By M/S. Kolte-Patil Developers Ltd
Total Page:16
File Type:pdf, Size:1020Kb
\ FORM – 1 & 1A REDEVELOPMENT OF “SAGAR VAIBHAV CO-OP HOUSING SOCIETY LTD.” At Plot bearing CTS no. 51 of Village Mandapeshwar, Dahisar (West), Opposite Mary Immaculate Girls School, Laxman Mhatre Road, Dahisar (West), Mumbai – 400068 By M/s. Kolte-Patil Developers Ltd. 501, 5th Floor, The Capital, Plot No. C70, G-Block, Bandra-Kurla Complex, Bandra (East), Mumbai – 400051 FORM – 1 REDEVELOPMENT OF “SAGAR VAIBHAV CO-OP HOUSING SOCIETY LTD.” At Plot bearing CTS no. 51 of Village Mandapeshwar, Dahisar (West), Opposite Mary Immaculate Girls School, Laxman Mhatre Road, Dahisar (West), Mumbai – 400068 By M/s. Kolte-Patil Developers Ltd. 501, 5th Floor, The Capital, Plot No. C70, G-Block, Bandra- Kurla Complex, Bandra (East), Mumbai – 400051 APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Sr. Item Details 1. Name of the project/s Redevelopment of “Sagar Vaibhav Co-op Housing Society Ltd.” at Dahisar 2. S. No. in the schedule 8 (B2) 3. Proposed capacity/area/length/tonnage Total Plot Area: 4,994.70 Sq.mt. to be handled/command area/lease Built-up Area as per FSI: 12,473.62 Sq.mt. area/number of wells to be drilled Total Construction Built -up Area: 22,347.13 Sq.mt. Project Proposal: Configuration Details Wing A: Lower Ground + Upper Ground + Flats: 213 Podium + 19 Floors Nos. Wing B: Lower Ground + Upper Ground + Podium + 18 Floors + 19th Floor (Pt.) Wing C: Lower Ground + Upper Ground + Podium + 18 Floors + 19th Floor (Pt.) 4. New/Expansion/Modernization Redevelopment 5. Existing Capacity/ Area etc. Not applicable 6. Category of project i.e.’ A’ or ‘B’ 8(B2) 7. Does it attract the general condition? If Not Applicable yes, please specify. 8. Does it attract the specific condition? Not Applicable If yes, please specify. 9. Location Dahisar (West) Plot/Survey/Khasra No. CTS no. 51 Village Mandapeshwar Tehsil Borivali District Mumbai Suburban State Maharashtra 10. Nearest railway station Dahisar Railway station: Within 2.00 Km (Road Distance) Nearest airport Mumbai Chhatrapati Shivaji Airport: Within 20.00 Km (Road Distance) 11. Nearest Town, city, District Mumbai headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Mumbai Metropolitan Region Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. Kolte-Patil Developers Ltd. 14. Registered Address 501, 5th Floor, The Capital, Plot No. C70, G-Block, Bandra- Kurla Complex, Bandra (East), Mumbai – 400051 15. Address for correspondence 501, 5th Floor, The Capital, Plot No. C70, G-Block, Bandra- Kurla Complex, Bandra (East), Mumbai – 400051 Name Mr. Niren Chaudhary Designation(Owner/Partner/ CEO) Deputy Project Director 1 Form 1- Proposed Redevelopment Project at Dahisar Address 501, 5th Floor, The Capital, Plot No. C70, G-Block, Bandra- Kurla Complex, Bandra (East), Mumbai Pin Code 400051 E-mail [email protected] Mobile number 8550996875 Telephone No. 022 61770100 Fax No. 022 61770100 16. Details of Alternative Sites examined, Not applicable if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects Not applicable 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? Not Applicable (b) The Wildlife (Protection) Act, 1972? NOC from Wild Life Board is Not Applicable as per Draft Notification reg. ESZ of SGNP published by MOEF & CC u/no. S.O.229 (E) dated 22/01/2016 & Minutes of meeting of 20th Expert Committee meeting held on 5th July, 2016 followed by corrigendum for the correction in the MOM on the basis of Government of Maharashtra letter dated 26.07.2016 from the Office of Principal Chief Conservator of Forests (HQFF) for declaration of Eco Sensitive Zone (ESZ) around wildlife sanctuaries/national parks. (c) The C.R.Z Notification, 1991? Not Applicable 22. Whether there is any Government NOC from MHADA Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / No wherever possible) with source of information data 1.1 Permanent or temporary change No Project site is in residential zone as per DP remarks. 2 Form 1- Proposed Redevelopment Project at Dahisar Sr. Information/Checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / No wherever possible) with source of information data in land use, land cover or DP remarks are attached as Enclosure 1 topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No Demolition of existing structures – 5 Residential Buildings vegetation and building? and one society office is involved 1.3 Creation of new land uses? No -- 1.4 Pre-construction investigation Yes Geotechnical Investigation has been carried out and report e.g. bore houses, soil testing? is attached as Enclosure-2 1.5 Construction works? Yes Residential redevelopment 1.6 Demolition works? No Demolition of existing structures – 5 Residential Buildings and one society office is involved 1.7 Temporary sites used for No -- construction works or housing of construction workers? 1.8 Above ground building, Yes Demolition debris, excavation material & construction structures or earthworks waste material shall be partly reused on site and partly including linear structures, cut disposed to the authorized land fill site. and fill or excavations 1.9 Underground works including No -- mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Temporary storage facilities to store the construction raw materials? material. 1.15 Facilities for treatment or Yes • STP for treatment of sewage disposal of solid waste or liquid • Segregation of solid waste into non-biodegradable and effluents? biodegradable garbage • Treatment of biodegradable waste in Organic Waste Converter • Segregation of Non-biodegradable waste into recyclable & non-recyclable. Recyclable waste: To recyclers Non-Recyclable waste: To M.C.G.M. • Dried sludge from STP : As manure 1.16 Facilities for long term housing No -- of operational workers? 1.17 New road, rail, or sea traffic No -- during construction or operation? 1.18 New road, rail, air waterborne No -- or other transport infrastructure including new or altered routes and stations, ports, airports etc? 3 Form 1- Proposed Redevelopment Project at Dahisar Sr. Information/Checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / No wherever possible) with source of information data 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission No -- lines or pipelines? 1.21 Impoundment, damming, No -- culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No 1.23 Abstraction or transfers of water No -- from ground or surface waters? 1.24 Changes in water bodies or the Yes By considering the runoff prior to development and runoff land surface affecting drainage after development there is some increment in runoff of or run-off? storm water. Incremental Runoff = 0.06 m3/sec 1.25 Transport of personnel or Yes Transport of construction materials. materials for construction, Precautions taken to reduce the impact of the vehicular operation or decommissioning? movement by trying to avoid the vehicular trips during peak hours. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Since this is a redevelopment project there will be influx of either temporarily or ~ 595 persons (Sale occupancy only) permanently? 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? No -- 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr. Information/checklist Yes / Details thereof (with approximate quantities /rates, wherever No. confirmation No possible) with source of information data 2.1 Land especially No The land is in developed infrastructure area. undeveloped or agricultural land (ha) 2.2 Water (expected source Yes During Operational Phase – & competing users) unit For Workers : From M.C.G.M.: 12 KLD : KLD For Construction: From Water tankers: 10 - 20 KLD (Depending upon the activity) During Operational Phase – Fresh water from M.C.G.M.: 96 KLD (Domestic) 4 Form 1- Proposed Redevelopment Project at Dahisar Sr. Information/checklist Yes / Details thereof (with approximate quantities /rates, wherever No. confirmation No possible) with source of information data 2.3 Minerals (MT) No --- 2.4 Construction material – Yes Quantity : As per requirement stone, aggregates, and / Stone aggregates demand will be met from the clay/soil soil (expected source – generated after excavation and from open market MT) Sources: The material required for construction activities shall be procured from company’s authorized / approved vendors only. The vendor’s performance will be monitored periodically. In case of urgency or non-availability of materials from authorized/approved vendors, it will be procured from the open market.