Effects of Heavy Equipment on Physical Properties of Soils and on Long-Term Productivity: a Review of Literature and Current Research

Total Page:16

File Type:pdf, Size:1020Kb

Effects of Heavy Equipment on Physical Properties of Soils and on Long-Term Productivity: a Review of Literature and Current Research NATIONAL COUNCIL FOR AIR AND STREAM IMPROVEMENT EFFECTS OF HEAVY EQUIPMENT ON PHYSICAL PROPERTIES OF SOILS AND ON LONG-TERM PRODUCTIVITY: A REVIEW OF LITERATURE AND CURRENT RESEARCH TECHNICAL BULLETIN NO. 887 OCTOBER 2004 by Richard E. Miller, Ph.D. USDA Forest Service Olympia, Washington Stephen R. Colbert, Ph.D. American Forest Management Raleigh, North Carolina Larry A. Morris, Ph.D. University of Georgia Athens, Georgia Acknowledgments The authors thank those colleagues who provided information, particularly from unpublished reports. These include Bill McFee of Purdue University; Nick Chappell of Potlatch Corporation; and Cindy Prescott of the University of British Columbia. Special appreciation is due Janet Jones and Sherry Dean for editorial assistance and to Eric Vance for his technical review. For more information about this research, contact: Eric D. Vance, Ph.D. Alan A. Lucier, Ph.D. Project Leader Senior Vice President NCASI NCASI P.O. Box 13318 P.O. Box 13318 Research Triangle Park, N.C 27709-3318 Research Triangle Park, N.C. 27709-3318 (919) 941-6415 (919) 941-6403 [email protected] [email protected] For information about NCASI publications, contact: Publications Coordinator NCASI P.O. Box 13318 Research Triangle Park, NC 27709-3318 (919) 941-6400 [email protected] National Council for Air and Stream Improvement, Inc. (NCASI). 2004. Effects of heavy equipment on physical properties of soils and on long-term productivity: A review of literature and current research. Technical Bulletin No. 887. Research Triangle Park, N.C.: National Council for Air and Stream Improvement, Inc. © 2004 by the National Council for Air and Stream Improvement, Inc. serving the environmental research needs of the forest products industry since 1943 PRESIDENT’S NOTE Soil physical properties heavily influence the availability of water, nutrients, and oxygen to trees and are strongly related to the ability of a site to sustain productive forest growth. Soil physical properties also influence the susceptibility of soils to erosion, which has implications for both long- term site productivity and water quality. Forest management has the potential to degrade soil physical properties, but degradation can usually be avoided through appropriate management practices. Management can even mitigate poor physical properties inherent to some soil types or that result from past land uses or management practices. Because the physical state of the soil directly influences several indicators of sustainable forest management, it is intrinsically relevant to the goals of forest certification. Quantifying relationships between soil physical properties and tree growth and the effects of forest management practices on these relationships is difficult. This is due to the close ties between forest growth and other site limiting factors related to climate, topography, and inherent soil fertility. Because of these complexities, traditional agricultural models of soil disturbance and productivity cannot always be used to interpret the effects of forest management practices. Soil disturbance can also indirectly influence tree growth and stand productivity by altering limiting site factors. For example, soil compaction reduces vegetative competition and increases tree seedling growth on some sites. Effects of management practices also depend to a large extent on the time of year the practices take place, the type of equipment used, the expertise of the operator, and whether appropriate guidelines (e.g., Best Management Practices) are followed. Despite evidence of negative effects of soil disturbance, trees have a remarkable ability to adapt. There is also strong evidence that short-term effects of management-induced soil disturbance on tree growth should not be used to derive conclusions about long-term site productivity. This report provides a comprehensive review of relationships between soil physical properties and long-term site productivity. It contains detailed information on a) mechanistic relationships between soil physical properties and root growth, b) tree growth on disturbed soil, c) soil recovery from compaction and puddling, d) ameliorating soil disturbance, and e) preventive measures. The report is based on data collected from a wide range of forest sites across the United States, western Canada, Australia, and New Zealand, and should serve as a valuable reference on this important topic for years to come. Ronald A. Yeske October 2004 National Council for Air and Stream Improvement au service de la recherche environnementale pour l’industrie forestière depuis 1943 MOT DU PRÉSIDENT Les propriétés physiques des sols jouent un rôle important dans l’approvisionnement des arbres en eau, en éléments nutritifs et en oxygène et sont intimement liées à la capacité du site de soutenir la croissance des arbres d’une façon productive. Les propriétés physiques des sols influencent également leur susceptibilité à l’érosion ce qui a des conséquences à long terme sur la productivité des sites et la qualité de l’eau. Les pratiques d’aménagement forestier peuvent détériorer les propriétés physiques des sols, mais cette dégradation est évitable si on fait appel à des pratiques d’aménagement adéquates. Les gestionnaires peuvent même réduire les faibles propriétés physiques inhérentes de certains types de sols ou de ceux découlant d’une utilisation passée des terres ou de vieilles pratiques d’aménagement. Les conditions physiques des sols sont par nature liées aux objectifs de la certification forestière car elles influencent directement plusieurs indicateurs d’aménagement forestier durable. Il est difficile de déterminer les relations entre les propriétés physiques des sols et la croissance des arbres et de quantifier l’effet des pratiques d’aménagement forestier sur ces relations en raison des liens étroits qui existent entre la croissance des arbres et les autres facteurs limitatifs du site liés au climat, à la topographie et à la fertilité inhérente du sol. Compte tenu de la complexité du système, il n’est pas toujours possible de faire appel aux modèles agricoles traditionnels sur la productivité et le déséquilibre des sols pour interpréter les effets des pratiques de gestion forestière. Les perturbations du sol peuvent également agir indirectement sur la croissance des arbres et la productivité des peuplements en modifiant les facteurs limitatifs du site. Par exemple, le tassement des sols diminue la concurrence végétale et augmente la croissance des semis d’arbres sur certains sites. Les effets des pratiques d’aménagement dépendent aussi en grande partie de la période dans l’année où s’opèrent ces pratiques, du type d’équipement employé, de la compétence de l’opérateur et de l’utilisation ou non de directives adéquates (c’est-à-dire de bonnes pratiques de gestion). Malgré qu’on puisse démontrer les effets négatifs de la perturbation des sols sur les arbres, ceux-ci ont une capacité remarquable d’adaptation. Il y a aussi de nombreuses évidences que les effets à court terme de la perturbation des sols sur la croissance des arbres causée par un aménagement artificiel ne devraient pas servir à établir des conclusions sur la productivité à long terme du site. Le présent rapport est une revue complète des relations entre les propriétés physiques des sols et la productivité à long terme d’un site. Il contient de l’information détaillée sur a) les relations mécanistes entre les propriétés physiques des sols et la croissance des racines, b) la croissance des arbres sur des sols perturbés, c) la régénération d’un sol tassé ou transformé en boue, d) les façons de moins perturber les sols et e) les mesures de prévention. Ce rapport repose sur des données recueillies dans de nombreux sites forestiers à travers les États-Unis, l’ouest canadien, l’Australie et la Nouvelle-Zélande. Il devrait être une référence utile pour les prochaines années en ce qui concerne cet important sujet. Ronald A. Yeske Octobre 2004 National Council for Air and Stream Improvement EFFECTS OF HEAVY EQUIPMENT ON PHYSICAL PROPERTIES OF SOILS AND ON LONG-TERM PRODUCTIVITY: A REVIEW OF LITERATURE AND CURRENT RESEARCH TECHNICAL BULLETIN NO. 887 OCTOBER 2004 ABSTRACT Soil disturbance caused by heavy equipment used for harvesting or site preparation can have negative effects on soil properties and long-term forest site productivity. Soil compaction, churning, rutting, mixing, displacement, and removal are types of disturbance that can reduce tree root growth through their influence on soil physical, chemical, and biological properties. Removal or displacement of surface soil can also expose deeper subsoil, which may be less suitable for root growth due to its greater bulk density and soil strength. Most information on the effects of soil disturbance on root growth is derived from studies of agricultural crops under carefully controlled laboratory and greenhouse conditions. In contrast, trees are long-lived and have great capacity to adapt to restrictive soil conditions through morphological and distributional changes in their root system. This adaptive capacity limits our ability to predict how trees will respond to soil compaction under field conditions. In most soils, compaction reduces subsequent root growth in direct proportion to the degree of compaction. The long-term significance of observed short-term reductions in growth will depend on whether reduced root growth is associated with a) an overall reduction in rootable soil volume and quality or b) simply a slower exploitation of the pre-disturbance
Recommended publications
  • Heavy Equipment
    Heavy Equipment Code: 5913 Version: 01 Copyright © 2007. All Rights Reserved. Heavy Equipment General Assessment Information Blueprint Contents General Assessment Information Sample Written Items Written Assessment Information Performance Assessment Information Specic Competencies Covered in the Test Sample Performance Job Test Type: The Heavy Equipment assessment is included in NOCTI’s Teacher assessment battery. Teacher assessments measure an individual’s technical knowledge and skills in a proctored prociency examination format. These assessments are used in a large number of states as part of the teacher licensing and/or certication process, assessing competency in all aspects of a particular industry. NOCTI Teacher tests typically oer both a written and performance component that must be administered at a NOCTI-approved Area Test Center. Teacher assessments can be delivered in an online or paper/pencil format. Revision Team: The assessment content is based on input from subject matter experts representing the state of Pennsylvania. CIP Code 49.0202- Construction/Heavy Career Cluster 2- 47-2073.00- Operating Engineers Equipment/Earthmoving Architecture and Construction and Other Construction Equipment Operation Equipment Operators NOCTI Teacher Assessment Page 2 of 12 Heavy Equipment Wrien Assessment NOCTI written assessments consist of questions to measure an individual’s factual theoretical knowledge. Administration Time: 3 hours Number of Questions: 232 Number of Sessions: This assessment may be administered in one, two, or three
    [Show full text]
  • MECHANIC I/II Application Deadline: September 16, 2020
    INYO COUNTY PERSONNEL SERVICES (760) 878-0377 P. O. BOX 249 FAX (760) 878-0465 INDEPENDENCE , CA 93526 AN EQUAL OPPORTUNITY EMPLOYER (WOMEN, MINORITIES, AND DISABLED ARE ENCOURAGED TO APPLY) ANNOUNCES AN OPEN RECRUITMENT FOR: HEAVY EQUIPMENT MECHANIC I/II Application Deadline: September 16, 2020 DEPARTMENT: Road LOCATION: Countywide SALARY: Mechanic I: Range 58 $3583 $3761 $3945 $4146 $4346 (+ 2-1/2% tool allowance) Mechanic II: Range 60 $3758 $3941 $4139 $4350 $4564 (+2-1/2% tool allowance) (The above monthly salary is paid over 26 pay periods annually.) **BENEFITS: CalPERS Retirement System: Existing (“Classic”) CalPERS members hired prior to January 1, 2013 (2% at 55) – Inyo County pays employee contribution of 7% for current CalPERS members; New (“PEPRA”) CalPERS members hired after January 1, 2013 (2% at 62) will be required to pay employee portion of retirement. Medical Plan – Inyo County pays a portion of employee and dependent monthly premium on PERS medical plans; 100% of employee and dependent monthly premium paid for dental and vision; $20,000 term life insurance policy on employee. Vacation – 10 days per year during the first three years; 15 days per year after three years; 1 additional day for each year of service after ten years to a maximum of 25 days per year. Sick leave – 15 days per year. Flex (personal days) – 5 days per fiscal year. Paid holidays – 11 per year. ESSENTIAL JOB DUTIES: Maintains, repairs, and overhauls gasoline and diesel-powered construction, maintenance, and automotive equipment; examines and locates mechanical defects in a wide variety of automotive, road construction, and maintenance equipment, including diesel and gasoline-powered trucks, tractors, and motor graders; makes a variety of mechanical repairs including engine tune-ups, brake relining, electrical system repair; maintains records of time and materials used on each job; uses welding equipment to fabricate, rebuild, and strengthen various equipment parts; operates a variety of vehicles and equipment.
    [Show full text]
  • Slope Stability
    SLOPE STABILITY 1. General. Any excavation, which alters the levee or channel bank cross-section, either temporarily or permanently, must be checked to verify slope stability. Placement of stockpiles, heavy equipment, or other surcharges may also cause channel bank instabilities and should be analyzed. Verification of slope stability involves three basic parts: 1) obtaining subsurface information, 2) determining soil shear strengths and 2) determining a potential slide failure surface which provides the minimum safety factor against failure for various river stages. EM 1110-2-1913 and EM 1110-2-1902 provide detailed guidance for preparing a slope stability analysis. 2. Subsurface Information. Subsurface information in the vicinity of the proposed work can generally be obtained from the original levee/channel construction plans. Boring logs shown in these plans may or may not be located close to the work and the engineer must determine if additional subsurface information is needed. Additional boring(s) at the site are generally beneficial. Other completed work in the nearby vicinity may also provide useful information. Soil type, thickness of each soil zone, depth to bedrock, and groundwater conditions must be known to proceed with a slope stability analysis. 3. Selection of Soil Shear Strengths. Soils in and under levees in the Kansas City District usually consist of varying mixtures of sands, silts, and clays. Shear strength of these soils is defined in terms of a friction component (φ) and a cohesion component (C). C and φ can be determined by testing soil samples in special laboratory test apparatus or from special equipment, which can measure these parameters on site.
    [Show full text]
  • Appendix F: Geotechnical Engineering Investigation
    City of Santa Rosa—College Creek Apartments Project CEQA Guidelines Section 15183 Environmental Checklist Appendix F: Geotechnical Engineering Investigation FirstCarbon Solutions THIS PAGE INTENTIONALLY LEFT BLANK GEOTECHNICAL ENGINEERING INVESTIGATION PROPOSED WEST COLLEGE A VENUE APARTMENTS 2150 W. COLLEGE A VENUE SANT A ROSA, CALIFORNIA KA PROJECT No. 042-19004 APRIL 16, 2019 Prepared for: Ms. ROYCE PATCH USA PROPERTIES FUND, INC. 3200 DOUGLAS BOULEVARD, SUITE 200 ROSEVILLE, CALIFORNIA 95661 Prepared by: KRAzAN & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING DIVISION 1061 SERPENTINE LANE, SUITE F PLEASANTON, CALIFORNIA 94566 (925) 307-1160 ~~l<razan_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING• ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 16, 2019 KA Project No. 042-19004 Ms. Royce Patch USA Properties Fund, Inc. 3200 Douglas Boulevard, Suite 200 Roseville, California 95661 RE: Geotechnical Engineering Investigation Proposed West College Avenue Apartments 2150 W. College A venue Santa Rosa, California Dear Ms. Patch: In accordance with your request, we have completed a Geotechnical Engineering Investigation for the above-referenced site. The results of our investigation are presented in the attached report. If you have any questions, or if we may be of further assistance, please do not hesitate to contact our office at (925) 307-1160. DRJ:ht With Offices Serving The Western United States 1061 Serpentine Lane, Suite F •Pleasanton CA 94566 • (925) 307-1160 •Fax: (925) 307-1161 04219004 Report (West College Ave Apartments).doc
    [Show full text]
  • Harvesting Peat from the Bog to Your Operation
    MEDIA & FERTILIZER Harvesting Peat from the Bog to your Operation Figure 1. A virgin sphagnum bog in Quebec, Canada. Learn what’s involved in harvesting, packaging and shipping peat for horticulture production. The Canadian Peat Moss Industry By Neil Mattson, Bill Miller and Jeff Bishop • In 1999, 1.2 million metric tons of peat (10 million cubic meters) was harvested in Canada. n the 1960s, professors at Cornell University Harvesting and Processing were among the fi rst to advocate the use of peat When a company wants to open a new peat • It is estimated that 70 million metric tons in their soilless Peat-Lite mixes for greenhouse bog for harvesting, surveys are conducted to of peat accumulates annually in Canada, so production. Several properties of peat moss determine if a site contains horticulture grade current harvesting represents 1.7 percent Ihave led to its widespread adoption by the industry sphagnum. Th e peat should have a depth of at of annual accumulation. Thus, peat is over the intervening decades; these include: high least 2 meters, as it is desirable that a bog be able accumulating some 60 times faster than water holding and cation exchange capacity, lack to be harvested for many years (Figure 2). Ditches it is being harvested. of residual herbicides and weed seeds compared are built to drain surface water and access roads • Canada is estimated to contain 280 mil- to soil and composts, and low incidence of root- lion acres of peat land. In contrast, the peat borne pathogens. industry harvests on ca. 42,000 acres.
    [Show full text]
  • Heavy Equipment & Earth-Moving Activities
    Spill Response Agencies This brochure is one of a series of pamphlets • Erosion Prevention describing storm drain protection measures. ! To report a spill or release of hazardous material that actively threatens people or property call: Other pamphlets include: Stormwater ! After clearing, grading or excavating, ex- City of Long Beach - Fire Department posed soil poses a clear and immediate danger of Dial 911 Automotive Maintenance & Car Care Best Management stormwater pollution. Revegeta- ! To report a spill or release of motor oil, paint, solvents, or fuel in immediate danger of entering storm drain system call: Food Service Industry tion (permanent or temporary) City of Long Beach - Fire Department Fresh Concrete & Mortar Practices (BMPs) Dial 911 is an excellent form of ero- Application sion control for any site. If not in immediate danger of entering storm drain system call: General Construction & Site City of Long Beach - Fire Department Supervision Avoid excavation (562) 436-8211 ! To report non-hazardous spills in sewer system call: Horse Owners & Equine and grading activities during wet weather. City of Long Beach - Water Department Industry (562) 570-2390 Home Repair & Remodeling ! Construct diversion dikes to channel runoff Storm Drains & Public Streets around the site. Line channels with grass or ! To report clogged catch basins & drains call: Landscaping, Gardening & Pest Control City of Long Beach - Water Department roughened pavement to reduce runoff veloc- (562) 570-2390 Painting ity. ! To report sediment of mud in public street or alley call: City of Long Beach - Department of Public Works Swimming Pool, Jacuzzi & (562) 570-2700 Fountain Maintenance ! Cover stockpiles and excavated ! To report trash, leaves, branches, & grass clippings in the Roadwork & Paving soil with secured tarps or plas- public street or alley call: City of Long Beach - Department of Public Works For additional brochures call: tic sheeting.
    [Show full text]
  • For Geotechnical Investigations Over Quarry 1 and Quarry 2
    ENVIRONMENTALWORK PLAN For Geotechnical Investigations Over Quarry 1 and Quarry 2 CRATER RESOURCES SUPERFUND SITE UPPER MERION TOWNSHIP MONTGOMERY COUNTY, PA Prepared for: Renaissance Land Associates, L.P., Renaissance Land Associates II, L.P. and Renaissance Land Associates III, L.P. King of Prussia, Pennsylvania Prepared by: Synergy Environmental, Inc. Royersford, Pennsylvania Synergy Project No. 14-00151-01 March 2016 AR301824 Table of Contents 1.0 INTRODUCTION .................................................................................................................. 2 1.1 Previous Superfund Remedial Action Construction................................................................... 2 1.2 Approved Activities ..................................................................................................................... 2 1.3 Proposed Activities ...................................................................................................................... 3 2.0 PLANNED CONSTRUCTION CHANGES ............................................................................... 3 2.1 Geotechnical Borings within the Quarry limits .......................................................................... 3 2.2 Soil & Material Handling for Geotechnical Borings .................................................................. 4 2.3 Temporary Impacted Soil Staging and Disposal ........................................................................ 4 2.4 Documentation and Reporting ....................................................................................................
    [Show full text]
  • Heavy Equipment Operator Start Or Enhance Skills in Heavy Construction
    FAS T-TRACK CAREER TRAINING PROGRAM Heavy Equipment Operator Start or Enhance Skills in Heavy Construction Become a heavy equipment operator and earn an industry recognized credential. The Heavy Equipment Operator program was developed to meet the growing employment demands for equipment operators in the Shenandoah Valley, Northern Virginia and surrounding areas. A heavy equipment operator runs a variety of contractor equipment and trucks used in the construction of buildings, bridges, dams and roads. The primary applications of heavy equipment in construction are in demolition work, earth moving, trench digging, road construction and site grading. Heavy Equipment Operator Level 1 Fast-Track Career Training Program This class serves as the first level of training in the Heavy Training Benefits Equipment Operator program. Students will learn the following content: orientation to the trade, heavy equipment • Two-month National certification safety, identification of heavy equipment, basic operational • Guarantee to interview with hiring techniques, utility tractors, introduction to earthmoving, companies grades, interpreting civil drawings, and heavy highway basics • Short fast-track training to quickly gain skills orientation. • Safe hands-on simulator learning with on the job experiences March 26, 2019 – June 13, 2019 Tue, Thu 5 PM – 9 PM • Experience a variety of on-the-job scenarios LFCC Vint Hill Site and equipment 4151 Weeks Dr. Warrenton, VA 20187 • Experienced instructors and state-of-the-art equipment Registration Contact • Endorsed by the Carlene Hurdle Heavy Construction Workforce Director, Fauquier Campus Contractors Association 540-351-1045 | [email protected] /HEO Course Outline # Hours Watch Collin and Jason’s story, visit LFCCWorkforce.com/HEO. Employment Outlook Career Overview Median Wage $22.06 hr, $45,890/yr Heavy Equipment Operator The heavy equipment operator operates a variety of Project Growth through 2024 Faster than avg.
    [Show full text]
  • Investigation of Vertical Members to Resist Surficial Slope Instabilties
    m a r g o r P h c r a e s e R y a w h g i H n i s n o c s i W i s c o n s i n H i g h w a y R e s e a r c h P r o g r a m Investigation of Vertical Members to Resist Surficial Slope Instabilites SPR # 0092-05-09 Hani Titi and Sam Helwany Department of Civil Engineering and Mechanics University of Wisconsin-Milwaukee June 2007 WHRP 07-03 Wisconsin Highway Research Program Project ID 0092-05-09 Investigation of Vertical Members to Resist Surficial Slope Instabilities Final Report Hani H. Titi, Ph.D., P.E. Associate Professor and Sam Helwany, Ph.D., P.E. Associate Professor Department of Civil Engineering and Mechanics University of Wisconsin – Milwaukee 3200 N. Cramer St. Milwaukee, WI 53211 Submitted to The Wisconsin Department of Transportation June 2007 1. Report No. 2. Government Accession No 3. Recipient’s Catalog No 4. Title and Subtitle 5. Report Date June 2007 Investigation of Vertical Members to Resist Surficial Slope 6. Performing Organization Code Instabilities 7. Authors Performing Organization Report No. Hani H. Titi and Sam Helwany 8. Performing Organization Name and Address 10. Work Unit No. (TRAIS) University of Wisconsin-Milwaukee Office of Research Services and Administration 11. Contract or Grant No. Mitchell Hall, Room 273Milwaukee, WI 53201 WHRP 0092-05-09 12. Sponsoring Agency Name and Address 13. Type of Report and Period Wisconsin Department of Transportation Covered Division of Transportation Infrastructure Development Research Coordination Section 14.
    [Show full text]
  • Heavy Equipment Operator Site Leader
    HEAVY EQUIPMENT OPERATOR SITE LEADER JOB CODE: 7406 DEPARTMENT: Tioga Co. Public Works CLASSIFICATION: Non Competitive SALARY CODE: Public Works, Grade 1A ADOPTED: 9/95; Revised 5/96, 4/13, 06/18, 01/20, Tioga Co. Personnel & Civil Service DISTINGUISHING FEATURES OF THE CLASS: The work involves responsibility for leading and participating in the operation of a variety of heavy equipment used in road maintenance, construction projects or other public work activities. The work is performed under the direct supervision of the Highway Working Supervisor. General supervision is received from the Commissioner and Deputy Commissioner of Public Works. Leeway is allowed for the use of independent judgment in carrying out the details of the work. Supervision may be exercised over the work of Laborers, Heavy and Motor Equipment Operators. Does related work as required. TYPICAL WORK ACTIVITIES: (Illustrative only) Leads and participates in the operation of all equipment used in the construction and maintenance of highways, bridges and other public works projects; Leads and participates in the use of snow removal equipment including plows, heavy trucks, graders and 4 wheel drive snow plows; Leads and participates in a variety of manual tasks such as cleaning culverts, shoveling snow, painting, sweeping and any other assigned task; Oversees construction and maintenance work to determine acceptability and conformance to standards; Trains and directs employees performing the duties of maintenance, construction and repair work for the Public Works
    [Show full text]
  • Dual-Axis Inclinometer HMDS1000B-KIT
    Dual-Axis Inclinometer HMDS1000B-KIT www.inclinometers.com.au Table Of Contents Introduction ............................................................................................................................................................................. 2 Suggested Applications .................................................................................................................................................................. 3 Optional Accessories ...................................................................................................................................................................... 3 Package Contents ....................................................................................................................................................................... 4 Installation ................................................................................................................................................................................. 5 Navigating the Menu .................................................................................................................................................................. 5 Adjusting the Back-light.............................................................................................................................................................. 5 Display Modes .........................................................................................................................................................................
    [Show full text]
  • Trenching and Shoring Guidelines
    Trenching and Shoring Guidelines August 2020 TABLE of CONTENTS I. General II. Definition III. Requirements IV. Soil Types V. Test Methods and Evaluating Soil Types VI. Ingress and Egress VII. Exposure to Falling Loads VIII. Warning Systems for Mobile Equipment IX. Hazardous Atmospheres and Confined Spaces X. Standing Water and Water Accumulation XI. Benching, Sloping, Shoring, and Shielding Requirements A. Benching B. Sloping C. Shoring D. Shielding XII. Training and Recordkeeping Appendix A: Trench Inspection and Entry Authorization Form Trenching and Shoring Guidelines I. General Excavating is recognized as one of the most hazardous operations. This standard shall provide guidance for University employees who perform excavations on property owned by the University of Northern Colorado (UNC). II. Definitions Aluminum hydraulic shoring: An engineered shoring system comprised of aluminum hydraulic cylinders (cross braces), used in conjunction with vertical rails (uprights) or horizontal rails (walers). Such a system is designed specifically to support the sidewalls of an excavation and prevent cave-ins. Benching: A method used to protect employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. Cave-in: The separation of a mass of soil or rock material from the side of an excavation, or the loss of soil from under a trench shield or support system, and its sudden movement into the excavation, either by falling or sliding, in sufficient quantity so that it could entrap, bury, or otherwise injure and immobilize a person. Competent Person: An individual who is capable of identifying existing and predictable hazards or working conditions that is hazardous, unsanitary, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate or control these hazards and conditions.
    [Show full text]