All Train Time Table
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
List of Polling Stations for 187 மானாம ைர(தனி)
List of Polling Stations for 187 மானாமைர(தனி) Assembly Segment within the 31 சிவகங்ைக Parliamentary Constituency Sl.No Polling Location and name of building in which Polling Areas Whether for All station No. Polling Station located Voters or Men only or Women only 12 3 4 5 1 1 PANCHAYAT UNION PRIMARY 1.Arasanoor (P) Sembur (R V) Sembur , 99.OVERSEAS ELECTORS OVERSEAS ELECTORS All Voters SCHOOL, ,SEMBUR 2 2 COMMUNITY HALL ,ENATHI 1.Enathi-theli (p) (R V) Enathi , 99.OVERSEAS ELECTORS OVERSEAS ELECTORS All Voters 3 3 PANCHAYAT UNION MIDDLE 1.Enathi-theli (p) (R V) Enathi , 99.OVERSEAS ELECTORS OVERSEAS ELECTORS All Voters SCHOOL, ENATHI ,EASTEN SIDE NEW BUILDING NORTH PORTION 4 4 PANCHAYAT UNION PRIMARY 1.Enathi-theli (p) (R V) Kuyavan gulam , 2.Enathi-theli (p) (R V) Sokkaiyan patti , 99.OVERSEAS All Voters SCHOOL, SOKKAIYANPATTI ELECTORS OVERSEAS ELECTORS ,NORTH PORTION 5 5 PANCHAYAT UNION PRIMARY 1.Enathi-theli (p) (R V) theli , 2.Enathi-theli (p) (R V) manjakudi , 99.OVERSEAS ELECTORS All Voters SCHOOL,THELI OVERSEAS ELECTORS 6 6 PANCHAYAT UNION MIDDLE 1.Kanakkangudi (p) Enathi (R V) Ward 1 kanakkangudi , 2.Kanakkangudi (p) Enathi (R V) Ward 2 All Voters SCHOOL, KANAKKANGUDI kanakkangudi , 99.OVERSEAS ELECTORS OVERSEAS ELECTORS 7 7 PANCHAYAT UNION PRIMARY 1.Poovanthi (p) (R V) Keezhapoovanthi , 2.Poovanthi (p) (R V) Kottaippoovanthi , 99.OVERSEAS All Voters SCHOOL, POOVANTHI ,WEST ELECTORS OVERSEAS ELECTORS WING 8 8 PANCHAYAT UNION PRIMARY 1.Poovanthi (p) (R V) Pappanvalasai , 99.OVERSEAS ELECTORS OVERSEAS ELECTORS All Voters SCHOOL, PAPPANVALASAI ,NORTH PORTION 9 9 PANCHAYAT UNION PRIMARY 1.Poovanthi (p) (R V) Mela poovanthi , 99.OVERSEAS ELECTORS OVERSEAS ELECTORS All Voters SCHOOL, POOVANTHI ,EAST WING Page Number : 1 of 53 List of Polling Stations for 187 மானாமைர(தனி) Assembly Segment within the 31 சிவகங்ைக Parliamentary Constituency Sl.No Polling Location and name of building in which Polling Areas Whether for All station No. -
C O N T E N T S
29.08.2013 1 C O N T E N T S Fifteenth Series, Vol. XXXV, Fourteenth Session, 2013/1935 (Saka) No. 15, Thursday, August 29, 2013/Bhadrapada 07, 1935 (Saka) S U B J E C T P A G E S SUBMISSION BY MEMBERS Re: Fall in the value of Rupee 3-11 ORAL ANSWER TO QUESTION *Starred Question No. 262 12-26 WRITTEN ANSWERS TO QUESTIONS Starred Question Nos.263 to 280 27-118 Unstarred Question Nos. 2991 to 3016 and 3018 to 3219 119-549 *The sign + marked above the name of a Member indicates that the Question was actually asked on the floor of the House by that Member. 29.08.2013 2 REFERENCE BY THE SPEAKER 550 National Sports Day PAPERS LAID ON THE TABLE 551-555 MESSAGES FROM RAJYA SABHA AND BILLS AS PASSED BY RAJYA SABHA 556-570 PUBLIC ACCOUNTS COMMITTEE 87th and 88th Reports 571 COMMITTEE ON GOVERNMENT ASSURANCES 29th to 35th Reports 571 COMMITTEE ON SUBORDINATE LEGISLATION th 36 Report 572 STANDING COMMITTEE ON URBAN DEVELOPMENT th 26 Report 572 STANDING COMMITTEE ON CHEMICALS AND FERTILIZERS th 39 Report 572 STANDING COMMITTEE ON COAL AND STEEL th th (i)38 to 40 Reports (ii) Statements 573 STANDING COMMITTEE ON SOCIAL JUSTICE AND EMPOWERMENT Statements 574 29.08.2013 3 STANDING COMMITTEE ON HOME AFFAIRS 173rd Report 575 STATEMENTS BY MINISTERS 580 -600 (i) Status of implementation of the recommendations contained in the 240th Report of the Standing Committee on Science and Technology, Environment and Forests on Demands for Grants (2013-14), pertaining to the Department of Science and Technology, Ministry of Science and Technology. -
Solar Plus Energy Storage System at Dahod, Gujarat Traction Sub-Station by Indian Railways
SOLAR PLUS ENERGY STORAGE SYSTEM AT DAHOD, GUJARAT TRACTION SUB-STATION BY INDIAN RAILWAYS 11, January 2021 Submitted to Tetra Tech ES, Inc. (DELETE THIS BLANK PAGE AFTER CREATING PDF. IT’S HERE TO MAKE FACING PAGES AND LEFT/RIGHT PAGE NUMBERS SEQUENCE CORRECTLY IN WORD. BE CAREFUL TO NOT DELETE THIS SECTION BREAK EITHER, UNTIL AFTER YOU HAVE GENERATED A FINAL PDF. IT WILL THROW OFF THE LEFT/RIGHT PAGE LAYOUT.) SOLAR PLUS ENERGY STORAGE SYSTEM AT DAHOD, GUJARAT TRACTION SUB- STATION BY INDIA RAILWAYS Prepared for: United States Agency for International Development (USAID/India) American Embassy Shantipath, Chanakyapuri New Delhi-110021, India Phone: +91-11-24198000 Submitted by: Tetra Tech ES, Inc. A-111 11th Floor, Himalaya House, K.G. Marg, Connaught Place New Delhi-110001, India Phone: +91-11-47374000 DISCLAIMER This report is prepared for the M/s Tetra Tech ES, Inc. for the ‘assessment of the Vendor Rating Framework (VRF)’. This report is prepared under the Contract Number AID-OAA-I-13-00019/AID- OAA-TO-17-00011. DATA DISCLAIMER The data, information and assumptions (hereinafter ‘data-set’) used in this document are in good faith and from the source to the best of PACE-D 2.0 RE (the program) knowledge. The program does not represent or warrant that any dataset used will be error-free or provide specific results. The results and the findings are delivered on "as-is" and "as-available" dataset. All dataset provided are subject to change without notice and vary the outcomes, recommendations, and results. The program disclaims any responsibility for the accuracy or correctness of the dataset. -
HS2 Unlocking the Benefits
i HS2 Unlocking the benefits West Midlands Connectivity Package ii 2.7 million people live in the West Midlands metropolitan area, the largest urban area outside of London 1 The Connectivity Package will improve regional and local links The High Speed to High Speed Rail Two (HS2) and encourage sustainable Rail Network will growth using the released rail capacity from the West Coast Main Line. Economic benefits will therefore be maximised provide much- across the West Midlands region with capacity constraints on needed additional rail the already congested local transport networks being relieved. capacity connecting Based on international experience of High Speed Rail, the main urban areas implementation of the Connectivity Package to transform the proposed HS2 interchanges into integrated regional of the UK along a transport hubs is fundamental if our businesses are to expand new North-South fast their markets, access a wider workforce and develop local economic networks. Improved connectivity will undoubtedly connection. To capture attract new business and promote innovation across our and maximise the manufacturing and service sectors. distribution of HS2’s The Package will have a positive impact across a range of economic challenges facing Local Enterprise Partnerships potential benefits, (LEPs) in the West Midlands such as slow business cluster authorities across formation, urban youth unemployment and limited access to international gateways. The arrival of HS2 also underpins the West Midlands development plans for Birmingham city centre and UK region have prepared a Central, stimulating further job creation from high-value economic activity in the West Midlands. Delivery of the Transport Connectivity Package will ensure that key locations are effectively linked Package, which will up to HS2 stations overcoming any potential consequences of building HS2 without connections to these places. -
Tambaram to Sengottai New Train Time Table
Tambaram To Sengottai New Train Time Table Unacademic Ezra concoct very nosily while Torrey remains oxidized and asinine. Which Basil supervene so accursedly that Corwin actualizes her brat? Acanthoid and cinnamic Oliver retches her womb excreted while Davoud shikars some resurrection blearily. Sengottai antyodaya express group, new train to time table schedule at indian railways train leave from tambaram to protect carriage horses need your email id Indian railways that runs between Sengottai and Tambaram. Nice journey and great service. Moreover, India. Get Details About The Sengottai. Tambaram to tambaram and timing of which time table schedule at your destination on a new indian express app. The city of Chennai in Tamil Nadu, SILAMBU EXPRESS. Try to sengottai station has been granted an administrator on time! The lines at the station following one of happy first in Chennai to be electrified. Crores from internal resources, which are not enough to meet the growing demand of the section let alone its future requirements. You rest check IRCTC Train Status or steel Live Train Status of any Indian Railways Train standing at Indian Railways Train Running Status. Why Book Tambaram to Sengottai Tickets on Paytm? Can you help too? Kottayam passengers happy and timing for tickets book on time table from tambaram? Working at tambaram to give them in comments. We have integrated this great technology of live bus tracking in almost all of our buses. The feasibility of connecting Pattukottai with Karaikal through a direct train should be looked into and implemented in the next timetable revision. Pattukottai should initiate steps to sengottai? Sengottai special trains between sengottai and get down these pages from in national travels for money or not likely to sengottai to sengottai train? Tambaram to Sengottai on Paytm. -
Belmond Directory
BELMOND WELCOMES THE WORLD 2 LANDMARK HOTELS 4 GREAT TRAIN JOURNEYS 6 PIONEERING RIVER CRUISES 8 “HAPPINESS IS NOT A GOAL — IT’S A BY-PRODUCT OF A LIFE WELL-LIVED” ELEANOR ROOSEVELT 10 HOTELS ST. PETERSBURG TRAINS EDINBURGH DUBLIN MANCHESTER RIVER CRUISES OXFORDSHIRE LONDON PARIS BURGUNDY VENICE PORTOFINO FLORENCE RAVELLO NEW YORK MALLORCA NORTH AMERICA 14 – 29 TAORMINA ST MICHAELS SOUTH AMERICA 30 – 49 SANTA MADEIRA CHARLESTON BARBARA EUROPE 50 – 85 AFRICA 86 – 91 ASIA 92 – 109 SAN MIGUEL DE RIVIERA AYEYARWADY RIVER ALLENDE MAYA ST MARTIN CHINDWIN RIVER LUANG YANGON PRABANG BANGKOK SIEM REAP KOH SAMUI MACHU PICCHU SACRED VALLEY JIMBARAN LIMA CUSCO AREQUIPA LAKE TITICACA RIO DE MOREMI RESERVE JANEIRO CHOBE NATIONAL IGUASSU OKAVANGO DELTA PARK FALLS 12 CAPE TOWN 13 NORTH AMERICA GLAMOROUS HOTELS, RESORTS AND RESTAURANTS IN THE USA, MEXICO AND THE CARIBBEAN. 14 THE RESORT’S STYLISH SUITES, VILLAS AND RESTAURANTS HAVE BEEN BEAUTIFULLY DESIGNED TO OPEN UP FRESH OCEAN VISTAS AND LET THE LIGHT FLOOD IN. 83 SUITES AND ROOMS, 8 THREE- AND FOUR- BEDROOM VILLAS • TWO RESTAURANTS, BAR Beside the island’s most spectacular sweep AND BEACH BAR, WINE CELLAR • LA SAMANNA SPA, FITNESS CENTER, 3 TENNIS COURTS, of sand, where France meets the Caribbean 2 SWIMMING POOLS • WATERSPORTS, BEACH CABANAS, PRIVATE BOAT • THE RENDEZVOUS PAVILION FOR MEETINGS • 5KM FROM MARIGOT 16 BELMOND LA SAMANNA PO BOX 4077, 97064 ST MARTIN, CEDEX, FRENCH WEST INDIES TEL: +590 590 87 6400 (FRENCH CAPITAL) AND FROM JULIANA AIRPORT 17 63 SUITES AND ROOMS • GASTRONOMIC DINING AND BAR, BEACH RESTAURANT, TEQUILA AND CEVICHE BAR • AWARD- WINNING KINAN SPA, WATERSPORTS, INCLUDING CAVE DIVING • 3 POOLS, 2 TENNIS COURTS • SPACES FOR WEDDINGS, MEETINGS AND CONFERENCES • CULTURAL TOURS, CHILDREN’S PROGRAMME • 40KM FROM CANCÚN TALCUM-WHITE SANDS STRETCH INTO THE DISTANCE ON WHAT HAS BEEN VOTED ONE OF THE WORLD’S FINEST BEACHES— THE ULTIMATE RETREAT IN WHICH TO RELAX, SIP TEQUILA AND DINE. -
LOK SABHA ___ SYNOPSIS of DEBATES (Proceedings Other Than
LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Tuesday, July 15, 2014 / Ashadha 24, 1936 (Saka) ______ STATEMENT BY MINISTER Re: Reported meeting of an Indian journalist with Hafiz Saeed in Pakistan. THE MINISTER OF EXTERNAL AFFAIRS AND MINISTER OF OVERSEAS INDIAN AFFAIRS (SHRIMATI SUSHMA SWARAJ): On the issue which was raised yesterday in the House, I, with utmost responsibility and categorically and equivocally would like to inform this House that the Government of India has no connection to the visit by Shri Ved Prakash Vaidik to Pakistan or his meeting with Hafiz Saeed there. Neither before leaving for Pakistan nor at his arrival there, he informed the Government that he was to meet Hafiz Saeed there. This was his purely private visit and meeting. It has been alleged here that he was somebody‟s emissary, somebody‟s disciple or the Government of India had facilitated the meeting. This is totally untrue as well as unfortunate. I would like to reiterate that the Government of India has no relation to it whatsoever. *MATTERS UNDER RULE 377 (i) SHRI BHARAT SINGH laid a statement regarding need to start work on multipurpose project for development of various facilities in Ballia Parliamentary constituency, Uttar Pradesh. (ii) SHRI BHANU PRATAP SINGH VERMA laid a statement regarding need to extend Shram Shakti Express running between New Delhi to Kanpur upto Jhansi. (iii) SHRIMATI JAYSHREEBEN PATEL laid a statement regarding need to expedite development of National Highway No. 228 declared as a Dandi Heritage route. (iv) SHRI DEVJI M. PATEL laid a statement regarding need to provide better railway connectivity in Jalore Parliamentary Constituency in Rajasthan. -
TRAIN : Rocky Mountaineer
------------------------------------------------------------------------------------------------------------------------------------------ TRAIN : Rocky Mountaineer JOURNEY : Coastal Passage: Seattle to Calgary (Eastbound) Journey Duration : Upto 7 Days Day to Day Itinerary Day 1 : Arrive Seattle and spend time exploring Seattle's waterfront, China town, Pioneer Square, the sights of Pike Place market and Space needle on your own. Overnight at Seattle. Day 2 : Check out of the Hotel and a coach will transfer you to the King Street Station for your Rocky Mountaineer journey to Vancouver. Highlights include Chittenden Locks linking Puget Sound to Lakes Union and Washington, the fishing fleet (and Boeing jets) of Everett, the fields at the foot of the Cascade Mountains near Mount Vernon, sunset views of Bellingham Bay and the San Juan Islands beyond, and the community of White Rock across the Canadian border. Arrive Avncouver and get transferred to the Hotel. Overnight in Vancouver. Day 3 : Take the day to explore the beautiful coastal city of Vancouver on your own. Overnight in Vancouver. Day 4 : Travel onboard the Rocky Mountaineer from Vancouver to Kamloops. Highlights include the rushing waters of Hell’s Gate in the Fraser Canyon and the steep slopes and rock sheds along the Thompson River. Overnight in Kamloops Day 5 : Your journey continues eastwards to the Canadian Rockies and the province of Alberta. Highlights include Craigellachie, where the last spike of the Canadian Pacific Railway was driven, Rogers Pass, the Kicking Horse Canyon, and the Spiral Tunnels. Your rail journey ends this evening in the resort town of Banff. Overnight in Banff. www.luxurytrains.in Page 1 ------------------------------------------------------------------------------------------------------------------------------------------ Day 6 : A half-day tour takes you into Yoho National Park to view some of its natural wonders. -
World Bank Document
PROCUREMENT PLAN Project information: India; Tamil Nadu Irrigated Agriculture Modernization Project; P158522 Project Implementation agency: The lead implementing agency will be the WRD Public Disclosure Authorized under the administrative jurisdiction of Principal Secretary, PWD. Other implementing agencies will be the Departments of Agriculture, Agricultural Engineering, Agricultural Marketing and Agribusiness, Horticulture, Animal Husbandry and Fisheries; Tamil Nadu Agricultural University (TNAU), Tamil Nadu Fisheries University (TNFU), and Tamil Nadu Veterinary and Animal Sciences University (TANUVAS). A project implementation cell (PIC) will be established in each of participating line department and agency to oversee the implementation of their specific activities. The key functions of each PIC will be to prepare, implement, monitor their annual work plans and coordinate with MDPU. The PIC will consist of a nodal officer, and other staff in technical, procurement, finance, and safeguards areas as needed. Public Disclosure Authorized Date of the Procurement Plan: Dec 14, 2016 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions Public Disclosure Authorized for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. -
C:\Users\ACCER\Desktop\JULY QUESTION LIST\Final Make\Final
LOK SABHA ______ List of Questions for ORAL ANSWERS Wednesday, August 11, 2021/Sravana 20, 1943 (Saka) ______ (Prime Minister; Ministries of Atomic Energy; Coal; Commerce and Industry; Communications; Defence; Development of North Eastern Region; Electronics and Information Technology; External Affairs; Law and Justice; Mines; Parliamentary Affairs; Personnel, Public Grievances and Pensions; Planning; Railways; Space; Statistics and Programme Implementation) (¯ÖϬÖÖ®Ö ´ÖÓ¡Öß; ¯Ö¸ü´ÖÖÞÖã ‰ú•ÖÖÔ; ÛúÖêµÖ»ÖÖ; ¾ÖÖ×ÞÖ•µÖ †Öî¸ü ˆªÖêÝÖ; ÃÖÓ“ÖÖ¸ü; ¸üõÖÖ; ˆ¢Ö¸ü ¯Öæ¾Öá õÖê¡Ö ×¾ÖÛúÖÃÖ; ‡»ÖꌙÒüÖò×®ÖÛúß †Öî¸ü ÃÖæ“Ö®ÖÖ ¯ÖÏÖîªÖê×ÝÖÛúß; ×¾Ö¤êü¿Ö; ×¾Ö×¬Ö †Öî¸ü ®µÖÖµÖ; ÜÖÖ®Ö; ÃÖÓÃÖ¤üßµÖ ÛúÖµÖÔ; ÛúÖÙ´ÖÛú, »ÖÖêÛú ׿ÖÛúÖµÖŸÖ †Öî¸ü ¯Öë¿Ö®Ö; µÖÖê•Ö®ÖÖ; ¸êü»Ö; †ÓŸÖ׸üõÖ; ÃÖÖÓ×ܵÖÛúß †Öî¸ü ÛúÖµÖÔÛÎú´Ö ÛúÖµÖÖÔ®¾ÖµÖ®Ö ´ÖÓ¡ÖÖ»ÖµÖ) ______ Total Number of Questions — 20 VIP References authority empowered to act against companies *321. SHRIMATI SANGEETA KUMARI SINGH following unethical business models and infringing on DEO: the Foreign Direct Investment (FDI) norms in the country, SHRI BHOLA SINGH: particularly in e-commerce sector and if so, the details thereof; Will the Minister of RAILWAYS ¸êü»Ö ´ÖÓ¡Öß (b) whether the Government proposes to set up a be pleased to state: regulatory authority for the e-commerce sector in the (a) whether VIP references for release of HO quota country and if so, the details thereof; by the Ministry of Railways/Indian Railways/Zones are (c) whether the Government proposes to not being given priority in recent times; bring in a national -
West Midlands & Chilterns Route Study Technical Appendices
Long Term Planning Process West Midlands & Chilterns Route Study Technical Appendices August 2017 Contents August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 02 Technical Appendices 03 A1 - Midlands Rail Hub: Central Birmingham 04 elements A2 - Midlands Rail Hub: Birmingham to 11 Nottingham/Leicester elements A3 - Midlands Rail Hub: Birmingham to 17 Worcester/Hereford via Bromsgrove elements A4 - Chiltern Route 24 A5 - Birmingham to Leamington Spa via 27 Coventry A6 - Passenger capacity at stations 30 A7 - Business Case analysis 50 Technical Appendicies August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 03 Introduction to Technical Appendices Cost estimation These Technical Appendices provide the technical evidence to Cost estimates have been prepared for interventions or packages of support the conclusions and choices for funders presented in the interventions proposed in the Route Study. The estimates are based main Route Study document. The areas of technical analysis on the pre-GRIP data available, concept drawings and high level outlined in these appendices are capability analysis, concept specification of the intervention scope. To reflect the level of development (at pre-GRIP level), cost estimation, business case information available to support the estimate production, a analysis and passenger capacity analysis at stations. contingency sum of 60% has been added. The estimates do not include inflation. Indicative cost ranges have been provided based The appendices are presented by geographical area with the on this assessment. exception of the business case analysis and passenger capacity analysis. Business case analysis The areas of technical analysis are summarised below. Business case analysis has been undertaken to demonstrate to funders whether a potential investment option is affordable and Capability Analysis offers value for money. -
Inventory of Soil Resources of Dahod District, Gujarat Using Remote Sensing and GIS Techniques
Inventory of Soil Resources of Dahod District, Gujarat Using Remote Sensing and GIS Techniques ABSTRACT 1. Survey Area Dahod district, Gujarat 2. Geographical Extent 73°15' to 74°30'- East Longitude. 20°30' to 23°30’- North Latitude. 3. Agro Climate Region Semi-Arid - Gujarat plain and hills. 4. Total area of the district 3,88,067 ha. 5. Kind of Survey Soil Resource Mapping using Remote Sensing Techniques. 6. Base map (a) IRS-ID Geo-coded Satellite Imagery (1:50,000 Scale) (b) SOI –Toposheet ( 1:50,000 scale ) 7. Scale of mapping 1:50,000 8. Period of survey Dec, 2008 9. Soil Series association mapped and their respective area. S. Mapping Mapping Soil Association Area (ha) Area % No unit symbol 1 BAn8c1 B02 Dungra-Kavachiya 1116 0.29 2 BAn8d1 B03 Kavachiya-Dungra 1057 0.27 3 BAn6c1 B04 Kavachiya-Dungra 133 0.03 4 BAn6c2 B05 Dungra-Kavachiya 5270 1.36 5 BAn6a1 B06 Kavachiya-Dungra 1913 0.49 6 BAu5a1 B07 Singalvan-Jambar 9848 2.54 7 BAu4a1 B08 Jambar-Singalvan 7998 2.06 8 BAu4d1 B09 Jambar-Singalvan 7618 1.96 9 BAv3a1 B10 Chandravan-Kadaba 9502 2.45 10 BAw2a1 B11 Sagbara-Chandeliya 7487 1.93 11 BAw2a2 B12 Chandeliya-Sagbara 3964 1.02 12 BAg4d1 B13 Kadaba-Chandeliya 473 0.12 13 BAu5a2 B14 Singalvan-Jambar 954 0.25 14 GRn8c1 G01 Dhanpur-Dungarwant 3977 1.02 15 GRn8d1 G02 Dhanpur-Dungarwant 8307 2.14 16 GRn6d1 G04 Dhanpur-Dungarwant 498 0.13 17 GRn6c1 G05 Dhanpur-Dungarwant 1614 0.42 18 GRu4c1 G06 Surkheda-Od 3002 0.77 19 GRu4d1 G07 Surkheda-Panvad 2047 0.53 20 GRu4a1 G08 Surkheda-Dhamodi 10427 2.69 21 GRv3a1 G09 Od-Bardoli 5416 1.40 22 GRw2a1