<<

II II

• •

' '

. .

, ,

e e

""

at at

·

l\\.llH l\\.llH

n n

1 1

ft ft

·

f

l l

r, r,

•,.. •,..

your your

, ,

020 020

how how is is

O O

l l

2

()t

,,,

jh jh

and/or and/or

this this

•, •,

as as

or or

1, 1,

crl crl

R R

. .

\t \t

on on

and and

r r

Council Council

' '

of of

" "

Plan Plan

Un

the the

Mid Mid

·

( (

MA

. .

, ,

CO

6 6

pro-forma pro-forma

......

the the

.~ .~

-

Council Council

view view

,1111111111 ,1111111111

t\, t\,

the the

part part

1 1

l

.,. .,.

• •

a a

Draft Draft

l'

Strategy Strategy

I('''' I(''''

I I

of of

' '

Local Local ,

2020 2020

as as

the the

'

t t

Environmental Environmental

Strategic Strategic

n

-

Strategy Strategy

,

considered considered

a a

a

Strategy

the the

Plan Plan

parallel parallel

fairness fairness

that that

Te

1epresentations 1epresentations

be be

attached attached

In In

representation; representation;

MUDPS/159 MUDPS/159

Plan Plan

March March

on on

express express

Plan Plan

of of

Report, Report,

to to

Plan Plan

plt1n@D11dlllStN

. .

Council Council

t

Plan Plan

Draft Draft

to to

the the

Council Council

Strategic Strategic

Ref: Ref:

132 132

t t

12th 12th

advise advise

written written

the the

Draft Draft

the the

Draft Draft

ric

Road Road

t

to to original original

oprn.en

-

l

them them

by by

132 132

-

is

to to

process

interests interests

incorporating incorporating

D

Department Department

eve

_

d

consultation consultation

your your

write write

rafelt rafelt

complete complete

the the

2030 2030

Development Development

ng ng

-

Development Development

I I

6EN 6EN

2030 2030

i

03000 03000

l l

to to

i

Ulster

in in

Environmental Environmental

. .

submitted submitted

-

inviting inviting

representation representation

treated treated

Ballyronan

COUNCIL COUNCIL

you you

Plan Plan

Ema

BT45 BT45

Maghe

Incorporating Incorporating

Local Local

Plann

50 50

Tel Tel

Mid Mid

be be

Plan Plan

add add

Local Local

and and

Appraisal, Appraisal,

original original

and and

who who

to to

consultation consultation

or or

Report) Report)

-

the the

representation representation

Report) Report)

original original

the the

Strategy

a a

in in

on on

request request

those those

process process

your your

Plan Plan

BOROUGH BOROUGH

amend amend

all all

Appraisal Appraisal

process process

error error

made made

to to

compliant compliant

for for

to to

Development Development

(SNSEA (SNSEA

Development Development

Sustainability Sustainability

a a

Draft Draft

an an

Council Council

-

wish wish

wish wish

. .

GLENS GLENS

the the

representations representations

or or

Local Local

writing writing

the the

Ceantair Ceantair

(Environmental (Environmental

& &

; ;

Local Local

already already

ROAD ROAD

on on

you you

ensure ensure

you you

consultation consultation

Council Council

re-consultation re-consultation

2030 2030

Ulster Ulster

on on

to to

a a

identified identified

Sustainability Sustainability

written written

process

have have

that that

that that

Assessment Assessment

DICKSON DICKSON

Plan Plan

re-consultation re-consultation Council Council

Report Report

Report, Report,

COAST COAST

has has

District District

Mid Mid

LarUladh LarUladh

Comhairle Comhairle

you you

order order

: :

previous previous

PLANNING PLANNING

the the

individually individually

those those

to

in in

DICKSON DICKSON

is is

of of

B B

Confirm Confirm

representation

re-consulting re-consulting

Confirm Confirm

the the

OF OF

that, that,

District District

1EY 1EY

DENISE DENISE

undertaking undertaking

wish wish

Council Council

SNSEA SNSEA

b) b)

a) a)

part part

PORTSTEWART

also also

Annex Annex

Given Given

the the

Development Development

now now

Strategy Strategy

Ulster Ulster

is is

Environmental Environmental

re-consultation re-consultation

Assessment Assessment

The The

Re-Consultation Re-Consultation

accompanying accompanying

Dear Dear

Council Council

they they

during during

As As

DENISE DENISE

BT52 BT52

HEAD HEAD

66 66

COLERAINE CAUSEWAY CAUSEWAY c) Confirm that you wish for your original representation to be withdrawn and that you no longer wish to make a representation.

If we do not receive your completed proforma by 5pm on 21 May 2020 we will take it that you wish your original representation to be considered by the Council as part of this re- consultation process.

If you decide to amend your original representation or submit a new representation, the re-consultation period for the Draft Plan Strategy, SA/SEA Report and associated documents will commence at 10am on 25th March 2020 for a period of 8-weeks, closing at 5pm on 21st May 2020.

The Draft Plan Strategy, Sustainability Appraisal incorporating Strategic Environmental Assessment Report (SA/SEA Report), Equality Impact Screening Report and Rural Needs Impact Assessment, Habitats Regulations Assessment, as well as other background supporting documents, are available for you to view on the Councils website at www.midulstercouncil.org/Planninq/Mid-Ulster-Development­ Plan . ·Should you require a hard copy of any of the supporting documents please get in touch and we will be happy to provide them.

As part of this re-consultation the Council are undertaking a series of public exhibitions and drop-in events at various locations where Council planning staff will be available to answer questions. Please see Annex A for details.

Representations and the completed pro-form should be addressed to: Local Development Plan T earn District Council Planning Department 50 Ballyronan Road BT45 6EN Alternatively, you can email your comments to; developmentplan@m id ulstercou ncil.org

If you have any questions about the above - or about the re-consultation process in general - please get in touch as soon as possible.

I look forward to hearing from you .

Yours sincerely,

Sinead McEvoy Head of Local Development Plan Local Development Plan T earn 2020

2020 2020 2020

2020 2020

2020

2020

2020 2020

2020

2020

2020

March

April

th April April

2020

March

- t

s st March th March

April April

h March March

25 April

t

1

1 8

April

st st Aprir2020

March

Date

th

th

nd

nd

th

th 26

April 2 2 9 th

-

th

31 31 7

30

30

6

rd

27

3

2020 Wednesday Thursday Friday Monday

Monday

Tuesday Monaay Tuesday Friday Wednesday Wednesday Wednesday Tuesday Thursday Thursday Thursday

-

-

7pm

7pm

7pm

7pm 7pm 7pm

events:

-

- -

Time

inn

30pm 30pm

30pm

. .

.

3pm-7pm 1 3pm 5 3pm- 3pm-7pm

3pm-7pm 3pm-7pm 3pm- 3pm-7pm 1 3pm-7pm 3pm-7pm 5.30pm

3pm-7pm 3pm- 3pm 3pm

drop -

and

Club Main -

Centre Street

Theatre Theatre

-

60

Arts Arts Centre

Centre

Centre

r,

Heritage

Youth

Centre

Main

Aughnacloy

Centre

Centre

Resource

Community

House House

Hote

-

Leisure

exhibitions

-

Lane,

Community

Calms

Tree Burnavon Burnavon

Bridewell lley Bridewell

Cornmill

Street,

of Parish

_

St.

Aghaloo

Location Ranfurly

Ranfurly Recreation

The

The The

The

=va

-

The

-

-

-

-

- tre -

-

-

Granaghan

School

Rowan -

Moore

Galbally

Series

Ardboe

- -

-

Centre

.c.en

-

Old 70

A-

Fivemiletown

,

Arts

Cookstown Centre Cookstown Centre Dungannon Centre Magherafelt Aughnacloy Centre Maghera Galbally and Swatragh Coalisland Magherafelt Pomeroy Centre, Dungannon Swatragh - (Cornstore) Street, Ardboe aod.Arts Fivem1Ietown

ANNEX

j j

no no

my my

I I

BT45 BT45

as as

contact contact

that that

Planning Planning

additional additional

and and

l l

any any

please please

Team, Team,

considered considered

administrative administrative

Magherafelt, Magherafelt,

with with

be be

Plan Plan

withdrawn withdrawn

EV EV

(for (for

1 1

to to

above, above,

be be

Road, Road,

representatio

(along (along

to to

BT52 BT52

the the

origral origral

forma forma

. .

. .

Development Development

MUDPS/159 MUDPS/159

my my

Ballyronan Ballyronan

Pro Pro

to to

representation representation

to to

50 50

representation representation

completing completing

add add

COLERAINE, COLERAINE,

Number: Number:

above) above)

or or

org org

original original

.

l

Council, Council,

original original

completed completed

[b)] [b)]

below. below.

when when

my my

ROAD, ROAD,

my my

representation. representation.

amend amend

for for

this this

box box

2020. 2020.

a a

to to

for for

Reference Reference

District District

ticked ticked

stercounci

l

Pro-forma Pro-forma

wish wish

May May

wish wish

I I

wish wish

make make

return return

I I

I I

have have

assistance assistance

to to

Ulster Ulster

21st 21st

that that

DICKSON DICKSON

you you

applicable applicable

that that

that that

you you

on on

Mid Mid

wish wish

PORTSTEWART PORTSTEWART

if if

Response Response

the the

......

66 66

require require

5pm 5pm

Representation Representation

B B -

confirm confirm

ensure ensure

confirm confirm

confirm confirm

tick tick

DENISE DENISE

longer longer

I I

I I

representation. representation.

I I

......

by by

only) only)

you you

c) c)

a) a)

b) b)

Department, Department,

GEN, GEN,

Please Please

documents documents

If If

developmentplan@midu

Date: Date:

Signature: Signature:

Name: Name:

Original Original use use

Please Please

ANNEX ANNEX Address: Address: