Local Highways Maintenance Block
Total Page:16
File Type:pdf, Size:1020Kb
Local Highways Maintenance Block - Appendix 2(a) Highway and Transport Integrated Transport Block - Appendix 2(b) Delivery Programme Status - Approved 2020/21 (Note: Greyed out schemes are reserve scheme within the programme. Delivery will be subject to in year funding availability) Location Scheme Details Programme Delivery Scheme Road Build Parish Locality CLC Road Name Details or Extent Work Type Project Manager Status No Class Year Footway Surfacing & Drainage Works 03237 Aldingbourne ALDINGBOURNE Eastern Arun FOOTPATH 299 PROW - Surfacing Countryside Services 2020/21 Footpath links Westergate Street and Hook Lane Footway Surfacing & Drainage Works 03237 Aldingbourne ALDINGBOURNE Eastern Arun FOOTPATH 299 PROW - Surfacing Countryside Services 2020/21 Footpath links Westergate Street and Hook Lane Design refurbishment for Rose Green Drive / Nyetimber Lane signal Aldwick ALDWICK Western Arun ROSE GREEN DRIVE junction refurbishment C47 Design Traffic Signals 2020/21 Asset ID : 1514 943611 Aldwick ALDWICK Western Arun BOXGROVE GARDENS Pryors Lane to Fernhurst Gardens D64 Footway Microasphalt Infrastructure - Footway 2020/21 Turnpike Road Footway extension Town/Village Enhancement 60300059 Amberley AMBERLEY Chanctonbury TURNPIKE ROAD Footway extension from Newland Gardens, over culvert to playing fields Improvements 2020/21 Schemes entrance Angmering Footbridge 4000218 Angmering ANGMERING Eastern Arun ANGMERING BYPASS FOOTBRIDGE Asset ID: 3059 E108/405 Paint Infrastructure - Structures 2020/21 Paint Surfacing & Drainage Works 04272 Angmering ANGMERING Eastern Arun BYWAY 3605 (COW LANE) PROW - Surfacing Countryside Services 2020/21 Path runs parallel to the A280 Angmering Bypass Footway Surfacing & Drainage Works 05601 Ashurst ASHURST Chanctonbury BRIDLEWAY 2370 PROW - Surfacing Countryside Services Reserve Scheme TBC Path runs northwards off Ford Lane Countywide Drainage Infrastructure - Site Investigations N/A Various Various Highway Drainage - Site Investigations Various Routine and Cyclical Lead Professional Block Allocation Various Locations Identified In Year Countywide Drainage Infrastructure - Maintenance and Repairs N/A Various Various Highway Drainage - Maintenance & Repairs Various Routine and Cyclical Lead Professional Block Allocation Various Locations Identified In Year Bridge replacement Works 24463 Billingshurst BILLINGSHURST North Horsham FOOTPATH 1919 Bridge is located on Public Footpath 1919, just east of the D118 PROW - Bridge Works Countryside Services 2020/21 (Wooddale Lane). 6009804 Billingshurst BILLINGSHURST North Horsham DAUX AVENUE Daux Way to end D115 Footway Reconstruction Infrastructure - Footway TBC 6009804/1 Billingshurst BILLINGSHURST North Horsham ROSIER WAY Side of 48 Daux Avenue D115 Footway Reconstruction Infrastructure - Footway TBC Design refurbishment for Canada Grove signal junction refurbishment Bognor Regis BOGNOR REGIS Western Arun CANADA GROVE C157 Design Traffic Signals 2020/21 Asset ID : 1510 6004913 Bognor Regis BOGNOR REGIS Western Arun GLENCATHARA ROAD Nyewood Lane to Ellasdale Road D66 Carriageway Resurfacing Carriageway - Infrastructure 2020/21 Town/Village Enhancement 6011035 Boxgrove BOXGROVE South Chichester THE STREET Footway refurbishments, road markings etc Improvements 2020/21 Schemes Safer Routes to School Central & South Mid 70500460 Burgess Hill BURGESS HILL KEYMER ROAD Burgess Hill School For Girls Crossing Improvements Local Transport Improvements 2020/21 Sussex Construction School Safety Zone Central & South Mid 70500484 Burgess Hill BURGESS HILL ROYAL GEORGE ROAD The Gattons School C352 Safer Routes to School Local Transport Improvements 2020/21 Sussex Construction Central and South 6009020 Burgess Hill BURGESS HILL CANTS LANE Junction Road to Kings Way C354 / P186 Carriageway Resurfacing Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 6009008 Burgess Hill BURGESS HILL MEADOW LANE Potters Lane to Oakmead Road D182 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 6009008/1 Burgess Hill BURGESS HILL CLAYTON DRIVE Chanctonbury Road to end D182 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 6009008/2 Burgess Hill BURGESS HILL WOLSTONBURY WAY Queens Crescent to Station Road D182 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 6009008/3 Burgess Hill BURGESS HILL WOODCREST ROAD Potters Lane to end D182 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 6009008/4 Burgess Hill BURGESS HILL HOLMESDALE ROAD Potters Lane to Chanctonbury Road D182 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 6009008/5 Burgess Hill BURGESS HILL OAKMEAD ROAD Chanctonbury Road to Meadow Lane D182 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 6009008/6 Burgess Hill BURGESS HILL PRIORY ROAD Chanctonbury Road to Chanctonbury Road D182 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South London Road to Queens Crescent (inc Cul de sacs nos. 78 to 92, Nos110 6009008/7 Burgess Hill BURGESS HILL CHANCTONBURY ROAD D182 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex to 124 and Nos 32 to 40) Central and South 6009008/8 Burgess Hill BURGESS HILL QUEENS CRESCENT Station Road to No 37 inc nos 36 to 50 D182 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 935560 Burgess Hill BURGESS HILL ORCHARD ROAD Condor Way to Royal George Road, inc. side roads D159 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 935560/1 Burgess Hill BURGESS HILL ERIN WAY Orchard Road to end D159 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 935560/2 Burgess Hill BURGESS HILL CHERRY CLOSE Orchard Road to end D159 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 935560/3 Burgess Hill BURGESS HILL CONDOR WAY Victoria Avenue to Royal George Road D159 Carriageway Micro Asphalt Carriageway - Infrastructure 2020/21 Mid Sussex Central and South 6010310 Burgess Hill BURGESS HILL A273 LONDON ROAD Pedestrian Refuge Island Crossing Facilities Improvements 2020/21 Mid Sussex Central and South 6011197 Burgess Hill BURGESS HILL KINGS WAY Pedestrian crossing and footway improvements Crossing Facilities Improvements 2020/21 Mid Sussex Junction Improvements Chichester CHICHESTER South Chichester WESTHAMPNETT Westhampnett Road/ St Pancras/ Spitalfield Lane/ St James Road Highway Improvements Local Transport Improvements 2020/21 Prelim Design 70532173 Chichester CHICHESTER South Chichester BISHOP LUFFA CLOSE TO REAR OF SCHOOL (Bishop Luffa Close to Centurion Way cycleway) E54 Footway Reconstruction Infrastructure - Footway TBC Joint working (CDC, CCC, WSCC) Project Chichester CHICHESTER South Chichester City Centre Streetscape Various City Centre Refurbishment Infrastructure - Footway 2020/21 ITB Contribution to Design Improved cycle links Chichester CHICHESTER South Chichester OAKLANDS WAY Shared Pedestrian / Cycle way on Northern Side of Oaklands Way A286 Cycle Improvments Local Transport Improvements 2020/21 Design Shared Use path Improvements Chidham and CHIDHAM South Chichester BROAD ROAD Broad Road Cycle Improvements Local Transport Improvements 2020/21 Hambrook Design Faygate Crossing Signage 6010306 Colgate FAYGATE North Horsham CRAWLEY ROAD EASTBOUND Small Works Improvements 2020/21 New signage and improvements to pedestrian crossing Countywide Carriageway Infrastructure - N/A Various Various Countywide Carriageway Patching Various Carriageway Patching Routine and Cyclical Lead Professional 2020/21 Block Allocation Various Locations Countywide Carriageway Infrastructure - N/A Various Various Countywide Structural Patching (Fixed Resource) Various Carriageway Structural Patching Routine and Cyclical Lead Professional 2020/21 Block Allocation Various Locations Countywide Carriageway Infrastructure - Carriageway Routine and Cyclical Lead N/A Various Various Carriageway Joint Repairs Various Block Allocation Various Locations Joint repairs Professional Countywide Carriageway Infrastructure - Carriageway N/A Various Various Fixed Resource Winter Damage (Structural Patching) Various Routine and Cyclical Lead Professional 2020/21 Block Allocation Various Locations Structural Pathing Countywide Carriageway Infrastructure - Carriageway Network Resiliance - N/A Various Various Various Small Resurfacing Works Routine and Cyclical Lead Professional 2020/21 Block Allocation Various Locations Small Resurfacing Works Countywide Footway Infrastructure - N/A Various Various Footway Patching (In year repairs) Various Footway Patching Routine and Cyclical Lead Professional 2020/21 Block Allocation Various Locations Countywide Road Restraint Infrastructure - Street Furniture - N/A Various Various Countywide Response to Damaged Safety Fencing Various Routine and Cyclical Lead Professional 2020/21 Block Allocation Various Locations Road Restraint systems Countywide Drainage Infrastructure - N/A Various Various Highway Drainage Improvements Various Highway Drainage Improvements Routine and Cyclical Lead Professional 2020/21 Block Allocation Various Locations Countywide Drainage Infrastructure - N/A Various Various Highway Drainage - Small Works Various Small Works Routine and Cyclical Lead Professional 2020/21 Block Allocation Various Locations Page