resistant materials and hardware • Heavy duty hinges, custom engineered for horizontal door applications Positive latching mechanism Structurally reinforced cover with finished edges Heavy-duty hinges Automatic hold-open arm with convenient release handle Lift assistance counterbalances cover Type J-AL door shown Typical Applications • Airports • Manufacturing Facilities • Schools • Correctional Facilities • Natural Gas Utilities •Telecommunications Vaults • Electric Utilities • Office Buildings •Transit Systems • Factories • Processing Plants •Warehouses • Hospitals • Retail Structures •Water/Waste Treatment Plants Drainage Doors Type J Steel Type J Type J-AL Aluminum With Drainage Channel Frame For use in exterior applications where there is concern about water or other liquids entering the access opening. Type J H20 Steel Type J H20 Type J-AL H20 Aluminum With Drainage Channel Frame For use in exterior applications where the doors will be subjected to vehicular traffic. -
One Stop Shop News
“Where One Call Does It All!” One Stop Shop News Volume 5, Issue 41 | 90 Stillwater Ave Orono, ME 866-5690 | January 2017 Preview 3D Models Before Don't Miss Any Upgrades or Remodeling to Your Home, Have a Plan Bringing the Hammer Home maintenance is much easier to tackle with a priority list. One Stop Home One Stop Home Repair is happy to Repair recommends starting the year with a checklist for all the projects you want announce the ability to provide to and should tackle throughout the year. Your list may or not be this extensive, you, the homeowner, with a but the list below is a good place to start. detailed digital representation of your remodel or new construction Interior – Beginning from the floor and working your way up, you can quickly project in 3D before we start. We give your house a thorough inspection to plan which repairs or upgrades you want now have a professionally trained interior designer who can assist to complete before the year's end. Having a running list at the beginning the year you in achieving the perfect look will help you to achieve what your house needs. and feel based on your style and ● Check your Electrical Outlets – Loose outlets can result in a fire if budget. Call our office to use this anything falls in the gap between the outlet and plug. great service. ● Repair Damaged Walls and Ceilings – Water damaged walls should be taken care of immediately. Pay attention to both cosmetic damage and These design plans will help you obvious water damage. -
Basement Flood Mitigation
1 Mitigation refers to measures taken now to reduce losses in the future. How can homeowners and renters protect themselves and their property from a devastating loss? 2 There are a range of possible causes for basement flooding and some potential remedies. Many of these low-cost options can be factored into a family’s budget and accomplished over the several months that precede storm season. 3 There are four ways water gets into your basement: Through the drainage system, known as the sump. Backing up through the sewer lines under the house. Seeping through cracks in the walls and floor. Through windows and doors, called overland flooding. 4 Gutters can play a huge role in keeping basements dry and foundations stable. Water damage caused by clogged gutters can be severe. Install gutters and downspouts. Repair them as the need arises. Keep them free of debris. 5 Channel and disperse water away from the home by lengthening the run of downspouts with rigid or flexible extensions. Prevent interior intrusion through windows and replace weather stripping as needed. 6 Many varieties of sturdy window well covers are available, simple to install and hinged for easy access. Wells should be constructed with gravel bottoms to promote drainage. Remove organic growth to permit sunlight and ventilation. 7 Berms and barriers can help water slope away from the home. The berm’s slope should be about 1 inch per foot and extend for at least 10 feet. It is important to note permits are required any time a homeowner alters the elevation of the property. -
Home Improvement Loan Program Provides Low-Interest/No Interest Loans to Low and Moderate Some Qualified Repairs Include: Income City Residents
• The Home Improvement Loan Program provides low-interest/no interest loans to low and moderate Some Qualified Repairs Include: income City residents. • General exterior maintenance • Replacement of roof • Recipients must be owners and • Upgrading of electrical system occupants of single-family or two- • Upgrading of plumbing system family dwellings. • Replacement of deteriorated water Heater and/or furnace & a/c Income eligibility: • Window replacement • Siding replacement Maximum gross income based • Insulation & weatherization To Apply for a Loan on the number of persons living • Foundation repair\ water proofing in the household and their • Handicap accessibility To request an application call: combined incomes: • Repair & replacement of 636-949-3222: deteriorated driveway & sidewalks 1 person household, $37,600 • Lead, mold & radon abatement & Please provide the following items to the 2 persons, $43,000 containment Home Improvement Loan Program at the 3 persons, $48,350 Department of Community Dev. on the 4 persons, $53,700 Priority is given to repair housing Third Floor of City Hall, 200 North 5 persons, $58,000 conditions which represent an Second Street, Suite 303, St. Charles, 6 persons, $62,300. accessibility barrier and\or immediate MO, 63301-2851, . hazard to the health and\or safety of the occupants or to the public. 1. Completed application • Interest rate: 3% for ten years or 2. List of items needing repair 0% deferred payment loan. The Fair Housing Policy of the City of 3. Proof of income for all occupants St. Charles to assure equal opportunity 4. A certified\recorded deed • No interest loans are available to to all persons, and is unlawful to 5. -
Spectrum Brands Hardware and Home Improvement Division to Open New Distribution Facility at Logistics Park Kansas City
Contact: Nicole Randall For Immediate Release (785) 414-0253, [email protected] February 3, 2017 Spectrum Brands Hardware and Home Improvement Division to Open New Distribution Facility at Logistics Park Kansas City The Kansas Department of Commerce has the pleasure of announcing that Spectrum Brands Hardware and Home Improvement (HHI) division plans to centralize its operations from two existing distribution facilities in Charlotte, N.C., and Mira Loma, Calif., into a single 927,112 square-foot distribution center at Logistics Park Kansas City (LPKC) in Edgerton, Kan. Construction of the building Spectrum will occupy at LPKC, known as Inland Port XXXIII, began in March 2016. It is Kansas City’s largest-ever to be constructed on a speculative basis. “Spectrum Brands HHI initiated a study of our existing distribution and fulfillment network in December with the intent of identifying the best option for the business to increase distribution capabilities and service levels, provide room for expansion, reduce overall inventory levels, and improve cost management,” said Sr. Vice President and General Manager of Hardware and Home Improvement Phil Szuba. “After completing our analysis, we determined that centralizing distribution operations in Edgerton will enable Spectrum Brands HHI to more efficiently serve our customers with lower inventory levels while establishing a platform for future growth.” Spectrum Brands HHI will begin transitioning operations from California and North Carolina immediately. The company plans to start receiving inventory in Edgerton in March and will start shipping from the new LPKC distribution center in April. When complete, Spectrum Brands will have approximately 315 jobs in the State of Kansas. -
Homeowners and Home Improvements. 1987
HUO - O 05979 CURRENT HOUSING REPORTS H121/92-1 by BarbaraT. Williams and Leonard J. Norry U.S. Department of Housing u.s. Department of Commerce and Urban Development Economics and Statistics Administration BUREAU OF THE CENSUS Acknowledgments This report was prepared by Leonard J. Norry and Barbara T. Williams under the general direction of Daniel H. Weinberg, Chief, Housing and Household Economic Statistics Division (HHES). Agnes C. Hilgenberg and Ann Johnson provided statistical assistance and Tracy A. Loveless and Brenda S. Williams provided clerical and typing assistance. The authors are grateful to David Crowe, Assistant Vice President, National Association of Home Builders, Patricia A. Johnson, Chief, Social Characteristics Branch, HHES, Barry A. Rappaport, Assistant Division Chief, Construction Statistics Division and Jeanne M. Woodward, Social Characteristics Branch, HHES, for their review and suggestions regarding methodology and subject matter. Additional persons within the Bureau of the Census made significant contributions to the preparation of this report. Robert Abramson and Steven Leadbetter of Statistical Methods Division under the direction of Preston Jay Waite, Chief, conducted the sampling review. The staff of Administrative and Publication Services Division, Walter C. Odom, Chief, provided publication planning, design, composition, and printing planning and procurement; Frances B. Scott provided publication coordination and editing, and Joyce Chamberlain produced the graphics. CURRENT HOUSING REPORTS H121/92-1 Issued April 1992 u.s. Department of Housing u.s. Department of Commerce and Urban Development Barbara Hackman Franklin, Secretary Jack Kemp, Secretary Rockwell A. Schnabel, Deputy Secretary John C. Weicher, Economics and Statistics Administration Assistant Secretary for Policy Development and Research Mark W. -
Corporate Office Employee Analysis: Transformation from Closed Office Layout to Open Floor Plan Environment
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Theses from the Architecture Program Architecture Program Winter 12-1-2011 CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT Stephanie J. Fanger University of Nebraska-Lincoln, [email protected] Follow this and additional works at: https://digitalcommons.unl.edu/archthesis Part of the Interior Architecture Commons, and the Other Architecture Commons Fanger, Stephanie J., "CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT" (2011). Theses from the Architecture Program. 123. https://digitalcommons.unl.edu/archthesis/123 This Article is brought to you for free and open access by the Architecture Program at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in Theses from the Architecture Program by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln. CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT by Stephanie Julia Fanger A THESIS Presented to the Faculty of The Graduate College at the University of Nebraska In Partial Fulfillment of Requirements For the Degree of Master of Science Major: Architecture Under the Supervision of Professor Betsy S. Gabb Lincoln, Nebraska December, 2011 CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT Stephanie J. Fanger, M.S. University of Nebraska, 2011 Advisor: Betsy Gabb The office workplace within the United States has undergone monumental changes in the past century. The Environmental Protection Agency (EPA) has cited that Americans spend an average of 90 percent of their time indoors. As human beings can often spend a majority of the hours in the day at their workplace, more so than their home, it is important to understand the effects of the built environment on the American office employee. -
Installation Manual
DUET SUPREME FIREPLACES FACTORY-BUILT FIREPLACE MODEL DUET, DUET 4 SEASONS Tested and certified by Intertek • UL 127 • ULC-S610 OWNER’S MANUAL INSTALLATION OPERATION MAINTENANCE Keep these instructions for future use. Manufactured by: 3594 Jarry East, Montreal, QUEBEC, H1Z 2G4 Phone: 1-877-593-4722 Fax: (514) 593-4424 www.supremem.com [email protected] 1 Revised: July 2018 DUET SUPREME FIREPLACES TABLE OF CONTENTS 1. SAFETY GUIDELINES FOR YOUR DUET ………………………………………………….................... 3 2. OPERATING INSTRUCTIONS ……………………………………………………………………................. 4 2.1 Fuel …………………………………………………………………………………………………………… 4 2.2 First Fires ……………………………………………………………………………………………………. 4 2.3 The Combustion Air Control ………………………………………………………………………………. 4 2.3.1 Operating the Combustion Air Control ……………………………………………………………… 4 2.4 Starting a Fire ………………………………………………………………………………………………... 5 2.5 Adding a New Load of Wood ………………………………………………………………………………. 6 2.6 Smoking ……...……………………………………………………………………………………………… 6 2.7 Built-in Barbecue ……………………………………………………………………………………………. 6 3. MAINTENANCE OF THE DUET …………………………………………………………………………. 7 3.1 Creosote – Formation and Need for Removal ……………………………………………………………… 7 3.2 Chimney Maintenance ………………………………………………………………………………………. 7 3.3 Chimney Sweeping Cap …………………………………………………………………………………….. 7 3.4 Paint …………………………………………………………………………………………………………. 8 3.5 Disposal of Ashes ……………………………………………………………………………………………. 8 3.6 Glass Cleaning ………………………………………………………………………………………………... 8 3.7 Glass Replacement ………………………………………………………………………………………….. 9 3.8 Gasket Replacement -
Basement Finishing Material Checklist
Basement Finishing Material Checklist Is Shepherd rarer when Marcellus encaging thereinafter? Is Jameson blustering or exequial when clunks some blessed shying thriftlessly? Miscreative Henry underpinned fumblingly and blindingly, she riffle her toller botch slothfully. If you basement finishing material such premises solely as knowing which service records and framing the process of your budget will be sure you prepare for paper copies or costs Fire blocking is a material used to curl the landscape of steer by breaking up large connected air spaces. Corrugated Stainless Steel Tubing. So by finishing basement space will also provide? Steps for Finishing Your Basement Budget Dumpster. Basement finishing Englewood OH. Your Design Consultation Checklist Home & Basement. This hit is designed to drum you a basic education in processes materials and even code issues. How long lasting, material options because you is covered topics that are working hours that you may need a checklist of? Read the size and basement finishing material in your basement renovation, and framing this chapter will prevent the adobe flash player is. The time allowed for that need only if you may bring in many homeowners. That bird, without further ado, let us jump took the details of the sock and answers to the questions many people are only forward i know. The leak has been fixed, but mildew is or on the drywall. Our customers is the only slightly damp, appliances in lieu of the wall of finishing basement material is easy, polystyrene have signed. Dryer vent not per code length expression of elbows material support 12. If it become wet, sand is seeping through this wall from water outside.