Project Components
Total Page:16
File Type:pdf, Size:1020Kb
AMRUT-CONTRUCTION OF 12MLD STP AT KUREEPUZHA, KOLLAM Name of work This project aims to address the sewage management issues in 10 wards of kollam corporation (Thevally , Vadakkumbhagham , Ashramam , Kadappakada , Contonment , Thamarakulam , Description Pallithottam , Port , Kachery , Thangassery ) with total Total coverage of 68003 based on Moving Bed Bio Reactor( MBBR) Technology with provision for septage handling for co- treatment with sewage and Recycling System for the treated Water including Operation & Maintenance for 10 years at Kureepuzha in Kollam corporation Administrative Go(Rt)No.LSGD -516/2018LSGD dated 22.8.2018. Sanction AS Amount(Rs) 30 Crores Revised AS G.O.No.1169/2020/LSGD dated 17.06.2020 Revised AS 319188678/- (31.91 CRORE) Amount(Rs) Technical ORDER No. TS/2018-2019/2018/9433 dated 13.9.2018 Sanction TS Amount(Rs) 29.86Crore. Tender E Tender No: 28/2018 -18 /SE/Q Dt 28.1.2019 : extended to 08.02.2019 Work Order KWA/PHC/Q/D1/1867/2018 dated 27.04.2020 Agreement No. No.11/2020-21/SE/Q dated 28.10.2020 APAC 25.96 Crore Name of M/s Hydro tech Paryavaran(India) Pvt. Ltd. JV with M/s ABM Civil ventures pvt ltd. P- Contractor 31.Indl area Phase –viii, SAS Nagar,Mohali-160071. Site hand over date 04.11.2020 Duration of Project 12months Scheduled date 27.10.2021 of Completion Expected Date 03.11.2021 of Completion Total Bill Nil Submitted (Rs) Total Bill Paid Nil (Rs) Project Components DAILY WORK PROGRESS Date Works Remarks 11.01.2021 Structural Design work in progress 10.1.2021 Structural Design work in progress 09.1.2021 Structural Design work in progress 08.1.2021 Tree committee meeting conducted and forest officials demanded corporation authorities to demarcate the trees and after verification valuation may be given. Mayor directed to do the same urgently. 07.1.2021 Structural Design work in progress 06.1.2021 Design for compound wall approved and directed to start the work immediately, Layout and HFD submitted to WASCON for approval 05.1.2021 Layout design with corrected HFD submitted for verification , Meeting held at Corporation regarding the progress and issues and Mayor directed to take immediate action to demarcate the school side and then proceed with compound wall works 04.1.2021 Design works in progress and a meeting is scheduled with Hon. Mayor kollam on 5.01.2020 03.01.2021 Design works in progress 02.01.2021 Design works in progress 01.01.2021 Design works in progress 31.12.2020 Design works in progress 30.12.2020 Design works in progress 29.12.2020 Design works in progress 28.12.2020 Design works in progress & social forestry officers visited the site for valuation of trees 27.12.2020 Design works in progress 26.12.2020 Design works in progress 25.12.2020 Design works in progress 24.12.2020 Design works in progress 23.12.2020 Design works in progress 22.12.2020 Design works in progress 21.12.2020 Design works in progress 20.12.2020 Design works in progress 19.12.2020 Design works in progress & materials for temporary fencing reached at site 18.12.2020 Design works in progress 17.12.2020 Design works in progress 16.12.2020 Design works in progress 15.12.2020 Design works in progress 14.12.2020 Design works in progress 13.12.2020 Design works in progress 12.12.2020 Design works in progress 11.12.2020 Design works in progress 10.12.2020 Design works in progress 09.12.2020 Design works in progress 08.12.2020 Design works in progress 07.12.2020 Design works in progress 06.12.2020 Design works in progress 05.12.2020 Design works in progress 04.12.2020 Design works in progress 03.12.2020 Design works in progress & for compound wall design was asked to revise as per NIT. 02.12.2020 Design works in progress & compound wall design submitted 01.12.2020 Design works in progress 30.11.2020 Design works in progress 29.11.2020 Design works in progress 28.11.2020 Work Schedule submitted by the contractor 27.11.2020 Design works in progress 26.11.2020 Design works in progress 25.11.2020 Design works in progress 24.11.2020 Design works in progress as per soil Investigation conducted 23.11.2020 Meeting with SE, PHC, Kollam with contractor & directed to speed up the work and for submitting work schedule & design urgently 22.11.2020 Soil Investigation report in preparation 21.11.2020 Soil Investigation report in preparation 20.11.2020 Soil Investigation report in preparation 19.11.2020 Soil investigation completed 18.11.2020 Soil investigation in progress Soil investigation in progress 17.11.20 16.11.20 Soil investigation in progress 15.11.20 Soil investigation in progress 14.11.20 Soil investigation in progress Soil investigation in progress 13.11.20 12.11.20 Soil investigation in progress Soil investigation in progress 11.11.20 Survey for fixing positions as per tentative layout of each 10.11.20 components Positions for soil investigation to be conducted is identified 09.11.20 Boundary and tentative layout drawing preparation in progress 08.11.20 07.11.20 Boundary and tentative layout drawing preparation in progress Boundary and tentative layout drawing preparation in progress 06.11.20 5.11.20 Survey completed and foundation stones laid Site handed over to the contractor , Survey work started 4.11.20 .