To View More Samplers Click Here
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Victorian Heritage Database Place Details - 1/1/2014 Darbyshire Hill No.1 & No
Victorian Heritage Database place details - 1/1/2014 Darbyshire Hill No.1 & No. 2 Bridges Location: Wodonga-Cudgewa Railway, midway between Bullioh & Darbyshire, BULLIOH, TOWONG SHIRE Heritage Inventory (HI) Number: 1 Listing Authority: HI Extent of Registration: Statement of Significance: Darbyshire Hill Nos. 1 and 2 Bridges are single-track rail bridges of three-storey pier design and combine standard fifteen feet timber-beam approach spans with twenty feet rolled-steel-joist spans over the main channels. The timber piers on these bridges are fitted with rare double-longitudinal walings. No. 2: timber and steel composite rail bridge 96.6 metres (317 feet) long, with unusually tall 4 pile timber piers (max. height, 21.3 metres, 79 feet), six timber-beam approach spans each of fifteen feet (4.6 metres), eleven rolled-steel-joist spans each of twenty feet (6.1 metres), and a straight deck of standard transverse-timber design. This bridge, 21.3 metres high, is the tallest railway bridge of timber and steel joist construction to survive in Victoria. No. 1 timber and steel composite rail bridge 65.48 metres (215 feet) long, with unusually tall 4 pile timber piers (max. height, 16.45 metres, 54 feet), and a curving transverse-timber deck. This bridge has five timber-beam spans each of standard fifteen feet (4.6 metre) Victorian Railways design, and seven rolled-steel-joist spans each of twenty feet (6.1 metres). Darbyshire Hill Nos.1 and 2 Bridges were built in 1916 as part of the Wodonga-Cudgewa railway. The line was closed in 1981. -
Regional Development Victoria Regional Development Victoria
Regional Development victoRia Annual Report 12-13 RDV ANNUAL REPORT 12-13 CONTENTS PG1 CONTENTS Highlights 2012-13 _________________________________________________2 Introduction ______________________________________________________6 Chief Executive Foreword 6 Overview _________________________________________________________8 Responsibilities 8 Profile 9 Regional Policy Advisory Committee 11 Partners and Stakeholders 12 Operation of the Regional Policy Advisory Committee 14 Delivering the Regional Development Australia Initiative 15 Working with Regional Cities Victoria 16 Working with Rural Councils Victoria 17 Implementing the Regional Growth Fund 18 Regional Growth Fund: Delivering Major Infrastructure 20 Regional Growth Fund: Energy for the Regions 28 Regional Growth Fund: Supporting Local Initiatives 29 Regional Growth Fund: Latrobe Valley Industry and Infrastructure Fund 31 Regional Growth Fund: Other Key Initiatives 33 Disaster Recovery Support 34 Regional Economic Growth Project 36 Geelong Advancement Fund 37 Farmers’ Markets 37 Thinking Regional and Rural Guidelines 38 Hosting the Organisation of Economic Cooperation and Development 38 2013 Regional Victoria Living Expo 39 Good Move Regional Marketing Campaign 40 Future Priorities 2013-14 42 Finance ________________________________________________________ 44 RDV Grant Payments 45 Economic Infrastructure 63 Output Targets and Performance 69 Revenue and Expenses 70 Financial Performance 71 Compliance 71 Legislation 71 Front and back cover image shows the new $52.6 million Regional and Community Health Hub (REACH) at Deakin University’s Waurn Ponds campus in Geelong. Contact Information _______________________________________________72 RDV ANNUAL REPORT 12-13 RDV ANNUAL REPORT 12-13 HIGHLIGHTS PG2 HIGHLIGHTS PG3 September 2012 December 2012 > Announced the date for the 2013 Regional > Supported the $46.9 million Victoria Living Expo at the Good Move redevelopment of central Wodonga with campaign stand at the Royal Melbourne $3 million from the Regional Growth Show. -
Relevant Project Experience
RELEVANT PROJECT EXPERIENCE Aquatic Feasibility and Facility Projects Hydrotherapy Feasibility - City of Bayside Guidelines for Outdoor Seasonal Pools - Maintenance, Retrofitting, Refurbishment & Re-Building Input - Aquatics Gosford Olympic Pool Feasibility and Design Concept - Central Recreation Victoria Coast Council Corryong Swimming Pool Master Plan - Shire of Towong Aquatic Facility Design Concept - Shire of Moorabool Corroyong Swimming Pool Coomunity Engagement - Shire of Aquatics Feasibility Study - Shire of Moorabool Towong Mildura Waves Competitive Neutrality Review - Mildura Rural City Newman Recreation Facilities Master Plan (including aquatic Whittlesea Swimming Pool Upgrade Feasibility - City of Whittle- facilities) - Shire of East Pilbara sea Business Case and Concept for a Kununurra Aquatic and Hydrotherapy Facility Feasibility - Shire of Campaspe Leisure Facility - City of Wyndham Management of the Operation of the Swimming Pools 2017-2018 Business Case and Feasibility - Tweed Regional Sports - West Coast Council Centre (including aquatic centre) - Tweed Shire West Coast Aquatic Facilities Strategy - West Coast Council Business and Marketing Plan for a new Aquatic Centre - City of Orange Portland Leisure and Aquatic Centre Feasibility Study - including Business Plan and Concept Design - Shire of Glenelg Regional Aquatic and Netball Precinct Feasibility and Master plan - Yarra Ranges Shire Short Term Aquatic Demand Strategy - City of Wyndham Aquatic Facility Development Strategy and Strategic Technical Review of Seymour -
Corangamite Planning Scheme Amendment
Planning and Environment Act 1987 CORANGAMITE PLANNING SCHEME AMENDMENT C36 EXPLANATORY REPORT Who is the planning authority? This amendment has been prepared by the Corangamite Shire Council, which is the planning authority for this amendment. The amendment has been made at the request of the Corangamite Shire Council. Land affected by the amendment The amendment applies to all places listed in the Schedule to Clause 43.01 Heritage Overlay. This includes all land within 10 heritage precincts and 76 individual places proposed for inclusion in the Schedule to the Heritage Overlay. The amendment identifies 10 heritage precincts in the following locations: 1. Cobden Commercial and Civic Precinct, Curdie Street and High Street, Cobden 2. Derrinallum Commercial Precinct, Main Street, Derrinallum 3. Lismore Early Township Precinct, Ferrers Street and High Street, Lismore Noorat Township Precinct, Terang-Mortlake Road, Glenormiston Road, McKinnons Bridge Road 4. and Factory Lane, Noorat Pomborneit North Township Precinct, Princes Highway, Foxhow-Pomborneit Road and Rands 5. Road, Pomborneit North Skipton Township Precinct, Montgomery Street, Cleveland Street, Anderson Street and Wright 6. Street, Skipton 7. High Street Commercial Precinct, High Street, Terang 8. Lyons Street Precinct, Lyons Street and Baynes, Terang 9. Thomson Street Precinct, Thomson Street, Terang Bradshaws Hill Residential Precinct, Warrnambool Road, Seymour Street and Tobin Street, 10. Terang. The extent of each precinct is shown on the attached maps. The amendment also identifies 76 individual places and applies to land known as: 1. Former Berrybank State School No. 3639, 7772 Hamilton Highway, Berrybank 2. Berrybank Homestead Complex, 8004 Hamilton Highway, Berrybank 3. Warwarick Homestead Complex, 315 Darlington Road, Bookaar 4. -
' Victoria's Biodiversity: – Directions in Management'
' Victoria's Biodiversity: – Directions in Management' _ Crown (State of Victoria) 1997 Copyright in photographs and fine art remains with the photographers and artists unless otherwise stated Published by the Department of Natural Resources and Environment 8 Nicholson Street, East Melbourne 3002, Victoria This document in conjunction with 'Victoria's Biodiversity — Our Living Wealth' and 'Victoria's Biodiversity — Sustaining Our Living Wealth' comprise the Strategy required under Section 17 of the 'Flora and Fauna Guarantee Act' 1988. Produced by the Secretary, Department of Natural Resources and Environment. This publication is copyright. Apart from any fair dealing for private study, research, criticism or review allowed under the Copyright Act 1968, no part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, photocopying or otherwise, without the prior permission of the copyright holder. ISBN 0 7306 6763 4 Project co-ordination — David Meagher Design & production — O2 Design Film & printing — D & D Printing Printed on recycled paper to help conserve our natural environment 2 Victorian Biodiversity in the Year 2020: A History of the Future Throughout the world, Victoria has been recognised for over a decade as the premier state in Australia for the protection and enhancement of its biodiversity assets. It has the nation's most comprehensive reserve system forming the cornerstone for the sustainable use of Victoria's terrestrial, freshwater and marine ecosystems. In 2020, these 'jewels in Victoria's crown' are highly valued by the local community and international visitors. As our understanding of the biodiversity of Victoria increased many 'conservation' issues were resolved because there was an increased awareness of what each component added to the health of the environment. -
Victoria Regio
VICTORIA. ANNO QUADRAGESIMO TERTIO VICTORIA REGIO. No. DCLIV. An Act to apply a sum out of the Consolidated Revenue to the service of the year ending on the last day of June One thousand eight hundred and eighty and to appropriate the Supplies granted in this Session of Parliament. [5th February 1880.] MOST GRACIOUS SOVEREIGN— E Your Mai esty's most dutiful and loyal subjects the Legislative Preamble. W Assembly of Victoria in Parliament assembled towards making good the supply which we have cheerfully granted to Your Majesty in this session of Parliament have resolved to grant unto Your Majesty the sums hereinafter mentioned and do therefore most humblv beseech Your Majesty that it may be enacted And be it enacted by the Queen's Most Excellent Majesty by and with the advice and consent of the Legis lative Council and the Legislative Assembly of Victoria in this present Parliament assembled and by the authority of the same as follows:— 1. Out of the Consolidated Revenue there shall and may be Application of issued and applied for or towards making good the supply granted to mone>rs Her Majesty a sum not exceeding One million seven hundred and seventy- .£1,779,772. nine thousand seven hundred and seventy-two pounds for the service of the year ending on the thirtieth dav of June One thousand eight hundred and eighty. 2. All sums granted by this Act and the other Acts mentioned Appropriation of in the First Schedule annexed to this Act out of the said Consolidated _SuJ^es; First Selie-liilc, Revenue towards making irood the supply granted to Her Majestv amounting" Published as a Supplement to the c Victoria Government Gazette' of Friday, 6th February JSKO. -
Town and Country Planning Board of Victoria
1965-66 VICTORIA TWENTIETH ANNUAL REPORT OF THE TOWN AND COUNTRY PLANNING BOARD OF VICTORIA FOR THE PERIOD lsr JULY, 1964, TO 30rH JUNE, 1965 PRESENTED TO BOTH HOUSES OF PARLIAMENT PURSUANT TO SECTION 5 (2) OF THE TOWN AND COUNTRY PLANNING ACT 1961 [Appro:timate Cost of Report-Preparation, not given. Printing (225 copies), $736.00 By Authority A. C. BROOKS. GOVERNMENT PRINTER. MELBOURNE. No. 31.-[25 cents]-11377 /65. INDEX PAGE The Board s Regulations s Planning Schemes Examined by the Board 6 Hazelwood Joint Planning Scheme 7 City of Ringwood Planning Scheme 7 City of Maryborough Planning Scheme .. 8 Borough of Port Fairy Planning Scheme 8 Shire of Corio Planning Scheme-Lara Township Nos. 1 and 2 8 Shire of Sherbrooke Planning Scheme-Shire of Knox Planning Scheme 9 Eildon Reservoir .. 10 Eildon Reservoir Planning Scheme (Shire of Alexandra) 10 Eildon Reservoir Planning Scheme (Shire of Mansfield) 10 Eildon Sub-regional Planning Scheme, Extension A, 1963 11 Eppalock Planning Scheme 11 French Island Planning Scheme 12 Lake Bellfield Planning Scheme 13 Lake Buffalo Planning Scheme 13 Lake Glenmaggie Planning Scheme 14 Latrobe Valley Sub-regional Planning Scheme 1949, Extension A, 1964 15 Phillip Island Planning Scheme 15 Tower Hill Planning Scheme 16 Waratah Bay Planning Scheme 16 Planning Control for Victoria's Coastline 16 Lake Tyers to Cape Howe Coastal Planning Scheme 17 South-Western Coastal Planning Scheme (Shire of Portland) 18 South-Western Coastal Planning Scheme (Shire of Belfast) 18 South-Western Coastal Planning Scheme (Shire of Warrnambool) 18 South-Western Coastal Planning Scheme (Shire of Heytesbury) 18 South-Western Coastal Planning Scheme (Shire of Otway) 18 Wonthaggi Coastal Planning Scheme (Borough of Wonthaggi) 18 Melbourne Metropolitan Planning Scheme 19 Melbourne's Boulevards 20 Planning Control Around Victoria's Reservoirs 21 Uniform Building Regulations 21 INDEX-continued. -
Electronic Gaming Machines Strategy 2015-2020
Electronic Gaming Machines Strategy 2015-2020 Version: 1.1 Date approved: 22 December 2015 Reviewed: 15 January 2019 Responsible Department: Planning Related policies: Nil 1 Purpose ................................................................................................................. 3 2 Definitions ............................................................................................................. 3 3 Acronyms .............................................................................................................. 5 4 Scope .................................................................................................................... 5 5 Executive Summary ............................................................................................. 5 6 Gambling and EGMs in the City of Casey ........................................................... 6 7 City of Casey Position on Electronic Gaming Machines ................................... 7 7.1 Advocacy & Partnerships ....................................................................................... 7 7.2 Local Economy ....................................................................................................... 8 7.3 Consultation & Information Provision ...................................................................... 9 7.4 Community Wellbeing ............................................................................................ 9 7.5 Planning Assessment .......................................................................................... -
To Owon Ng S Hire E Cou Unci L
TOOWONG SHIRE COUNCIL Decision on application for a higher cap for 2016-17 May 2016 An appropriate citation for this paper is: Essential Services Commission 2016, Towong Shire Council — Decision on application for a higher cap for 2016-17, May. ESSENTIAL SERVICES COMMISSION. THIS PUBLICATION IS COPYRIGHT. NO PART MAY BE REPRODUCED BY ANY PROCESS EXCEPT IN ACCORDANCE WITH THE PROVISIONS OF THE COPYRIGHT ACT 1968 AND THE PERMISSION OF THE ESSENTIAL SERVICES COMMISSION. CONTENTS 1. OUR DECISION 1 2. WHAT DID THE COUNCIL APPLY FOR AND WHY? 3 3. HOW DID WE REACH OUR DECISION? 4 APPENDIX A: SUMMARY OF COMMUNICATIONS WITH TOWONG 10 APPENDIX B: LGPRF INDICATOR DEFINITIONS 11 ESSENTIAL SERVICES COMMISSION DECISION ON APPLICATION FOR A HIGHER CAP 2016-17 III VICTORIA TOWONG SHIRE COUNCIL 1. OUR DECISION The Fair Go Rates System (FGRS), established in the Local Government Act 1989 (the Act), requires local councils to limit their average annual rate increases to a rate cap, determined annually by the Minister for Local Government (the Minister).1 For the 2016-17 rating year, the cap has been set at 2.5 per cent. Councils wishing to increase their average annual rates by more than 2.5 per cent in 2016-17 must first obtain approval from the Essential Services Commission (the Commission). We are responsible for approving, rejecting or approving in part the higher cap sought by a council. This paper outlines our decision in response to an application by Towong Shire Council (Towong) for a higher cap of 6.34 per cent (which includes the Minister’s rate cap of 2.5 per cent) to apply in 2016-17. -
Moyne Warrnambool Rural Housing and Settlement Strategy
Moyne Warrnambool Rural Housing and Settlement Strategy Rural Housing and Settlement Strategy Report 23 March 2010 Prepared by CPG Australia Contents 1 Introduction 1 1.1 Principles 1 2 Social and settlement 2 2.1 Social and settlement objectives 2 2.2 Social and settlement strategies 2 2.2.1 Overview of recommendations 2 2.2.2 Sustainable communities 4 2.2.3 Role, hierarchy and growth of settlements 4 2.2.4 Settlement Boundaries 6 2.3 Choice and diversity of lots, housing opportunities and vacant land 6 2.3.1 Overview of recommendations 6 2.3.2 Lot sizes and density 6 2.3.3 Vacant and available land 7 3 Economic 8 3.1 Economic objectives 8 3.2 Economic strategies 8 3.2.1 Overview of recommendations 8 3.2.2 Houses in agricultural areas and farming zones 8 4 Environment 10 4.1 Environmental objectives 10 4.2 Overview of recommendations 10 4.3 Commentary 10 4.4 Studies 10 5 Framlingham Mission 11 5.1 Site details: History 11 5.1.1 Early history 11 5.1.2 Hand-back 11 5.2 Site Details: Current Conditions 12 5.2.1 Framlingham Aboriginal Trust 12 5.2.2 Kikkabush 12 5.3 Planning Scheme Controls 13 5.4 Planning for Aboriginal Communities 13 5.4.1 Victoria 13 5.4.2 Western Australia 13 5.4.3 Northern Territory 14 5.5 Discussion and Principles 14 5.5.1 Appropriate Zone 12 5.5.2 Principles 12 5.6 Recommendations for Framlingham 15 6 EnPlan Report – Moyne Shire Land Capability and Biodiversity Project 16 Attachment 1 Settlement Appraisal 18 Attachment 2 Settlement Services Audit 96 Glossary 97 1 Introduction This document details the recommended strategy for the future management of housing and settlement throughout the rural areas of the Shire of Moyne and the City of Warrnambool. -
Corangamite Heritage Study Stage 2 Volume 3 Reviewed
CORANGAMITE HERITAGE STUDY STAGE 2 VOLUME 3 REVIEWED AND REVISED THEMATIC ENVIRONMENTAL HISTORY Prepared for Corangamite Shire Council Samantha Westbrooke Ray Tonkin 13 Richards Street 179 Spensley St Coburg 3058 Clifton Hill 3068 ph 03 9354 3451 ph 03 9029 3687 mob 0417 537 413 mob 0408 313 721 [email protected] [email protected] INTRODUCTION This report comprises Volume 3 of the Corangamite Heritage Study (Stage 2) 2013 (the Study). The purpose of the Study is to complete the identification, assessment and documentation of places of post-contact cultural significance within Corangamite Shire, excluding the town of Camperdown (the study area) and to make recommendations for their future conservation. This volume contains the Reviewed and Revised Thematic Environmental History. It should be read in conjunction with Volumes 1 & 2 of the Study, which contain the following: • Volume 1. Overview, Methodology & Recommendations • Volume 2. Citations for Precincts, Individual Places and Cultural Landscapes This document was reviewed and revised by Ray Tonkin and Samantha Westbrooke in July 2013 as part of the completion of the Corangamite Heritage Study, Stage 2. This was a task required by the brief for the Stage 2 study and was designed to ensure that the findings of the Stage 2 study were incorporated into the final version of the Thematic Environmental History. The revision largely amounts to the addition of material to supplement certain themes and the addition of further examples of places that illustrate those themes. There has also been a significant re-formatting of the document. Most of the original version was presented in a landscape format. -
Forty -Second Annual Report
1955 VICTORIA COUNTRY ROADS BOARD FORTY -SECOND ANNUAL REPORT FOR YEAR ENDED 30TH JUNE, 1955 PRESENTED TO BOT:S. HOUSES 01<' PARLIAMENT PURSUA~'l' ro ACT No. 3662. ! Approximate Cost ot Rttport. ~ Preparat10tl1 nor. given. Printiug t l,OfJH l.:'oJ.Ue&J, ~770 ] By Autbomy : \V. J\L HOUSTON. c;OVERNMENT PRINTER. MELBOURNE. ;'i<o. 32.-[3s. 6d.i-l2648;55. Dual carriageway and channelization of Princes Highway through township of Dandenong. Cover.-A recently constructed pre-cast concrete bridge over Lightning Creek on tne Omeo Hignway. COUNTRY ROADS BOARD FORTY-SECOND ANNUAL REPORT, 1955 CONTENTS FINANCE~ Page Increase in revenue 7 fn&dequacy of funds for present works 9 Applications for funds 9 Receipts from motor registration fees, &c. 10 Commonwealth Aid Roads Act 1954 .. 10 I.nan moneys 11 Total works, allocation 11 MAIN ROADS- Allocation of funds 11 Apportionment of costs 11 Contributions by Municipal Councils 12 Particulars of works carried out 12 STATE HIGHWAYS- Restricted allocation of funds 18 Works carried out 18 TOURISTS' ROADS- Allocation of funds 27 Works carried out 27 J<'ORESTS RoADS- Funds allocated 29 Works carried out 29 UNCLASSIFIED ROADS- Applications from Councils for grants 29 Amounts allotted 29 Major works cal'ried out 29 BRIDGES- Board's financial resources immfficient 32 Construction-completed or in progress 32 Metropolitan bridges as Country bridges .. 33 J!'LOOD AND RGSH FIRE DAMAGE-- Most seriously affected areas 43 Applications received and grants made 43 WORKS FOR OTiillR AuTHORITms Department of Public Works