HEC 24 Highway Stormwater Pump Station Design

Total Page:16

File Type:pdf, Size:1020Kb

HEC 24 Highway Stormwater Pump Station Design Publication No. FHWA-NHI-01-007 February 2001 U.S. Department of Transportation Federal Highway Administration Hydraulic Engineering Circular No. 24 HIGHWAY STORMWATER PUMP STATION DESIGN Technical Report Documentation Page 1. Report No. 2. Governmental Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle 5. Report Date Highway Stormwater Pump Station Design February 2001 Hydraulic Engineering Circular 24 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Peter N. Smith 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Parsons Brinckerhoff 11. Contract or Grant No. Barton Oaks Plaza Two 901 Mopac Expressway South, Suite 595 DTFH61-97-C-00033 Austin, TX 78746 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Federal Highway Administration Final Report Office of Bridge Technology Applications, HIBT-20 14. Sponsoring Agency Code 400 Seventh Street, SW., Room 3203 Washington, D.C. 20590 15. Supplementary Notes FHWA COTR: Arlo Waddoups (Ayres Associates) formerly of FHWA Technical Assistance: Philip Thompson, Johnny Morris (Ayres Associates), Dan Ghere (Illinois DOT), 16. Abstract This circular provides a comprehensive and practical guide for the design of stormwater pump station systems associated with transportation facilities. Guidance is provided for the planning and design of pump stations which collect, convey, and discharge stormwater flowing within and along the right-of-way of transportation systems. Methods and procedures are given for determining cumulative inflow, system storage needs, pump configuration and selection, discharge system size, and sump dimensions. Pump house features are identified and construction and maintenance considerations are addressed. Additionally, considerations for retrofitting existing storm water pump stations are presented. 17. Key Words 18. Distribution Statement Pump Station, Pumps, Storm Drain, This document is available to the public from Stormwater Management, Hydraulic, National Technical Information Service, Hydraulic Engineering Circular, HEC, Springfield, Virginia 22151 Highway Hydraulic Design 19. Security Classif. (of this report) 20. Security Classif. (of this page) 21. No. of Pages 22. Price Unclassified Unclassified 218 Form DOT F 1700.7 (8-72)Reproduction of completed page authorized This page intentionally left blank. Table of Contents 1. INTRODUCTION 1-1 1.1 Need For Stormwater Pump Stations 1-1 1.2 Intent of Manual 1-1 1.3 Organization of Manual 1-1 1.4 Unit Convention 1-1 1.4.1 SI versus Metric 1-1 1.4.2 Caution on Unit Usage 1-1 2. PUMP STATION COMPONENTS 2-1 2.1 Introduction 2-1 2.2 Collection System 2-1 2.3 Storage Unit 2-1 2.4 Wells 2-2 2.5 Pumps 2-2 2.6 Pump Controls 2-2 2.7 Pump Drivers 2-2 2.8 Station Housing 2-2 2.9 Sump Pump 2-3 2.10 Power Supply 2-3 2.11 Security and Access Features 2-3 2.11.1 Security 2-3 2.11.2 Access 2-4 2.12 Other Features 2-4 2.12.1 Hoists 2-4 2.12.2 Trash Racks 2-4 3. PUMPS AND PUMP STATION TYPES 3-1 3.1 Introduction 3-1 3.2 Classification of Pumps 3-1 3.2.1 Dynamic Pumps 3-1 3.2.2 Positive Displacement Pumps 3-1 3.3 Impeller Types 3-1 3.3.1 Axial-Flow Pumps 3-2 3.3.2 Radial-Flow Pumps 3-2 3.3.3 Mixed-Flow Pumps 3-2 3.3.4 Propeller versus Impeller 3-3 3.3.5 Comparison of Impeller Types 3-3 3.4 Pumps For Stormwater Use 3-3 3.4.1 Submersible Pumps 3-3 3.4.2 Vertical Shaft Pumps 3-4 3.4.3 Horizontal Pumps 3-6 3.5 Wet-Pit Stations 3-7 3.5.1 Vertical Pumps in Rectangular Wells 3-7 i 3.5.2 Vertical Pumps in Circular Wells 3-12 3.5.3 Submersible Pumps in Rectangular Wells 3-13 3.5.4 Submersible Pumps in Circular Wells 3-15 3.6 Dry-Pit Stations 3-18 3.6.1 Dry Well 3-18 3.6.2 Wet Well for Dry-Pit Station 3-19 3.6.3 Storage Unit 3-19 3.7 Comparison of Pit Types 3-19 3.7.1 Dry-Pit Station 3-19 3.7.2 Wet-Pit Station 3-20 3.8 Station Type Selection 3-20 3.9 Debris and Sediment Handling 3-20 4. PUMP STATION DESIGN PROCESS 4-1 4.1 Introduction 4-1 4.2 Overview of Pump System Hydraulic operation 4-1 4.3 Pump System Design Objectives 4-2 4.4 Pump Station Design Process Flowchart 4-2 4.5 Planning Phase 4-5 4.5.1 General Planning Considerations 4-5 4.5.2 Level of Effort for Planning 4-5 4.6 Schematic Development Phase 4-6 4.6.1 Data Collection 4-6 4.6.2 Evaluation of General Facility Design Criteria and Constraints 4-6 4.6.3 Evaluation of Alignment Alternatives and Value Engineering 4-7 4.6.4 Roadway Profile Guidelines 4-8 4.7 Design Phase 4-8 4.8 Development of Plans, Specifications and Estimates 4-12 4.8.1 Layouts and Details 4-12 4.8.2 Specifications, Provisions and General Notes 4-12 4.8.3 Design Review 4-12 4.9 Construction and Testing 4-13 4.10 Operation and Maintenance Phase 4-13 4.11 Retrofitting Stage 4-13 5. SITE PLANNING AND HYDROLOGY 5-1 5.1 Introduction 5-1 5.2 Considerations for Site Planning 5-1 5.2.1 Drainage Area 5-1 5.2.2 Proximity 5-2 5.2.3 Site Access 5-3 5.2.4 Power Sources 5-5 5.2.5 Storage 5-5 5.2.6 Environmental Quality 5-5 5.2.7 Safety 5-6 5.2.8 Security 5-7 5.2.9 Utilities 5-7 ii 5.2.10 Soil Investigations 5-7 5.3 Hydrologic Considerations and Criteria 5-7 5.3.1 Premise for Design 5-7 5.3.2 Design Frequency 5-8 5.3.3 Check Frequency 5-8 5.4 Design Hydrograph 5-8 5.4.1 Hydrologic Methods 5-9 5.5 Procedure to Determine Mass Inflow 5-10 6. STORAGE SYSTEM 6-1 6.1 Introduction 6-1 6.2 Storage Components 6-1 6.3 Storage Concepts 6-1 6.3.1 Storage Potential 6-1 6.3.2 Storage Design Philosophies 6-2 6.3.3 Available Storage 6-3 6.3.4 Procedure to Estimate Total Available Storage Required 6-3 6.4 Collection System 6-4 6.4.1 Procedure to Establish Collection System 6-5 6.5 Maximum Highwater Elevation 6-5 6.5.1 Roadway Low Point 6-5 6.5.2 Hydraulic Grade Line 6-5 6.5.3 Procedure to Determine Allowable Highwater in Wet Well 6-6 6.6 Wet Well System 6-6 6.6.1 Procedure to Select Preliminary Wet Well Dimensions 6-7 6.7 Storage Unit 6-7 6.8 Storage Calculations 6-8 6.8.1 Sloping Conduit 6-9 6.8.2 Example of Storage in a Sloping Pipe 6-10 6.8.3 Procedure to Establish Storage Unit Dimensions 6-11 6.8.4 Procedure to Develop Stage-Storage Curve 6-12 7. PUMP CONFIGURATION AND MASS CURVE ROUTING 7-1 7.1 Introduction 7-1 7.2 Criteria and Considerations for Pump Configurations 7-1 7.2.1 Number of Pumps 7-1 7.2.2 Size of Pumps 7-1 7.2.3 Pump Sequencing 7-1 7.2.4 Pump Switching Elevations 7-2 7.2.5 Procedure to Estimate Capacity and Number of Pumps 7-3 7.2.6 Pump Cycling 7-4 7.2.7 Allowable Minimum Cycling Time 7-4 7.2.8 Usable Storage 7-5 7.2.9 Pump Cycling Time 7-5 7.2.10 Usable Storage Calculations 7-9 7.2.11 Procedure to Determine Trial Switching 7-12 7.3 Mass Curve Routing 7-15 iii 7.3.1 Procedure to Perform Mass Curve Routing 7-16 7.3.2 Procedure to Check Routing Mass Curve 7-17 8. DISCHARGE LINE AND PUMP SELECTION 8-1 8.1 Discharge Line Components 8-1 8.1.1 Basic Line 8-1 8.1.2 Manifold System 8-1 8.1.3 Design Size 8-1 8.1.4 Procedure to Determine Discharge Pipe Size 8-2 8.1.5 Pump Discharge Pipe Material and Configuration Guidelines 8-2 8.1.6 Appurtenances 8-4 8.1.7 Preventing Reverse Flow 8-6 8.1.8 Hydraulic Transients 8-6 8.1.9 Accessories 8-6 8.1.10 Valves 8-6 8.1.11 Flap Gates and Flap Valves 8-8 8.1.12 Outfall 8-10 8.1.13 Friction Loss Equations 8-11 8.1.14 Appurtenance Energy Losses 8-13 8.2 Total Dynamic Head and System Curve 8-15 8.2.1 Total Dynamic Head 8-15 8.2.2 System Head Curve 8-16 8.2.3 Procedure to Determine System Curves 8-17 8.3 Pump Characteristics 8-21 8.3.1 Cavitation 8-21 8.3.2 Vortexing 8-21 8.3.3 Net Positive Suction Head Required 8-22 8.3.4 Net Positive Suction Head Available 8-22 8.3.5 Net Positive Suction Head Margin 8-23 8.3.6 Submergence 8-24 8.3.7 Specific Speed 8-24 8.3.8 Suction Specific Speed 8-24 8.3.9 Selection of Impeller Type 8-25 8.3.10 Pump Performance 8-25 8.3.11 Design Point and Operation Range 8-27 8.3.12 Example of Pump Selection 8-29 8.3.13 Procedure to Select Manufacturer’s Pumps and Discharge Piping 8-29 8.3.14 Pump Bell/Intake Diameter 8-32 8.3.15 Power and Efficiency 8-32 9.
Recommended publications
  • A Model-Based Assessment of Infiltration and Inflow in the Scope of Controlling Separate Sanitary Overflows at Pumping Stations Olivier Raynaud, C
    A model-based assessment of infiltration and inflow in the scope of controlling separate sanitary overflows at pumping stations Olivier Raynaud, C. Joannis, Franck Schoefs, F. Billard To cite this version: Olivier Raynaud, C. Joannis, Franck Schoefs, F. Billard. A model-based assessment of infiltration and inflow in the scope of controlling separate sanitary overflows at pumping stations. 11thInter- national Conference on Urban Drainage (ICUD 08), 2008, Edinburgh (Sotland), United Kingdom. hal-01007760 HAL Id: hal-01007760 https://hal.archives-ouvertes.fr/hal-01007760 Submitted on 18 Nov 2017 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. A model-based assessment of infiltration and inflow in the scope of controlling separate sanitary overflows at pumping stations O. Raynaud1, C. Joannis1, F. Schoefs2, F. Billard3 1Laboratoire Central des Ponts et Chaussées, Route de Bouaye, B.P 4129, 44 341 Bouguenais Cedex, France 2Institut de Recherche en Génie Civil et Mécanique (Gém), Nantes, France 3Nantes Métropole, Direction de l’assainissement, Nantes, France ABSTRACT Infiltration & Inflow (I&I) are a major cause for separate sanitary sewers overflows (SSOs). A proper planning of actions for controlling SSOs needs a precise quantification of these events, as well as an identification of the respective contributions of infiltration into sewer and inappropriate connection of runoff water to sanitary sewers.
    [Show full text]
  • Map Plan and Report for Proposed Sewer District
    MAP, PLAN AND REPORT SEWER DISTRICT FORMATION SCHOHARIE BUSINESS PARK TOWN OF SCHOHARIE, NEW YORK MARCH 11, 2020 197 ELM STREET PO BOX 610 COBLESKILL, NEW YORK 12043 TABLE OF CONTENTS 1 Introduction 1 2 Wastewater System History 1 3 Existing Conditions 1 4 Evaluation of Facilities 5 5 Proposed Sewer District Options 7 6 Conclusion and Recommendations 8 APPENDICES A Schoharie Business Park Mapping B NYSDEC Correspondence C Existing Sewer System Schematic D Water Production Data E Existing SPDES Permit F Mapping of Sewer District Options G Proposed Improvements H User Cost Calculations I Proposed Sewer District Map and Description Page 1 1 INTRODUCTION The Schoharie Business Park (SBP) consists of 13 tax parcels as indicated on the mapping in Appendix A. The Business Park is currently served by private water and sewer systems and a private road network. Recently, NYSDEC has urged the Town to consider forming a Sewer District so that certain administrative and ownership issues related to the sewer system can be addressed. While the water system and the road network also have some technical issues that need attention, the scope of this Map, Plan and Report (MPR) only includes the Sewer System. 2 WASTEWATER SYSTEM HISTORY The wastewater system for the Schoharie Business Park was issued a discharge permit from NYSDEC in March of 2001. In 2002, Schoharie Park Sewage Works, Inc. was formed to operate the wastewater system under the NYS Transportation Corporation Law. In 2017, when many properties within the Schoharie Business Park were sold, Schoharie Park Sewage Works, Inc. was dissolved. This has left two options for the proper administration of the sewer system: 1) the current owner of the Schoharie Business Park (7 Summits, LLC) can form a new Transportation Corporation or 2) the Town of Schoharie can form a Sewer District.
    [Show full text]
  • Infiltration/Inflow Task Force Report
    INFILTRATION/INFLOW TASK FORCE REPORT A GUIDANCE DOCUMENT FOR MWRA MEMBER SEWER COMMUNITIES AND REGIONAL STAKEHOLDERS MARCH 2001 INFILTRATION/INFLOW TASK FORCE REPORT A GUIDANCE DOCUMENT FOR MWRA MEMBER SEWER COMMUNITIES AND REGIONAL STAKEHOLDERS MARCH 2001 Executive Summary This report is the product of the Infiltration/Inflow (I/I) Task Force. It has been developed through the cooperative efforts of the 43 Massachusetts Water Resources Authority (MWRA) member sewer communities, MWRA Advisory Board, The Wastewater Advisory Committee (WAC) to the MWRA, Charles River Watershed Association (CRWA), Fore River Watershed Association (FRWA), Mystic River Watershed Association (MRWA), Neponset River Watershed Association (NRWA), South Shore Chamber of Commerce (SSCC), Massachusetts Department of Environmental Protection (DEP), United States Environmental Protection Agency (EPA), and MWRA. The I/I Task Force recommends implementation of the regional I/I reduction goals and implementation strategies detailed in this report. The report outlines a regional I/I reduction plan with appropriate burdens and benefits for stakeholders. The report is intended to be a guidance document for use by local sewer communities, as well as other regional stakeholders, who may tailor appropriate aspects of the report recommendations to their unique situations. Severe storms in October 1996 and June 1998 led to the unusual circumstance of numerous sanitary sewer overflows (SSOs) from local and MWRA collection systems. In the aftermath of these events, EPA and DEP began an aggressive effort to make MWRA regulate flows from community sewer systems. MWRA recommended cooperative efforts by local collection system operators, as well as regulators and environmental advocates, would be more effective than a prescriptive, enforcement based approach.
    [Show full text]
  • Recommended Standards for Wastewater Facilities
    RECOMMENDED STANDARDS for WASTEWATER FACILITIES POLICIES FOR THE DESIGN, REVIEW, AND APPROVAL OF PLANS AND SPECIFICATIONS FOR WASTEWATER COLLECTION AND TREATMENT FACILITIES 2014 EDITION A REPORT OF THE WASTEWATER COMMITTEE OF THE GREAT LAKES - UPPER MISSISSIPPI RIVER BOARD OF STATE AND PROVINCIAL PUBLIC HEALTH AND ENVIRONMENTAL MANAGERS MEMBER STATES AND PROVINCE ILLINOIS NEW YORK INDIANA OHIO IOWA ONTARIO MICHIGAN PENNSYLVANIA MINNESOTA WISCONSIN MISSOURI PUBLISHED BY: Health Research, Inc., Health Education Services Division P.O. Box 7126 Albany, N.Y. 12224 Phone: (518) 439-7286 Visit Our Web Site http://www.healthresearch.org/store/ten-state-standards Copyright © 2014 by the Great Lakes - Upper Mississippi River Board of State and Provincial Public Health and Environmental Managers This document, or portions thereof, may be reproduced without permission if credit is given to the Board and to this publication as a source. ii TABLE OF CONTENTS CHAPTER PAGE FOREWORD ..................................................................................................................................... v 10 ENGINEERING REPORTS AND FACILITY PLANS 10. General ............................................................................................................................. 10-1 11. Engineering Report Or Facility Plan ................................................................................ 10-1 12. Pre-Design Meeting ....................................................................................................... 10-12
    [Show full text]
  • Design Standards for Stormwater Detention and Retention for Pima County
    Pima County Regional Flood Control District Design Standards for Stormwater Detention and Retention Supplement to Title 16, Chapter 16.48, Runoff Detention Systems Floodplain and Erosion Hazard Management Ordinance Pima County Regional Flood Control District 97 E. Congress St., 3rd Floor Tucson, AZ 85701-1791 (520) 724 -4600 June 2014 _________________ Design Standards for Stormwater Detention and Retention for Pima County REVISIONS Because of ongoing regulatory and technical changes in the fields of floodplain and stormwater management, revisions to this manual will be required from time to time. Such revisions will be approved by the Floodplain Administrator. Hard copy (printed) revisions will not be distributed. It is the holder’s responsibility to keep the document current by periodically checking the Regional Flood Control District’s web page for new digital versions. The revision history of the document is listed below. Chronology of Publication, Updates and Revisions Description Date First Edition June 2014 Chapter 6 Revised to Include Benefits of February 2015 Multiple-Use Basins I _________________ Design Standards for Stormwater Detention and Retention for Pima County TABLE OF CONTENTS No. Description Page No. 1. INTRODUCTION ................................................................................................. 1 1.1 Purpose ......................................................................................................................1 1.2 Ordinance Overview and Detention Requirements ..................................................2
    [Show full text]
  • Type of Waste Treated Wastewater Outfall Number 001 Outfall Location
    Expiration Date: November 30, 2015 Permit Number: 101694 File Number: 71832 Page 1 of 16 Pages NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM WASTE DISCHARGE PERMIT Department of Environmental Quality Western Region - Salem Office 750 Front Street NE, Suite 120, Salem, OR 97301-1039 Telephone: (503) 378-8240 Issued pursuant to ORS 468B.050 and The Federal Clean Water Act ISSUED TO: SOURCES COVERED BY THIS PERMIT: City of Powers Outfall Outfall PO Box 250 Type of Waste Number Location Powers, OR 97466 Treated Wastewater 001 R.M. 28.0 FACILITY TYPE AND LOCATION: RECEIVING STREAM INFORMATION: Trickling Filter - High Rate Basin: South Coast POWERS STP Sub-Basin: Coquille 285 E CEDAR ST POWERS Receiving Stream: South Fork Coquille River LLID: 1241417430803 28.0 D Treatment System Class: Level II County: COOS Collection System Class; Level I EPA REFERENCE NO: OR0026930 Issued in response to Application No. 968383 received October 5,2010. This permit is issued based on the land use findings in jhe permit record. •7 Steve Sclmurbusch Acting Water Quality Manager Western Region North PERMITTED ACTIVITIES Until this permit expires or is modified or revoked, the permittee is authorized to construct, install, modify, or operate a wastewater collection, treatment, control and disposal system and discharge to public waters adequately treated wastewaters only from the authorized discharge point or points established in Schedule A and only in conformance with all the requirements, limitations, and conditions set forth in the attached schedules as follows: Page Schedule A - Waste Discharge Limitations not to be Exceeded 2 Schedule B - Minimum Monitoring and Reporting Requirements....
    [Show full text]
  • Graham Park Sewage Pumping Station and Force Main Improvement Project
    Graham Park Sewage Pumping Station and Force Main Improvements Project Number: SPS112 Project Summary Project Commencement: Anticipated Start of Construction - Spring 2019 Project Description: Replacement of an existing antiquated Sewage Pumping Station (SPS) and force main (FM), and raise the SPS control building and equipment above the 100-year flood plain elevation. Scope of Work: This project will consist of installing a new submersible SPS with new controls, motors, emergency generator, by-pass connection on FM, and new flow metering equipment. The proposed pump control enclosure will be about 12’ in height and will be approximately 7’ by 13’ in size consisting of a faux-brick façade. The facility will be enclosed with an 8’ high chain-link fence with barbed-wire and locked for security. Additionally, the project will provide emergency backup supply and protect pump station facilities from storm surge flooding. Project benefits: The project will improve service reliability, safety conditions, and provide permanent back-up power. Project impact on residents/customers Noise associated with construction. Construction trucks accessing the SPS. Daily cleanup during construction to remove dust and dirt. Potential impact on traffic: Our standard roadway and traffic matters are outlined below. The Construction Contractor will be required to comply with Department of Environmental Quality (DEQ) Erosion and Sediment Control requirements to ensure all construction traffic does not track dirt on roads. The Service Authority will include in the construction contract a provision for fees to be assessed if the Construction Contractor does not comply with these requirements. Regular project updates to the impact of traffic will be listed on the website Graham Park Project.
    [Show full text]
  • Private Sewer Systems Defects and Overflows How Do Sewer System
    Private Sewer Systems Defects and Overflows Most sanitary sewer systems are constructed as a network of manholes and pipes that flow from each building that generates sewage to a wastewater treatment plant. Private services, also called laterals, are pipes from the building to the sewer main. In some areas, the public system owns and maintains the “lower lateral” from the sewer main to the edge of the easement or right-of-way, and the private property owner owns and maintains the “upper lateral” the remainder of the way to the building. In other areas, the private property owner owns and maintains both the lower and upper laterals. Finding and fixing sewer defects on private property sewer systems can prevent sewer overflows and backups that can cause health hazards, inhibit economic growth, and result in long-term environmental damage. How Do Sewer System Defects Cause Overflows? Private sanitary sewer systems, the earliest of which were built in the mid 1800s, carry domestic wastewater away from private properties separately from stormwater. These systems have deteriorated over the years, are typically not maintained or replaced due to funding, and their ability to transport sanitary wastewater has been compromised due to population growth. As a result, these systems can experience separate sanitary sewer overflows (SSOs) both on public and private property. SSOs are generally caused by infiltration that occurs when clean water such as groundwater enters the sanitary sewer through defects in the system or inflow from stormwater that enters the system through defects and illegal connections. SSOs can also be caused by inadequate pipe sizes when population growth exceeds the original design conditions.
    [Show full text]
  • Pump Station Design Guidelines – Second Edition
    Pump Station Design Guidelines – Second Edition Jensen Engineered Systems 825 Steneri Way Sparks, NV 89431 For design assistance call (855)468-5600 ©2012 Jensen Precast JensenEngineeredSystems.com TABLE OF CONTENTS INTRODUCTION ............................................................................................................................................................. 3 PURPOSE OF THIS GUIDE ........................................................................................................................................... 3 OVERVIEW OF A TYPICAL JES SUBMERSIBLE LIFT STATION ....................................................................................... 3 DESIGN PROCESS ....................................................................................................................................................... 3 BASIC PUMP SELECTION ............................................................................................................................................... 5 THE SYSTEM CURVE ................................................................................................................................................... 5 STATIC LOSSES....................................................................................................................................................... 5 FRICTION LOSSES .................................................................................................................................................. 6 TOTAL DYNAMIC HEAD ........................................................................................................................................
    [Show full text]
  • Actions for Flood Resilient Homes: Sewage Ejector Pump
    Actions for Flood Resilient Homes: Sewage Ejector Pump What is a sewage ejector pump? Who needs a Sewage Ejector Pump? A sewage ejector pump is used when plumbing fixtures You’ll need an ejector pump if you have plumbing fixtures at a in your home are located below the main sewer line (e.g., lower level than the municipal sewer line. basement bathrooms or laundry rooms). It is designed to A permit is/is not required elevate wastewater so it can move up and out of your home to the sewer. Before flood action During flood action After flood action How does a sewage ejector pump Other considerations work? • A standard ejector pump kit with a ½- to ¾-horsepower A sewage ejector pump is required when a motor and a 30- or 40-gallon tank is normally big enough for an home’s wastewater discharge pipe is elevated average residential installation. above plumbing fixtures. The advantage • You may opt to install a backup pump to guard against failure. of having an elevated discharge pipe is that You can also consider buying a pump that sounds an alarm sewage in the city sanitary pipes is less likely to when the pump fails. flow into the home by gravity. This approach is similar to the use of a backflow prevention • Ejector pumps generally last several years if well maintained. valve. You should schedule a plumber for annual service (cleaning the pump, oiling the motor, inspecting the float and condition of the Like a sump pump, an ejector pump sits in pump, removing debris lodged in the tank).
    [Show full text]
  • Sanitary Sewer Overflow Corrective Action Plan/Engineering Report
    FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN ENGINEERING REPORT 408 College Street, West Fayetteville, TN 37334 (931)433-1522 CONSOLIDATED TECHNOLOGIES, INC. Engineers in Water and Earth Sciences Nashville, Tennessee TABLE OF CONTENTS Page 1 INTRODUCTION 1.1 Background and Purpose Scope 2 EXISTING SEWER SYSTEM 2.1 Gravity Sewers 2.2 Pumping Stations 2.2 Wastewater Treatment Plant 2.3 3 EXISTING WASTEWATER TREATMENT PLANT 3.1 Plant Design Data 3.2 Influent Pump Station 3.2 Headworks 3.2 Aeration Basins 3.3 Secondary Clarifiers 3.3 Return Sludge Pump Station 3.3 Disinfection Facilities 3.4 Sludge Digestion and Holding Facilities 3.4 Sludge Disposal Site 3.4 Drying Beds 3.5 Staff 3.5 Operating Review 3.5 4 PREVIOUS SEWER SYSTEM OVERFLOWS (SSO’s) 4.1 Existing Problems 4.2 5 EXISTING AND FUTURE SEWER FLOWS 5.1 Flow Measurement Data 5.2 Projection of Future Flows 5.4 6 PLAN FOR I/I REDUCTION AND ELIMINATION OF SSO’s 6.1 New Construction Sewer System Rehabilitation 7 RECOMMENDED CAPITAL IMPROVEMENTS 7.1 Projects Currently Under Design/Construction 7.2 Projects Planned for Construction 7.3 Project Schedule 7.6 Project Maps LIST OF TABLES 2.1 Pump Station Information 2.3 3.1 Discharge Monitoring Reports Summary 3.5 4.1 Overflows/Bypasses 4.2 5.1 Flow Monitoring Sites 5.2 TABLE OF CONTENTS (Continued) LIST OF TABLES (Continued) Page 5.2 Historical Sewer and Water Customers 5.4 5.3 Future Flow Projections 5.5 7.1 Project Schedule 7.6 Follows Page LIST OF FIGURES 2.1 General Map 2.2 3.1 Site
    [Show full text]
  • Hydraulics Manual Chapter 13 APPENDIX F – STORM DRAINAGE
    Storm Drainage 13-F-1 APPENDIX F STORM DRAINS 1.0 Introduction This appendix provides information for the planning and hydraulic design of storm drainage systems. The methodology is intended for those with an understanding of basic hydrologic and hydraulic concepts and principles. Hydrologic concepts were discussed in Chapter 7. Important hydraulic principles include flow classification, conservation of mass, conservation of momentum, and conservation of energy. These elements were introduced in Chapter 8. Guidance on procedures to evaluate energy losses associated with storm drain systems is provided in Appendix G. A storm drain is that portion of the highway drainage system which receives surface water through inlets and conveys the water through a network of pipes to an outfall (see figure below). It is composed of different lengths and sizes of pipe connected by appurtenant structures. A section of pipe connecting one inlet or appurtenant structure to another is termed a "segment" or "run". Appurtenant structures include inlet structures (excluding the actual inlet opening), access holes, junction chambers, and other miscellaneous structures. LEFT BRANCH 4 RIGHT BRANCH 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 1 3 1 1 1 2 2 1 1. Lateral storm drain 5 2. Submain storm drain 3. Main or trunk storm drain 5 4. Intercepting storm drain 5. Outfall storm drain Manhole CREEK Typical Closed Conduit Storm Drain System Storm drain system design begins after inlet capacity and spacing (Appendix D) have been determined. Then, on a drainage system map, the connecting pipes, access holes, direction of flow, outfall location, existing drainage features and any necessary horizontal/vertical adjustments to avoid existing utilities would be documented.
    [Show full text]