LONDON BOROUGH OF SUTTON

ST. HELIER, AND WANDLE VALLEY LOCAL COMMITTEE

Tuesday, 10th February, 2009 at 7.00 pm

Muschamp Primary School, Muschamp Road,

There will be a consultation exhibition regarding local neighbourhood recycling centres throughout the meeting.

To all members of the St. Helier, The Wrythe and Wandle Valley Local Committee:-

Chair: Councillor Dave Callaghan Vice-Chair Councillor Paddy Kane Councillors: Sheila Andrews, Margaret Court, John Drage, Colin Stears, Sue Stears, David Theobald and Roger Thistle

Community Jean Crossby (Circle Residents Association), Judy McDaid Representatives – (Durand Close Residents' Association) and Patrick Murphy (Four non voting Square Group)

Paul Martin Chief Executive Civic Offices St Nicholas Way SUTTON SM1 1EA

30 January 2009

This meeting will be recorded so that the recording can be made available to the public on the Council’s website www.sutton.gov.uk

Enquiries to: Angela Guest, Area Co-ordinator, Tel: 020 8770 5122, Email: [email protected]

Copies of reports are available in large print on request

Reminder – Declaration of Interests

Members should consider the following interests and whether they have any they should declare.

Personal interests :

Where it might reasonably be regarded that a matter will affect the well-being or financial position of you, a member of your family, any person with whom you have a close association, or any person or body with which you or they are involved or in which they have a relevant beneficial interest, to a greater extent than the majority of people affected by the decision.

In this case you should declare the interest and state the nature of it.

Personal and Prejudicial Interests :

Where a personal interest is thought to be so significant that a member of the public, with knowledge of the facts, would consider it likely to prejudice the member’s judgment of the public interest.

In this case you should declare the interest, state the nature of it, and leave the meeting room.

Further information can be found in the Council's Code of Conduct. If you are in any doubt as to whether you have an interest you should seek advice before the Committee meeting from either Richard Shortman or Stephen Lawrence.

If, during the course of the Committee meeting, you consider you may have an interest you should always declare it.

Involvement of Public in Local Committees

Local committees are intended to be inclusive and involve local residents and stakeholders. Anyone resident in the area is welcome to attend their local committee - dates and venues will be published on the Council's website (www.sutton.gov.uk) and on borough notice boards.

The Chair shall have discretion to invite comments from members of the public on specific items while they are being discussed. Residents may also request the right to raise issues, not on the agenda, at the Chair’s discretion.

AGENDA

1. APOLOGIES FOR ABSENCE AND INTRODUCTIONS

2. MINUTES OF THE LAST MEETING (Pages 1 - 6)

Minutes of the meeting held on 9 December 2008.

3. PETITION - TRAFFIC CALMING IN NIGHTINGALE ROAD (Pages 7 - 14)

A petition of more than 50 signatures has been received regarding traffic speed in Nightingale Road: The petition reads: “We, the undersigned, call on the police and the council to take action to reduce traffic speeds in Nightingale Road, Carshalton before there are any further serious accidents and to improve conditions for residents of the road and adjacent areas.” Mr Youell or a representative will be given 4 minutes in which to present this petition.

Report of the Executive Head Planning, Transport and Highways is attached.

Indicative time 20 minutes

4. WANDLE GATING PROJECT (Pages 15 - 18)

Report from the Head of Planning, Transport and Highways.

Indicative time 15 minutes

5. SAFER NEIGHBOURHOOD TEAMS - UPDATE

There will be a verbal update on local Safer Neighbourhood Teams.

Indicative time 15 minutes

6. ST HELIER ESTATE - BOX BATHROOMS

Further to minute 1049/08 Andrew Chalk, Head of Project Delivery – Sutton Housing Partnership will be attending the meeting to explain the project and answer questions.

Indicative time 15 minutes

7. THORNTON ROAD CROSSING

A verbal report will be given by an officer.

Indicative time 20 minutes

8. MIDDLETON ROAD - HEAVY VEHICLE USE

Further to minute 871/08 in which a vehicle count was requested a verbal report will be given.

Indicative time 15 minutes

9. DRAFT MASTERPLAN FOR CONSULTATION (Pages 19 - 22)

Report of the Executive Head Planning, Transport and Highways.

Indicative time 10 minutes

10. CONSULTATION ON PROPOSED DEVELOPMENT CONTROL POLICIES AND SITES FOR FUTURE DEVELOPMENT. (Pages 23 - 26)

Report of the Executive Head Planning, Transport and Highways.

Indicative time 5 minutes

11. GRANT FUNDING FOR TRANSPORT SCHEMES 2009/2010 (LOCAL IMPLEMENTATION PLAN) (Pages 27 - 42)

Report of the Traffic and Highways Manager.

Indicative time 10 minutes

12. ANY URGENT BUSINESS BROUGHT FORWARD AT THE DIRECTION OF THE CHAIR

a) Camera for Tweeddale Road This item was requested by Councillor Paddy Kane. It is proposed that the Safer Sutton Partnership (SSP) are requested to install a camera in Tweeddale Road for 6 to 8 weeks as vehicles are routinely driving the wrong way up the one-way section.

The committee are recommended to note this proposal and to request that the Area Co-ordinator seeks the view of SSP and to have an agenda item to the next meeting.

FURTHER REPORTS FOR INFORMATION

13. SUTTON TOWN CENTRE AREA ACTION PLAN: PREFERRED OPTIONS CONSULTATION 15 APRIL - 26 MAY 2009

This Preferred Options document sets out a bold new vision for shopping, leisure facilities, additional homes and office space to meet business needs. Plans to create a cultural ‘hub’ in a new Civic Quarter and major development at Sutton Station are also proposed. Documents will be available on seats for you to take away.

14. DRAFT WORKPLAN (Pages 43 - 44)

15. DATE OF NEXT MEETING

The next meeting will be held on Tuesday 7 April, 7pm at Muschamp Primary School.

This page is intentionally left blank Page 1 Agenda Item 2 St. Helier, The Wrythe and Wandle Valley Local Committee 9 December 2008

ST. HELIER, THE WRYTHE AND WANDLE VALLEY LOCAL COMMITTEE

9 December 2008 at 7.00 pm

MEMBERS: Councillor Dave Callaghan (Chair), Councillor Paddy Kane (Vice- Chair) and Councillors Sheila Andrews, Margaret Court, John Drage, Colin Stears, Sue Stears and Roger Thistle

SPECIAL Jean Crossby (Circle Residents Association) ADVISORS:

ABSENT: Councillor David Theobald

1042. APOLOGIES FOR ABSENCE AND INTRODUCTIONS

The Chair gave a warm thank you to Jo Ashby, teacher, and the children from the Muschamp School Choir for their entertainment prior to the start of the meeting.

The Chair welcomed everyone to the meeting and introduced committee members, community representatives and officers to the audience.

Apologies were received from Councillor David Theobald. Apologies for lateness were received from Councillor Colin Stears who attended just after the start of item three on the agenda.

Apologies were also received from Dave Lunn and from Inspector Derek Fleeman, .

The Chair announced that the and St Helier Open Space needed help to receive up to £400,000 from the Mayor of . Ten grants will be given to London's most popular parks in need to make them cleaner, safer, greener, and nicer places to visit. In total there were 47 parks in the running for the prize, one of which is our own River Wandle in St Helier. Leaflets were given out and all were encouraged to have their vote.

1043. MINUTES OF THE LAST MEETING

The Minutes of the meeting held on 14 October 2008 were approved as a correct record and signed by the Chair.

Further to Minute 863/08 the Chair announced that had agreed £50k to fund a pedestrian crossing at Thornton Road. This would be discussed at the next meeting of this committee on 10 February 2009.

1044. FUTURE HEALTH PROVISION - INCLUDING ST HELIER HOSPITAL

Stephen Waring, Programme Director for Better Health Care Closer to Home (BHCH), Andrew Grimes, Project Manager for Sutton was also in attendance.

Stephen Waring tabled a slide presentation and discussed Better Health Care Closer to Home and upgrading services which involved three main components.

• Upgrading St Helier Hospital to improve services • Developing four new health centres – two in Sutton and two in • Increasing intermediate care to reduce hospitalisation.

It was reported that there would be £215 Million invested in the overall programme including St Helier Hospital’s development (c. £140 million) which included an urgent care centre dealing with minor injuries, intermediate and post operative care. A full Accident and Emergency service would continue at St Helier. One of

1005 Agenda Item 2 Page 2 St. Helier, The Wrythe and Wandle Valley Local Committee 9 December 2008

the four new health centres would be based at Shotfield Health Centre. A temporary clinic would be set up in Mint House, to provide decanting space for services whilst Shotfield was being developed.

The new health centre at Shotfield would be the first centre to be completed and would deal with minor injuries, minor procedures and also provide facilities for blood tests, ECGs, X-rays, community therapists and dentistry. The centre would be open for 12 hours per day and five days a week. Work on this facility should be complete in about 2 years time.

There would be voluntary sector support and community mental health care available at the new health clinics, which would deal with up to 50% of outpatients services and would be more accessible which would be a great improvement for the residents of the borough.

There was a proposal to demolish Ferguson House at St Helier Hospital to provide a new facility, which would house services such as a major new ward block and outpatient consulting rooms and other services such as coronary care, physiotherapy, cardiac rehabilitation, occupational therapy, pharmacy and the League of Friends. Currently Ferguson House holds two floors of nurses’ accommodation, one floor of offices and at least one floor of services to patients. These would all be re-sited but Mr Waring was unable to say where to, as the details had not yet been worked out.

This programme was very long term and therefore difficult to state timescales accurately. The Outline Business Case had been submitted and he expected approval within the next few months. The next stage would be the procurement and full Business Case, which was expected to take 18-24 months, and then construction would follow this. The local care centre at Wallington was on a faster track and was expected to be completed by 2010/11; the Nelson and the Wilson Hospitals were expected by 2012/13 and St Helier Hospital by 2016/17.

With regards to the Queen Mary’s Children’s Hospital it was explained that there was a review of Women’s and Children’s services across Epsom and St Helier Trust which meant that, in terms of this programme, plans were modest in that it was assumed there would be no change. However, all premises not in this programme would have their backlog maintenance brought up to date.

It was planned to dispose of the Sutton Hospital site and money from this would be used to pay for costs. This plan was not expected for another 8-10 years and in the meantime would be used as a temporary home for services that were moving from their present locations whilst upgrades were underway. This would mean that Sutton Hospital would also receive some internal upgrading to allow for this to happen. It was considered that Sutton Hospital site was not a viable option for the future.

It was explained that the Mental Health Trust would be running a major consultation exercise on the provision of mental health inpatient services. The Chiltern Wing and mental health services were not part of the programme being managed by the Primary Care Trust (PCT).

In response to questions and comments it was confirmed that: • A chiropody service would continue at Shotfield Centre. • Details could not be given on where women’s and children’s services would be located, as a major review was taking place of these services. The outcome of the review will be known in 2009. • The geographical plan used in the slides was indicative only and not set in stone. There was nothing planned for the grey triangular area on the plan. The grey area behind the main hospital building, on the plan, depicts old parts of the hospital that may be demolished. • That St Helier were projecting a surplus this year and had cleared their debt in the previous year.

1006 Page 3 Agenda Item 2 St. Helier, The Wrythe and Wandle Valley Local Committee 9 December 2008

• There would be a GP in all the local care centres as well as St Helier and the PCT would work with GPs who needed to upgrade their premises. • The impact of this programme on GPs would be easier referrals to hospital or outpatient services. • That services were more likely to move out of St George’s Trust and into Sutton and Merton – not the other way round. • The only services that were likely to be provided outside the area of the PCT would be highly specialised services such as stroke care.

Comments made that were to be taken back by Stephen Waring included: • That people living with rheumatoid arthritis would have a problem going anywhere other than St Helier for their injections. • That Ferguson house has 16 consulting rooms and not 15 as stated in the report. • Jean Crossby explained that the Green Lane Clinic had moved over and patients were promised all sorts of services that never materialised. • Jean Crossby explained that diabetic services used to be provided all under one roof and patients were now expected to travel to various venues for different services. Stephen Waring expressed his disappointment in hearing this and it was the opposite that the PCT were aiming at. He invited Jean to take part in the planning process for diabetic services.

Resolved: (i) To thank Stephen Waring for his attendance.

(ii) To request that Stephen Waring take back the points raised by committee as listed in the body of the minute.

Councillor John Drage declared a personal interest in that he was a non-executive director for the PCT.

Councillor Sue Stears declared a personal interest as she works at St Helier Hospital.

The meeting was adjourned at 20.15pm for a 10 minute comfort break and reconvened at 20.25pm.

1045. CONSULTATION ON THE COUNCIL'S BUDGET 2009/10

Sue Higgins, Strategic Director of Resources and Councillor John Drage, Executive Member for Resources, explained the process for this year’s budget consultation and explained some of the proposals for extra spending i.e. waste disposal and areas for budget reductions. The council tax level had not yet been set but there was a policy commitment to an increase of 3.4% or lower.

The consultation period ends on 27 January. The Executive would take representations at their meeting on 13 January 2009. The Executive would then consider the council tax and budget in February 2009 which would then go on to full Council on 1 March for approval.

The consultation leaflet received praise from one member of the public as being well set out and clear.

There were various questions from the public which received responses and all were encouraged to complete the consultation forms and hand them in before they left the meeting.

Resolved: To thank Sue Higgins and Councillor Drage for presenting their report and responding to questions and to thank Nic Wilson who also attended the meeting for the Communications Team.

1007 Agenda Item 2 Page 4 St. Helier, The Wrythe and Wandle Valley Local Committee 9 December 2008

1046. AREA IMPROVEMENTS - PUBLIC REALM

Rick Martinez, Locality Lead Officer, presented his update report on the public realm projects. Some of the schemes have been completed which was good news.

Further updates since the report went out included: • The Thomas Wall chain link fencing would be completed by end of January. • Royston Park – provision of wooden posts would be started this week. • The Quad fencing had not been completed. Waiting to hear when the contractor can come and complete the full run of fencing requested. • Green Lane trees were beginning to be planted. • There would be a more detailed report to come to the next meeting of this committee.

Councillor Kane spoke of the mistakes made with The Quad fencing and barrier and requested that ward councillors be notified as soon as possible as to what was going on.

Councillor Kane also requested to know why several projects were still listed for further consultation and requested to know who would be doing the consultation, with whom and for what reason as it was his belief that enough consultation had already taken place.

Rick Martinez confirmed that 30 metres of fence had not been provided at the Quad and would be taking this forward. With regard to the projects requiring further consultation he explained that these were projects where details of what exactly was required, needed to be agreed so that they could be properly costed. There was also ongoing discussion at the council regarding revenue costs of hanging baskets but it was hoped to have a response at the next meeting.

Councillor Drage commented that for several meetings he has raised that issue of barriers along the Wandle Trail by Buckhurst Avenue and that at the last meeting it was agreed to ask the police if they would have any designing out crime budget to put towards it. The scheme was also not on the list put before committee.

Resolved: (i) To request that Rick Martinez liaises with appropriate officers to get some target dates put into the programme.

(ii) To request that Rick Martinez liaises with appropriate officers to correct the fencing at The Quad.

(iii) To request that Rick Martinez adds the Wandle Trail barriers to the list of projects if there were no alternative methods of funding the scheme.

1047. SAFER NEIGHBOURHOOD TEAMS - UPDATE

The Safer Neighbourhood Team (SNT) had not been able to attend this meeting but Inspector Fleeman had given the Chair some information they wished to be relayed.

Operation Astral which was an operation to curb anti social behaviour calls from Halloween and over the Guy Fawkes period. There had been 30% reduction in calls on last year’s operation and 60% reduction on the year before that (the first year of Operation Astral).

From 5 January 2009 some SNT sergeants were moving to new wards. Sgt Nicholson would be leaving for Carshalton Central, Sgt Reilly would leaving for North and Sgt Crane would remain at The Wrythe SNT.

1008 Page 5 Agenda Item 2 St. Helier, The Wrythe and Wandle Valley Local Committee 9 December 2008

The new sergeants would be Sgt Dave Glennon for St Helier SNT and Sgt Tom O’Donoghue for Wandle Valley SNT. It was hoped that both would attend the next local committee to introduce themselves.

Resolved: To note.

1048. WEST STREET 20MPH ZONE EXTENSION

The Chair explained that this item was deferred as there were ongoing discussions about changes to the road system around Wrythe Green which included West Street.

Resolved : To note.

1049. ANY URGENT BUSINESS BROUGHT FORWARD AT THE DIRECTION OF THE CHAIR

St Helier Estate – box bathrooms

Jean Crossby had raised concerns about the progress of works on the refurbishment of box bathrooms in the St Helier area and that residents did not feel informed.

Resolved: To have this as an agenda item for the next meeting of this committee and to invite Sutton Housing Partnership to attend.

1050. DRAFT WORKPLAN

Resolved: (i) To request a report for the next meeting of this committee on options for pedestrian crossing at Thornton Road.

(ii) To move some agenda items listed for the next committee to future meetings as there were too many.

(iii) To note the thanks received, for the committee’s work at Thornton Road, from Jean Crossby.

1051. DATE OF NEXT MEETING

Resolved : To note that the next meeting of this committee would be held on 10 February 2009, 7pm, at Muschamp Primary School.

The meeting ended at 9.30 pm

Chair: Date:

1009 Agenda Item 2 Page 6 St. Helier, The Wrythe and Wandle Valley Local Committee 9 December 2008

1010 Page 7 Agenda Item 3

London Borough of Sutton

St. Helier, The Wrythe and Wandle Valley Local Committee - 10 February 2009

Report of the Executive Head of Planning and Transportation

NIGHTINGALE ROAD - PETITION FOR TRAFFIC CALMING

Ward Location: The Wrythe Author(s) and Contact Phone Number(s): Ray Puddy - 020 8770 6127 Area Served: St. Helier, The Wrythe Executive Councillor: Councillor Colin Hall and Wandle Valley

Report for Information only

Summary This report informs Members of a petition from residents of Nightingale Road expressing concern and anger about speeding vehicles and seeking the introduction of some traffic calming. Recommendations I recommend to Committee that it notes the contents of the petition and:- 1. that funds will be needed to process this report any further. 2. that funds are sought to permit modifications to be made to the carriageway markings and traffic signs on Nightingale Road as identified within paragraph 4.3 of this report. 3. that future funds are sought from Transport for London to introduce more robust traffic calming measures. 4. that the Executive Head of Planning & Transportation, in consultation with the Chair and Ward Councillors, be given delegated authority to proceed with proposals that achieve a favourable support and within any budget allocation made available.

1. Background 1.1 The 2007/2008 Local Implementation Plan Transport Settlement included funding for a Local Safety Scheme in Nightingale Road and Hackbridge Road. However due to, initially with Hackbridge Bridge reconstruction project, and later with staff resource difficulties, the scheme proceeded no further than the outline planning stage. Consequently the funding was withdrawn by T fL. 1.2 A petition has now been presented to the Council that states “We the undersigned call upon the Police and the Council to reduce traffic speeds in Nightingale Road, Carshalton before there are any further serious accidents and improve conditions for residents of the road and adjacent areas”

1 Agenda Item 3 Page 8

1.3 The petition contained a total of 54 signatures, made up as follows:- 28 residents from 22 households in Nightingale Road 10 residents from 8 households in Cooper Crescent 16 residents from 16 households in Bucklers Way 1.4 These households are clustered at the lower end of Nightingale Road

2. Issues 2.1 Current site conditions 2.1.1 Results of a traffic survey undertaken in January are shown in Appendix 1. Traffic volumes are not disproportionally high for this class of road. The figures show the normal peak distribution of traffic between 8 - 9am and 5 - 6pm. 2.1.2 Average vehicular speeds during the normal working day ranged from 31.7mph to 35.7mph. Higher figures were recorded much later in the evening when there were fewer cars on the road. 2.1.3 The latest three-year accident statistics available show there have been 6 personal injury accidents in Nightingale Road, with a further two in Hackbridge Road. Outline details of these are given in Appendix 2 attached to this report. This accident rate is not significantly high compared with similar roads throughout the Borough. 2.1.4 Of the six accidents on Nightingale Road speed was directly identified as a causation factor in two incidents, although it may also had a bearing on two more. The remaining two accidents were due to a defective vehicle and poor driving techniques, and no amount of traffic calming measures would prevent these from happening.

2.2 Officer Comment 2.2.1 This accident rate is not significantly high compared with similar roads throughout the Borough. However, those that have occurred were no doubt disconcerting to local householders. 2.2.2 Currently the Council has no funds to introduce traffic calming measures on Nightingale Road. Notwithstanding this, a site inspection has taken place and possible measures have been identified should funds become available. 2.2.3 The current timetable for Hackbridge Bridge Reconstruction Scheme, indicates that the construction work is planned to start in October 2009 and be completed late 2010. Hackbridge Road ard Nightingala Road are designated as an alternative and a temporary diversion route. The diversionary works for some Utility Plants may commence in summer 2009. 2.2.4 Possible low cost measures The use of carriageway marking and good quality traffic signs can have a distinctive effect on the speed of traffic. Such measures are generally quite simple and quick to implement but more importantly can have an immediate effect of driver behaviour. For example:-

2 Page 9 Agenda Item 3

• Parking on the south side of Nightingale Road between Bucklers Way and Culvers Way restricts Carshalton bound traffic movements while Hackbridge bound traffic runs freely. Marking out the parking area and adjustment of the centre line carriageway marking would have the visual effect of reducing the traffic lanes which, in turn, will reduce the speed of Hackbridge bound movements. • Internally illuminated “Bend” signs already exist on Nightingale Road either side of the Strawberry Lane junction. Replacing these with a Diamond Grade reflective sign on a high visibility background would make these signs more prominent and visible during both, day light and after dark. Associated with this the carriageway markings should be renewed and the centre line increased in width from its current 100mm (4”) to 150mm (6”).

These suggested measures are located within the vicinity of the main cluster of accidents on Nightingale Road. They would make vehicle drivers more aware of road conditions, which should in turn lead to a general reduction in vehicular speed.

2.2.5 Possible Medium Cost measure The original outline proposal for Nightingale Road included introducing a mini- roundabout at its junction with Strawberry Lane. Such roundabouts work best when there have balanced traffic flows on all arms. Howevere, traffic movements in and out of Strawberry Lane are not of the consistency that would achieve anything other than a minor reduction of speed. A further suggestion is the provision of a set of pedestrian refuges in the vicinity of Rossignol Gardens.

2.2.6 Higher Cost measures To make any proposed mini-roundabout at the Strawberry Lane junction operate effectively as a speed reducing / traffic calming feature it should be place on a junction speed table. A further speed table could be placed on the existing Zebra Crossing in Nightingale Road near Cooper Crescent. The combination of these two sets of vertical deflection features would create a “gateway” feature and have a significant impact on vehicle speed.

3. Financial Implications 3.1 As noted above, currently there are no funds avaiable to undertake any of these suggestions. 3.2 Modifications to the traffic signs and carriageway markings should cost no more than £7000. 3.3 The implementation of a mini-roundabout at Strawberry Lane on a speed table and the provision of a speed table on the existing Zebra Crossing by Coopers Crescent could cost in excess of £25,000. 3.4 It would be necessary to seek funding from Transport for London to implement these suggestions.

3 Agenda Item 3 Page 10

4. Influence of the Council’s Core Values 4.1 The proposed measures will help to provide a safer environment for those living in the area and will contribute to the achievement of the Council’s accident reduction targets. 4.2 The scheme will cater for all sections of the community

5. Equality Impact Assessment The proposals to buid the zebra crossing on raised table will provide a better access for disabled and people with prams or push chairs. It promotes social inclusion by ensuring good and safer access to local amenities. 6. Background Papers Local Implementation Plan Funding Settlement 2007 / 2008 Petition dated 18 th December 2008 seeking traffic calming in Nightingale Road

10.02.2009 Committee Rep 2008 V1.3

4 Page 11 Agenda Item 3

Appendix A Results from Traffic Surveys – Nightingale Road 12 th January – 16 th January NE towards Hackbridge and SW towards Carshalton

VOLUME

Hour Monday Tuesday Wednesday Thursday Friday 5 day average

Commencing NE SW NE SW NE SW NE SW NE SW NE SW

06.00 180 100 203 102 188 103 199 94 192 105 192 101

07.00 301 262 282 255 273 221 283 252 314 251 291 248

08.00 472 387 451 419 427 426 410 433 411 426 434 418

09.00 331 284 324 258 344 269 340 284 328 291 333 277

10.00 249 218 236 195 250 245 278 253 253 212 253 225

11.00 243 258 259 231 260 246 249 227 262 239 255 240

12.00 257 248 258 259 272 274 297 310 317 325 280 283

13.00 252 268 259 263 275 305 249 291 278 288 263 283

14.00 285 275 264 296 276 312 318 309 334 342 295 307

15.00 321 363 371 364 374 366 367 375 399 412 366 376

16.00 304 389 336 389 314 388 328 425 355 437 327 406

17.00 304 524 335 554 319 507 311 529 320 586 318 540

18.00 286 348 304 406 321 417 304 347 316 355 306 375

19.00 197 239 224 246 238 284 230 246 244 278 227 259

20.00 171 173 169 197 171 156 167 188 165 196 169 182

21.00 125 133 132 120 139 118 130 112 140 114 133 119

22.00 76 68 116 87 101 99 104 106 96 121 99 96

23.00 45 46 58 69 56 56 68 65 67 66 59 60

5 Agenda Item 3 Page 12

85%ile SPEED SURVEY

Hour Monday Tuesday Wednesday Thursday Friday 5 day average

Commencing NE SW NE SW NE SW NE SW NE SW NE SW

06.00 35.7 34.8 35.5 35.5 35.9 35.1 37.9 35.6 35.2 35.1 36 35.2

07.00 34.2 33.4 34.4 34 35.8 33.9 34.8 34.2 33.6 32.3 34.6 33.6

08.00 33 32.5 32.9 33.3 33.2 33.6 34.2 33.9 32.8 31.5 33.2 33

09.00 34.5 34.4 28.9 32.6 34.6 34.7 34.6 34.7 34.1 34.2 33.3 34.1

10.00 34.8 35 33.9 34.8 34.1 34.4 35 34.5 34.6 34.8 34.5 34.7

11.00 34.8 34.6 34.4 34.9 34.4 35 34.9 35.9 34.9 36.3 34.7 35.3

12.00 32.8 34.4 35 35.1 34.6 34.7 34.5 35.6 34.7 35.6 34.3 35.1

13.00 33.9 34.6 34.9 35.8 35.4 35.5 35.4 36 35.3 36.6 35 35.7

14.00 34.6 34.4 34.4 35.1 34.9 34.8 35.4 35.3 35.4 35.5 34.9 35

15.00 33.5 33.9 33.6 33.6 33 34.2 34.4 34 34.5 33.9 33.8 33.9

16.00 33.5 32.9 33.2 34.1 33 33.6 34.1 34 34.3 33.9 33.6 33.7

17.00 31.1 32 32.5 31.8 33.4 31.1 32.8 31.8 32.9 31.8 32.5 31.7

18.00 33.4 32.1 33.1 32.4 34.3 32.6 32.3 31.9 32.3 31.5 33.1 32.1

19.00 34.8 34.3 35.1 34.2 33.8 33.5 34 34.5 34.5 34.5 34.4 34.2

20.00 35.1 35.2 34.9 34.7 35.4 35.5 35.5 35.6 36.2 35.1 35.4 35.2

21.00 35.6 35.7 35.8 34.7 34.6 36.8 36.5 35.6 35.9 35.8 35.7 35.7

22.00 35.5 38.2 35.5 36.9 35.9 35.8 36 37.4 36.9 37.7 36 37.2

23.00 35.8 38 37.6 37.8 37.5 39.2 37.4 35.7 37.9 35.5 37.2 37.2

6 Appendix B

Details of Road Traffic Accidents on Nightingale Road

Location Severity Outline details Probable causation factor

1 30m south-west of SERIOUS Two cars travelling towards Carshalton when second car ran into the back Driving too close to vehicle in front. Culvers Way F 27 of the first, injuring driver. 2 At junction with Culvers Way Slight M 37 Car emerging from Culvers Way is hit by car travelling towards Hackbridge. Emerging car failed to judge gap in Slight F 57 traffic to make turn. Slight F 62 3 At junction with Culvers Way Slight M 20 Temporary traffic lights at junction controlling vehicle movements. Motor Failed to obey traffic signal. Cycle went against red signal and was hit by car from opposite direction Page 13 4 At junction with Culvers Way Slight M 66 Car lost control and hit lamp column Defective tyre 5 At junction with Slight M 21 Temporary traffic lights at junction controlling vehicle movements. Car Travelling too fast for the conditions. Strawberry Lane travelling towards Hackbridge suddenly braked and wheels locked up causing loss of control 6 80m north east of Slight M 18 Two cars travelling towards Hackbridge are racing when one losses control Travelling too fast for the conditions Dale Park Road Slight M 20 and hit car coming in opposite direction, injuring occupants.

Details of Road Traffic Accidents on Hackbridge Road

Location Severity Outline details Probable causation factor

7 85m south west of Slight M 27 Motor Cycle collides with parked car Inexperienced or learner driver London Road Agenda Item3 8 84m south west of Elm Road Slight F 9 Car lost control on bend and hit lamp column, injuring passenger Travelling too fast for the conditions

Page 14

This page is intentionally left blank Page 15 Agenda Item 4

London Borough of Sutton Beddington and Wallington Local Committee – 3 February 2009 St Helier, The Wrythe and Wandle Valley Local Committee – 10 February 2009

Report of the Head of Planning, Transportation and Highways

PROPOSED WANDLE GATEWAYS IMPROVEMENT SCHEME

Ward Location: Various Author(s) Jeff Wilson (x6258) Area Served: Borough-wide

Report for Decision

Summary Viridor Waste Management Ltd has kindly agreed to assign part of its landfill tax receipt under the Landfill Communities Fund programme to fund 90% of the cost of an access/enviromental improvement scheme along the River Wandle, with a 10% contribution from the Council. This Report outlines the scope of proposed improvements and the arrangements under which the improvement works will be implemented. Recommendations I recommend the Committee to: a. record its thanks to Viridor Waste Management on behalf of the Council for assigning £270,000 of its landfill tax receipts to this project; b. approve the Wandle Gateways Improvement Scheme; c. approve the allocation of £13,500 in respect of the Beddington and Wallington Local Committee Public Realm funding as a contribution to the project. d. approve the allocation of £13,500 in respect of the St Helier, The Wrythe and Wandle Valley Local Committee Public Realm funding as a contribution to the project. 1. Background 1.1 Under the Landfill Communities Fund programme, the Government allows 90% of the landfill tax that is raised on the disposal of waste at landfill sites and paid by landfill operators to be used to fund environmental projects in the vicinity of landfill sites. The funding for environmental projects must be paid to an approved ‘environmental body’ for spending on environmental projects. All environmental bodies – typically organisations with charitable trust status – must be registered with the Government’s regulatory body, ‘EnTrust’, which has been set up to oversee the Landfill Communities Fund programme. 1.2 In discussions with Viridor Waste Management, which manages the Beddington Landfill site, the company has agreed to assign part of its landfill tax receipts to the 1 Agenda Item 4 Page 16

implementation of an access/environmental improvement scheme along the River Wandle and nominate Global to Local Foundation, as a registered environmental body, to oversee the implementation of the works. To secure the funding for this project, a third party, such as the Council, must provide a contribution of 10% of the total grant allocation for the project to Viridor Waste Management Ltd. 1.3 The Council has successfully undertaken a number of environmental schemes under the Landfill Communities Fund programme in the past, including improvements to Beddington Village Hall, Mellows Park, Elms Pond and Watercress Park. 2. The Wandle Gateways Improvement Scheme 2.1 The Sutton UDP seeks to protect the River Wandle as a ‘green corridor’ for nature conservation, amenity and leisure, for its landscape value and for a walkway and cycleway. The Sutton Local Development Framework proposes the creation of a new Wandle Valley Regional Park within South London, which would include the River Wandle and all adjoining parks open spaces and footpath/cycleway linkages along the Wandle riverside from to Sutton and . 2.2 Within Sutton, the Council is proposing the implementation of proposals for improved provision for recreation and leisure along the River Wandle, for protecting and enhancing the River Wandle for wildlife and biodiversity and for extending/improving cycling and walking along the Wandle Trail. 2.3 These proposals are set out in the Wandle Strategy and Action Plan, which was approved by the Council in March 1997 and involved environmental improvements at some 18 key sites along the River Wandle, which are ‘gateways’ to the Wandle Trail and provide access from surrounding residential areas. 2.4 The Wandle Gateways Improvement Scheme, which was submitted for consideration under the Landfill Communities Fund programme was developed from the proposals set out in the Wandle Strategy and Action Plan, with a view to improving access to the River Wandle for residents and visitors for recreation and leisure, improving the environment and public amenity of the open spaces along the River Wandle and enhancing the nature conservation and biodiversity value of this stretch of the River Wandle. In addition the scheme would form part of the creation and long-term development of the Wandle Valley Regional Park and establish an identity for the Regional Park. 2.5 The scheme focuses on 8 key sites along the River Wandle: • Goat Road, Budge Lane, Buckhurst Avenue and Culvers Avenue within the Hackbridge area, and; • Guy Road, Hilliers Lane, Richmond Green and Cedars Road within the Beddington area. 2.6 The proposed treatments at these gateway sites will reflect the appropriate character of each site, utilising materials, planting and signage in keeping with the surroundings. In dealing with local access issues, proposed treatments for particular sites include the need for additional railings, access management, surfacing, provision of seating/amenities, planting, etc and erection of signs and information boards. 2.7 The scheme has been submitted to EnTrust for approval under the Landfill Communities Fund programme. The total cost of the scheme, including design and

2 Page 17 Agenda Item 4

supervision and EnTrust’s on-costs for administering the Landfill Communities Fund programme is £270,000. 2.8 Under the arrangements agreed with Viridor, the detailed design, tender preparation, the letting of the contract and supervision of works would be carried by Global to Local Foundation in accordance with the Council’s standing Orders and on behalf of the Council. The project management and administration would be undertaken by Global to Local Foundation on behalf of EnTrust. 2.9 Maintenance of the improvement works over the first three years would be undertaken as part of the part of the contract. However, all of the sites are under the responsibility of the Council to maintain, and while the increased future maintenance costs arising from the improvement scheme will be minimal, the Parks Service currently maintains open spaces along the Wandle Trail and there is funding from Transport for London for the maintenance of cycleways, including the Wandle Trail. 2.10 The Business Plan submitted to Viridor Ltd for the Wandle Gateways Improvement Scheme also suggests that the Council seeks to attract additional revenue funding for maintenance from new advertising hoarding sites close to the Wandle Trail. The site at Budge Lane, in particular, is visible from Middleton Road and close to the Wandle Valley and the Willow Lane Trading Estates and could generate significant income for maintaining gateway sites within the Borough. 2.11 In the longer term, the future management and maintenance of the Wandle Trail and these gateway sites should be determined through the agreed proposals for the creation and development of the Wandle Valley Regional Park 2.12 It is proposed that the Council’s contribution of £27,000 towards the cost of the Wandle Gateway Improvements Scheme should be met equally from the Public Realm budget for the St Helier, The Wrythe and Wandle Valley and the Beddington and Wallington committees. 3. Financial Implications 3.1 The total cost of the proposed scheme is £270k. 3.2 90% of the total cost of the scheme is to be funded by Landfill Tax Receipts that have been assigned by Viridor Waste Management Ltd and LBS is required to provide a third party contribution of £27k. 3.3 The LBS element is to be funded from the Public Realm Capital Programme that has been allocated to the Local Committees. The scheme involves investment in two local committee areas and the contribution of £27k is to be split equally between Beddington and Wallington Local Committee and St Helier, The Wrythe and Wandle Valley Local Committee. 4. Influence of the Council’s Core Values 4.1 Carrying out this improvement scheme is a wise investment for the future. It will improve access by foot and cycle and provide better access to recreation and leisure facilities for residents, making the Council’s services open and accessible. 5. Contribution to the Achievement of the Council’s Policy Aims 5.1 The scheme will help to encourage walking and cycling, provide better access to recreation and leisure facilities and significantly enhance the quality of the environment within the Wandle Valley Corridor, and willtherefore contribute to the

3 Agenda Item 4 Page 18

Council’s aim of Achieving Environmental Sustainability and will help with the Council’s aim of Achieving Social Inclusion. 6. Equality Impact Assessment 6.1 Environmental improvements along the River Wandle should assist regeneration of the Wandle Valley Corridor and provide significant opportunities for improvements for the economic, social and environmental wellbeing of all groups within the local community. The Wandle Gateway Improvements Scheme should enable more equal access to recreation and leisure facilities within Borough for all groups, particularly for those with disabilities.

4 Page 19 Agenda Item 9

London Borough of Sutton

St. Helier, The Wrythe, Wandle Valley Local Committee-10 February 2009

Report of the Executive Head of Planning, Transport and Highways

DRAFT HACKBRIDGE MASTERPLAN FOR CONSULTATION

Ward Location: Wandle Valley Author(s) and Contact Phone Number(s): Paul McAleer (6307)

Area Served: Hackbridge Lead Councillor: Lyn Gleeson Report for Information Summary The Report outlines the draft Hackbridge Masterplan and the public consultation arrangements.

Recommendations I recommend the Local Committee note the public consultation arrangements set out in this Report.

1. Background 1.1 The draft Hackbridge Masterplan has been prepared to provide a framework for the future development of the Hackbridge area and inform policies put forward for Hackbridge in the Council’s new Local Development Framework for the Borough. 1.2 In addition the Masterplan forms part of the wider ‘Hackbridge Initiative’, where Hackbridge will be promoted as flagship sustainable regeneration project in line with the aspirations of the Borough’s ‘One Planet Living’ and emerging Sustainablity Action Plan. 1.3 Tibbalds Planning and Urban Design were commissioned to produce a draft Hackbridge Masterplan, the key elements of which are: • An overall urban design framework for the Hackbridge neighbourhood as a whole, dealing with land use, movement, landscape and open space and public realm improvements; • Individual development briefs for five strategic sites as identified in the Local Development Framework: Felnex Trading Estate, former Kelvin House site, Land North of Hackbridge Station, Land North of BedZed and the Wandle Valley Trading Estate 1.4 In preparing the draft Masterplan, ‘stakeholder’ workshops were held with the local community, landowners and business representatives in September 2008 on the future possibilities for Hackbridge to gauge local opinion at the early stage of the process. The workshops built on the significant amount of public consultation on the future of Hackbridge that had already undertaken, including Hackbridge Week earlier in the year. The feedback was generally very supportive of the principles put forward. 1.5 The Consultants and council officers have also met with the landowners of each of the strategic sites to get an understanding of landowners’ aspirations for the development of 1 Agenda Item 9 Page 20

individual sites and of the wider Hackbridge neighbourhood. 1.6 The Planning Advisory Group at the 24 November 2008 meeting resolved unanimously to endorse the draft Hackbridge Masterplan for public consultation and to be regarded as a material consideration for development control purposes. 1.7 The draft Masterplan will be finalised following the public consultation and will be taken forward in the preparation of the Local Development Framework, which will provide detailed statutory guidance on the future development of Hackbridge.

2. Consultation Arrangements 2.1 The consultation arrangements, scheduled for a 6-week period commencing 11 February 2009, will be carried out in accordance with the Council’s Community Engagement Strategy and will involve: • Distributing a leaflet, summarising the draft Hackbridge Masterplan, to all residents and businesses within Hackbridge, and through libraries, Council Offices and sending copies to individuals on request. • Consultation letters to those who participated in the September Stakeholder Workshops, landowners, business and relevant statutory bodies. • Making the draft Masterplan document available for inspection at nearby local libraries and the Council’s offices at Civic Centre and at Denmark Road, Carshalton; • Advertising the Masterplan through articles in local newspapers and on the Council’s Website, as well as making copies of the masterplan available at http://consult.sutton.gov.uk, in the Central Library, local libraries and the main Council offices. • A public exhibition will be held through the consultation period at the All Saints Community Hall. The opening times for viewing the exhibition are: - Tuesday 4:00pm to 9:00pm - Wednesday 10:00am to 1:00pm - Thursday 5:00pm to 9:00pm - Friday 10:00am to 1:00pm - Saturday 10:00am to 2:00pm • Council officers will be on hand at the exhibition at the following times, to provide advice on the document: - Tuesday 2nd March 2009 from 4:00pm to 6:00pm - Thursday 12th March 2009 from 6:00pm to 8:00pm - Saturday 14th March 2009 10:00am to 12:00pm - Wednesday 18th March 2009 from 11:00am to 1:00pm

3. Next Stages 3.1 The results of the consultation on the draft Hackbridge Masterplan will be submitted to the Council’s Planning Advisory Group for consideration in May 2009 and forwarded to all those organisations and individuals that responded to the Consultation.

2 Page 21 Agenda Item 9

4. Financial Implications 4.1 The cost of the proposed consultation can be contained within the Council’s existing 2008/09 Strategic Revenue Budget.

5. Influence on Council’s Core Values 5.1 Producing and making available the draft Hackbridge Masterplan for consultation with the local community and all stakeholders is helping to contribute to working in partnership with people living and working within the Borough and making the Council’s services open and accessible.

6. Contribution to the Achievement of Council’s Policy Aims 6.1 Preparing the draft Hackbridge Masterplan will contribute to the Council’s aim of Achieving Environmental Sustainability by providing improved educational facilities within the Borough. Consultation on the draft Hackbridge Masterplan will help with the Council’s aim of Achieving Social Inclusion.

7. Equality Impact Assessment

7.1 The Council has produced an Equalities Impact Assessment to accompany the Core Planning Strategy, Proposed Submission, which sets out how equalities have been taken into account in the preparation of the document. The provisions of that Assessment fully cover the preparation of the draft Hackbridge Masterplan.

3 Page 22

This page is intentionally left blank Page 23 Agenda Item 10

London Borough of Sutton St Helier, The Wrythe and Wandle Valley Local Committee 10 February 2009

Report of the Executive Head of Planning, Transport and Highways

Consultation on Proposed Development Control Policies and Sites for Future Development.

Ward Location: Borough-wide Author(s) and Contact Phone Number(s): Keith Fraser (6254)

Area Served: Borough-wide Lead Councillor: Lyn Gleeson Report for Information Summary The Report outlines the background to and the consultation arrangements for one of the planning documents that forms part of the new Local Development Framework and which puts forward proposed new development control policies and sites for future development.

Recommendations I recommend the Local Committee notes the purpose of the Plan and the arrangements for making comments.

1. Background 1.1 The Site Development Policies Development Plan forms one of a number of documents making up the Council’s Local Development Framework that will, when adopted, replace the Sutton Unitary Development Plan. The main purpose of the Plan is to identify key sites necessary to meet the borough’s needs over the next 10 to 15 years, for housing, shops and business use etc. and to put forward policies that will be used to help decide future planning applications.

1.2 The document does not include proposals for sites within Sutton town centre, which are set out in a separate Plan, but does include those sites identified within the draft Hackbridge Masterplan. A report on the Masterplan is found elsewhere on this Agenda.

1.3 Appendix A of this Report sets out a list of preferred sites for future development in this Local Committee Area. Members will receive a copy of the Plan and are encouraged to respond to the consultation. Consultation on this Plan and the Masterplan will take place at the same time so the results of both consultations will inform the preparation of the Local Development Framework.

2. Consultation Arrangements

2.1 The consultation will take place between 11 February and 25 March 2009 and the arrangements include: • Sending consultation letters to statutory bodies, organisations, groups, businesses and other parties who have previously expressed views or are known to have an interest in planning policy matters in the Borough.

1 Agenda Item 10 Page 24

• Sending the document to major stakeholders either as a hard copy or e version and making the document available on the Council’s web site. • Distributing a leaflet summarising the content of the Site Development Policies Document through libraries, Council Offices, Council forums, Community Champions and sending copies to individuals on request. • Undertaking 3 area-based workshops at Carshalton College, Carshalton (18 February 2009); Trinity Centre, Wallington (19 February 2009) and St Bedes Conference Centre, North (26 February 2009) to discuss aspects of the document as well as a workshop with community champions to assist them to disseminate information to their members. (Details of workshops and registration available by contacting 020 8770 6432 or by email to [email protected]). • Advertising the document through Public Notices/Articles in local newspapers and on the Councils Website as well as making copies of the document available at http://consult.sutton.gov.uk , in the Central Library, local libraries and the main Council offices.

2.2 Electronic responses are encouraged using the on-line consultation system at http://consult.sutton.gov.uk or by using the above e-mail address. Alternatively, responses can be made on the standard response form and faxed or sent to the Council’s Strategic Planning Section.

3. Next Stages 3.1 After considering the comments from this consultation, the Plan may need to be revised before being subject to a period of further consultation and then submitted to the Secretary of State to be considered at an Examination in Public. The Plan would then be adopted by the Council, incorporating any recommendations made by the Inspector.

4 Financial Implications 4.1 The cost of the proposed consultation can be contained within the Council’s existing 2008/09 Strategic Revenue Budget.

5. Influence on Council’s Core Values 5.1 Producing and making available the draft Local Development Framework for consultation with the local community and all stakeholders is contributing towards working in partnership with people living and working within the Borough and making the Council’s services open and accessible.

6. Contribution to the Achievement of Council’s Policy Aims 6.1 Preparation of this Plan will help focus attention on issues of environmental quality and sustainability, thereby contributing to the Council’s aim of Achieving Environmental Sustainability by protecting our environment now and in the future. Further consultation on the document will contribute towards the aim of Achieving Social Inclusion.

7. Equality Impact Assessment 7.1 The Plan will help implement the Council’s objective of Creating Strong, Active and Inclusive Communities, promoting social inclusion by ensuring good access to town centre services and facilities for all sections of the community. Particular attention is

2 Page 25 Agenda Item 10

focussed on contacting groups and individuals representing a wide range of locations, ages and ethnic communities.

APPENDIX A List of Sites within St Helier, The Wrythe, Wandle Valley Local Committee Area

Ref Site Name Proposed Use A 18 Council Offices, Denmark Road, Residential Carshalton A 19 Car Park, Langcroft Close, Carshalton Residential A 20 Felnex Trading Estate, London Road, Residential, Retail, Employment and Hackbridge Community A 23 Land adjacent to Hackbridge Station Residential and Employment A24 Land north of BedZed, London Road, Residential, Education and Open Hackbridge Space A26 Plumpton Trading Estate and Gas Holder Industry A27 St Helier Hospital Health A28 Kelvin House, London Road, Hackbridge Retail, Offices and Residential A32 Wandle Valley Trading Estate, Goat Road Residential. Employment and Open Space C1 Glastonbury Centre, Hartland Road Residential (Possible new school site)

3 Page 26

This page is intentionally left blank Page 27 Agenda Item 11

London Borough of Sutton

Sutton Local Committee – 5 February 2009 St.Helier, The Wrythe and Wandle Valley – 10 Feb 2009 Sutton South, Cheam Belmont Local Committee – 12 February 2009 Carshalton and Clockhouse Local Committee – 17 February 2009 Cheam North and Local Committee – 19 February 2009 Beddington and Wallington Local Committee – 30 March 2009

Report of the Traffic and Highway Works Manager

GRANT FUNDING FOR TRANSPORT SCHEMES 2009/2010 (LOCAL IMPLEMENTATION PLAN FUNDING)

Ward Location: Not Applicable Author(s) and Contact Phone Numbers: Area Served: Borough-Wide Paul Blunt 020 8770 6445 Lead Councillor: Councillor Colin Hall

Executive Decision Report

Summary The Council has been advised by Transport for London (TfL) of the Local Implementation Plan (LIP) Funding for 2009/10. L.B. Sutton has been allocated a grant of £5,275,000 for 2009/10, plus £77,600 through SWELTRAC towards transport schemes. In addition, £1,578,000 has been committed for ongoing schemes into 20010/11 and £425,000 for 2011/12. Any LIP schemes that have been committed under the 2008/9 programme, but are uncompleted by 31/3/09 will take priority over new schemes. Recommendations I recommend the Committee to: a. Note the 2009/10 LIP funding settlement and the programme for which TfL has agreed the grant. b. Agree the list of schemes relevant to this Local Committee. c. Delegate to the Executive Head Planning & Transportation, in consultation with the Chair and Ward Councillors to agree details of individual schemes. 1. Background 1.1 The Council submitted its Local Implementation Plan Reporting and Funding Submission (LIP RFS) for 2009/10 to TfL last June in accordance with guidance issued earlier in the year. The LIP RFS system is used as a basis for allocating capital funding to London local authorities for roads, transport, traffic and other highway related matters. The Council was required to prioritise its proposals in various topics as part of the bid. 1.2 Package bids were submitted on behalf of Sutton through the London Bus Priority Network (LBPN) partnership, the London Cycle Network (LCN+) partnership and through

1 Agenda Item 11 Page 28

the South and West London Transport Conference (SWELTRAC) sub regional partnership. 2. Issues 2.1 TfL announced the settlement on 20 th November 2008. They have made a funding allocation to Sutton under several discrete topic headings totalling £5,352,600 for 2009/10 with a commitment of £1,578,000 for 2010/11 and £425,000 for 2011/12. 2.2 This years settlement of £5,352,600 represents an increase of 22% on last year’s settlement of £4,388,000 and is well above the average for London Boroughs. The increase is primarily due to funding for the Sutton Town Centre Regeneration Scheme. However, funding for Beddington Lane has increased and there is additional funding for the Wallington Integrated Transport Package Project. TfL managers of the respective LIP programmes have assessed boroughs’ funding applications based on the priorities indicated by the boroughs, the available funding from TfL’s 2009/10 Business Plan and the criteria set out within the LIP Annual Progress Reporting Guidance 2009/10 – 2010/11. Allocations for Principal Road Renewal, Bridge Assessment & Strengthening, Area Based Schemes, Road Safety and Bus Priority schemes continue to be strongly influenced by the application of needs-based considerations. These transport areas account for about 60% of allocated funding. Therefore, the total amount allocated to a borough is greatly influenced by the need for such work. 2.3 Details of the 2009/10 allocations are listed in the Appendix and summarised as follows: Principal Road Maintenance and Bridge Structures 2.4 TfL have allocated £120,000 for maintenance of on the Principal Road Network. This covers a section of the A237 London Road. £1,510,000 has been allocated for strengthening of Hackbridge Railway Bridge. Road Safety & 20mph zones 2.5 An allocation of £693,000 for local safety schemes has been made. TfL have specified the individual Local Schemes in the settlement from the list prioritised in our bid. Larger schemes identified are Stanley Park Road (£100,000), Bishopsford/Middleton Rd junction (£70,000), High St/Oakhill Rd (£160,000), Thornton Road (£50,000), STEPS Zones 18 (£60,000) and 37 (£50,000). £40,000 has been allocated for education, training and publicity. 2.6 An allocation of £267,000 has been made for implementation of three 20 mph zones in the following areas: a). STEPS Zone 40 (Beddington). b). STEPS Zone 7 (Cheam Village). c). STEPS Zone 19 (Carshalton, north of Ruskin Road). Walking and Cycling 2.7 £144,000 has been allocated for Walking to fund the design and consultation on the Wallington Integrated Transport Package and the pedestrian/cycle/equestrian crossings in Woodmansterne Road near Diamond Riding School. 2.8 £234,000 has been allocated for cycling schemes on the London Cycle Network (LCN+). Schemes include Sutton Town Centre (£75,000), Green Lane, (£79,000), and Rose Hill/High Street (£80,000). A further allocation of £302,000 has been made for cycling in addition to the LCN+ allocation, principally to cover design and consultation on the Wallington Integrated Transport Package, the Toucan crossing in Woodmansterne Road by Oaks Track, a contraflow facility in Brunswick Road, and alterations to allow cyclists through the road closures in Rd and Westcroft Road. Funding for cycle parking (£60,000) and cycle roadcraft training (£108,000) have increased considerably form last year. Funding for Cycling on Greenways is expected to be announced in March. Buses

2 Page 29 Agenda Item 11

2.9 £287,000 has been allocated for Bus Priority schemes. The allocation is for schemes at various locations including Woodcote Road, Wallington (£40,000), Kimpton Road (£45,000), Marlowe Way (£40,000) and Station Approach, Wallington (£40,000). 2.10 £74,000 has been allocated for Bus Accessibility Schemes principally to improve access at bus stops on a number of routes. The allocation for bus priority is better than last year. Schemes over £50,000 are subject to a cost/benefit analysis. School Travel Plans, Workplace Travel Plans and Travel Awareness 2.11 An allocation of £384,000 has been made for School Travel Plans. This includes a Safe Routes to Schools scheme at St Mary’s RC, Carshalton, two school travel advisers, various travel promotion schemes including Walk to School Once a Week (WOW), Theatre in Education and Transition Packs giving travel advice to parents etc. 2.12 Workplace Travel Plans has been given an allocation of £80,000. Travel Awareness did not receive an allocation. Regeneration, CPZ’s, Environment and Local Area Accessibility 2.13 £200,000 has been allocated to cover further work on the Beddington Lane improvement scheme. £45,000 has been given to produce initial designs and consult on Controlled Parking Zones for Worcester Park, Belmont Village and Carshalton Beeches. £60,000 has been allocated under the Environment heading, £30,000 will be used to fund air quality monitoring. £65,000 has been allocated for Local Area Accessibility. Details are to be agreed with TfL. Town Centres. 2.14 An allocation of £670,000 for 2009/10 and a commitment of £600,000 for 2010/11 have been made for the Sutton Town Centre Regeneration scheme. SWELTRAC 2.15 The SWELTRAC settlement includes £80,000 for improvements to the Kimpton Strategic Industrial Area. However, this allocation will be reduced by 3% to cover the management and administration provided by SWELTRAC (revised total £77,600). Our bid for a station access scheme at Wallington was approved last year to progress to detailed design and consultation. Subject to further approval by TfL, it is likely to be funded for implementation using the SWELTRAC budget (Estimated costs £400,000). Local Transport Funding 2.16 £100,000 has been allocated to each borough to spend on the transport priorities of their choice. This is on a trial basis and proposals must be broadly consistent with the Mayor’s Transport Strategy. Comments 2.17 The total settlement for the 33 London Boroughs this year is £168m. The average for each borough is therefore £5.09m. Sutton’s settlement of £5.3526m is in the top five allocations across London boroughs. Per a head of population the allocation is in the top three with only City of London (population 8000) and LB Richmond being higher. This is principally due to the allocation for the Sutton Town Centre regeneration project and the Hackbridge railway bridge reconstruction. 2.18 TfL is working with Boroughs to reform the current LIP funding processes and reduce bureaucracy. Council officers and members have had two meetings with Peter Hendy, London’s Transport Commissioner, to lobby for greater flexibility in the process to allow Sutton to create the Smarter Travel Sutton (STS) legacy project ‘Enabling Smarter Travel Choices’. Building on the success of STS, Integrated Transport Packages will be implemented across the Borough starting in Wallington. TfL have committed substantial funds for this project over the next three years (£919,000 in total). Joint branding is no longer a requirement and delegated powers to shift funds between programmes have increased. London Council’s Transport and Environment Committee has set up a working group to address bureaucracy in the TfL/borough relationship. In future years it is proposed to reduce the number of programmes from 20 plus to only 5 for 2010/11 onwards. 3 Agenda Item 11 Page 30

2.19 As in previous years, any schemes not completed during the previous year will have to be funded from these allocations before they can be used for new schemes. 3. Financial Implications 3.1 Transport for London (TfL) provides, through the Local Implementation Plan Reporting and Funding Submission System (LIP RFS), financial support for borough schemes intended to improve the quality, safety and accessibility of the local travelling environment. On 20 th November 2008, the Major of London announced that support of £168m for Local Implementation Plans (LIPs) was to be included in the TfL Budget and Business Plan for 2009/10. This represents a 4.3% increase over the equivalent figure for 2008/09. 3.2 Based on an annual LIP Reporting and Funding Submission by Sutton, the Mayor announced that for 2009/10 Sutton will receive £5,275K of funding from TfL (including £1,510K for London Road, Hackbridge bridge strengthening) to tackle a range of issues from reducing road casualties to supporting town centre regeneration. This is an increase of £935K (22%) over the corresponding figure of £4,340K (including £1,520K for London Road, Hackbridge bridge strengthening) for 2008/09. Excluding the Hackbridge scheme, the allocation for 2009/10 is £3,765K compared to £2,820K for 2008/09, representing an increase of 34%. In addition to these figures, there is £78K (2008/09 £48K) from TfL’s allocation to the South and West London Transport Conference (SWELTRAC). 3.3 The 2009/10 settlement for Sutton includes funding, as detailed above, for key local schemes aimed at reducing pollution, town centre regeneration, bridge works on London Road, Hackbridge, improvements to the Kimpton Strategic Industrial Area, reducing road casualties and tackling the school run. 3.4 The Capital Programme has been amended to include the funding allocated by TfL. Financial provision has been released and approval is now sought from Local Committees, so that schemes for which funding has been allocated may proceed. 4. Influence of the Council’s Core Values 4.1 LIP schemes contribute to the following council Core Values: Working in Partnership , as schemes are developed in partnership with TfL and others; Involvement in Decisions , as schemes are developed in consultation with residents and other stakeholders; Accessible Services , as schemes are designed to be fully accessible to all and provide access to key services; High Quality, Cost effective Services , as schemes are designed to be cost effective and yet high quality; Equality , as schemes are designed to cater for all sections of the population and take account of the needs of disabled and minority groups; Investing Wisely for the Future , as schemes are designed to maintain infrastructure in a good condition to avoid future problems, and schemes are designed to reduce the long term environmental damage caused by motorised transport in line with the Councils One Planet Living pledge. 5. Contribution to the Council’s Corporate Action Plans Safety Schemes, Bus Priority, Travel Awareness, Cycling and Walking Schemes will contribute to long term environmental sustainability. Bus Stop Accessibility and. Environmental schemes (e.g. air monitoring) will promote community well being. 6. Equalities Impact Assessment Accessibility schemes including bus stop improvements will promote social inclusion and full accessibility for all residents particularly disabled people, older people and young people. Safe Routes to School schemes will improve safety for children. Tactile paving facilities will be provided for visually impaired people. 7. Background Papers LIP RFS Submission 2009/10, LIP Funding letter and enclosure dated 20 Nov. 2008. 8. Appendix Allocations for specific schemes together with original bid information.

4 Page 31 Agenda Item 11

APPENDIX

London Borough of Sutton

Specific Schemes 2009/10 LIPRFS Allocation November 2008

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area

Principal Road Renewal RO

Principal Roads in the Borough with CI's (Condition Index) 70+ (London Road between Longfield Avenue and the 120.000 - - 120.000 - St.H Railway Bridge, Hackbridge)

Principal Roads in the Borough with CI's 70+ (London Road between the Railway Bridge and the Grange 133.000 ------Restaurant, Hackbridge)

Principal Roads in the Borough with CI's 50 to 70 (Woodcote Road between Hawthorne Road and Avenue 170.000 ------Road)

Principal Roads in the Borough with CI's 50 to 70 (Bishopsford Road between Green Wrythe Lane and Rose 179.000 ------Hill)

RO - £k 602.000 - - 120.000 - - -

Bridge Strengthening & Assessment BR London Road, Hackbridge (Reconstruction of a road 1,520.000 100.000 - 1,510.000 - - St.H & B&W bridge to a new standard) ongoing project

Central Road: Load Assessment 20.000 60.000 - - - - - London Road/Millgreen Road: Reconstruction of a new 10.000 20.000 75.000 - - - - culvert

Hillier Lane: Concrete Repairs 10.000 ------

Pembury Avenue: Waterproofing and Safety Parapet 5.000 50.000 - - - - -

London Road/Millgreen Land: Safety Parapet 27.000 ------

Civic Offices: Subway - Waterproofing 10.000 75.000 - - - - -

Therapia Lane: Safety Parapet 5.000 50.000 - - - - -

Manor Road/Woodcote Road: Safety Parapet 10.000 100.000 - - - - -

Plough Lane Footbridge: Covered Way 15.000 140.000 - - - - -

Throwley Way Footbridge: Covered Way 15.000 110.000 - - - - -

Grange Vale: Signs Implementation 12.000 ------

BR - £k 1,659.000 705.000 75.000 1,510.000 - - -

Local Safety Schemes LSS

Stafford Rd./Woodcote Road Junction - Proposed introduction of pedestrian phases on Stafford Road and Stanley Park Road areas. Rephasing signals and timing 40.000 - - 40.000 - - B&W with 2 adjacent signaled junctions and 4 Pelicans. Conversion of one pelican to a toucan crossing. Anti skid to be added on the approaches and at the junction. Middleton Road/Goat Road junction. Joint scheme with 20.000 - - 20.000 - - St.H L.B. Merton. Feasibility to start 1/4/09 Stanley Park Road - Entry treatments, traffic islands, antiskid surfacing on all approach arms to existing traffic signal junctions including existing pelican/puffin crossings. Traffic/pedestrian islands to assist pedestrians in crossing 100.000 - - 100.000 - - B&W the road and to reduce traffic speeds. Waiting restrictions along all side roads entry/exit to improve sightlines. Entry treatments, islands & antiskid surfacing.

1 10 Agenda Item 11 Page 32

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area A217 Bishopsford Road/Middleton Road junction - Apply antiskid surfacing at the junction, road markings to create 70.000 - - 70.000 - - St.H left/right turning lane and enlarge refuge islands. Future Scheme Development 45.000 - - 45.000 - - All

STEPS Zone 3 - Traffic Calming 40.000 ------STEPS Zone 37 - Traffic Calming (North of Acre Lane). 50.000 75.000 - 50.000 - - C&C & B&W Feasibility to start 1/4/09 Woodcote Road/Woodmansterne Lane junction. Investigate signals. Woodcote Road/The Drive junction 20.000 150.000 - 20.000 - B&W improvements High Street, Sutton. Raised table at Oakhill Road, antiskid 160.000 80.000 40.000 160.000 - - Sut surfacing and footway improvements. Green Wrythe Lane/Thornton Road - Modify junction table, improve street lighting, install guard railing etc. Investigate 50.000 100.000 - 50.000 - - St.H traffic signals for implementation in 2010/11. STEPS Zone 18 - Traffic Calming (South of Pound Street). 60.000 - - 60.000 - C&C Feasibility to start 1/4/09 Westmead Road/St Barnabas Road/Lower Road - Mini 55.000 - - - - - roundabout with refuge islands. STEPS Zone20 - Feasibility/Design & Consultation on 15.000 37.000 - 15.000 - - C&C & B&W Traffic Calming (North of Stanley Park Rd.) STEPS Zone 21 - Feasibility/Design & Consultation on 15.000 47.000 - 15.000 - - C&C & B&W Traffic Calming (South of Stanley Park Rd.) Woodmansterne Road/Croydon Lane/Carshalton Road junction.- Junction improvements to include designated turning lanes, new traffic islands, adjustment of existing 40.000 - - 40.000 - - C&C islands, improvement of signage and speed reducing measures on Woodmansterne Lane and Croydon Lane on the approaches to the junction. Park Road & Boundary Road - Completion of previous 8.000 - - 8.000 - - B&W scheme. Croydon Lane/ Lane - Completion of 3.000 ------previous scheme. LSS - £k 791.000 489.000 40.000 693.000 - - -

20 mph Zones ZO STEPS Zone 40 (Beddington) 20mph in Mallinson Rd, 80.000 - - 80.000 - - C&C & B&W Crispin Crescent, Mellow Close & Derry Rd. STEPS Zone 6 66.000 ------

STEPS Zone 7 (East of St.Dunstans Hill) 92.000 - - 92.000 - - Sut.Sth

STEPS Zone 19 (South of Ruskin Rd.) 95.000 - - 95.000 - - C&C & B&W

STEPS Zone 13 120.000 ------

ZO - £k 453.000 - - 267.000 - - -

Education Training & Publicity ETP

Going Up Scheme (Road Safety Education) 20.000 25.000 28.000 20.000 - - All

After You've Passed (Motorcycle Training) 20.000 25.000 28.000 20.000 - - All

Driving Assessments for the Elderly 30.000 35.000 38.000 - - - -

Theatre In Education (Road Safety Specific) 25.000 30.000 - - - -

Child Pedestrian Training (Kerbcraft) 25.000 35.000 35.000 - - - -

ETP - £k 120.000 150.000 129.000 40.000 - - -

Walking W

Woodmansterne Road near Diamond Riding School 58.000 - - 29.000 - - C&C Equestrian crossing to complete 2008/09 scheme

Wallington Integrated Package: Wallington District Centre "ped shed" and key walking routes: upgrade of key walking routes within 800m "ped shed" catchment round 115.000 660.000 660.000 115.000 660.000 - B&W Wallington District Centre; Design Fees/Consultation 2009/10 Implementation 2010/2011 onwards

2 10 Page 33 Agenda Item 11

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area

Little Woodcote Lane - Footway adjacent to Lower Pillory 40.000 ------Down for 300m east. (Alongside Little Woodcote Lane)

Public Rights of Way up-grade surfaces and access points 50.000 ------

Clifton Road and Belmont Road; Wallington introduce narrowed junctions and raised tables and undertake 30.000 ------consultation to introduce "no entry" plugs North Street mini roundabout j/w Nightingale Road raised 80.000 ------entry treatment on each arm

Bishopsford Road puffin crossing near Newstead Walk in 5.000 50.000 - - - - - partnership with LB Merton

Sutton Town Centre renewal project arrival points for 10.000 30.000 - - - - - pedestrians - feasibility and consultation

Application for progressing the PERS toolkit and having it 10.000 ------applied to borough schemes

W - £k 398.000 740.000 660.000 144.000 660.000 - -

Cycling - Non LCN+ CS Woodmansterne Road near Oaks Track Toucan crossing 58.000 - - 29.000 - - C&C to complete 2007/08 scheme

Wallington Integrated Package: Wallington Network: 115.000 725.000 725.000 30.000 25.000 25.000 B&W development and upgrade of Borough Cycle network for the Wallington area. Design Fees/Consultation: 2009/10 Implementation: 2010/2011 onwards Carshalton Park Road, Carshalton introduce a cycle facility 18.000 - - 15.000 - - C&C through existing road closure Westcroft Road, Carshalton introduce a cycle facility 10.000 - - 10.000 - - B&W through existing road closure and improve facilities Brunswick Road Sutton introduce a cycling contra-flow 40.000 - - 20.000 - - Sut. along existing one-way road Upland Road to Banstead Road Carshalton up-grade 7.000 ------existing footpath to allow cycling Sutton Town Centre renewal project arrival points for cyclists - allow cycling on the footway between 25.000 ------Avenue and Lewis Road Sutton Town Centre renewal project arrival points for 10.000 30.000 - 10.000 30.000 - Sut. cyclists feasibility and consultation Various locations identified by cycling group around the 18.000 20.000 25.000 - - - - borough implement flush dropped kerbs Safety audits and after study traffic counts to monitor 3.000 - - 3.000 - - All schemes Cycle Parking to include renewing and increasing cycle parking facilities in Sutton High Street as part of Sutton 60.000 - - 60.000 - - All Town Centre renewal project Cycle Roadside Training (BikeAbility) 126.000 136.000 150.000 108.000 - - All

National Standards Cycling Instructor Training 5.000 5.000 5.000 3.000 - - All

3.000 3.000 3.000 - - - All Maintaining of standard of Cycle Training Uniforms 5.000 ------National Standards Accreditation Bicycle Roadshow 15.000 15.000 15.000 - - - All

National Standards Training Materials 10.000 ------

15.000 ------Cycle Route Cards Cycle Training - People with disabilities 14.000 15.000 16.000 14.000 - - All

Wrythe Lane: Toucan Crossing 25.000 ------

CS - £k 582.000 949.000 939.000 302.000 55.000 25.000 -

3 10 Agenda Item 11 Page 34

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area

Cycling LCN+ LCN

Route 75 (link 191)Richmond Road to Bridle Path 100.000 ------Beddington new cycle bridge alongside pedestrian bridge

Route 29 (link 193) entire link maintenance 3.000 ------

Route 75 (link 191) entire link maintenance 8.000 3.000 - - - - -

Route 75 (link 191) Beddington Park footpath from London Road widen and convert footpath to allow cycling to re- 50.000 ------route route 75 from car park Route 75 (link 191) in conjunction with Sutton Town Centre renewal project complete upgrade from 75.000 - - 75.000 - - Sut. Road to Benhill Avenue Route 29 (link 193) in conjunction with Sutton Town Centre renewal project complete the upgrade from 37.000 ------Throwley Way to Sutton Railway Station Route 29 (link 193) Green Lane, Morden, Rose Hill. Introduce advisory cycle lane in Green Lane and entry 79.000 - - 79.000 - - St.H treatments at some junctions. Route 29 (link 193) Rose Hill / High Street. Introduce more 155.000 - - 80.000 - - Sut. cycling friendly measures.

LCN - £k 507.000 3.000 - 234.000 - - -

Cycling on Greenways CG

Rose Hill Park Phase 2 - Extend route from Community 70.000 - TBC - - Sut Centre past Tennis Courts to exit by Angel Hill

Elm Road Recreation Ground - Widen existing path to 40.000 - TBC - - CNWP allow cycling.

Mellows Park - New cycle route from Stafford Road to 50.000 - TBC - - B&W Sandy Lane North.

CG 160.000 3.000 - TBC - - -

Bus Stop Accessibility BSA

Ensuring bus stops are accessible. Red surfacing, bus stop cage and clearway, adequate kerb height etc. Batch 1 Route S1, 80 , 127, 151 Green Wrythe Lane Bus Stop H0580, Middleton Road 16.000 - - 16.000 - - St.H (Bus Stop 20195), Hackbridge Road (Bus Stop 7772, 19121), London Road (Bus Stop 590, 16867, 36974) London Road (Bus Stop 590, 16867, 36974) and Peterborough Road (Bus Stop H0581)

Batch 2 Route 151, 280, N44 Thornton Road (Bus Stop 36897, 36898, 36917, 36916) Bishopsford Road (Bus Stop 18558, 18555) 13.000 - - 13.000 - - St.H Green Wrythe Lane (Bus Stop 20189, 20191, 20192) Rose Hill (Bus Stop 4530)

Batch 3 Route 157, 151, S1, 127 Wrythe Green (Bus Stop 19128, 1920, R0718, 19118) Erskine Road (Bus Stop H0576, H0575) Green Wrythe 13.000 - - 13.000 - - St.H Lane (Bus Stop 36896, 20188) Nightingale Road (Bus Stop 19126, 19123, 19127, 19124, 19125) Hackbridge Road (Bus Stop 19122) Batch 4 Routes S3, 80, 420, 820, 280, 962, S1 Cotswold Road (Bus Stop BP1302, 18593), 12.000 - - 12.000 - - Sut.Sth Brighton Road (Bus Stop 410), The Quadrant (Bus Stop 35897)

4 10 Page 35 Agenda Item 11

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area

Batch 5 Routes S1, 80, 151, 164, 213, 280, 407, 413, 420, 820, 470, 613, 962, S1, S4, S3, N44, N213, 154 Oakhill Road (Bus Stop H0573), St. Nicholas Way (Bus Stop 35568), Crown Road (Bus Stop 35573, 35556), Benhill Avenue (Bus Stop 6480, 6481), 19.000 - - 10.000 - - Sut Bushy Road (Bus Stop 18539, 18542), Marshall Road (Bus Stop 31982, BP1453), High Street (Bus Stop 6479), Throwley Way (Bus Stop 35336), Westmead Road (Bus Stop 6484)

Batch 6 Routes 80, 613, S1 Bushy Road (Bus Stop 18537, 18540), 12.000 ------Oakhill Road (Bus Stop H0567, H0568)

Batch 7 Routes 151, 213, 613, 627, 668, N213, 280, N44 9.000 ------Cheam Common Road (Bus Stop 8354, 14875)

Batch 8 Routes 127, 463, 612 Woodcote Road (Bus Stop 17725, 17726, 16614, 16613), 8.000 ------Stafford Road (Bus Stop 6503) Batch 9 Routes 93, 151, 213, 613, 627, N213 Malden Road (Bus Stop 10839, LG59, 16719), Church Hill Road (Bus Stop R0286, LG01, 34197), Priory Road (Bus 22.000 ------Stop 29979), Cheam Common Road (Bus Stop 16721, 585), Central Road (Bus Stop 26959)

Batch 10 Routes 455, 463, 151, 410, 612 Marlow Way (Bus Stop BP067), 22.000 ------Beddington Lane (Bus Stop BP1716, BP2119, BP1717, BP2117, BP3541, BP2120, BP2118)

Batch 11 Routes 151, 213, 613, 627, X26, N213, 470 The Broadway (Bus Stop 16716), Malden Road (Bus Stop 25077, 16720 16717), Kingsway 22.000 ------Road (Bus Stop BP3676), Station Way (Bus Stop BP3677)

Batch 12 Routes 151, 410, 463, 612, 627, S4 London Road (Bus Stop 17358, 17356, 17355, 17354, 7.500 ------13760), Manor Road (Bus Stop 17352, 17353, 33895, 589), Railway Approach (Bus Stop 36654, 36653, 36652)

Batch 13 Routes 127, 463, 612, 627, S4, 410, 455, 157, 154, N213 Woodcote Road (Bus Stop 16617, 16615, 16624, 16623, 4.000 ------16620, 16616, 16616, 16619, 16618), Shotfield Road (Bus Stop 35996), Stanley Park Road (Bus Stop 6497)

Batch 14 Routes, 140, 420, 820, S1, 613, 470, 962, S3, S4 1.500 ------High Street (Bus Stop 3733, 29910), Collingwood Road (Bus Stop 18541)

Batch 15 Route 463 The Mount (Bus Stop BP813, BP2500), 14.000 ------Banstead Road (Bus Stop BP 625, BP626)

Create register for Bus Stop Clearways and times of 10.000 - - 10.000 - - All operation

BSA - £k 205.000 - - 74.000 - - -

Bus Priority BP Woodcote Road/ Wallington - Northbound bus stop lay-by 40.000 - - 40.000 - - B&W and new loading bay Central Road/Cheam Common Road. Convert lay-by fully into bus stop with bus stop clearway marking and red 15.000 - - 15.000 - - CNWP surfacing. Station Approach, Wallington - Relocation of bus stop in 40.000 - - 40.000 - - B&W connection with the Station Access scheme

5 10 Agenda Item 11 Page 36

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area Marlowe Way. Review signal timing and layout at the junction to improve the junction capacity. Review 40.000 8.000 - 40.000 8.000 - B&W circulation within ASDA car park. Review and amend waiting and loading provisions on Marlowe Way. Downs Road / Cotswold Road - Review junction layout 25.000 - - 25.000 - - Sut.Sth Kimpton Road - Install bus gate on Kimpton Road and install new bus stop in TESCO car park (subject to S3 40.000 - - 45.000 - - CNWP route change to serve Kimpton). Angel Hill / High Street - Review signal timings 12.000 - - 12.000 - - Sut. Cheam Common Road - Bus lane to facilitate all bus 70.000 ------routes Ringstead Road/Westmead Road. Review parking layout on Ringstead Road and Westmead Road and introduce waiting and loading restrictions. Renew bus cage markings 25.000 - - 20.000 - - C&C on both sides of Ringstead Road, near junction with Westmead Road. Review parking layout adjacent to Zebra Crossing. R166 - Two new bus stops - Area 25.000 - - 25.000 - - C&C Colston Avenue - Revise parking restrictions and review 40.000 5.000 - - - - - pinch points.

Rose Hill - Extend existing bus lane 30.000 5.000 - - - - - Central Road, Worcester Park - New Bus stops or bus 15.000 15.000 - - - - - lane - Feasibility Study

R 280 - Improve journey time - Study 5.000 ------

Park Hill - Revise parking restrictions 15.000 ------

Stanley Park Road - Revise parking restrictions 10.000 ------

Orchard Hill - New bus access & bus stops. 5.000 5.000 - - 5.000 - - Woodcote Road - Separate loading facility from 10.000 ------southbound bus stop

Hackbridge area - New bus infrastructure - Study 5.000 10.000 - - 10.000 - -

Routes S4 and 127 - Review signal timings 45.000 ------

Peterborough Road - Revise parking restrictions 10.000 ------

Erskine Road - Revise parking restrictions and review 10.000 ------pinch points. Cavendish Road - Reduce height of ramp to avoid 30.000 - - 10.000 - - Sut.Sth. grounding

Marshall's Road bus stop - Relocation of Route S4 stop. 10.000 ------

Dibdin Road - Revise parking restrictions 10.000 ------

Wrythe Lane - Revise parking restrictions 10.000 5.000 - - 5.000 - -

Duke of Edinburgh Road - Revise parking restrictions 8.000 ------

Witby Road - Revise parking restrictions 8.000 ------

Stanley Road - Revise parking restrictions 10.000 ------Cambridge Road/ Carshalton Road - Revise parking 8.000 ------restrictions Bishopsford Road - Bus lanes. 50.000 25.000 - - - - -

Route 213 - Scoping study 5.000 ------

Route 151 - Scoping study 5.000 ------

Borough Admin Fee 15.000 - - 15.000 - - -

BP - £k 701.000 78.000 - 287.000 28.000 - -

School Travel Plans STP

6 10 Page 37 Agenda Item 11

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area Transition Packs - advice to parents , pupils and teachers to promote sustainable travel to school from primary to 90.000 - - 70.000 - - All secondary school School Travel Advisor (2 posts) 67.000 - - 67.000 - - All

School Sustainable Small Grant Scheme 40.000 - - 40.000 - - All

WOW - Walk to school Once a Week 40.000 - - 40.000 - - All

Teacher supply cover 14.000 - - 14.000 - - All

Theatre in Education 24.000 - - 20.000 - - All

STP link with Eco/sustainable schools 25.000 - - 5.000 - - All

Helen Young - STP Ambassador 6.000 ------

Review and rewrite seminars 5.000 - - 5.000 - - All

Marketing and promotion 6.000 - - 6.000 - - All

Increasing levels of cycling in schools 12.000 12.000 12.000 3.000 - - All

Family Cycle training to promote active travel in families 15.000 - - 5.000 - - All

WOW - Big WoW promotion 2.000 - - 2.000 - - All

Schools car free day event 2.000 - - 2.000 - - All Journeys to school schools' photo competition, exhibition 2.000 - - 2.000 - - All & reception Walk To School Week promotion 4.000 - - 4.000 - - All Bandon Hill Primary: General Traffic Calming investigations. Entry treatment Wordsworth Road/Sandy 5.000 6.000 - 5.000 - - B&W Lane South.

11.000 14.000 - 11.000 - - B&W Beddington Infants: General Traffic Calming & Environmental Improvement investigations and proposals Foresters Primary: General Traffic Calming measures - feasibility, design & consultation. Entry treatments at Shaw 15.000 19.000 - - - - - Way & Hermes Way with Redford Avenue.

High View Primary: Feasibility studies into Traffic Calming 13.000 15.000 - 13.000 - - B&W measures

Holy Trinity: Feasibility studies to improving local crossing 3.000 3.000 - 3.000 - - B&W facilities St Elphege`s Infants & Juniors: General Traffic Calming 4.000 6.000 - 4.000 - - B&W measures - feasibility, design & consultation. Amy Johnson Primary: General Traffic Calming measures - 8.000 6.000 - 8.000 - - B&W feasibility, design & consultation. St. Mary's RC - Raised zebra crossing in Shorts Road, 65.000 - - 35.000 - - C&C additional crossing island, footway widening, etc.

Sherwood Park: Zebra Crosssing in Streeters Lane, guard 60.000 ------railing, etc.

20.000 ------The John Fisher School - Street lighting improvements

St. Dunstans, Cheam - Raised table and crossing in Anne 55.000 ------Boleyn's Walk, etc.

15.000 ------Abbey Primary - Improve street lighting

Carshalton High School for Girls - Relocate school entrance, raise Pelican crossing on a flat topped table, 25.000 ------widen footway, extend 20 mph limit, etc.

Sutton Grammar School - Improve street lighting and 15.000 ------footways

All Saints, - Pinch points, entry treatment, extend 60.000 ------zig-zag & 20 mph limit, improve street lighting etc.

Cheam Fields Primary - Pelican crossing on raised table to 40.000 ------replace Zebra in Malden Road.

7 10 Agenda Item 11 Page 38

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area Robin Hood Infants and Junior School: General Traffic Calming measures - feasibility, design and consultation. 45.000 62.000 - - - - - Implementation 2010/11. Carew Manor: General Environmental Improvements - 20.000 24.000 - 20.000 - - - feasibility, design & consultation. STP - £k 833.000 167.000 12.000 384.000 - - -

Workplace Travel Plans WTP

Workplace Travel Plan incentives 10.000 ------

Business Travel Networks 60.000 - - 60.000 - - All

Sutton Chamber of Commerce Partnership 25.000 - - 15.000 - - All

Increasing levels of cycling to workplaces 12.000 12.000 12.000 5.000 - - All

WTP - £k 107.000 12.000 12.000 80.000 - - -

Travel Awareness TA Hackbridge sustainable project - community workshops, 50.000 ------promotional events

Travel awareness events and activities 40.000 ------

Safer Sutton Partnership/Smartwater marking 30.000 ------

STS website development and maintenance 30.000 ------

Mobile Travel Information Unit 30.000 ------

Promotion of area based schemes 20.000 ------Recruitment and training of community champions to offer 10.000 ------PTP service

Sutton Leisure and Active Lifestyles Map 6.000 ------

TA - Amount of Funding Bid £k 216.000 ------

Regeneration RP

Beddington Industrial Area 500.000 2,000.000 2,000.000 200.000 150.000 B&W

RP - £k 500.000 2,000.000 2,000.000 200.000 150.000 - -

Environment ENV

Air Text - Air Pollution alerts 40.000 ------

Vehicle Emission Testing using Remote Sensing 20.000 ------Equipment - Accusan

12 Months Air Quality Monitoring 37.000 - - 30.000 - - All

Boroughwide Traffic Monitoring/29 sites measuring 40.000 ------vehicles/cycles/pedestrians Walkit - Commission Borough Coverage on best and least 10.000 - - 10.000 - - All polluted route between two points on foot.

Climate Change Ambassadors Workshop 12.000 13.000 14.000 - - - -

Carbon Experience 30.000 5.000 - 20.000 - - All

ENV - £k 189.000 18.000 14.000 60.000 - - -

Controlled Parking Zones PC Worcester Park - (Sutton side of the station) Produce initial designs and publicly consult on proposals to implement controlled parking on road up to the borough boundary. Kingston side mostly unaffected by commuter parking, as 27.000 38.000 - 15.000 15.000 - CNWP there are waiting restriction already in place and many of the properties have their own off-street parking.

8 10 Page 39 Agenda Item 11

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area

Belmont Village (road off from the railway station) - Produce initial designs and publicly consult on proposals to implement controlled parking. Commuter parking 15.000 30.000 - 15.000 15.000 - Sut.Sth. causing extreme parking difficulties in neighbourhood and affecting local shops.

Carshalton Beaches - (Roads around the railway station) - Produce initial designs and publicly consult in roads 15.000 20.000 - 15.000 15.000 - C&C close to the station on proposals to implement controlled parking.

Carshalton & Hackbridge Review newly implemented CPZ 6.000 10.000 - - - - -

Parking & loading review on A roads, town centres and busy bus routes - with an aim to maintain traffic 15.000 45.000 40.000 - - - - movement by providing better placed loading and disabled parking.

PC - £k 78.000 143.000 40.000 45.000 45.000 - -

Local Area Accessibility AS

Outline Work Programme 40.000 40.000 40.000 65.000 40.000 - All Central Rd. & Worcester Park - Investigate removal of 20.000 ------guard railing and de-cluttering - Study

AS - £k 60.000 40.000 40.000 65.000 40.000 - -

Freight (Bid through Freight Quality Partnership) FS

Review Lorry Ban Signage 30.000 ------

Sutton Town Centre: Freight and Deliveries Review 50.000 ------

FS - £k 80.000 ------

Parallel Initiatives PI A237 Manor Road - Woodcote Road, Wallington. Corridor 30.000 ------study PI - £k 30.000 ------

Town Centres TC

Sutton Town Centre 1,500.000 100.000 100.000 670.000 600.000 400.000 Sut.

TC - £k 1,500.000 100.000 100.000 670.000 600.000 400.000 -

Community Transport CT Improve Passenger safety in Taxis and Private Hire 35.000 ------Vehicles Driver Training 10.000 ------

CT - £k 45.000 ------

SWELTRAC (Bid through Lead Borough)

Kimpton Industrial Estate (Physical Measures) 100.000 - - 80.000 - - CNWP

Kimpton Industrial Estate (Signage) 15.000 ------

Wallington Town Centre 250.000 ------

SWELTRAC - £k 365.000 - - 80.000 - - -

Local Transport Funding LTF

Local Transport Funding 100.000 All

LTF £k - - - 100.000 - - -

TOTAL 10181.000 5594.000 4061.000 5355.000 1578.000 425.000 0.000 Key: St.H = St.Helier, The Wrythe & Wandle Valley Local Sut.Sth = Sutton South, Cheam and Belmont Committee Local Committee

9 10 Agenda Item 11 Page 40

Commitment Bid (£k) Bid (£k) Bid (£k) Allocation Committee (£k) Scheme Name 2009/10 2010/11 2011/12 2009/2010 2010/11 2011/12 Area CNWP = Cheam North and Worcester Park B&W = Beddington and Wallington Local Committee Local Committee C&C = Carshalton and Clockhouse Local Committee Sut = Sutton Local Committee

10 10 SHTWWV LC - 2008/09 Draft Work Programme

Date and Venue Core Business Responsible Info (I) or (To include public realm timeline) Officer Decision (D)

Tues 7 April – 7pm SNT St Helier parking – update following extra parking provision at I/D Suton.Arena Muschamp Halesowen Rd kerbs – update on financial position Foran Forghani I/D Primary School Neighbourhood Recycling Centres - feedback Provisional Planned Highways Maintenance Martin French I Green Wrythe Scheme (incl West St ) Paul Tugwell Area Improvements – full report back Rick Martinez Hackbridge Eco Suburb – Update Katherine Hudson I Older Persons Strategy (doesn’t have to come at all) Darren Stevens Camera for Tweeddale rd – cars going wrong way up one-way SSP Take Part Take Pride Suzy Humphries/ Page 41 Communications Team Assembly Walk – parking enforcement June ASB issues on bridge over A217 Chair email 20/1/09

Further updates to come from Pat Berlin re Waterloo Cottages

Agenda Item14

Updated 29 January 2009 Page 42

This page is intentionally left blank