Ottapallm., R Environmental Clearance
Total Page:16
File Type:pdf, Size:1020Kb
PROCEEDINGS OF THE IMPACTASSESSMENT , DLS]]RI.IqI_ENVIRONMENT (Present: P. Marykutty,lAS - Chairman, Afsana Perween,IAS - Member Secretary, Prof.Dr.A.V Sonthoshkumar - Member, Samuel Vanapalgheta Pachuau, Divisional Forest Officer - Member. ) Sub : DEIAA, Palakkad - Environmental Clearance - The granite building stone quarry project of Sri. George Joseph, PPK Granites & Crusher Products Pvt. Ltd, Chunangad (PO), Ottapallm., r Environmental Clearance No.E/270311-6lDEIAA. Dated : 2L104120L7. Ref : l.No. SO 190(E) dt:2010L/L6 of MoEF Government of India. t 2.Lr. No. LRG 5-2016137766/9 dt 17106116 of District Collector, Palakkad. 3.Lr. No. 4t95lEC2/2015 SEIAA dt: 10/0612016, L9/07/2016 of SEIAA, Palakkad. 4. Online application filed by Sri. George Joseph, PPK Granites & Crusher Products Pvt. Ltd, Chunangad (PO), Ottapalam. 5. Minutes of DEAC meeting held on 2510112017. 6. Minutes of DEIAA meeting held on 0910312017. Environmental Clearance No. 4/16 Sii. George Joseph, PPK Granites & Crusher Products Pvt. Ltd, Chunangad (PO), Ottapalam Taluk, Palakkad District has filed online application for the Environmental Clearance for the granite building stone quarry project of PPK Granites & Crusher Products Pvt. Ltd having an extent of 2.4374 Hectares of land in Survey Nos. 135 of Ambalappara-Il Village. After necessary verification done by Member Secretary DEIAA, the application was forwarded to the District Expert Appraisal Committee (DEAC) for further necessary action. DEAC conducted site inspection on 2Il0Ll20I7 and a meeting on 2510112017. The DEAC recommended for issuance of Environmental Clearance for the granite building stone quarry project of PPK Granites & Crusher Products Pvt. Ltd in Survey Nos. 135 of Ambalappara-Il Village of Ottapalam Taluk in which a buffer distance of more than 100 mtr has been maintained. I The meeting of DEIAA chaired by the Chairman, DEIAA & District Collector was convened on 09/03/2017 to consider the proposals submitted by DEAC. After discussion of all the t proposals with the Member Secretary DEIAA and other members present. DEIAA decided to issue Environmental Clearance to the proponent subject to the general conditions enclosed with this order plus the specific conditions mentioned below : 1)A Mines manager shall be appointed to control, direct, manage and supervise the Quarrying operations as required under the Mines Act, 1952. 2) Health and welfare measures for the persons employed shall be implemented. I 3)Controlled blasting should be practiced and blasting shall be done only during day time. The mitigative measures for contol of ground vibrations to a.nest the fly rocks and boulders should be implemented. 4)Plantation shall be done which includes a green belt of adequate width around the Mining Lease area excluding the rocky area, along roads, overburden dumps and non mineralized area by planting suitable native specious in consultation with the local DFO/Agriculture Department. S)The drains should be regularly de silted and maintained properly. Check dam and gully checks shall be constructed wherever required to arrest siltation. De siltation shall also be done every year before the onset of monsoon. , 6)Fencing must be maintained properly all around the lease area. 7)The CSR need redrafting with inclusion of felt needs of the locality. B)Appropriate sign boards should be displayed. 9)The blasting time must be displayed and strictly adhered to. 10)The PPV values must be less than 10 mm/sec. 11)Dust suppression mechanism must be in place. 12)A separate small plot to be maintained in the premise to preserve rare and endemic species, if any, listed in the biodiversityrassessment. The proponent Sri. George Joseph, PPK Granites & Crusher Products Pvt. Ltd, Chunangad (PO),,Ottapalam Taluk, Palakkad Distict has remitted the processing charge of Rs.l-,00,000/- (Rupees One Lakh only) as per Chalan No. KL00668448220L61-7 dt: 22103/20L7, District Treasury Palakkad as one-time processing fee for Environmental Clearance in the name of O/o Member Secretary, DEIAA (Head of Accout - 1-425-00-501-99). AIso the total amount of CSR activities (of 5 years) is Eight lakh Ninteytwo thousand five hundred rupees which needs to be redrafted as per specific condition No. 7. The clearance issued will also be subject to full and effective implementation of all the undertakings given in the application form, mitigation measures in the Environment Management Plan in Chapter 7 of the Pre-Feasibility Report and the mining features including progressive mine closure plan as submitted with the application and relied on for grant of this clearance. The above undertlakings and the conditions and undertakings in mining, blasting, mine drainage, progressive mine closure plan of the Mining Plan as submitted will be deemed to be part of this proceedings as herein. conditions as undertaken by the proponent, as if incorporated , date of this clearance, Validity of the Environmental Clearance will be five years from the anybody from the safety area or subject to earlier review in the event of genuine complaint from An affidavit submitted by violation or non-compliance of any of the conditions stipulated herein. has to be scrupulously proponent regarding compliance of the general and specific conditions followed. Sri. George Joseph, Under the circumstances stated above, sanction is hereby accorded to Taluk, Palakkad District ppK Granites & crusher Products Pvt. Ltd, chunangad (Po), ottapalam Products Pvt. Ltd in Survey Nos' for the building stone quarry project of PPK Granites & Crusher EC will become operational only after 135 of Ambalappara-Il Village of ottapalanr Taluk. fulfiliment of all the pre-mining conditions' will be monitored by the Geologist, Palakkad' , Compliance of the conditions herein by the project proponent l.Necessary assistance for entry and inspection should be provided inspection or monitoring' and those who are engaged or entrusted by him to the staff for Palakkad to take 2.lnstances of violation if any shall be reported to the District Collector, No' SO 637 legal action under the Environment (Protection) Act, 1986 and Notification and Forest, Government of India' (L ) dated ZBl}zl2OL of the Ministry of Environment To Chunangad (PO)' , Sri. George Joseph, PPK Granites & Crusher Products Pvt' Ltd, Ottapalam Taluk, Palakkad District copy to : 1. The chairman, DEIAA & District collector, Palakkad 2. The Chairman, SEIAA' 3. The Chairman, DEAC' 4. The Tahsildar, OttaPalam' Geologist, Palakkad. 6. Village Off icer, Ambalappara-Il' 7. Divisional Forest officer, Palakkad (Member of DEIAA) B. Dr.A.V. Santhoshkumar, Professor, Kerala Agricultural University Member of DEIAA) (ExPert ' 9. Secretary Ambalappara Grama Panchayath' ST'ATE ENVIRONMENT ]MPACT ASSI'SSMENT AUTHORITY KERALA (for rnining projects) I ' uld be in.stalled as pcr the prcvailing provisions of KMBII / 2' agreed under the affidavit filed by the proponent should be 3' Suitable avenue-frees sh_ould be planted along either side of the tarred roail aud open par!.ing y, inclutling ofapproach road and internalroads. 4' possible solar energy generation and utilization shall be cnsured as an essential part of 5 Sprinklers slrall be installed and used in ttre project site to ctlntain dust emissions. Eco-restoration 6' including the mine closure pian shalt be done at the ortrn cost of the profect proponent. l' At least 10 percent out of the total excavated pit area should be retained as water storage areas and tl be reilaimed with stacked dumping and overburden and-plantert with that ale eco-friendly, if no other condjtjon ofpir -specific on reclaanation 8. Corporate Social Responsibility (csR) agreed upon by the proponent shopld be impleurente<l 9. The lease area shall be fenced off with trarbed w'ires to s rninimum height of 4ft eround, before sttrting of mining, Atl thc boundary lndicators (boarcls, sfores, markings, etc) shall be protected at all tJmes and shsll bc conspicuous. I (r. Waming alzrrrns indicating the time of blastiirg (to be done at specific timings) has to be arre.nged as per stipulations ofExplosive Departrnent. 11. Coutroi ncesurbs on noise and vibration prescribed byKSPCB should be inrplemented.. t2. Quarying activitjes should be limited to daj'time as per KS?CB guidelines/J-prci{jc condirions. Blasting should be doue in a controlled rnanner as specified u| the regulations of Exp1osives Departrnent or an)' othsr concerDecl agcncy. 14. A licensed person should superviso'contro.l the brasting operations. 15. Access roads to the quarry shall be tarred to contain dust emjssions that rnay arise cturing transportati on of m atsrial s. 16. Overburden materiafs should be managed. withjn the site and used for recla:nation of rnine pit as per mine closure plan / specific cond jfions, l?. Height of benches should not exccecl jlention 5 m, and width shoulcl not bc less than 5 m,. if thcrc is |o is fhe rnining plan/specific con<ijtion. I8. Mats to reduce fly rock blast to a n)axirnunr of l0 ppv sbould bc provided. 19, Maximum depth of mi-oing fronr general grouncl level at sife shali not exceed IOrn 20, No mi[ing operatiorn should be carried out at. plr...r havirrg a slope greater Ut"o +-s". Lt,a7 Acoustic enblosures should have bccn pro,,,ided to reducc souna umpt;fications in addition to the prolisions green of tett and hollorv brick envelop for cn:shers so tlat t}te noise level is kept thi wi n prescrib cd s rand&rds gi ven by C--p CB/K S pCB . 22, The workers on site should the be provided with the required protecfive equiprnent such as ear muffs, helmet, etc. lJ- th clarifircrs to be provided in the lowcr slopes arouncl lhe core area to L+-.A Tbc ftansportation o"lll*rr.r, should be done in covered trucks ro contain dust cmissions. 25. The proponent shouldplant trees at least 5 tirnes of the loss that has beeu occurred whiLe olearing the land for the pro.iect.