Search Results Recreational Program Project Database

Your search for projects in State: MI, Total Results : 316

State Project Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2016 Bergland-Sidnaw Trail Bergland-Sidnaw Trail Bergland-Sidnaw Trail bridge over the South 1 Ontonagon $0 Unknown $0

Bridge over the South Branch

Branch Ontonagon River

MI 2016 Higgins Lake Trail Higgins Lake Trail Unspecified/Unidentifiable 4 Roscommon $0 Unknown $0

MI 2016 Alpena to Hillman Trail Alpena to Hillman Trail Bridges and Culverts 1 Alpena $0 Unknown $0

MI 2016 Musketawa Trail Connector Musketawa Trail Connector 2 Muskegon $0 Unknown $0

MI 2016 Baraga-Arnheim Rail-Trail Baraga-Arnheim Rail-Trail Baraga-Arnheim Trail culvert renovation 1 Baraga $0 Unknown $0

MI 2016 Kalkaska Mt. Bike Trail Kalkaska Mt. Bike Trail Kalkaska Mt. Bike Trail 1 Kalkaska $0 Unknown $0

MI 2016 Trail Engineering, Design, and Trailway program engineering and design 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0

System Cost Estimating 8, 9, 10, 11, 12,

13, 14

MI 2016 Michigan State Park Trail Partnership Grants Trailway program partnership grants 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0

System 8, 9, 10, 11, 12,

13, 14

MI 2016 Iron Belle Trail Environmental investigation for purchase of 5 Genesee $0 Unknown $0

Iron Belle Trail corridor

MI 2016 State Park Linear Trail O&M State Park Linear Trail O&M State park linear trail operation and 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0

Projects Projects maintenance 8, 9, 10, 11, 12,

13, 14

MI 2016 Winter Recreation Trails Maintenance Pathway crossing, ski groom and parking lot 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0

maintenance 8, 9, 10, 11, 12,

13, 14

MI 2016 Michigan State Park Trail Pathway Signage Upgrades Pathway Signage Upgrades 1, 2, 3, 4, 5, 6, 7, Statewide $0 Unknown $0

System 8, 9, 10, 11, 12,

13, 14

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2014 High Country Pathway High County Pathway Replace 920' of boardwalk and puncheon, 1 Cheboygan, Presque $30,000 $7,500 $37,500

Improvements stabilize 800' puncheon and 550' elevated Isle. Montmorency

boardwalk and stabilize two boardwalk

stream crossings at four sites on the trail.

MI 2014 Ausable Foot Trail Engineering/design for two Replace two stream crossings on the trail 1 Crawford $25,000 $6,250 $31,250

bridge replacements and

construction if funds

available on the Amusable

foot trail at Hartwick Pines

S.P.

MI 2014 Hart Montague State Park Funding assistance for Resurface and widen the 22 mile rail-trail. 2 Oceana, Muskegon $325,000 $81,250 $406,250

Trail re-surfacing the asphalt on

the W. Field Memorial

Hart-Montaque Trail State

Park

MI 2014 Kalamazoo Valley Trail Engineering/design for the Engineering/Design for a section of planned 6 Kalamazoo $50,000 $12,500 $62,500

Kalamazoo River Valley Trail "Lake to Lake Trail", cross state trailway,

through the northern section from Port Huron to South Haven.

of the Fort Custer Recreation

Area

MI 2014 Lakelands Trail State Park Engineering/design for two Engineering/Design for surfacing two 7, 8 Livingston, Ingham, $60,000 $15,000 $75,000

and Horse Trail sections of the Lakelands sections of the Lakeland's Trail SP Jackson

Trail State Park surfacing

MI 2014 Michigan State Park Signs State Park trail sign Replace damage and missing signs on trails 8, 11, 14 Oakland, Lapeer $70,000 $17,500 $87,500

replacement at seven State Parks. The Parks are;

Metamora, Ortonville, Holly, Pontiac Lk.,

Pround Lk. And Bald Mnt.

MI 2014 Statewide Connected Trail Trailway Project survey, Survey, engineering and design on state 1, 2, 3, 4, 5, 6, 7, Statewide $192,000 $48,000 $240,000

System engineering, design and rail-trails. 8, 9, 10, 11, 12,

special projects: DNR rail 13, 14

trails

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2014 State Park Linear Trail O&M State Park Linear Trail O&M 200+ miles of surfaced rail-trails, activities 2, 3, 4, 6, 7, 8 Statewide $267,000 $66,750 $333,750

Projects Projects include brushing, mowing, surface and

washout repairs, intersection marking, sign

replacement, bridge decking and railing

repairs.

MI 2014 ORV and Snowmobile trail Bridge Engineering, Lincoln Funds to inspect existing bridge and provide 2 Lake $25,000 $6,250 $31,250

system Hills Snowmobile-ORV Trail repair or replacement engineering/design as

determined appropriate.

MI 2014 Musketawa Trail Musketawa Trail connector Providing engineering and design for a 2 Muskegon $150,000 $37,500 $187,500

trail engineering: bridge and section of boardwalk and bridge needed in

boardwalk the connector trail that connects the

Musketawa trail with the City of Muskegon's

trail system

MI 2014 Van Buren Trail State Park Van Buren Trail State Park Engineer, design trail connections and 6 Van Buren $50,000 $12,500 $62,500

Trail Surface Improvements trailhead improvements for two sections of

the VanBuren Trail: one within the City limits

of South Haven and the second section

within the boundaries of Van Buren S.P.

MI 2014 Betsie Valley Trail surface Engineering and design for completing the 1 Benzie $70,000 $17,500 $87,500

completion upgrade of the trail surfacing to the program

engineering/design standard limestone aggregate that supports

accessible use.

MI 2014 Green Pine Pathway Green Pine Pathway Wet Design and install appropriate wet area 4 Clare $25,000 $6,250 $31,250

Area Crossing Upgrades crossing structures to cross wet areas in

several locations on this pathway.

MI 2014 Ionia Rec. Area Pedestrian Bridge Funds to construct pedestrian trail bridge 3 Ionia $125,000 $31,250 $156,250

construction at Ionia Rec. previously engineered

Area

MI 2014 Kalkaska Mt. Bike Trail Kalkaska Mt. Bike Trail Design and install appropriate wet area 1 Kalkaska $28,500 $7,125 $35,625

CROSSINGS crossing structures to cross wet areas in

several locations on this pathway.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2014 Seven State Trail System Rest Benches for Seven Funds to install rest benches at seven State 8, 11, 14 Oakland, Lapeer $21,000 $5,250 $26,250

State Park Trail System Park trail Systems The Parks are; Metamora,

Ortonville, Holly, Pontiac Lk., Pround Lk, And

Bald Mnt..

MI 2014 North Eastern State Trail Directional/Trailhead Locator Funds to install directional signage for 1 Cheboygan, Presque $10,000 $2,500 $12,500

Signs for the North Eastern locating trailhead parking areas for the North Isle, Alpena

State Trail Eastern State Trail on interstate highway,

state and local roads.

MI 2014 Snowmobile & ORV Trail Construction/Renovation of Funds to complete renovation of 325' box 1 Houghton $320,000 $80,000 $400,000

Systems Box Culvert under culvert under the Houghton-Calumet

Houghton-Calumet Rail-trail Rail-trail. Engineering was completed by an

at St. Louis Creek earlier trail grant.

MI 2014 Brule River Trail system Additional funds for Brule Partnership with Wisconsin to renovate 1 Iron $15,000 $100,000 $115,000

River trail system, Michigan bridge and trail planned to connect the

portion Wisconsin and Michigan Trail system

MI 2014 Statewide Snowmobile Partnership project with Funds to assist with a study of the trail 1 Houghton $20,000 $80,000 $100,000

System National Park Service (NPS) corridor, it's ownership, encroachments, and

to study development to identify options for multi-use development

options for multi-use trail of the trail corridor to be known as the

opportunities on the Hancock "Copper Heritage Trail".

to Calumet Rail-trail to be

developed as the "Copper

Heritage Trail"

MI 2014 ORV trails Assistance for Development Funds to assist with development of a 1, 2, 3, 4, 5, 6, 7, Statewide $20,000 $5,000 $25,000

of a National ORV national guidebook on ORV trail design, 8, 9, 10, 11, 12,

Guidebook for Construction construction and maintenance of sustainable 13, 14

and Maintenance of OHV ORV trails and facilities

Trails for the Future.

MI 2014 Statewide Snowmobile Trail Partnership with Baraga Funds to assist with replacement of two 1 Baraga $15,000 $3,750 $18,750

System County Road Commission, bridges used by State Snowmobile Trail #15

funds to assist with

replacement of two bridges

on Snowmobile trail #15.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2014 Trail Trail Connector Funds to engineer/design and construct a 11 Wayne $650,000 $162,500 $812,500

Engineering/Design and section of trail through Maybury State Park to

Construction; Maybury State connect with adjacent community trails/parks

Park

MI 2014 Kal-Haven and Van Buren Trail Surface Improvement Funds to provide engineering/design and cost 6 Van Buren $75,000 $18,750 $93,750

Trail System Engineering/Design; estimates for completion of trail surfacing of

Kal-Haven and Van Buren sections of the Kal-Haven and Van Buren

Trail Segments State Park Rail-trails

MI 2014 Milliken State Park Trail Engineering for Installation of Funds for engineering for abutments to install 11 Wayne $30,000 $7,500 $37,500

Re-cycled Bridge; Milliken an historic 1800's bridge on the trail system

State Park at the Wm. Milliken State Park.

MI 2013 North Boulevard Connector - North Construct .5 mile 8' wide bituminous trail and 4 Wexford $204,700 $51,175 $255,875

Trail Boulevard Connector Trail a 1/10 mile 8' wide bituminous and 10' wide

boardwalk section of trail to provide a safe

connection to the Carl T. Johnson Hunting

and Fishing Visitors Center and the trail

around Lake Cadillac and the...

MI 2013 Michigan Statewide Rail-Trail Trailway Project survey, Survey, engineering and design on state 1, 2, 3, 4, 5, 6, 7, Statewide $252,700 $63,175 $315,875

System engineering, design and rail-trails. 8, 9, 10, 11, 12,

special projects: DNR rail 13, 14

trails

MI 2013 North Central State Trail North Central State Development of trailside/trailhead facilities 1 Cheboygan $57,600 $300,900 $358,500

Trail-Indian River Marina including, site grading, connector walkways,

Park Trailhead- phase 2 parking and signage.

MI 2013 Clinton-Ionia-Shiawassee CIS Trail- Prairie Creek Structural evaluation and repair and renovate 3 Ionia $50,000 $25,000 $75,000

Trail Bridge Renovation decking and railing on rail trail bridge.

MI 2013 Michigan ORV Trail System ORV Sign Program Upgrade Signage on a 3000+ mile trail system. 1, 2, 3, 4, 5 Multiple Counties $305,000 $475,000 $780,000

- Phase IV

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2013 Oakland County Trail Connector/linkage sections Development of connector/linkage sections of 11 Oakland $570,000 $142,500 $712,500

System of trail to other local trails trail to other local trails like Oakland Co. and

Highland Twp. trail systems including; 2.5

miles of multi-use trails and 1.25 miles of

equestrian trails, trailhead facilities and

signage.

MI 2013 Fred Meijer White Pine Trail Surfacing of the final 40.8 miles of this trail 4 Montcalm, Mecosta, $245,000 $3,130,500 $3,375,500

state park and decking and trailing treatment Osceola

of 5 bridges.

MI 2013 Fred Meijer Flat River Valley Surface over 2 miles of trail with asphalt 3 Ionia $300,000 $1,175,214 $1,475,214

Trail surfacing, deck and rail 3 bridges

MI 2013 ORV and Snowmobile trail Goose Creek Construct approx. 7 mi. of new trail route, 4 Kalkaska $105,000 $26,250 $131,250

system ORV/Snowmobile Trail includes installation of a box culvert over

Re-route and Culvert stream.

MI 2013 Trails Bridge construction: Craig Replacement of two bridges on the trail 1 Baraga $380,000 $95,000 $475,000

Lake State Park system in Craig Lake State Park

MI 2013 Upper Peninsula ORV/Road ORV riding opportunities Connector trails to connect the motorized trail 1, 2, 3, 4, 5, 6, 7, Statewide $150,000 $37,500 $187,500

system in Michigan's Upper Peninsula and 8, 9, 10, 11, 12,

provide access to services and lodging and 13, 14

restaurants.

MI 2013 Michigan State Snowmobile XC Ski Grooming Program Grooming and parking lot plowing on State 1, 2, 3, 4, 5, 6, 7, Statewide $65,000 $16,250 $81,250

Trail System Forest Pathways that allow cross country 8, 9, 10, 11, 12,

skiing. 13, 14

MI 2013 State Administration RTP: Program Audit Audit for the RTP Program 1, 2, 3, 4, 5, 6, 7, Statewide $5,000 $1,250 $6,250

8, 9, 10, 11, 12,

13, 14

MI 2013 Brimley Multi-use Trail Brimley Multi-use Trail Brimley Multi-use Trail Bridge engineering 1 Chippewa $70,000 $17,500 $87,500

Bridge engineering

MI 2013 ORV and Snowmobile trail Brule River Trail system Partnership with Wisconsin to renovate 1 Iron $100,000 $25,000 $125,000

system Michigan portion; 50% for bridge and short connector trail planned to

bridge, 50% for trail connect the Wisconsin and Michigan Trail

connection system.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2013 ORV and Snowmobile trail Cranberry Lake Purchase pre-engineered portable bridge and 1 Chippewa $65,000 $16,250 $81,250

system ORV/Snowmobile Trail #47 engineer support abutments for the bridge.

Bridge and Engineering for

abutments

MI 2013 Rail-Trail System Boundary Marking of State Boundary marking of state owned rail-trails in 1, 2, 3, 4, 5, 6, 7, Statewide $45,000 $11,250 $56,250

Rail-trails in the Upper the UP 8, 9, 10, 11, 12,

Peninsula 13, 14

MI 2013 Michigan snowmobile trail Murphy Creek Bridge and Engineering of bridge and abutments to 1 Schoolcraft $25,000 $6,250 $31,250

system Abutment Engineering replace bridge in bad repair

MI 2012 Linear State Park Trails State Park Rail-Trail 200+ miles of surfaced rail-trails, activities 1, 2, 3, 4, 5, 6, 7, Statewide $210,000 $52,500 $262,500

Operations and Maintenance include brushing, mowing, surface and 8, 9, 10, 11, 12,

washout repairs, intersection marking, sign 13, 14

replacement, bridge decking and railing

repairs.

MI 2012 State Trailways Engineering, Design, and Engineering, Design, and Survey 1, 2, 3, 4, 5, 6, 7, Statewide $454,000 $113,500 $567,500

Survey 8, 9, 10, 11, 12,

13, 14

MI 2012 Baraga-Arnheim Rail-Trail Bridge Engineering, Two Bridge Engineering, Two Bridges, Two 1 Baraga $75,000 $18,750 $93,750

Bridges, Two Culverts Culverts

MI 2012 North Central State Trail Trailbed Repairs Trailbed Repairs 1 Cheboygan $50,000 $12,500 $62,500

MI 2012 Pere Marquette State Trail Trail Signage for Trailhead Trail Signage for Trailhead Locations 1, 2, 4 Clare, Osceola, Lake $4,000 $1,000 $5,000

Locations

MI 2012 Hancock-Calumet Trail Trail Cross Drain Structure Engineering evaluation of cross trail drainage 1 Houghton $200,000 $50,000 $250,000

Analysis structures including cost estimating and

identifying priorities for addressing repairs.

MI 2012 Houghton to Chassel Trail Trail Maintenance Trail Maintenance 1 Houghton $50,000 $12,500 $62,500

MI 2012 Stateline Trail Rail-Trail Bridge Repair Repair or replace decking, railing and make 1 Iron $315,000 $78,750 $393,750

needed improvements to structural elements

of this 168' trestle.

MI 2012 Stateline Trail Rail-Trail Bridge Repair Repair or replace decking, railing and make 1 Iron $225,000 $56,250 $281,250

needed improvements to structural elements

of this 114' trestle.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2012 Fort Custer Recreation Area Trail Separation Assist with separation of trails for horses and 6 Kalamazoo $45,000 $11,250 $56,250

mt. bikes.

MI 2012 Musketawa Trail East Musketawa Trailhead Trailhead parking area being provided by 2 Kent $100,000 $25,000 $125,000

Construction local business with a separate entry drive and

connector walk to the trail.

MI 2012 Trails in Mackinac County Trail Surface Upgrade Trail Surface Upgrade 1 Mackinac $320,000 $80,000 $400,000

MI 2012 Flowers Creek Bridge ORV/Snowmobile Bridge Replacement of inadequate bridge over 4 Missaukee $195,000 $48,750 $243,750

Chase Creek for use by ORV's, snowmobiles

and trail grooming equipment.

MI 2012 Canada Creek High Country Bridge Replacement Bridge Replacement 1 Montgomery $180,000 $45,000 $225,000

Pathway

MI 2012 Parmalee Bridge Water Access Site Water Access Site Improvements 1 Oscoda $25,000 $6,250 $31,250

Improvements

MI 2012 North Central State Trail Trail Maintenance and Trail Maintenance and Equipment 1 Otsego, Cheboygan $18,000 $4,500 $22,500

Equipment

MI 2012 Cheboygan to Alpena Trail Bridge Replacement Replace Bridge over 1 Presquelsle $300,000 $75,000 $375,000

MI 2012 Fox River Pathway Parking Upgrades/Signage Parking Upgrades, Signage 1 Schoolcraft, Alger $8,500 $2,125 $10,625

MI 2012 Statewide ORV Facilities ORV Enforcement ORV Enforcement Equipment 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500

Equipment 8, 9, 10, 11, 12,

13, 14

MI 2012 Statewide ORV Facilities ORV Sign Upgrade Phase 3 ORV Sign Upgrade Phase 3 of 4- NLP/UP 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000

of 4 8, 9, 10, 11, 12,

13, 14

MI 2012 Van Buren State Park Trail Regional Trail Connections Regional Trail Connections Construction 6 Van Buren $455,000 $113,750 $568,750

Construction

MI 2012 Chase Creek Bridge ORV/Snowmobile Bridge Replacement of inadequate bridge over 4 Wexford $425,000 $106,250 $531,250

Chase Creek for use by ORV's, snowmobiles

and trail grooming equipment.

MI 2011 Allegan State Game Area, Day Ride Parking Improvements to expand a parking area to 2 Allegan $6,000 $1,000 $7,000

Pine Point Improvements: Allegan State provide better access and more capacity for

Game Area, Pine Point horse trailers at an access point to a 55-mile

horse trail system.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2011 Northern Lower and Upper ORV Trail System Sign Signage 1, 2, 3 Multiple Counties $250,000 $250,000 $500,000

Peninsulas Project-Phase II

MI 2011 Millersburg Historic Park and Trailhead Development - Parking, restroom building, warming/picnic 1 Presque lsle $211,000 $492,000 $703,000

Trailhead Millersburg Trailhead shelter, benches, signage

MI 2011 Ocqueoc Falls Pathway Pathway Trailhead Unique project renovating trailhead parking 1 Presque Isle $260,000 $532,000 $792,000

Renovation- Ocqueoc Falls area and day use site providing universal

Pathway access to experience the only water fall in

Michigan's Lower Peninsula.

MI 2011 Berry Junction Trail Trail Surface Improvements - Trail surface improvements, part of Michigan 2 Muskegon $100,000 $900,000 $1,000,000

Berry Junction Trail Statewide Trailway System

MI 2011 Deadman's Hill-Landslide, Trailhead Upgrades ? Two trailheads that serve a popular pathway 1 Antrim $5,000 $1,250 $6,250

Jordan River Pathway Deadman's Hill / Landslide & in the Jordan River Valley and are major

Jordan River Pathway scenic overlook destinations in fall color

season.

MI 2011 Craig Lake State Park Trails Analysis and Design for Trail Analysis for design needs and subsequent 1 Baraga $55,000 $13,750 $68,750

Renovation and design on five miles of trail system.

Replacement of Two Replacement of two bridges.

Bridges- Craig Lake State

Park

MI 2011 State Forest Rail-Trail Trail Partnership Partnership management agreements for 2, 5, 10 Benzie, Lapeer, $75,000 $18,750 $93,750

Management & Projects: maintenance of sections of State Forest Saginaw

FMD Rail-Trails rail-trail

MI 2011 North Central State Trail Trailhead Improvements - Restroom upgrades to facilitate year-around 1 Cheboygan $50,000 $12,500 $62,500

North Central State Trail - public use of restroom that will be used as

Indian River-Phase 1 part of the trailhead development in Indian

River.

MI 2011 North Central State Trail Rail-Trail Bridge Renovation: Rail-Trail Bridge Renovation 1 Cheboygan $1,000,000 $250,000 $1,250,000

Indian River Trestle- North

Central State Trail

MI 2011 North Central State Trail Rail-Trail Bridge Repairs: Repairs to 5 bridges on the 62 mile North 1 Cheboygan $75,000 $18,750 $93,750

North Central State Trail Central State Trail.

MI 2011 Fur Farm Bridge Bridge Replacement: Fur Bridge Replacement 4 Clare $235,000 $58,750 $293,750

Farm Snowmobile Bridge

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2011 Ausable River Water Trail Canoe Landing Minor adjustments needed in layout of new 1 Crawford $20,000 $5,000 $25,000

Renovations-Rainbow launch/landing facilities at these two

Bend/Castle Landings locations.

MI 2011 Boardman River Water Trail Canoe Launch Renovation ? Project is to renovate launch area to reduce 4 Grand Traverse $11,000 $2,750 $13,750

Boardman River, Scheck's sedimentation into Blue Ribbon Trout Stream

Place Trailcamp and improve river ingress/egress.

MI 2011 Houghton to Lake Linden Rail-Trail Cross Drain Engineering assessment including cost 1 Houghton $200,000 $50,000 $250,000

Trail Engineering Structural estimating of Multiple cross drains on a

Analysis section of State owned rail-trail from north of

Houghton to just north of Lake Linden.

MI 2011 Ionia Rec. Area Hiking Trail Bridge Engineering for replacement of bridge that 3 Ionia $50,000 $12,500 $62,500

Replacement Engineering had to be removed on popular hiking trail.

MI 2011 Stateline Trail Rail-Trail Bridge Three bridges identified in engineering study 1 Iron $800,000 $200,000 $1,000,000

Renovations: Stateline Trail- as higher priority for maintenance.

Iron River to Beechwood No.

20, 21, 27

MI 2011 West Twin Lake Bridge Bridge Replacement: West Bridge Replacement 2 Lake $345,000 $86,250 $431,250

Twin Creek

ORV/Snowmobile Bridge

MI 2011 East Twin Creek Bridge Bridge Replacement: East Bridge Replacement 2 Lake $295,000 $73,750 $368,750

Twin Creek

ORV/Snowmobile Bridge

MI 2011 Pere Marquette State Trail Trailhead Information Kiosks: 56 mile rail-trail needs locations for trail use 2, 4 Lake, Osceola, Clare $26,000 $6,500 $32,500

Pere Marquette State Trail safety and support facility information. Kiosks

are the same type being installed on other

trails in the system.

MI 2011 Upper Spring Trail Trail Improvements: Upper Improve grade and stabilize surface on 1 Mackinac $9,200 $2,300 $11,500

Spring Trail at Arch Rock section of trail at natural feature site and

install benches and informational signage.

MI 2011 Trail Construction of Construction of approximately 0.5 miles of 1 Marquette $166,000 $41,500 $207,500

Non-motorized Trail trail from park entrance to park day use area

Connection- Van Riper State on Lake Michigamme.

Park

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2011 Little Presque Isle Trail Trail and Trailhead Replace broken down fencing along 1 Marquette $20,000 $5,000 $25,000

Improvements- Little lakeshore drop-off and upgrade trailhead

Presque Isle parking and entry road surface.

MI 2011 Marquette to Munising Rail-Trail Bridge Redeck and paint bridge over M-28 on the 1 Marquette $375,000 $93,750 $468,750

Rail-Trail Renovations: M-28 bridge, Marquette to Munising rail-trail.

Marquette to Munising Trail

MI 2011 Flowers Creek Bridge Bridge Replacement: Bridge Replacement 4 Missaukee $195,000 $48,750 $243,750

Flowers Creek

ORV/Snowmobile Bridge

MI 2011 Construction of Regional Construction of trail connections 11 Oakland $430,000 $107,500 $537,500

Trail State Park Trail Connections

MI 2011 Elk Hill Trail Camp Trailcamp Expansion Study- Study to investigate opportunities for 1 Otsego $25,000 $6,250 $31,250

Elk Hill Trailcamp expanded camping capacity for equestrian

users utilizing this camp as a recreation

destination.

MI 2011 Rail-Trail Highway Trailhead Rail-Trail Highway Trailhead, Installation of directional signs 1 Otsego, Cheboygan $18,000 $4,500 $22,500

Location and Directional

Signs

MI 2011 High Country Pathway Bridge Replacement ? This is a bridge on the 70-mile High Country 1 Presque lsle $180,000 $45,000 $225,000

Canada Creek: High Country Pathway backpacking loop trail

Pathway

MI 2011 North and South Higgins Engineering Design for Trail Engineering and design for construction of 1, 4 Roscommon, $95,000 $23,750 $118,750

State Park Trails Connections to Regional approximately 3-miles of trail in two State Crawford

Loop Trail ? North and South Parks to be part of a larger 23.5 mile trail

Higgins Lake State Parks around Higgins Lake.

MI 2011 Clinton-Ionia-Shiawassee Trail Design/Engineering- Design and engineering for development of a 3, 8 Shiawassee, Clinton, $100,000 $25,000 $125,000

Trail CIS Trail 42 mile section of State owned rail-trail being Ionia

developed for multi-use transportation and

recreation use

MI 2011 Van Buren Trails Construction of Construction of approx 4.5 miles of surfaced 6 Van Buren $405,000 $101,250 $506,250

Non-motorized trail trail connection from City of South Haven to

connection- Van Buren State beach at Van Buren State

Park Park.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2011 Michigan Statewide Rail-Trail Linear Parks Partnership Assist with partnership projects on State Park 1, 2, 3, 4, 5, 6, 7, Statewide $150,000 $37,500 $187,500

System Operations/Maintenance managed rail-trails. 8, 9, 10, 11, 12,

Lump Sum 13, 14

MI 2011 Michigan Statewide Rail-Trail Trail Survey, Engineering, Survey, design, and engineer projects on 1, 2, 3, 4, 5, 6, 7, Statewide $685,000 $171,250 $856,250

System Design and Special Projects: State Forest rail-trails. 8, 9, 10, 11, 12,

FMD Rail-Trails 13, 14

MI 2011 Maybury State Park Trail Trail Loop Re-surfacing Approximate 3 mile internal park trail loop 11 Wayne $52,000 $13,000 $65,000

engineering- Maybury State system at this very popular Urban State Park

Park needs asphalt resurfacing

MI 2011 Chase Creek Bridge Bridge Replacement: Chase Bridge Replacement 2 Wexford $425,000 $106,250 $531,250

Creek ORV/Snowmobile

Bridge

MI 2011 North and South Higgins Engineering Design for Trail Engineering and design for construction of 1, 4 Roscommon, $95,000 $23,750 $118,750

State Park Trails Connections to Regional approximately 3-miles of trail in two State Crawford

Loop Trail ? North and South Parks to be part of a larger 23.5 mile trail

Higgins Lake State Parks around Higgins Lake.

MI 2010 Harlow Lake Pathway Trail Surface Hardening- Assist with re-surfacing of rail-trail pathway. 1 Marquette $90,000 $82,000 $172,000

Harlow Lake Pathway

MI 2010 Michigan State ORV and ORV Trail System Sign Sign system development for better public 1, 2, 3, 4, 5, 6, 7, Statewide $125,000 $375,000 $500,000

Snowmobile System Project communication of riding opportunities. 8, 9, 10, 11, 12,

13, 14

MI 2010 Mackinaw City Trail Mackinaw City Construction oversight and quality control for 1 Cheboygan, Emmet $80,000 $881,400 $961,400

Trail/Trailhead Engineering asphalt surfacing approximately 2 miles of

trail in Mackinaw City and construction of

picnic pavilion with landscape, bicycle

parking, and lighting.

MI 2010 Lake Superior Trail - Almost 100 foot suspension bridge that 1 Gogebic $75,000 $18,750 $93,750

Suspension Bridge Repairs, routes the North Country and Lake Superior

Presque Isle River Trail. It has renovation needs recommended

by an engineering consultant to have it meet

current safety and code requirements.

MI 2010 Gooseneck Creek Bridge Replace Gooseneck Creek Replace degraded rail-trail bridge. 1 Houghton $200,000 $50,000 $250,000

Bridge

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2010 Falling Waters Trail Bridge Renovation- Falling Assist with renovation and upgrade of bridge 7 Jackson $50,000 $12,500 $62,500

Waters Trail with new decking and railing system.

MI 2010 Fort Wilkins State Park Fort Wilkins State Park - Renovate one older bridge and construct new 1 Keweenaw $300,000 $75,000 $375,000

Construction of Two Bridges bridge to separate users from vehicle traffic.

MI 2010 Hart to Montague Trail Resurface Hart to Montague Assist with engineering for re-surfacing 22 2 Oceana $185,000 $46,250 $231,250

Trail State Park mile asphalt trail.

MI 2010 Townline Creek Bridge Townline Creek Bridge Replace existing bridge which is degenerated 4 Roscommon $250,000 $62,500 $312,500

to the point of being too costly to repair.

MI 2010 State Administration Trailway Engineering, Various survey, design, and engineering 1, 2, 3, 4, 5, 6, 7, Statewide $400,000 $100,000 $500,000

Design, Survey, and Special projects as well as several small 8, 9, 10, 11, 12,

Projects development /repair projects 13, 14

MI 2010 Kal-Haven Trail Resurface Kal-Haven Trail Assist with re-surface project on 34-mile 6 Van Buren, $136,000 $34,000 $170,000

State Park rail-trail including; crossing improvements, Kalamazoo

signage, grading and tree removal, and trail

and bridge engineering necessary to meet

AASHTO standards..

MI 2010 White Pine Trail White Pine Trail Section Provide funding for engineering costs 2, 4 Wexford, Osceola $250,000 $62,500 $312,500

Surfacing associated with this approximately 18 mile

surfacing project.

MI 2009 State Rail-Trail System Rail-Trail Bridge Engineering Part of the State Rail-trail system. Assist with 1 Marquette $300,000 $313,000 $613,000

and Construction development of trail connection to business

district by providing engineering and

construction of bridge needed over Chocolay

River.

MI 2009 State Park Trail System Equestrian Trail Re-Route Part of the State Park trail system. Re-route 3 Ionia $167,500 $41,875 $209,375

and Bridge Construction trail to better location that alleviates erosion

problems. Construct bridge to cross creek

and harden banks for an alternate water

crossing.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2009 State Park Trail System Construct Boardwalk and Part of the State Park trail system. Complete 3 Mason $120,000 $30,000 $150,000

Bridges phased boardwalk construction, construct

accessible walkway connection from bridge

to Visitors Center, and improve surface of

bridge.

MI 2009 State Park Trail System Construct Boardwalk and Part of State Park trail system. Construct 1 Emmet $120,000 $30,000 $150,000

Bridges approximately 100 foot boardwalk and two

bridges over creeks.

MI 2009 State Park Trail System Sign Installation Part of State Park trail system. Sign 1, 2, 9, 10, 11 Chippewa, $66,500 $16,625 $83,125

replacement and upgrade at 11 State Park Cheboygan, Emmet,

trail systems. Oakland, Huron,

Sanilac, Alcona, Iosco,

Mason

MI 2009 Highland State Park Trail Design and Engineering Part of the State Park trail system - Oakland 11 Oakland $45,000 $11,250 $56,250

System Co. trail connections. Survey and

design/engineering trail connections and

support facilities in Highland State Park and

to connect with county trail system.

MI 2009 Iron Ore Heritage Trail Design and Engineering Part of State Rail-Trail system. 1 Marquette $52,500 $13,125 $65,625

Design/engineering for development of trail

linkage into Van Riper State Park from the

regional Iron Ore Heritage Trail.

MI 2009 Trail Construction Part of State Park trail system. Engineering 1 Alcona $30,000 $7,500 $37,500

and surfacing approx. 1/2 mile of trail to

connect existing park trails to park use areas.

MI 2009 Van Buren Trail, Kal-Haven Design and Engineering Part of the State Park rail-trail system and 6 Van Buren $50,000 $12,500 $62,500

Trail park connection. Design and engineering to

develop trail to connect Van Buren State Park

to the Van Buren Trail, the City of South

Haven and the Kal-Haven Trails.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2009 Trail Design and Engineering Part of State Park trail system. Design and 8 Oakland $60,000 $15,000 $75,000

System engineering to develop a 4-mile trail section

to connect the dispersed facilities in Holly

Recreation Area.

MI 2009 Michigan State ORV and Bridge Replacement Part of state's designated ORV and 4 Roscommon $305,000 $76,250 $381,250

Snowmobile System Snowmobile trail systems. Replace aging

bridge on ORV/Snowmobile trail.

MI 2009 Michigan State ORV and Bridge Replacement Part of state's designated ORV and 2 Wexford $250,000 $62,500 $312,500

Snowmobile System Snowmobile trail systems. Replace aging

ORV/Snowmobile bridge.

MI 2009 Michigan State ORV and ORV/Sno Bridge Part of state's designated ORV and 2 Lake $335,000 $83,750 $418,750

Snowmobile System Replacement Snowmobile trail systems. Replace aging

ORV/Snowmobile bridge.

MI 2009 Michigan State ORV and Bridge Replacement Part of state's designated ORV and 2 Lake $212,000 $53,000 $265,000

Snowmobile System Snowmobile trail systems. Replace aging

ORV/Snowmobile trail bridge.

MI 2009 State Forest Pathway Public Information for State Forest Pathway and Campground 1, 2, 4 Various $45,000 $11,250 $56,250

Pathway and Campground Recreation System. Public information for

System Pathway (60) and Campground (149) system.

MI 2009 State Forest Recreation Renovate Water Trail Access Part of State Forest Recreation Boating 1 Crawford $110,000 $27,500 $137,500

Boating Access Access program. Renovate deteriorating

canoe launches, stabilize stream banks and

develop accessible access routes.

MI 2009 State Rail-Trail System Trail Construction Part of State Rail-Trail system trail 2 Muskegon $295,000 $73,750 $368,750

connections. Development of 1.25 mile trail

section connecting state and local trails.

MI 2009 State Rail-Trail System Trail and Trailhead Part of the State Rail-trail system. Assist with 1 Cheboygan $445,000 $111,250 $556,250

Improvements development of trailhead facility including

parking, restrooms, information station,

benches, picnic pavilion, and signage.

MI 2009 Musketawa Trails, White Trail Connection Design and engineering to develop a 10 foot 2, 3 Kent $150,000 $37,500 $187,500

Pine Trails Engineering/Design wide trail connection between the Musketawa

and White Pine Trails.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2009 State Rail-Trail System Trail Construction Part of State Rail-Trail system. Survey and 1 Cheboygan, Emmet $100,000 $25,000 $125,000

engineering/design for trailhead completion,

trail connections and surface trail section out

to Mill Creek Historic State Park.

MI 2009 State Rail-Trail System Trail Construction Part of State Rail-Trail system. Construction 8 Oakland $120,000 $30,000 $150,000

of approximately 3/4 mile of trail adjacent to

paved rail-trail using various trail surfaces to

test long-term durability and maintenance

requirements.

MI 2009 State Rail-Trail System Bridge Renovation Part of the State Rail-trail system. 1 Ontonagon $705,000 $176,250 $881,250

Renovations of structural, decking, and railing

system on 443 foot long rail-trail bridge.

MI 2009 State Rail-Trail System Rail-Trail Bridge Engineering Part of the designated state snowmobile trail 1 Dickinson $35,000 $8,750 $43,750

system. Bridge is County owned. Engineering

of necessary improvements to bridge on

snowmobile rail-trail, could include structural

work, decking, and railing depending on

engineering evaluation.

MI 2009 State Rail-Trail System Evaluate Title and Part of State Rail-Trail system. Evaluate title 1 Houghton, Keweenaw $40,000 $10,000 $50,000

Ownership Status of and ownership status of sections of railroad

Railroad Rights-of-Way right-of-way desired to make trail

connections.

MI 2009 ORV Study Study on Snowmobile and Assist with cost of national study on 1, 2, 3, 4, 5, 6, 7, Statewide $15,000 $3,750 $18,750

ORV Stopping Distances snowmobile and ORV stopping distances for 8, 9, 10, 11, 12,

signage specifications. Stopping distance 13, 14

study being conducted through the USDA

Forest Service Technology Center.

MI 2008 Bergland Rail-Trail Bridge Renovation One of the major bridges on the 41 mile long 1 Ontonagon $431,000 $107,750 $538,750

Sidnaw - Bergland Rail-trail. Renovations

identified in engineering analysis done on the

bridge for bridge structural integrity and

replace deck and rail system.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2008 Marquette-Munising Trail, Trail Surfacing Part of the Michigan Statewide Rail-Trail 1 Marquette $294,000 $73,500 $367,500

Chocolay Segment system. Surface 6.25 mile section of rail-trail

with compacted limestone mixture.

MI 2008 Upper Peninsula Trail and Trailhead Part of the Department of Natural Resource's 1 Marquette $95,000 $23,750 $118,750

Renovation Upper Peninsula forest recreation program.

Repair and replacement of trail safety

structures (fence, handrails and access)

along shoreline trail of Lake Superior and

upgrade surface of parking and access...

MI 2008 State Forest Pathway Trailhead Improvements Part of the State Forest Pathway System. 4 Missaukee $56,000 $14,000 $70,000

System, Cadillac Pathway Hard surface the parking area with

compacted limestone mixture to provide

safer, more accessible and easier to maintain

parking surface at the trailhead of this

pathway.

MI 2008 Alpena to Cheboygan Trail Trail/Road Crossing Part of the Statewide Rail-trail system. 1 Presque Isle $90,000 $22,500 $112,500

Realignment Construction Construct realigned trail/road crossings that

cross at 70 degrees or more to provide a

safer crossing of roads by trail users.

MI 2008 Musketawa Trail, Muskegon Asphalt Trail Construction Part of the Statewide Rail-Trail system. 2 Muskegon $105,000 $348,000 $453,000

Connection and Improvements Construction of 1.8 mile trail segment to

connect two existing trails. Includes base

preparation, asphalt surface, signage,

restoration, etc.

MI 2008 Cheboygan Trailhead Trailhead Development - Part of the Statewide Trailways System. 1 Cheboygan $340,000 $85,000 $425,000

Cheboygan Trailhead Construction of trailhead facility including

restroom, picnic pavilion, parking, signage,

lighting, and landscaping.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2008 Michigan Shore to Shore Trail Camp Facilities Trail camp facility on the Michigan Shore to 1 Missaukee $340,000 $85,000 $425,000

Riding/Hiking Trail Shore Riding/Hiking Trail. Re-design of trail

camp, trail and boat access site to provide

better circulation and more efficient camping

layout in a camp that can accommodate 200

person rides.

MI 2008 Accessible Trail Surface Part of the State Park system. On a 2.6 mile 2 Muskegon $190,000 $300,000 $490,000

Prototype - Muskegon State looped trail, install approximately 1000 feet of

Park 6 foot wide stabilized engineered wood fiber

surface to the trail and surface the remainder

with crushed limestone.

MI 2008 Wells State Park Trail Surfacing Part of the State Park system. Development 1 Menominee $77,000 $250,000 $327,000

of .7 miles of trail with a combination of

concrete, and stabilized engineered wood

fiber surfacing.

MI 2008 Mitchell State Park Trail and Boardwalk Part of the State Park system. 2.5 mile trail to 2 Cadillac $67,000 $16,750 $83,750

Renovation be upgraded with compacted limestone

surface and existing boardwalks and bridges

re-built.

MI 2008 Trail Renovation and Part of the State Park system. Upgrade of .8 10 Huron $13,000 $250,000 $263,000

Surfacing - Port Crescent mile of trail with crushed aggregate surfacing.

State Park

MI 2007 Mackinac State Historic Accessible Trail Part of the Mackinac State Historic Parks trail 1 Cheboygan $57,500 $1,340 $58,840

Parks Trail System Improvements system. Surface and alignment

improvements to existing trail to provide

universal access to all trail users.

MI 2007 Michigan Statewide Rail-Trail Bridge Improvements Part of the Statewide Rail-trail System. Assist 1, 2, 3, 4, 5, 6, 7, Statewide $558,000 $150,000 $708,000

System with major renovation project on historic 128 8, 9, 10, 11, 12,

foot long former railroad trestle bridge. 13, 14

MI 2007 Michigan Statewide Rail-Trail Rail-Trail Development Part of the Statewide Rail-trail System. 1, 2, 3, 4, 5, 6, 7, Statewide $12,000 $273,000 $285,000

System Provide engineering, design and survey 8, 9, 10, 11, 12,

services for state rail-trail projects. 13, 14

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2007 State Forest Campground Trailhead Improvements Part of the State Forest Campground system. 1, 2, 3, 4, 5, 6, 7, Statewide $155,000 $320,000 $475,000

Reposition use areas in State Forest 8, 9, 10, 11, 12,

Campground to eliminate use conflicts, 13, 14

improve circulation and access to trail

system, improve campsite orientation and

barrier-free access within the facility.

MI 2007 Michigan Statewide Rail-Trail Road/Trail Crossing Safety Part of the Statewide Rail-Trail system. Assist 1, 2, 3, 4, 5, 6, 7, Statewide $144,000 $2,104,218 $2,248,218

System Improvements with aggregate surfacing, trail/road crossing 8, 9, 10, 11, 12,

re-alignments on 61 mile rail-trail. 13, 14

MI 2007 Michigan State Forest Trail Construction Part of the Michigan State Forest Pathway 1, 2, 3, 4, 5, 6, 7, Statewide $18,000 $4,500 $22,500

Pathway System System. Design and construction of pathway 8, 9, 10, 11, 12,

segment to link two existing Pathway facilities 13, 14

to provide a longer trail opportunity for the

public.

MI 2007 Michigan Statewide Rail-Trail Bridge Improvements Part of the Statewide Rail-trail System. 1, 2, 3, 4, 5, 6, 7, Statewide $40,000 $10,000 $50,000

System Engineering assessment and evaluation of 8, 9, 10, 11, 12,

existing former railroad bridge to determine 13, 14

costs for upgrade of decking and painting.

MI 2007 Michigan Statewide Rail-Trail Bridge Improvements Part of the Statewide Rail-trail System. 1, 2, 3, 4, 5, 6, 7, Statewide $400,000 $100,000 $500,000

System Renovations as identified in engineering 8, 9, 10, 11, 12,

analysis for bridge structural integrity and 13, 14

decking and railings as needed.

MI 2007 Michigan Shore to Shore Trailhead Improvements Campground on the Michigan Shore to Shore 1, 2, 3, 4, 5, 6, 7, Statewide $81,000 $20,250 $101,250

Riding/Hiking Trail Riding/Hiking Trail. Engineering and design 8, 9, 10, 11, 12,

to reconstruct trail camp facility. 13, 14

MI 2007 Michigan Statewide Rail-Trail Trail Maintenance Part of the Statewide Rail-trail System. Assist 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000

System with management and maintenance on State 8, 9, 10, 11, 12,

park rail-trails. 13, 14

MI 2007 Michigan Statewide Rail-Trail Trail Improvements Part of the Statewide Rail-trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $85,000 $21,250 $106,250

System Renovate and re-surface approximately 1500 8, 9, 10, 11, 12,

feet of trail with asphalt. 13, 14

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2007 Fort Wilkins State Park Bridge Improvements Part of the Ft. Wilkins State Park trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $65,000 $16,250 $81,250

Evaluate two bridges and design and provide 8, 9, 10, 11, 12,

cost estimates for appropriate replacement 13, 14

as necessary.

MI 2007 and City Trail Construction Part of State Park Trail System. Complete 1, 2, 3, 4, 5, 6, 7, Statewide $183,000 $45,750 $228,750

of Monroe plans for trail development and construct trail 8, 9, 10, 11, 12,

segment to connect Sterling State Park trail 13, 14

system to the City of Monroe's trail system.

MI 2007 Michigan State Park Trail Engineering, Design, and Part of the State Park Trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $28,500 $7,125 $35,625

System Cost Estimating Engineering, design, and cost estimating for 8, 9, 10, 11, 12,

re-surfacing trail and provision of natural 13, 14

resources interpretation elements.

MI 2007 Michigan State Park Trail Install Signs Part of the State Park trail system. Upgrade 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500

System trailhead and trail directional signage at eight 8, 9, 10, 11, 12,

State Parks. 13, 14

MI 2007 Michigan State Forest Trail Renovation Part of the Statewide State Forest Pathway 1, 2, 3, 4, 5, 6, 7, Statewide $75,000 $18,750 $93,750

Pathway System System. Projects for improvement and 8, 9, 10, 11, 12,

upgrade of existing pathways and projects 13, 14

causing safety concerns due to unforeseen

outside influences, i.e., damage caused by

wind or water.

MI 2006 Unspecified/Unidentifiable Trailhead Construction Part of the State Forest Recreation program. Unspecified/Unidentifi $52,000 $13,000 $65,000

Trail camp improvements including; site able

development, road improvements, hitching

posts, picnic tables and fire rings, information

station, fee pipe and signage.

MI 2006 Michigan State Forest Water Trail Improvements Part of the State Forest boating access 1, 2, 3, 4, 5, 6, 7, Statewide $35,000 $8,750 $43,750

program. Remove deteriorating dock 8, 9, 10, 11, 12,

structures at two locations and replace with 13, 14

smaller structures to enhance use by boaters

as well as fit better with streambank

environment of this natural river.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2006 Michigan State Forest Design and Engineering Part of State Forest boating access program. 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500

Engineering to develop plans, specs and bid 8, 9, 10, 11, 12,

documents to construct new access site to 13, 14

replace existing site and to restore existing

site. The existing site is located at an

undesirable location on a...

MI 2006 Michigan Statewide Rail-Trail Bridge Improvements Part of Michigan's Statewide Rail-Trail 1, 2, 3, 4, 5, 6, 7, Statewide $408,000 $102,000 $510,000

System System. Repair old trestle bridge to preserve 8, 9, 10, 11, 12,

for trail use. 13, 14

MI 2006 Michigan Statewide ORV OHV Area Development Part of the Statewide ORV Trails System. 1, 2, 3, 4, 5, 6, 7, Statewide $60,000 $15,000 $75,000

Trails System Develop trailhead facility including: parking 8, 9, 10, 11, 12,

area, accessible toilet and information 13, 14

station.

MI 2006 Michigan Shore to Shore Trail Improvements Part of Michigan Shore to Shore 1, 2, 3, 4, 5, 6, 7, Statewide $193,000 $48,250 $241,250

Riding/Hiking Trail Riding/Hiking Trail. Engineering for 8, 9, 10, 11, 12,

development of plans, specs and bid 13, 14

documents for camp and road improvements.

Phase one construction including: vehicle

control elements/posts, initial campsite and

road...

MI 2006 Michigan State Forest Bridge Improvements Part of the State Forest Recreation program. 1, 2, 3, 4, 5, 6, 7, Statewide $90,000 $22,500 $112,500

Install new railing system on bridge and 8, 9, 10, 11, 12,

design and install sand retaining structure to 13, 14

protect bridge support system.

MI 2006 Unspecified/Unidentifiable Unspecified/Unidentifiable Unspecified/Unidentifi $20,000 $5,000 $25,000

able

MI 2006 Michigan State Snowmobile Design and Engineering Part of the statewide snowmobile trail 1, 2, 3, 4, 5, 6, 7, Statewide $30,000 $7,500 $37,500

Trail System system. Engineering to develop plans, spec, 8, 9, 10, 11, 12,

bid documents to install standard aggregate 13, 14

surfacing to the existing trailbed.

MI 2006 Unspecified/Unidentifiable Unspecified/Unidentifiable Unspecified/Unidentifi $40,000 $10,000 $50,000

able

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2006 Michigan Statewide Rail-Trail Rail-Trail Development Part of State Rail-Trail system. Survey, 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000

System design, engineering, planning and special 8, 9, 10, 11, 12,

construction projects as identified by the 13, 14

State Trails Coordinator.

MI 2006 Michigan State Park Trail Design and Engineering Part of State Park trail system. Engineering to 1, 2, 3, 4, 5, 6, 7, Statewide $80,000 $20,000 $100,000

System develop preliminary plans and cost estimating 8, 9, 10, 11, 12,

to complete 150 feet of boardwalk to 13, 14

complete trail along Big Sable River in critical

dune area, complete an engineering

evaluation of the existing bridge...

MI 2006 Michigan State Park Trail Design and Engineering Part of the State Park trails system. 1, 2, 3, 4, 5, 6, 7, Statewide $56,000 $14,000 $70,000

System Engineering to develop plans, specs and bid 8, 9, 10, 11, 12,

documents for new trail bridge and re-route of 13, 14

existing trail to the new bridge location.

MI 2006 Michigan State Park Trail Trail Renovation and Part of State Park trail system. Trail 1, 2, 3, 4, 5, 6, 7, Statewide $30,000 $7,500 $37,500

System Drainage Improvements restoration and improvements including; 8, 9, 10, 11, 12,

constructing short trail re-routes, trail 13, 14

drainage work including culverts and

restoration of abandoned sections of trail.

MI 2006 Michigan State Park Trail Design and Engineering Part of State Park trail system. Survey, 1, 2, 3, 4, 5, 6, 7, Statewide $150,000 $37,500 $187,500

System design and engineering to develop 8, 9, 10, 11, 12,

preliminary plans and cost estimating to 13, 14

renovate 8 mile equestrian trail system and

engineering evaluation of utilities at

equestrian campground/trailhead to

determine need...

MI 2006 Michigan State Park Trail Trailhead Construction Part of State Park trail system. Construct 1, 2, 3, 4, 5, 6, 7, Statewide $30,000 $7,500 $37,500

System small trailhead parking lot and install 8, 9, 10, 11, 12,

interpretive signage. 13, 14

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2006 Michigan State Park Trail Boardwalk Construction and Part of State Park trail system. Trails 1, 2, 3, 4, 5, 6, 7, Statewide $36,000 $9,000 $45,000

System Trailhead Improvements improvements to enhance nature 8, 9, 10, 11, 12,

interpretation including: development of 13, 14

boardwalk section to access wetland,

information and interpretive signage and

bench installation for lecture/group tour focus

area.

MI 2006 Michigan State Park Trail Boardwalk and Bridge Part of State Park trail system. Engineering to 1, 2, 3, 4, 5, 6, 7, Statewide $47,000 $11,750 $58,750

System Construction provide preliminary plans and cost estimates 8, 9, 10, 11, 12,

to construct 100 feet of boardwalk and two 13, 14

trail bridges.

MI 2006 Michigan State Park Trail Trail Construction and Part of the State Park trail system. Surface 1, 2, 3, 4, 5, 6, 7, Statewide $26,000 $6,500 $32,500

System Trailhead Improvements existing trail with limestone fines, construct 8, 9, 10, 11, 12,

observation deck/rest area, update trailhead 13, 14

interpretive and information signs.

MI 2006 Michilimackinac State Park Trail Renovation and Part of the interpretive trail system at 1 Cheboygan $120,000 $30,000 $150,000

Improvements Michilimackinac State Park historic complex.

Renovate historic pathway system accessing

turn of the century lighthouse including

lighting, interpretive and directional signage,

benches and litter receptacles.

MI 2006 Unspecified/Unidentifiable Trailhead Construction Part of a campground/trail/boating-fishing Unspecified/Unidentifi $42,000 $10,500 $52,500

recreation complex. Renovation of trail camp able

area including addition of picket posts at

restroom area, install two accessible toilets,

well house improvement and trail drainage

improvements.

MI 2005 Michigan State Snowmobile Bridge Improvements Part of the Michigan Snowmobile Trail 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000

Trail System System. Engineering evaluation of 42 bridges 8, 9, 10, 11, 12,

on this trail to establish priority needs to 13, 14

address upgrades necessary.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2005 Michigan State Forest Trail Improvements Part of the Michigan State Forest Pathway 1, 2, 3, 4, 5, 6, 7, Statewide $23,000 $5,750 $28,750

Pathway System System. Install compacted aggregate surface 8, 9, 10, 11, 12,

to provide stable trail tread. 13, 14

MI 2005 Michigan State Forest Trail Improvements Part of the Michigan State Forest Pathway 1, 2, 3, 4, 5, 6, 7, Statewide $16,000 $4,000 $20,000

Pathway System System. Install compacted aggregate surface 8, 9, 10, 11, 12,

to provide stable trail tread. 13, 14

MI 2005 State Forest Pathway Bridge Construction Part of the State Forest Pathway System. 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500

System Replace second bridge on the pathway. 8, 9, 10, 11, 12,

13, 14

MI 2005 Michigan State ORV and Trailhead Construction Part of the Statewide ORV and Snowmobile 1, 2, 3, 4, 5, 6, 7, Statewide $60,000 $15,000 $75,000

Snowmobile System Trail Systems. Develop standard program 8, 9, 10, 11, 12,

trailhead including parking, information 13, 14

station, accessible vault toilet.

MI 2005 Fort Michilimackinac Accessible Trail Main visitor route to the historic reconstructed 1 Emmet, Cheboygan $12,500 $3,125 $15,625

Improvements and 1715 French fort complex. Route includes

Interpretive Facilities historic interpretive information to set the

stage for the visitor's interactive fort visit

experience. Re-surface trail to provide stable

universal access...

MI 2005 Big Sable River Trail and Boardwalk This project is to assist with development of a 2 Lake, Mason $150,000 $37,500 $187,500

Construction section of an overall 1 1/2 mile trail loop

along the Big Sable River. The finished trail

will be universally accessible and includes

ramps and elevated boardwalk. Site

preparation and grading,...

MI 2005 Michigan State Park Trail Trail Improvements Part of the State Park historical interpretation Unspecified/Unidentifi $42,000 $10,500 $52,500

System program. Develop and surface approximately able

2100 feet of interpretive trail with compacted

crushed aggregate. Includes provision of two

accessible ramps to accomplish universal

access to existing...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2005 Michigan Statewide Rail-Trail Trail Improvements Part of the Michigan Statewide Rail-Trail 1, 2, 3, 4, 5, 6, 7, Statewide $60,000 $15,000 $75,000

System System. Install compacted crushed 8, 9, 10, 11, 12,

aggregate surface on 5+ miles of trail. 13, 14

MI 2005 Michigan Statewide Rail-Trail Trail Maintenance Part of the Michigan Statewide Rail-Trail 1, 2, 3, 4, 5, 6, 7, Statewide $40,000 $10,000 $50,000

System System. Brush and clear approximately 12 8, 9, 10, 11, 12,

miles of trail corridor. 13, 14

MI 2005 Michigan Statewide Rail-Trail Trail Maintenance Part of the Michigan Statewide Rail-Trail 1, 2, 3, 4, 5, 6, 7, Statewide $50,000 $12,500 $62,500

System System. Brush and clear 6-7 miles of rail-trail 8, 9, 10, 11, 12,

corridor. 13, 14

MI 2005 Michigan Statewide Rail-Trail Rail-Trail Development Part of the Statewide Rail-Trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $100,000 $25,000 $125,000

System Remove and dispose of railroad tie debris left 8, 9, 10, 11, 12,

behind by the railroad company on 18 miles 13, 14

of trail corridor.

MI 2005 Michigan Statewide Rail-Trail Survey and Engineering Part of the Statewide Rail-trail system. 1, 2, 3, 4, 5, 6, 7, Statewide $250,000 $62,500 $312,500

System Various trail surveys, design and engineering 8, 9, 10, 11, 12,

projects. 13, 14

MI 2003 Goose Creek Trail Trail Improvements Improvements 1 Crawford $20,000 $20,000 $40,000

MI 2003 Huron Valley Trail Construct Trail 11 Oakland $25,000 $25,000 $50,000

MI 2003 Frank Anderson Trail, Construct Trail, Maintenance 5 Bay $40,000 $40,000 $80,000

Campground Day Use Trail

MI 2003 Historic Mill Creek State Trail and Trailhead Construct Trail, Trailhead 1 Cheboygan $60,000 $60,000 $120,000

Park Construction

MI 2003 Day Maintenance 1 Leelanau $60,000 $60,000 $120,000

Use Trail

MI 2003 High Country Pathway Bridges 1 Otsego $74,800 $74,800 $149,600

MI 2003 White Pine Trail Construct Trail 3 Kent $80,000 $80,000 $160,000

MI 2003 Linear State Parks, State Trail Maintenance Maintenance 1, 2, 3, 4, 5, 6, 7, Statewide $84,300 $84,300 $168,600

Park Trails 8, 9, 10, 11, 12,

13, 14

MI 2003 Snowmobile Trails Winter Trail Improvements Maintenance, Grooming 1, 2, 3, 4, 6 Statewide $245,000 $245,000 $490,000

MI 2003 ORV Trail OHV Area Improvements Maintenance, Signage 1, 2, 4 Statewide $245,000 $245,000 $490,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2003 Polly Ann Lapeer Trail Maintenance Maintenance 1, 2, 3, 4, 5, 6, 7, Statewide $329,000 $329,000 $658,000

8, 9, 10, 11, 12,

13, 14

MI 2003 I-75 Bridge Installation Bridge 1 Mackinac $1,016,000 $1,016,000 $2,032,000

MI 2002 Lake Dubonnet Trail Improvements 1 Grand Traverse $35,000 $10,000 $45,000

MI 2002 Historic Mill Creek State Improvements 1 Cheboygan $103,000 $21,500 $124,500

Park

MI 2002 White Pine Trail State Park Construct Trail 2 Wexford $60,000 $36,500 $96,500

MI 2002 Van Buren State Park, Paw Bridge 6 Van Buren $400,000 $100,000 $500,000

Paw River

MI 2002 Snowmobile Trails Grooming 1, 2, 3, 4, 5, 6, 7, Statewide $0 $185,583 $185,583

8, 9, 10, 11, 12,

13, 14

MI 2002 Off Road Vehicle Trails Trail Maintenance Maintenance 1, 2, 3, 4, 5, 6, 7, Statewide $0 $185,583 $185,583

8, 9, 10, 11, 12,

13, 14

MI 2002 Cheboygan Rail-Trail Improvements 1 Otsego, Livingston $80,000 $220,000 $300,000

MI 2002 White Pine Trail State Park Construct Trail 3 Kent $98,000 $820,600 $918,600

MI 2002 ORV Trails Trailhead Construction Trailhead 1, 2, 3, 4, 5, 6, 7, Statewide $126,500 $31,625 $158,125

8, 9, 10, 11, 12,

13, 14

MI 2002 Devil's Lake ORV Area Bridge 1 Alpena $40,000 $10,000 $50,000

MI 2002 Mason Tract Pathway Bridges 4 Crawford $20,000 $10,000 $30,000

MI 2002 Carriage Road and Townsite Maintenance 1 Delta $86,700 $21,675 $108,375

Path

MI 2002 State Forest Pathways Maintenance, Improvements 1 Delta, Luce, Mackinac, $36,600 $9,150 $45,750

Lake

MI 2002 Lake Ann Connector Trail Bridge 1 Benzie, Grand $45,000 $11,250 $56,250

Traverse

MI 2002 Frieda Trail Construct Trail 1 Houghton $31,100 $7,775 $38,875

MI 2002 Little Manistee Maintenance 2 Lake $11,000 $2,750 $13,750

ORV/Snowmobile Trail

MI 2002 Silver Creek Pathway Maintenance 2 Lake $25,900 $6,475 $32,375

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2002 Pere Marquette State Trail Maintenance 2, 4 Lake, Osceola, Clare $29,157 $7,289 $36,446

MI 2002 Day Use Area Trail Improvements 1 Marquette $16,300 $4,075 $20,375

MI 2002 Trails Improvements 1 Mason $40,000 $10,000 $50,000

MI 2002 Lake of the Clouds Trails, Construct Trail 1 Ontonagon $55,000 $13,750 $68,750

Presque Isle Trails

MI 2002 Pere Marquette State Trail Maintenance 4 Osceola $70,400 $17,600 $88,000

MI 2002 Heritage Trail Improvements, Erosion Control, Signage 2 Wexford $45,000 $11,250 $56,250

MI 2002 High Rollways Overlook Improvements 4 Wexford $30,000 $7,500 $37,500

MI 2001 Winter Recreation Trails Winter Trail Improvements Improvements, Maintenance Various 1, 2, 3, 4, 5, 6, 7, Statewide $0 $194,868 $194,868

Snowmobile Trails 8, 9, 10, 11, 12,

13, 14

MI 2001 Winter Recreation Trails Winter Trail Improvements Improvements, Maintenance Various 1, 2, 3, 4, 5, 6, 7, Statewide $0 $194,868 $194,868

Snowmobile Trails 8, 9, 10, 11, 12,

13, 14

MI 2001 Upper Peninsula Trail Improvements 1 Statewide $80,000 $20,000 $100,000

Snowmobile Trails

MI 2001 Various ORV Trails Trailhead Construction Trailhead Facilities, Parking Areas, Signage, 1, 2, 3, 4, 5, 6, 7, Statewide $157,700 $39,425 $197,125

Restroom 8, 9, 10, 11, 12,

13, 14

MI 2001 Frank Anderson Trail Construct Trail 5 Bay $78,000 $19,500 $97,500

MI 2001 Northern Lower Peninsula Improvements, Maintenance 1 Emmet $70,000 $17,500 $87,500

Rail-Trails

MI 2001 Keweenaw Trail Bridge 1 Houghton $330,000 $82,500 $412,500

MI 2001 Pinckney, Brighton, Trail Improvements 8, 9 Washtenaw, $42,800 $10,700 $53,500

Metamora, Hadley Livingston, Lapeer

Recreation Areas

MI 2001 Island Lake State Recreation Bridge 8 Livingston $115,000 $28,750 $143,750

Area Trails

MI 2001 Brown's Brook Area Construct Trail, Benches, Displays 11 Mackinac $47,600 $11,900 $59,500

MI 2001 Harlow Lake Pathway Maintenance, Bridges 1 Marquette $84,400 $21,100 $105,500

MI 2001 Sterling State Park Construct Trail, Parking Lot, Trailhead, 16 Monroe $553,443 $138,361 $691,804

Bridge, Signage

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 2000 Snowmobile Trails Trail Maintenance and Improvements to 1, 2, 3, 4, 5, 6, 7, Statewide $0 $177,187 $177,187

Snowmobile Trails 8, 9, 10, 11, 12,

13, 14

MI 2000 Off Road Vehicle Trails Trail Maintenance 1, 2, 3, 4, 5, 6, 7, Statewide $0 $177,188 $177,188

8, 9, 10, 11, 12,

13, 14

MI 2000 Betsie Valley Trail Construct Trail, ADA 1 Benzie $230,000 $57,500 $287,500

MI 2000 Algonquin State Forest Maintenance, Trailhead 1 Chippewa $18,900 $4,725 $23,625

Pathway

MI 2000 Wakefield Union Pacific Rail Construct Trail 1 Gogebic $77,400 $19,350 $96,750

Grade

MI 2000 Trail # 2 Improvements, Box Culvert Installation 1 Gogebic $90,200 $22,550 $112,750

MI 2000 Lakelands Trail State Park Trail Maintenance, ADA 8 Ingham, Livingston $149,000 $37,250 $186,250

and Horse Trail

MI 2000 Iron River-Marenisco Trail Renovate Trail With Surfacing 1 Iron $14,400 $3,600 $18,000

MI 2000 Polly Ann Trail Construct Trail 9 Lapeer $20,000 $5,000 $25,000

MI 2000 Republic to Champion Grade Bridge Repairs 1 Marquette $84,900 $21,225 $106,125

MI 2000 Montague-Berry Junction Construct Trail, ADA 2 Muskegon $50,000 $12,500 $62,500

Trail

MI 2000 Musketawa Trail Improvements, Trail Surfacing 2 Muskegon $105,000 $26,250 $131,250

MI 2000 Trail and Accessibility Trail and Accessibility Trail Maintenance, ADA 1, 2, 3, 4, 5, 6, 7, Statewide $55,000 $13,750 $68,750

Improvements Improvements 8, 9, 10, 11, 12,

13, 14

MI 2000 State Forest Pathway Trail Maintenance and Grooming 1, 2, 4 Statewide $77,900 $19,475 $97,375

MI 2000 ORV Trails Trailhead Development, ADA 1, 2, 4 Statewide $293,000 $73,250 $366,250

MI 2000 Michigan Statewide Rail-Trail Trail Maintenance, Trailhead 1, 2, 4 Statewide $52,300 $13,075 $65,375

System

MI 2000 Van Buren Trail Construct Trail, Trailhead, ADA 8 Van Buren $99,497 $24,874 $124,371

MI 1998 Addison, Orion, Oxford Trail Improvements Improvements, Which May Include, Grading, 9 Oakland $10,000 $10,000 $20,000

Erosion,

MI 1998 Almira, Long Lake Township, Trail Construction Construction of 5+ Miles of Trail 1 Benzie, Grand $7,990 $16,500 $24,490

Benzie Traverse

MI 1998 Greenwood Township Trail Construction Construct Overlook Site Facility 2 Wexford $19,750 $19,750 $39,500

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 1998 Alpena, Wilson Township Trail Construction and Trail and Trail Facility Construction and 1 Alpena $35,000 $42,000 $77,000

Trailhead Improvements Renovation

MI 1998 Rail-Trail Development Rail-Trail Development Rail-Trail Improvements 2, 3, 4, 6, 8 Ingham, Kent, $49,400 $49,400 $98,800

Livingston, Mecosta,

Montcalm, Muske

MI 1998 Kinross, Eden, Lake, Liberty Accessible Trail Construct Fully Accessible Trailhead 1, 2, 4 Multiple Counties $60,000 $60,000 $120,000

Township Improvements Facilities

MI 1998 Beaver Creek Township Trail Improvements Resurface Access and Camp Roads 4 Crawford $4,000 $1,000 $5,000

MI 1997 Orient T17N-R4W Drainage Improvements Clear Side Drainage Ditches 4 Osceola $195,038 $2,000 $197,038

MI 1997 Lovells Township Trail Improvements Widen and Re-Surface Access and Camp 1 Crawford $6,000 $4,000 $10,000

Roads

MI 1996 Mentor Township Trail Construction Construction of New 3/4 Mi Trail, Construct 4 Oscoda $4,000 $4,000 $8,000

New Bridge

MI 1996 Ausable Township Install Signs Replace Dir and Interpretive Signage 4 Roscommon $7,000 $7,000 $14,000

Aggregate Surface

MI 1996 Commerce Township Boardwalk Construction Replace Boardwalk 11 Oakland $9,000 $9,000 $18,000

MI 1996 Frederic, Beaver Crk, Lake, Trail Improvements Widen and Straighten 26M of Existing Trail 1 Multiple Counties $13,000 $13,000 $26,000

Bear Lake Township, Crawfo

MI 1996 Northern Lower and Upper Safety and Environmental Law Enf for Env Prot and Safety ORV Use 1, 2, 4 Peninsula $19,481 $19,481 $38,962

Peninsula Education On A

MI 1996 Algoma Township Trailhead Construction Develop Trailhead Facilities, Surfaced 3 Kent $20,000 $20,000 $40,000

Parking Area, Acc toil

MI 1996 Northern Lower and Upper Trail Maintenance Pathway Maint, Brushing, Sign and Trail 1, 2, 4 Peninsula $20,300 $20,300 $40,600

Peninsula Marker Replacement

MI 1996 Stockbridge, Unadilla and Trail Improvements Increase Cleared Width Along Trail Corridor 8 Ingham, Livingston $25,000 $25,000 $50,000

Putnam Township, Ingham

Living

MI 1996 Matchwood, Ontonagon Trail Construction Construct New 12' Wide Trail 1 Ontonagon $25,000 $26,000 $51,000

Township

MI 1996 Summerfield Township Bridge Improvements Renovate Existing Bridge 4 Clare $27,000 $27,000 $54,000

MI 1996 Stanton Township Bridge Installation Construct New Bridge 1 Houghton $32,500 $32,500 $65,000

MI 1996 Carp Lake Township Trail Renovation Erosion Control and Asphalt Surface 1 Ontonagon $35,000 $35,000 $70,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

MI 1996 Northern Lower and Upper Trail Maintenance Trail Maintenance of Dedicated ORV 1, 2, 4 Peninsula $38,000 $38,000 $76,000

Peninsula County Trail/Rte. Sys

MI 1996 Ononagon, Rockland Trail Renovation Develop, renovate 1.2 Mi Interpretive Trail 1 Ontonagon $50,000 $50,000 $100,000

Township

MI 1996 Wright, Chester, Ravenna, Bridge Improvements Deck and Rail 15 Bridges, Clean Up Debris, 3 Muskegon $60,000 $60,000 $120,000

Sullivan, Fruitport Install S

MI 1996 Algoma Township Trail Relocation Relocate Trail Segment 3 Kent $60,000 $60,000 $120,000

MI 1996 Quincy Township Trail Improvements Upgrade for Multiple-Use. Surface Parallel 1 Houghton $18,400 $77,000 $95,400

Trails

MI 1996 Various Parking Areas Trailhead Construction Improvements Trailhead Parking Areas, 6 Van Buren $80,000 $80,000 $160,000

Culvert and Co

MI 1996 Various State Trails Trailhead Construction Development of Trailhead Facilities, 1, 2, 4 Multiple Counties $100,000 $100,000 $200,000

Aggregate Surfaced Parking

MI 1996 Greenland Township Bridge Improvements Replace Decking and Railings On the 374+/-' 1 Ontonagon $100,000 $100,000 $200,000

Mid Brid

MI 1996 Chester, Ravenna Township, Trail Improvements Assist in construction of 5.3-mile of Trail 2 Muskegon $35,681 $250,000 $285,681

Ottawa, Muskegon County Surface

MI 1993 Statewide Trail Maintenance Trail Improvements 1, 2, 4, 5 Statewide $86,564 $21,641 $108,205

MI 1993 Statewide Trail Maintenance Trail Improvements Clearing, Brushing, Confidence Marking, Trail 1, 2, 4, 5 Statewide $47,000 $11,750 $58,750

Grooming

MI 1993 Statewide Trail Maintenance Trail Improvements Brushing and signing, designated ORV 1, 2, 4, 5 Statewide $180,000 $45,000 $225,000

maintenance of confide

MI 1993 Freeman Township Trailhead Improvements Construct Trailhead Parking for the Trail 4 Clare $2,000 $500 $2,500

MI 1993 Green Lake Township Trail Construction Construction Trail 1 Grand Traverse $9,800 $2,450 $12,250

MI 1993 Green Lake Township Trail Construction Construct and Install. of 6 Barrier Free toilets. 1 Grand Traverse $14,000 $3,500 $17,500

Brush

MI 1993 Montague Township Trail Construction Construct 900' Trail, Fencing, topsoil and 2 Muskegon $55,000 $13,750 $68,750

Seeding,

MI 1993 Roscommon Township Bridge Renovation Reconstruct 5 Bridges 4 Roscommon $4,200 $1,050 $5,250

Grand $38,380,501 $26,583,670 $64,964,171

Totals

(all results)