Search Results Recreational Trails Program Project Database
Your search for projects in State: MI, Total Results : 316
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2016 Bergland-Sidnaw Trail Bergland-Sidnaw Trail Bergland-Sidnaw Trail bridge over the South 1 Ontonagon $0 Unknown $0
Bridge over the South Branch Ontonagon River
Branch Ontonagon River
MI 2016 Higgins Lake Trail Higgins Lake Trail Unspecified/Unidentifiable 4 Roscommon $0 Unknown $0
MI 2016 Alpena to Hillman Trail Alpena to Hillman Trail Bridges and Culverts 1 Alpena $0 Unknown $0
MI 2016 Musketawa Trail Musketawa Trail Connector Musketawa Trail Connector 2 Muskegon $0 Unknown $0
MI 2016 Baraga-Arnheim Rail-Trail Baraga-Arnheim Rail-Trail Baraga-Arnheim Trail culvert renovation 1 Baraga $0 Unknown $0
MI 2016 Kalkaska Mt. Bike Trail Kalkaska Mt. Bike Trail Kalkaska Mt. Bike Trail 1 Kalkaska $0 Unknown $0
MI 2016 Michigan State Park Trail Engineering, Design, and Trailway program engineering and design 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0
System Cost Estimating 8, 9, 10, 11, 12,
13, 14
MI 2016 Michigan State Park Trail Partnership Grants Trailway program partnership grants 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0
System 8, 9, 10, 11, 12,
13, 14
MI 2016 Iron Belle Trail Iron Belle Trail Environmental investigation for purchase of 5 Genesee $0 Unknown $0
Iron Belle Trail corridor
MI 2016 State Park Linear Trail O&M State Park Linear Trail O&M State park linear trail operation and 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0
Projects Projects maintenance 8, 9, 10, 11, 12,
13, 14
MI 2016 Winter Recreation Trails Maintenance Pathway crossing, ski groom and parking lot 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0
maintenance 8, 9, 10, 11, 12,
13, 14
MI 2016 Michigan State Park Trail Pathway Signage Upgrades Pathway Signage Upgrades 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0
System 8, 9, 10, 11, 12,
13, 14
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2014 High Country Pathway High County Pathway Replace 920' of boardwalk and puncheon, 1 Cheboygan, Presque $30,000 $7,500 $37,500
Improvements stabilize 800' puncheon and 550' elevated Isle. Montmorency
boardwalk and stabilize two boardwalk
stream crossings at four sites on the trail.
MI 2014 Ausable Foot Trail Engineering/design for two Replace two stream crossings on the trail 1 Crawford $25,000 $6,250 $31,250
bridge replacements and
construction if funds
available on the Amusable
foot trail at Hartwick Pines
S.P.
MI 2014 Hart Montague State Park Funding assistance for Resurface and widen the 22 mile rail-trail. 2 Oceana, Muskegon $325,000 $81,250 $406,250
Trail re-surfacing the asphalt on
the W. Field Memorial
Hart-Montaque Trail State
Park
MI 2014 Kalamazoo Valley Trail Engineering/design for the Engineering/Design for a section of planned 6 Kalamazoo $50,000 $12,500 $62,500
Kalamazoo River Valley Trail "Lake to Lake Trail", cross state trailway,
through the northern section from Port Huron to South Haven.
of the Fort Custer Recreation
Area
MI 2014 Lakelands Trail State Park Engineering/design for two Engineering/Design for surfacing two 7, 8 Livingston, Ingham, $60,000 $15,000 $75,000
and Horse Trail sections of the Lakelands sections of the Lakeland's Trail SP Jackson
Trail State Park surfacing
MI 2014 Michigan State Park Signs State Park trail sign Replace damage and missing signs on trails 8, 11, 14 Oakland, Lapeer $70,000 $17,500 $87,500
replacement at seven State Parks. The Parks are;
Metamora, Ortonville, Holly, Pontiac Lk.,
Pround Lk. And Bald Mnt.
MI 2014 Statewide Connected Trail Trailway Project survey, Survey, engineering and design on state 1, 2, 3, 4, 5, 6, 7, Statewide $192,000 $48,000 $240,000
System engineering, design and rail-trails. 8, 9, 10, 11, 12,
special projects: DNR rail 13, 14
trails
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2014 State Park Linear Trail O&M State Park Linear Trail O&M 200+ miles of surfaced rail-trails, activities 2, 3, 4, 6, 7, 8 Statewide $267,000 $66,750 $333,750
Projects Projects include brushing, mowing, surface and
washout repairs, intersection marking, sign
replacement, bridge decking and railing
repairs.
MI 2014 ORV and Snowmobile trail Bridge Engineering, Lincoln Funds to inspect existing bridge and provide 2 Lake $25,000 $6,250 $31,250
system Hills Snowmobile-ORV Trail repair or replacement engineering/design as
determined appropriate.
MI 2014 Musketawa Trail Musketawa Trail connector Providing engineering and design for a 2 Muskegon $150,000 $37,500 $187,500
trail engineering: bridge and section of boardwalk and bridge needed in
boardwalk the connector trail that connects the
Musketawa trail with the City of Muskegon's
trail system
MI 2014 Van Buren Trail State Park Van Buren Trail State Park Engineer, design trail connections and 6 Van Buren $50,000 $12,500 $62,500
Trail Surface Improvements trailhead improvements for two sections of
the VanBuren Trail: one within the City limits
of South Haven and the second section
within the boundaries of Van Buren S.P.
MI 2014 Betsie Valley Trail Betsie Valley Trail surface Engineering and design for completing the 1 Benzie $70,000 $17,500 $87,500
completion upgrade of the trail surfacing to the program
engineering/design standard limestone aggregate that supports
accessible use.
MI 2014 Green Pine Pathway Green Pine Pathway Wet Design and install appropriate wet area 4 Clare $25,000 $6,250 $31,250
Area Crossing Upgrades crossing structures to cross wet areas in
several locations on this pathway.
MI 2014 Ionia Rec. Area Pedestrian Bridge Funds to construct pedestrian trail bridge 3 Ionia $125,000 $31,250 $156,250
construction at Ionia Rec. previously engineered
Area
MI 2014 Kalkaska Mt. Bike Trail Kalkaska Mt. Bike Trail Design and install appropriate wet area 1 Kalkaska $28,500 $7,125 $35,625
CROSSINGS crossing structures to cross wet areas in
several locations on this pathway.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2014 Seven State Trail System Rest Benches for Seven Funds to install rest benches at seven State 8, 11, 14 Oakland, Lapeer $21,000 $5,250 $26,250
State Park Trail System Park trail Systems The Parks are; Metamora,
Ortonville, Holly, Pontiac Lk., Pround Lk, And
Bald Mnt..
MI 2014 North Eastern State Trail Directional/Trailhead Locator Funds to install directional signage for 1 Cheboygan, Presque $10,000 $2,500 $12,500
Signs for the North Eastern locating trailhead parking areas for the North Isle, Alpena
State Trail Eastern State Trail on interstate highway,
state and local roads.
MI 2014 Snowmobile & ORV Trail Construction/Renovation of Funds to complete renovation of 325' box 1 Houghton $320,000 $80,000 $400,000
Systems Box Culvert under culvert under the Houghton-Calumet
Houghton-Calumet Rail-trail Rail-trail. Engineering was completed by an
at St. Louis Creek earlier trail grant.
MI 2014 Brule River Trail system Additional funds for Brule Partnership with Wisconsin to renovate 1 Iron $15,000 $100,000 $115,000
River trail system, Michigan bridge and trail planned to connect the
portion Wisconsin and Michigan Trail system
MI 2014 Statewide Snowmobile Partnership project with Funds to assist with a study of the trail 1 Houghton $20,000 $80,000 $100,000
System National Park Service (NPS) corridor, it's ownership, encroachments, and
to study development to identify options for multi-use development
options for multi-use trail of the trail corridor to be known as the
opportunities on the Hancock "Copper Heritage Trail".
to Calumet Rail-trail to be
developed as the "Copper
Heritage Trail"
MI 2014 ORV trails Assistance for Development Funds to assist with development of a 1, 2, 3, 4, 5, 6, 7, Statewide $20,000 $5,000 $25,000
of a National ORV national guidebook on ORV trail design, 8, 9, 10, 11, 12,
Guidebook for Construction construction and maintenance of sustainable 13, 14
and Maintenance of OHV ORV trails and facilities
Trails for the Future.
MI 2014 Statewide Snowmobile Trail Partnership with Baraga Funds to assist with replacement of two 1 Baraga $15,000 $3,750 $18,750
System County Road Commission, bridges used by State Snowmobile Trail #15
funds to assist with
replacement of two bridges
on Snowmobile trail #15.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2014 Maybury State Park Trail Trail Connector Funds to engineer/design and construct a 11 Wayne $650,000 $162,500 $812,500
Engineering/Design and section of trail through Maybury State Park to
Construction; Maybury State connect with adjacent community trails/parks
Park
MI 2014 Kal-Haven and Van Buren Trail Surface Improvement Funds to provide engineering/design and cost 6 Van Buren $75,000 $18,750 $93,750
Trail System Engineering/Design; estimates for completion of trail surfacing of
Kal-Haven and Van Buren sections of the Kal-Haven and Van Buren
Trail Segments State Park Rail-trails
MI 2014 Milliken State Park Trail Engineering for Installation of Funds for engineering for abutments to install 11 Wayne $30,000 $7,500 $37,500
Re-cycled Bridge; Milliken an historic 1800's bridge on the trail system
State Park at the Wm. Milliken State Park.
MI 2013 North Boulevard Connector Mitchell State Park - North Construct .5 mile 8' wide bituminous trail and 4 Wexford $204,700 $51,175 $255,875
Trail Boulevard Connector Trail a 1/10 mile 8' wide bituminous and 10' wide
boardwalk section of trail to provide a safe
connection to the Carl T. Johnson Hunting
and Fishing Visitors Center and the trail
around Lake Cadillac and the...
MI 2013 Michigan Statewide Rail-Trail Trailway Project survey, Survey, engineering and design on state 1, 2, 3, 4, 5, 6, 7, Statewide $252,700 $63,175 $315,875
System engineering, design and rail-trails. 8, 9, 10, 11, 12,
special projects: DNR rail 13, 14
trails
MI 2013 North Central State Trail North Central State Development of trailside/trailhead facilities 1 Cheboygan $57,600 $300,900 $358,500
Trail-Indian River Marina including, site grading, connector walkways,
Park Trailhead- phase 2 parking and signage.
MI 2013 Clinton-Ionia-Shiawassee CIS Trail- Prairie Creek Structural evaluation and repair and renovate 3 Ionia $50,000 $25,000 $75,000
Trail Bridge Renovation decking and railing on rail trail bridge.
MI 2013 Michigan ORV Trail System ORV Sign Program Upgrade Signage on a 3000+ mile trail system. 1, 2, 3, 4, 5 Multiple Counties $305,000 $475,000 $780,000
- Phase IV
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2013 Oakland County Trail Connector/linkage sections Development of connector/linkage sections of 11 Oakland $570,000 $142,500 $712,500
System of trail to other local trails trail to other local trails like Oakland Co. and
Highland Twp. trail systems including; 2.5
miles of multi-use trails and 1.25 miles of
equestrian trails, trailhead facilities and
signage.
MI 2013 Fred Meijer White Pine Trail Surfacing of the final 40.8 miles of this trail 4 Montcalm, Mecosta, $245,000 $3,130,500 $3,375,500
state park and decking and trailing treatment Osceola
of 5 bridges.
MI 2013 Fred Meijer Flat River Valley Surface over 2 miles of trail with asphalt 3 Ionia $300,000 $1,175,214 $1,475,214
Trail surfacing, deck and rail 3 bridges
MI 2013 ORV and Snowmobile trail Goose Creek Construct approx. 7 mi. of new trail route, 4 Kalkaska $105,000 $26,250 $131,250
system ORV/Snowmobile Trail includes installation of a box culvert over
Re-route and Culvert stream.
MI 2013 Craig Lake State Park Trails Bridge construction: Craig Replacement of two bridges on the trail 1 Baraga $380,000 $95,000 $475,000
Lake State Park system in Craig Lake State Park
MI 2013 Upper Peninsula ORV/Road ORV riding opportunities Connector trails to connect the motorized trail 1, 2, 3, 4, 5, 6, 7, Statewide $150,000 $37,500 $187,500
system in Michigan's Upper Peninsula and 8, 9, 10, 11, 12,
provide access to services and lodging and 13, 14
restaurants.
MI 2013 Michigan State Snowmobile XC Ski Grooming Program Grooming and parking lot plowing on State 1, 2, 3, 4, 5, 6, 7, Statewide $65,000 $16,250 $81,250
Trail System Forest Pathways that allow cross country 8, 9, 10, 11, 12,
skiing. 13, 14
MI 2013 State Administration RTP: Program Audit Audit for the RTP Program 1, 2, 3, 4, 5, 6, 7, Statewide $5,000 $1,250 $6,250
8, 9, 10, 11, 12,
13, 14
MI 2013 Brimley Multi-use Trail Brimley Multi-use Trail Brimley Multi-use Trail Bridge engineering 1 Chippewa $70,000 $17,500 $87,500
Bridge engineering
MI 2013 ORV and Snowmobile trail Brule River Trail system Partnership with Wisconsin to renovate 1 Iron $100,000 $25,000 $125,000
system Michigan portion; 50% for bridge and short connector trail planned to
bridge, 50% for trail connect the Wisconsin and Michigan Trail
connection system.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2013 ORV and Snowmobile trail Cranberry Lake Purchase pre-engineered portable bridge and 1 Chippewa $65,000 $16,250 $81,250
system ORV/Snowmobile Trail #47 engineer support abutments for the bridge.
Bridge and Engineering for
abutments
MI 2013 Rail-Trail System Boundary Marking of State Boundary marking of state owned rail-trails in 1, 2, 3, 4, 5, 6, 7, Statewide $45,000 $11,250 $56,250
Rail-trails in the Upper the UP 8, 9, 10, 11, 12,
Peninsula 13, 14
MI 2013 Michigan snowmobile trail Murphy Creek Bridge and Engineering of bridge and abutments to 1 Schoolcraft $25,000 $6,250 $31,250
system Abutment Engineering replace bridge in bad repair
MI 2012 Linear State Park Trails State Park Rail-Trail 200+ miles of surfaced rail-trails, activities 1, 2, 3, 4, 5, 6, 7, Statewide $210,000 $52,500 $262,500
Operations and Maintenance include brushing, mowing, surface and 8, 9, 10, 11, 12,
washout repairs, intersection marking, sign 13, 14
replacement, bridge decking and railing
repairs.
MI 2012 State Trailways Engineering, Design, and Engineering, Design, and Survey 1, 2, 3, 4, 5, 6, 7, Statewide $454,000 $113,500 $567,500
Survey 8, 9, 10, 11, 12,
13, 14
MI 2012 Baraga-Arnheim Rail-Trail Bridge Engineering, Two Bridge Engineering, Two Bridges, Two 1 Baraga $75,000 $18,750 $93,750
Bridges, Two Culverts Culverts
MI 2012 North Central State Trail Trailbed Repairs Trailbed Repairs 1 Cheboygan $50,000 $12,500 $62,500
MI 2012 Pere Marquette State Trail Trail Signage for Trailhead Trail Signage for Trailhead Locations 1, 2, 4 Clare, Osceola, Lake $4,000 $1,000 $5,000
Locations
MI 2012 Hancock-Calumet Trail Trail Cross Drain Structure Engineering evaluation of cross trail drainage 1 Houghton $200,000 $50,000 $250,000
Analysis structures including cost estimating and
identifying priorities for addressing repairs.
MI 2012 Houghton to Chassel Trail Trail Maintenance Trail Maintenance 1 Houghton $50,000 $12,500 $62,500
MI 2012 Stateline Trail Rail-Trail Bridge Repair Repair or replace decking, railing and make 1 Iron $315,000 $78,750 $393,750
needed improvements to structural elements
of this 168' trestle.
MI 2012 Stateline Trail Rail-Trail Bridge Repair Repair or replace decking, railing and make 1 Iron $225,000 $56,250 $281,250
needed improvements to structural elements
of this 114' trestle.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2012 Fort Custer Recreation Area Trail Separation Assist with separation of trails for horses and 6 Kalamazoo $45,000 $11,250 $56,250
mt. bikes.
MI 2012 Musketawa Trail East Musketawa Trailhead Trailhead parking area being provided by 2 Kent $100,000 $25,000 $125,000
Construction local business with a separate entry drive and
connector walk to the trail.
MI 2012 Trails in Mackinac County Trail Surface Upgrade Trail Surface Upgrade 1 Mackinac $320,000 $80,000 $400,000
MI 2012 Flowers Creek Bridge ORV/Snowmobile Bridge Replacement of inadequate bridge over 4 Missaukee $195,000 $48,750 $243,750
Chase Creek for use by ORV's, snowmobiles
and trail grooming equipment.
MI 2012 Canada Creek High Country Bridge Replacement Bridge Replacement 1 Montgomery $180,000 $45,000 $225,000
Pathway
MI 2012 Parmalee Bridge Water Access Site Water Access Site Improvements 1 Oscoda $25,000 $6,250 $31,250
Improvements
MI 2012 North Central State Trail Trail Maintenance and Trail Maintenance and Equipment 1 Otsego, Cheboygan $18,000 $4,500 $22,500
Equipment
MI 2012 Cheboygan to Alpena Trail Bridge Replacement Replace Bridge over Ocqueoc River 1 Presquelsle $300,000 $75,000 $375,000
MI 2012 Fox River Pathway Parking Upgrades/Signage Parking Upgrades, Signage 1 Schoolcraft, Alger $8,500 $2,125 $10,625
MI 2012 Statewide ORV Facilities ORV Enforcement ORV Enforcement Equipment 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500
Equipment 8, 9, 10, 11, 12,
13, 14
MI 2012 Statewide ORV Facilities ORV Sign Upgrade Phase 3 ORV Sign Upgrade Phase 3 of 4- NLP/UP 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000
of 4 8, 9, 10, 11, 12,
13, 14
MI 2012 Van Buren State Park Trail Regional Trail Connections Regional Trail Connections Construction 6 Van Buren $455,000 $113,750 $568,750
Construction
MI 2012 Chase Creek Bridge ORV/Snowmobile Bridge Replacement of inadequate bridge over 4 Wexford $425,000 $106,250 $531,250
Chase Creek for use by ORV's, snowmobiles
and trail grooming equipment.
MI 2011 Allegan State Game Area, Day Ride Parking Improvements to expand a parking area to 2 Allegan $6,000 $1,000 $7,000
Pine Point Improvements: Allegan State provide better access and more capacity for
Game Area, Pine Point horse trailers at an access point to a 55-mile
horse trail system.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2011 Northern Lower and Upper ORV Trail System Sign Signage 1, 2, 3 Multiple Counties $250,000 $250,000 $500,000
Peninsulas Project-Phase II
MI 2011 Millersburg Historic Park and Trailhead Development - Parking, restroom building, warming/picnic 1 Presque lsle $211,000 $492,000 $703,000
Trailhead Millersburg Trailhead shelter, benches, signage
MI 2011 Ocqueoc Falls Pathway Pathway Trailhead Unique project renovating trailhead parking 1 Presque Isle $260,000 $532,000 $792,000
Renovation- Ocqueoc Falls area and day use site providing universal
Pathway access to experience the only water fall in
Michigan's Lower Peninsula.
MI 2011 Berry Junction Trail Trail Surface Improvements - Trail surface improvements, part of Michigan 2 Muskegon $100,000 $900,000 $1,000,000
Berry Junction Trail Statewide Trailway System
MI 2011 Deadman's Hill-Landslide, Trailhead Upgrades ? Two trailheads that serve a popular pathway 1 Antrim $5,000 $1,250 $6,250
Jordan River Pathway Deadman's Hill / Landslide & in the Jordan River Valley and are major
Jordan River Pathway scenic overlook destinations in fall color
season.
MI 2011 Craig Lake State Park Trails Analysis and Design for Trail Analysis for design needs and subsequent 1 Baraga $55,000 $13,750 $68,750
Renovation and design on five miles of trail system.
Replacement of Two Replacement of two bridges.
Bridges- Craig Lake State
Park
MI 2011 State Forest Rail-Trail Trail Partnership Partnership management agreements for 2, 5, 10 Benzie, Lapeer, $75,000 $18,750 $93,750
Management & Projects: maintenance of sections of State Forest Saginaw
FMD Rail-Trails rail-trail
MI 2011 North Central State Trail Trailhead Improvements - Restroom upgrades to facilitate year-around 1 Cheboygan $50,000 $12,500 $62,500
North Central State Trail - public use of restroom that will be used as
Indian River-Phase 1 part of the trailhead development in Indian
River.
MI 2011 North Central State Trail Rail-Trail Bridge Renovation: Rail-Trail Bridge Renovation 1 Cheboygan $1,000,000 $250,000 $1,250,000
Indian River Trestle- North
Central State Trail
MI 2011 North Central State Trail Rail-Trail Bridge Repairs: Repairs to 5 bridges on the 62 mile North 1 Cheboygan $75,000 $18,750 $93,750
North Central State Trail Central State Trail.
MI 2011 Fur Farm Bridge Bridge Replacement: Fur Bridge Replacement 4 Clare $235,000 $58,750 $293,750
Farm Snowmobile Bridge
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2011 Ausable River Water Trail Canoe Landing Minor adjustments needed in layout of new 1 Crawford $20,000 $5,000 $25,000
Renovations-Rainbow launch/landing facilities at these two
Bend/Castle Landings locations.
MI 2011 Boardman River Water Trail Canoe Launch Renovation ? Project is to renovate launch area to reduce 4 Grand Traverse $11,000 $2,750 $13,750
Boardman River, Scheck's sedimentation into Blue Ribbon Trout Stream
Place Trailcamp and improve river ingress/egress.
MI 2011 Houghton to Lake Linden Rail-Trail Cross Drain Engineering assessment including cost 1 Houghton $200,000 $50,000 $250,000
Trail Engineering Structural estimating of Multiple cross drains on a
Analysis section of State owned rail-trail from north of
Houghton to just north of Lake Linden.
MI 2011 Ionia Rec. Area Hiking Trail Bridge Engineering for replacement of bridge that 3 Ionia $50,000 $12,500 $62,500
Replacement Engineering had to be removed on popular hiking trail.
MI 2011 Stateline Trail Rail-Trail Bridge Three bridges identified in engineering study 1 Iron $800,000 $200,000 $1,000,000
Renovations: Stateline Trail- as higher priority for maintenance.
Iron River to Beechwood No.
20, 21, 27
MI 2011 West Twin Lake Bridge Bridge Replacement: West Bridge Replacement 2 Lake $345,000 $86,250 $431,250
Twin Creek
ORV/Snowmobile Bridge
MI 2011 East Twin Creek Bridge Bridge Replacement: East Bridge Replacement 2 Lake $295,000 $73,750 $368,750
Twin Creek
ORV/Snowmobile Bridge
MI 2011 Pere Marquette State Trail Trailhead Information Kiosks: 56 mile rail-trail needs locations for trail use 2, 4 Lake, Osceola, Clare $26,000 $6,500 $32,500
Pere Marquette State Trail safety and support facility information. Kiosks
are the same type being installed on other
trails in the system.
MI 2011 Upper Spring Trail Trail Improvements: Upper Improve grade and stabilize surface on 1 Mackinac $9,200 $2,300 $11,500
Spring Trail at Arch Rock section of trail at natural feature site and
install benches and informational signage.
MI 2011 Van Riper State Park Trail Construction of Construction of approximately 0.5 miles of 1 Marquette $166,000 $41,500 $207,500
Non-motorized Trail trail from park entrance to park day use area
Connection- Van Riper State on Lake Michigamme.
Park
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2011 Little Presque Isle Trail Trail and Trailhead Replace broken down fencing along 1 Marquette $20,000 $5,000 $25,000
Improvements- Little lakeshore drop-off and upgrade trailhead
Presque Isle parking and entry road surface.
MI 2011 Marquette to Munising Rail-Trail Bridge Redeck and paint bridge over M-28 on the 1 Marquette $375,000 $93,750 $468,750
Rail-Trail Renovations: M-28 bridge, Marquette to Munising rail-trail.
Marquette to Munising Trail
MI 2011 Flowers Creek Bridge Bridge Replacement: Bridge Replacement 4 Missaukee $195,000 $48,750 $243,750
Flowers Creek
ORV/Snowmobile Bridge
MI 2011 Highland Recreation Area Construction of Regional Construction of trail connections 11 Oakland $430,000 $107,500 $537,500
Trail State Park Trail Connections
MI 2011 Elk Hill Trail Camp Trailcamp Expansion Study- Study to investigate opportunities for 1 Otsego $25,000 $6,250 $31,250
Elk Hill Trailcamp expanded camping capacity for equestrian
users utilizing this camp as a recreation
destination.
MI 2011 Rail-Trail Highway Trailhead Rail-Trail Highway Trailhead, Installation of directional signs 1 Otsego, Cheboygan $18,000 $4,500 $22,500
Location and Directional
Signs
MI 2011 High Country Pathway Bridge Replacement ? This is a bridge on the 70-mile High Country 1 Presque lsle $180,000 $45,000 $225,000
Canada Creek: High Country Pathway backpacking loop trail
Pathway
MI 2011 North and South Higgins Engineering Design for Trail Engineering and design for construction of 1, 4 Roscommon, $95,000 $23,750 $118,750
State Park Trails Connections to Regional approximately 3-miles of trail in two State Crawford
Loop Trail ? North and South Parks to be part of a larger 23.5 mile trail
Higgins Lake State Parks around Higgins Lake.
MI 2011 Clinton-Ionia-Shiawassee Trail Design/Engineering- Design and engineering for development of a 3, 8 Shiawassee, Clinton, $100,000 $25,000 $125,000
Trail CIS Trail 42 mile section of State owned rail-trail being Ionia
developed for multi-use transportation and
recreation use
MI 2011 Van Buren Trails Construction of Construction of approx 4.5 miles of surfaced 6 Van Buren $405,000 $101,250 $506,250
Non-motorized trail trail connection from City of South Haven to
connection- Van Buren State Lake Michigan beach at Van Buren State
Park Park.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2011 Michigan Statewide Rail-Trail Linear Parks Partnership Assist with partnership projects on State Park 1, 2, 3, 4, 5, 6, 7, Statewide $150,000 $37,500 $187,500
System Operations/Maintenance managed rail-trails. 8, 9, 10, 11, 12,
Lump Sum 13, 14
MI 2011 Michigan Statewide Rail-Trail Trail Survey, Engineering, Survey, design, and engineer projects on 1, 2, 3, 4, 5, 6, 7, Statewide $685,000 $171,250 $856,250
System Design and Special Projects: State Forest rail-trails. 8, 9, 10, 11, 12,
FMD Rail-Trails 13, 14
MI 2011 Maybury State Park Trail Trail Loop Re-surfacing Approximate 3 mile internal park trail loop 11 Wayne $52,000 $13,000 $65,000
engineering- Maybury State system at this very popular Urban State Park
Park needs asphalt resurfacing
MI 2011 Chase Creek Bridge Bridge Replacement: Chase Bridge Replacement 2 Wexford $425,000 $106,250 $531,250
Creek ORV/Snowmobile
Bridge
MI 2011 North and South Higgins Engineering Design for Trail Engineering and design for construction of 1, 4 Roscommon, $95,000 $23,750 $118,750
State Park Trails Connections to Regional approximately 3-miles of trail in two State Crawford
Loop Trail ? North and South Parks to be part of a larger 23.5 mile trail
Higgins Lake State Parks around Higgins Lake.
MI 2010 Harlow Lake Pathway Trail Surface Hardening- Assist with re-surfacing of rail-trail pathway. 1 Marquette $90,000 $82,000 $172,000
Harlow Lake Pathway
MI 2010 Michigan State ORV and ORV Trail System Sign Sign system development for better public 1, 2, 3, 4, 5, 6, 7, Statewide $125,000 $375,000 $500,000
Snowmobile System Project communication of riding opportunities. 8, 9, 10, 11, 12,
13, 14
MI 2010 Mackinaw City Trail Mackinaw City Construction oversight and quality control for 1 Cheboygan, Emmet $80,000 $881,400 $961,400
Trail/Trailhead Engineering asphalt surfacing approximately 2 miles of
trail in Mackinaw City and construction of
picnic pavilion with landscape, bicycle
parking, and lighting.
MI 2010 Lake Superior Trail Porcupine Mountains - Almost 100 foot suspension bridge that 1 Gogebic $75,000 $18,750 $93,750
Suspension Bridge Repairs, routes the North Country and Lake Superior
Presque Isle River Trail. It has renovation needs recommended
by an engineering consultant to have it meet
current safety and code requirements.
MI 2010 Gooseneck Creek Bridge Replace Gooseneck Creek Replace degraded rail-trail bridge. 1 Houghton $200,000 $50,000 $250,000
Bridge
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2010 Falling Waters Trail Bridge Renovation- Falling Assist with renovation and upgrade of bridge 7 Jackson $50,000 $12,500 $62,500
Waters Trail with new decking and railing system.
MI 2010 Fort Wilkins State Park Fort Wilkins State Park - Renovate one older bridge and construct new 1 Keweenaw $300,000 $75,000 $375,000
Construction of Two Bridges bridge to separate users from vehicle traffic.
MI 2010 Hart to Montague Trail Resurface Hart to Montague Assist with engineering for re-surfacing 22 2 Oceana $185,000 $46,250 $231,250
Trail State Park mile asphalt trail.
MI 2010 Townline Creek Bridge Townline Creek Bridge Replace existing bridge which is degenerated 4 Roscommon $250,000 $62,500 $312,500
to the point of being too costly to repair.
MI 2010 State Administration Trailway Engineering, Various survey, design, and engineering 1, 2, 3, 4, 5, 6, 7, Statewide $400,000 $100,000 $500,000
Design, Survey, and Special projects as well as several small 8, 9, 10, 11, 12,
Projects development /repair projects 13, 14
MI 2010 Kal-Haven Trail Resurface Kal-Haven Trail Assist with re-surface project on 34-mile 6 Van Buren, $136,000 $34,000 $170,000
State Park rail-trail including; crossing improvements, Kalamazoo
signage, grading and tree removal, and trail
and bridge engineering necessary to meet
AASHTO standards..
MI 2010 White Pine Trail White Pine Trail Section Provide funding for engineering costs 2, 4 Wexford, Osceola $250,000 $62,500 $312,500
Surfacing associated with this approximately 18 mile
surfacing project.
MI 2009 State Rail-Trail System Rail-Trail Bridge Engineering Part of the State Rail-trail system. Assist with 1 Marquette $300,000 $313,000 $613,000
and Construction development of trail connection to business
district by providing engineering and
construction of bridge needed over Chocolay
River.
MI 2009 State Park Trail System Equestrian Trail Re-Route Part of the State Park trail system. Re-route 3 Ionia $167,500 $41,875 $209,375
and Bridge Construction trail to better location that alleviates erosion
problems. Construct bridge to cross creek
and harden banks for an alternate water
crossing.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2009 State Park Trail System Construct Boardwalk and Part of the State Park trail system. Complete 3 Mason $120,000 $30,000 $150,000
Bridges phased boardwalk construction, construct
accessible walkway connection from bridge
to Visitors Center, and improve surface of
bridge.
MI 2009 State Park Trail System Construct Boardwalk and Part of State Park trail system. Construct 1 Emmet $120,000 $30,000 $150,000
Bridges approximately 100 foot boardwalk and two
bridges over creeks.
MI 2009 State Park Trail System Sign Installation Part of State Park trail system. Sign 1, 2, 9, 10, 11 Chippewa, $66,500 $16,625 $83,125
replacement and upgrade at 11 State Park Cheboygan, Emmet,
trail systems. Oakland, Huron,
Sanilac, Alcona, Iosco,
Mason
MI 2009 Highland State Park Trail Design and Engineering Part of the State Park trail system - Oakland 11 Oakland $45,000 $11,250 $56,250
System Co. trail connections. Survey and
design/engineering trail connections and
support facilities in Highland State Park and
to connect with county trail system.
MI 2009 Iron Ore Heritage Trail Design and Engineering Part of State Rail-Trail system. 1 Marquette $52,500 $13,125 $65,625
Design/engineering for development of trail
linkage into Van Riper State Park from the
regional Iron Ore Heritage Trail.
MI 2009 Harrisville State Park Trail Construction Part of State Park trail system. Engineering 1 Alcona $30,000 $7,500 $37,500
and surfacing approx. 1/2 mile of trail to
connect existing park trails to park use areas.
MI 2009 Van Buren Trail, Kal-Haven Design and Engineering Part of the State Park rail-trail system and 6 Van Buren $50,000 $12,500 $62,500
Trail park connection. Design and engineering to
develop trail to connect Van Buren State Park
to the Van Buren Trail, the City of South
Haven and the Kal-Haven Trails.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2009 Holly Recreation Area Trail Design and Engineering Part of State Park trail system. Design and 8 Oakland $60,000 $15,000 $75,000
System engineering to develop a 4-mile trail section
to connect the dispersed facilities in Holly
Recreation Area.
MI 2009 Michigan State ORV and Bridge Replacement Part of state's designated ORV and 4 Roscommon $305,000 $76,250 $381,250
Snowmobile System Snowmobile trail systems. Replace aging
bridge on ORV/Snowmobile trail.
MI 2009 Michigan State ORV and Bridge Replacement Part of state's designated ORV and 2 Wexford $250,000 $62,500 $312,500
Snowmobile System Snowmobile trail systems. Replace aging
ORV/Snowmobile bridge.
MI 2009 Michigan State ORV and ORV/Sno Bridge Part of state's designated ORV and 2 Lake $335,000 $83,750 $418,750
Snowmobile System Replacement Snowmobile trail systems. Replace aging
ORV/Snowmobile bridge.
MI 2009 Michigan State ORV and Bridge Replacement Part of state's designated ORV and 2 Lake $212,000 $53,000 $265,000
Snowmobile System Snowmobile trail systems. Replace aging
ORV/Snowmobile trail bridge.
MI 2009 State Forest Pathway Public Information for State Forest Pathway and Campground 1, 2, 4 Various $45,000 $11,250 $56,250
Pathway and Campground Recreation System. Public information for
System Pathway (60) and Campground (149) system.
MI 2009 State Forest Recreation Renovate Water Trail Access Part of State Forest Recreation Boating 1 Crawford $110,000 $27,500 $137,500
Boating Access Access program. Renovate deteriorating
canoe launches, stabilize stream banks and
develop accessible access routes.
MI 2009 State Rail-Trail System Trail Construction Part of State Rail-Trail system trail 2 Muskegon $295,000 $73,750 $368,750
connections. Development of 1.25 mile trail
section connecting state and local trails.
MI 2009 State Rail-Trail System Trail and Trailhead Part of the State Rail-trail system. Assist with 1 Cheboygan $445,000 $111,250 $556,250
Improvements development of trailhead facility including
parking, restrooms, information station,
benches, picnic pavilion, and signage.
MI 2009 Musketawa Trails, White Trail Connection Design and engineering to develop a 10 foot 2, 3 Kent $150,000 $37,500 $187,500
Pine Trails Engineering/Design wide trail connection between the Musketawa
and White Pine Trails.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2009 State Rail-Trail System Trail Construction Part of State Rail-Trail system. Survey and 1 Cheboygan, Emmet $100,000 $25,000 $125,000
engineering/design for trailhead completion,
trail connections and surface trail section out
to Mill Creek Historic State Park.
MI 2009 State Rail-Trail System Trail Construction Part of State Rail-Trail system. Construction 8 Oakland $120,000 $30,000 $150,000
of approximately 3/4 mile of trail adjacent to
paved rail-trail using various trail surfaces to
test long-term durability and maintenance
requirements.
MI 2009 State Rail-Trail System Bridge Renovation Part of the State Rail-trail system. 1 Ontonagon $705,000 $176,250 $881,250
Renovations of structural, decking, and railing
system on 443 foot long rail-trail bridge.
MI 2009 State Rail-Trail System Rail-Trail Bridge Engineering Part of the designated state snowmobile trail 1 Dickinson $35,000 $8,750 $43,750
system. Bridge is County owned. Engineering
of necessary improvements to bridge on
snowmobile rail-trail, could include structural
work, decking, and railing depending on
engineering evaluation.
MI 2009 State Rail-Trail System Evaluate Title and Part of State Rail-Trail system. Evaluate title 1 Houghton, Keweenaw $40,000 $10,000 $50,000
Ownership Status of and ownership status of sections of railroad
Railroad Rights-of-Way right-of-way desired to make trail
connections.
MI 2009 ORV Study Study on Snowmobile and Assist with cost of national study on 1, 2, 3, 4, 5, 6, 7, Statewide $15,000 $3,750 $18,750
ORV Stopping Distances snowmobile and ORV stopping distances for 8, 9, 10, 11, 12,
signage specifications. Stopping distance 13, 14
study being conducted through the USDA
Forest Service Technology Center.
MI 2008 Bergland Rail-Trail Bridge Renovation One of the major bridges on the 41 mile long 1 Ontonagon $431,000 $107,750 $538,750
Sidnaw - Bergland Rail-trail. Renovations
identified in engineering analysis done on the
bridge for bridge structural integrity and
replace deck and rail system.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2008 Marquette-Munising Trail, Trail Surfacing Part of the Michigan Statewide Rail-Trail 1 Marquette $294,000 $73,500 $367,500
Chocolay Segment system. Surface 6.25 mile section of rail-trail
with compacted limestone mixture.
MI 2008 Upper Peninsula Trail and Trailhead Part of the Department of Natural Resource's 1 Marquette $95,000 $23,750 $118,750
Renovation Upper Peninsula forest recreation program.
Repair and replacement of trail safety
structures (fence, handrails and access)
along shoreline trail of Lake Superior and
upgrade surface of parking and access...
MI 2008 State Forest Pathway Trailhead Improvements Part of the State Forest Pathway System. 4 Missaukee $56,000 $14,000 $70,000
System, Cadillac Pathway Hard surface the parking area with
compacted limestone mixture to provide
safer, more accessible and easier to maintain
parking surface at the trailhead of this
pathway.
MI 2008 Alpena to Cheboygan Trail Trail/Road Crossing Part of the Statewide Rail-trail system. 1 Presque Isle $90,000 $22,500 $112,500
Realignment Construction Construct realigned trail/road crossings that
cross at 70 degrees or more to provide a
safer crossing of roads by trail users.
MI 2008 Musketawa Trail, Muskegon Asphalt Trail Construction Part of the Statewide Rail-Trail system. 2 Muskegon $105,000 $348,000 $453,000
Connection and Improvements Construction of 1.8 mile trail segment to
connect two existing trails. Includes base
preparation, asphalt surface, signage,
restoration, etc.
MI 2008 Cheboygan Trailhead Trailhead Development - Part of the Statewide Trailways System. 1 Cheboygan $340,000 $85,000 $425,000
Cheboygan Trailhead Construction of trailhead facility including
restroom, picnic pavilion, parking, signage,
lighting, and landscaping.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2008 Michigan Shore to Shore Trail Camp Facilities Trail camp facility on the Michigan Shore to 1 Missaukee $340,000 $85,000 $425,000
Riding/Hiking Trail Shore Riding/Hiking Trail. Re-design of trail
camp, trail and boat access site to provide
better circulation and more efficient camping
layout in a camp that can accommodate 200
person rides.
MI 2008 Muskegon State Park Accessible Trail Surface Part of the State Park system. On a 2.6 mile 2 Muskegon $190,000 $300,000 $490,000
Prototype - Muskegon State looped trail, install approximately 1000 feet of
Park 6 foot wide stabilized engineered wood fiber
surface to the trail and surface the remainder
with crushed limestone.
MI 2008 Wells State Park Trail Surfacing Part of the State Park system. Development 1 Menominee $77,000 $250,000 $327,000
of .7 miles of trail with a combination of
concrete, and stabilized engineered wood
fiber surfacing.
MI 2008 Mitchell State Park Trail and Boardwalk Part of the State Park system. 2.5 mile trail to 2 Cadillac $67,000 $16,750 $83,750
Renovation be upgraded with compacted limestone
surface and existing boardwalks and bridges
re-built.
MI 2008 Port Crescent State Park Trail Renovation and Part of the State Park system. Upgrade of .8 10 Huron $13,000 $250,000 $263,000
Surfacing - Port Crescent mile of trail with crushed aggregate surfacing.
State Park
MI 2007 Mackinac State Historic Accessible Trail Part of the Mackinac State Historic Parks trail 1 Cheboygan $57,500 $1,340 $58,840
Parks Trail System Improvements system. Surface and alignment
improvements to existing trail to provide
universal access to all trail users.
MI 2007 Michigan Statewide Rail-Trail Bridge Improvements Part of the Statewide Rail-trail System. Assist 1, 2, 3, 4, 5, 6, 7, Statewide $558,000 $150,000 $708,000
System with major renovation project on historic 128 8, 9, 10, 11, 12,
foot long former railroad trestle bridge. 13, 14
MI 2007 Michigan Statewide Rail-Trail Rail-Trail Development Part of the Statewide Rail-trail System. 1, 2, 3, 4, 5, 6, 7, Statewide $12,000 $273,000 $285,000
System Provide engineering, design and survey 8, 9, 10, 11, 12,
services for state rail-trail projects. 13, 14
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2007 State Forest Campground Trailhead Improvements Part of the State Forest Campground system. 1, 2, 3, 4, 5, 6, 7, Statewide $155,000 $320,000 $475,000
Reposition use areas in State Forest 8, 9, 10, 11, 12,
Campground to eliminate use conflicts, 13, 14
improve circulation and access to trail
system, improve campsite orientation and
barrier-free access within the facility.
MI 2007 Michigan Statewide Rail-Trail Road/Trail Crossing Safety Part of the Statewide Rail-Trail system. Assist 1, 2, 3, 4, 5, 6, 7, Statewide $144,000 $2,104,218 $2,248,218
System Improvements with aggregate surfacing, trail/road crossing 8, 9, 10, 11, 12,
re-alignments on 61 mile rail-trail. 13, 14
MI 2007 Michigan State Forest Trail Construction Part of the Michigan State Forest Pathway 1, 2, 3, 4, 5, 6, 7, Statewide $18,000 $4,500 $22,500
Pathway System System. Design and construction of pathway 8, 9, 10, 11, 12,
segment to link two existing Pathway facilities 13, 14
to provide a longer trail opportunity for the
public.
MI 2007 Michigan Statewide Rail-Trail Bridge Improvements Part of the Statewide Rail-trail System. 1, 2, 3, 4, 5, 6, 7, Statewide $40,000 $10,000 $50,000
System Engineering assessment and evaluation of 8, 9, 10, 11, 12,
existing former railroad bridge to determine 13, 14
costs for upgrade of decking and painting.
MI 2007 Michigan Statewide Rail-Trail Bridge Improvements Part of the Statewide Rail-trail System. 1, 2, 3, 4, 5, 6, 7, Statewide $400,000 $100,000 $500,000
System Renovations as identified in engineering 8, 9, 10, 11, 12,
analysis for bridge structural integrity and 13, 14
decking and railings as needed.
MI 2007 Michigan Shore to Shore Trailhead Improvements Campground on the Michigan Shore to Shore 1, 2, 3, 4, 5, 6, 7, Statewide $81,000 $20,250 $101,250
Riding/Hiking Trail Riding/Hiking Trail. Engineering and design 8, 9, 10, 11, 12,
to reconstruct trail camp facility. 13, 14
MI 2007 Michigan Statewide Rail-Trail Trail Maintenance Part of the Statewide Rail-trail System. Assist 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000
System with management and maintenance on State 8, 9, 10, 11, 12,
park rail-trails. 13, 14
MI 2007 Michigan Statewide Rail-Trail Trail Improvements Part of the Statewide Rail-trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $85,000 $21,250 $106,250
System Renovate and re-surface approximately 1500 8, 9, 10, 11, 12,
feet of trail with asphalt. 13, 14
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2007 Fort Wilkins State Park Bridge Improvements Part of the Ft. Wilkins State Park trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $65,000 $16,250 $81,250
Evaluate two bridges and design and provide 8, 9, 10, 11, 12,
cost estimates for appropriate replacement 13, 14
as necessary.
MI 2007 Sterling State Park and City Trail Construction Part of State Park Trail System. Complete 1, 2, 3, 4, 5, 6, 7, Statewide $183,000 $45,750 $228,750
of Monroe plans for trail development and construct trail 8, 9, 10, 11, 12,
segment to connect Sterling State Park trail 13, 14
system to the City of Monroe's trail system.
MI 2007 Michigan State Park Trail Engineering, Design, and Part of the State Park Trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $28,500 $7,125 $35,625
System Cost Estimating Engineering, design, and cost estimating for 8, 9, 10, 11, 12,
re-surfacing trail and provision of natural 13, 14
resources interpretation elements.
MI 2007 Michigan State Park Trail Install Signs Part of the State Park trail system. Upgrade 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500
System trailhead and trail directional signage at eight 8, 9, 10, 11, 12,
State Parks. 13, 14
MI 2007 Michigan State Forest Trail Renovation Part of the Statewide State Forest Pathway 1, 2, 3, 4, 5, 6, 7, Statewide $75,000 $18,750 $93,750
Pathway System System. Projects for improvement and 8, 9, 10, 11, 12,
upgrade of existing pathways and projects 13, 14
causing safety concerns due to unforeseen
outside influences, i.e., damage caused by
wind or water.
MI 2006 Unspecified/Unidentifiable Trailhead Construction Part of the State Forest Recreation program. Unspecified/Unidentifi $52,000 $13,000 $65,000
Trail camp improvements including; site able
development, road improvements, hitching
posts, picnic tables and fire rings, information
station, fee pipe and signage.
MI 2006 Michigan State Forest Water Trail Improvements Part of the State Forest boating access 1, 2, 3, 4, 5, 6, 7, Statewide $35,000 $8,750 $43,750
program. Remove deteriorating dock 8, 9, 10, 11, 12,
structures at two locations and replace with 13, 14
smaller structures to enhance use by boaters
as well as fit better with streambank
environment of this natural river.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2006 Michigan State Forest Design and Engineering Part of State Forest boating access program. 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500
Engineering to develop plans, specs and bid 8, 9, 10, 11, 12,
documents to construct new access site to 13, 14
replace existing site and to restore existing
site. The existing site is located at an
undesirable location on a...
MI 2006 Michigan Statewide Rail-Trail Bridge Improvements Part of Michigan's Statewide Rail-Trail 1, 2, 3, 4, 5, 6, 7, Statewide $408,000 $102,000 $510,000
System System. Repair old trestle bridge to preserve 8, 9, 10, 11, 12,
for trail use. 13, 14
MI 2006 Michigan Statewide ORV OHV Area Development Part of the Statewide ORV Trails System. 1, 2, 3, 4, 5, 6, 7, Statewide $60,000 $15,000 $75,000
Trails System Develop trailhead facility including: parking 8, 9, 10, 11, 12,
area, accessible toilet and information 13, 14
station.
MI 2006 Michigan Shore to Shore Trail Improvements Part of Michigan Shore to Shore 1, 2, 3, 4, 5, 6, 7, Statewide $193,000 $48,250 $241,250
Riding/Hiking Trail Riding/Hiking Trail. Engineering for 8, 9, 10, 11, 12,
development of plans, specs and bid 13, 14
documents for camp and road improvements.
Phase one construction including: vehicle
control elements/posts, initial campsite and
road...
MI 2006 Michigan State Forest Bridge Improvements Part of the State Forest Recreation program. 1, 2, 3, 4, 5, 6, 7, Statewide $90,000 $22,500 $112,500
Install new railing system on bridge and 8, 9, 10, 11, 12,
design and install sand retaining structure to 13, 14
protect bridge support system.
MI 2006 Unspecified/Unidentifiable Unspecified/Unidentifiable Unspecified/Unidentifi $20,000 $5,000 $25,000
able
MI 2006 Michigan State Snowmobile Design and Engineering Part of the statewide snowmobile trail 1, 2, 3, 4, 5, 6, 7, Statewide $30,000 $7,500 $37,500
Trail System system. Engineering to develop plans, spec, 8, 9, 10, 11, 12,
bid documents to install standard aggregate 13, 14
surfacing to the existing trailbed.
MI 2006 Unspecified/Unidentifiable Unspecified/Unidentifiable Unspecified/Unidentifi $40,000 $10,000 $50,000
able
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2006 Michigan Statewide Rail-Trail Rail-Trail Development Part of State Rail-Trail system. Survey, 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000
System design, engineering, planning and special 8, 9, 10, 11, 12,
construction projects as identified by the 13, 14
State Trails Coordinator.
MI 2006 Michigan State Park Trail Design and Engineering Part of State Park trail system. Engineering to 1, 2, 3, 4, 5, 6, 7, Statewide $80,000 $20,000 $100,000
System develop preliminary plans and cost estimating 8, 9, 10, 11, 12,
to complete 150 feet of boardwalk to 13, 14
complete trail along Big Sable River in critical
dune area, complete an engineering
evaluation of the existing bridge...
MI 2006 Michigan State Park Trail Design and Engineering Part of the State Park trails system. 1, 2, 3, 4, 5, 6, 7, Statewide $56,000 $14,000 $70,000
System Engineering to develop plans, specs and bid 8, 9, 10, 11, 12,
documents for new trail bridge and re-route of 13, 14
existing trail to the new bridge location.
MI 2006 Michigan State Park Trail Trail Renovation and Part of State Park trail system. Trail 1, 2, 3, 4, 5, 6, 7, Statewide $30,000 $7,500 $37,500
System Drainage Improvements restoration and improvements including; 8, 9, 10, 11, 12,
constructing short trail re-routes, trail 13, 14
drainage work including culverts and
restoration of abandoned sections of trail.
MI 2006 Michigan State Park Trail Design and Engineering Part of State Park trail system. Survey, 1, 2, 3, 4, 5, 6, 7, Statewide $150,000 $37,500 $187,500
System design and engineering to develop 8, 9, 10, 11, 12,
preliminary plans and cost estimating to 13, 14
renovate 8 mile equestrian trail system and
engineering evaluation of utilities at
equestrian campground/trailhead to
determine need...
MI 2006 Michigan State Park Trail Trailhead Construction Part of State Park trail system. Construct 1, 2, 3, 4, 5, 6, 7, Statewide $30,000 $7,500 $37,500
System small trailhead parking lot and install 8, 9, 10, 11, 12,
interpretive signage. 13, 14
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2006 Michigan State Park Trail Boardwalk Construction and Part of State Park trail system. Trails 1, 2, 3, 4, 5, 6, 7, Statewide $36,000 $9,000 $45,000
System Trailhead Improvements improvements to enhance nature 8, 9, 10, 11, 12,
interpretation including: development of 13, 14
boardwalk section to access wetland,
information and interpretive signage and
bench installation for lecture/group tour focus
area.
MI 2006 Michigan State Park Trail Boardwalk and Bridge Part of State Park trail system. Engineering to 1, 2, 3, 4, 5, 6, 7, Statewide $47,000 $11,750 $58,750
System Construction provide preliminary plans and cost estimates 8, 9, 10, 11, 12,
to construct 100 feet of boardwalk and two 13, 14
trail bridges.
MI 2006 Michigan State Park Trail Trail Construction and Part of the State Park trail system. Surface 1, 2, 3, 4, 5, 6, 7, Statewide $26,000 $6,500 $32,500
System Trailhead Improvements existing trail with limestone fines, construct 8, 9, 10, 11, 12,
observation deck/rest area, update trailhead 13, 14
interpretive and information signs.
MI 2006 Michilimackinac State Park Trail Renovation and Part of the interpretive trail system at 1 Cheboygan $120,000 $30,000 $150,000
Improvements Michilimackinac State Park historic complex.
Renovate historic pathway system accessing
turn of the century lighthouse including
lighting, interpretive and directional signage,
benches and litter receptacles.
MI 2006 Unspecified/Unidentifiable Trailhead Construction Part of a campground/trail/boating-fishing Unspecified/Unidentifi $42,000 $10,500 $52,500
recreation complex. Renovation of trail camp able
area including addition of picket posts at
restroom area, install two accessible toilets,
well house improvement and trail drainage
improvements.
MI 2005 Michigan State Snowmobile Bridge Improvements Part of the Michigan Snowmobile Trail 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000
Trail System System. Engineering evaluation of 42 bridges 8, 9, 10, 11, 12,
on this trail to establish priority needs to 13, 14
address upgrades necessary.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2005 Michigan State Forest Trail Improvements Part of the Michigan State Forest Pathway 1, 2, 3, 4, 5, 6, 7, Statewide $23,000 $5,750 $28,750
Pathway System System. Install compacted aggregate surface 8, 9, 10, 11, 12,
to provide stable trail tread. 13, 14
MI 2005 Michigan State Forest Trail Improvements Part of the Michigan State Forest Pathway 1, 2, 3, 4, 5, 6, 7, Statewide $16,000 $4,000 $20,000
Pathway System System. Install compacted aggregate surface 8, 9, 10, 11, 12,
to provide stable trail tread. 13, 14
MI 2005 State Forest Pathway Bridge Construction Part of the State Forest Pathway System. 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500
System Replace second bridge on the pathway. 8, 9, 10, 11, 12,
13, 14
MI 2005 Michigan State ORV and Trailhead Construction Part of the Statewide ORV and Snowmobile 1, 2, 3, 4, 5, 6, 7, Statewide $60,000 $15,000 $75,000
Snowmobile System Trail Systems. Develop standard program 8, 9, 10, 11, 12,
trailhead including parking, information 13, 14
station, accessible vault toilet.
MI 2005 Fort Michilimackinac Accessible Trail Main visitor route to the historic reconstructed 1 Emmet, Cheboygan $12,500 $3,125 $15,625
Improvements and 1715 French fort complex. Route includes
Interpretive Facilities historic interpretive information to set the
stage for the visitor's interactive fort visit
experience. Re-surface trail to provide stable
universal access...
MI 2005 Big Sable River Trail and Boardwalk This project is to assist with development of a 2 Lake, Mason $150,000 $37,500 $187,500
Construction section of an overall 1 1/2 mile trail loop
along the Big Sable River. The finished trail
will be universally accessible and includes
ramps and elevated boardwalk. Site
preparation and grading,...
MI 2005 Michigan State Park Trail Trail Improvements Part of the State Park historical interpretation Unspecified/Unidentifi $42,000 $10,500 $52,500
System program. Develop and surface approximately able
2100 feet of interpretive trail with compacted
crushed aggregate. Includes provision of two
accessible ramps to accomplish universal
access to existing...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2005 Michigan Statewide Rail-Trail Trail Improvements Part of the Michigan Statewide Rail-Trail 1, 2, 3, 4, 5, 6, 7, Statewide $60,000 $15,000 $75,000
System System. Install compacted crushed 8, 9, 10, 11, 12,
aggregate surface on 5+ miles of trail. 13, 14
MI 2005 Michigan Statewide Rail-Trail Trail Maintenance Part of the Michigan Statewide Rail-Trail 1, 2, 3, 4, 5, 6, 7, Statewide $40,000 $10,000 $50,000
System System. Brush and clear approximately 12 8, 9, 10, 11, 12,
miles of trail corridor. 13, 14
MI 2005 Michigan Statewide Rail-Trail Trail Maintenance Part of the Michigan Statewide Rail-Trail 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500
System System. Brush and clear 6-7 miles of rail-trail 8, 9, 10, 11, 12,
corridor. 13, 14
MI 2005 Michigan Statewide Rail-Trail Rail-Trail Development Part of the Statewide Rail-Trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000
System Remove and dispose of railroad tie debris left 8, 9, 10, 11, 12,
behind by the railroad company on 18 miles 13, 14
of trail corridor.
MI 2005 Michigan Statewide Rail-Trail Survey and Engineering Part of the Statewide Rail-trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $250,000 $62,500 $312,500
System Various trail surveys, design and engineering 8, 9, 10, 11, 12,
projects. 13, 14
MI 2003 Goose Creek Trail Trail Improvements Improvements 1 Crawford $20,000 $20,000 $40,000
MI 2003 Huron Valley Trail Construct Trail 11 Oakland $25,000 $25,000 $50,000
MI 2003 Frank Anderson Trail, Construct Trail, Maintenance 5 Bay $40,000 $40,000 $80,000
Campground Day Use Trail
MI 2003 Historic Mill Creek State Trail and Trailhead Construct Trail, Trailhead 1 Cheboygan $60,000 $60,000 $120,000
Park Construction
MI 2003 Leelanau State Park Day Maintenance 1 Leelanau $60,000 $60,000 $120,000
Use Trail
MI 2003 High Country Pathway Bridges 1 Otsego $74,800 $74,800 $149,600
MI 2003 White Pine Trail Construct Trail 3 Kent $80,000 $80,000 $160,000
MI 2003 Linear State Parks, State Trail Maintenance Maintenance 1, 2, 3, 4, 5, 6, 7, Statewide $84,300 $84,300 $168,600
Park Trails 8, 9, 10, 11, 12,
13, 14
MI 2003 Snowmobile Trails Winter Trail Improvements Maintenance, Grooming 1, 2, 3, 4, 6 Statewide $245,000 $245,000 $490,000
MI 2003 ORV Trail OHV Area Improvements Maintenance, Signage 1, 2, 4 Statewide $245,000 $245,000 $490,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2003 Polly Ann Lapeer Trail Maintenance Maintenance 1, 2, 3, 4, 5, 6, 7, Statewide $329,000 $329,000 $658,000
8, 9, 10, 11, 12,
13, 14
MI 2003 I-75 Bridge Installation Bridge 1 Mackinac $1,016,000 $1,016,000 $2,032,000
MI 2002 Lake Dubonnet Trail Improvements 1 Grand Traverse $35,000 $10,000 $45,000
MI 2002 Historic Mill Creek State Improvements 1 Cheboygan $103,000 $21,500 $124,500
Park
MI 2002 White Pine Trail State Park Construct Trail 2 Wexford $60,000 $36,500 $96,500
MI 2002 Van Buren State Park, Paw Bridge 6 Van Buren $400,000 $100,000 $500,000
Paw River
MI 2002 Snowmobile Trails Grooming 1, 2, 3, 4, 5, 6, 7, Statewide $0 $185,583 $185,583
8, 9, 10, 11, 12,
13, 14
MI 2002 Off Road Vehicle Trails Trail Maintenance Maintenance 1, 2, 3, 4, 5, 6, 7, Statewide $0 $185,583 $185,583
8, 9, 10, 11, 12,
13, 14
MI 2002 Cheboygan Rail-Trail Improvements 1 Otsego, Livingston $80,000 $220,000 $300,000
MI 2002 White Pine Trail State Park Construct Trail 3 Kent $98,000 $820,600 $918,600
MI 2002 ORV Trails Trailhead Construction Trailhead 1, 2, 3, 4, 5, 6, 7, Statewide $126,500 $31,625 $158,125
8, 9, 10, 11, 12,
13, 14
MI 2002 Devil's Lake ORV Area Bridge 1 Alpena $40,000 $10,000 $50,000
MI 2002 Mason Tract Pathway Bridges 4 Crawford $20,000 $10,000 $30,000
MI 2002 Carriage Road and Townsite Maintenance 1 Delta $86,700 $21,675 $108,375
Path
MI 2002 State Forest Pathways Maintenance, Improvements 1 Delta, Luce, Mackinac, $36,600 $9,150 $45,750
Lake
MI 2002 Lake Ann Connector Trail Bridge 1 Benzie, Grand $45,000 $11,250 $56,250
Traverse
MI 2002 Frieda Trail Construct Trail 1 Houghton $31,100 $7,775 $38,875
MI 2002 Little Manistee Maintenance 2 Lake $11,000 $2,750 $13,750
ORV/Snowmobile Trail
MI 2002 Silver Creek Pathway Maintenance 2 Lake $25,900 $6,475 $32,375
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2002 Pere Marquette State Trail Maintenance 2, 4 Lake, Osceola, Clare $29,157 $7,289 $36,446
MI 2002 Day Use Area Trail Improvements 1 Marquette $16,300 $4,075 $20,375
MI 2002 Ludington State Park Trails Improvements 1 Mason $40,000 $10,000 $50,000
MI 2002 Lake of the Clouds Trails, Construct Trail 1 Ontonagon $55,000 $13,750 $68,750
Presque Isle Trails
MI 2002 Pere Marquette State Trail Maintenance 4 Osceola $70,400 $17,600 $88,000
MI 2002 Heritage Trail Improvements, Erosion Control, Signage 2 Wexford $45,000 $11,250 $56,250
MI 2002 High Rollways Overlook Improvements 4 Wexford $30,000 $7,500 $37,500
MI 2001 Winter Recreation Trails Winter Trail Improvements Improvements, Maintenance Various 1, 2, 3, 4, 5, 6, 7, Statewide $0 $194,868 $194,868
Snowmobile Trails 8, 9, 10, 11, 12,
13, 14
MI 2001 Winter Recreation Trails Winter Trail Improvements Improvements, Maintenance Various 1, 2, 3, 4, 5, 6, 7, Statewide $0 $194,868 $194,868
Snowmobile Trails 8, 9, 10, 11, 12,
13, 14
MI 2001 Upper Peninsula Trail Improvements 1 Statewide $80,000 $20,000 $100,000
Snowmobile Trails
MI 2001 Various ORV Trails Trailhead Construction Trailhead Facilities, Parking Areas, Signage, 1, 2, 3, 4, 5, 6, 7, Statewide $157,700 $39,425 $197,125
Restroom 8, 9, 10, 11, 12,
13, 14
MI 2001 Frank Anderson Trail Construct Trail 5 Bay $78,000 $19,500 $97,500
MI 2001 Northern Lower Peninsula Improvements, Maintenance 1 Emmet $70,000 $17,500 $87,500
Rail-Trails
MI 2001 Keweenaw Trail Bridge 1 Houghton $330,000 $82,500 $412,500
MI 2001 Pinckney, Brighton, Trail Improvements 8, 9 Washtenaw, $42,800 $10,700 $53,500
Metamora, Hadley Livingston, Lapeer
Recreation Areas
MI 2001 Island Lake State Recreation Bridge 8 Livingston $115,000 $28,750 $143,750
Area Trails
MI 2001 Brown's Brook Area Construct Trail, Benches, Displays 11 Mackinac $47,600 $11,900 $59,500
MI 2001 Harlow Lake Pathway Maintenance, Bridges 1 Marquette $84,400 $21,100 $105,500
MI 2001 Sterling State Park Construct Trail, Parking Lot, Trailhead, 16 Monroe $553,443 $138,361 $691,804
Bridge, Signage
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 2000 Snowmobile Trails Trail Maintenance and Improvements to 1, 2, 3, 4, 5, 6, 7, Statewide $0 $177,187 $177,187
Snowmobile Trails 8, 9, 10, 11, 12,
13, 14
MI 2000 Off Road Vehicle Trails Trail Maintenance 1, 2, 3, 4, 5, 6, 7, Statewide $0 $177,188 $177,188
8, 9, 10, 11, 12,
13, 14
MI 2000 Betsie Valley Trail Construct Trail, ADA 1 Benzie $230,000 $57,500 $287,500
MI 2000 Algonquin State Forest Maintenance, Trailhead 1 Chippewa $18,900 $4,725 $23,625
Pathway
MI 2000 Wakefield Union Pacific Rail Construct Trail 1 Gogebic $77,400 $19,350 $96,750
Grade
MI 2000 Trail # 2 Improvements, Box Culvert Installation 1 Gogebic $90,200 $22,550 $112,750
MI 2000 Lakelands Trail State Park Trail Maintenance, ADA 8 Ingham, Livingston $149,000 $37,250 $186,250
and Horse Trail
MI 2000 Iron River-Marenisco Trail Renovate Trail With Surfacing 1 Iron $14,400 $3,600 $18,000
MI 2000 Polly Ann Trail Construct Trail 9 Lapeer $20,000 $5,000 $25,000
MI 2000 Republic to Champion Grade Bridge Repairs 1 Marquette $84,900 $21,225 $106,125
MI 2000 Montague-Berry Junction Construct Trail, ADA 2 Muskegon $50,000 $12,500 $62,500
Trail
MI 2000 Musketawa Trail Improvements, Trail Surfacing 2 Muskegon $105,000 $26,250 $131,250
MI 2000 Trail and Accessibility Trail and Accessibility Trail Maintenance, ADA 1, 2, 3, 4, 5, 6, 7, Statewide $55,000 $13,750 $68,750
Improvements Improvements 8, 9, 10, 11, 12,
13, 14
MI 2000 State Forest Pathway Trail Maintenance and Grooming 1, 2, 4 Statewide $77,900 $19,475 $97,375
MI 2000 ORV Trails Trailhead Development, ADA 1, 2, 4 Statewide $293,000 $73,250 $366,250
MI 2000 Michigan Statewide Rail-Trail Trail Maintenance, Trailhead 1, 2, 4 Statewide $52,300 $13,075 $65,375
System
MI 2000 Van Buren Trail Construct Trail, Trailhead, ADA 8 Van Buren $99,497 $24,874 $124,371
MI 1998 Addison, Orion, Oxford Trail Improvements Improvements, Which May Include, Grading, 9 Oakland $10,000 $10,000 $20,000
Erosion,
MI 1998 Almira, Long Lake Township, Trail Construction Construction of 5+ Miles of Trail 1 Benzie, Grand $7,990 $16,500 $24,490
Benzie Traverse
MI 1998 Greenwood Township Trail Construction Construct Overlook Site Facility 2 Wexford $19,750 $19,750 $39,500
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 1998 Alpena, Wilson Township Trail Construction and Trail and Trail Facility Construction and 1 Alpena $35,000 $42,000 $77,000
Trailhead Improvements Renovation
MI 1998 Rail-Trail Development Rail-Trail Development Rail-Trail Improvements 2, 3, 4, 6, 8 Ingham, Kent, $49,400 $49,400 $98,800
Livingston, Mecosta,
Montcalm, Muske
MI 1998 Kinross, Eden, Lake, Liberty Accessible Trail Construct Fully Accessible Trailhead 1, 2, 4 Multiple Counties $60,000 $60,000 $120,000
Township Improvements Facilities
MI 1998 Beaver Creek Township Trail Improvements Resurface Access and Camp Roads 4 Crawford $4,000 $1,000 $5,000
MI 1997 Orient T17N-R4W Drainage Improvements Clear Side Drainage Ditches 4 Osceola $195,038 $2,000 $197,038
MI 1997 Lovells Township Trail Improvements Widen and Re-Surface Access and Camp 1 Crawford $6,000 $4,000 $10,000
Roads
MI 1996 Mentor Township Trail Construction Construction of New 3/4 Mi Trail, Construct 4 Oscoda $4,000 $4,000 $8,000
New Bridge
MI 1996 Ausable Township Install Signs Replace Dir and Interpretive Signage 4 Roscommon $7,000 $7,000 $14,000
Aggregate Surface
MI 1996 Commerce Township Boardwalk Construction Replace Boardwalk 11 Oakland $9,000 $9,000 $18,000
MI 1996 Frederic, Beaver Crk, Lake, Trail Improvements Widen and Straighten 26M of Existing Trail 1 Multiple Counties $13,000 $13,000 $26,000
Bear Lake Township, Crawfo
MI 1996 Northern Lower and Upper Safety and Environmental Law Enf for Env Prot and Safety ORV Use 1, 2, 4 Peninsula $19,481 $19,481 $38,962
Peninsula Education On A
MI 1996 Algoma Township Trailhead Construction Develop Trailhead Facilities, Surfaced 3 Kent $20,000 $20,000 $40,000
Parking Area, Acc toil
MI 1996 Northern Lower and Upper Trail Maintenance Pathway Maint, Brushing, Sign and Trail 1, 2, 4 Peninsula $20,300 $20,300 $40,600
Peninsula Marker Replacement
MI 1996 Stockbridge, Unadilla and Trail Improvements Increase Cleared Width Along Trail Corridor 8 Ingham, Livingston $25,000 $25,000 $50,000
Putnam Township, Ingham
Living
MI 1996 Matchwood, Ontonagon Trail Construction Construct New 12' Wide Trail 1 Ontonagon $25,000 $26,000 $51,000
Township
MI 1996 Summerfield Township Bridge Improvements Renovate Existing Bridge 4 Clare $27,000 $27,000 $54,000
MI 1996 Stanton Township Bridge Installation Construct New Bridge 1 Houghton $32,500 $32,500 $65,000
MI 1996 Carp Lake Township Trail Renovation Erosion Control and Asphalt Surface 1 Ontonagon $35,000 $35,000 $70,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
MI 1996 Northern Lower and Upper Trail Maintenance Trail Maintenance of Dedicated ORV 1, 2, 4 Peninsula $38,000 $38,000 $76,000
Peninsula County Trail/Rte. Sys
MI 1996 Ononagon, Rockland Trail Renovation Develop, renovate 1.2 Mi Interpretive Trail 1 Ontonagon $50,000 $50,000 $100,000
Township
MI 1996 Wright, Chester, Ravenna, Bridge Improvements Deck and Rail 15 Bridges, Clean Up Debris, 3 Muskegon $60,000 $60,000 $120,000
Sullivan, Fruitport Install S
MI 1996 Algoma Township Trail Relocation Relocate Trail Segment 3 Kent $60,000 $60,000 $120,000
MI 1996 Quincy Township Trail Improvements Upgrade for Multiple-Use. Surface Parallel 1 Houghton $18,400 $77,000 $95,400
Trails
MI 1996 Various Parking Areas Trailhead Construction Improvements Trailhead Parking Areas, 6 Van Buren $80,000 $80,000 $160,000
Culvert and Co
MI 1996 Various State Trails Trailhead Construction Development of Trailhead Facilities, 1, 2, 4 Multiple Counties $100,000 $100,000 $200,000
Aggregate Surfaced Parking
MI 1996 Greenland Township Bridge Improvements Replace Decking and Railings On the 374+/-' 1 Ontonagon $100,000 $100,000 $200,000
Mid Brid
MI 1996 Chester, Ravenna Township, Trail Improvements Assist in construction of 5.3-mile of Trail 2 Muskegon $35,681 $250,000 $285,681
Ottawa, Muskegon County Surface
MI 1993 Statewide Trail Maintenance Trail Improvements 1, 2, 4, 5 Statewide $86,564 $21,641 $108,205
MI 1993 Statewide Trail Maintenance Trail Improvements Clearing, Brushing, Confidence Marking, Trail 1, 2, 4, 5 Statewide $47,000 $11,750 $58,750
Grooming
MI 1993 Statewide Trail Maintenance Trail Improvements Brushing and signing, designated ORV 1, 2, 4, 5 Statewide $180,000 $45,000 $225,000
maintenance of confide
MI 1993 Freeman Township Trailhead Improvements Construct Trailhead Parking for the Trail 4 Clare $2,000 $500 $2,500
MI 1993 Green Lake Township Trail Construction Construction Trail 1 Grand Traverse $9,800 $2,450 $12,250
MI 1993 Green Lake Township Trail Construction Construct and Install. of 6 Barrier Free toilets. 1 Grand Traverse $14,000 $3,500 $17,500
Brush
MI 1993 Montague Township Trail Construction Construct 900' Trail, Fencing, topsoil and 2 Muskegon $55,000 $13,750 $68,750
Seeding,
MI 1993 Roscommon Township Bridge Renovation Reconstruct 5 Bridges 4 Roscommon $4,200 $1,050 $5,250
Grand $38,380,501 $26,583,670 $64,964,171
Totals
(all results)