Waterlink Way (Lower Sydenham to Greenwich)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
October 2019
Issue 147 November 2019 Delivered free to 4000 households in Brockley Conservation Area Charity No: 1004245 three times a year: March, June and November www.brockleysociety.org.uk Open Meeting & AGM Wednesday 13 November 2019 St Peter’s Church, Wickham Rd, SE4 1LT 7.30pm: Speaker: S.I. Martin: Black Historical Presence in Lewisham from 1593 onwards Steve I Martin specialises in the fields of Black British history and literature. He works with museums, archives and the education sector to bring diverse histories to wider audiences. 8.45-9.30pm: Annual General Meeting Brandt Karl Photograph: Brockley Society proposes to update its Hilly Fields Fayre 22 June 2019: Crowds round the arena enjoy Heart of Steel Orchestra’s music. 1974 constitution to become a Community More pictures on page 3 Infrastructure Organisation (CIO) Association Model. Membership has included everyone living in the Brockley Conservation Hilly Fields Fayre 22 June 2019 Area and anyone else who wishes to be a member. We will retain this, with two forms Once again we were blessed with fine weather Orchestra, Raptorxotics bird of prey display, of membership: for what felt like the best attended Fayre and the ever-popular dog show judged by 1) Voting membership open to anyone who ever. Thousands of visitors from far and John Hankinson Vets. Feedback from the has indicated agreement with the charity’s wide were entertained by the Telegraph many stallholders was extremely positive, purposes and who accepts the duty of Community Choir, Aquila Taekwondo, the and our own Tea & Cake and Barbecue members set out in the constitution. -
HA16 Rivers and Streams London's Rivers and Streams Resource
HA16 Rivers and Streams Definition All free-flowing watercourses above the tidal limit London’s rivers and streams resource The total length of watercourses (not including those with a tidal influence) are provided in table 1a and 1b. These figures are based on catchment areas and do not include all watercourses or small watercourses such as drainage ditches. Table 1a: Catchment area and length of fresh water rivers and streams in SE London Watercourse name Length (km) Catchment area (km2) Hogsmill 9.9 73 Surbiton stream 6.0 Bonesgate stream 5.0 Horton stream 5.3 Greens lane stream 1.8 Ewel court stream 2.7 Hogsmill stream 0.5 Beverley Brook 14.3 64 Kingsmere stream 3.1 Penponds overflow 1.3 Queensmere stream 2.4 Keswick avenue ditch 1.2 Cannizaro park stream 1.7 Coombe Brook 1 Pyl Brook 5.3 East Pyl Brook 3.9 old pyl ditch 0.7 Merton ditch culvert 4.3 Grand drive ditch 0.5 Wandle 26.7 202 Wimbledon park stream 1.6 Railway ditch 1.1 Summerstown ditch 2.2 Graveney/ Norbury brook 9.5 Figgs marsh ditch 3.6 Bunces ditch 1.2 Pickle ditch 0.9 Morden Hall loop 2.5 Beddington corner branch 0.7 Beddington effluent ditch 1.6 Oily ditch 3.9 Cemetery ditch 2.8 Therapia ditch 0.9 Micham road new culvert 2.1 Station farm ditch 0.7 Ravenbourne 17.4 180 Quaggy (kyd Brook) 5.6 Quaggy hither green 1 Grove park ditch 0.5 Milk street ditch 0.3 Ravensbourne honor oak 1.9 Pool river 5.1 Chaffinch Brook 4.4 Spring Brook 1.6 The Beck 7.8 St James stream 2.8 Nursery stream 3.3 Konstamm ditch 0.4 River Cray 12.6 45 River Shuttle 6.4 Wincham Stream 5.6 Marsh Dykes -
Tender Specs
7. Service Specification Route: 358 Contract Reference: QC48906 This Service Specification forms section 7 of the ITT and should be read in conjunction with the ITT document, Version 1 dated 29 September 2011. You are formally invited to tender for the provision of the bus service detailed below and in accordance with this Service Specification. Tenderers must ensure that a Compliant Tender is submitted and this will only be considered for evaluation if all parts of the Tender documents, as set out in section 11, have been received by the Corporation by the Date of Tender. The Tender must be fully completed in the required format, in accordance with the Instructions to Tenderers. A Compliant Tender must comply fully with the requirements of the Framework Agreement; adhere to the requirements of the Service Specification; and reflect the price of operating the Services with new vehicles. Route Number 358 Terminus Points Orpington Station and Crystal Palace Parade On Mondays to Fridays, towards Orpington Station, buses are not required to serve Orpington, Walnuts Centre before 0830 (i.e. buses should not start arriving at Orpington, Walnuts Centre before 0830) Contract Basis Incentivised Commencement Date 12th September 2015 Vehicle Type 70 capacity, dual door, single deck, minimum 12m long Current Maximum Approved 12.0 metres long and 2.5 metres wide Dimensions New Vehicles Mandatory Yes Hybrid Price Required Yes Sponsored Route No Advertising Rights Operator Minimum Performance Standard Average Excess Wait Time - No more than 1.10 - Route No. 119 minutes Extension Threshold - Route No. Average Excess Wait Time Threshold - 0.95 119 minutes Minimum Operated Mileage No less than 98.00% Standard - Route No. -
Deptford Church Street & Greenwich Pumping Station
DEPTFORD CHURCH STREET & GREENWICH PUMPING STATION ONLINE COMMUNITY LIAISON WORKING GROUP 13 July 2021 STAFF Chair: Mehboob Khan Tideway • Darren Kehoe, Project Manager Greenwich • Anil Dhillon, Project Manager Deptford • Natasha Rudat • Emily Black CVB – main works contractor • Audric Rivaud, Deptford Church Street Site Manager • Anna Fish– Deptford Church Street, Environmental Advisor • Robert Margariti-Smith, Greenwich, Tunnel & Site Manager • Rebecca Oyibo • Joe Selwood AGENDA Deptford Update • Works update • Looking ahead • Noise and vibration Greenwich Update • Works update • Looking ahead • Noise and vibration Community Investment Community Feedback / Questions DEPTFORD CHURCH STREET WHAT WE’RE BUILDING DEPTFORD WORKS UPDATE SHAFT & CULVERT Shaft • Vortex pipe installed and secondary lining complete • Tunnel Boring Machine crossing complete • Vortex generator works on-going Culvert • Excavation complete • Base slab and walls complete • Opening to shaft complete DEPTFORD WORKS UPDATE COMBINED SEWER OVERFLOW (CSO) CSO Phase 1: Interception Chamber • Internal walls and roof complete • Mechanical, Electrical, Instrumentation, Controls, Automation (MEICA) equipment installation on-going CSO Phase 2: Sewer connection • Protection works of Deptford Green Foul Sewer complete • Secant piling works complete • Capping beam and excavation to Deptford Storm Relief Sewer on-going time hours: Monday to Friday: 22:00 to 08:00 DEPTFORD 12 MONTHS LOOK AHEAD WHAT TO EXPECT AT DEPTFORD CSO: connection to existing sewer Mitigations • This work will take place over a 10 hour shift – the time of the shift • Method of works chosen to limit noise will be dependent on the tidal restrictions in the Deptford Storm Relief Sewer’ generation such as sawing concrete into • Lights to illuminate works and walkways after dark blocks easily transportable off site. -
The London Rivers Action Plan
The london rivers action plan A tool to help restore rivers for people and nature January 2009 www.therrc.co.uk/lrap.php acknowledgements 1 Steering Group Joanna Heisse, Environment Agency Jan Hewlett, Greater London Authority Liane Jarman,WWF-UK Renata Kowalik, London Wildlife Trust Jenny Mant,The River Restoration Centre Peter Massini, Natural England Robert Oates,Thames Rivers Restoration Trust Kevin Reid, Greater London Authority Sarah Scott, Environment Agency Dave Webb, Environment Agency Support We would also like to thank the following for their support and contributions to the programme: • The Underwood Trust for their support to the Thames Rivers Restoration Trust • Valerie Selby (Wandsworth Borough Council) • Ian Tomes (Environment Agency) • HSBC's support of the WWF Thames programme through the global HSBC Climate Partnership • Thames21 • Rob and Rhoda Burns/Drawing Attention for design and graphics work Photo acknowledgements We are very grateful for the use of photographs throughout this document which are annotated as follows: 1 Environment Agency 2 The River Restoration Centre 3 Andy Pepper (ATPEC Ltd) HOW TO USE THIS GUIDE This booklet is to be used in conjunction with an interactive website administered by the The River Restoration Centre (www.therrc.co.uk/lrap.php).Whilst it provides an overview of the aspirations of a range of organisations including those mentioned above, the main value of this document is to use it as a tool to find out about river restoration opportunities so that they can be flagged up early in the planning process.The website provides a forum for keeping such information up to date. -
358 Bus Time Schedule & Line Route
358 bus time schedule & line map 358 Crystal Palace View In Website Mode The 358 bus line (Crystal Palace) has 2 routes. For regular weekdays, their operation hours are: (1) Crystal Palace: 12:00 AM - 11:40 PM (2) Orpington Station: 12:00 AM - 11:40 PM Use the Moovit App to ƒnd the closest 358 bus station near you and ƒnd out when is the next 358 bus arriving. Direction: Crystal Palace 358 bus Time Schedule 76 stops Crystal Palace Route Timetable: VIEW LINE SCHEDULE Sunday 12:00 AM - 11:40 PM Monday 12:00 AM - 11:40 PM Orpington Bus Station (E) Station Approach, London Tuesday 12:00 AM - 11:40 PM High Storpington War Memorial (R) Wednesday 12:00 AM - 11:40 PM 299-301 High Street, London Thursday 12:00 AM - 11:40 PM Orpington / Walnuts Centre (X) Friday 12:00 AM - 11:40 PM High Storpington War Memorial (S) Saturday 12:00 AM - 11:40 PM 299-301 High Street, London Hillcrest Road Orpington (M) Sevenoaks Road, London 358 bus Info Sevenoaks Road / Tower Road (D) Direction: Crystal Palace Stops: 76 Sevenoaks Road Orpington Hospital Orpington Trip Duration: 77 min (E) Line Summary: Orpington Bus Station (E), High Helegan Close, London Storpington War Memorial (R), Orpington / Walnuts Centre (X), High Storpington War Memorial (S), Sevenoaks Road Cloonmore Avenue Orpington Hillcrest Road Orpington (M), Sevenoaks Road / (F) Tower Road (D), Sevenoaks Road Orpington Hospital Orpington (E), Sevenoaks Road Cloonmore Avenue Crescent Way (G) Orpington (F), Crescent Way (G), Glentrammon Road Green Street Green (E), Farnborough Hill Bus Garage Glentrammon -
Ravensbourne Vision
RAVENSBOURNE VISION YOUR CATCHMENT - YOUR VISION 2015-2021 Enhancing the quality of our rivers with local communities THE CATCHMENT The area of land that includes farms, parks, gardens, buildings and roads, through which water drains into the rivers and streams, makes up the catchment. The rivers of the Ravensbourne catchment rise in the London Boroughs of Bromley and Croydon and run for 25kms northwards through the Boroughs of Lewisham and Greenwich until they meet the River Thames at Deptford. The three main rivers, the Ravensbourne, Quaggy and Pool have mostly been straightened, set in concrete and diverted over time while the more natural, and naturalised, sections of the river are providing both havens for wildlife and popular places for public access to nature. 1 2 3 Norman Park Sutcliffe Park Chinbrook Meadows 4 5 6 Ladywell Fields Linear Park Cornmill Gardens RIVER RAVENSBOURNE CATCHMENT MAP 6 2 4 5 3 1 WHERE DO WE GO FROM HERE We want a Ravensbourne catchment that continues to develop into a destination of enjoyment and discovery. A catchment where: • new development enhances the river and allows nature to thrive. • opportunities for leisure, education and discovery are commonplace. • community and volunteer groups are well supported in their work along the river. • enhancement and education programmes benefit local people. • A locally supported Catchment Plan that creates a path toward a healthy future for the rivers within the catchment. A natural place where: • species and habitats thrive along clean-water river corridors. • a diverse natural environment attracts people to the rivers. • a mosaic habitats and green corridors allow species to move freely throughout the catchment. -
Regeneration in Deptford, London
Regeneration in Deptford, London September 2008 Produced by Dr. Gareth Potts BURA Director of Research, Policy and Best Practice Contact: 07792 817156 Table of Contents Planning and Regeneration Strategy ......................................................................................................................... 3 Early Community Regeneration .............................................................................................................................. 11 Renewal of the Pepys Estate .................................................................................................................................... 15 Riverside Schemes ...................................................................................................................................................... 18 Inland Development ................................................................................................................................................... 24 Deptford Town Centre Regeneration Programme ............................................................................................ 33 Some Novel Approaches to Regeneration ........................................................................................................... 36 Appendices .................................................................................................................................................................. 38 Planning and Regeneration Strategy The Planning Framework The key planning guidelines are set out in the -
Standard Schedule TR2-58329-Ssa-SL-1-1
Schedule TR2-59565-sSa-SL-1-1 Schedule information Route: TR2 No. of vehicles used on 25 schedule: Service change: 59565 - SCHEDULE, STRUCTURAL Implementation date: 28 August 2021 Day type: sSa - Special Saturday Operator: SL - ARRIVA LONDON SOUTH Option: 1 Version: 1 Schedule comment: Option comment: TRAMLINK RAIL REPLACEMENT SERVICE Timing points Timing point Transit node Stop ADDSAP Addiscombe, Ashburton Park HJ08 ASHBURTON PARK 17338 Ashburton Park ADDSAP Addiscombe, Ashburton Park HJ08 ASHBURTON PARK 17339 Ashburton Park ADDSTS Addiscombe, Tramstop HJ15 BINGHAM ROAD 17342 Addiscombe Tram Stop ADDSTS Addiscombe, Tramstop HJ15 BINGHAM ROAD 17343 Addiscombe Tram Stop ARNTRM Arena Tram Stop HJ10 LONG LANE BYWOOD AVENUE 18799 Arena Tram Stop ARNTRM Arena Tram Stop HJ10 LONG LANE BYWOOD AVENUE R0746 Arena Tram Stop BECKJS Beckenham Junction Station FJ07 BECKENHAM JUNCTION STN TRS169 Beckenham Junction BECKJS Beckenham Junction Station FJ07 BECKENHAM JUNCTION STN TRS174 Beckenham Junction BECKRD Beckenham Road FP01 BECKENHAM R MACKENZIE RD 19768 Beckenham Road Tram Stop BECKRD Beckenham Road FP01 BECKENHAM R MACKENZIE RD 19769 Beckenham Road Tram Stop BIRKSN Birkbeck Station FP02 BIRKBECK STATION 17413 Birkbeck Station BIRKSN Birkbeck Station FP02 BIRKBECK STATION 17414 Birkbeck Station CROYCO Croydon, Cherry Orchard Road HC25 E CROYDON CHERRY ORCH RD 17348 Addiscombe Road CROYCO Croydon, Cherry Orchard Road HC25 E CROYDON CHERRY ORCH RD 26842 Cherry Orchard Rd / East Croydon Stn CROYPR Croydon, Parkview Road HJ14 ADDISCOMBE BLACK HORSE -
SYD SOC NEWS 2010 Autumn
SYDENHAM SOCIETY NEWS Autumn 2010 SAVE SYDENHAM LIBRARY! Sydenham Library is under threat of closure following a proposal by Lewisham Council officers to close five of the Borough’s twelve libraries in an attempt to save £830,000. As well as Sydenham, New Cross, Crofton Park, Blackheath and Grove Park libraries also face the axe. The proposals were announced in early August and the Council is conducting a public consultation before mayor Sir Steve Bullock makes a decision on the issue on 17 November 17. Unsurprisingly, a vociferous campaign against the proposed The Save Sydenham Library Campaign has launched closure is under way. The Save Sydenham Library campaign an online and paper petition and is asking people to write was launched after a public consultation on 19 August. to the Mayor to show the depth of public feeling against the Campaigners point out that Sydenham Library is more than proposed closure. The issue has dominated the Sydenham and just Library; it is a much loved and well-used community asset Perry Vale Assemblies and that of Bellingham on 20 October, and hosts a number of activities apart from lending books. whose residents are also served the 106 year- old Library. As well as reading groups for seniors and people for whom In the relatively short space of time since the Save English is a second language, it is also used by four local Sydenham Library campaign was launched it has gathered primary schools, which will not be able to avail themselves of momentum and garnered widespread support. The people of alternative libraries in Forest Hill or Lewisham. -
South East London Green Chain Plus Area Framework in 2007, Substantial Progress Has Been Made in the Development of the Open Space Network in the Area
All South East London Green London Chain Plus Green Area Framework Grid 6 Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 8 Area Description 9 Strategic Context 10 Vision 12 Objectives 14 Opportunities 16 Project Identification 18 Project Update 20 Clusters 22 Projects Map 24 Rolling Projects List 28 Phase Two Early Delivery 30 Project Details 50 Forward Strategy 52 Gap Analysis 53 Recommendations 56 Appendices 56 Baseline Description 58 ALGG SPG Chapter 5 GGA06 Links 60 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA06 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www. london.gov.uk/publication/all-london-green-grid-spg . -
Re- Survey of S INC S / Report for Lewisham Planning Se Rvice
Re - survey of survey SINC s / Report for Report Lewisham PlanningLewisham Service Appendix 4: updated and new citations The Ecology Consultancy Re-survey of SINCs / Report for London Borough Lewisham Sites of Importance for Nature Conservation in Lewisham (BC) – Boundary change (U): SINC upgraded to Site of Borough Importance Name in blue: Proposed Site of Local Importance Name in red: Name change LeB01 – Grade II and Grade I merged into a single Borough designation LeB01 – Amended SINC number as a result of the above change or new site List of Sites of Metropolitan Importance M031 The River Thames and tidal tributaries (citation not amended) M069 Blackheath and Greenwich Park (Lewisham part updated only) M122 Forest Hill to New Cross Gate Railway Cutting M135 Beckenham Place Park (LNR) (BC) List of Sites of Borough Importance: LeB01 Brockley and Ladywell Cemeteries LeB02 Hither Green Cemetery, Lewisham Crematorium and Reigate Road Open Space (BC) LeB03 Downham Woodland Walk (LNR) (BC) LeB04 Pool River Linear Park (BC) LeB05 Hillcrest Estate Woodland LeB06 Grove Park Nature Reserve LeB07 Forster Memorial Park (BC) LeB08 Burnt Ash Pond Nature Reserve (LNR) LeB09 Horniman Gardens, Horniman Railway Trail and Horniman Triangle LeB10 Durham Hill (BC) LeB11 Dacres Wood Nature Reserve and Sydenham Park Railway Cutting (LNR) LeB12 Loats Pit LeB13 Grove Park Cemetery LeB14 Sue Godfrey Nature Park (LNR) LeB15 Honor Oak Road Covered Reservoir LeB16 St Mary's Churchyard, Lewisham LeB17 River Quaggy at Manor House Gardens LeB18 Mayow Park LeB19 Spring