Traffic & Transport Capital Schemes
Total Page:16
File Type:pdf, Size:1020Kb
Area Forums: Key CAF: Chiswick Area Forum Complete IBAF: Isleworth & Brentford Area Forum Cancelled CHAF: Central Hounslow Area Forum On Hold HCAF: Heston & Cranford Area Forum BFHAF: Bedfont, Feltham & Hanworth Area Forum Traffic & Transport Capital Schemes - December 2020 Number of live projects: 135 Indicative Implementation Date URN Project Title Street(s) Impacted Area Forum(s) Scheme Details Status (subject to approvals & statutory utility compliance) Awaiting start date from TM-2015-LowBridge Low bridge signing N/A # All Changing all warning signs to mandatory signs Hounslow Highways Autumn 2020 Hounslow Road , Feltham New signed and marked footway parking areas (A244), Hounslow Road, Feltham (A314), Staines Road, FW-2017- (A-Roads) Footway Parking - (A-Roads) Feltham (A315) # All Feasibility Spring 2021 Conversion of archway under Kew Bridge to a RAIL-2018-KewBridgeArch Kew Bridge Arch Kew Bridge # CAF, IBAF pedestrian route Feasibility Spring 2020 A315 from borough boundary to Hounslow Town Centre/ Kew Bridge Road A205 from Kew Bridge to Chiswick Roundabout. Includes Impacts on access to Dukes Road, Dukes Avenue, Wellesley Cycle Superhighway 9 - Chiswick to Hounslow Road and Stile Hall Gardens in Informal outline design CS9-2015-CHR-HTC Town Centre Chiswick # CAF, IBAF, CHAF Cycle improvements consultation Spring 2020 Provision of cycle lanes, pedestrian improvements and CORR-2016-Bath Rd Bath road - Cycle lanes and public realm Bath Road (Rosemary Avenue other road safety interventions Awaiting start date from (Rosemary to A4) improvements to A4) # CHAF, HCAF Hounslow Highways Winter 2021/22 Provision of cycle lanes, pedestrian improvements and CORR-2016-Bath Rd (HTC to Bath road - Cycle lanes and public realm Bath Road (Hounslow Town other road safety interventions Solway) improvements Centre to Solway) # CHAF, HCAF Detailed design Summer 2022 RAIL-2015-WLO A proposal to improve transport between Hounslow and Old Oak Common through provision of a passenger transport service on the Hounslow loop and then using the existing freight alignment at the Kew Curve to access the North London line. This could potentially include a new station on Lionel Road, to the west of the consented football stadium. The scheme could be extended via the Dudding Hill freight line to West London Orbital N/A # CHAF, IBAF Cricklewood. Mayors Transport Strategy Proposal 88. Feasibility Summer 2026 ENV-2019- FelthamHeritageTrail Feltham Heritage Trail N/A BFHAF Signage to promote heritage assets in Feltham Feasibility Unknown Bedfont Road Cycle Links - Bedfont Road Cycle Improvements on Bedfont Road from Bedfont On hold - awaiting TM-2017-BedfontRoadPhase3 Bridge to Chertsey Road (Phase 3) Bedfont Road BFHAF Road Bridge to Chertsey Road resource Unknown Staines Road - Hounslow CORR-2014- Staines Road Corridor - A244 Hounslow Road Road Junction to Bedfont Lane On Hold - Awaiting STAINES:A244:BedfontL to Bedfont Lane Junction BFHAF Improvements for cyclists Resource Unknown Footway between Park Way Improvement of cycle link between Feltham Arenas On Hold - Awaiting GREEN-2015-Harlingtonlink Greenways: Hounslow/Harlington Road Links and Harlington Road BFHAF and Hounslow Heath Resource Unknown Roads in vicinity of Sparrow ENV-2019- Farm schools, consideration of Informal detailed design SparrowFmSchoolSt Sparrow Farm - school street school streets BFHAF School street area on Denham Road consultation Winter 2019/20 GREEN-2012-West Area Greenways: West Area - Browells Lane to Browells Lane, Feltham High On Hold - awaiting Greenways Victoria Primary Street BFHAF Creation of new shared use path along Riverside planning consent Unknown PM-2016-FootwayShaftesbury New signed and marked footway parking areas Buckingham Ave, Elmcroft Close, Gladstone Ave, Helen Ave, Lansbury Ave, Rosslyn Awaiting start date from Shaftesbury Avenue Area Ave, Shaftesbury Ave Feltham BFHAF Hounslow Highways Spring 2021 TM-2018- Shared use route from borough boundary to Provision of shared use route from borough boundary HounslowRdshareduse Saxon Avenue Hounslow Road (Hanworth) BFHAF to Saxon Avenue to link cycle facilities to Crane Park Detailed Design Unknown RSE-2019-HanworthRdVAS Hanworth Road Vehicle Activated Signs Hanworth Road (Feltham) BFHAF Provision of VAS in Hanworth Road, Feltham Complete Summer 2020 GREEN-2012-West Area Greenways: West Area - Cardinal Infant Widening of existing path for shared cycle/pedestrian On hold awaiting Greenways Entrance Alleway off Cardinal Road BFHAF use and associated landscaping. planning Summer 2020 GREEN-2012-West Area Greenways: West Area - Cardinal Infant Widening of existing path for shared cycle/pedestrian On hold awaiting Greenways Entrance Alleway off Cardinal Road BFHAF use and associated landscaping. planning Summer 2020 Feltham High Street, Bedfont Lane, Hanworth Road, New Major renewal in Feltham area as part of feasibility for MAJOR-2014-FelthamPhase1 Feltham Major Scheme - Phase 1 Road, Hounslow Road BFHAF closure of Bedfont Lane Level Crossing Complete Autumn 2020 Feltham High Street, Bedfont Lane, New Road, Hounslow Road, Victoria Road, Mono Major renewal in Feltham area as part of feasibility for MAJOR-2014-FelthamPhase2 Feltham Major Scheme - Phase 2 Lane BFHAF closure of Bedfont Lane Level Crossing Complete Autumn 2020 Potential formalisation of parking on green space On Hold - awaiting PM-2019-FawnsManor Fawns Manor Road - Env Improvements Fawns Manor Road BFHAF owned by housing. resource Summer 2020 Hampton Lane - Safety assessment of junction Hampton Lane - Safety assessment of junction for RSE-2019-HamptonLane for pedestrians Hampton Lane BFHAF pedestrians Detailed design Summer 2021 Traffic management scheme for New Road Traffic management scheme to improve traffic flow and Awaiting start date from TM-2017-NewRoadBedfont (One Way Working) New Road, Bedfont BFHAF safety on New Road, Bedfont Hounslow Highways Spring 2021 A312/A315 Junction (Tesco s106) Pedestrian Feasibility study for pedestrian Improvements at this On Hold - Awaiting TM-2016-A312/A315Junction Improvements - feasibility only A312/A315 Junction BFHAF junction review by TfL Summer 2020 Scheme to reduce traffic volumes in Colonial Traffic management scheme to improve traffic flow and TM-2019-ColonialRd Road, Feltham Colonial Road, Feltham BFHAF safety on Colonial Road, Feltham Detailed design Spring 2021 Traffic management scheme for New Road Traffic management scheme to improve traffic flow and Awaiting start date from TM-2017-NewRoadBedfont (One Way Working) New Road, Bedfont BFHAF safety on New Road, Bedfont Hounslow Highways Spring 2021 Scheme to reduce traffic volumes in Colonial Traffic management scheme to improve traffic flow and Awaiting start date from TM-2019-ColonialRd Road, Feltham Colonial Road, Feltham BFHAF safety on Colonial Road, Feltham Hounslow Highways Spring 2021 Awaiting start date from TM-2018-Churchfieldsbus Churchfields Avenue Bus Stand Churchfields Avenue BFHAF Public Realm improvement around Bus Stand Hounslow Highways Winter 2020/21 Awaiting start date from TM-2018-Churchfieldsbus Churchfields Avenue Bus Stand Churchfields Avenue BFHAF Public Realm improvement around Bus Stand Hounslow Highways Winter 2020/21 FW-2020-watermill Footway Parking Formalisation - Watermill Way Watermill Way BFHAF Footway Parking Formalisation - Watermill Way Feasibility Winter 2020/21 Design and construction of new pedestrian bridge on MAJOR-2014-FelthamPhase3 Feltham Major Scheme - Phase 3 Hounslow Road, Feltham BFHAF A244 Hounslow Road. Detailed Design Summer 2021 TM-2016-HounslowRoadPark- Cycle Improvements for Hounslow Road A316 Hanworth (Park Road to A316) Hounslow Road (Hanworth) BFHAF Cycle and Pedestrian improvements on this corridor Detailed Design Summer 2021 TM-2018- Shared use route from borough boundary to Provision of shared use route from borough boundary HounslowRdshareduse Saxon Avenue Hounslow Road (Hanworth) BFHAF to Saxon Avenue to link cycle facilities to Crane Park Detailed Design Unknown Alfred Road, Ashfield Road,Cardinal Road,Camden Avenue, Danesbury Road, CPZ-2019- Florence Road, Hanworth Informal outline design DanesburyRoadFelthamArea CPZ in Danesbury Avenue, Feltham Road (SW side) BFHAF CPZ in Danesbury Road, Feltham consultation Autumn 2021 GREEN-2019-GreenwayB391- A316 Greenway B391 to A316 Hounslow Road (Hanworth) BFHAF Provision of greenway alongside Longford River On hold Unknown RAIL-2015-SRA Proposal for a new link to Heathrow airport from Bedfont Road, Wooldridge Feltham to Terminal 5 broadly along the alignment of Close, Clockhouse Lane, Bedfont Road and inclusive of a new station in the Southern Rail Access to Heathrow Airport Great South West Road BFHAF vicinity of Clockhouse Roundabout. Feasibility Summer 2025 Chiswick West CPZ, Stile Hall Junction Protection (DYL at junctions) - Tranche 11 CPZ and Gunnersbury Estate PM-2018-Junctiontranche11 Junction protection tranche 11 CPZ. CAF Statutory Consultation Spring 2019 Area Forums: Key CAF: Chiswick Area Forum Complete IBAF: Isleworth & Brentford Area Forum Cancelled CHAF: Central Hounslow Area Forum On Hold HCAF: Heston & Cranford Area Forum BFHAF: Bedfont, Feltham & Hanworth Area Forum Traffic & Transport Capital Schemes - December 2020 Number of live projects: 135 Indicative Implementation Date URN Project Title Street(s) Impacted Area Forum(s) Scheme Details Status (subject to approvals & statutory utility compliance) Junction table on Power Road, junction with North TM-2019-Powerrdimp Junction table on Power Road Power Road CAF Circular On