Richmond Swale Valley Community Initiative Strategic Framework Strategy for the Future 2009-2014

Total Page:16

File Type:pdf, Size:1020Kb

Richmond Swale Valley Community Initiative Strategic Framework Strategy for the Future 2009-2014 CHRIS BLANDFORD ASSOCIATES environment landscape planning Richmond Swale Valley Community Initiative Strategic Framework Strategy for the Future 2009-2014 October 2009 CONTENTS Executive Summary 1.0 INTRODUCTION 1 2.0 REVIEW OF THE 2003 STRATEGIC FRAMEWORK 2 2.1 A Reminder: the 2003 RSVCI Strategy for the Future 2 2.2 Progress against the Strategy Goals 8 2.3 Learnings from the Last 5 Years 14 2.4 Implications for Emerging Priorities for the Future 17 3.0 STRATEGIC CONTEXT TODAY 18 3.1 Key Changes in the Strategic Context 18 3.2 Key New Related Plans and Strategies 18 4.0 CONSULTATION 23 4.1 Aims and Approach 23 4.2 Key Findings from the Workshops 24 4.3 Key Findings from the Youth Questionnaire 26 5.0 VISION AND KEY PRINCIPLES 29 5.1 Overview 29 5.2 Revised Vision for the Future 29 5.3 Principles of Sustainable Management and Development 30 5.4 Strategy Goals 30 6.0 STRATEGY GOALS AND PROJECTS 31 6.1 Strategy Goal A: Promoting Sustainability and the Green Agenda 31 6.2 Strategy Goal B: Diversifying the Economy and Attracting New Businesses 36 6.3 Strategy Goal C: Reaching Out to Young People 39 6.4 Strategy Goal D: Improving Richmond’s Offer, for both Locals and Visitors 42 6.5 Strategy Goal E: Improving Richmond’s Retail Offer 47 6.6 Strategy Goal F: Increasing Engagement and Collaboration with Catterick Garrison 48 October 2009 RSVCI Refresh 50018501_Final Strategy for the Future_EP 091009 Chris Blandford Associates 6.7 Strategy Goal G: Increasing Social Inclusion and Participation 50 6.8 Strategy Goal H: Improving Health and Well-Being 54 6.9 Strategy Goal I: Taking Care of Richmond’s Assets 56 6.10 Strategy Goal J: Carrying Out Regular Monitoring and Evaluation 60 6.11 Strategy Goal K: Ensuring Management Resources to Support Delivery 61 7.0 ACTION PLAN 63 7.1 Prioritisation, Target Outcomes and Delivery Mechanism 63 7.2 Potential Sources of Funding 64 7.3 Other Resources and Funding Sources 75 APPENDICES A Workshops - Attendance List B Workshops - Record of Ideas C Youth Consultation Questionnaire D Key Sources of Information October 2009 RSVCI Refresh 50018501_Final Strategy for the Future_EP 091009 Chris Blandford Associates Executive Summary Overview This document is the Richmond Swale Valley Community Initiative (RSVCI) Strategy for the Future 2009- 2014. It is a Strategic Framework for the sustainable economic, social and environmental development of Richmond, the Swale Valley and its setting. It is a community-led strategy that was developed through active consultation of community and stakeholder groups. The document updates and replaces the 2003 RSVCI Strategic Framework. Key Assets Richmond and the Swale Valley have a number of key assets that contribute to the area’s significance and distinctiveness. These assets need to be protected and conserved, but they also play an important role in helping to realise some of the aspirations for Richmond and the Swale Valley. As a result, they are integral to the RSVCI Strategy for the Future. They are summarised below: • Historic character; • Green character and superb landscape setting; • Nationally important wildlife habitats and species; • Status as a growing centre for outdoor pursuits and informal recreation; • Famous associations; and • Role as an important service centre for rural areas. Refreshing the 2003 RSVCI Strategic Framework A number of steps were taken to refresh the 2003 RSVCI Strategic Framework and develop the RSVCI Strategy for the Future 2009-2014 – progress on implementing the 2003 Strategic Framework was reviewed, key changes in the strategic context identified, and community and stakeholder consultations held. Out of these came a number of key findings that have informed the development of the revised Strategy for the Future: • Significant progress has been made on heritage conservation and its contribution to regeneration, and this needs to continue; • However, there now needs to be greater emphasis on defining the industries of the future, on diversifying the economy and promoting creativity, innovation and entrepreneurialism; • There needs to be greater emphasis on sustainability – both environmental and social; • Broader participation and more active contribution, better accessibility and more proactive engagement with young people is needed, as is a greater emphasis on health and well being for all communities; October 2009 RSVCI Refresh 50018501_Final Strategy for the Future_EP 091009 Chris Blandford Associates • Quality is important – it will make Richmond and its hinterland an even more compelling destination for locals and visitors, and help it to better compete in the challenging market place; • Collaboration is also important – there needs to be greater emphasis on collaborating with Catterick Garrison, and finding ways to develop complementary offers that benefit both sets of residents; and • There have been many visible successes, but better monitoring and evaluation of the contribution of these successes is required going forward. Revised Vision for the Future The 2003 long term Vision for the Future for Richmond and its hinterland still broadly articulates the right direction for Richmond, with some minor amendments required to reflect new shifts in emphasis. The revised Vision for the Future is set out below: Our historic town of Richmond will be appropriately revitalised to become an even more prosperous, lively and accessible place for all residents, visitors, shoppers and businesses. This renaissance will build on Richmond and the Swale Valley’s inherent strengths – its unique architectural, historical, natural and cultural heritage assets and the commitment of its communities. A focus on quality, sustainability and economic resilience will underpin Richmond’s growing reputation as one of the country’s leading and most innovative historic market towns. Principles of Sustainable Management and Development The three Principles of Sustainable Management and Development that were set out in the 2003 RSVCI Strategic Framework are still considered appropriate as they were originally articulated. They are as follows: • Principle 1: Sustain the unique character and significance of Richmond and the Swale Valley; • Principle 2: Ensure that all uses, activities and developments are sustainable; and • Principles 3: Ensure that the people living and working in Richmond and the Swale Valley are involved and supported in the implementation of the RSVCI. Strategy Goals and Projects In support of the revised Vision for the Future, 11 Strategy Goals and 50 Projects have been identified. These projects broadly focus on the next 5 years, although some will have longer term components. The Strategy Goals and Projects are listed in the table below. October 2009 RSVCI Refresh 50018501_Final Strategy for the Future_EP 091009 Chris Blandford Associates Strategy Project Goal Strategy Goal Project A1: Encourage a greater focus on sustainable transport systems A: Promoting Project A2: Increase domestic and commercial use of renewable energy and locally Sustainability sourced fuel and the Project A3: Encourage increased focus on energy efficiency Green Project A4: Encourage a greater focus on locally grown and locally sourced produce Agenda Project A5: Establish an eco-advice centre to promote sustainability and offer practical advice Project A6: Seek accreditation to celebrate and promote Richmond’s green credentials Strategy Goal Project B1: Establish a creative business hub in Richmond B: Project B2: Explore the potential for encouraging flagship organisations to relocate, or Diversifying establish an outpost in Richmond the Economy Project B3: Encourage the development of courses that are more closely aligned with and target new businesses Attracting Project B4: Foster the development of entrepreneurs and new businesses New Businesses Project B5: Actively promote Richmond as a quality of life destination Project B6: Continue to supply high quality office premises in Richmond through the restoration and renovation of historic buildings Strategy Goal Project C1: Increase the range of facilities specifically targeted at young people C: Reaching Project C2: Increase the range of events/activities specifically targeted at young people Out to Young Project C3: Actively engage young people in decisions and initiatives affecting their People future Project C4: Increase the range of placement and apprentice schemes available to young people Project C5: Promote Richmond and its facilities/events through channels tailored towards young people Strategy Goal Project D1: Continue to improve the public realm in Richmond D: Improving Project D2: Establish tighter controls for development in the town centre Richmond's Project D3: Continue to explore opportunities to increase pedestrian use of the market Offer, for place both Locals Project D4: Establish a programme of public art in Richmond and Visitors Project D5: Encourage development of the evening economy Project D6: Increase promotion and marketing of Richmond as a visitor destination Strategy Goal Project E1: Encourage the development of a niche, higher end retail offer in the town E: Improving centre Richmond's Project E2: Continue to roll out the Heritage Partnership Scheme to improve the quality Retail Offer of shop fronts in Richmond Project E3: Improve the quality of shop windows and merchandising Strategy Goal Project F1: Improve communication between Richmond and Catterick Garrison F: Increasing Engagement Project F2: Improve transport links between Richmond and Catterick Garrison and Collaboration
Recommended publications
  • Register of Lords' Interests
    REGISTER OF LORDS’ INTERESTS _________________ The following Members of the House of Lords have registered relevant interests under the code of conduct: ABERDARE, Lord Category 1: Directorships Director, WALTZ Programmes Limited (training for work/apprenticeships in London) Director, Twist Partnership Limited (promoting leadership through learning) Category 2: Remunerated employment, office, profession etc. Publications Consultant, Freemasons' Grand Charity (irregular employment) Category 10: Non-financial interests (c) Trustee, Berlioz Society Trustee, St John Cymru-Wales Category 10: Non-financial interests (e) Trustee, West Wycombe Charitable Trust ACTON, Lord Category 2: Remunerated employment, office, profession etc. Barrister (non-practising) ADAMS OF CRAIGIELEA, Baroness Nil No registrable interests ADDINGTON, Lord Category 7: Overseas visits Visit to India, 26 September-4 October 2009, under auspices of Liberal Democrats Friends of India; business class flights and accommodation paid for by Government of India Category 10: Non-financial interests (d) Vice President, British Dyslexia Association Category 10: Non-financial interests (e) Vice President, UK Sports Association Vice President, Lakenham Hewitt Rugby Club ADEBOWALE, Lord Category 1: Directorships Director, Leadership in Mind Ltd Non-executive Director, St Vincent Healthcare (retains 5% shares in this organisation) Category 2: Remunerated employment, office, profession etc. Chief Executive Officer, Turning Point (social care registered charity) Occasional income from broadcasting
    [Show full text]
  • House of Lords Minute
    REGISTER OF LORDS’ INTERESTS _________________ The following Members of the House of Lords have registered relevant interests under the code of conduct: ABERDARE, Lord Category 1: Directorships Director, WALTZ Programmes Limited (training for work/apprenticeships in London) Director, Twist Partnership Limited (promoting leadership through learning) Category 2: Remunerated employment, office, profession etc. Publications Consultant, Freemasons' Grand Charity (irregular employment) Category 10: Non-financial interests (c) Trustee, Berlioz Society Trustee, St John Cymru-Wales Category 10: Non-financial interests (e) Trustee, West Wycombe Charitable Trust ACTON, Lord Category 2: Remunerated employment, office, profession etc. Barrister (non-practising) ADAMS OF CRAIGIELEA, Baroness Nil No registrable interests ADDINGTON, Lord Category 7: Overseas visits Visit to India, 26 September-4 October 2009, under auspices of Liberal Democrats Friends of India; business class flights and accommodation paid for by Government of India Category 10: Non-financial interests (d) Vice President, British Dyslexia Association Category 10: Non-financial interests (e) Vice President, UK Sports Association Vice President, Lakenham Hewitt Rugby Club ADEBOWALE, Lord Category 1: Directorships Director, Leadership in Mind Ltd Non-executive Director, St Vincent Healthcare (retains 5% shares in this organisation) Category 2: Remunerated employment, office, profession etc. Chief Executive Officer, Turning Point (social care registered charity) Occasional income from broadcasting
    [Show full text]
  • Easby Abbey, Maison Dieu and Frenchgate
    From the Drummer Boy Stone you can Darlington Rd is Anchorage Hill. (IP 7). WALK 3 either walk alongside the river by TR at You may wish to cross the road to look The Castle, Easby Abbey, the gates to the Boat House. Note there at this historic area. is a set of steep steps at the far end. Maison Dieu, Frenchgate OR continue past the Drummer Boy DISTANCE = APPROX. 5.5 KM Stone on a narrow, sometimes muddy path. Both routes meet at a kissing A pleasant stroll east of Richmond footpath past the old Grammar School gate going into a field. Once in the field along the river Swale to Easby Abbey through to the main road. Cross the keep follow the fence line to Abbey returning on a higher route with road with care into Lombard’s Wynd. Mill House. Go through the gate and panoramic views across the town. Lombard’s Wynd is an ancient route continue along the access drive to Note the route via Easby Low Road is linking the river Swale to the top Easby Abbey. (IP17) not Access friendly whereas the old of Frenchgate. railway track via the Station is From the Abbey TL, passing on your At the road junction TL, walk 200m to Continue along Lombard’s Wynd to left St Agatha’s Church: (IP 18) and the traffic lights and The Green Howards The route a T junction. TR and follow this lane the ruined Abbey Gate on your right. Monument. Walk down Frenchgate From the Castle, walk into the Market signed to Easby.
    [Show full text]
  • River Basin Management Plan Humber River Basin District Annex C
    River Basin Management Plan Humber River Basin District Annex C: Actions to deliver objectives Contents C.1 Introduction 2 C. 2 Actions we can all take 8 C.3 All sectors 10 C.4 Agriculture and rural land management 16 C.5 Angling and conservation 39 C.6 Central government 50 C.7 Environment Agency 60 C.8 Industry, manufacturing and other business 83 C.9 Local and regional government 83 C.10 Mining and quarrying 98 C.11 Navigation 103 C.12 Urban and transport 110 C.13 Water industry 116 C.1 Introduction This annex sets out tables of the actions (the programmes of measures) that are proposed for each sector. Actions are the on the ground activities that will implemented to manage the pressures on the water environment and achieve the objectives of this plan. Further information relating to these actions and how they have been developed is given in: • Annex B Objectives for waters in the Humber River Basin District This gives information on the current status and environmental objectives that have been set and when it is planned to achieve these • Annex D Protected area objectives (including programmes for Natura 2000) This gives details of the location of protected areas, the monitoring networks for these, the environmental objectives and additional information on programmes of work for Natura 2000 sites. • Annex E Actions appraisal This gives information about how we have set the water body objectives for this plan and how we have selected the actions • Annex F Mechanisms for action This sets out the mechanisms - that is, the policy, legal, financial and voluntary arrangements - that allow actions to be put in place The actions are set out in tables for each sector.
    [Show full text]
  • The Impact of Historical Metal Mining on the River Swale Catchment, North Yorkshire, U.K
    THE IMPACT OF HISTORICAL METAL MINING ON THE RIVER SWALE CATCHMENT, NORTH YORKSHIRE, U.K. IAN DENNIS UNIVERSITY OF WALES, ABERYSTWYTH JULY 2005 Abstract ABSTRACT This investigation examines the impact of historical metal mining on the River Swale catchment, North Yorkshire, U.K. Approximately 550,000 tonnes of Pb were extracted from mines in the Swale catchment during the eighteenth and nineteenth centuries. Mining and processing operations were relatively inefficient, leading to the discharge of large quantities of metal-rich sediment into the fluvial system. The primary aim of this thesis is to assess the physical and chemical impacts of the discharge of metals from historical mining activities on the River Swale catchment as a whole. The dispersal, storage and transfer of metal-rich sediment in formerly mined tributaries, floodplain and flood sediments are evaluated, and the environmental consequences of mining are assessed. A detailed geochemical survey of the River Swale catchment indicates that channel and floodplain sediments within formerly mined tributaries exhibit extremely high concentrations of Pb, Zn and Cd. Similar enrichment is observed in floodplain sediments from throughout the catchment, suggesting that large volumes of material have been transported from the tributaries and deposited on the Swale floodplain. Evidence from contemporary flood sediments suggests that considerable quantities of metal-rich sediment continue to be cycled through the system almost 100 years after the cessation of mining operations. Sediment budgeting suggests that 32,000 tonnes of Pb remain stored in formerly mined tributaries, with a further 123,000 tonnes stored in the Swale floodplain. Combined storage represents more than half of the total Pb that is likely to have been released during mining operations, suggesting that the impacts of metal mining are extremely long-lasting.
    [Show full text]
  • Land Adjacent to 77 Richmond Road, Brompton on Swale. Offers in The
    Land adjacent to 77 Richmond Road, Brompton On Swale. Offers in the region of £170,000 With full Planning Permission for a substantial four bedroomed detached property, this single building plot is located on the edge of this very popular and convenient village. With riverside frontage and having the benefit of fishing rights on the River Swale single plots such as this are rarely available. Greyfriars 15 King Street Richmond North Yorkshire DL10 4HP T 01748 821700 F 01748 821431 E [email protected] W www.irvingsproperty.co.uk Land adjacent to 77 Richmond Road, Brompton On Swale The Plot Proposed Dwelling In a riverside position on the edge of this very popular village The planning permission allows for the construction of a four with good road access, the building plot extends to bedroomed detached house set over two floors which offers approximately 0.68 acres (2,700 sq m) and comes with Full large open plan living accommodation to the ground floor, and Planning Permission to construct a substantial four bedroomed four bedrooms to the first floor, the master having an ensuite detached house. The Planning Permission was granted in and walk in wardrobe. February 2014 by Richmondshire District Council. Reference number: 14/00190/FULL. Full details can be viewed on the In addition to the dwelling house there is separate planning Richmondshire District Council website. permission for a double garage. Wayleaves and Easements The site is to be sold with the benefits of rights of way, easements and wayleaves whether mentioned in these particulars or not. The site is to be sold with the benefit of fishing rights on the River Swale.
    [Show full text]
  • Rivers . North-Tyne, Wear, Tees and Swale
    A bibliography of the rivers North Tyne, Wear, Tees and Swale Item Type book Authors Horne, J.E.M. Publisher Freshwater Biological Association Download date 05/10/2021 06:16:41 Link to Item http://hdl.handle.net/1834/22782 FRESHWATER BIOLOGICAL ASSOCIATION A Bibliography of the RIVERS . NORTH-TYNE, WEAR, TEES AND SWALE J. E. M. Horne, OCCASIONAL PUBLICATION No. 3 A BIBLIOGRAPHY OF THE RIVERS NORTH TYNE, WEAR, TEES AND SWALE compiled by J.E.M. Horne Freshwater Biological Association Occasional Publication No. 3 1977 3 Introduction CONTENTS This bibliography is intended to cover published and unpublished Page work on the freshwater sections of the rivers North Tyne, Wear, Tees and Introduction 3 Swale, their tributaries and their catchment areas. References to the 1. Works of general or local interest, not particularly related to South Tyne and to some other rivers in the area have been included when the four rivers 5 apparently relevant, but have not been deliberately sought. No date 1.1 Surveys and general works limits have been fixed, but I have not attempted to cover all the work 1.2 Botany of nineteenth century naturalists, geologists and topographers, and it is 1.3 Zoology likely that some papers published in 1975-76 may not have been seen by 1.4 Hydrology and hydrography 1.5 Geology and meteorology me. I hope to continue collecting references and would be glad to 1.6 Water supply receive copies or notifications of papers omitted and new publications. 2. The River Tyne and its catchment area 12 While I have tried to include all papers which deal with the physics, chemistry and biology of the four rivers, references to the catchment 2.1 Surveys and general works a) The river area are more selective.
    [Show full text]
  • The Garth Ellerton on Swale, Richmond
    The Garth Ellerton On Swale, Richmond The Garth Ellerton On Swale, Richmond, North Yorkshire, DL10 6AP An Outstanding Country Property In A Secluded Village Location With1.25 Acres Gardens & Grounds • Individually Designed Detached Residence • A Self -Contained 2 Bedroom Flat • Secluded Yet Highly Accessible Location • Spacious 5 Bedroom Accommodation • Stunning Gardens and Grounds • Guide Price: £690,000 • SITUATION Darlington and Northallerton. vegetable plot which have been meticulously Dining Kitchen Scorton 2 miles. Richmond 7 Miles. Golf – Catterick, Bedale, Romanby maintained. There is a large double garage with Beauti fully designed fitted oak wall and floor Northallerton 8 miles. Darlington 11 miles. Northallerton, Richmond and Darlington. provision for ample parking in the drive. units. Granite worktops. All NEFF appliances (All distances approximate). Communications – A.1 Trunk Road within fitted induction hob, oven, grill and micr owave. approximately 2 miles with interchanges at ACCOMMODATION Fitted wall and floor units. Extractor hood. Ellerton on Swale is a small hamlet near Catterick Village and Brompton On Swale. Spotlights. Wood burning stove with back Scorton which is a very popular village just Main East Coast Railway Station at Darlington SEE FLOOR PLAN boiler. Good sized dining area. French Doors north of the m arket town of Northallerton and and Northallerton. Teesside International leading to rear garden and patio area. Radiator. South of Darlington. Ellerton on Swale is close Airport (30 mins approx). GROUND FLOOR Feature gothic arched doors leading to sitting to the popular village of Scorton. Scorton has a room. thriving village comm unity with a shop, public DESCRIPTION Reception Hall houses, doctors surgery and garage.
    [Show full text]
  • Programme £2
    20th ANNIVERSARY 1996-2016 A sinister story of superstition, sacrifice and dirty laundry Based on a short story by Rudyard Kipling Adapted by Nobby Dimon Directed by Vivienne Garnett Programme £2 SUPPORTED BY Angels of the North Country Richmond Town Council North Country 20th Anniversary Stats Welcome to our 20th anniversary season Age 20 (First tour May/June 1996) On behalf of the Board I am delighted to Nobby is to be congratulated for holding Touring Productions 31 welcome you to our third production for on to his vision for excellence and ensuring Community Plays 3 our 20th anniversary year. It is an that rural communities have access to Performances 1139 achievement to be celebrating 20 years of North Country Theatre’s theatrical, Total Audience 100,000 + North Country Theatre. I joined the Board educational and Furthest South West Hendred, Oxfordshire back in 2003 and became Chair the site specific work Furthest North Poolewe, Wester Ross following year. It’s been good to have been and the Board are Most visited village hall outside North Yorks Carlops, nr Edinburgh (21) part of such an imaginative and well-loved pleased to have Bishops Castle/Edgton (22) company, that is supported by its audience been able to play a Most visited village hall inside North Yorks Kirklington (22) not just financially, but in many other ways small part in this Regular professional venues include Georgian Theatre Royal, too. Looking back over my numerous success story. Helmsley Arts Centre, Otley Courthouse, Chair’s reports for the AGM’s I have been The Wynd Theatre Melrose, reminded of just how much inventive, Faye Doorbar The Ropewalk, Barton on Humber quality work has been carried out by such a Actor who has appeared in the most plays Mark Cronfield (12) small team.
    [Show full text]
  • Yorkshire Swale Flood History 2013
    Yorkshire Swale flood history 2013 Sources The greater part of the information for the River Swale comes from a comprehensive PhD thesis by Hugh Bowen Willliams to the University of Leeds in 1957.He in turn has derived his information from newspaper reports, diaries, local topographic descriptions, minutes of Local Authority and Highway Board and, further back in time, from Quarter Sessions bridge accounts. The information is supplemented by various conversations which Williams had with farmers who owned land adjacent to the river. Where possible the height of the flood at the nearest cross- section of the place referred to in the notes is given. This has either been levelled or estimated from the available data. Together with the level above Ordnance Datum (feet) and the section in question there is given (in brackets) the height of the flood above normal water level. Information is also included from the neighbouring dales (mainly Wensleydale and Teesdale) as this gives some indication of conditions in Swaledale. Williams indicates that this is by no means a complete list, but probably contains most of the major floods in the last 200 years, together with some of the smaller ones in the last 70 years. Date and Rainfall Description sources 11 Sep 1673 Spate carried away dwelling house at Brompton-on-Swale. Burnsell Bridge on the Wharfe was washed away. North Riding Selseth Bridge in the Parish of Ranbaldkirke became ruinous by reason of the late great storm. Quarter Sessions (NRQS) ? Jul 1682 Late Brompton Bridge by the late great floods has fallen down. NRQS Speight(1891) Bridge at Brompton-on-Swale was damaged.
    [Show full text]
  • The Bedale Hounds, 1832-1908
    T ‘ he B edale H ounds. E F RAN K H . R AR YN D . Life is c hiefly froth and bubble ; Two things stand like stone : ’ K d e a r tr ub e in n ss in nothe s o l , ura r n Co ge in you ow . Linds G ay ordon . PUB LIS H ED B Y . D E E SON S D AR LIN G TON w R SS R . P f re ace . In resen n th e fo ow n a es to th e read er m c ef p ti g ll i g p g , y hi d esire has been to preserve th e hu nting rec ord s o f a s ort n cou n r and H u nt w c a t ou tse f of no p i g t y ; hi h, l h gh i l reat ant u t c a m s aren a e from t at famou s H u nt g iq i y, l i p t g h , Th R a ave e n a m n s e t at ere is e e by. Ih b e d o i h d h th littl n d ote to be fou n in h oo r is n t m u a c e o c . e d t e b k . The h There are always lots of anec d o tes afloat in any hu nting an Ia n f B w u t it a s o eo e field ( d h ve ple ty o them ) .
    [Show full text]
  • Humber River Basin District WFD Investigation
    Humber River Basin District WFD Investigation Mining Pollution: Catchment Characterisation Report (up-dated 10 January 2014) Project details Project name Gunnerside Gill catchment characterisation Contact John Barber, GWCL-Yorkshire Area NoCam assessment Probably Not Impacted: Score = 1: Rank = 355 (Eng) River length impacted Gunnerside Gill = 6km downstream of mines Mining Waste Directive inventory Yes (Bunton Lead Mine) Water body summary information Surface Water Body ID GB104027069090 (Humber River Basin District) Surface Water Body Name Gunnerside Gill (Gunnerside Beck) Surface Water Catchment Swale, Ure, Nidd & Upper Ouse (SUNO) Surface Water Body Type Mid, Small, Siliceous (Secondary River) Groundwater Body ID GB40402G701900 (Humber River Basin District) Groundwater Body Name SUNO: Millstone Grit & Carboniferous Limestone RBP Measure in WAP None (Good Status - but see below) RFF Database No Figure 1. Gunnerside Gill location within the Humber River Basin District (in pink) 1 Background information Surface water body classification Status in 2009 Ecological Status Good Biological Status Good General Physico-Chemical Status High Hydromorphological Status Not High Hydromorphological Designation Not a Heavily Modified Water Body Specific Pollutants Overall High Chemical Status Does Not Require Assessment Groundwater body Status Confid Predicted Reason for not classification in 2009 -ence Status achieving good status Disproportionate cost Chemical Status Overall Poor High Good by 2027 Technically infeasible Saline Intrusion Good High Good - Surface Water Impacts Poor Low Good by 2027 Technically infeasible Wetland (GWDTE) Impacts Good Low Good - Drinking Water Protected Area Poor High Good by 2027 Disproportionate cost General Chemical Assessment Poor Low Good by 2027 Technically infeasible Upward Pollutant Trend Yes - - - Figure 2. Gunnerside Gill catchment location 2 Pollution from abandoned metal mines adversely impacts both surface water quality and aqueous ecology with potential reduction in WFD status.
    [Show full text]