TN3013-CERP Project Indian River Lagoon
Total Page:16
File Type:pdf, Size:1020Kb
CERP Project: Indian River Lagoon - South About Everglades Restoration News & Events Facts & Information Learn & Teach Get Involved Programs Projects & Studies Home » Projects & Studies » Indian River Lagoon - South Home Join our mailing list Projects & Studies Overview and receive CERP updates CERP Project: by e-mail! Glossary of Project Terms Indian River Lagoon - South Project List Learn more about the Plants and SHARE: Animals of the Everglades! Feasibility Studies Non-CERP Restoration View our fact sheets on the Projects Comprehensive Everglades Restoration Plan (CERP) CERP GIS Project Locator 19 Aug 2013 | FACT SHEET Project & Study Documents Updated IRL-S Fact Sheet (1.8 mb, PDF) View upcoming CERP meetings and workshops Public Meetings & Workshops 19 Aug 2013 | CONSTRUCTION UPDATE IRL-S Construction Update (PDF) 3 Nov 2011 | IN THE SPOTLIGHT (FEATURE ARTICLE): USACE, partners, stakeholders celebrate another milestone in restoring America's Everglades | VIEW FULL ARTICLE 26 Oct 2011 | News Release: U.S. Army Corps of Engineers, partners, stakeholders celebrate another milestone in restoring America's Everglades (PDF) VIRTUAL TOURS: Component Virtual Tour View a virtual tour of all components of the IRL Project The Indian River Lagoon (IRL) is considered the most biologically diverse estuarine system in the continental United States with more than 3,000 species of animal and plants according to the Smithsonian Marine Institute. Project purpose is to improve surface-water management in the C-23/C-24, C-25, and C-44 basins for habitat improvement in the Saint Lucie River (SLR) Estuary and southern portions of the Indian River Lagoon. The project is expected to provide significant water-quality improvement benefits to both the IRL and the SLR Estuary by reducing the load of nutrients, pesticides, and suspended materials from basins runoff. Based on the feasibility study and PIR approved by Congress in 2007 and further refinements, the project is expected to include the following components: Construction and operation of four new large-scale above-ground reservoirs and their connecting canals, control structures, levees and pumps to capture water from the, C-23, C-24, C-25, and C-44 canals for increased storage. A total combined new water storage of about 130,000 acre-ft (44 billion of gallons) of new storage. http://www.evergladesplan.org/pm/projects/proj_07_irl_south.aspx[1/27/2014 10:42:26 AM] CERP Project: Indian River Lagoon - South Construction and operation of four new storm-water treatment areas (STAs) (constructed marsh), one for each C-23/C-24 North, C-23/C-24 South, C-25, and C-44 basins, to reduce sediment, phosphorus, and nitrogen entering the SLR estuary and the IRL. A total combined new STAs (constructed marsh) of about 9,100 acres. Restoration of about 92,100 acres of upland/wetland areas and habitat with ditch plugging, berm construction, and periodic fire maintenance. Redirection of water from the C-23/C-24 basin to the Northfork of the SLR attenuating freshwater flows to the estuary. About 7.9 million cubic yards of muck removal from the SLR’s estuary. About 900 acres of oyster shell, reef balls, and artificial submerged aquatic vegetation near muck removal sites will be added for habitat improvement. Informational Videos About Everglades Restoration Evans Creek on Saint Lucie Estuary C-44 Reservoir and Storm-water Treatment Area Birds of Saint Lucie County, FL http://www.youtube.com/watch?v=aPked5Zxt98 Virtual Tours View a virtual tour of all components of the IRL Project View the virtual tour of the C-44 Reservoir and Storm-water Treatment Area (RSTA) Sites of Interest (External Links) Naturally Central Florida – Indian River Lagoon (VIDEO) Indian River Lagoon National Estuary Program Introduction to a Natural Treasure (PDF) Indian River Lagoon Species Inventory The Lagoon and You Informational Video (Saint Johns River WMD) http://www.evergladesplan.org/pm/projects/proj_07_irl_south.aspx[1/27/2014 10:42:26 AM] CERP Project: Indian River Lagoon - South Other Informational Videos of Interest Everglades History - Part 1 Part 2 Part 3 Part 4 http://www.youtube.com/watch?v=ekwOBo-sI3g&NR=1 Teacher and Students Resources Coloring Book (4.7 mb, PDF) Activity Book (3.5 mb, PDF) Related Links & Project Documents: View the project management plan for this project View the fact sheet for IRL-South View the current project status report (PDF) View the Final PIR and Supplemental EIS (2004) View the Chief of Engineers Report for IRL-South (2004) http://www.evergladesplan.org/pm/projects/proj_07_irl_south.aspx[1/27/2014 10:42:26 AM] CERP Project: Indian River Lagoon - South View the project map for this project (PDF) View other project documents for this project View the Aug 2010 SFWMD Governing Board Presentation on the IRL-South Project Partnership Agreement (PDF) Project Contacts: U.S. Army Corps of Engineers: Orlando Ramos-Gines, USACE Senior Project Manager [email protected] Sponsor: Beth Kacvinsky, SFWMD [email protected] Susan Ray, SFWMD [email protected] Project Details: Project South Florida Water Management District Sponsor: Project For scheduling information regarding this project, please Schedule: see the Master Implementation Sequencing Plan (MISP). Project Phase: Pre-Construction, Engineering and Design Design 12 May 2000 Agreement: CERP B, UU (Part 1 and 2) Component Designation: Project 09 Sep 2010 Cooperation Agreement: Authorization: WRDA 2007 Back to Top USACE SFWMD Accessibility Contact Us Glossary Privacy Search En Español An Kreyòl http://www.evergladesplan.org/pm/projects/proj_07_irl_south.aspx[1/27/2014 10:42:26 AM].