HO/IT/LT/ Date : To, Dy. General Manager (IT), Akola / / / / / / / Nasik //.

System Analyst (IT), / / Aurangabad (R) / Beed / / Buldhana / / / / / / Jalna / / Nagpur (U) / Nasik Rural / Osmanabad / /Pen / Pune Rural / / / / Sindhudurg / / / / / Washi / .

Sub : LT Billing Version 2.4.16. Ref :- 1.MERC Net metering Regulations 2015 notified on 10.09.2015 2. Comm. Circular 258 Ref. No. Comm/CP/Solar-Net metering/3051 dt. 25.01.2016

Please download the files LTVER2.4.16.ZIP from Info portal http://webagent.rapdrp.mahadiscom.in/portal/Info%20Portal/LT%20AMENDMENT/Forms/AllItems.aspx . Please follow the procedure as per the instruction sheet enclosed. Before reporting any problem in the software, please verify that the latest version has been used. If the problem still persists, the same should be reported to S.A. (s/w Testing)/S.A. (LT billing). In case of non receipt of Program files should be reported to Dy. General Manager. Please bring contents of this amendment to the notice of user units as well. Please send acknowledgement of implementation of this notice by return fax as per enclosed format.

Chief General Manager (IT) Copy f.w.c.s: Chief Engineer (Comm.) Chief Engineer (Dist.) Chief General Manager (Int. Audit) Chief General Manager (Corp. Accts.) Copy to: S.E.(TRC) All SEs (by email)/All SDOs(by email)

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. Prakashganga, 1st Floor, Plot No. C-19, ‘E’ Block, - Complex, Mumbai-400 051. Phone : 26598595. Fax : 26598586 Email:[email protected] : www.mahadiscom.in Purpose of Amendment

1.The State Regulatory Commision has formulated and notified the MERC (Net Metering for Solar Rooftop Systems) Regulations, 2015 on 10th Sep 2015. Accordingly Commercial Circular No. 258 under reference 2 is released. Following methodology will be used for billing.

i. As per provisions consumer can have either Net Meter, or pair of meters, one for recording the import and other for recording the export of electricity.

ii. Consumers eligible for TOD tariff should have TOD Net Meter installed.

iii. Consumers not eligible for TOD tariff may have TOD or Non-TOD Net Meter installed.

iv. Following components will be shown on bill separately : i.The quantum of electricity units exported by the eligible consumer ii.The quantum of electricity units imported by the eligible consumer iii.The net quantum of electricity units billed for payment by the eligible consumer.

v. If the quantum of electricity units imported exceeds the quantum exported during the billing period, bill will be raised for net electricity consumption after adjusting the credited units.

vi. If the quantum of electricity units exported exceeds the quantum imported during the billing period, the excess quantum will be carried forward to the next billing cycle.

vii. In case the consumer is eligible for TOD tariff, the consumption in each TOD slot will be first compensated with units injected in corresponding TOD slot. Any injection over and above the consumption in a TOD slot will be accounted as if the excess injection had occurred during off-peak hours i.e. during A zone only. Examples are given below

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. Prakashganga, 1st Floor, Plot No. C-19, ‘E’ Block, Bandra-Kurla Complex, Mumbai-400 051. Phone : 26598595. Fax : 26598586 Email:[email protected] : www.mahadiscom.in CASE-I Import Export Offset Excess Units for Net Units Carry Forward Units Units units adjustment in ‘Slot-A’ for Billing Units

Slot-A 250 0 0 0 250 0 Slot-B 250 200 200 0 50 0 Slot-C 250 90 90 0 160 0 Slot-D 250 10 10 0 240 0 Total 1000 300 300 0 700 0

CASE-II Import Export Offset Excess Units for Net Units Carry Forward Units Units units adjustment in ‘Slot-A’ for Billing Units

Slot-A 250 0 250 0 0 410 Slot-B 250 800 250 550 0 0 Slot-C 250 360 250 110 0 0 Slot-D 250 40 40 0 210 0 Total 1000 1200 790 410 210 410

viii. The unadjusted net credited units as at the end of each financial year will be purchased by MSEDCL at its Average Cost of Power Purchase as approved by the commision for that year. The credit of the same will be passed in the immediate succeeding billing cycle i.e. in first billing cycle of financial year (i.e. April in case of monthly billing) and the cumulative quantum of injected electricity carried forward will be re-set to zero.

ix. In case of consumer is disconnected, unadjusted banked units will be treated as lapsed and will not be carry forwarded.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. Prakashganga, 1st Floor, Plot No. C-19, ‘E’ Block, Bandra-Kurla Complex, Mumbai-400 051. Phone : 26598595. Fax : 26598586 Email:[email protected] : www.mahadiscom.in x . Bill of Solar rooftop consumers is generated in case of normal reading only. xi. There is no change in computation of Billing Demand. xii. Power Factor will be computed on units before adjusting export units. xiii. Net units used for billing will be shown as sale in MIS and all other reports. For purpose of Energy Audit units before adjusting export units will be considered.

LT Billing application is modified as a. Two Meter type code are added/updated for TOD/Non TOD solar rooftop export meter.

Meter Type Code Description 90 SOLAR ROOFTOP NON TOD EXPORT METER 91 SOLAR ROOFTOP TOD EXPORT METER b. B36 card is used to identify Solar Roof top consumer and capacity of solar rooftop consumers as

Field Column Position Length Remark

From To Solar Rooftop_Flag 75 75 1 Value ‘Y’ or ‘N’

Capacity of Solar 76 81 6 Fill capacity of Rooftop solar Rooftop in KW with one decimal c. To identify Export/ Net Meter, Meter_Type ( column 31) field in B25 card is used. Meter Type Description 8 Export Meter 9 Net Meter d. Meter replacement card (B19/B25) For Non TOD meter of Solar Rooftop consumer is modified as per annexure attached. Also LTIP data entry software is modified for meter replacement(B0024) and meter readings(B0030) of Solar Rooftop consumer . Meter replacement (B0024) and Consumer meter (B0025) forms in LTIP dataentry software is modified for new value Export and Net meter in Meter type field. e. To feed manual reading of export, use second meter reading column in B30 card as per annexure attached.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. Prakashganga, 1st Floor, Plot No. C-19, ‘E’ Block, Bandra-Kurla Complex, Mumbai-400 051. Phone : 26598595. Fax : 26598586 Email:[email protected] : www.mahadiscom.in f. For Net meter two meters are added in meter assignment.

Make code Serial Number Meter Type Code Description Net meter Make Net meter Serial 11 for Non TOD/71 for TOD For Import code number ‘500’ +Net meter Net meter Serial 90 for Non TOD/91 for TOD For Export Make_code number

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. Prakashganga, 1st Floor, Plot No. C-19, ‘E’ Block, Bandra-Kurla Complex, Mumbai-400 051. Phone : 26598595. Fax : 26598586 Email:[email protected] : www.mahadiscom.in