Minutes of the Meeting of Bmw Committee No. 1 Held on 30.10.2008
Total Page:16
File Type:pdf, Size:1020Kb
MINUTES OF THE MEETING OF BMW COMMITTEE NO. 1 HELD ON 30.10.2008 The following officials attended the meeting:- 1. Sh. J. K. Dadoo, Chairman, DPCC -- in Chair 2. Dr. Anil Kumar , Member Secretary, DPCC -- Member 3. Dr. T. K. Joshi, COEH, MAMC -- Member 4. Dr. Chetna Harjai , Scientist, Deptt of Env. GNCT, Delhi -- Member 5. Sh. D.K.Singh , Environmental Engineer , DPCC -- Member 6. Sh. Sanjay Vatts , AEE (BMW), DPCC -- Member 7. Sh. Shyam Sunder, AEE (BMW), DPCC -- Member
The meeting of the BMW Committee No. 1 , constituted for deciding Application for grant of Authorization under the BMW Rules and Consent under the Air / Water Acts was held on 30.10.2008 . Decisions taken by the Committee ,are given below:
1.Decisions taken w.r.t.Agenda No.1 (Total 139 Cases , of Private Hospitals / Common Operators / Drug Mfg Units / Drug Stockiest etc.) are at Annexure 1. Personal Hearing was given in case of 16 Hospitals and the representative(s) of the Hospitals were heard and decisions taken in these 16 cases are at S.No. 9,18,19,25,29,32,35,36, 47,49,50,51,53,54, 69,74 of Annexure 1.
2.Decisions taken w.r.t. Agenda No 2 (Total 54 Cases, of Govt. Hospitals (52 cases) & Govt. Research Institute (two case at S.No. 46 and 53 ) ) are at Annexure 2 .
3.Decisions taken w.r.t Agenda No. 3 ( Issue regarding letters issued for acoustic enclosure, noise monitoring report for DG sets, affidavit for compliance, in respect Health Care Units / Nursing Homes) are at Annexure 3.
4.Decisions taken w.r.t Agenda No.4 (Drug Manufacturing Units,Approved Testing Laboratories & Blood Banks , action taken earlier based on the Lists collected from the Drugs Controller of GNCT Delhi ) are at Annexure 4.
5.Decisions taken w.r.t Agenda No. 5, Regarding proposals received from Dr. T.K.Joshi on (i) Study on the Lead (ii) Study on the Effect of Mercury Waste , are at Annexure 5.
6.Decision taken w.r.t Agenda No.6 ( News Paper Item “Bio – medical waste plagues NCR” published in Times of India (Delhi Edition) on 5th May, 2008 regarding Training through ASSOCHAM) ) is at Annexure 6.
Trainee & Officials of BMWM Cell , informed that some of the Health Care Establishments (HCEs) are coming up / have come up , however not in the records of DPCC. ShTarun Jindal, Trainee BMWM Cell, to inspect and report in respect of the following units in the next meeting of the BMW Committee on 28.11.2008; (i) Jain Health Care, Shakti Nagar Chowk Delhi -07, (ii) Dr. Lal Path Labs , E Block , Sector 18 , Rohini, Delhi -85 (iii) Hospital under construction at Nand Nagri (iv) Ayushman Hospital, Sector 5, Dwarka , Delhi .
Letter to be written to Principal Secretary (Health) Govt. of NCT of Delhi regarding providing list of Govt. Hospitals which are under construction / proposed and to be brought on record.
The next meeting of the BMW Committee No.1 will be held on 28.11.2008 at 3 : P.M.
The meeting ended with a vote of thanks to the Chair. 1.Status of Jain Health care Shakti Nagar Chowk, Dr. Lal Lab at Rohini, Hospital under construction at Nand Nagri and Ayushman Hospital, sector 5 Dwarka to be brought on 28.11.2008. Trainee to inspect and report.
2.Letter to be written to Principal Secretary Health regarding Govt. Hospital under construction to be brought on record. DECISIONS TAKEN BY BMW COMMITTEE NO.1 IN THE MEETING HELD ON 30.10.2008 W.R.T. AGENDA NO.1(139 CASES OF PVT.HOSPITALS/COMMON OPERATORS/DRUG MFG./DRUG STOCKIST ETC.) ANNEXURE 1 Sl. Name and Authorizati Consent Decision of the Action Taken w.r.t Decision of the committee in Action Taken w.r.t Decision Taken NO. Address on status Status committee on 31- Decision Taken on . the Meeting on 04-10-2007 on 04-10.2007 of the Unit 8-2007 31-8-2007 / Remarks 58. M/s Applied for Applied for 1. SCN under rule 1.SCN has been The case was discussed in Show Cause Notice u/s 5 of EPA Synergy authorizatio Consent on 7 of BMW Rules issued on 03.09.2007 detail & Show Cause Notice issued on 12.10.07 for the Waste n on 27.06.06 be issued for the 2. Inspection has issued to the operator on decisions taken by the Manageme 22.06.06 with 3 following: 1. waste been conducted on 03.09.2007, Reply received committee. Reply along with the nt Pvt. Ltd. for 3 years years fee. should not be kept 27-9-2007. from the Operator of the affidavit received for the Near as per Consent to in open. 2. ‘On 3. SCN u/s 5 of EP CBMWT and inspection compliance of the decision taken Composite Rules. operate Govt. Duty’ on Act was issued by carried out on 27.09.07, were by the committee. Informed that Plant , Authorizati was vehicles should CPCB on 7-9-2007 also considered and following provided filter press, informed Sukhdev on was granted on not be display. 3. after the inspection decisions were taken : regarding never use of manual Vihar granted on 07.11.06 sludge dewatering on 24-7-2007 (i) W.r.t deficiency “The Bio – mode of operation in the Okhla , 07.11.06 for 1year . device be provided 4. Operator has Medical Waste should be kept installed PLC, and regarding New Delhi- for 1year with ETP.4. submitted reply to in closed bins” mentioned in installation of Rota meters and 20. Manual mode on both the notices the said Notice,Reply is pressure gauges, lids provided PLC should not be mentioned above. factually incorrect and the to all BMW plastic containers used. 5. Measures 5. The fact finding Committee has decided to and necessary measures taken to control smell committee has been issue Show Cause Notice for to control the smell, display sign from BMW be constituted by DHS Closure of the Facility. (on Govt. Duty have been taken. 6. Rota for the complaints (ii) Regarding erasing of “ On erased, no segregation is done meter should be received from Government Duty “ printed on within the facility, records of provided at PC residents the vehicles used for BMW collection &SC of incinerator. of Sukhdev Vihar and collecting BMW , the and incineration / autoclaving the representations Committee accepts the reply. are being maintained. Operator received from the (iii) Regarding installation of of the CBMWT requested for operators. Filter Press with the ETP for exemption from depositing the 6. Letter issued to dewatering of sludge as Bank Guarantee. As directed by The Principal mentioned in the said Notice, Chairman DPCC letter issued on Secretary (Health) for despite clear Notice the unit 07.11.07 informing that no allotment of has not complied with the exemption from Bank Guarantee alternative site. directions and given is possible. Operator submitted 7.Meeting of justifications which is not the Bank Guarantee of Rs. One Committee acceptable to the Committee. Lakh , valid for 6 months. constituted by Pr. The Operator of the CBMWT The Operator of the facility had Secy.(Health) Facility is once again directed requested for grant of GNCTD, was held on to install Filter Press within authorization under BMW Rules 24.10.07. three weeks and confirm since earlier granted 8. Authorization through an Affidavit before authorization expired on under BMW Rules & next date of meeting of the 06.11.07.( Consent to operate Consent to operate Committee i.e on 15.11.2007. also expired on 06.11.07.) under Air Act granted (iv) Regarding “The manual to the Operator of mode of operation in the CBMWT Facility was installed programmable Logic upto 06.11.2007. Control (PLC) based control 9. Letter from CPCB system should be removed “ dated: 05.10.07 to mentioned in the said Notice, CBMWT facility with Committee is not satisfied directions for taking with the reply and the certain measures for Committee insists that the compliance of Automatic System (PLC) BMW Rules may also Should only be used as be perused.( Copy mentioned in th CPCB enclosed) Guidelines and an Affidavit should be filed by the Operator with in three weeks and he should comply with this direction before the next meeting of this Committee i.e. on 15.11.2007.To ensure that Operator of the said CBMWT Facility, complies with this direction, the Operator of the Facility , will submit a Bank Guarantee of Rs. One Lakh , valid for Six month period , in favour of Delhi Pollution Control Committee, within three weeks along with the said Affidavit. (v) Regarding “Necessary measures should be taken for controlling the smell generated from BMW within the facility “mentioned in the Notice, the Committee accepts the reply, however any discontinuance or irregularity in the action will result in filing of another Bank Guarantee of Rs. One Lakh valid for Six month period, in favour of DPCC, by the Operator of the said Facility. (vi) Regarding “ Rota – meters and pressure gauges should be installed in the primary and secondary chamber of the Incinerator “ mentioned in the said Notice , the Operator of the said Facility has not filed factually correct reply since the Rota meter and pressure gauges not found installed during the inspection on 27.09.07. The Committee directs him to file an Affidavit after installation of Rota meters and Pressure Gauges, within three weeks.
Decision Taken by the Committee in the Meeting on 15-11-2007: Since a complaint against this unit has been processed & submitted to Hon’ble Lt. Governor , Delhi, and since its Authorization under BMW Rules & Consent under the Air / Water Act , lapsed on 06.11.07 , full yearly authorization or 3 yearly authorization / consent under the said Rules / Acts is not possible under the circumstances. An interim extension of the Authorization under BMW Rules and Consent to operate under the Air / Water Acts , upto 31.12.2007, is granted by which time the status of the complaint will be decided. Meanwhile Member Secretary, DPCC, will speak to Medical Deptt./ Directorate of Health Services & get the report of the Committee set up by them for deciding on shifting his location. Action Taken Report w.r.t. meeting on 15.11.07: (i) Authorization under BMW Rules and consent to operate under the Air & Water Acts extended upto 31.12.07. (ii) Letter issued to the Convenor of the Committee constituted for said operator seeking report of the committee. Report awaited. (III) The operator has submitted a list of 8 units w.r.t the letter issued seeking the list of the units (drug mfg units) from which the operator is collecting BMW waste however the units not applied for authorization..
M/s Synergy Waste Management Pvt. Ltd, Near Composite Plant, Sukhdev Vihar, Okhla, Delhi-20. Decision Taken by BMW Committee No. 1 in the Meeting Held on 15.01.2008 : “Both, the decision of Hon’ble Lt. Governor and the inspection report are not yet available on file. These reports may be expedited and put up on file formally through Member Secretary, DPCC and other members of the Committee to the Chairman. Since this may take 15 days, the authorization under BMW Rules and Consent to operate under Air & Water Acts may be extended for interim period of one month i.e. 31st January, 2008.” Action Taken w.r.t Meeting on 15.01.2008 : In view of the above decision taken by the said BMW Committee No. 1, the extension of the Authorization under BMW Rules and Consent under the Air / Water Acts up to 31.01.2008, has been issued on 25.01.2008. Report of the Independent Committee received and put up in file . As directed by the Chairman, DPCC, the same is placed before the BMW Committee No.1 for the decision. Decision Taken by BMW Committee No. 1 in the Meeting Held on 08.02.2008 : The report of the Committee constituted by Pr. Secretary (Health) to enquire into the case of M/s Synergy Waste Management Pvt. Ltd. was placed before BMW Committee No-I today. The report is clear that in the long run it would not be advisable to keep the operation of Bio Medical Waste treatment facility at the existing premises at Okhla. Several options of alternate space were discussed. According to Dr. T.K. Joshi, there are three places which can be inspected and a decision can be taken in one of them which is free from all possible health hazards for operating such a facility. These are (a) Deen Dayal Upadhyaya Hospital, Hari Nagar, New Delhi (b) Rao Tula Ram Memorial Hospital, Jafferpur, Delhi & (c) Maharishi Balmiki Hospital, Pooth Khurd, Delhi. The above three premises may be inspected by a team headed by Dr. T.K. Joshi, Mr. D.K. Singh and the management of Synergey Waste Management Pvt. Ltd. so that an amicable solution could be found out. The report will be submitted on or before 29.02.2008. The authorization & consent of M/s Synergy Waste Management Pvt. Ltd. may be extended upto 29.02.2008 in view of the above and in the extension letter; one of the deficiencies noted would be communicated. Action Taken w.r.t Meeting on 08.02.2008: (i) Authorization under BMW Rules and Consent to Operate under the Air & Water Acts extended upto 29.02.08 vide letter issued on 22 .02.08 & one of the deficiencies noted has been communicated. (ii)A letter dated 29.02.08, was received from the director of M/s Synergy Waste Management Pvt. Ltd. requesting for extension of authorization under BMW Rules for one year. As directed by Chairman, DPCC, a letter has been issued to the said operator informing that the extension of authorization under the said Bio-medical Waste Rules, for a year, is not possible. (iii) A team headed by Dr. T.K.Joshi inspected the following three sites on 27.02.08 ; 1. Deen Dayal Upadhyaya Hospital, Hari Nagar, Delhi-64 2. Rao Tula Ram Memorial Hospital, Jafferpur, Delhi- 43. 3.Maharishi Balmiki Hospital, Pooth Khurd, Delhi-39 and report was submitted to Chairman DPCC in file. The team found that none of the above mentioned three sites of the Hospitals are suitable for the establishment of a Common Bio-Medical Waste Treatment Facility. As directed by the Chairman, DPCC, the matter is placed before the BMW Committee No.1.(iv) A letter dated 29.02.08, has also been received from the director of M/s Synergy Waste Management Pvt. Ltd., requesting to provide a copy of the said report of the team. Decision Taken by BMW Committee No. 1 in the Meeting Held on 18.03.2008 : (i) While Directorate of Health Services (DHS) , Govt. of NCT Delhi and the Private Operator (M/s Synergy Waste Management Pvt. Ltd, Near Composite Plant, Sukhdev Vihar, Okhla, Delhi- 20.) will follow up with DDA for allotment of land for the Common Bio Medical Waste Treatment Facility , this matter will be raised in the list of issues to be taken up by Chairman, DPCC with Vice Chairman, DDA. (ii) Authorization under BMW Rules and Consent to Operate under the Air & Water Acts extended upto 30.04.2008. (iii)Operator must get the land organized by himself or through DDA. Action Taken w.r.t Meeting on 18.03.2008: (i) Aforementioned decision taken by the BMW Committee No.1, was sent to CMC for inclusion in the list of issues to be taken up by Chairman, DPCC with Vice Chairman, DDA. (ii) Authorization under BMW Rules and Consent to Operate under the Air & Water Acts extended upto 30.04.2008 vide letter issued on 09.04.08 mentioning the aforementioned decision taken by the BMW Committee No.1 in the meeting held on 18.03.08. (iii) Copy of the said letter was also sent to Directorate of Health Services (DHS) , Govt. of NCT Delhi. (iv) A letter dated 28.04.08 has been received from the director of M/s Synergy Waste Management Pvt. Ltd., requesting for extension of authorization. Vide another letter dated 28.04.08 the Director of the unit has stated the back ground / brief of the allotment of the said site by DDA to DHS for the said facility and also stated that the said site was inspected by officials of DHS, CPCB, DPCC & COEH prior to its establishment. The said site is on the allotted land by DDA to DHS for carrying out the activities of treatment and disposal of BMW. It is also mentioned that in the surrounding area is being used for waste management activities e.g. Okhla STP, MCD compost plant, NDMC waste to power project etc. It is mentioned that DHS and DDA are in a better position to explain about the site that was already given to the operator or suggest an alternate site for the treatment and disposal of BMW. It is also mentioned by the operator that whatever directions were given to the operator, the same was complied and also enclosed the copy of stack monitoring report and water analysis report dated 19.09.07. showing parameters within the prescribed limit. It is also mentioned that the operator has approached DHS for looking for an alternate land also. Requested for looking the matter sympathetically and for grant of authorization under BMW Rules and Consent to Operate under Air and Water Act. v. A representation has been received from the residents of Sukhdev Vihar, DDA flats regarding health hazards due to treatment of large quantity of BMW at the said plant of CBMWTF. Near the residential area of Sukhdev Vihar Decisions Taken by BMW Committee No. 1 in the Meeting Held on 06.05.2008 : (i) For finding a suitable alternative site for this Common BMW Treatment Facility, a letter may be written by Chairman, DPCC, to Vice Chairman, DDA, and Commissioner, MCD, since this unit will have to be trans-located soon. (ii) Authorization under BMW Rules and Consent to Operate under the Air & Water Acts extended upto the next BMW Committee meeting on 13.06.2008. Action Taken w.r.t Meeting on 06.05.2008: (i) Letter issued to, Vice Chairman, DDA, and Commissioner, MCD, for finding a suitable alternative site for this Common BMW Treatment Facility . (ii)Authorization under BMW Rules and Consent to Operate under the Air & Water Acts extended upto 13.06.2008 vide letter issued on 21.05.08.Representatiom from the operator received regarding extension of Authorization. Decisions Taken by BMW Committee No. 1 in the Meeting Held on 13.06.2008 : Authorization under BMW Rules an d Consent to Operate under the Air & Water Acts extended upto the next BMW Committee meeting on 14.07.2008. Action Taken w.r.t Meeting on 13.06.2008: (i) Authorization under BMW Rules and Consent to Operate under the Air & Water Acts extended upto 14.07..2008 vide letter issued on 27.06.08. (ii) A letter from CMO ( BMW) , Deptt of Health Govt. of NCT , Delhi received informing that Deptt of Health & Family Welfare ,GNCT Delhi, has already taken up the matter with the DDA & has applied for an alternative land for the present CTF at Okhla.
Decisions Taken by BMW Committee No. 1 in the Meeting Held on 14.07.2008 : “Ask the two operators that on what basis they are charging the fee and how are they increasing the fee overnight by 100 %. A formal clear justification of increasing the fee may be submitted that must be examined properly and file may be submitted administratively. If the unit does not behave, no further extension of authorization will be granted. Reply must come within 15 days and file to be put up administratively. Action Taken w.r.t Meeting on 14.07.08: Letter issued to both the Common Operators of Bio- Medical Waste Treatment Facilities in Delhi .
Decisions Taken by BMW Committee No. 1 in the Meeting Held on 27.08.2008 : Both Metro-Biocare & Synergy are unauthorizingly increasing prices. File to be submitted administratively without waiting for minutes.
Action Taken w.r.t. Meeting on 27.08.2008 : File submitted administratively. As directed by Chairman, DPCC, information has been tabulated and dealt in common file on the issue of rates /service charges. A PIL has been filed against the operator . Representations have been received from the unit ( also from Chief Minister Office ) regarding request for extension of authorization.
Decisions Taken by BMW Committee No. 1 in the Meeting Held on 29.09.2008 : (i) Action as per the decisions taken today in case of Agenda No. 1 (Regarding rates / service charges for BMW ).
(ii) The same Committee which inspected earlier will inspect now for PLC system and file report by 30.10.2008 at which time Bank Gaurantee issue will be decided. Action Taken w.r.t. Meeting on 29.09.2008 : (i) Letter issued Regarding rates / service charges for BMW. (ii) Inspected on 15.10.08. (iii) There is PIL/High Court Case WP(C) 6976 of 2008 “P.K. Nayyar & Others Vs U.O.I & Others, regarding case filed against M/s Synergy Waste Management Pvt. Ltd. by the residents of DDA Flats Sukhdev Vihar, Delhi. DPCC is one of the respondents and Affidavit has been filed in the Court. High Court vide order dated 24.09.08 had requested Chief Secretary, GNCT Delhi, to convene a meeting of the Secretaries of the concerned departments and key personnel of the concerned agencies with a view to taking urgent steps for relocation of the BMW treatment facility. The meeting was taken by the Chief secretary on 22.10.08. Two Letters received from the Operator, one regarding the representation w.r.t. meeting of Chief Secretary, Delhi regarding the High Court Case and another one in reply to the letter issued to the Operator on the Rate/charges for BMW issue.
Decisions Taken by BMW Committee No. 1 in the Meeting Held on 30.10.2008:
Chief Secretary, Govt of NCT Delhi, took a meeting on 22.10.2008 & follow up action is being taken accordingly . The BMW Committee will be apprised of the updated position on 28.11.2008 . Regarding letter received from the Operator on the issue of Rates / Service Charges for BMW , Operator be asked to follow the Directorate of Health Services(DHS) agreement. Place a copy on the file. Inspection of the unit was conducted by Independent Committee headed by Air Mashl (Retd.) L.K.Verma , Dr. T.K..Joshi & DPCC official on 15.10.08 . The inspection report was placed before the Committee. Installed Programmable Logic Control (PLC) based control System was found in use & found operating satisfactorily. Independent Committee had recommended in its report to segregate Cat 6 waste in red bags (and not in yellow bags) to reduce load on the incinerator in order to reduce emission and particulate matter pollution. Both the Operators be issued a letter in this regard to convey this to their member units for proper segregation of the Bio-Medical Waste.
(J.K. Dadoo) (Dr. Anil Kumar) ( Dr.T.K.Joshi) ( Dr. Chetna Harjai) ( D.K.Singh) ( Sanjay Vatts ) ( Shyam Sunder ) Chairman,DPCC Member Secretary,DPCC COEH ,MAMC Scientist, DOE , GNCTD EE(BMWM Cell) AEE(BMWM Cell) AEE (BMWM Cell) Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 1. Lok Nay 1600 C- 12- 03- 1. Authorization Reminder Letter Membe MS has Dr. Chetna to ak 001 Jan- Mar- is valid up to 18- letter be issued r spoken speak to MS Hospital 04 08(op 2-2010. sent Secreta to MS of of the , New erate) 2. Earlier SCN administrat ry,DPC the Hospital. Delhi-2 u/s 21/22 of Air ively to C, to Hospital, Act was issued new Pr. speak who has on 6-3- 2007(C/241) and Secy to assured on 11-6- (Health) Medical to do the 2007(C/243) for getting Superin needful seeking consent the tendent urgently. application under Consent to of the the Air Act. Establish. Hospita 3. Complaint was l. received regarding mismanagement of BMW. 4. Balance Fee for Rs. 496500 not received. 5. Applied for Consent to operate on 03.03.08. 6. As decided in the meeting on 18.03.08, letter for deficiencies was issued including seeking application for Consent to Establish under the Air & Water Acts. 7. As per the general decision taken on 06.05.08, letter issued for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 8. Hospital was inspected w.r.t News Paper Clipping & also reference was received from Hon’ble Lt. Governors office . Incinerator & Autoclave etc. were also inspected. Air Pollution Control Device ( APCD) installed with the incinerator was found not operational. By pass system found existing for the discharge of the emissions of the incinerator. Acoustic Enclosure / acoustic treatment of the rooms where DG Sets are kept not provided & adequate stack height not provided for the DG Sets ETP is yet to be commissioned. 9. Reply Letter sent to Lt. Governor’s office. 10. Based on the complaint received against the kabariwalas operating near the Hospital an inspection was conducted by the PGRC officials & as decided by the CMC (orange ) & after the hearing given to the kabariwalas & based on their statements regarding collection of BMW by the ragpickers from the Dhalaos of the hospitals in the nearby area including the name of this hospital , a Show Cause Notice was given to the hospital on 25.07.08. 11. Reply received w.r.t said SCN stating that BMW is being managed properly and there is no pilferage of the BMW or picking up by the ragpickers . 12. Not applied for Consent to Establish under the Air & Water Acts. 13. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued. 14. Pointwise reply dated 16.10.08, regarding correction of the discrepancies observed during inspection is received informing: Air Pollution Control Device is being made functional and also incinerator’s chimney has been repaired. For providing acoustic enclosures to the DG sets reply of PWD engineer attached. (i) Balance fee of Rs.4,96,500/- received (ii)Informed that ETP installation work is completed capacity is of 12.50KLD and approx. cost of the work of ETP is Rs.70lacs. (iii)Noise monitoring report submitted.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 2. Guru 938 NE- 22- 19- 1. Authorization Reminder Letter Membe MS has Dr. Chetna Teg 001 May- Dec- is valid up to 18- letter be issued r spoken to speak to Bahadur 07 07(op 2-2010 (C/234). sent Secreta to MS of MS of the Hospital erate) 2. SCN u/s. 21/22 administrat ry,DPC the Hospital. , of Air Act was ively to C, to Hospital, Shahdar issued on 6-3- new Pr. speak who has a , 07(C/233) and Delhi-95 11-6-07(C/237) . Secy to assured 3. A meeting was (Health) Medical to do the also taken by Pr. for getting Superin needful Secy. (Health) on the tendent urgently. 25.10.07 Consent to of the regarding Establish Hospita installation of l.. ETP . 4.Consent to operate application received however noise report for DG Sets & stack monitoring report for Boiler not submitted. 5.As decided in the meeting on 18.03.08, letter for deficiencies was issued including seeking application for Consent to Establish under the Air & Water Acts. 6.As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7. A complaint has been received against the hospital for not handling the BMW properly. 8. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued. 9. Letter dated 23.10.08 received regarding all the machinery like autoclave, incinerator and shredder plant are in working order.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 3. Deen 500 W- 13- 16- 1. SCN u/s 5 of Reminder Letter Membe MS has Dr. Chetna to Dayal 002 Oct- Jan- EPA was issued letter be issued r spoken speak to MS Upadhy 04 & 08(op on 6-3- sent reply Secreta to MS of of the rd a 23 erate) 2007(C/282) . administrat awaited. ry,DPC the Hospital. Hospital July 2. As decided on ively to C, to Hospital, , Hari 2008 1-8-2007, D.O. new Pr. speak who has Nagar, letter was issued New on 17-8-2007 to Secy to assured Delhi-64 Pr Secy (Health) (Health) Medical to do the regarding for getting Superin needful deficiencies the tendent urgently. observed . Consent to of the 3. Applied for Establish Hospita Consent to l.. Operate on 16.01.08 4. As decided in the meeting on 18.03.08, letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts. 5. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 4. Charak 150 ND- 09- Not 1. SCN u/s 5 of Reminder Letter Membe MS has Based on Palika 003 Jun- Applie EPA was issued letter be issued r spoken reply Hospital 06 d earlier & reply issued with Secreta to MS of received, , Moti was received with copy to Pr. ry, the issue Bagh , the remarks that Secretary DPCC, Hospital, reminder to New all the to CM. to who has apply for CTE Delhi-21 deficiencies mentioned in speak assured and submit SCN have been to to do the compliance rectified (C/202). Medical needful of other 2. SCN u/s 21/22 Superin urgently. decisions of Air Act was tendent of BMW issued on 16-3- of the Committee.. 207(C/201) and Hospita on 11-6- l.. 2007(C/203) . 3. As decided on 1-8-2007, D.O. letter was issued on 17-8-2007 to Chairperson, NDMC. 4. Reminder letter issued on 28.09.07, however consent application not received. 5 EE (BMW) talked to the official of the hospital as decided on 15.11.07. However not applied for consent under the Air Act. 6. As decided in the meeting on 18.03.08, letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts. 6. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7.Reply dated 19- 06-08.w.r.t letter dated 26-05-08 received informing about doing the needful as directed. 8. As per the decision taken in meeting on 13.06.08 a letter from chairman DPCC to Chairman NDMC was issued. Letter dated 23.10.08 received.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 5. Ram 1000 ND- 29- 20.09. 1. Authorization is Dr. Joshi Dr. Joshi Membe MS has Dr. Chetna to Manoha 002 Jun- 07(op valid up to 18-02- to talk to talked r spoken speak to MS r Lohia 06 erate) 2010 (C/183). MS and Secreta to MS of of the 2.Deficiencies Hospital sought out. ry,DPC the Hospital. observed w.r.t. , Baba C, to Hospital, Kharak consent speak who has Singh application Marg received e.g. to assured ND-1 noise monitoring Medical to do the report of all the Superin needful DG sets not tendent urgently. submitted & it also of the not clear that all the DG sets are Hospita having acoustic l.. enclosure & as well as adequate stack height. Stack monitoring report of the boilers (2nos.) not submitted. Affidavit submitted is not proper. HCU requested for review of the decision taken for installation of ETP referring the prescribed standard under EPA.. 5.Noise Monitoring Report for DG sets received from DPCC Laboratory shows meeting the norms. 6. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts. 6..Letter received on 22.5.2008 enquiring that whether installation of ETP is required or not. 7 As per the general decision taken on 06.05.08, letter issued for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 8.EE(BMW) had talked to the official (s) of the hospital . 9. As per the decision taken in meeting on 13.06.08 a common letter to Jt. Secy(Health) with copy to D.G. (CPWD) from chairman, DPCC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 6. G.B. 601 C- 30- 26.09. 1.As decided on Letter from Letter Membe MS has Dr. Chetna to Pant 002 Jun- 07(op 1-8-2007, D.O. Chairman issued r spoken speak to MS Hospital 06 erate) letter was issued to Director, Secreta to MS of of the , J.L. on 17-8-2007 to GB Pant to ry,DPC the Hospital. Nehru Pr Secy (Health). apply for C, to Hospital, Marg, 2. Complaint Consent to speak who has New was received Delhi-2 regarding Establish to assured mismanagement immediatel Medical to do the of BMW. y. Superin needful 3.Applied for tendent urgently. consent under Air of the Act on 26.09.07, Hospita however stack l.. monitoring report for boiler not submitted. Acoustic enclosure/acousti c treatment of the room not provided for the 9 DG Sets out of 12 DG Sets with the hospital. Adequate stack height not provided for all the DG Sets 4. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts. 5. Letter has been received requesting to issue clearance certificate to operate the incinerator. 6.As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7.Point wise reply dated 02-07-08 w.r.t letter dated 26-05-08 received. 8. Based on the complaint received against the kabariwalas operating near the Hospital an inspection was conducted by the PGRC officials & as decided by the CMC (orange ) & after the hearing given to the kabariwalas & based on their statements regarding collection of BMW by the ragpickers from the Dhalaos of the hospitals in the nearby area including the name of this hospital , a Show Cause Notice was given to the hospital on 25.07.08. 9. Reply received w.r.t said SCN stating that BMW is being managed properly and there is no pilferage of the BMW or picking up by the ragpickers . 10. An inspection of the hospital was conducted on 22.07.08 & BMW management found satisfactory. However Separate isolated storage site needs to be provided. Acoustic enclosure/acousti c treatment of the room not provided for the 9 DG Sets out of 12 DG Sets with the hospital. Adequate stack height not provided for all the DG Sets. The hospital has recently installed Microwave . ETP found installed & was in operation (on trial run). Storage site required to be provided for Sludge generated from the ETP & Collection tank for treated effluent should also be provided . Use of treated effluent should be increased which is presently about 10 %. 11. As decided by Chairman on file , a letter has been issued on 22.08.08 ,mentioning the deficiencies observed. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 7. Norther 312 C- 25- 19- 1. Application Dr. Joshi Dr. Joshi Membe MS has Dr. Chetna to n Railw 006 Aug- Nov- received for to speak to talked. r spoken speak to MS ay 06 07(op consent however Director Secreta to MS of of the Central erate) Stack monitoring General, ry,DPC the Hospital. Hospital report for the Health C, to Hospital, , Boiler & Noise Services speak who has Medical Monitoring report Director, for DG Sets not Railway to to assured Norther submitted. expedite. Medical to do the n Railw 2. As decided in Superin needful ay the meeting on tendent urgently. Basant 18.03.08 letter for of the Lane deficiencies was Hospita New issued including l.. Delhi-55 seeking application for Consent to Establish under Air & Water Acts. 3.As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 4.Reply dated 11-06-08 w.r.t letters dated 21- 04-08and 26-05- 08 regarding doing the needful as directed was received. 5..Asked to submit a list of authorized agencies by DPCC in order to process installation of ETP in hospital 6. A reply of the notice dated 11.06.07 on 15.09.08 informing acoustic treatment of DG set room and issuing of NOC under Air Act received.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 8. Guru 184 C- 11- 30-11- 1.Authorization is Reminder Letter Membe MS has Dr. Chetna to Nanak 003 Sep- 06(Op valid up to 18-2- letter be issued r spoken speak to MS Eye 06 erate) 2010(C/157). sent Secreta to MS of of the Centre, 2.Noise report administrat ry,DPC the Hospital. Maharaj shown that ively to C, to Hospital, a Ranjit Insertion Loss new Pr. speak who has Singh was not as per Marg , norms. Secy to assured New 3. As decided in (Health) Medical to do the Delhi the meeting on for getting Superin needful 18.03.08 letter for the tendent urgently. deficiencies was Consent to of the issued including Establish Hospita seeking l.. application for Consent to Establish under Air & Water Acts. 4..Copy of communication with PWD regarding Noise monitoring report submitted. 5.As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. Reply received 6.. Based on the complaint received against the kabariwalas operating near the Hospital an inspection was conducted by the PGRC officials & as decided by the CMC (orange ) & after the hearing given to the kabariwalas & based on their statements regarding collection of BMW by the ragpickers from the Dhalaos of the hospitals in the nearby area including the name of this hospital , a Show Cause Notice was given to the hospital on 25.07.08. 7. Reply received w.r.t said SCN stating that BMW is being managed properly and there is no pilferage of the BMW or picking up by the ragpickers . 8. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) was issued. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 9. E.S.I. 600 W- 30- Applie 1. Authorization Dr. Joshi Dr. Joshi Case to ------Ask the Hospit 001 Nov- d for is valid up to 18- to speak to talked be Hospital to al , 06 CTE 2-2010(C/99). MS and taken install ETP. Basai on 2. SCN u/s 21/22 resolve. up on within 3mont Darap 17.09. Air Act was 30.10.0 h Call on ur,Ring 08 issued on 11-6- 8. 28.11.2008 Road , 2006 (C/103). New 4. DO letter was Delhi- issued to J.S 15 (Labour), GOI with a copy to DG, reply received from DG ESI, 5 EE (BMW) talked to the official of the hospital as decided on 15.11.07.. 5. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 6..As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7. Reply Letter dated 19-06-08 received. 8. As per the decision taken in meeting on 13.06.08 EE talked to officials of the hospital.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 10 All India 1596 S- 28- 12.09. 1.SCN for refusal MS to talk MS has Ask the Letter Issue . Institute 001 Dec- 08(CT of authorization to MS and spoken to unit to issued. reminder to of 07 O) was issued on resolve. MS of the install install ETP Medical and 21-2- Hospital, ETP & within three Science 12.09. 2007(C/204). who has STP. months. Call , Ansari 08 2. Reply to SCN assured to Call on on Nagar, (CTE) u/s 5 of EPA New received with the do the 30.10.0 28.11.2008 Delhi-29 remarks that needful 8 necessary urgently. instruction for strict compliance of the statutory provisions have been issued to concerned officer (C/207). 3. HCU was inspected on 8-8- 2007(C/212) during which various deficiencies were observed regarding BMW management 4. DO letter issued to Director AIIMS with copy to JS (Health) GOI on 03.10.07. Consent application not received. 5 EE (BMW) talked to the official of the hospital as decided on 15.11.07. However not applied for consent under the Air Act. 6. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 7. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 8.Reply dated 11- 06-08.w.r.t letter dated 26-05-08 received informing about doing the needful as directed. 9. As per the decision taken in meeting on 13.06.08 a common letter toJt. Secy(Health) with copy to D.G. (CPWD) from chairman, DPCC was issued. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 11 Safderju 1531 S- 05- 12-09- 1.Authorization is CTE CTE Ask the Letter Issue . ng 002 Mar- 08 valid up to 30-01- granted issued. unit to issued reminder for Hospital 07 (Rene 2010(C/268). Letter install ETP and , wal 2.SCN u/s 21/22 Unit may issued. ETP & other Aurobin operat of Air Act to be asked STP. decisions of do e) & submit noise to file Call on BMW MargNe 08.08. monitoring report w Delhi- 08 of DG sets was CGWA 30.10.0 Committee . 29 (CTE) issued on 21-06- clearance 8 2007 (C/275). within 01 3.Noise month. monitoring report of D.G. sets yet to be received. 4. DO letter issued to JS (Health) GOI on 03.10.07. 5. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 6.As per the general decision taken on 06.05.08, letter issued ON 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. EE(BMW) had talked to the official (s) of the hospital . 7. As per the decision taken in meeting on 13.06.08 a common letter to Jt. Secy(Health) with copy to D.G. (CPWD) from chairman, DPCC was issued. 8.Applied for CTE on 08.08.08. 9. Letter dated 24.10.08 received.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 12 Aruna 100 N- 11- 18.09. 1. Authorization Reminder Letter Membe MS has Dr. Chetna to . Asaf Ali 005 Aug- 07(op is valid up to 30- letter be issued. r spoken speak to MS Hospital 04 erate) 01-2010 (C/186). sent Reply Secreta to MS of of the , 5 2. Acoustic administrat waited. ry, the Hospital. Rajpur enclosure with ively to DPCC, Hospital, Road, the DG set new Pr. to who has Delhi provided, however noise Secy speak assured monitoring report (Health) to to do the not submitted. for getting Medical needful 3. As decided in the Superin urgently. the meeting on Consent to tendent 18.03.08 letter for Establish of the deficiencies was Hospita issued including l.. seeking application for Consent to Establish under Air & Water Acts 6. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy (Health) with copy to Pr.Secy (PWD) from chairman, DPCC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 13 Sanjay 100 NW- 30- 27.04. 1. SCN under Reminder Letter Membe MS has Dr. Chetna to . Gandhi 012 Nov- 04 BMW Rule was letter be issued r spoken speak to MS Memori 04 issued on 21-2- sent reply Secreta to MS of of the al 2007(C/80). administrat awaited. ry,DPC the Hospital. Hospital 2. Reply to SCN ively to C, to Hospital, , u/s 5 of EPA new Pr. speak who has Mangol received with the puri remark that Secy to assured ,Delhi corrective (Health) Medical to do the measures have for getting Superin needful been the tendent urgently. taken(C/81). Consent to of the 3. As decided on Establish Hospita 1-8-2007, D.O. l.. letter was issued on 17-8-2007 to Pr Secy (Health).4. Meeting taken by Pr. Secy. (Health) on 25.09.07, HCU was directed (in the meeting) to inform DPCC about the rectification measures.5.Thre e years expired after the submission of the earlier consent application; however HCU has not applied afresh for consent under the Air Act. 6.Talked to the official of the hospital as decided on 15.11.07. However not applied a fresh for consent under Air Act. 7. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 8. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 9..Reply dated 16-06-08.w.r.t latter dated 26- 05-08.regarding doing the needful as directed was received. 10. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 14 Vallabh 60 N- 14- 10.09. 1. Authorization CTE CTE Ask the Letter Consent to . ai Patel 007 Dec- 07(op is valid up to 30- granted. issued unit to issued Operate Chest 04 erate) 01-2010 (C/31). install Granted. Institute, & 2. HCU has five Universi 18.07. applied for items ty of 08(CT consent to as per Delhi, E) operate under Air PO- Act on the Box.No- 10.09.07.& for general 2101, Consent to decisio Delhi-7 Establish on n taken 18.07.08. Noise on Monitoring 06.05.0 Report received , 8 . Call shows meeting on the norms. 30.10.0 8
15 Dr. B.R. 50 SW- 22- 24.10. 1.Authorization is CTE CTE Ask the Letter Consent to . Sur 038 Feb- 07 valid up to 30-10- granted. issued unit to issued Operate Hemopa 05 (opera 2010(C/46). install Granted. thic te) & 2Applied for five College 04.08. consent under Air items & 08 Act on 24.10.07. as per Hospital (CTE) Noise Monitoring , Report for DG the Nanakp Sets submitted. general ura, Shows meeting decisio Moti the norms. n taken Bagh, 3. Applied for on New Consent to 06.05.0 Delhi-22 Establish on 8 . Call 04.08.08 on 4. As per the 30.10.0 decision taken in 8 meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 16 Rajan 1155 NW- 02.Au 13- 1. SCN under Issue Notice Membe MS has Dr. Chetna to . babu 001 g-05 Nov- Rules 7 of BMW notice to issued r spoken speak to MS Hospital 07 Rules was issued the unit to Secreta to MS of of the on 21-2- , GTB apply for ry,DPC the Hospital. 2007(C/142) and Nagar, CTE and C, to Hospital, Kingswa 11-6-2007(C/142). correct all speak who has y Reply received Camp,D informed the to assured elhi-9 regarding deficiencie Medical to do the corrective s noted Superin needful measure taken during the tendent urgently. w.r.t BMW inspection. of the management. 3. As decided on Hospita 1-8-2007, D.O. l.. letter was issued on 17-8-2007 & 01.10.07 to Addl. Commissioner, MCD./ Commissioner MC D..4.Letters/Sever al representations received requesting permission to operate the Incinerator for trial testing since Hospital has installed APCD after issuance of Directions u/s 5 of EP Act (issued on 17.04.06 (c/112). 5.Application received for consent to operate however, noise monitoring report for DG Sets not submitted.6. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts7.. As per the general decision taken on 06.05.08, letter issued on 26.05 . 08 for installation of: (a) Solar water heating system(b) Rain water harvesting system(c) Replacement of ordinary Bulbs with CFL(d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 8.EE(BMW) had talked to the official (s)of the hospital . 10.Reply received dated 12-06- 08.w.r.t letter dated 26-05- 08.informing about doing the needful as directed . 11. As decided by the Committee an inspection of the Hospital was conducted on 24.07.08 & deficiencies were observed . Incinerator was not in operation. . Hospital is having 2 No 320 KVA DG Sets Without Acoustic Enclosure / acoustic treatment of the room.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 17 E.S.I Ho 250 E- 03.07. 14- 1. Authorization Dr. Joshi Dr. Joshi Membe MS has Dr. Chetna to . spital, 001 07 Mar- is valid up to 7-3- to speak to talked r spoken speak to MS Jhilmil, 08 2010 (C/132). MS and Secreta to MS of of the Delhi- 2.. Applied for resolve. ry,DPC the Hospital. 110095 consent under C, to Hospital, the Air Act on speak who has 14.03.08 along with Noise to assured Monitoring report Medical to do the of both DG sets Superin needful of 312.5 and 180 tendent urgently. KVA. As per the of the report the Hospita insertion loss l. meeting the prescribed norms. Stack monitoring report of the boiler not submitted. 3. . As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 4.Letter dated 10- 06-08 requesting for no objection certificate for installation of x- ray unit at hospital received. 5.As per the general decision taken on 06.05.08, letter issued on 26.05 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6.Letter dated 04.06.08 & 10.06.08 have been received wherein HCU has requested for issuance of NOC of X-Ray Unit. 7.EE(BMW) had talked to the official (s) of the hospital .
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 18 G.L. 97 N- 24- 17.06. 1. Authorization CTE CTE Ask the Letter Dr. Chetna to . Maternit 006 Apr- 08 is valid up to 30- granted. issued and unit(i) issued speak to MS y 07 (CTO) 5- However, Notice to of the Hospital & 2010(C/82).2.App notice may issued install Hospital. (MCD) , 17.06. lied for Consent be issued five Ajmeri 08( C to Establish & for items gate, TE) Consent to Kamla Operate on correction as per Market, 17.06.08. 3. Paid the the Delhi-6 balance fee of deficiencie general Rs. 17800 , s noted decisio asked earlier. 4. during the n taken Inspected on inspection. on 21.08.08 & 06.05.0 deficiencies 8 (ii) for observed w.r.t correcti compliance of on of BMW Rules deficien ( storage containers were cies by not containing 30.10.0 proper colour 8 plastin bags & were without labeling of Bio- hazard symbol. Isolated storage facility not provided for BMW. Incinerable BMW is sent to the incinerator of MVID Hospital which is also of MCD. For other plastic infected BMW ( Autoclavable waste) proper waste treatment /disposal facility not found. Stack height with the DG Set found inadequate.howe ver DG Set is having acoustic enclosure. 19 M.V.I.D 227 NW- 22- 20- 1.Applied under Air CTE CTE Ask the Letter Dr. Chetna to . Hospital 004 Dec- Apr- Act on 20-4-2007 granted. issued and unit(i) issued speak to MS (MCD), 04 07(CT (C/115). 2. D.O. letter was issued on However, letter to of the Kingswa & O)& 17-8-2007 & deficiencie issued install Hospital. y Camp, 09.06. 26.06. 01.10.07 to Addl. s noted in five Delhi-9 08 08(CT Commissioner, the items E) MCD./ Commissioner inspection as per MCD., seeking for must be the appropriate action w.r.t. deficiencies corrected general pointed (c/126). before decisio 3.As decided in the meeting on considerin n taken 18.03.08 letter for g the on deficiencies was renewal 06.05.0 issued including application 8 (ii) for seeking . correcti application for on of CTE under Air & deficien Water Acts 4.Applied for cies by renewal of 30.10.0 authorization on 8 09.06.2008.5.Reply dated 01-07-08.w.r.t letter dated 25-04- 08.regareding submission of test report of waste water generated from hospital was received.6. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system(c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7.Applied for renewal of authorization on 09.06.2008. 8. EE(BMW) had talked to the official (s)of the hospital .9. Reply received w.r.t letter dated 26.05.08. 10. Inspection was conducted on 24.07.08 & deficiencies were observed w.r.t the Incinerator & APCD Installed. 10.Pointwise reply dated 15.10.08, regarding correction of deficiencies observed during inspection on 24.07.08 received informing :(a) Bio- hazard symbols have been provided. Separate storage room for BMW provided.(b)E.T.P. installation will be carried out by the Engg.Deptt. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 20 Lal 100 E- 8- 28- 1. Authorization Reminder Letter Membe MS has Dr. Chetna to . Bahadur 002 Aug- Dec- is valid up to 30- letter be issued r spoken speak to MS Shastri 06 07 5-2010((C/197). sent Secreta to MS of of the Hospital 2. HCU submitted administrat ry,DPC the Hospital. , a letter on 18-7- ively to Pr. C, to Hospital, Khichrip 2007(C/220) Secy speak who has ur wherein they have requested (Health) to assured to know about the for getting Medical to do the justification of the Superin needful balance fee in Consent to tendent urgently. respect to Establish. of the authorization Hospita issued on 20-6- l.. 2007(C/197). 3. HCU was inspected and BMW management found as per rule. (C / 221).4. Reply received along with copy of letters to PWD for comments/conse nt applications.4. EE (BMW) talked to the official of the hospital as decided on 15.11.07 .5. Application received for consent to operate however, noise monitoring report for DG Sets and stack monitoring report for boiler not submitted. 6.As decided in the meeting on 18.03.08 letter for deficiencies was issued on 25.04.08 including seeking application for Consent to Establish under Air & Water Acts7.Reply received dated. 24-06-08.w.r.t latter dated 25- 04-08. 8.As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of:(a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building.10.EE(B MW) had talked to the official (s) of the hospital . 11. Reply received vide letter dated 07.08.08 stating that applied for CTE however CTE application not received so far. Also informed that NMR for DG Sets, Stack Monitoring report for incinerator ( VOC parameter not monitored) & Waste Water monitoring report submitted ( Bio- assay parameter not meeting the standards) 12. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) was issued. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 21 A&UTib 150 C- 22- 28- 1. Authorization Reminder Letter Membe MS has Dr. Chetna to . bia 007 Sep- Sep- is valid up to 30- letter be issued r spoken speak to MS College 06 06 5-2010. sent reply Secreta to MS of of the Hospital 2. HCU was administrat awaited ry,DPC the Hospital. , Karol inspected on 23- ively to Pr. C, to Hospital, Bagh, 8-2007(C/110) Secy speak who has New and the BMW Delhi-5 management (Health) to assured found as per rule. for getting Medical to do the 3. The stack the Superin needful height with the Consent to tendent urgently. DG set is yet to Establish. of the be increased. Hospita 6. Meeting taken l.. by Pr. Secy. (Health) on 25.09.07, HCU was directed ( in the meeting) to comply with norms/standards prescribed for DG Sets and submit compliance report along with the Noise Monitoring report to DPCC. However noise monitoring report not received. 4. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 5..As per the general decision taken on 06.05.08, letter issued for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6.EE(BMW) had talked to the official (s) of the hospital . 7. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 22 Dr. 500 NW- 02.08 13- 1. SCN under Issue Notice Membe MS has Dr. Chetna to . Baba 002 .07 Aug- EPA was issued notice for issued. r spoken speak to MS Saheb 07(CT on 23-3- corrections Secreta to MS of of the Ambedk O) 2007(C/68) & 11- of ry,DPC the Hospital. ar Not 6-2007(C/70) . deficiencie C, to Hospital, Hospit applie 2.As decided on s noted by speak who has Sector- d for 1-8-2007, D.O. 6, CTE. letter was issued inspection to assured Rohini on 17-8-2007 to team and Medical to do the , New Pr Secy also ask Superin needful Delhi- (Health).3. the unit to tendent urgently. 85al, Meeting taken by apply for of the Pr. Secy. (Health) CTE. Hospita on 25.09.07, l.. HCU was directed ( in the meeting) to inform DPCC about the rectification measures. 4.As decided in the meeting on 18.03.08 letter for deficiencies was issued on 21.04.08 including seeking application for Consent to Establish under Air & Water Acts 5..Reply dated 02.06.08 w.r.t. letter dated 21.4.2008 received regarding rectification of deficiencies observed during inspection 6.. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7 Inspection of the hospital was conducted on 20.08.08 & deficiencies were observed . Near the BMW Storage solid waste found spilled on ground & the condition was pathetic. Proper segregation of BMW not observed. Bio – hazard Symbol not provided over the Containers & on the storage site. Proper records keeping for BMW not observed. 8. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) was issued. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 23 LRS 515 S- 17- 06- 1. Authorization is To be Dr. Joshi Membe MS has Dr. T.K. Joshi . Institute 004 Jul-06 Aug- valid up to 7-3- 2010(C/248). ( with inspected talked. To r spoken Team to of 07 condition that HCU and Dr. be Secreta to MS of inspect and Tubercu (CTO) shall close down the Joshi to inspected. ry,DPC the report. Call losis, & CTE incinerator). speak to C, to Hospital, on Sri on 2. SCN u/s 21/22 of Air Act was issued on Director of speak who has 28.11.2008 Aurbind 27.10. 23-3-7(C/239) and the to assured o Marg 08 11-6-207(C/253). New 3. DO letter issued to hospital. Medical to do the Delhi-30 JS (Health), GOI. On Superin needful 01.10.07 seeking tendent urgently. replies of the notices issued on 23.03.07 & of the 11.06.07. Hospita 4. HCU applied for l.. consent to operate under Air Act on 6-8- 2007(C261) alongwith the noise monitoring report(C/255). 5.. HCU has also requested to operate the incinerator(C/252) as APCD has been installed. 6. ETP not installed. HCU Is having 520. Beds. 7. Letter was issued for the trial run of the incinerator seeking stack monitoring report within 30 days and the hospital to install the ETP. 8. The hospital has submitted stack analysis report but the parameter of Volatile Organic Compound was not analyzed for the ash generated from the incinerator. No information regarding ETP was submitted. No waste water analysis report was submitted. 9. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 10. Reply received w.r.t. letter dated 02.05.2008. CTE not applied. Analysis report of incinerator ash submitted however not within the limit. 11. As per the general decision taken on 06.05.08, letter issued for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 12.E(BMW) had talked to the official (s) of the hospital . 13.Reply received dated 13-06-08 w.r.t letter dated 26-05-08 regarding doing the needful as directed . 14.To be inspected as per the decision taken on 13.06.08 Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 24 Kasturb 450 C- 3- 17- 1. HCU has Chairman Letter Membe MS has Dr. Chetna to . a 004 Aug- Jan- applied For to write to issued r spoken speak to MS Hospital 06 05 Consent to Commissio Secreta to MS of of the , Near Operate under ner, MCD ry, the Hospital. Jama Air Act on 17-1- for CTE. DPCC, Hospital, Masjid, 2005. to who has New 2. As decided in Delhi-2 the meeting on speak assured 18.03.08 letter for to to do the deficiencies was Medical needful issued on Superin urgently. 21.04.08 including tendent seeking of the application for Hospita Consent to Establish under l.. Air & Water Acts 3. Reply received w.r.t. letter issued on 21.4.2008. NMR submitted. 4..Reply dated 03-06-08. received. 5. As per the general decision taken on 06.05.08, letter issued for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6. Another letter received on 14.07.08 w.r.t letter dated 26.05.08, informing that needful is being done. 7. As per the decision taken in meeting on 13.06.08 EE talked to officials of the hospital.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 25 Sardar 50 W- 7-Jul- 18- 1. As per Reminder Letter Case to As Hospital to . Valabh 206 06 Dec- direction HCU letter be issued be directed submit Bhai 07(CT was inspected on issued. taken by compliance Patel O) 19-3-2007(C/31) up on Chairma of Hospital and but BMW 30.10.0 n, file deficiencies , East CTE Management not 8. was w.r.t Patel on found as per rule. Nagar, 28.08. 2. Applied for submitte documents New 08 Consent however d. etcregarding Delhi-8 Noise Monitoring Consent report for DG application Sets not and submit submitted. waste water 3 As decided in details and the meeting on CGWA 18.03.08 letter for clearance. deficiencies was issued on 21.04.08 including seeking application for Consent to Establish under Air & Water Acts. 4. Reply dated 12-06-08. received w.r.t letter dated 21- 04-08. requesting one month time to submit required information . 5. Letter recived dated 07.07.08. 6. EE(BMW) had talked to the official (s) of the hospital . 7.Reply received. Sent copy of the letter dated 01.08.08. addressed to PWD for the compliance of the directions given by DPCC. 8. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 26 Nehru 100 S- 1- 5- 1. Authorization is Reminder Letter Membe MS has Consent to . Homeop 013 Dec- Dec- valid up to letter be issued r spoken Establish athic 06 06(Op 07.03.2010 2. Consent to issued. Secreta to MS of Granted. Medical erate ry,DPC the College, valid Operate is valid up to 07.03.2010. C, to Hospital, Defence upto 3. Noise Monitoring speak who has Colony, 07.03. Report for DG Set to assured New 10)) submitted for 125 Delhi-24 KVA DG.Set. Medical to do the 4. As decided in Superin needful the meeting on tendent urgently. 18.03.08 letter for of the deficiencies was Hospita issued including l.. seeking application for Consent to Establish under Air & Water Acts5. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system(c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6.Reply dated 12- 06-08,w.r.t letter dated 26-05- 08.received. Another letter DATED 29.07.08 received ( copy of letter addressed to Exe. Eng. PWD for compliance w.r.t. directions by DPCC. 7. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued. 8.Reply dated 1.10.08 received informing that Consent to Establish application will be submitted within 10 days.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 27 Satyaw 200 NW- 13- Not 1. HCU applied Reminder Letter Membe MS has Dr. Chetna to . adi Raja 278 Jun- Applie for authorization letter be issued r spoken speak to MS Harish 07 d on 13-6-7(C/56). issued. Secreta to MS of of the Chande 2. HCU did not ry,DPC the Hospital. r apply for consent C, to Hospital, hospital, to operate under speak who has Plot Air Act. No.30,S 3. SCU under to assured ector- BMW Rules was Medical to do the 7A, issued on 11-6- Superin needful Narela, 2007(C/46). tendent urgently. Delhi-40 4.. As decided on of the 1-8-2007, D.O. Hospita letter was issued l.. on 17-8-2007 to Pr Secy (Health). 5. Meeting taken by Pr. Secy. (Health) on 25.09.07, it was decided that MS of the Hospital should submit Consent application within 15 days. 6.. Talked to the official of the hospital as decided on 15.11.07.Howeve r Consent Application under Air Act not received. 7.. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 8. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 9.Copy of Communication to EE(PWD) received w.r.t. letter dated 26.5.2008. 10.EE(BMW)had talked to the official (s) of the hospital . 11. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) was issued. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 28 Jag 200 NE- 25- 20.11 1. Authorization Reminder Letter Membe MS has Dr. Chetna to . Pravesh 104 Oct- .07(O is valid up to 7-3- letter be issued r spoken speak to MS Chand 06 perate 2010 (C/29). issued. Secreta to MS of of the Hospital ) 2. SCN under Air ry,DPC the Hospital and (Shastri Act was issued C, to Hospital, explain the Park on 23-3- speak who has situation. Hospital 2007(C/28) and to assured ),Govt. 11-6- Medical to do the of NCT 2007(C/33).3. As Superin needful of Delhi, decided on 1-8- tendent urgently. Shastri 2007, D.O. letter of the Park,De was issued on Hospita lhi-53 17-8-2007 to Pr l.. Secy (Health). 4.As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 5..As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building .6..EE(BMW) had talked to the official (s) of the hospital . 7. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued. Letter dated 24.10.08 received from the hospital. 29 Norther 50 C- 20- 21- 1. Authorization CTE CTE Inform Letter Dr. Chetna to . n 010 Aug- Nov- is valid up to 7-3- granted. issued. the unit issued speak to MS Railway 04 07(op 2010(C/56). Committee Inspected to of the Division erate) 2 As decided in to inspect. alongwith correct Hospital. the meeting on al & Dr.T.K.Jos all the Hospital 21.07. 18.03.08 letter for hi on deficien , S.P. 08(CT deficiencies was Mukherj E) issued including 17.09.08 cies ee seeking noted Marg, application for by Delhi-6 Consent to inspecti Establish under on Air & Water Acts team 3. EE(BMW) had talked to the by official (s) of the 30.10.0 hospital. 8 4 Applied for CTE on 21.07.08. 5.Deficiencies observed during inspection are:- (i)Log book of BMW not maintained. (ii)Agreement with CBMWT expired and currently waste found stored in storage area is there for quite some time. (iii)Sharp waste management not proper. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 30 Ayurved 100 NW- 14.11 CTE 1. SCN under Air Chairman Letter Membe MS has Consent to . ic 008 .07 on Act (C/84) was to write to issued r spoken Establish Hospital 27.10. issued on 11-6-7 and BMW Rules Commissio Secreta to MS of Granted. , MCD, 08 & ner, MCD ry,DPC the Haiderp CTO (C/82 & C/85) was issued on 23-3-07 for CTE. C, to Hospital, ur, on and 11-6-2007. speak who has Delhi-52 27.10. 2..As decided on 1- to assured 08 8-2007, D.O. letter was issued on 17- Medical to do the 8-2007 & 01.10.07 Superin needful to Addl. tendent urgently. Commissioner, of the MCD./ Hospita Commissioner MCD., seeking l. consent and authorization application,. Applied for authorization on 14.11.07, 3. EE (BMW) talked to the official of the hospital as decided on 15.11.07. 4.Vide letter dated 18.12.07 informed regarding having DG Set of 75 KVA which is not working since 2005 and in future it will function under the Air Act. 5.. However Consent Application under Air Act not received so far. 5 As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 6 As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7. EE(BMW) had talked to the official (s) of the hospital . 8.Note received from RMS stating that necessary proceedings have been initiated and Engineering department has been apprised about the directions of DPCC. Claims that there is no BMW generation in the hospital being a Ayurvedic Hospital.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 31 Babu 100 NW- 29- 27.09. 1. Authorization CTE CTE CGWA Letter Issue . Jagjeev 009 Jun- 07(op is valid up to 7-3- granted. issued with clearan issued reminder for an Ram 06 erate) 2010(C/112). However, conditions ce to CGWA Memori & 2. Applied for CGWA be clearance. al 06.08. Consent.. Stack clearance filed. Hospital 08(CT Monitoring report to be filed Also , E) for DG Set Jahangi submitted, shows within 01 unit to rpuri, emissions within month. file Delhi-33 limit. Noise complia monitoring report nce for DG set(125 w.r.t 5 KVA) not conditio submitted. ns of 3.As decided in letter the meeting on dated 18.03.08 letter for 26.05.2 deficiencies was issued including 008. seeking application for Consent to Establish under Air & Water Acts 4. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 5.EE(BMW) talked to the official (s) of the hospital 6. Reply Received. 7. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 32 Majeedi 136 S- 23- 08.10. 1. Authorization Dr. Joshi Dr. Joshi Membe MS has Issue . a 009 Feb- 07(op under BMW to speak to talked r spoken reminder for Hospital 07 erte) Rules is valid MS and Secreta to MS of installation of , Jamia upto 7-3- expedite. ry,DPC the ETP and also Hamdar 2010(C/180). C, to Hospital, for applying d, 2. SCN u/s 21/22 speak who has for CTE. Call IHMMR of Air Act was Campus issued on 23-3- to assured on , 2007 and 11-6- Medical to do the 28.11.2008 Hamdar 2007(C/179 & Superin needful d C/196). tendent urgently. Nagar, 3. HCU submitted of the New the reply that in Hospita Delhi- response to l. 110 062 SCN(C/195) with the remarks that there is no DG set being operated by the hospital, however they get the electricity in case of no power from DG set being operated by Hamdard University. 4.As decided on 1-8-2007, D.O. letter was issued on 17.08.07 toJt.Sec y(Health), GOI. S eeking consentap plication. .5. Applied for Consent to Operate on 08.10.07. Letter received. 6.As decided in the meeting on 18.03.08 letter for deficiencies was issued on 29.04.08 including seeking application for Consent to Establish under Air & Water Acts 7..Reply dated 22-05-08.w.r.t letter dated 29- 04-08. received. 8. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 9.EE(BMW) had talked to the official (s)of the hospital. 10. As per the decision taken in meeting on 13.06.08 letter was issued from MS,DPCC 11. Letter dated 23.10.08 received on 27.10.08.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 33 Jai 200 SW- 7- 27.09 1. HCU was Dr. Joshi Dr. Joshi Membe MS has Dr. Chetna to . Prakash 131 Sep- .07(C inspected on 19- to speak to talked. r spoken speak to MS Narayan 06 TO)& 3-2007(C/50) and MS and Secreta to MS of of the ApexTra Applie BMW expedite. ry,DPC the Hospital. uma d for Management C, to Hospital, Centre, CTE. found as per rule, speak who has Ansari but ETP was not Nagar, in operation. to assured Raj 2. HCU had not Medical to do the Nagar, submitted waste Superin needful New water test report tendent urgently. Delhi-29 3. Applied for of the Consent to Hospita Operate on l.. 27.09.07. Noise monitoring report for DG set received from DPCC lab. 4..As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 5.Reply received. 6. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7. As per the decision taken in meeting on 13.06.08 a common letter to Jt. Secy(Health) with copy to D.G. (CPWD) from chairman, DPCC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 34 Hedgew 200 E- 14-3- 19.12. 1. Authorization is CTE CTE Call for Letter Dr. Chetna to . ar Arog 158 07 07(op valid up to 30-5- granted issued complia issued speak to MS ya erate) 2010 (C/67). 2. SCN under Air subject to along with nce of of the Sanstha & the conditions. decisio Hospital. n, 20.08. Act was issued on 11-6-2007(C/65) condition n taken Opposit 08(CT since HCU had not the effluent on e E) applied for consent status, 27.08.2 CPCB, under Air Act. Karkard 3. As decided on 1- noise 008. ooma, 8-2007, D.O. letter monitoring east was issued on 17- report and Arjun 8-2007 to Pr Secy CGWA Nagar, (Health).4. clearance Delhi-32 Meeting taken by Pr. Secy. (Health) will be filed on 25.09.07, it was within 01 decided that MS of month. the Hospital should submit Consent application within 15 days and to inform DPCC for rectification measures taken w.r.t. deficiencies pointed out in the meeting. 5. EE (BMW) talked to the official of the hospital as decided on 15.11.07. 6.. Application for consent to operate received along with affidavit. The application reveals having two boilers (HSD fired) and two DG sets of 62.5 KVA,( without acoustic enclosure).Stack monitoring report not submitted. 7.. As decided in the meeting on 18.03.08, letter for deficiencies was issued on 21.04.08. Reply received. 8. Letter dated 26- 05-08 was issued as per the decision taken on 06.05.08. 9..Reply dated 09- 06-08 received w.r.t letter dated 21-04-08.regarding doing the needful as directed. 10. As per the general decision taken on 06.05.08, letter issued for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 11.Reply received w.r.t. letter dated 21.4.2008. EE(BMW) talked to the official (s) of the hospital 12.As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) was issued. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 35 Delhi 500(P SW- 22- 09.07. 1. The CTE CTE Dr. T.K. To be Issue . Govern ropos 135 Sep- 08( construction of granted issued. To Joshi’s inspecte Consent to ment ed 05 for HCU not started. and to be be team to d Establish for Hospital Hospi CTE) 2. Letters were inspected. inspected inspect. 750 beds. , tal) issued on 23-3- Sector- 2007 (C/9) and 9, 11-6-2007(C/10). Dwarka, 3. It was decided New in the meeting Delhi held on 1-8-2007, that at that time no action was warranted on part of DPCC as the HCU was not in operation. 4.. As decided in the meeting on 18.03.08, letter for deficiencies was issued on 26.05.08.. 5. Reply dated 16-06-08 w.r.t. letter dated 26.5- 08.received. 6. Applied for Consent to Establish . 7. Letter received from Directorate of Health Services referring that the matter is being looked after by PWD. 8. Environmental Clearance obtained from MOEF. 9. As per the decision taken in meeting on 13.06.08 EE talked to the officials of the hospital. 10.Consent to Establish was issued for 500 beds since Environmental Clearance was given by MOEF for 500 beds. 11. Letter dated 01.10.08 received stating that Consent to Establish is issued for 500beds whereas they have applied for consent to establish for 750beds asking for rectification of the same.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 36 Hindu 980 N- 5-Apr- Not 1. HCU was Dr. Joshi Dr. Joshi Membe MS has Dr. Chetna to . Rao 001 06 Applie inspected on 20- to speak to talked r spoken speak to MS Hospital d for 3-2007(C/207) MS and Secreta to MS of of the Delhi – Rene during which expedite. ry,DPC the Hospital. 110 wal BMW C, to Hospital, 007l. management speak who has found satisfactory but incinerator to assured was not in Medical to do the operation. Superin needful 2. SCN under Air tendent urgently. Act was issued of the on 11-6- Hospita 2007(C/210) but l.. HCU did not apply for consent under Air Act.3. HCU requested to extend the time limit for installation of ETP(C/211). 4. As decided on 1-8-2007, D.O. letter was issued on 17-8-2007 to Addl. Commissioner (Health), MCD5. As decided on 1- 8-2007, D.O. letter was issued on 17-8-2007 & 01.10.07 to Addl. Commissioner, MCD./ Commissioner MCD., seeking consent application under Air Act. 6. Letter dated 08.10.07 received and informed that matter regarding ETP is under process and will be finalized at the earliest.7. EE (BMW) talked to the official of the hospital as decided on 15.11.07.8. However Consent Application under Air Act not received so far. 9. ..As decided in the meeting on 18.03.08 letter for deficiencies was issued on 21.04.08 including seeking application for Consent to Establish under Air & Water Acts10. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building.11.EE(B MW) talked to the official (s) of the hospital 12.Reply dated 24-06-08. w.r.t latter dated 21- 04-08 and 26-05- 08. received informed doing the needful as directed. 11. As per the decision taken in meeting on 13.06.08 EE talked to officials of the hospital. 12. Letter dated 24.10.08 received. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 37 Rao 100 SW- 7- Not 1. Authorization Reminder Letter Membe MS has Dr. Chetna to . Tula 003 Nov- Applie is valid up to 7-3- letter be issued r spoken speak to MS Ram 06 d 2010(C/164). issued. Secreta to MS of of the Memori 2. SCN u/s 21/22 ry,DPC the Hospital. al of Air Act was C, to Hospital, Hospital issued on 01-5- speak who has , 2007(C/165) and Jafferpu on 11-06- to assured r, Delhi 2007(C/173) Medical to do the 3. Reply was Superin needful received with the tendent urgently. remark that of the APCD has been Hospita installed with l.. incinerator and stack report is also submitted and the installation of ETP is under process with PWD(C/172) . 4. Reply received to SCN u/s 21/22 with the remark that they have applied for consent under air act but the same has not been received(C/168). 5. Inspection was conducted on 9-7-2007 and BMW Management found as per rule. ( i/r at page 174- 175) 6. Incinerator was not in operation as the incinerable waste was not there. 8. Earlier spoken to Medical Superintendent of the Hospital, and it was informed that the Matter is under process and the application for consent under Air Act will be submitted very shortly. 9. Meeting taken by Pr. Secy. (Health) on 25.09.07, it was decided that MS of the Hospital should submit Consent application within 15 days. Not Applied for Consent though submitted required fee for DG set monitoring. 10. EE (BMW) talked to the official of the hospital as decided on 15.11.07. 11. However Consent Application under Air Act not received so far. 12. The hospital was inspected by a three member team headed by Dr. T.K.Joshi, on 27.02.08 and the records for incinerator revealed that incinerator was not operated during the period 19.11.07 to 03.12.07 and for the period 22.01.08 to 12.02.08 and the reasons could not be explained for the non-operation of the incinerator. It was also revealed from the records maintained that temperature in the secondary chamber of the incinerator is for below the prescribed temperature. 13. .As decided in the meeting on 18.03.08 letter for deficiencies was issued on 19.05.08 including seeking application for Consent to Establish under Air & Water Acts 14.Reply dated 12.06.08 enclosing Copy of communication to PWD regarding NMR, stack report and non operation of incinerator submitted. 15. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of : (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building.
16.EE(BMW) talked to the official (s) of the hospital.l 17. Reply received.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 38 Chacha 216 E- 1- 02.04. 1.Earlier Reminder Letter CTE CTE Authorization . Nehru 179 May- 08(CT Authorization was letter be issued. Dr. granted issued under BMW Bal 07 O) valid upto 22-3- issued.and Joshi subject Rules Chikats and 2007(C/13). Dr. Joshi talked to ETP Granted alya, CTE to speak to installat subject Geeta on 2. .As decided in MS. ion. to the Colony, 01.09. the meeting on Delhi- 08 18.03.08 letter for condition that 110 031 deficiencies was ETP will be issued on installed 21.04.08 within 3 including seeking months application for Consent to Establish under Air & Water Acts 3. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 4.EE(BMW) had talked to the official (s) of the hospital. 5..Reply dated 11-06-08. w.r.t latter dated 21- 04-08.and 26-05- 8. received regarding doing the needful as directed 6. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued. 7. Representation recived regarding grant of Authorization.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 39 Guru 100 W- 13- 19- 1. Authorization CTE CTE File Letter Dr. Chetna to . Gobind 006 Mar- Dec— was valid up to granted. issued with complia issued speak to MS Singh 07 07(Op 16-4-2007(C/42). Unit may conditions. nce of of the Govt. erate) 2. Application be asked decisio Hospital. Hospital & received for to expedite n taken , 03.07. consent however, Raghubi 08(CT noise monitoring the on r Nagar, E) report for DG installation 27.08.0 New Sets not of ETP 8 and Delhi- submitted. and w.r.t let 110 027 Waste water test ground ter report received water dated showing the parameters clearance 26.05.0 within from 8. prescribed limits. CGWA 3. . .As decided in within 01 the meeting on month. 18.03.08 letter for deficiencies was issued on 21.04.08 including seeking application for Consent to Establish under Air & Water Acts 4.. Reply received w.r.t. letter dated 21.4.2008. 5. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6.EE(BMW) had talked to the official (s)of the hospital. 7. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued. 8.No reply. 9. A copy of the Letter sent to Ex. Engr. PWD received asking PWD to expedite the installation of ETP and also to take CGWA clearance.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 40 Lady 1227 ND- 9- Applie 1. HCU applied Dr. Joshi Dr. Joshi Membe MS has Dr. Chetna to . Harding 001 May- d for authorization to speak to talked r spoken speak to MS Medical 07 on 9-3- MS/Princip Secreta to MS of of the College 2007(C/555). al and ry,DPC the Hospital. and 2. Authorization expedite C, to Hospital, Associat was valid up to speak who has ed 16-5- Hospital 2007(C/359). to assured , New 3. HCU applied Medical to do the Delhi for Consent to Superin needful Operate under tendent urgently. Air Act. of the 4. Letter issued Hospita on 28.12.07 l. asking Stack Monitoring report of Boilers as well as incinerator & for providing acoustic treatment/ enclosure for the 2 DG Sets of 160 KVA each , noise monitoring report for the DG Sets & also for installation of ETP. Reports/ Reply to the said letter received. 5. As decided in the meeting on 18.03.08, letter for deficiencies was issued on 25.04.08.. 6. Reply received w.r.t. letter dated 25.4.2008. 7.As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 8.EE(BMW) had talked to the official (s) of the hospital 9. As per the decision taken in meeting on 13.06.08 a common letter to Jt. Secy(Health) with copy to D.G. (CPWD) from chairman, DPCC was issued. 10.Reply dated 08.10.08 received regarding compliance of letter dated 26.05.08 informing: (i)Solar water heating systems were installed in the new building & 3 more are being installed.(ii)There are 17 Rain Water Harvesting pits in the institutional Area & 12 in residential area. (iii)Replacement of the ordinary bulbs with CFL is being carried out in phased manner.(iv)For ETP installation mentioned that 2 ETPs have to be installed for which necessary funds are not available & likely to be sanctioned in next financial year. Till then working only on the installation of 1 ETP and project estimate is enclosed, but no such enclosure found along with letter. (v)There are ample of trees present. Informed that Stack monitoring repots & Noise monitoring reports will be submitted as soon as they get it from NPC. Informed that Energy Auditing has been carried out in 2007 & accordingly all the energy saving measures are being taken. 11Monthly report of Bio-Medical Waste Management submitted. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 41 Central 150 W- 4- Not 1.Authorization is Reminder Letter Membe MS has Dr. Chetna to . Jail 005 Aug- Applie valid up to 1-7- letter be issued r spoken speak to MS Hospita 06(vali d 2009(C/124) was issued. Secreta to MS of of the l, Tihar d) issued with the condition that HCU ry,DPC the Hospital. will apply for C, to Hospital, consent under Air speak who has Act within two to assured months time. 2. Meeting taken by Medical to do the Pr. Secy. (Health) Superin needful on 25.09.07, it was tendent urgently. decided that MS of of the the Hospital should Hospita submit Consent application within l. 15 days. However Consent Application under Air Act not received so far. 3. Talked to the official of the hospital as decided on 15.11.07. 4. However Consent Application under Air Act not received so far. 5..As decided in the meeting on 18.03.08 letter for deficiencies was issued on 25.04.08 including seeking application for Consent to Establish under Air & Water Acts 6. Reply received informing that the matter has been referred to PWD in respect to letters received from DPCC. List of Lab was sought which was faxed to the hospital. 7. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of : (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 8.EE(BMW) talked to the official (s) of the hospital. 9.Reply dated 27- 05-08.w.r.t letter dated 25-04-08.& letters received on 08.07.08 w.r.t letter dated 26.05.08.mentionin g that to communicate with Prison Head Quarters for the necessary action. 10. As per the decision taken in meeting on 13.06.08 EE talked to officials of the hospital. 11.Received Copy of the letter sent to Superintendent Engineer, PWD forwarded. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 42 ESI 150 S- 22- Not 1. Earlier Dr. Joshi Dr. Joshi Membe MS has Dr. Chetna to . Hospital 012 Oct- Applie Authorization was to speak to talked r spoken speak to MS , Shree 07 d valid up to 2-11- DG and Secreta to MS of of the Maa 2007(C/135). expedite. ry,DPC the Hospital. Anandm 2. Applied for C, to Hospital, ayi renewal of speak who has Marg, Authorization Okhla under BMW to assured phase- Rules on Medical to do the 1, New 22.10.07 Superin needful Delhi- 3D.O. letter tendent urgently. 110020 issued to Jt. of the Secy. (Labour) Hospita GOI with copy to l. DG ESI. Reply received from JS. 4. Talked to the official of the hospital as decided on 15.11.07. 5. However Consent Application under Air Act not received so far. 6. .As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 7. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 8. EE(BMW) had talked to the official (s) of the hospital
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 43 ESI 100 NW- 05- 20- 1. Authorization Dr. Joshi Dr. Joshi Membe MS has Ask the . Hospital 010 Oct- Jul-05 was valid up to 1- to speak to talked r spoken Hospital to , Sector- 07 (CTO) 11-2007(C/91). DG and Secreta to MS of properly fill 15. & 2. Applied for expedite. ry,DPC the up the CTE Rohini 18.07. renewal of C, to Hospital, form and 08(CT authorization on speak who has submit O), 05.10.07 CTE 3 D.O. letter to assured compliance on issued to Jt. Medical to do the of earlier 24.10. Secy. (Labour) Superin needful decisions of 08. GOI with copy to tendent urgently. BMW DG ESI. Reply of the Committee. received from JS. Hospita 4. Talked to the l. official of the hospital as decided on 15.11.07. 5. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 6. As per the general decision taken on 06.05.08, letter issued ON 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7.EE(BMW) talked to the official (s) of the hospital 8.Letter dated 12-06-08 and 16-06- 08.w.r.t letter dated 26-05- 08.receiverd , asking for time upto 31-10-08, for necessary installation.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 44 Institute 190 NE- 5- 17.07. 1. Authorization CTE CTE CGWA Letter Dr. Chetna to . of 003 Aug- 08 is valid up to 4-8- granted issued with clearan issued speak to MS Human 05(vali (Oper 2008(C/109 of subject to conditions. ce and of the Behavio d) ate)& the concerned condition noise Hospital. ur & 04.08. file). ETP monitor Allied 08(CT 2. Applied for installed ing Science E) renewal of s, Near Consent to expeditiou report GTB Operate on sly and be Hospital 15.01.08. noise filed. , 3. Acoustic monitoring Dilshad Enclosure report and Garden provided for DG CGWA Set of 2x 625 clearance KVA & for other to be filed DG Set, (180 within 01 KVA DG Set) it is month. informed that it is not in operation ( acoustic enclosure not provided). Noise Monitoring Report for DG Set not submitted. 4.. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 5. As per the general decision taken on 06.05.08, letter issued ON 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6.EE(BMW) had talked to the official (s) of the hospital 7. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued. 8. CTE granted as per decision taked on 27.08.08. 9. Communication along with effluent test report from DPCC lab and a copy of letter addressed to HOD, Deptt. of Microbiology of IHBAS received. Parameter of Bio Assay not done.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 45 Palika 50 S- 09- Not 1. Authorization Reminder Letter Membe MS has Dr. Chetna to .. Maternit 018 Aug- Applie is valid up to 30- letter be issued r spoken speak to MS y 05 d 01-2010(C/128). issued. Secreta to MS of of the Hospital 2. SCN u/s 21/22 ry,DPC the Hospital. , Lodhi of Air Act was C, to Hospital, Colony , issued on 11-6- speak who has New 2007(C/137) but Delhi-3 HCU did not to assured apply under Air Medical to do the Act. Superin needful 3. As decided on tendent urgently. 1-8-2007, D.O. of the letter was issued Hospita on 17-8-2007 to l. Chairperson, NDMC.. 4. Letter issued seeking consent application under Air Act , HCU s has informed in its reply that there is no Boiler and DG Set in the Hospital and also informed that installed incinerator is not functional ( closed) 5. Talked to the official of the hospital as decided on 15.11.07. 6. As decided in the meeting on 18.03.08 letter for deficiencies was issued including seeking application for Consent to Establish under Air & Water Acts 7.EE(BMW)had talked to the official (s) of the hospital As per the decision taken in meeting on 13.06.08 a letter from Chairman ,DPCC to Chairman,NDMC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 46 Internati Nil SW- 21- 1. This is a case CTE CTE Compli Letter Dr. Chetna to onal 054 Mar- Applie of Research granted issued with ance of issued speak to Centre 05 d for Centre subject to conditions. decisio Concerned (Veterinary) of for and CTE & condition n of official. Govt , which is Genetic on CTO that noise 27.08.0 Enginee 11.06. engaged in on monitoring 8 to be ring & 08 (for 11.07. research activities report and filed by Bio renew 08 related with Tech, al) veterinary / CGWA 30.10.2 ICGEB Genetic clearance 008. Engineering & Campus to be filed have applied for , P.O. within 01 authorization Box under BMW month. 10504, Rules. Provisional Aruna Authorization Asaf Ali granted earlier Marg, was valid upto Delhi 05.11.2002. -67. Application for renewal was received on 21.03.05.which was placed before the BMW Committee No. 3, in its meeting held on 18.10.07, and it was decided by the said Committee that being a case of research institute, put up on file for deciding which BMW Committee should deal this case . The matter was put in fil e and as decided by MS, DPCC, this case has been included in the cases to be dealt by BMW Committee No.1. 2. The Institute has installed an incinerator for the disposal of BMW. and submitted stack monitoring report dated 19.05.05. showing parameters within the prescribed limits.3. Two DG Sets of capacity 625 KVA each found installed without acoustic enclosure during the inspection carried out on 27.06.05 .4. As decided in the meeting on 18.03.08, letter for deficiencies was issued. 5. Applied fresh on 11.06.08 for renewal of authorization under BMW Rules. Applied for Consent to Establish & Operate on 11.07.08.\ 6. EE (BMW) talked to the official (s) of the hospital. The HCU has submitted reply in response to the letter dated 02.05.2008 and has submitted balance fees.7. Inspection was conducted on 30.07.08 & deficiencies were observed w.r.t BMW rules. Work for installation of acoustic enclosure for DG Sets was going on for the 2 DG Sets of 625 KVA each. .Third DG Set is having inbuilt Acoustic Enclosure. ETP found installed.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 47 Bhagwa 200 NW- 19- 20- 1. This is a Reminder Letter Membe MS has Dr. Chetna to n 301 Mar- sep- case of letter be issued r spoken speak to MS Mahavir 07 07 Delhi GOVT. issued. Secreta to MS of of the Hospital ry,DPC the Hospital. , H – Hospital having 200 C, to Hospital, 4/5, beds. speak who has Pitampu 2. Earlier to assured ra, Delhi authorizati -34. on was Medical to do the granted Superin needful under tendent urgently. BMW of the Rules Hospita which was valid upto l.. 19.04.07. 3. The Hospital was inspected on 30.09.05 & two DG Sets of 750 KVA each were found with acoustic enclosure. Noise monitoring report of DG Sets not submitted. As per application DG Sets stack height is not adequate. 4. The BMW is disposed through M/s Synergy Waste Manageme nt Pvt. Ltd. 5. As decided in the meeting on 18.03.08, letter for deficiencie s was issued on 24.04.08 includind seeking CTE.. 6. Reply received w.r.t. letter dated 24.4.2008. 7. As per the general decision taken on 06.05.08, letter issued ON 26.05.08 for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 8. EE(BMW) talked to the official (s) of the hospital. 9.Reply dated 10.06.08 received w.r.t. letter dated 24.4.2008 regarding submission of reports w.r.t 2 DG sets and waste water generated in the hospital was received. 10 Reply dated 23- 06-08.w.r.t latter dated .26-.05-8 was received regarding doing the needful as directed 11. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 48 Swami 230 NE- 01- 10- 1. Authorization While CTE Letter Ask the Letter Dr. Chetna to 002 May- Jul- is valid up to 7-3- application issued unit to issued speak to MS Dayana 05 05(CT 2010. has been Inspected install of the nd O 2. Consent to received, it alongwith ETP Hospital. Hospital valid Operate is valid cannot be Dr. T.K. and file upto up to 30-5-2010. , processed Joshi on CGWA Shahdar 30.05. 3. As decided in since 17.09.08 clearan a , 10)& the meeting on Delhi-32 24.06. 18.03.08, letter wastewate ce. 08(CT for deficiencies r E) was issued on generation 02.05.08. Reply and its received vide treatment letter dated details are 09.06.08 not regarding submitted submission of and also reports for DG submit Sets & waste water test report. CGWA 4. Applied for clearance. Consent to MS to Establish. inform MS 5. As per the accordingl general decision y. taken on 06.05.08, letter issued on 26.05.08 for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6.Reply received in response to letter dated 02.05.2008. 7.EE(BMW) talked to the official (s) of the hospital. 8.Reply dated 10- 06-08,w.r .t letter dated 26-05- 08.received informing about doing the needful as directed . 9.Deficiencies observed during inspection are:- (i)Bins found absent at storage area bags were kept on ground. (ii)Puncture proof containers found absent. (iii)ETP installation is under consideration. 10.submitted reply of the letter issued w.r.t. decision on meeting of 27.08.08 informing: CTE applied, Waste water generation is 400KLD, process of ETP installation started, enquiring about status of ground water from concerned works & electric deptt. Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 49 MCD 55 S- 28- Not 1. Authorization Reminder Letter Membe MS has Dr. Chetna to Chest 236 Dec- Applie is valid till 30-10- letter be issued r spoken speak to MS Clinic 04 d 2010(C/80). issued. Secreta to MS of of the and 2. SCN u/s 21/22 ry,DPC the Hospital.. Hospital of Air Act was C, to Hospital, , Nehru issued on 11-06- speak who has Nagar, 2007(C/82) since New HCU had not to assured Delhi- applied under Air Medical to do the 65 Act. Superin needful 3. HCU submitted tendent urgently. the reply on 26-7- of the 2007(C/102) Hospita wherein it is l. mentioned that the DG set is out of order and not being used by them. 4. As decided in the meeting on 18.03.08, letter for deficiencies was issued on 02.05.08 including seeking application for CTE. 5. Reply received w.r.t. letter dated 02.05.08. Required documents not submitted instead asked whether it is necessary to obtain consent under Air / Water Acts. 6. EE(BMW) talked to the official (s) of the hospital & clarified the position that it is required.to apply for CTE. 7. Another letter dated 09.08.08 received . It is informed that PWD has been requested to provide information so that need ful can be done as directed by DPCC. It is also informed that neither Incinerator nor DG Set is working.since 2002. Letter received.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 50 Maharis 100 NW- 30- 26- 1. Authorization CTE CTE Compli Letter Dr. Chetna to hi 011 Jan- Mar- is valid up to 30- granted issued with ance of issued speak to MS Balmiki 04 07 01-2010 (C/84). subject to conditions 27.08.0 of the Hospital ( oper 2..Consent to the 8 Hospital. , Pooth ate Operate granted conditions decisio khurd , valid under Air Act as to submit n. Call New upto decided on Delhi-39 03.10. 04.10.07& valid CGWA on 10) upto 03.10.2010. clearance 30.10.2 & 3.. As decided in and proper 008. 07.07. the meeting on affidavit 08( C 18.03.08, letter will be filed TE) for deficiencies within 01 was issued. month. 4.. As per the general decision taken on 06.05.08, letter issued on 26.05.08 for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 5. Copy of communication to EE(PWD) by the HCU submitted w.r.t the letters issued by DPCC vide letter dated 11.06.08.6. Another letter received from the Hospital on 10.07.08 stating the matter has been referred to PWD. 6. As per the decision taken in meeting on 13.06.08 a common letter to Pr. Secy(Health) with copy to Pr.Secy(PWD) from chairman, DPCC was issued.
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 51 Dr. 52 E- 17- Not 1. Authorization Reminder Letter Membe MS has Dr. Chetna to Shyama 004 Aug- Applie is valid up to 7-3- letter be issued r spoken speak to MS Prasad 06 d 2010(C/56). issued. Secreta to MS of of the Mukherj 2. HCU reply to ry,DPC the Hospital. ee the SCN under C, to Hospital, Chest Air Act with the speak who has Hospital undertaking that , Patpar no DG set is in to assured ganj, operation(C/58). Medical to do the Delhi-91 3. As decided in Superin needful the meeting on tendent urgently. 18.03.08, letter of the for deficiencies Hospita was issued on l.. 26.05.08. 4.Reply dated 12- 06-08.w.r.t letter dated 26-05-08. received.Another letter received on 10.07.08. 5. EE(BMW) talked to the official (s) of the hospital. 6. Letter was received. 52 Constru 200 ……. Applie 1.Information CTE CTE Ask the Letter Dr. Chetna to . ction of d for regarding granted. issued unit to issued speak to 200 CTE. Construction of file Concerned Bedded 200 Bedded item- Official. hospital hospital at wise at Kokiwala Bagh , complia Kokiwal Ashok Vihar, a Phase-IV, Delhi- nce of BaghAs 52 retrieved by Environ hokViha CMC from the mental r, web site, was Cleara Phase- forwarded to nce IV, BMW cell and the conditio Delhi- same was ns 52. placed before the through Corresp committee. As an ondenc per the retrieved affidavit e information, . Call Address project involves - construction of on Exe.Eng general hospital 30.10.2 ineer,Se on a plot area of 008 ctor- 20105. 34 Sq.m 6,Rohini and the total , Delhi proposed builtup -85. area is 54298.05 Sq.m. 2. Letter was issued. Reply dated 20-06- 08.Regarding environmental clearance received . 3. Applied for Consent to Establish. Copy of Environmental Clearance from MOEF Received. 4. Site Inspected on 20.08.08. Construction of the hospital not started so far.. Boundary Wall /Fencing Exists. Gate of the boundary found locked .
Sl Name Bed Dist. Author Conse Status of the Decision Action Decisio Action Decision No and (No.) No. ization nt Case / Remarks Taken on Taken w.r.t. n Taken Taken Taken on . Address Applic Applic 27.08.08. Meeting on on w.r.t. 30.10.08 of HCU ation ation 27.08.08 29.09.0 Meeting Date Date 8 on 29.09.08 53 National ----- S- 3-Jun- Not 1. This is a Reminder Letter Membe MS has Dr. Chetna to Institute 149 04 applie research may be issued r spoken speak to of d Institute. Earlier Immunol issued. Secreta to MS of concerned the case dealt by ry,DPC the Official. ogy, BMW Committee Aruna C, to Hospital, No. 3 and as Asaf Ali speak who has decided case Marg, to MS assured New transferred to Delhi-67 Committee No. 1. of the to do the 2. Authorization Hospita needful is valid upto l. urgently. 30.04.09. 3. Not applied for consent to establish. 4. Letter dated 15.10.08 received asking for time to submit the form as testing of noise level of D.G. set and stack monitoring is in process. 54 Moti 81 W- 25- Not 1. This is a Ask unit to Letter Membe MS has Dr. Chetna to Nagar 015 Oct-07 applie hospital of apply for issued r spoken speak to MS Hospital d for Govt of CTE. Send (Acharya Secreta to MS of of the CTO. Delhi. copy to Pr. ry,DPC the Hospital. Bhikshu Not 2. Earlier Secy. Hospital) C, to Hospital, , Govt. of Applie authorizati Health. Delhi, d for on was speak who has Moti CTE. granted to assured Nagar, valid upto Delhi-15 Medical to do the 08-04-07. Superin needful 3. Not tendent urgently. applied of the for CTO. Not Hospita Applied l.. for CTE.
Annexure 3 Decisions taken by the BMW Committee No.1 ,in the Meeting Held 30.10.08, w.r.t Agen da No.3 (Issue regarding letters issued for acoustic enclosure, noise monitoring report for DG sets, affidavit for compliance, in respect Health Care Units / Nursing Homes)
A representation has been received from DMA Nursing Home & Medical Establishment Forum regarding the Show Cause Notices u/s 21 of the Air Act , issued to Nursing Homes by DPCC. 159 Show Cause Notices u/s 21 of the Air Act were issued to Health Care Units /Nursing Home which had not applied for consent to DPCC (The HCU was required to apply for consent, if having DG Set or Boiler and if not an affidavit was sought in this regard ) based on the decision taken by the BMW Committee No. 2 in its meeting held on 31.07.07. On the said Representation, Chairman, DPCC, had directed that they will file an affidavit stating they will put acoustic enclosures within 3 months. Let them do so & then put up in CMC (BMW) on 15.11.07.
Decision Taken by the BMW Committee No.1, in the Meeting on 15.11.2007: A letter be issued to DMA Nursing Home & Medical Establishment Forum informing that Nursing Homes having DG Set(s) are required to provide proper acoustic enclosure for DG Set(s) / acoustic treatment of the room where DG Set( s) is installed to meet the prescribed norms for DG Set and also required to provide adequate stack height with the DG Set(s) . Three months time given for compliance of the above and also for submission of Noise Monitoring report ( after providing Acoustic Enclosure / Acoustic treatment of the room) from any of the Empanelled laboratories by DPCC. They will also submit an Affidavit regarding compliance of the above within 3 months. Similar letter be issued in case of other Health Care units mentioned above (which have been issued Show Cause Notice u/s 21 of Air Act.). Action taken w.r.t. decision taken on 15.11.07: Letter issued to DMA Nursing Home & Medical Establishment Forum. Reply received from DMA and informed that they have written to their members to comply with section 21/22 of Air Act at the earliest and install a proper acoustic enclosure for DG Set (s) , acoustic treatment of the room where DG Set(s) is installed to meet the prescribed norms for DG Set and get them approved by the laboratories empanelled by DPCC. An Affidavit has also been submitted by the President of the said DMA Nursing Home & Medical Establishment Forum, in this regard. It is informed in the Affidavit that above requirement shall be fulfilled on or before 27.02.2008. Letters issued to the aforementioned Health Care units including 38 Nursing Homes. Decision Taken on 15.01.08 In view of the affidavit filed by the President of the DMA Nursing Home & Medical Establishment Forum, the case of the DG sets of Nursing Homes in BMW Cell be taken in March, 2008. By that time BMW Cell, may prepare list of Nursing Homes which have not confirmed regarding providing acoustic enclosure and noise monitoring. Action taken w.r.t. decision taken on 15.11.07 & 15.01.08 Status of the Health Care Establishments including 38 Nursing Homes which were issued letters after the decision taken on 15.11.07 is summarized below; (i) .Letters issued to HCUs : 160 (ii). No response / no reply : 121 (iii). Compliance affidavit submitted (w/o NMR) : 1 (iv). Noise Monitoring Report (NMR) received : 15 (in 1case old NMR and in 1 case consent to operate + NMR) (v). Letter received regarding no DG set : 7 (vi). Letter / Misc. Representation received : 11 (vii). Application submitted for Consent to Operate : 5 Decision Taken By the BMW Committee No.1, in the Meeting Held on 18.03.08 :
Member Secretary, DPCC, to call the Office Bearer of the DMA Nursing Home & Medical Establishment Forum and ask them to give compliance report by 31.03.2008. Action taken w.r.t. decision taken on 18.03.08 : Member Secretary, DPCC, called the Office Bearer of the DMA Nursing Home & Medical Establishment Forum on 26.03.08 and ask them to give compliance report by 31.03.2008. Another representation dated 20.03.08 received from the said Forum regarding request for exclusion of the Nursing Homes from the provisions of the Air & Water Acts . As per the decision taken by the BMW Committee No 2, in its meeting held on 05.02.08 letters were issued seeking application for Consent to Establish under Air & Water Acts within one month.. It was informed to the Office Bearers of the Forum that similar decision has also been taken by the BMW Committee No.1 & provisions of the Air and Water Acts and relevant sections of theses Acts were shown to the President of the Forum. Minutes of the said meeting was also sent to the Forum Vide letter dated 28.03.08.The Forum has submitted the status vide letter dated 15.04.08 and further updated status vide letter dated 30.04.08.
Decisions Taken in the Meeting of BMW Committee No. 1, on 06.05.08 :
The DMA Nursing Home & Medical Establishment Forum may be called for a meeting in the chamber of Chairman, DPCCC, on 19.05.2008 at 3.00 PM. Complete updated status to be provided to the Chairman , DPCC, two days in advance. Action taken w.r.t. decision taken on 06.05.08 :
The office bearers of DMA Nursing Home & Medical Establishment Forum were called for meeting on 19.05.2008. The office bearers of the said forum could not attend the said meeting due to their preoccupation. As directed by Chairman DPCC, a letter was issued to the forum on 26.05.08 seeking compliance report in respect of all the Health Care Units/Nursing Homes registered with the forum. Forum has submitted status in respect of 749 HCU’s. The status is based on the telephonic enquiry by the forum. Summarized statement by the forum was placed before the Committee. 2
Decisions Taken in the Meeting of BMW Committee No. 1, on 13.06.08 :
Issue Public Notice to all Health Care Establishments in NCT Delhi, for submission of an affidavit duly attested by the Notary Public, including statements (i) that adequate acoustic enclosure for DG Set(s) has been provided or acoustic treatment of the room where DG Set( s) is installed has been done to meet the prescribed norms by Ministry of Environment & Forest ,Govt. of India , for DG Sets (ii) that adequate stack height has been provided as per the norms prescribed by Ministry of Environment & Forest ,Govt. of India , for DG Sets (iii)that Noise Monitoring report for the D.G.Set(s) from the empanelled laboratory by Delhi Pollution Control Committee has been submitted to DPCC. (iv) that the Health Care Establishment is complying with the norms notified by the Ministry of Environment & Forest ,Govt. of India , for DG Sets .
Action taken w.r.t. decision taken on 13.06.08 : Public Notice issued on 06.07.08 in Times of India & on 05.07.08 in Punjab Kesari.
Decisions Taken in the Meeting of BMW Committee No. 1, on 14.07.08 :
Put up on file for administrative decision.
Action taken w.r.t. decision taken on 14.07.08 :
File submitted.
Decisions Taken in the Meeting of BMW Committee No. 1, on 27.08.08 :
File to be submitted administratively.
Action taken w.r.t. decision taken on 27.08.08 :
As decided the file has been submitted and as per the directions of Chairman, DPCC, the President of DMA has been asked to send the updated status of 749 units. A representation has been received from DMA requesting to exclude Nursing Homes from the provisions of the Air Act & from applying for Consent under the Air Act.
Decision Taken in the Meeting of BMW Committee No. 1, on 29.09.08 :
File to be submitted administratively with a complete analysis of what has happened so far , carefully by 06.10.08.
Action taken w.r.t. decision taken on 29.09.08 :
As decided the file has been submitted.
Decisions Taken by BMW Committee No. 1 in the Meeting Held on 30.10.2008:
Policy note approved for BMW Committee No 2 & 3, subject to certain modifications .To be seen by Member Secretary DPCC and Dr.T.K.Joshi , if waste water is large or has release problems. Chairman of BMW Committee No 2 & 3 , to be directed to follow this policy note and ensure there is no delay in processing of the cases of these Committees.
(J.K. Dadoo) (Dr. Anil Kumar) ( Dr.T.K.Joshi) Chairman,DPCC M.S.,DPCC COEH, MAMC
(Dr. Chetna Harjai) ( D.K.Singh ) (Sanjay Vatts ) ( Shyam Sunder) Scientist, Env.Deptt, GNCTD EE ( BMW) AEE ( BMW) AEE ( BMW) Annexure 4
Decisions taken by the BMW Committee No.1 ,in the Meeting Held 30.10.08, w.r.t Agenda No.4 ( Drug Manufacturing Units,Approved Testing Laboratories & Blood Banks, action taken earlier based on the Lists collected from the Drugs Controller of GNCT Delhi )
As per the decision taken by the BMW Committee No.1, in the meeting held on 15.11.2007, a letter was issued to the Drugs Controller of GNCT, Delhi on 26.12.07 and the drug Controller was requested to provide the list of all registered drug mfg. units, R& D Laboratories etc. . Lists were collected personally from the Office of Drugs Controller, GNCT Delhi and following are the brief of the units mentioned in the lists ; 1. No.of Licensed Drugs Manufacturing Units : 92 (including 8 units of Homeopathic Medicines 2. No. of Approved Testing Laboratories : 9 3. No. of Licensed Blood Banks : 54 [Under Central Govt - 8 , Under Govt. of Delhi - 8 Under MCD - 3, UnderVoluntary Organisation - 3 Under Pvt. Hospitals - 25, Pvt. Blood Banks - 7 Total : 155 Decision taken by the BMW Committee No. 1, in the Meeting Held on 15.01.08 : The BMW Rules are clear that laboratories including research laboratories, drug manufacturing units and licensed blood banks should take authorization under BMW Rules. Therefore Committee decided that all the 9 testing laboratories and 3 Blood Banks of voluntary organizations and 7 Pvt. Blood Banks may be asked to seek authorization under BMW Rules, quoting relevant sections. As regard, licensed drug manufacturing units, only those units having R & D facilities / laboratories should be issued Show Cause Notice to apply for authorization quoting relevant sections, giving 3 months time to apply for authorization under BMW Rules. Action taken report w.r.t. decision taken on 15.01.08: (i)Show Cause Notice to apply for authorization under BMW Rules, giving 3 months time to apply for authorization, issued to 87 units, out of above mentioned 92 units. Remaining 5 units had already applied for authorization. (ii)Letters issued to 8 testing laboratories out of 9 laboratories mentioned above, seeking application for authorization under BMW Rules, giving 3months time. Remaining 1laboratory has already applied for authorization. (iii)Letters issued to 9 Blood Banks out of 10 Blood Banks mentioned above, seeking application for authorization under BMW Rules, giving 3months time. Remaining 1 Blood Bank has applied for authorization. Decision Taken By the BMW Committee No.1, in the Meeting Held on 18.03.08 : Agenda Item No. 6 will be taken up in the month of May, 2008. Action taken report w.r.t. decision taken on 18.03.08: The matter is placed before the Committee .It is pertinent to mention here that letters for (i) to (iii) above were issued in the 3 rd / 4rth week of February , 2008 and 3 months time was given for applying for authorization under BMW Rules which is yet to be expired. Decisions Taken in the Meeting of BMW Committee No. 1, on 06.05.08 : To be taken up in the meeting on 13.06.2008 . M.S. and EE to follow up. Action taken report w.r.t. decision taken on 06.05.08: The matter was placed before the Committee and status was briefed. Decisions Taken in the Meeting of BMW Committee No. 1, on 13.06.08 : Issue a Public Notice seeking application for authorization under the Bio- Medical Waste ( Management and Handling) Rules, 1998, as amended to date, from all Drug/Pharmaceuticals Manufacturing Units, Pathological /Drug Testing Laboratories, Blood Banks, referring the provisions of the said rules regarding authorization..
2
Action taken report w.r.t. decision taken on 13.06.08: Public Notice issued in Hindustan Times on 02.07.08..
Decisions Taken in the Meeting of BMW Committee No. 1, on 14.07.08 : Put up on file for administrative decision.
Action taken report w.r.t. decision taken on 14.07.08: File submitted.
Decisions Taken in the Meeting of BMW Committee No. 1, on 27.08.08 : File to be submitted administratively.
Action taken report w.r.t. decision taken on 27.08.08 : As decided, the file was submitted. As directed by the Chairman, DPCC, reminder issued in case of 46 drug units (Out of Total 92 units) which have not responded to the Show Cause Notice issued on 18.02.08. Rest of the action taken as per the directions of the Chairman, DPCC. List of 7 drug units out of 11 units which have applied for Authorization under BMW Rules was placed before the Committee. Cases of rest 4 units (3 cases of Panacea Biotech Ltd. and 1 case of Shriram Institute) have already been taken by the Committee. In case of 9 drug units, SCN issued were returned back, as directed for pasting the letter, sites were visited by Trainee Engineer (BMW). Out of 9 units, in 7 cases, no such unit to which notices were issued, found existing. In 2 cases site could not be located. In case of 12 units, the units have claimed that not covered under BMW Rules . The list was placed before the Committee. Decision Taken in the Meeting of BMW Committee No. 1, on 29.09.08
Add the name of 53 (46 + 7) units in the list / Agenda for Private Hospitals. Rest of the matter to be put up on file.
Action taken report w.r.t. decision taken on 29.09.08 : As decided the Name of 53 units ( 46+ 7) added in the list /Agenda for Private Hospital . Rest of the matter was put in file.
Decisions Taken by BMW Committee No. 1 in the Meeting Held on 30.10.2008 :
All cases are to be placed in one single list / Agenda for Private Hospitals.
(J.K. Dadoo) (Dr. Anil Kumar) ( Dr.T.K.Joshi) Chairman,DPCC M.S.,DPCC COEH, MAMC
(Dr. Chetna Harjai) ( D.K.Singh ) (Sanjay Vatts ) ( Shyam Sunder) Scientist, Env.Deptt, GNCTD EE ( BMW) AEE ( BMW) AEE ( BMW)
Annexure 5
Decisions taken by BMW Committee No 1 in the Meeting Held on 30.10.2008 , w.r.t Agenda No. 5, Regarding proposals received from Dr. T.K.Joshi on (i) Study on the Lead (ii) Study on the Effect of Mercury Waste
(i) Action Taken Report w.r.t Study on the Lead Earlier in meeting on 08.02.08, It was decided that a study has to be done of the quantum of lead used in Delhi and is likely adverse impact on the citizen of Delhi. Such study will reveal the appropriate strategy for handling and containing the effect of lead on the health of the city. Based on study further necessary action will be taken. Information sought by Dr.T.K.Joshi was sent.
(ii) Action Taken Report w.r.t Study on the Effect of Mercury Waste In the meeting on 08.02.08 , it was decided that a formal study on the effect of Mercury Waste on the citizens of Delhi will be done since as informed by Dr.T.K.Joshi, no such study in Delhi has been carried out earlier. Dr. T.K. Joshi will submit a proposal. The proposal will also look at the appropriate technologies for disposal of Mercury waste in the city.Information sought by Dr T.K.Joshi was sent .
Decision Taken in the Meeting of BMW Committee No. 1, on 06.05.08 Dr. T.K. Joshi to submit the proposals for both the studies (i) Study on the lead & (ii) Study onthe Effect of Mercury Waste , within the month of May, 2008.
Action Taken : Letters issued to Dr. T.K. Joshi for the proposal for both the studies (i) Study on the lead & (ii) Study on the Effect of Mercury Waste. Separate proposals for both the studies, received from Dr. T.K.Joshi , were placed before the Committee Decision Taken in the Meeting of BMW Committee No. 1, on 13.06.08 Both the proposals received from Dr. T.K.Joshi may be examined by Dr. Chetna Harjai, Scientist , Deptt.of Environment and put up by 14.07.2008.
Action Taken w.r.t decision taken on 13.06.08 Copy of both the Proposals were given to Dr. Chetna Harjai in the meeting on 13.06.08. Her comments are awaited.
Decision Taken in the Meeting of BMW Committee No. 1, on 14.07.08 Put up on file for administrative decision.
Action Taken w.r.t decision taken on 14.07.08
Concerned files after getting the proposals for both the studies were submitted however not returned back then.
Decision Taken in the Meeting of BMW Committee No. 1, on 27.08.08 Both files to be procured & submitted administratively within a week.
Action Taken w.r.t decision taken on 27.08.08 :
Regarding (i) above as decided earlier by the Committee the proposal on Lead was examined by Dr. Chetna of Deptt.of Env. & Submitted to Chairman, DPCC. It is learnt from Ms Kamna that the said matter/ file was marked to her & as directed by Chairman she has to speak to Chairman, DPCC on the said matter.
Regarding (ii) Above , Proposal received from Dr. T.K.Joshi for Study on the effect of Mercury waste , Finance Deptt. of Govt. of NCT Delhi has given its concurrence .
2
Decisions Taken in the Meeting of BMW Committee No. 1, on 29.09.08 :
(i) Since Finance Deptt. of Govt. of NCT Delhi has given its concurrence on the Proposal received from Dr. T.K.Joshi for Study on the effect of Mercury waste, further action is to be taken by Dr.T.K.Joshi. (ii) Regarding the proposal received from Dr.T.K.Joshi on the study on Lead the matter to be decided administratively on file.
Action Taken w.r.t decision taken on 29.09.08 :
Regarding (i) above, a letter has been received from Dr.T.K.Joshi requesting for the release of payment to start the work.
Regarding (ii) above as decided on file by Chairman, DPCC, a letter has been issued to Dr..T.K.Joshi seeking his response on the points raised by the Deptt of Environment, GNCT Delhi on the proposal received from Dr.T.K.Joshi.
Decision Taken by BMW Committee No. 1 in the Meeting Held on 30.10.2008 : Action will be taken administratively.
(J.K. Dadoo) (Dr. Anil Kumar) ( Dr.T.K.Joshi) Chairman,DPCC M.S.,DPCC COEH, MAMC
(Dr. Chetna Harjai) ( D.K.Singh ) (Sanjay Vatts ) ( Shyam Sunder) Scientist, Env.Deptt, GNCTD EE ( BMW) AEE ( BMW) AEE ( BMW)
Annexure 6 Decisions taken by BMW Committee No 1 , in the Meeting Held on 30.10.2008, w.r.t Agenda No.6 ( News Paper Item “Bio – medical waste plagues NCR” published in Times of India (Delhi Edition) on 5th May, 2008 regarding Training through ASSOCHAM) )
The News Paper Item “Bio – medical waste plagues NCR” published in Times of India (Delhi Edition) on 5th May, 2008 ( Copy enclosed) was also taken as agenda item as per the directions of the Chairman DPCC & this was taken as Agenda No.10.
Decisions Taken in the Meeting of BMW Committee No. 1, on 06.05.08 For the news item on BMW, Member Secretary, DPCC, will talk to ASSOCHAM and offer the services of DPCC experts including Dr. T.K. Joshi, for arranging the training programme and for acquainting them with the operation of ETP & for disposing Bio – Medical Waste.To confirm in the next meeting of the BMW Committee on 13.06.08.
Action Taken Report: Member Secretary, DPCC talked to the Secretary General Sh. D.S. Rawat on the above matter and further action is to be taken by ASSOCHAM. Decisions Taken in the Meeting of BMW Committee No. 1, on 13.06.08 Await the response of ASSOCHAM. Action Taken w.r.t decision taken in the meeting on 13.06.08 Response of ASSOCHAM awaited. Decisions Taken in the Meeting of BMW Committee No. 1, on 14.07.08 Put up on file for administrative decision. Action Taken w.r.t decision taken in the meeting on 14.07.08 File submitted. Decisions Taken in the Meeting of BMW Committee No. 1, on 27.08.08 File to be submitted administratively. Action Taken w.r.t decision taken in the meeting on 27.08.08 As decided the file was submitted and a letter has been issued to ASSOCHAM regarding organizing one day Training Programme on BMW management & operation of ETP for the Health Care Establishments in Delhi in consultation with Dr. T.K.Joshi of COEH.
Decision Taken in the Meeting of BMW Committee No. 1, on 29.09.08: Dr..T.K.Joshi to sort it out and inform CMC on 30.10.08.
Action Taken w.r.t decision taken in the meeting on 29.09.08 ASSOCHAM has sent proposal for the Training on BMW Management & proposed date of Training is 26.11.08 and DPCC has been requested to sponsor Rs 2.5 Lacs for the said training. It is also informed that Dr. T.K.Joshi has been consulted in this regard.
Decisions Taken by BMW Committee No. 1 in the Meeting Held on 30.10.2008 :
ASSOCHAM to be asked what expertise they are having for conducting training programme on this issue .
(J.K. Dadoo) (Dr. Anil Kumar) ( Dr.T.K.Joshi) Chairman,DPCC M.S.,DPCC COEH, MAMC
(Dr. Chetna Harjai) ( D.K.Singh ) (Sanjay Vatts ) ( Shyam Sunder) Scientist, Env.Deptt, GNCTD EE ( BMW) AEE ( BMW) AEE ( BMW) Sl Name and Bed (No.) Dist. Authoriza Consent Status of the Case Decision Action Decision Action Decision Action Decision No. Address of No. tion Application / Remarks Taken on Taken Taken Taken Taken on Taken Taken on HCU Applicatio Date 14.07.08. w.r.t. on w.r.t. 29.09.08 w.r.t. 30.10.08 n Date Meeting 27.08.08 Meeting Meeting on on on 14.07.08. 27.08.08. 29.09.08. 1 Maharaja 350 W- 01.06.07 10.09.05 1. Applied for CTE EE (BMW) EE CTE Letter Dr. Chetna Dr. Reply Agrasen 003 (Operate), on 04.04.08. 2. to chase up (BMW) cannot issued. to speak to Chetna received Hospital, West 04.04.08 Inspected on on both talked to be Reply Medical spoken . Punjabi Bagh, (Establish) 10.06.08 letters and the granted awaited. Superinten Confirm New Delhi- 26 deficiencies were ensure officials till dent of the ation of observed.3. As per compliance. of the details of Hospital ETP, the decision taken Call on hospital. waste and get the Rain on 06.05.08, letter 27.08.2008. water things water issued on 26.05.08 treatment expedited. harvesti for installation of and ng (a) Solar water setting of system heating system (b) ETP/STP and Rain water is solar harvesting system confirme water (c) Replacement of d and heating ordinary Bulbs without system with CFL (d) ETP CGWA to be (e) Plantation of clearance filed by trees along side of since 28.11.2 the periphery of the ground 008 Hospital water building.4. As per drawl the decision taken about 10 in the meeting on KLD. 13.06.08 letter Ask the from MS, DPCC unit to was issued to MS expedite of the hospital this and indicating all the confirm. deficiencies and asking for correction of deficiencies and filing of an affidavit before 14.07.2008 without fail. 5. Reply received of the letter issued w.r.t. decision taken by the committee in its meeting held on 13.06.08. Affidavit submitted. Letter received on 24.10.08& informed that quotations received for ETP ,clearance obtained from CGWA, Solar water heating system is under installation, regarding RWHS technical feasibility is being undertaken, 1000 bulbs & 1200 tubelights have been replaced with CFL & plantation done. 2 Tirath Ram 165 N- 28.07.06 11.01.07 EE(BMW) EE Issue Letter Dr. Chetna Dr. Call for Hospital, 2 003 11.4.08(CTE) 1. Inspected on to chase up (BMW) reminder issued. to speak to Chetna personal ,R.B.L,Isher Das 05.11.07 and and ensure talked to for Reply Medical spoken hearing Sawhney Marg, deficiencies were compliance. the complian awaited. Superinten at 3.00 Rajpur found. 2. As per Call on officials ce. dent of the PM on Road,New Delhi the decision taken 27.08.2008. of the Hospital 28.11.2 -54 by Committee on hospital. and get the 008 15.11.07, Letter things was issued. Reply expedited. received. 3. As decided in the meeting on 18.03.08, letter for deficiencies was issued. 4. Applied for Consent to Establish on 11.04.08. Replied for the letter issued on 25.4.2008, Effluent analysis report submitted. 5. As per the general decision taken on 06.05.08, letter issued for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6.As per the decision taken in meeting on 13.06.08 CTE granted and letter seeking compliance w.r.t. letter dated 26.05.08 was issued. Reply received. 3 Shanti Mukund 144 E- 07.11.07(R 09.03.07 1.Applied for Since the Letter Issue Letter Dr. Chetna Dr. Call for Hospital, 2, 003 enewal) renewal of waste water Issued. reminder issued. to speak to Chetna personal Institutional authorization on generation for Reply Medical spoken hearing Area, Vikas 07.11.07. Applied is 33 KLD complian awaited Superinten at 3.10 Marg Extension, for Consent to directions ce. dent of the PM on Delhi-92 Operate on may be Hospital 28.11.2 09.03.07 however issued to and get 008 noise monitoring the hospital expedite all report was not by MS the submitted. for the DPCC, to required DG Sets. install ETP, nformation 2. Letter issued. apply for asked for. Reply received CTE and to referring earlier comply submitted Consent with to Operate directions application. Noise issued vide report submitted letter dated from RITES 26.05.08 Limited which is w.r.t not an approved decisions laboratory from taken on DPCC and results 06.05.2008. do not indicate . Call on Insertion Loss. Not 27.08.2008. Applied for Consent to Establish. 3. As decided in the meeting on 18.03.08, letter for deficiencies was issued. 4. Reply w.r.t letter issued on 25.4.2008 received 5. As per the general decision taken on 06.05.08, letter issued for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. Reply w.r.t letter issued on 25.4.2008 received.
8.As per the decision taken in the meeting on 13.06.08 the quantity of the waste water was ascertained by EE. Reply received. 4 Max Balaji 134 E- 20.09.07(R 20.11.06(CO) 1.Applied for Consent to Letter Issue Letter In reply to Dr. During Hospital, 108-A , 186 enewal) 18.03.08 renewal on Operate & Issued. reminder issued. DPCC Chetna discussi IP Extension, (CTE) & 20.09.07 without authorizatio for Reply letter dated spoken on with Patparganj, 31.03.08 fee for n will be complian received. 26.05.08, and Dr. Delhi-92 (CTE) authorization. 2. given only ce. the unit letter Chetna Inspected on when the claims to issued. unit has 28.03.08 and unit have an confirme BMW management complies ETP of 55 d that found as per the with KLD. Ask they will Rules.4. CTE for directions the unit to submit increasing of bed issued vide file adequac strength has also letter dated adequacy y report been applied on 26.05.08 report for of ETP 31.03.08. 3. Letter w.r.t the same within 1 dated 26-05-08.was decisions and also month issued taken on expedite solar 4.Reply dated 02- 06.05.2008. installation water 06-08.was received Inform the of solar heating w.r.t letter dated unit water system 26-05-08.about accordingly heating within 2 doing the needful . Call on system, months. as directed along 27.08.2008. rain water with analysis report harvesting of water effluent. structure 5.As per the urgently. decision taken in Dr.Chetna meeting on to speck to 13.06.08 Consent MS of the to Establish hospital granted for existing and ask building and for him to new building unit submit all is asked to submit the information w.r.t. required built up area, also particulars compliance of the without any letter dated delay.This 26.05.08 asked. must be 6. Reply of the clarified to letter issued w.r.t. the MS and decision taken by no CTE(for the committee in new its meeting held on building) 27.08.08 informing will be the compliance of granted if directions issued.7. all required Reply w.r.t. letter information dated 17.10.08 is not received, informed submitted that they have by requested for 30.10.2008 adequacy report for which is ETP, placed order the next for SWH System, date of RWH System is meeting. already in place. 10. In respect of new bldg., replied that, SWH will be installed and built up area is approx. 15000-16000 sq.mtr., CGWA clearance will be taken. 5 Pushpawati 114 S- 02.06.06 Applied for 1. The HCU was MS .DPCC The CTE Letter Dr. Chetna Dr. During Singhania 014 CTE on inspected on to call MS matter cannot issued to speak to Chetna discussi Research 12.08.08 18.12.07 and of the was be Reply Medical spoken on with Institute, Sheikh deficiencies were Hospital discusse granted received. Superinten Dr. Sarai Ph-II , observed. and d with without dent of the Chetna Press Enclave 2. As decided in persuade MS of installati Hospital unit has Marg, New the meeting on him to the on of and get confirme Delhi-17 18.03.08, letter for apply. Call hospital. ETP/STP expedite all d that deficiencies issued. on He has . Let the the they will Reply received. 3. 27.08.2008. assured unit file required install As per the general that the the nformation ETP decision taken on needful details of asked for. within 3 06.05.08, letter will be our months, issued for done.Ap decision Solar installation of: plied for dated Water (a) Solar water CTE. 06.05.20 heating heating system (b) 08. system Rain water Informati within 2 harvesting system on for months (c) Replacement of CGWA and will ordinary Bulbs clearance submit with CFL (d) ETP may also CGWA (e) Plantation of be clearanc trees along side of provided e within the periphery of the . one Hospital building. month. Reply received 4.Compliance of letter dated 26.05.08 seeked 5. Reply dated 12-06- 08.w.r.t letter dated 02-05- 08.informing about submitting the application for consent to establish and consent to operate within short time. 6.Reply dated 01.10.08 received regarding compliance of letter dated 26.05.08: (a)Quatations have been called from various venders for solar water heating system (b)Rain water harvesting system exists and functional.(c)90% work regarding replacement of ordinary bulbs with CFL has been completed.(d)For installation of ETP quatations have been called for. (e)Plantation of trees has been done. 6 Saroj Hospital, 2, 111 NW- 23.05.07 11.04.07 1. HCU was MS DPCC The Issue Letter Dr. Chetna Dr. Reply Institutional 006 inspected. BMW to call MS matter reminder issued. to speak to Chetna received Area, Sector 14 management found of the was for Medical spoken . Unit Extn. Rohini, as per Rules. Hospital to discusse complian Superinten has Delhi -85 2. Consent under comply d with ce. dent of the confirme air act and with MS of Hospital d that authorization under directions the and get ETP BMW rules issued issued vide hospital. expedite all will be as per decision letter dated He has the installed taken by the 26.05.08 assured required within 3 committee on w.r.t that the nformation months 15.11.07. decisions needful asked for. and Letter was Issued. taken on will be Solar Applied for 06.05.2008. done. water Consent to Call on heating Establish on 27.08.2008. system 17.03.08 and as and decided by the Rain Committee water Consent to harvesti Establish issued . ng 3.. As per the system general decision will be taken on 06.05.08, installed letter issued for within 1 installation of: month. (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 4. Compliance of letter dated 26.05.08 seeked w.r.t. decision taken in meeting on 13.06.08 4.Reply w.r.t. letter issued on 26.05.08.
7 Vidyasagar 110 S- 06.11.07 Applied for 1. The HCU was MS DPCC The CTE Letter Dr. Chetna Dr. Reply Institute of 011 CTE on inspected & to talk to matter cannot issued. to speak to Chetna submitte Mental Health 21.08.08 deficiencies were MS of the was be Reply Medical spoken d . Unit and Nuero observed. 2. As Hospital discusse granted awaited. Superinten will Sciences, 1, decided in the and d with without dent of the install Institutional meeting on persuade MS of installati Hospital ETP Area, Nehru 18.03.08, letter for him to the on of and get within Nagar, New deficiencies was apply. Call hospital. ETP/STP expedite all three Delhi – 65 issued. 3. Reply on He has and the months, received along with 27.08.2008. assured noise required install late fees.4. Reply that the monitori nformation Solar dated 12-06- needful ng asked for. Water 08.w.r.t dated 29- will be report. Heating 05-08.was received done.Ap Unit may System along with copies plied for also be and of registrar ion CTE. filed submit certificate and CGWA Noise noise monitoring clearance Monitori report. 5. As per . ng the general Report decision taken on of the 06.05.08, letter DG sets issued for within installation of: one (a) Solar water month, heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. EE(BMW) talked to the official (s) of the hospital . 6.Compliance w.r.t letter dated 26.05.08 received informing: Plantation is there, Water harvesting system is there, Taken permission from CGWA for 2bore wells, For Noise monitoring report fees of Rs.15,000/- submitted to DPCC, Effluent testing report is submitted, ETP will be installed shortly,. Reply received.As per the reply one month time is given ETP installation and solar water heating system installation 8 Brahm Shakti 105 NW- 25.10.04 Applied for 1. Inspected on EE(BMW) EE Issue Letter Dr. Chetna Dr. During Hospital & 013 CTE 08.11.07 and to chase up. (BMW) reminder issued. to speak to Chetna discussi Research Centre, deficiencies Call on talked to for Medical spoken on with U-1/78, Budh found.2. Reply 27.08.2008. the complian Superinten Dr. Vihar, Rohini, received in respect officials ce. dent of the Chetna Delhi – 41 of SCN dated of the Hospital unit has 13.12.07stated that hospital. and get confirme the deficiencies expedite all d that rectified. the they will 2.Letter Issued for required install Consent to nformation ETP Establish asked for. within 3 application . months, 3.Reply dated 13- Solar 06-08.received Water informing about Heating rectifying the System deficiencies within pointed during one inspection . month 4. As per the and general decision submit taken on 06.05.08, CGWA letter issued for clearanc installation of: e within (a) Solar water one heating system month.U (b) Rain water nit may harvesting system be (c) Replacement of informe ordinary Bulbs d that with CFL (d) ETP CTE (e) Plantation of cannot trees along side of be the periphery of the granted Hospital building. without 5. Reply of the ETP letter issued w.r.t. installati decision taken by on. the committee in its meeting held on 14.07.08 received. 6.Reply regarding compliance of Five points received informing: Installed solar water heating system, installed rain water harvesting system, replaced ordinary bulbs with CFLs, For ETP installation quotations have been called for., Plantation is already there. 9 R.L.K.C 104 W- 14.03.06 08.02.07(CT 1. The HCU was Consent to To be CTE Letter Call for Letter Unit Hospital ( A Unit 341 O)& inspected and Establish inspected cannot issued. personal for came of Dr. R.L.Khera 26.06.08(CT deficiencies were applied. 4 . be Inspected hearing at persona for Charitable E) found 2.Letter member granted alongwith 3.00 PM on l personal Trust ) Pandav issued.3. Reply team without Dr. T.K. 30.10.2008. hearing hearing nagar, near . recieved on comprising installati Joshi on issued. today. It Shadipur Depot, 15.04.08 informing of Dr. on of 15.09.08 has Delhi 08 about rectification T.K.Joshi,, ETP/STP been of deficiencies, EE(BMW ), and assured 4. Letlter dated 26- Dr. Chetna noise that 05-08 was issued & Trainee monitori installati 5.Reply dated 13- to inspect. ng on of 06-08.w.r.t letter Call on report. ETP will dated 26-05- 27.08.2008. Unit may be done 08.about asking for also be within time for doing the filed three needful as directed CGWA months was received . clearance and 6. As per the . submit general decision CGWA taken on 06.05.08, clearanc letter issued for e within installation of: one (a) Solar water month. heating system Call on (b) Rain water 28.11.2 harvesting system 008. (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. EE(BMW) talked to the official (s) of the hospital . 7. letter issued as per decision taken in the meeting on 13.06.08. Reply not received. 8.Deficiencies observed during inspection on 15.09.2008. 9. NMR for DG Set submitted.
10 City Hospital,B- 102 C- 26.05.08 22.11.06 1. The HCU was MS DPCC Letter Issue Letter Dr. Chetna Dr. No 1/1, N.E.A. Pusa 101 03.04.2008(C inspected to seek Issued. reminder issued. to speak to Chetna reply Road, New TE) deficiencies were compliance for Medical spoken received Delhi-60 observed.2. Letter with complian Superinten . During issued. directions ce. dent of the discussi 3. Applied for issued vide Hospital on with authorization on letter dated and get Dr. 26.5.2008. .4. 26.05.08 expedite all Chetna, Applied for CTE w.r.t the unit has on 03.04.08 decisions required confirme 5. As per the taken on nformation d that general decision 06.05.2008. asked for. they will taken on 06.05.08, Call on install letter issued for 27.08.2008. ETP installation of: within (a) Solar water three heating system (b) months Rain water time, harvesting system and (c) Replacement of install ordinary Bulbs Rain with CFL (d) ETP Water (e) Plantation of Harvesti trees along side of ng the periphery of the System Hospital within building.EE(BMW one ) talked to the month. official (s)of the hospital . 8. Reply of letter dated 26.05.08 received. 9. Reply of the letter issued w.r.t. decision taken by the committee in its meeting held on 13.06.08 received.
11 Bensups 100 SW- 22.02.07 22.02.07 1. MS DPCC The Issue Letter Dr. Chetna Dr. No reply Hospital, Near 147 (CTO)and HCU has applied f to call MS matter reminder issued to speak to Chetna received K.M. Chowk, Applied CTE or Authorization of the was for Medical spoken . During Sector-12, on 29.02.08 and CTE and hospital and discusse complian Superinten discussi Dwarka, Delhi - CTO .2. HCU was ask to d with ce. dent of the on with 75 (B.R.Dhawan inspected & complete MS of Hospital Dr. Charitable Trust) deficiencies were CTE the and get Chetna, observed 3.As application hospital. expedite all unit has decided in the with ground He has the confirme meeting on water assured required d that 18.03.08, letter for source that the nformation they will deficiencies was details, needful asked for. install issued.4.Reply CGWA will be ETP received and has clearance done. within informed that the and waste three HCU is registered water months for 60 beds and generation time, ETP will be and and installed in the treatment submit hospital on facility. If CGWA extension of the he does not clearanc bed strength from respond e within 60 to 100, affidavit properly, one in this regard has MS to issue month. been submitted. directions 5. As per the accordingly general decision . Call on taken on 06.05.08, 27.08.2008. letter issued for installation of: (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6. As per the decision taken in meeting on 13.06.08 CTE granted and EE ascertained the waste water generation.
12 Delhi Heart and 100 C- 04.09.04 19.3.2008(CT 1. HCU applied for Consent to To be CTE Inspected Dr. Chetna Dr. During Lung Institute, 3- 029 E) Applied renewal of Establish inspected cannot on to speak to Chetna discussi M.M II for CTO on authorization on 4- applied. 4 . be 15.09.08. Medical spoken on with ,Panchkuian 15.05.2008 9-2006. member granted Letter Superinten Dr. Road,N.Delhi-55 2.Inspected on team without issued. dent of the Chetna 05.11.07 & BMW comprising installati Hospital unit has management found of Dr. on of and get the confirme as per rules. T.K.Joshi,, ETP/STP things d that 3. Applied for EE(BMW ), and expedited. they will Consent to Dr. Chetna noise install Establish and & Trainee monitori ETP Consent to to inspect. ng within 3 Operate. Call on report. months, 4. As per the 27.08.2008. Unit may Solar general decision also be Water taken on 06.05.08, asked to Heating letter issued for file System installation of: CGWA and (a) Solar water clearance Rain heating system . Water (b) Rain water Harvesti harvesting system ng (c) Replacement of System ordinary Bulbs within with CFL one (d) ETP month (e) Plantation of and trees along side of submit the periphery of the CGWA Hospital building. clearanc 5. EE(BMW) e within talked to the one official (s) of the month. hospital .6. Reply dated 16-06- 08.received regarding doing the needful as directed in the letter dated 26-05-08 7. Inspected on 15.09.08 and deficiencies observed. 13 Devki Devi 193 S- Applied 26-9-06 MS DPCC Letter Call for Letter The Letter As per Foundation 275 1. Inspected on to issue Issued. personal issued representati issued. letter ( Max Devki 12.07.08 directions hearing ve of the submitte Devi Heart & deficiencies found. to MS of on unit came d unit Vascular 2. Letter submitted the hospital 06.10.20 for will Institute ) 2, by HCU on to get 08 with personal install Press Enclave 14.7.2008 with CGWA complian hearing Rain Road, Saket, photograph clearance ce of today. He Water New .Delhi -17. regarding removal and submit previous will Harvesti of deficiencies. expeditiousl direction apply for ng 3. As per the y. The s. Environme System general decision adjacent ntal and taken on 06.05.08, Super Clearance Solar letter issued for Specialty to MOEF, Water installation of: hospital in respect Heating (a) Solar water which also of the System heating system belongs to adjacent within (b) Rain water Max Group Super one harvesting system must get the Specialty month. (c) Replacement of Environme hospital ordinary Bulbs ntal which also with CFL Clearance belongs to (d) ETP because its Max (e) Plantation of capital cost Group, trees along side of was more before the periphery of the than Rs. 50 30.10.08 Hospital building. crores and also 4. Pointwise reply therefore file of letter dated comes compliance 26.05.08 received under EIA of five regarding doing the notification directions needful as directed. 2004. MS given by 4. Informed to issue DPCC vide regarding placing directions letter dated order for SWH immediatel 26.05.2008. System which is y and likely to be include the operational by Dec. name of 2008. this hospital in this list. 14 Max Super 104 S- 14.03.06 Consent 1.Authorization Super Letter Issue Letter Call on Letter Regardi Specialty 266 (Operate) granted and valid Specialty issued reminder issued. 30.10.2008 for ng Hospital, Valid upto upto 30-10-10. hospital for Reply for persona Environ 1,Press 30-10-10. 2.Consent which also complian awaited. Environme l mental Enclave Applied for (Operate) Valid belongs to ce. ntal hearing Clearan Road,Saket, CTE on upto 30-10-10. Not Max Group Clearance issued. ce New Delhi-17 23.09.08 applied for CTE. must get the compliance ,docume 3. Applied for Environme . ntary CTE. ntal proof for 4. Reply of the Clearance exempti letter issued w.r.t. because its on from decision taken by capital cost EC / the committee in was more affidavit its meeting held on than Rs. 50 be 14.07.08 received, crores asked. submitted the copy therefore Solar of environmental comes Water clearance. 5. Reply under EIA Heating received and notification System informed that 2004. MS , Rain placed order for to issue Water SWH System. Reg. directions Harvesti EC, notification of immediatel ng MOEF dated y and System 7.7.2004 has been include the to be quoted and claimed name of installed that said this hospital within notification is not in this list. one applicable. month, adequac y report of ETP and CGWA clearanc e to be submite d with one month. 15 Jessa Ram 102 C- 12.03.07 07.11.05 & 1. The HCU was 4 member To be Issue Letter the file Letter Unit to Hospital (A unit 008 30.10.07 inspected & team Inspecte reminder issued. indicates issued. be of R.B.Seth Jessa 23.5.2008(CT deficiencies comprising d. for Inspected trade asked to Ram & Bros E) observed. 2. of Dr. complian alongwith effluent of install Charitable Applied for T.K.Joshi,, ce. Dr.T.K.Jos approx. 27 ETP by Hospital) WEA Consent to EE(BMW ), hi on KLD other end of Karol Bagh,New Establish Dr. Chetna 15.09.08 than Decemb Delhi -05 3. As decided in & Trainee domestic er 2008 the meeting on to effluent. without 18.03.08, letter for inspect.Call The unit fail. deficiencies was on be issued issued.4. Reply 27.08.2008. directions recieved to install 5.As per the Seek ETP by general decision compliance November taken on 06.05.08, with 2008. letter issued. directions Deficiencie 6.Reply dated 10- issued vide s noted 06-08. with letter dated during reference to our 26.05.08 inspection letter dated 26-05- w.r.t on 08 .informing decisions 15.09.2008 about doing the taken on also to be needful as 06.05.2008. indicated to directed . the unit for 7.EE(BMW) correction talked to the by official (s) of the 30.10.08. hospital . 8.As per the decision taken on 13.06.08 CTE issued and also compliance w.r.t letter dated 26.05.08 seeked. 9.Compliance of letter dated 26.05.08 received. 10.Deficiencies were observed during inspection on 15.9.2008.11. Reply recieved , informed regarding rectification of deficiencies and have stated that they will update and inform status of installation of ETP within 2-3 weeks. 16 Shroff Charity 56 C- 26.05.06 22.09.06(CT 1. HCU applied for Seek Letter Issue Letter Dr. Chetna Dr. Since it Eye Hospital, 011 O)&09.06.08 renewal of compliance Issued. reminder issued. to speak to Chetna is an 5027, Kedar ( CTE) authorization on with for Medical spoken Eye Nath Road 26.05.06. directions complian Superinten Hospital ,Daryganj, New 3. HCU was issued vide ce. dent of the , ETP is Delhi-02 inspected on 14-8- letter dated Hospital not 2006 during which 26.05.08 and get required BMW management w.r.t expedite all to be found as per rule. decisions the installed 4.HCU has applied taken on required and one under Air Act on 06.05.2008. nformation month 22-9- 2006(C/114) Call on asked for. time is but noise 27.08.2008. given for monitoring report installati of DG sets ( 100, on of 75,125 KVA) not Solar submitted. Water 5.Inspected on Heating 05.11.07 System Management was and found satisfactory, Rain however Biohazard Water symbol not Harvesti provided at isolated ng storage. System. 6. As decided in the meeting on 18.03.08, letter for deficiencies was issued. 7. HCU replied that deficiencies have been rectified. 8.Reply dated 18- 06-08.along with waste water taste report received . 9. EE(BMW) talked to the official (s) of the hospital . 10. As per the decision taken in meeting of 13.06.08 CTE issued and also compliance w.r.t. letter dated 26.05.08 not received.
17 MGS Hospital, 100 W- 21.01.08 08.02.08 1. The HCU was In view of Letter Issue Letter Dr. Chetna Dr. During West Punjabi 008 inspected on 10 KLD Issued. reminder issued to speak to Chetna discussi Bagh , Rohtak 11.01.08 & ground for Medical spoken on with Road, New deficiencies water use . complian Superinten Dr. Delhi,-26 observed. Seek ce. dent of the Chetna 2. As decided in CGWA Hospital unit has the meeting on clearance. and get confirme 18.03.08, letter for CTE expedite all d that deficiencies was application the they will issued. shows required install 3.Reply received. waste water nformation ETP Applied for generation asked for. within 3 consent to of 20 KLD months, Establish on ask the unit Solar 22.05.08 to install Water 4. As per the ETP and Heating general decision confirm by System taken on 06.05.08, 27.08.2008. , Rain letter issued for Call on Water installation of: 27.08.2008. Harvesti (a) Solar water ng heating system System (b) Rain water within harvesting system one (c) Replacement of month ordinary Bulbs and with CFL submit (d) ETP CGWA (e) Plantation of clearanc trees along side of e within the periphery of the one Hospital building. month. EE(BMW) talked to the official (s) of the hospital . 5. As per the decision taken in meeting of 13.06.08 CTE issued and also EE checked the waste water generation and no of trees planted. 18 Kalra Hospital, 100 W- 04.06.07 Valid upto 1. HCU applied for Ask the unit Letter Issue Letter Call for Letter Unit A- 5 & 6, Kirti 012 14.09.09 renewal of to apply for Issued. reminder issued. personal for came Nagar, New authorization on CTE, for Inspected hearing at persona for Delhi-15 04.06.07. 2. comply complian alongwith 3.15 PM on l personal Consent to Operate with the ce. Dr. 30.10.2008. hearing hearing under Air Act is directions T.K.Joshi issued. today . valid upto 14-9- issued vide on 17.09.08 Represe 2009. letter dated ntative .4. The HCU was 26.05.08 says he inspected & w.r.t will file deficiencies were decisions CTE observed. taken on within 5. As decided in 06.05.2008. 10 days. the meeting on Call on It was 18.03.08, letter for 27.08.2008. also deficiencies was 4 member assured issued. team that the 6. Letter dated 26- comprising ETP & 05-08 was issued. of Dr. Solar 7. As per the Joshi, EE, Water general decision Dr. Chetna, Heating taken on 06.05.08, Trainee to System letter issued for inspect will be installation of: after receipt installed (a) Solar water of CTE within 3 heating system Application months. (b) Rain water to check Call on harvesting system whether 28.11.2 (c) Replacement of deficiencies 008 ordinary Bulbs corrected. with CFL Call on (d) ETP 27.08.2008. (e) Plantation of trees along side of the periphery of the Hospital building.
8.Reply dated 11- 06-08.w.r.t letter dated 26-05- 08.informing about during the needful as directed received. EE(BMW) talked to the official (s) of the hospital . 9. Deficiencies were observed during inspection on 15.9.2008. 19 Max Hospital 92 NW- 29.12.06(R 17.01.08 1. Applied for Bed (No.) Letter Issue Letter Call for Letter Unit ( A unit of Max 017 enewal) (CTO), renewal of Issued. reminder issued. personal for came for Health Care 18.3.2008- authorization on for Reply hearing at persona personal Institute Ltd.) CTE 29.12.06. 2. complian awaited. 3.30 PM on l hearing HB Twin Inspected on ce. 30.10.2008 hearing today. Towers, A 08.11.07 and with all the issued. Solar 2,3,&4, Netaji deficiencies were documents Water Subash Place, found. and Heating Wazirpur, Distt. 3.SCN issued for compliance System Centre, Delhi-34 the above 4. Reply of is received regarding directions assurded rectification already to be measures taken. issued. installed 5. Letter issued by seeking Consent to Decembe Establish r 2008. application, applied for Consent to Establish on 18.3.2008. 6. Inspection conducted.Waste water test repot for the treated effluent from the ETP has been asked from the HCU. 7.As decided in the meeting on 18.03.08, letter for deficiencies was issued.Test report received . 6. EE(BMW) talked to the official (s) of the hospital. 7. As per the decision taken in meeting on 13.06.08 Consent to Establish issued. Letter issued. Regarding built up area etc. the matter was submitted in file. Reply not received. 8. Reply of the letter issued w.r.t. decision taken by the committee in its meeting held on 14.07.08.CGWA clearance not submitted, informing water supply is being provided by M/s QR properties to them. 9. Reply recieved w.r.t. letter dated 13.10.08 and informed that they have placed order for SWH system and have requested for adequacy report of ETP. 20 National Heart 80 S- 07.03.07 Applied for 1. Applied for MS DPCC Letter CTE Letter Dr. Chetna Dr. During Institute, 49- 50, 069 CTE on Consent to to issue Issued.C cannot issued. to speak to Chetna discussi Community 15.07.08 Establish directions TE be Reply Medical spoken on with Centre, East of 2. HCU was to MS of applied granted awaited Superinten Dr. Kailash, New inspected and the hospital without dent of the Chetna Delhi-65 deficiencies were to apply for installati Hospital unit has found. Consent to on of and get confirme 3. As decided in Establish . ETP/STP expedite all d that the meeting on Call on and the ETP will 18.03.08, letter for 27.08.2008. noise required be deficiencies was monitori nformation installed issued. ng asked for. within 3 4. No reply report. months recieved Unit may and 5. EE(BMW) also be noise talked to the filed monitiro official (s) of the CGWA ng hospital. clearance report 6.Reply w.r.t. . and direction issued on CGWA 14.08.08 received. clearanc e shall be submitte d within one month. 21 Sitaram Bhartia 71 S- 11.10.07 11.10.07 1. HCU had Ask the unit Letter Issue Letter CTE & CTE The unit Institute of 051 29.04.08(CT submitted the to comply ssued.Re reminder issued Authorizati was is Science & E) applications for with ply for on under already required Research, B-16, Renewal of directions Received complian BMW issued to Qutub authorization under issued vide . ce. Rules as per confirm Institutional BMW Rules and letter dated granted. decision installati Area, New Delhi for consent under 26.05.08 Unit to taken on of – 16 Air Act. w.r.t send the on Solar 2. The HCU was decisions confirmatio 13.06.0 Water inspected & BMW taken on n on 8. Heating mgt found as per 06.05.2008. installation Authoriz System rule. Call on of solar ation within 3. As decided in 27.08.2008. water issued. one the meeting on heating Letter month , 18.03.08, letter was system. issued. without issued. fail. 4. Applied fo CTE on 29.04.08. 5.Reply dated 20- 05-08.was received .regarding submission of balance fee of 2years for the authorization amount. 6. EE(BMW) talked to the official (s) of the hospital . 7. Reply received in response to letter dated 02.05.2008. NMR , stack monitoring report of boiler and effluent analysis report (without parameters of BOD and Bio assay Test) submitted. 8. CTE issued. Reply w.r.t. letter dated 26.05.08 received.
22 Deepak 60 E- 19.02.07 29.5.2008(CT 1. Inspected on CTE Letter Call for Letter The SIT to SIT to Memorial 006 E) 01.01.08 and applied. Issued. personal issued representati inspect. inspect. Hospital, 5, 29.5.2008(CT deficiencies were Issue hearing ve of the Call on Institutional O) found reminder on unit came 28.11.2 Area, Vikas 2. As decided in for affidavit 06.10.20 for 008. Marg Extn. 2 , the meeting on for 08 with personal Delhi-92 18.03.08, letter for correction all hearing deficiencies was of details today. SIT issued. 3.As per deficiencies sought. to inspect the general . Call on and report decision taken on 27.08.2008. w.r.t. waste 06.05.08, letter water issued. generation 4. Reply dated 17- and need 06-08.w.r.t dated for 25-04-08.regarding STP/ETP. authorization under Call on BMW rules 30.10.2008. received. 5. EE(BMW) talked to the official (s) of the hospital .6.HCU applied for CTE & CTO. 7.As per the decision taken on 13.06.08 Affadavit for correction of deficiencies asked. 23 Nazar Kanwar 60 N- 05.05.06 Applied for 1. Inspected on MS DPCC Letter Issue Letter SIT to Inspecte The unit Surana 095 CTE & CTO 02.01.08 and to issue Issued. reminder issued. inspect and d by SIT is not Hospital(A Unit both on deficiencies found. directions for report w.r.t. on having of Bram Health 05.09.08 2. Letter issued on for complian waste water 30.10.0 sewer Care (P) LTD), 15.02.08 seeking applying ce. generation 8 connecti 219/220, N.K. application for for Consent and need on. Surana Marg, Consent to to Establish for They Gulabi Bagh, Establish & for and for STP/ETP. are Delhi - 07 correction of correction Call on required Deficiencies. of 30.10.2008. to instal However reply deficiencies ETP for was not received. . Call on which 3 3 As decided in the 27.08.2008. months meeting on time is 18.03.08, letter for given, deficiencies was one issued. month 4.Reply dated 12- time is 06-08.w.r.t phone given for call from Mr.singh Rain on 11-06- Water 08.regarding action Harvesti taken report. ng 5. EE(BMW) System talked to the , Solar official (s) of the Water hospital . Reply Heating received System 6. Reply of the and for letter issued w.r.t. submitin decision taken by g the committee in CGWA its meeting held on clearanc 14.07.08 received e. Unit alongwith affidavit be also for correction of asked to deficiencies. 7. file Applied for CTE & complai CTO. nce to the deficien cies observe d during inspecti on on 30.10.2 008.
24 Venu Eye 60 S- 18.09.06 16.03.07 1. Inspected & MS DPCC Letter For CTE, Letter Dr. Chetna Dr. The unit Institute & 017 Applied for BMW mgt found to issue issued.R unit may issued. to speak to Chetna to file Research Centre, CTE on as per rule except directions eply quickly Medical spoken Noise 1/31, 9.07.08 that bio-hazard for received. file noise Superinten Monitori Institutional symbol at isolated applying monitori dent of the ng Area, Phase – 2 , storage site was not for Consent ng report Hospital Report Sheikh Sarai, provided. to Establish and and get of the New Delhi-17 2. Letter issued. . Call on CGWA expedite all DG Reply received 27.08.2008. clearance the Set(s) informed regarding . required and rectification of nformation CGWA deficiencies . 3. asked for. clearanc EE(BMW) talked e within to the official (s) of a the hospital month, 4. CTE applied without fail. 25 Jeewan Hospital 60 S- 04.01.08 04.01.08 1. HCU was MS DPCC Letter Issue Letter Cal for Letter Call on & Nursing Home 016 (CTO) inspected & to issue Issued. reminder issued personal for 28.11.2 Pvt. Ltd., Gali 02.09.08 deficiencies were directions for hearing at persona 008 No.1 Jeewan (CTE) observed.SCN for complian 3.45 PM on l Nagar, New Issued. applying ce. 30.10.2008 hearing Delhi-14 2. After the for Consent issued. inspection the to unit has applied Establish. for Authorization Call on & informed 27.08.2008. regarding rectification measures taken. A letter received regarding deficiencies rectified. 3. Applied for Consent to Operate. under Air Act.As decided in the meeting on 18.03.08. 4.Reply dated 17- 06-08.regarding renewal of authorization 5. EE(BMW) talked to the official (s) of the hospital .
26 Red Cross 57 NE- 09.04.07 03.03.2008(C 1. HCU applied for Issue Letter CTE CTE issued Dr. Chetna Dr. During Maternity & 006 TE) renewal of reminder Issued. granted with to speak to Chetna discussi Child care authorization on 9- for subject conditions. Medical spoken on with Hospital, New 4-2007. 2. Applied correction to the Superinten Dr. Seemapuri, for Consent to of condition dent of the Chetna Delhi-95 Establish. deficiencies waste Hospital unit has 3.HCU was . Call on water and get confirme inspected and 27.08.2008. generatio expedite all d that deficiencies were n details the they will found.4 .As and required submit decided in the noise nformation Noise meeting on monitori asked for. Monitori 18.03.08, letter for ng report ng deficiencies was will be Report issued. filed of the 5. Replied on within DG 26.5.2008. The unit 01 Set(s) still has not month. from submitted CTO DPCC application and approve NMR. d 6.As per the laborato decision taken on ries and 13.06.08 Letter for provide correction of waste deficiencies issued. water Reply received. generati 7. Reply of the on letter issued w.r.t. details decision taken by within a the committee in month . its meeting held on 14.07.08 received. Desired noise monitoring report not submitted.
27 Metro Hospital 52 E- 06.08.2007 Applied (CTE 1. HCU applied for CTE Letter CTE CTE SIT to SIT to SIT to & Cancer 007 on 01.07.08) renewal of applied. Issued. granted issued with inspect and inspect. inspect. Institute ( Earlier authorization on Ground subject conditions. report w.r.t. Call on Anand 25-7-2005. 2. From water use to the waste water 28.11.2 Hospital,) 21, the same premises is 20 KLD, condition generation 008. Community an application for therefore, waste and need Centre, Preet authorization under CGWA water for Vihar, Delhi-92 BMW Rules has clearance is generatio STP/ETP. been received in required. n details Call on the Name of Metro Since the and 30.10.2008. Hospital & Cancer consumptio noise Institute ( A Unit n of water monitori of Anand Health is 20 KLD, ng report Care LTD.) on the unit will be 06.08.2007( having may be filed 70 beds). asked to file within 3. Inspected on correct 01 01.01.08. as waste water month. informed the generation hospital have sold figure and out to Metro based on Hospital & Cancer the waste Institute since water Jan.2006. figures, Deficiencies were decision for observed during ETP may inspection. be taken. 4. As decided in Call on the meeting on 27.08.2008. 18.03.08, letter for deficiencies was issued. 5.Reply dated 13- 06-08.w.r.t letter dated 25-04-08.was received asking for a week time . 6. Applied for Consent to establish and Consent to Operate. 7. EE(BMW) talked to the official (s) of the hospital .
28 Jeevan Anmol 51 E- 23.03.04 19.11.07(CT 1. The HCU Reminder Letter Issue Letter Ask the Letter Call for Hospital, Mayur 015 O) 12.06.08 applied for to seek Issued.R reminder issued. CGWA issued. personal Vihar Phase-I , (CTE) authorization on compliance eply for clearance.D hearing Delhi-91 23-3-2004(C/47), with Received complian r.Chetna to at 3.20 provisional directions . ce. speak to PM on authorization was issued vide Medical 28.11.2 granted which letter dated Superinten 008 expired on 23-3- 26.05.08 dent of the 2005(C/49) w.r.t Hospital thereafter not decisions and get applied for taken on expedite all Authorization 06.05.2008. the under BMW Rules. Call on required 2. HCU was 27.08.2008. information inspected on 13- asked for. 10-2005 and BMW management found as per rule(C/54) except adequate stack height with DG sets. 3. A letter was sent on 3-5-2006(C/55) wherein they were directed to install the adequate stack height and informed that stack has been increased. (C/58). 4. Application received for consent, however noise monitoring report for DG Sets not submitted. 5. Inspected on 01.01.08. During the inspection deficiencies were found. 6. As decided in the meeting on 18.03.08, letter for deficiencies was issued.Applied for CTE. 7. EE(BMW) talked to the official (s) of the hospital . 8. As per the decision taken on 13.06.08 Consent to Establish issued. Reply w.r.t letter dated 26.05.08 received. 9.Reply received of the letter dated 09.07.08
29 Park Hospital, 100 W- 24.07.07 25.07.07(oper 1. Inspected on 17- It must be Letter CTE Letter Call for Letter Unit 12, Meera 326 ate) 3-05(C/13) , no clarified to Issued.R cannot issued personal for came Enclave &14.03.08( E isolated storage site the hospital eply be hearing at persona for (Chowkhandi) stablish) for BMW that without Received granted 4.00 P.M. l personal Near Keshavpur &10.06.08(Es provided. 2. A compliance . without on hearing hearing Depot, Outer tablish) letter was sent on with installati 30.10.2008. issued. today . It Ring Road, New 17-4-05(C/15).3. A directions on of assured Delhi-18 complaint was also issued vide ETP/STP installati received for letter dated and on of improper 26.05.08 noise ETP management of w.r.t monitori within 3 BMW(C/19) in decisions ng months April 2007. As per taken on report. and Letter from DHS 06.05.2008 Unit may CGWA Dated 22.08.07 Consent to also be clerance inspection was Establish filed within 1 done by DHS cannot be CGWA month. official and it was granted. clearance Unit will informed that Call on . submit complaint could 27.08.2008. Noise not be established. Monitori (C/ 48) ng 3.Noise Monitoring Report Report for DG Set for the submitted. 3rd DG 4. HCU was set inspected & within a following are the month. observations: Call on Hospital has 28.11.2 increased the 008. capacity of beds upto 100 beds .Not submitted waste water test report.BMW segregation though being done and color coding system followed however from perusal of BMW records and also observing the conditions of BMW Containers, proper segregation is not being done and needs improvement in this regards. Isolated storage site for BMW not provided.Sharp management found satisfactory. Hospital is having 2 D.G. Sets of 62.5 KVA & 20 KVA ( with acoustic enclosure,) but adequate stack height not provided with D.G. Sets. Both D.G. Sets were kept outside the Hospital (backside of hospital.) in which 20 KVA D.G. Set not in use (as reported) & also same was not mentioned in the consent application by the Hospital. 5. Informed regarding rectification of the deficiencies observed during the inspection. Submitted Affidavit that another DG Set (Old One ) with acoustic enclosure however not working/ Operation. 7. Letter for deficiencies issued on 21.04.08. 8. Waste water analysis report from DPCC lab received, Indicating the analyzed parameters are within the limit. 9. Letter issued, as per the general decision taken on 06.05.08, for installation of:(a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL(d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 10.Reply dated 30- 05-08.with reference to letter dated 26-05-08.was received mentioning inability to put rain water harvesting system . 11. Again submitted consent to establish on 10.06.08.12. Reply received w.r.t letter issued after the meeting on 13.06.08 & informed that ETP will be installed. Regarding rain water harvesting it is informed that Building is of old period & at that time rain water harvesting was not mandatory. 30 Bhatia Global 50 W- 05.08.04 Applied 1. The HCU was Since CTE Letter Dr. Chetna Dr. No reply Hospital 307- 007 (CTE on inspected & ground cannot issued. to speak to Chetna recveive 308, Ambica 23.06.08) & deficiencies were water use be Medical spoken d. Unit Vihar, New CTO (but fee observed. is 17 KLD, granted Superinten to install Delhi-87 not 2. As decided in CGWA without dent of the ETP submitted) the meeting on clearance is installati Hospital within 3 18.03.08, letter for required. on of and get months deficiencies was Since waste ETP/STP expedite all and issued. water and the submit 3. Applied for generation noise required Noise Consent to is 25 KLD, monitori nformation Monitori Establish/ Operate unit may be ng asked for. ng (fee for CTO not directed to report. Report submitted ). install ETP Unit may of the 4. EE(BMW) had expeditiousl also be DG talked to the y.Call on filed Set(s) official (s) of the 27.08.2008. CGWA and hospital . clearance CGWA . clearanc e within one month. 31 Surya Hospital, 55 E- Applied 1. Inspected on Since Letter CTE Letter Dr. Chetna Dr. Unit to 388/11-C, East 013 for 23.06.08( CT 01.01.08 and some ground Issued. cannot issued. to speak to Chetna install Azad Nagar, Renewal O & deficiencies were water use be Medical spoken ETP Delhi-51. of CTE.both) observed. is 07 KLD, granted Superinten within 3 authorizati Letter Issued. CGWA without dent of the months on on Reply received. clearance is installati Hospital and file 11.6.2008. Informed regarding required. on of and get an management of Since waste ETP/STP expedite all affidavit BMW as per water and the regardin instructions. Noise generation noise required g monitoring report is 7 KLD monitori nformation stoppag submitted for 125 ETP is ng asked for. e of KVA DG Set & required report. usage of informed regarding and must be Unit may ground removal of 50 installed also be water. KVA DG Set expeditiousl filed Applied for y. Call on CGWA Consent to 27.08.2008. clearance Establish & . Consent to Operate on 23.06.08. As decided in the meeting on 18.03.08, letter for deficiencies was issued. 6.Applied for authorization under BMW rules on 11-06-08. 7 EE(BMW) talked to the official (s) of the hospital 8.Letter stating that it is a small unit and space is much less and financially it may not be viable proposition to install ETP received. Reply received w.r.t letter issued earlier and informed that stopped the use of ground water and quotations are being received for ETP. 32 Kukreja Hospital 103 W- 18.01.08(r 27.11.07(oper 1.Applied for Since 3 Letter Issue Letter Call for Letter Unit & Heart Centre, 018 Enewal) ate) & renewal of KLD use Issued. reminder issued.Repl personal for came C-1, Vishal 13.03.08(Esta authorization On of ground for y awaited. hearing at persona for Enclave, New blish) 18.01.08 2. water, ask complian 4:15 P.M. l personal Delhi-27 Applied for him to ce. on hearing hearing Consent on apply for 30.10.2008. issued. today . 27.11.07 , however CGWA. Represe noise monitoring clearance ntative report for DG Set Since waste of the not submitted. water is 2 unit Submitted fee for KLD, unit assured noise monitoring. may be that 3. The HCU was asked to ETP will inspected & install mini be deficiencies were ETP and installed observed. CTE form within 3 4. Letter issued. is required months , Reply received to filled CGWA Applied for properly. clearanc Consent to Call on e within Establish. 27.08.2008. a month Informed and l regarding noise Solar monitoring Water conducted by Heating DPCC. & also System about rectification within of the one deficiencies.Test month. report asked for the Call on waste water not 28.11.2 submitted. 008 5.. As per the general decision taken on 06.05.08, letter issued for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. EE(BMW) talked to the official (s) of the hospital . Reply received. 7. CTE issued w.r.t. decision taken by the committee in its meeting held on 13.06.08 33 Jivodaya 65 NW- 29.01.08 04.02.08(CT 1Applied for Seek Letter Issue Letter Dr. Chetna Dr. The Hospital, Ashok 014 O) renewal of compliance Issued. reminder issued. to speak to Chetna HCU to Vihar, Phase-1, 05.05.2008(C authorization on with Reply for Medical spoken submit Delhi-52 TE) 29.01.08 . directions received. complian Superinten & the 3. Inspected on issued w.r.t ce. dent of the inspecte analysis 02.01.08 and decision Hospital d the report of deficiencies taken on and request unit on the observed: 13.06.08.Ca to install 30.10.0 waste - Advised to apply ll on ETP for 8. water for consent under 27.08.2008. which discharg Air Act. funding e in the 4. Applied for will be sewer Consent to Operate done by and on 04.02.08. Old DPCC if install Noise monitoring target Solar report for DG Sets( audience is Water 125 & 43 KVA) destitutes . Heating submitted along System with the Consent , Rain Application. Water 5 .As decided in Harvesti the meeting on ng 18.03.08, letter for System deficiencies was within a issued. month 6. Applied for and Consent to submit Establish on complia 05.05.08 nce of 7.NO Reply 8. the EE(BMW) talked defician to the official (s) cies of the hospital. observe 9. As per the d during decision taken on inspecti 13.06.08 Consent on on to Establish issued. 30.10.2 Reply w.r.t letter 008 dated 26.05.08 received. Letter /representation received. 34 Mai Kamliwali 50 W- 24.09.07 Not Applied 1 Applied for MS DPCC Letter Issue Letter Dr. Chetna Dr. Call for Hospital, J- 022 renewal of to issue Issued. reminder issued. to speak to Chetna personal block, authorization on directions for Reply Medical spoken hearing Community 24.09.07. to apply for complian awaited. Superinten at Centre, Rajouri 3. The HCU was Consent to ce. dent of the 3.30PM Garden, New inspected some Establish Hospital on Delhi-27 deficiencies are and to seek and get 28.11.2 observed. compliance expedite all 008 4. Letter issued on with the 15.02.08. Reply directions required received. Not issued vide information Applied for letter dated asked for. Consent to 26.05.08 Establish. w.r.t 5. As decided in decisions the meeting on taken on 18.03.08, letter for 06.05.2008. deficiencies was Call on issued. 27.08.2008. 6.Reply dated 12- . 06-08.received Informing about rectifying the deficiencies observed during inspection. 8. EE(BMW) talked to the official (s)of the hospital. Reply received. 9.Reply dated 04.10.08 regarding compliance of 26.05.08 decision received informing: CTE submitted, Solar Water Heating System will be installed shortly as order been placed, Jt. Director (building) DDA has been approached for installation of Rain Water Harvesting system, ordinary bulbs have been replaced with CFL, ETP is under consideration, Plantation of trees has been carried out, and order for DG set- sound proof with acoustic enclosure have been placed. 35 Shree Jeewan 52 nos. W- 29.06.05 & 03.03.08 1The HCU applied MS DPCC Letter CTE Letter Call for Letter Unit Hospital, 67/1, 024 on (CTO) for renewal of to issue Issued. cannot issued. personal for came New Rohtak 03.03.08 30.07.08 authorization on directions be hearing at persona for Road, Delhi -05 (CTE) 29-6-05 & on to apply for granted 4:30 P.M. l personal 03.03.08 Consent to without on hearing hearing 2.Hospital was Establish installati 30.10.2008 issued. today . inspected on and to seek on of It will file 27.09.2006. compliance ETP/STP CGWA 3. HCU had not with and clearnac applied for consent directions noise e within under Air Act. issued vide monitori 1 month Having DG Set of letter dated ng . ETP is 75 KVA with 26.05.08 report. not acoustic enclosure. w.r.t Unit may required 4. The HCU was decisions also be . Call on inspected & some taken on filed 28.11.2 deficiencies were 06.05.2008. CGWA 008 observed. Call on clearance 5.Letter issued 0n 27.08.2008. . 15.02.08. Reply received. Applied for Consent to operate however not applied for Consent to Establish. Informed regarding rectification of the deficiencies. 7. As decided in the meeting on 18.03.08, letter for deficiencies was issued. 6.Reply dated 29- 04-08.w.r.t letter dated 21-04-8 regarding submission of documents related to consent under air / water acts. 7. EE(BMW) had talked to the official (s) of the hospital . 36 Jaipur Golden 256 NW- 0.9.06.08 08.09.08(Ren 1. Letter issued on MS DPCC Letter Issue Letter Call for Letter Unit Hospital, 2, 003 ewal CTO ), 13.12.07 to apply to issue Issued. reminder issued. personal for came Institutional CTE - a fresh for directions for Reply hearing at persona for Area , Sec-3, 29.10.2008 authorization under to apply for complian awaited. 4:45 P.M. l personal Rohini, Delhi-85 BMW Rules and to Consent to ce. on hearing hearing submit test report Establish 30.10.2008 issued. today .It for Bio-assay test and to seek assured from I.P. compliance installati University or I.I.T. with on of Delhi . Reply was directions ETP not received and as issued vide within 3 decided on letter dated month 15.01.08, a letter 26.05.08 and was issued seeking w.r.t Solar application for decisions Water Consent to taken on Heating Establish , however 06.05.2008. System reply not received. Call on within 1 2.As decided in the 27.08.2008. month. meeting on Call on 18.03.08, letter for 28.11.2 deficiencies was 0008 issued. Inspected. DG Set of 1010 KVA found installed without adequate stack height and no stack analysis report submitted. Bins for storage needs to be properly labeled. Application for renewal of authorization filed on 09.06.2008 10.Latter dated 26- 05-08 was issued 11.Reply dated.11- 06-08.w.r.t letter dated 26-05-08 regarding doing the needful as directed. 12. Letter issued. As per the general decision taken on 06.05.08, letter issued for installation of five things.Applied for renewal of authorization on 09.06.2008. 13.As per decision taken on 13.06.08 letter issued. Applied for CTE. 37 Sunder Lal Jain 178 NW- 04-Dec-06 10.01.07 1. HCU applied for MS DPCC Letter Since Letter Dr. Chetna Dr. Call for Charitable 007 consent under Air to issue Issued. unit has issued. to speak to Chetna personal Hospital, Ashok Act on 10-1- directions a built up Reply Medical spoken hearing Vihar, Phase III, 2007along with the to apply for area of awaited. Superinten at Delhi-52 noise monitoring Consent to 67000 dent of the 3.40PM report of DG sets. Establish sq. m. Hospital on 2. A letter was and to seek therefore and get 28.11.2 issued on 13.12.07 compliance requires expedite all 008 to submit Bio- with Environ the assay test report directions mental required from I.P. issued vide Clearanc nformation University or from letter dated e apart asked for. I.I.T. Delhi . 26.05.08 from 9. Reply received w.r.t ETP but without the decisions installati desired monitoring taken on on, report, however the 06.05.2008. providin HCU submitted Call on g noise amount of 27.08.2008. monitori Rs2000/- and ng report stated “kindly and arrange for required collection of to file sample for waste CGWA water analysis clearance report (Bio-assay test report) from our hospital premises. 10 As decided in the meeting on 15.01.08, letter was issued seeking application for Consent to Establish. However reply was not received. Consent to Establish application not received. As decided on 18.03.08 letter issued . Inspection conducted on 01.05.2008. Again letter issued on 26.05.08. 11. Reply received on 10.07.08 informed that quotations received for ETP.12. Letter issued. As per the general decision taken on 06.05.08, letter issued for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 13. EE had talked to officials of the hospital. 38 Rajiv Gandhi 162 NW- 28.11.06 29-12-06 1. The unit applied Reminder Letter Issue Letter Authorizati Authoriz Unit to Cancer Institute 005 26.5.2008(CT for renewal of to seek Issued.R reminder issued. on under ation submit &Research E) authorization under compliance eply for BMW issued. CGWA Centre, Sector- BMW Rules on with Received complian Rules clearanc VI, Rohini, New 28.11.06.(Earlier directions . ce. granted e and Delhi-85 authorization issued vide subject to adequac expired on letter dated CGWA y report 03.07.06) 26.05.08 clearance of ETP 2. The Application w.r.t and filing within for Consent to decisions of one Operate(Renewal) taken on adequacy month , was submitted on 06.05.2008. report for without 29.12.06 (earlier and also ETP. fail. granted Consent to seek Operate was valid permission upto 31.07.05) from along with stack CGWA for monitoring report ground of DG sets(C/177- water C/1178) & for drawl. Call Boiler wherein the on analyzed 27.08.2008. parameters are within the prescribed standards. As decided in the meeting on 18.03.08, letter for deficiencies was issued. 9. Applied for Consent to Establish on 26.05.08 11.Reply dated 12- 06-08. w.r.t letter dated 26-05-08.was received regarding doing the needful as directed. 12. As per the general decision taken on 06.05.08, letter issued for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. EE(BMW) talked to the official (s)of the hospital . 13. As per the decision taken on 13.06.08 Consent to Establish issued. Reply w.r.t letter dated 26.05.08 received. 39 Indian Spinal 115 SW- Applied 29.02.08 1. The HCU was Since Letter CTE Letter Adequacy Letter Unit to Injuries Centre, 004 inspected on 1-8- ground Issued. cannot issued. report and issued. submit Sector-C, Vasant 2006 and some water use is be Reply CGWA CGWA Kunj, New deficiencies were 19 KLD granted awaited. clearance clearanc Delhi-110 070 observed . 5. SCN CGWA without be filed. e and for refusal of clearance is installati Call on adequac authorization was required. on of 30.10.2008 y report issued on 5-12- Waste ETP/STP of ETP 2006 and HCU water . Unit is within submitted the reply generation also one along with the is 10 KLD, required month , noise monitoring adequacy to file without report wherein the report of CGWA fail. insertion loss is not ETP may clearance within the be filed. . prescribed Call on standards. 27.08.2008. 2.Application for authorization received. 3. Applied for consent to operate on 29.02.08. Noise report, boiler stack report & wastewater analysis report submitted. Letter issued. Application for Consent to Establish not received. As decided in the meeting on 18.03.08, letter for deficiencies was issued. 10. Letter dated 26- 05-08.was issued 12.Reply dated 11- 06-08.w.r.t letter dated 26-05-08.was received informing about during the needful as directed. 13. As per the general decision taken on 06.05.08, letter issued for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. Reply received 40 Primus Ortho & 100 ND- 10.12.07 03.10.07( CT 1. Applied for CTE Reminder Letter Issue Letter Call on ______Unit to Spine Hospital 024 E) & on 03.10.07 for seeking Issued. reminder issued.Repl 30.10.2008 ___ file ( of Delhi 03.12..07 100 bedded compliance for y received. confirma Hospital (CTO ) Hospital replacing with complian tion of Society ), 2, existing 70 bedded directions ce. installati Chandergupt Hospital. 2. issued vide on of Marg, Applied for CTO letter dated Solar Chankayapuri, & Authorization 26.05.08 Water New Delhi-21 under BMW Rules w.r.t Heating however specific decisions System reply not received taken on within a w.r.t the letter 06.05.2008. month. issued & regarding Call on ETP. 3.The 27.08.2008. hospital was inspected on 28.03.08 & Deficiencies were observed. letter for deficiencies was issued.4.As per the general decision taken on 06.05.08, letter issued for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building.5. Reply received vide letter dated 21.08.08 informed that Rain Water Harvesting System is installed. The ordinary bulbs have been replaced by CFL. The trees have been planted. ETP will be installed by 31st March 2009 as permitted by you.For Solar Water Heating System quotations have been called for.As per the decision taken on 13.06.08 CTE issued. Reply of the letter issued w.r.t. decision taken in the meeting on 14.7.08 received giving compliance report. Letter received on 27.10.08 & informed that quotations for solar water heating system receved & will be completed in Nov.08. 41 Batra Hospital & 495 s- 26-Jul-06 Not Applied MS DPCC Letter Issue Letter Dr. Chetna Dr. Unit to Medical 005 1. Not applied for to issue Issued. reminder issued to speak to Chetna submit Research Centre, consent. directions for Medical spoken CTE 1, Tughlakabad 2. HCU has to MS of complian Superinten and and file Institutional submitted the reply the Hospital ce. dent of the letter an Area,Mehrauli that ETP has been for Hospital issued. affidavit Badarpur Road, installed and now it applying and get stating Delhi is functional. for Consent expedite all the total 3. HCU has also to the number submitted the Establish. required of beds waste water test Call on information in the report for 27.08.2008. asked hospital, ETP.Letter issued. for.Also within a Reply received adequacy week informed that all report for without reports are ETP be fail. submitted. filed before Application for 30.10.2008. CTE not received.As decided in the meeting on 18.03.08, letter for deficiencies was issued. 5.As per the general decision taken on 06.05.08, letter issued for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 6.EE(BMW) talked to the official (s)of the hospital . 7.Communication received on 25.09.08 informing STP is fully functional,water sample has been collected and report will be sent soon alongwith CTE.
42 Holy Family 298 S- 13.04.07 19.01.07(CT 1. Applied for MS DPCC Letter Issue Letter Dr. Chetna Dr. HCU to hospital, Okhla 006 O) & renewal of to issue Issued. reminder issued. to speak Chetna install Road, 23.10.07(CT authorization directions for to Medical spoken Solar E) on 13-4-2007. 2. to MS of complian Superinten Water The HCU was the hospital ce. dent of the Heating inspected on 10- for Hospital to System 11-2006. 3. The applying expedite and HCU did not for Consent CTE, submit submit the noise to Establish adequacy adequac monitoring and for report for y, report report.As decided compliance both ETPs of ETP , in the meeting on with and CGWA CGWA 18.03.08, letter for directions clearance. clearanc deficiencies was issued vide Call on e ,within issued. letter dated 30.10.2008 one 4. As per the 26.05.08 month. general decision w.r.t taken on 06.05.08, decisions letter issued for taken on installation of (a) 06.05.2008. Solar water heating Call on system (b) Rain 27.08.2008. water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. EE(BMW) talked to the official (s) Of the hospital . Reply was received.
43 Sir Ganga Ram 500 C- 07.07.06 13.11.06 Inform the Letter Issue Letter Call on ______Consent Hospital, 005 (CTO)& 1. Authorization deficiencies Issued. reminder issued. 30.10.2008. ____ to Rajender Nagar, 29.09.08(CT under BMW Rules to the unit. for Reply Establis New Delhi - 110 E) and CTO is valid Case of complian awaited. h 008 up to 30-5-2010. CTE ce. Granted 2.. As per the application subject general decision will be to taken on 06.05.08, decided conditio letter issued for once ETP is n that installation of (a) installed. CGWA Solar water heating Call on clearanc system (b) Rain 27.08.2008. e will be water harvesting submitte system (c) d within Replacement of a ordinary Bulbs month. with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 3. Reply received dated 04-06-08 w.r.t letter dated 26-05-8.informing about doing the needful as directed. 4. As per the decision taken on 13.06.08 letter issued..
44 I.P Medical 661 S- 05.06.06 19.02.07 1 Letter issued Inform the Letter Issue Letter Dr Chetna Dr. Unit to Corp. Ltd.Sarita 003 11.06.2008(C after the decision deficiencies Issued. reminder issued. to speak to Chetna submit Vihar , Mathura TE) on06.05.08. Reply to the unit. for Reply MS of the spoken adequac Road , New received. Case of complian awaited. hospital y report Delhi-44 2.Inspected by a CTE ce. for of the team alongwith Dr. application expediting ETP T.K.Joshi , on will be ETP and and 11.07.08.BMW decided ask for CGWA management found once ETP is CGWA clearanc satisfactory installed. clearance. e by however Call on 28.11.2 improvement 27.08.2008. 008 required w.r.t providing proper containers at the storage site. ETP found under construction & it was informed that it will be completed in a months time.3. Letter issued. Reply received CTE applied. As per the general decision taken on 06.05.08, letter issued for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. Reply received 4. Reply of the letter issued w.r.t. decision on 14.07.08 received informing that the deficiencies stated has been noted and will be complied. 5. Reply received ,informed that ETP under trial run and will be fully commissioned by 10.11.08.G33 45 Fortis Lt. Rajan 158 SW- 01-May-06 26.06.06 1. HCU applied for MS DPCC Letter Issue Letter Ask the Letter The unit Dhall Charitable 149 (CTE) and 1- authorization on 1- to direct Issued. reminder issued. unit to file issued + to Trust, Secto-B, Sep-06(CTO) 5-2006(C17).2. MS of the for Reply adequacy Dr.Chet submit Aruna Asaf Ali HCU was hospital to complian received. report of na adequac arg, Vasant Kunj inspected on 22-8- apply for ce. ETP. As Spoken. y report 2006(C18) and Consent to per 2004 of the BMW management Establish Notificatio ETP , found as per rule. and to seek n,with 86 Environ 3. HCU applied compliance KLD of mental under Air Act n 1- with waste water Clearan 9-2006. directions ,Environme ce , 4. Waste Water issued vide ntal install monitoring report letter dated Clearance Solar submitted. 26.05.08 is also Water 5. As per the w.r.t required.Dr Heating decision taken in decisions . Chetna to System the meeting held taken on expedite and on 1-8-2007, 06.05.2008. for both. Rain consent under Air Call on Water Act and 27.08.2008. Harvesti authorization under ng BMW rule has System been issued. within a 6. As per the month. general decision taken on 06.05.08, letter issued for installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7.Reply of the letter issued w.r.t. decision taken by the committee in its meeting held on 27.08.08 received informing that CTE already being submitted on 26.06.06
46 Moolchand 150 S- 05.02.06 23-Jun/04 1. As per decision MS DPCC Letter CTE Letter Dr Chetna Dr. Unit to Hospital, Lajpat 008 (CTO) 12- taken in the to direct Issued. cannot issued to speak to Chetna install Nagar-III , New Aug-08(CTE) meeting held on 1- MS of the be MS of the spoken ETP Delhi-24 8-07, HCU has hospital to granted Hospital within 3 been inspected on apply for without and get months, 14-8-2007(C/194) Consent to installati expedite all and BMW Establish on of the Management found and to seek ETP/STP required as per rule.5. As compliance and information per decision taken with noise asked for. on 31.08.07, directions monitori Consent under Air issued vide ng Act and letter dated report. Authorization 26.05.08 Unit is under BMW Rules w.r.t also issued. decisions required 2. As per the taken on to file general decision 06.05.2008. CGWA taken on 06.05.08, Call on clearance letter issued for 27.08.2008. . installation of (a) Solar water heating system (b) Rain water harvesting system (c) Replacement of ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 3. As per the decision taken on 13.06.08 letter issued. Reply received..
47 Rockland 130 S- 28-03-06 27-12-06 1. The HCU was MS DPCC Letter Issue Letter Call for Letter Unit Hospital,B-33- 276 inspected on 22-9- to direct Issued.R reminder issued personal for came 34, Qutab 2006(C/30) and MS of the eply for .Reply hearing at persona for institutional BMW management hospital to Received complian awaited. 5.00 PM on l personal Area, New found as per rule apply for . ce. 30.10.2008 hearing hearing Delhi-16 and acoustic Consent to issued. today . It enclosure has been Establish assured provided with the and to seek installati D.G. sets. compliance on of 2. As per the with ETP decision taken in directions with 3 the meeting held issued vide months, on 1-8-2007, letter dated Solar consent under Air 26.05.08 Water Act and w.r.t Heating authorization under decisions System BMW rule has taken on by end been issued 06.05.2008. of 3. As per the Call on Decemb general decision 27.08.2008 er , taken on 06.05.08, 2008. letter issued on Issue 26.05.08 for letter for installation of (a) CGWA Solar water heating clearanc system (b) Rain e . Call water harvesting on system (c) 28.11.2 Replacement of 008 ordinary Bulbs with CFL (d) ETP (e) Plantation of trees along side of the periphery of the Hospital building. 7. As per the decision taken on 13.06.08 letter issued. Reply received. 8.Reply dated 01.10.08 received informing that for ETP installation quatations have been called for. 48 Sant Parmanand 120 N- 18-04-07 14.06.06(CT MS DPCC Letter Issue Letter Dr Chetna Dr. CGWA Hospital, 18, 004 O)& 1. As per the to direct issued. reminder issued. to speak to Chetna clearanc Civil Lines, 22.10.08(CT decision taken in MS of the for Reply MS of the spoken e to be Sham Nath E) the meeting held hospital to complian awaited. hospital submitte MargDelhi-6 on 1-8-2007, apply for ce. and get d within consent under Air Consent to expedite all one Act and Establish the month, authorization under and to seek required Solar BMW rule has ompliance information Water been issued with asked for. Heating 2.. As per the directions System general decision issued vide , Rain taken on 06.05.08, letter dated Water letter issued on 26.05.08 Harvesti 26.05.08 for w.r.t ng installation of (a) decisions System Solar water heating taken on to be system (b) Rain 06.05.2008. installed water harvesting Call on within system (c) 27.08.2008. one Replacement of month , ordinary Bulbs ETP to with CFL (d) ETP be (e) Plantation of installed trees along side of within 3 the periphery of the months . Hospital building. 3. As per the decision taken on 13.06.08 letter issued. 4. Reply of letter issued w.r.t decision taken on 14.07.08 received informing that proposal for solar water heating system, rain water harvesting system ,replacement of ordinary bulbs & ETP installation ius under consideration and will be implemented shortly.
49 Mata Chanan 210 W- 28.04.06( 28.04.06(CT 1. HCU is having MS DPCC Letter Issue Letter Call for Letter Unit Devi Hospital, 004 Auth Valid O)& valid authorization to direct Issued. reminder isssued personal for came C-1, Janak upto 27.10.08(CT upto 04.05.09 & MS of the for hearing at persona for Puri,New Delhi 04.05.09) E) Consent to Operate hospital to complian 5:15 P.M. l personal Under Air Act. apply for ce. on hearing hearing 2. As per the onsent to 30.10.2008 issued. today general decision Establish and taken on 06.05.08, and to seek assured letter issued on compliance installati 26.05.08 for with on of installation of (a) directions ETP Solar water heating issued within 3 system (b) Rain videletter months, water harvesting dated Rain system (c) 26.05.08 Water Replacement of w.r.t Harvesti ordinary Bulbs decisions ng with CFL (d) ETP taken on System (e) Plantation of 06.05.2008. and trees along side of Call on Solar the periphery of the 27.08.2008. Water Hospital building. Heating 3..letter received System on 14.07.08 w.r.t within letter dated one 26.05.08, month. informing that needful is being done. 6. As per the decision taken on 13.06.08 letter issued. Reply received.
50 Sri Balaji Action 200 W- 21.06.07 22.06.07 1. HCU is having MS DPCC Direction Issue Letter Call for Letter Unit Medical Institute 327 valid authorization to direct s Issued. reminder issued. personal for came , FC-34, A-4, & Consent to MS of the for hearing at persona for Paschim Vihar, Operate Under Air hospital to complian 5:30 P.M. l personal New Delhi- 63 Act. apply for ce. on hearing hearing 2. As per the onsent to 30.10.2008. issued. today, it general decision Establish has taken on 06.05.08, and been letter issued on toseekcomp directed 26.05.08 for liance with to install installation of (a) directions solar Solar water heating issued vide water system (b) Rain letter dated heating water harvesting 26.05.08 system system (c) w.r.t within Replacement of decisions one ordinary Bulbs taken on month with CFL (d) ETP 06.05.2008. and (e) Plantation of Call on submit trees along side of 27.08.2008. adequac the periphery of the y report Hospital building. of the 3. As per the ETP decision taken on within 13.06.08 letter one issued. month,a nd file CTE within a week.
51 Jeewan Mala 104 C- 04.07.06 08.01.07 1. The HCU was MS DPCC Letter CTE Letter Call for Letter Unit Hospital(P)Ltd., 012 (CTO) inspected on 27-9- to direct Issued. cannot issued. personal for came 67/1, New 01.08.08(CT 2006(C/80) and MS of the be Reply hearing at persona for Rohtak E) BMW management hospital to granted awaited. 5:45 P.M. l personal Road.New Delhi found as per rule. apply for without on hearing hearing -05 The HCU was Consent to installati 30.10.2008. issued. today . It again inspected on Establish on of has 09.07.2007 since and to seek ETP/STP been complaints were compliance and asked to received against with noise install the Hospital and directions monitori Solar BMW management issued vide ng Water was found as per letter dated report. Heating rule ( ( C/134). 26.05.08 Unit is System 2.Consent issued w.r.t also within under Air Act & decisions required one Authorization taken on to file month under BMW Rules 06.05.2008. CGWA and issued as per the Call on clearance Rain decision taken on 27.08.2008. . Water 04.10.07. Harvesti 3. As per the ng general decision System taken on 06.05.08, within letter issued on two 26.05.08 for months, installation of (a) ETP is Solar water heating to be system (b) Rain installed water harvesting within system (c) three Replacement of months ordinary Bulbs and with CFL (d) ETP CGWA (e) Plantation of clearanc trees along side of e to be the periphery of the submitte Hospital d within building.4. As per one the decision taken month. on 13.06.08 letter issued. Reply received. 5. Compliance report and CGWA clearance not submitted. 52 G.M.Modi 100 S- 29.06.07 13.08.07 1. Consent issued MS DPCC Letter Issue Letter Dr Chetna Dr. Unit to Hospital and 010 (CTO) & under Air Act. to direct Issued. reminder issued to speak to Chetna install Research Centre CTE on 04 . &Authorization MS of the for MS of the spoken ETP for Medical 09.08 issued under BMW hospital to complian hospital within Science, Mandir Rules as per the apply for ce. and get three Marg, Saket , decision taken on Consent to Trainee expedite all months New Delhi -17 04.10.07. Establish to give the and 2. As per the and to seek letter required submit general decision compliance dated information CGWA taken on 06.05.08, with 09.07.08 asked for. clearanc letter issued on directions personall e within 26.05.08 for issued vide y. one installation of (a) letter dated month. Solar water heating 26.05.08 system (b) Rain w.r.t water harvesting decisions system (c) taken on Replacement of 06.05.2008. ordinary Bulbs Call on with CFL (d) ETP 27.08.2008. (e) Plantation of trees along side of the periphery of the Hospital building 3.Reply w.r.t letter dated 26.05.08 received 4. As per the decision taken on 13.06.08 letter issued. 5.Reply of letter dated 14.08.08 received informing they have installed solar water heating system and rain water harvesting system.Asked for six month time for installation of ETP . 53 Jeewan Mala 50 C- 03.07.06 08.01.07 1. HCU is having MS DPCC Letter CTE Letter Call for Letter Unit Hospital Pvt. 091 (CTO) valid authorization to direct Issued cannot issued. personal for came Ltd., 66- A/2, 01.08.08 & Consent to MS of the be Reply hearing at persona for New Rohtak (CTE) Operate Under Air hospital to granted awaited. 6:00 P.M. l personal Road, New Act. apply for without on hearing hearing Delhi-05 2.Letter issued as Consent to installati 30.10.2008. issued. today . It per the decision Establish on of has taken on 13.06.08 and to seek ETP/STP been for installation of compliance . Unit is asked to (a) Solar water with also install heating system (b) directions required Solar Rain water issued vide to file Water harvesting system letter dated CGWA Heating (c) Replacement of 26.05.08 clearance System ordinary Bulbs w.r.t . within with CFL (d) ETP decisions one (e) Plantation of taken on month trees along side of 06.05.2008. and the periphery of the Call on Rain Hospital building . 27.08.2008. Water 3 Reply received Harvesti informing that ng needful is being System done. within 4. Reply received two w.r.t letter issued months, on 14.08.08 ETP is informing to be quotation for solar installed water heating within system has been three obtained and will months be completed and shortly.For rain CGWA water harvesting clearanc quotation has been e to be called for. ordinary submitte bulbs have been d within replaced by CFL. one Sapling have been month. planted in MCD park. between the two hospitals. 54 Jeewan Nursing 100 C- 11.07.07 O7.07.06 1. Consent under MS DPCC Letter Issue Letter Call for Letter Unit Home & 016 (CTO) and Air Act granted & to direct Issued. reminder issued. personal for came Hospital, 2-B, Applied for valid.. MS of the for hearing at persona for Pusa Road, New CTE 2. Inspected on hospital to complian 6:15 P.M. l personal Delhi-05 on25.08.08 29.04.08, apply for ce. on hearing hearing management of the Consent to 30.10.2008. issued. today . It BMW found as per Establish has to rule w.r.t. and to seek install segregation, color compliance Solar coded bags.HCU is with Water Having two DG directions Heating sets of capacity issued vide System 62.5KVA & letter dated within 82.5KVA with 26.05.08 one acoustic enclosure w.r.t month, and the stack decisions Rain (combined) found taken on Water adequate. 06.05.2008. Harvesti 3 Letter issued ON Call on ng 26.05.08 as per the 27.08.2008. System general decision within taken on 06.05.08, two letter issued for months installation of (a) and Solar water heating ETP system (b) Rain within 3 water harvesting months. system (c) To be Replacement of reviewe ordinary Bulbs d on with CFL (d) ETP 28.11.2 (e) Plantation of 008 trees along side of the periphery of the Hospital building. 4.Reply dated 12- 06-08,was received along with noise monitoring report waste water analysis.5 Reply received w.r.t letter issued on14.07.08 . 55 Dr. B.L.Kapur 500 C- ___ 13.03.08(Esta 1. CTE application Deficiencie Letter Ask the Letter Ask the Letter Issue Memorial blish) was received. 2. s be Issued. unit to issued. unit to file issued + Consent Hospital , 5, Built up Area is informed to file EC Reply item-wise Dr.Chet to Pusa Road, Delhi 101247 Sq meter. the unit. clearance awaited. compliance na Establis 08 3. Total Water Since the . affidavit of Spoken. h Consumption- 574 waste water Environme subject KLD.. Effluent – is 263 ntal to 263 KLD, unit Clearance’s conditio KLD(Domestic) & may be conditions. n that 10 KLD directed to Dr Chetna Solar ( Cooling& Boiler install ETP to expedite Water Blow Down and expeditiousl other Heating Softening Plant ) y and also documents System .STP proposed of issue letter asked for shall be 300 KLD Capacity based on by DPCC installed .Boilers ( 4 the within Nos).Rain water decisions one Harvesting shall taken in the month. also be done by meeting on taking suitable 06.05.2008. measures..Letter & 13.06.08. for deficiencies was issued on 21.04.08.3.Reply dated 06-06-08.was received.4.Letter dated 13-06-08 regarding redevelopment of the hospital received.5. EC given by MOEF vide letter dated 13.06.08.6. Inspected by a team along with Dr.T.K.Joshi, on 11.07.08. Construction of the Hospital was going on.7. Case of HCU was placed before CMC( Orange) meeting on 07.10.08 and as decided a letter was issued for submission of adequacy report for ETP & for the clarification regarding no of beds ( EC given by MOEF was for 400 beds whereas HCU has applied to DPCC for CTE for 500 Bedded hospital). Reply received wrt letter dated 17.10.08 HCU approached NPC for adequecy report which is awaited. A letter has also been received from MOEF. 56 Yashraj Bio- NA 19-10-06 Not 1.In respect of this No action. ------No ------Ask the Letter Unit to Technology Ltd., Applicable unit, G.B. Pant ------action unit to file issued. file C-34.Mulund Hospital was ------compliance complian (West), Mumbai- visited on23-3-207 report w.r.t ce report 80 and the bottles in provisions w.r.t which the BMW of BMW provision fluid being carried Rules and s of out were seen inform BMW which were having regarding Rules Biohazard symbol training and and lebel however protocol inform Inspection of the and the regarding vehicle and number of training arrangement used training protocol for the sessions and the transportation of and the number bio-fluid could not number of of verified as the no staff they training one was came to have sessions carry the fluid from trained. and the the transporter Unit to number during the send the of staff inspection. training they 2.Presentation was curriculum. have given by the trained, representative of the the unit before the training committee on curriculu 01.08.2007 . m within 3.Letters were one issued in the past month seeking photographs etc for handlinf of BMW and later on an affidavit was also sought regarding proper handling of BMW fluids during the transportation and training etc to the handling staff. 4.Replies to the letters issued were received & unit submitted the asked photographs , an affidavit as asked by the BMW Committee and other information sought. 5.Authorization as decided in the BMW meeting held on 06.05.08 was issued to the unit.& remaining fee for two years as decided by the Committee has been returned to the unit.6.As decided on 29.09.08 a letter was issued. Reply awaited. 57 Metro Bio-Care NA Having Having valid 1. Inspection was No action. Letter Both the File Action as Letter Operato services (P) valid Consent conducted and a Issued. Common submitted per the issued.. r be Limited, Authorizati letter was issued on Operator administrati decisions Represe asked to on 25-5-2007 to s Metro vely taken today ntation / follow rectify the Bio-Care in case of Letter the deficiencies within Services Agenda received Director 3 months. (P) No. 1 ate of 2 Reply received Limited (Regarding Health regarding & M/s rates / Services rectification of Synergy service (DHS) deficiencies. Waste charges for agreem 3.Installed new Manage BMW ). ent. incinerator as per ment Place a direction of CPCB. Pvt. Ltd. copy on are the file. 4..Directions unauthor issued by CPCB izedly u/s 5 of EPA on increasin 03.10.07, to the g service operator to initiate charges/r necessary actions ates for to ensure (a) BMW . Efficient working File to be of droplet submitte Separators for d control of moisture administr in flue gas (b) atively Emission without parameters are waiting always met with for standards minutes. prescribed in the BMW Rules. 5.Inspected on 23- 8-2007 6.SCN was issued for providing (i)sludge dewatering device. (ii). Manual mode on PLC should not be used. (iii) Rota meter should be provided at PC &SC of incinerator.7. Reply Received along with an affidavit regarding directions given by DPCC have been complied. 8.Letter received, regarding compliance with the directions by CPCB.9.Operator submitted affidavit sought by CPCB.10.Unit was inspected on 27.03.08 and compliance w.r.t directions given was observed. 11. CPCB has released the bank guarantee of unit.12. Letter received w.r.t.letter dated 21.10.08. 59 Panacea Biotec R& D S 13.11..07 22.02.06(CT 1. Unit is engaged Ask the unit CTE Letter Dr Chetna Dr. Call for Ltd. , A-224, activities -291 O) & CTE in R&D of to indicate cannot issued. to speak Chetna personal PH – I , Okhla for on 27.11.07 Vaccines.CTO how 1.4 be Reply and get spoken hearing Industrial Area, Vaccines applied on KLD waste granted awaited. expedite all at 3.50 Delhi -20. 22.02.06. 2. water is without the PM on Inspected by the being installati required 28.11.2 officials of PGRC treated and on of information 008. on 27.04.07. & was whether ETP/STP asked for. placed before CMC ETP is and (Orange)in its installed. noise meeting on Call on monitori 09.10.07. 3. Unit is 27.08.2008. ng having a DG Set of reports. 380 KVA with acoustic enclosure and also have a oil fired Boiler for which information was not provided in the consent application. The unit had concealed information and not provided adequate stack height., it was decided that the unit shall apply for CTE and submit a Bank Guarantee of Rs. 50,000 . Unit applied for CTE on 27.11.07 and submitted Bank Guarantee of Rs. 50,000. valid upto 21.11.08. 4. Unit submitted test report for the waste water generated from the unit showing that the parameters are within the limit. 5.Stack monitoring report for the Oil fired Boiler was not submitted. 6.Activities/ processes of the unit are covered under HW ( M& H) Rules. Inspection was done on 31.03.08 & deficiencies were observed.7 Lletters issued as decided by the Committee.. Replies received. 60 Panacea Biotec Mfg of S 13.11..07 20.01.06(Ren 1. This is a case of Since waste Letter CTE Letter Dr Chetna Dr. Call for Ltd. , A- 239- Vaccines -292 ewal) & CTE manufacturing of water Issued. cannot issued. to speak Chetna personal 242, PH – I , on 27.11.07 Vaccines and generation be and get spoken hearing Okhla Industrial operating since is 4.5 KLD granted expedite all at 4: 00 Area, Delhi -20. 1989.CTO applied out of total without the PM on on 20.01.06. The water installati required 28.11.2 unit has submitted consumptio on of information 008 two set of n of 13.5 ETP/STP asked for. application form KLD, unit and for consent may be noise (renewal) dated directed to monitori 12.07.06& install ETP ng 20.01.06 and and file reports. contradictory affidavit for statements were correction made in the of applications. 2. The deficiencies unit was inspected . Call on by the officials of 27.08.2008. PGRC on 25.09.07. & was placed before CMC (Orange) in its meeting held on 09.10.07. 3. The team inspected the unit on 06.11.07 & it was observed that unit had not applied for authorization under BMW Rules though having agreement with M/S Synergy Waste Management Pvt. Ltd., for the disposal of the BMW.
4. Applied for the Authorization on 13.11.07. 5. As per the Hazardous Waste ( M& H) Rules , 1989, as amended to date, the activities/ processes of the unit are covered under the said Rules. 6..Inspection done on 31.03.08 & deficiencies were observed. 7.Letters were issued as decided by the Committee and reply received . 61 Panacea Biotec ---- S - 13.11..07 28.10.05(Ren 1. Unit is engaged Since Letter Issue Letter Dr Chetna Dr. Call for Ltd. , B- 1/ E-12, 293 ewal) & CTE in mfg. of ground Issued. reminder issued to speak Chetna personal Mohan Co- on 27.11.07 pharmaceuticals. 2. water use for reply and get spoken hearing operative It was inspected by is 6 KLD, complian awited. expedite all at 4: 10 Industrial Estate, PGRC on CGWA ce. the PM on Delhi -44.. 25.09.07. & matter clearance is required 28.11.2 was placed before required. information 008 CMC (Orange)in Since waste asked for. meeting on water 09.10.07.3.Unit is generation having two DG is 4 KLD, Set of 380 KVA & unit may be 725 KVA with directed to acoustic enclosure install ETP and LPG Bhatti. and submit 4.Unit submitted affidavit for test report for the correction waste water of generated from the deficiencies unit. . Call on 5. Inspection done 27.08.2008. on 06.11.07 & it was found that unit had not applied for the authorization under BMW Rules, though disposing BMW through M/s Synergy Waste Management Pvt. Ltd..Isolated storage site for BMW not provided. 6.. Activities/ processes of the unit are covered under the HW Rules. 7. The unit was inspected by the team on 03.03.08. Waste Water is generated for which no ETP / Equalization tank provided .Other Unit M/s Panacea Bio – Pharmaceuticals Research at First Floor a R & D Laboratory is also operating which has not applied for authorization under BMW Rules. Liquid BMW from this Laboratory is given to said operator however the said Operator has informed contrary to this.8.Letter for deficiencies were issued & reply to the letters received. 62 Shriram Institute ---- N- 28.02.07 Applied for This is a case of MS DPCC Letter CTE Letter Dr Chetna Dr. Unit to for Industial 069 CTE on research institute to direct Issued. cannot issued. to speak Chetna install Research , 19, 22.08.08 but which is engaged MS of the Applied be Reply and get spoken. ETP University Road, not for CTO. in research related Institute to for CTE granted awaited expedite all within Delhi-07. with animals and file Consent without the three generates BMW to installati required months. 2. The Institute had Establish on of information applied for the application ETP/STP asked for. authorization under . Call on and the BMW Rules, 27.08.2008. noise on 29.06.2001 & monitori again on 28.02.07. ng report. 3. Inspected on Unit is 29.04.08 and also deficiencies were required observed. to file 4.Letter issued CGWA based on the clearance decision taken on . 06.05.08. Reply received asking time for filing application for Consent to Operate/ Establish. 5.Reply dated 06- 06-08.w.r. t. letter dated 26-05- 08.regarding taking necessary steps to meet BMW guidelines was received. 6. Letter issued. Reply received. Asked time for filing application for consent to operate/Establish. 7.Waste Water, Emissions and Noise monitoring reports pertaining to DG stacks have been submitted, States that plans to install ETP as and when need arises.8. Applied for CTE but have not applied for CTO. Reply recieved 63 Neeman Medical Storage & S- 16.04.08 ------Show Cause Notice Issue Reminde Issue Letter Authorizati Authoriz No International Distribution 301 as decided in the reminder r letter reminder issued on under ation Action ( Asia) Ltd. , of Clinical Meeting on seeking not for BMW Rule issued. Max House, trial 15.01.08 was affidavit issued complian s Granted. Ground Floor, 1, material. issued to the Unit for since ce. Dr. Jha Marg, on 22.02.08. correction unit Okhla, Delhi -20 Applied for of submitte authorization under deficiencies d BMW Rules ON . Call on required 16.04.08 27.08.2008. affidavit Inspection was for done on 30.04.08 rectificat & following are the ion of main observations : deficienc (i) Separate ies. Storage room provided for the storage of discarded medicines / drugs however discarded medicines /drugs also found stored outside the room and without proper labeling of Bio – Hazard Symbol (ii) Log Book for the expired / discarded medicines could not be shown (iii) About 65 Containers ( Card Board Boxes) of 20 – 30 kg each of discarded medicines found in the storage room. (iv) The unit has agreement with M/s Synergy Waste Management Pvt. Ltd for the disposal of discarded medicines / drugs. V.Reply dated 05- 06-08.w.r.t letter dated 26-05- 08.regarding rectification of deficiencies . (Proper Bio hazard symbol display ,storage room for discarded medicines ,log book maintenance .)was received. Letter issued. Reply received. As per the decision taken on 13.06.08 letter issued. Reply not received. 64 LG Life Sciences Drug SW- 12.03.08 Not Applied Show Cause Notice Issue Reminde Issue Letter Authorizati Authoriz No India Pvt. Ltd., Stockist & 163 as decided in the reminder r letter reminder issued on under ation Action LG House, AB- Marketing/ Meeting on seeking not for BMW Rule issued. 3, Safderjung Importer 15.01.08 was affidavit issued complian s Granted. Enclave,Delhi- issued to the Unit for since ce. 29 on 22.02.08. Reply correction unit received. Applied of submitte for authorization deficiencies d under BMW Rules . Call on required on 12.03.08. 27.08.2008. affidavit Inspection was for done on 30.04.08 rectificat & following are the ion of main observations : deficienc (i) The site / ies on Premises is the 22.07.08. Central Office of the Unit which imports medicines/ drugs from the Korea & distributes in India . Discarded / expiry medicines / drugs are collected back & disposed through this office. (ii) Separate Storage room not provided for the storage of discarded medicines / drugs & the same was kept in common room.(iii) Log Book for the expired / discarded medicines need to be maintained. (iv) Bio – Hazard sybol not provided on the discarded medicines box. (v) The unit has agreement with M/s Synergy Waste Management Pvt. Ltd for the disposal of discarded medicines / drugs. (vi) The unit is having 3 DG Sets of 50 KVA( 2 No.) & 25 KVA ( One No) with acoustic enclosure.VII.Repl y dated 13-06- 08.regarding rectification of the deficiencies found during inspection (Separate storage room for discarded medicines with proper Bio Hazard Symbol) was received Letter issued. As decided on 13.06.08 letter issued. Required affidavit submitted.. 65 Imperial Storage & ….. 12.05.08 ------1.Show Cause Issue Reminde Issue Letter Authorizati Authoriz No Marketing Distribution Notice as decided reminder r letter reminder issued on under ation Action Services of in the Meeting on seeking not for BMW Rule issued. (Johnson & Medicines 15.01.08 was affidavit issued complian s Granted. Johnson Ltd.), & Drugs issued to the Unit for since ce. 9/43, Kirti on 22.02.08 since correction unit Nagar, Delhi-15 not applied for of submitte authorization.. deficiencies d Reply received . Call on required however had not 27.08.2008. affidavit applied for for authorization under rectificat BMW Rules . ion of 2.Inspected on deficienc 29.04.08. ies on Following are the 22.07.08 main observations : & 20.08.08. (i) It is a ware house which is also centre for the storage & distribution of medicines & drugs of Johnson & Johnson Ltd. (ii) About 1000 kg of expired drugs was found stored for disposal. (iii)As per certificate dated: 03.01.08 given by the operator of a facility that 686Kg of solid waste & 1225 liters of liquid waste has been destroyed. (iv) The unit has agreement with M/s Synergy Waste Management Pvt. Ltd. for the disposal of the discarded medicines / drugs (iv ) Having 3 nos. of DG set of capacity 2x125 KVA & 1x160 KVA & the stack height provided with DG sets are adequate. (Acoustic enclosure provided). 3. As per the decision taken on 06.05.08, a letter was issued. Reply received informed regarding rectification measures taken ( provided Bio- Hazard symbol on the storage site.). Applied for authorization under BMW Rules. 4. Letter issued. EE(BMW) talked to the official (s) of the unit. Reply received . As per the decision taken on 13.06.08 letter issued. Required affidavit submitted.As decided by the Committee Authorization has been issued to the unit. 66 Keimed Limited, Drug S - 31.03.08 ----- Show Cause Notice Issue Letter Issue Letter Authorizati Authoriz No E-18, B-1 Extn, Stockist/ as decided in the reminder issued. reminder issued on under ation Action Mohan Co- Marketing Meeting on seeking Reply for BMW Rule issued. operative 15.01.08 was affidavit received complian s Granted. Industrial Estate, issued to the Unit for submitte ce. Mathura Road, on 22.02.08. correction d Delhi-44 Premises were of affidavit inspected on deficiencies regardin 03.03.08 and unit . Call on g found engaged in 27.08.2008. rectificat Storage of Drugs / ion of Pharmaceuticals the and its marketing . deficienc It was informed ies. that only one time ( on 09.10.07) a consignment of discarded drugs of 125 kg was given to M/s Synergy Waste Management Pvt. LTD. For its disposal. It was also informed that unit is sending back the discarded medicines to the manufactures, however in case of such eventuality the unit shall dispose the BMW to one of the approved Common BMW Operators.As decided in the meeting on 18.03.08, letter for deficiencies was issued. Reply dated .12- 06-08.w.r.t latter dated 06-05- 08.regarding confirmation about taking corrective measures received. As decided on 13.06.08 letter issued.Required affidavit submitted.. 67 Apollo Hospitals Stocking & S- 31.03.08 ----- Show Cause Notice Issue Letter Issue Letter Authorizati Authoriz No Enterprises Selling of 299 as decided in the reminder Issued. reminder issued. on under ation Action Limited (Ahel medicines / Meeting on seeking for Reply BMW Rule issued. Unit Apollo Drugs 15.01.08 was affidavit complian awaited. s Granted. Pharmacy), issued to the Unit for ce. IMCL Complex, on 22.02.08. correction Sarita Vihar, Applied for of Delhi-Mathura authorization under deficiencies Road, Delhi-76 BMW Rules on . Call on 0.08. Inspection 27.08.2008. was done on 30.04.08 & following are the main observations : (i) This site is the Centre for the NCR for distribution of the medicines/ drugs of Apollo Pharmacy. (ii) Separate Storage room / Isolated storage site not provided for the storage of discarded/ expired medicines / drugs. (iii) Labeling of Bio – Hazard Symbol not provided. (ii) Proper records/ Log Book not maintained for discarded medicines / drugs. (iv) The unit has agreement with M/s Synergy Waste Management Pvt. Ltd for the disposal of discarded medicines / drugs.
(V).No reply received. Letter issued . As per the decision taken on 13.06.08 letter issued. As decided by the Committee Authorization has been issued to the unit.
68 Becton ….. ….. 19.03.08 Not applied Show Cause Notice 4 member To be Issue Letter The To be To be Dickinson India as decided in the team inspected reminder issued inspection inspecte inspecte P.Ltd., 2, Meeting on comprising . for team to d. d .Call Community 15.01.08 was of Dr. T.K. complian inspect the on Centre , 3RD issued to the Unit Joshi, ce. Mandawali 28.11.2 Floor, Anand on 22.02.08. Reply EE(BMW), storage site 008. House , Saket w not received. Not Dr. Chetna and submit Delhi -17) Applied for & Trainee report by 3 ( Head Office at authorization under to inspect. 0.10.08. 6th Floor BMW Rules / Call on Signature Consent to 27.08.2008. Tower-B South Establish. Applied City, for authorization. on 19-03-08. Inspected. As per the decision taken on 13.06.08 Storage site at mandolin to be inspected.
69 M/s ……. ………. Not Applied The project figures . MS Inspecte Issue Letter Call for Letter Unit FoundationIntern for CTE in the list of 18 ,DPCC to d on reminder issued personal for came ational projects provided direct the 20.08.08 for hearing at persona for Charitable Trust by MoEFvide letter unit to complian 6:30 P.M. l personal Society 306, dated 16.04.08. As apply for ce. on hearing hearing Kohat Enclave, directed by Consent to Deficien 30.10.2008 issued. today. Pitampura, Delhi Chairman DPCC Establish cies The unit -34 Notice issued on & also seek observed to file 30.04.08 for copy of during CTE applying for Environme inspectio within consent to establish ntal n to be 10 days. and to submit Clearance . correspo environment Unit to nded. clearance from submit the MoEF required 2. Decision taken data as on 06.05.08 : asked based EE (BMW) to on the follow up. decision Ask the unit to file taken on following five 13.06.08. things : Call on (i)Consent to 27.08.2008 Establish (ii)Environmental Clearance (iii)Affidavit indicating date of start of construction and completion of construction. (iv) Approved architectural drawing (v) Completion Certificate. 3. Chairman,DPCC, to inspect. Letter issued. 4.As per the decision taken on 13.06.08 letter issued. Reply received. 70 Oscar Bio Tech 550 …….. Applied for The unit has Call for .Letter The unit File Call on Damage Issue Pvt. Ltd. (Multi CTE applied for consent personal Issued. has come submitted 07.10.2008 s and reminde Super Specialty 20.12.05. to establish on hearing on for to in bank r notice Hospital, A- 20.12.05 for 550 27.08.2008 personal CMC(Oran CMC (Ora Gaurant for Bl;ock, Shalimar beded hospital at at 3.00 PM. hearing ge) and nge) tee complia Bagh, Delhi-52) A-Block Shalimar By that and hearing decided nce of office address D- Bagh. Plot area as time unit seeks attended by by CMC CMC 5, !st floor,Okhla per affidavit must two representati (Orange decision Industrial Area, submitted is 29664 comply weeks ves of the ) not s by Phase-1, Delhi- Sq. m and built up with all the time for unit on submitte 06.11.2 20 area will be 5515 . documentar applying 10.09.08.C d. Case, 008 29 sq.m. Proposed y evidence with the MC(Orang was without date of including queries e) has taken in waiting commissioning as CGWA raised by decided the for per application was clearance, DPCC. damages of CMC minutes. 01.12.07. water ETP Since the Rs. 10 (Orange Send consumption total installation next Lakhs and ) on file 830 and item meeting Bank 07.10.0 administ KLD(Domestic wise of Gaurantee 8. As ratively 40KLD, sanitation compliance CMC(B of Rs. 1.2 decided on 265KLD, cooling of EC MW) Crore to be to be 07.11.2 495KLD, conditions. will be submitted taken by 008. horticulture Call on held only by the unit. BMW 20KLD & others 27.08.2008. on Committ 10 KLD). ETP 06.10.20 ee no. 1 with design 08 which in the capacity of is six meeting 250KLD is week on proposed with away. 30.10.0 secondary and File may 8. tertiary treatment. be Treated wastewater brought will be reused for in the cooling and CMC(Or horticultural ange) of purpose. DG sets- 10.09.20 1000KVA & 750 08 and KVA proposed unit may with acoustic file all enclosure. It is the mentioned that unit required will comply with documen BMW Rules. ts before As per the decision 10.09.20 taken by CMC in 08. Call its meeting taken for on 18.02.08, a personal letter was issued to hearing the unit on on 07.03.08 asking 10.09.20 EIA clearance. 8. 2.Reply dated 21- 05-08 regarding approval for consent to establish for the construction of hospital along with original affidavit was received. 3. Decision taken on 06.05.08 : Environmental Clearance (EC) filed. Ask the unit to file item-wise compliance of the EC conditions during the construction and the general conditions. Unit be also asked to commit on affidavit that it will follow the conditions in the operation phase. Response to be filed by BMW Cell in the meeting on 13.06.08. Check from the website of MOEF whether there is any adverse order in this case. Ask to file following : (i)Affidavit indicating date of start of construction and completion of construction. (ii) Approved architectural drawing (iii) Completion Certificate Chairman, DPCC, to inspect. 5. As per the decision taken on 13.06.08 Letter issued. Reply was recived w.r.t to said letter. 71 Society of 400 ………… 14.7.2006 The unit has Ask the unit To be Issue Letter Dr. Chetna Dr. Call for Unique Hospital applied for consent to file the inspected reminder issued to remind Chetna personal & Research to establish on CGWA . for for filing spoken hearing Institute ( Multi 14.07.06 for clearance complian of at 4.20 Super Specialty 400beded hospital for ground ce. documents. PM on Hospital & at Sector-19 water. Dr. Joshi’s 28.11.2 Research Dwarka, Delhi. Regarding team to 008 Institute at Plot area as per waste water inspect Call Sector-19 affidavit submitted i.e. 144 on Dwarka, Delhi) is 31502 Sq. m and KLD, direct 30.10.08. office address built up area will the unit to BD-73, Pitam be 29819.917 sq.m. install the Pura, Delhi-88 Proposed date of ETP and commissioning as also file the per application was required 01.10.07. water documents consumption total as per the 340 decision KLD(Domestic taken on 180KLD, cooling 13.06.2008. 140KLD, others 20 Call on KLD). ETP with 27.08.2008. design capacity of 150KLD is proposed with secondary and tertiary treatment. Treated wastewater will be reused for cooling and horticultural purpose. DG sets- 3 nos of 750 KVA capacity each proposed with acoustic enclosure. 3nos. oil fired boilers (1500Kg/hours. It is mentioned that unit will comply with BMW Rules. Environmental Clearance given by MoEF vide letter dated 16.05.07. As per the decision taken by CMC in its meeting taken on 18.02.08, a letter was issued to the unit on 11.03.08 asking to file an affidavit for compliance of EIA clearance conditions. However no reply received in this regard. As decided on 06.05.08, the unit was asked to file item-wise compliance of the EC conditions during the construction and the general conditions. and to commit on affidavit that it will follow the conditions in the operation phaseand was Asked to file following : (i) Affidavit indicating date of start of construction and completion of construction. (ii) Approved architectural drawing (iii) Completion Certificate As per the decision taken on 13.06.08 Letter issued.
72 Delhi 0 C- 20.03.07 Not Applied Case of Research 4 member To be Issue Letter Dr Chetna Dr. Dr. Biochemical 034 institute. As team inspected reminder issued to speak Chetna Chetna Research decided by the comprising . for Inspected and get spoken to speak Laboratory, Chairman DPCC, of Dr. T.K. complian alongwith expedite all to the 4874, Ansari all Research Joshi, EE ce. Dr. the concern Road, 24 Institute to be (bmw), T.K.Joshi required ed Daryaganj, taken up by BMW Dr.Chetna, information official. Delhi-2 Committee Trainee to asked for. no.1.Decision inspect. taken on 06.05.08: Call on Ask the unit to 27.08.2008. apply for Consent to Establish under the Air & Water Acts. Not applied for Consent to Establish & Operate As per the decision taken on 13.06.08 Letter issued. Observation during the inspection:- This is not a research lab it is just a simple testing laboratory. 73 St. Stephen's 595 N- 13-06-06 Consent 1. MS , DPCC Lette CTE CTE issued Adequacy Letter Dr. Hospital Tis 002 (valid up granted14.08. Authorization and to direct rissued granted with report and issued. Chetna Hazari, Delhi-54 to 08(CTE) Consent Granted 2. MS of the Reply subjected conditions. CGWA to speak 5-07-09) As per the general hospital to Received to clearance to MS of decision taken on file . Applied condition to be filed. the 06.05.08, letter application forCTE. that Call on hospital. issued for for Consent CGWA 30.10.2008 installation of to Establish clearance (a) Solar water and to seek and heating system compliance Adequac (b) Rain water w.r.t letter y report harvesting system issued to of ETP (c) Replacement of the Hospital to be ordinary Bulbs on filed with CFL 26.05.2008. within (d) ETP Call on 01 (e) Plantation of 27.08.2008. month. trees along side of the periphery of the Hospital building. 3. As per the decision taken on 13.06.08 letter issued. Reply received. 74 Jeewan 50 S- 14-01-08 Applied for 1. ------Issue Letter Call for Letter Unit Hospital & 022 CTE Authorization reminder issued personal for came Nursing on12.09.08 expired on 06-06- for hearing at persona for HomeGate 07. 2. Applied for complian 6.45 PM on l personal No.2,Jeewan renewal on 14-01- ce. 30.10.2008 hearing hearing Nagar, 08. issued. today. Opp.Maharani 3. Applied for CTE Bagh, New consent to establish applicati Delhi 110014 and not applied for on will CTO. be submitte d within a week. Call on 28.11.2 008 75 Madhukar 125 S- Fresh 24-Jul-08 1. This is a fresh ------CTE Letter SIT to SIT to Issue Multispecility 318 Case, (CTE) case. Applied for cannot issued inspect and inspect. Consent Hospital and applied CTE on 24-07-08. be report. Call to Research Centre for CTE 2. Proposed date granted on Establis Plot No. 5,FC- of commissioning without 30.10.2008 h . 29, Geetanjali 2010. 3. Reply installati Enclave, New dated 14.10.08 on of Delhi received ETP/STP informing: ETP and will be installed at noise the time of monitori construction. Noise ng monitoring will be report. sent after Unit is installation of DG also sets. Applied for required CGWA clearance. to file CGWA clearance . 76 Sembramky CBWTF W- Fresh 23-Jul- This is a fresh case. ------Call on Letter Let reply Letter Call on Environmental 370 Case, 08(CTE) Applied for CTE - 06.10.20 issued come from received 28.11.2 Management applied on 23-07-08 for the 08. COI or from 008 Pvt. Ltd for CTE Establishment of Applican DDA to COI. Khasra No. Common Bio- t needs sort out informin 83/22, Nale Wali Medical Waste to file all conformity g that Gali, Mundka Treatment Facility the issue. the Udyog Nagar, (CBWTF) at concerne area for Delhi-41 Mundka. d the site 2. As per MPD documen is not a 2001, Swarn Park ts. conform Mundka is ing mentioned at sl. industria No. 16 of the list of l area 20 non conforming as on clusters of date. industrial Howeve concentration r for having more than setting 70% plots in the up cluster with BMW industrial activities Treatme for redevelopment . nt Facility 3. The activity “ in the Hazardous Waste area, Processing viz. DPCC hospital/medical/in may dustrial waste” is decide mentioned at sl no. on its 46 of the list of own prohibited / level negative list of dependi industries ng upon (Annexure III) of dire MPD 2021. As per need of the note given in Delhi as the said Annexure well as, III a Public utility as per service involving provisio any of the activities n of referred to above MPD- shall be permitted 2021 in subject to consulta environmental tion with laws. DDA, if 4. The applicant needed has mentioned that plot area for the said facility will be one acre. 5. The applicant has mentioned that all the required equipments like incinerator (Double Chamber) with venturi scrubber, autoclaves, shredder etc. shall be installed. ETP shall be installed and treated effluent shall be reused. 6.A copy of letter from Office of the C.O.I received..
77 Envirocare CBWTF ------This is a case of #VALUE! ------Call on Unit has Letter Dr. Waste representation 06.10.20 applied for issued Chetna Management received from the 08 establishme to speak Company, Co., unit for the nt of . 72-A, Baba Establishment of Common Complex, Common Bio- Bio- Taimoor Marg, Medical Waste Medical New Delhi-65 Treatment Facility Waste (CBWTF) in Delhi. Treatment 2. The unit is not Facility for having any land of which they its own for the said require purpose and land from requested for Govt. Of providing the land. Delhi. This 3. As directed by letter may the Chairman, be DPCC the case is forwarded placed before the to DDA for Committee. appropriate action with a copy to Pr. Secretary (Health) . 78 Escorts Heart 222 S- 26.05.06 20.06.05 Authorization ------Ask the Letter Consent Institute & 007 ( CTO Valid till unit to file issued. to Research Centre, Renewal) 03.07.09.2. CGWA Operate Consent to operate clearance Granted Okhla Road ND- expired on and subject 25 11.06.08. to the 3. Compliance of conditio letter issued on n that 26.05.08 received. CGWA 4. Stack clearanc Monitoring report e will be of oil fired & CNG submitte fired boiler d within submitted one Concentration of month. the Particulate Matter meeting the prescribed norms. 5. ETP effluent test report submitted. Analysed parameter meeting the prescribed norms. 79 M/s Alcit (India) 27.04.07. Add the Added SIT to Pvt. Ltd. name of to the inspect. A-17, Lawrence 53 (46+7) list. Call on Road Industrial units in 28.11.2 Area, Phase-I, the 008. Delhi-110083 list/agend a for Pvt. Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 80 M/s. Alde Medi Not Add the Added Issue Impex Ltd. Applied name of to the notice K-33, Udyog 53 (46+7) list. for Nagar, Rohtak units in submitti Road, the ng Delhi-110041 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 81 M/s Ambey Not Add the Added Issue Laboratories, Applied name of to the notice D-10, DSIDC 53 (46+7) list. for Industrial units in submitti Complex, the ng Rohtak Road, list/agend applicati Delhi-110041 a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 82 M/s Arora Not Add the Added Issue Pharmaceuticals Applied name of to the notice (P) Ltd. 53 (46+7) list. for C-35/13, units in submitti Lawrence Road the ng Indl list/agend applicati Area, Delhi- a for Pvt. on for 110035 Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
83 M/s Care and Not Add the Added Issue Cure Applied name of to the notice Pharmaceuticals 53 (46+7) list. for Pvt. Ltd. units in submitti 164, Naharpur the ng Village, list/agend applicati Delhi-110085 a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 84 M/s Chempo Not Add the Added Issue Biologicals, A- Applied name of to the notice 50, G.T. Karnal 53 (46+7) list. for Road Industrial units in submitti Area, the ng Delhi-110033 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 85 M/s Chempo Not Add the Added Issue Drugs, Applied name of to the notice A-50, G.T. 53 (46+7) list. for Karnal Road units in submitti Industrial Area, the ng Delhi-110033 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
86 M/s Cooper Not Add the Added Issue Pharma, Applied name of to the notice B-59, Wazirpur 53 (46+7) list. for Industrial Area, units in submitti Delhi-110052 the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 87 M/s Dr. Not Add the Added Issue Wadhawa Applied name of to the notice Chemicals 53 (46+7) list. for Works, units in submitti F-14/58, Model the ng Town, list/agend applicati Delhi-110009. a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 88 M/s Dr. Wadhwa Not Add the Added Issue Pharmaceuticals, Applied name of to the notice G-40/2, 53 (46+7) list. for Lawarence Road, units in submitti Delhi-110035. the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
89 M/s Gene Not Add the Added Issue Laboratories Applied name of to the notice Ltd.,B-6, Badli 53 (46+7) list. for Industrial Area, units in submitti Delhi-110042. the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 90 M/s Gopesh 24.09.08 Add the Added SIT to Pharma, H-1455, name of to the inspect. DSIDC, Narela 53 (46+7) list. Call on Indl. Park, units in 28.11.2 Narels, Delhi- the 008. 110040. list/agend a for Pvt. Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 91 M/s La Grande Not Add the Added Issue Pvt. Ltd., Applied name of to the notice G-40/2, 53 (46+7) list. for Lawrence Road, units in submitti Delhi-110035. the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 92 M/s Nav Bharat Not Add the Added Issue Impex, C-24, Applied name of to the notice Lawreance Road, 53 (46+7) list. for Industrial Area, units in submitti Delhi-110035 the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 93 M/s. Nice Not Add the Added Issue Pharmaceuticals, Applied name of to the notice G-40/1, 53 (46+7) list. for Lawrence Road, units in submitti Industrial Area, the ng Delhi-110035 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
94 M/s Nice Not Add the Added Issue Remedies,A- Applied name of to the notice 61/2, G.T. 53 (46+7) list. for Karnal Road, units in submitti Industrial Area, the ng Delhi-110033 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 95 Standford Not Add the Added Issue Laboratories Pvt. Applied name of to the notice Ltd.K-30, Udyog 53 (46+7) list. for Nagar Industrial units in submitti Area, Phase-I the ng Delhi-110041 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 96 M/s. Swarn Not Add the Added Issue Enterprises,I-5, Applied name of to the notice Badli Indl. Area, 53 (46+7) list. for Delhi units in submitti the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
97 M/s. Sisla Not Add the Added Issue Laboratories J- Applied name of to the notice 2050, DSIDC, 53 (46+7) list. for Indl. Area units in submitti Narela, the ng Delhi-110040 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 98 M/s Bio Not Add the Added Issue Laboratories, Applied name of to the notice I-2118, DSIDC 53 (46+7) list. for Narela Indl. units in submitti Area, the ng Delhi-110040 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 99 M/s. Chemo Not Add the Added Issue Remedies, Applied name of to the notice A-50, G.T. 53 (46+7) list. for Karnal Road, units in submitti Industrial Area, the ng Delhi-110033 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 100 M/s. Wang Not Add the Added Issue Laboratories Applied name of to the notice International, 53 (46+7) list. for Office No. 2- units in submitti IInd Floor, Plot the ng No. 7, Local list/agend applicati Shopping Centre, a for Pvt. on for Karampura, Hospitals, authoriz New Delhi as ation C/o M/s Tose decided in under International Pvt. agenda 6 BMW Ltd., of the Rules H-1429, 1441, meeting of without DSIDC Indl 29.09.08,. waiting Area, Narela, for Delhi-110040. minutes of meeting. Call on 28.11.2 008. 101 M/s. Atlanta Not Add the Added Issue Pharmaceuticals Applied name of to the notice Off. No. 1, IInd 53 (46+7) list. for Floor, Plot No. 7, units in submitti Local the ng Shopping Centre, list/agend applicati Karampura, a for Pvt. on for New Delhi- Hospitals, authoriz 110015. as ation C/o M/s Tose decided in under International Pvt. agenda 6 BMW Ltd., of the Rules H-1429, 1441, meeting of without DSIDC Indl 29.09.08,. waiting Area, Narela, for Delhi-110040. minutes of meeting. Call on 28.11.2 008.
102 M/s Dr. Not Add the Added Issue Wellman’s Applied name of to the notice Homoeopathic 53 (46+7) list. for Laboratories units in submitti Ltd., AM-4, the ng Dilkhus Indl list/agend applicati Estate, G.T. a for Pvt. on for Karnal Road, Hospitals, authoriz Delhi-110035. as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
103 M/s Dr. Not Add the Added Issue Wellman’s Applied name of to the notice Homoeopathic 53 (46+7) list. for Laboratories units in submitti Ltd., A-108, the ng Wazirpur list/agend applicati Industrial Area, a for Pvt. on for Delhi-110052 Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 104 JVS Pharma Not Add the Added Issue Co.,A-108, Applied name of to the notice Wazirpur Indl. 53 (46+7) list. for Area, units in submitti Delhi-110052. the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 105 M/s. Abyss 24.09.08 Add the Added SIT to Pharma (P) name of to the inspect. Ltd.,B-121, 53 (46+7) list. Call on Phase-I, units in 28.11.2 Mayapuri, the 008. New Delhi- list/agend 110064. a for Pvt. Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 106 M/s. Alpine Not Add the Added Issue Industries,A-67, Applied name of to the notice Naraina 53 (46+7) list. for Industrial Area, units in submitti Phase-I, the ng New Delhi- list/agend applicati 110015. a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 107 M/s. Arbro 11.08.08 Add the Added SIT to Pharmaceuticals name of to the inspect. Limited, 6/14, 53 (46+7) list. Call on Kirti Nagar units in 28.11.2 Industrial Area, the 008. New Delhi- list/agend 110015 a for Pvt. Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 108 M/s. Bio Not Add the Added Issue Laboratories,302 Applied name of to the notice 6/7, Ranjit 53 (46+7) list. for Nagar, units in submitti Delhi-110008 the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 109 M/s. Grand Not Add the Added Issue Chemicals Applied name of to the notice Works, 53 (46+7) list. for C-212/2, units in submitti Mayapuri the ng Industrial Area, list/agend applicati New Delhi- a for Pvt. on for 11064 Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
110 M/s. Indus Not Add the Added Issue Pharma Pvt. Applied name of to the notice Ltd., 53 (46+7) list. for 5/2, Kirti Nagar units in submitti Industrial Area, the ng New Delhi- list/agend applicati 110015 a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 111 M/s. J.K. 17.09.08 Add the Added SIT to Remedies, name of to the inspect . 8/41, Kirti Nagar 53 (46+7) list. Call on Industrial Area, units in 28.11.2 New Delhi- the 008. 110015 list/agend a for Pvt. Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 112 M/s. New Loyds Not Add the Added Issue Surgico, B-15, Applied name of to the notice DSIDC 53 (46+7) list. for Complex, units in submitti Industrial Area, the ng Kirti Nagar, list/agend applicati New Delhi- a for Pvt. on for 110015 Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 113 M/s. Tribhawan 01.09.08 Add the Added SIT to Injectables, name of to the inspect. 8/39, Kirti Nagar 53 (46+7) list. Call on Industrial Area, units in 28.11.2 New Delhi- the 008. 110015 list/agend a for Pvt. Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 114 M/s. Wang Not Add the Added Issue Pharmaceuticals Applied name of to the notice & Chemicals,35- 53 (46+7) list. for A, Goyala units in submitti Khurd, Near the ng Najafgrah, list/agend applicati Delhi a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 115 M/s. Hahnemann Not Add the Added Issue Pharmaceuticals Applied name of to the notice (P) Ltd., 53 (46+7) list. for A-7, Narain units in submitti Industrial Area, the ng Phase-I, list/agend applicati New Delhi- a for Pvt. on for 110028 Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 116 Narm Not Add the Added Issue Pharmaceuticals, Applied name of to the notice A-9611, 53 (46+7) list. for Mayapuri units in submitti Industrial Area, the ng New Delhi- list/agend applicati 110064. a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
117 M/s. Asclepius Not Add the Added Issue Pharmaceuticals Applied name of to the notice Pvt. Ltd., 53 (46+7) list. for F-34/7, Okhla units in submitti Area, Phase –II, the ng New Delhi- list/agend applicati 110020 a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 118 M/s. J. Mitra & 24.06.08 Add the Added SIT to Co. Ltd.,A-180, name of to the inspect. Okhla Industrial 53 (46+7) list. Call on Area, units in 28.11.2 New Delhi- the 008 110020 list/agend N124 a for Pvt. Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 119 M/s. Kidney Not Add the Added Issue Care Fludis (P) Applied name of to the notice Ltd.,A-45, Okhla 53 (46+7) list. for Industrial Area, units in submitti Phase-I, the ng New Delhi- list/agend applicati 110020. a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 120 M/s. MANB Not Add the Added Issue Health Care,Y- Applied name of to the notice 12, Okhla 53 (46+7) list. for Indutrial Area, units in submitti Phase-II, the ng New Delhi- list/agend applicati 110020 a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 121 M/s. New Life Not Add the Added Issue Pharmaceuticals, Applied name of to the notice A-240, Okhla 53 (46+7) list. for Industrial Area, units in submitti Phase-I, the ng New Delhi- list/agend applicati 110020 a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
122 M/s. Pine Not Add the Added Issue Pharma Pvt. Applied name of to the notice Limited,91/2, 53 (46+7) list. for Okhla Industrial units in submitti Area-I, the ng New Delhi- list/agend applicati 110020. a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 123 M/s. Radicura 19.03.08 Add the Added SIT to Pharmaceuticals name of to the inspect. Pvt. Ltd.,B-117, 53 (46+7) list. Call on Okhla Industrial units in 28.11.2 Area-I, the 008. New Delhi- list/agend 110020 a for Pvt. Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 124 M/s. Ranbaxy Not Add the Added Issue Fine Chemicals, Applied name of to the notice (Diagnostic 53 (46+7) list. for Division), A-3, units in submitti Okhla Phase-I, the ng New Delhi- list/agend applicati 110020. a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 125 M/s. Stericat Not Add the Added Issue Gustring Pvt. Applied name of to the notice Ltd.E-25/B-1, 53 (46+7) list. for Mohan Co-Op. units in submitti Indl Area, the ng Mathura Road, list/agend applicati New Delhi- a for Pvt. on for 110044 Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 126 Surgi Media D- Not Add the Added Issue 9/1, Ph-I, Okhla Applied name of to the notice Indl Area, 53 (46+7) list. for New Delhi- units in submitti 110020. the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
127 M/s. Unimax 25.03.08 Add the Added SIT to Pharmaceuticals name of to the inspect. (P) Ltd.C-57, 53 (46+7) list. Call on Okhla Industrial units in 28.11.2 Area, Phase-I, the 008.N13 New Delhi- list/agend 0 110020 a for Pvt. Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 128 M/s. Uttam Air Not Add the Added Issue Products Pvt. Applied name of to the notice Ltd.F-90/5, 53 (46+7) list. for Okhla Industrial units in submitti Area, the ng New Delhi- list/agend applicati 110020. a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
129 M/s R.P.L. 25.03.08 Add the Added SIT to (India) name of to the inspect. Pharmaceuticals 53 (46+7) list. Call on (P) Ltd. D-8/6, units in 28.11.2 Okhla Industrial the 008. Area Phase-I, list/agend New Delhi- a for Pvt. 110020 Hospitals, as decided in agenda 6 of the meeting of 29.09.08,. 130 M/s. H.C. Sen & Not Add the Added Issue Company 5A/1, Applied name of to the notice Darya Ganj. 53 (46+7) list. for Ansari Road, units in submitti New Delhi- the ng 110006 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
131 M/s. Medochem Not Add the Added Issue Laboratories Pvt. Applied name of to the notice Ltd. 53 (46+7) list. for 624/4A,Vishwas units in submitti Nagar,Shahdara the ng Delhi-110032 list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 132 M/s Best Not Add the Added Issue Laboratories,C- Applied name of to the notice 53, Phase-II, 53 (46+7) list. for Okhla Industrial units in submitti area, New Delhi- the ng 110020. list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 133 M/s U.K.Phama Not Add the Added Issue 4/2611, Bihari Applied name of to the notice Colony, Delhi- 53 (46+7) list. for 110032 units in submitti the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008.
134 M/s Frontie Not Add the Added Issue Chemical Works Applied name of to the notice A-6/3, Jhilmil 53 (46+7) list. for Indl.Area, Delhi units in submitti the ng list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 135 M/s. Logotech Not Add the Added Issue India Pvt. Ltd., Applied name of to the notice 403, Patparganj 53 (46+7) list. for Indl Area, units in submitti Patparganj the ng New Delhi. list/agend applicati a for Pvt. on for Hospitals, authoriz as ation decided in under agenda 6 BMW of the Rules meeting of without 29.09.08,. waiting for minutes of meeting. Call on 28.11.2 008. 136 Ayurveda Applied A Complaint The unit Letter Remind Letter Complianc Added Issue Kendra , B- 5/ against Ayurveda may be issued. . er for issued. e on to the authoriz 99 , Safderjang Kendra , B- 5/ asked to complia 30.10.200 list. ation Enclave , New 99 , Safderjang apply for nce. 8 and add with a Delhi -29. Enclave , New authorizati it to the conditio Delhi -29., was on under list n that received from Mr. BMW /Agenda exhaust N.K.Khanna of Rules and for the of the Safderjang also Private emissio Enclave & the confirm Hospitals. ns will said Ayurveda installation not be Kendra was of oil & towards inspected by the grease the Official of PGRC trap. Call residenc of DPCC and the on e of matter was also 27.08.200 complai placed before the 8. nant. CMC in its meetings on 18.06.08 & 04.07.08 .As per the inspection report the said Ayurveda Kendra is engaged in Ayurvedic treatment & premises is used for Ayurvedic Clinic/Hospital & Bio –Medical waste is generated . CMC in its meeting on 18.06.08 has taken following decision in this case; “ Based on the inspection report , it appears that it is an Ayurvedic hospital requiring authorization under BMW Rules . BMW Committee – I may inspect and report in the next BMW meeting on 14.07.08.” Later on Dr. Sudha Asokan of the said Ayurveda Kendra attended the hearing during the CMC ( Orange meeting and was directed to install Oil & Grease Trap Tank . Letter issued. As directed by Member Secretary an inspection was also conducted on 21.08.08 . Oil & Grease trap found installed . Unit is engaged in the oil massage( her bal oils) activity & as informed infectious waste is not generated from the unit / activity .
137 M/s Shanti 20 Applied M/s Shanti Complianc Added Put up Nursing Home Nursing Home e on to the the file limited, E-1, limited, E-1, 30.10.200 list. administ Panchsheel Panchsheel Park, 8 and add ratively. Park, Naveen it to the Naveen Shahdara, Delhi list Shahdara, was inspected by /Agenda Delhi the trainee BMW for the as directed by Private Chairman DPCC, Hospitals.. w.r.t complaint received & as decided by the Committee the matter was taken up in the previous meeting of the Committee held on 27.08.08 and as decided in the said meeting the case was put on file . The Nursing Home is 20 bedded & case pertains to BMW Committee No.2. As decided on file action is being taken . 138 M/s Ayush Not Regarding Ask to Letters Issue Therapy Applied Advertisement in install Oil issued notice Centre, C-62, the News Paper & Grease for Ist Floor, Preet by Ayush Trap in all submitti Vihar, Delhi Therapy Centre Ayush ng -92 as decided by the Therapy applicati Committee in the Centres in on for meeting on Delhi and authoriz 27.08.08 , an confirm in ation inspection of one a under of the therapy consolidat BMW Centre of Ayush ed manner Rules. in Preet Vihar by Call on Area of Delhi 30.10.200 28.11.2 ( M/s Ayush 8, giving 008 Therapy Centre, list of C-62, Ist Floor, addresses Preet Vihar, Delhi of each -92) was unit. conducted by a Team as directed by Chairman DPCC. The Centre found engaged in activity of massage using herbal / ayurvedic oil. About 100 no of people are coming to the centre per month. Oil & Grease trap not provided . 139 M/s Aspen 27.04.07. During the Ask the Letter Call on Case Issue Laboratories Pvt. inspection of M/s unit to issued. 30.10.200 added reminde Ltd., Jagat Diagnostic file CTE 8 for in the r letter. B-82, G.T. Pvt. Ltd. B -82 , and complianc list. Karnal Road, G.T.K. Road correct e of Industrial Area, Industrial Area, the correction Delhi-110033 Delhi-33 on deficien of 20.08.08, as cies deficiencie decided by the observe s. Add to Committee, In the d during the list same premises inspecti /Agenda another unit M/s on. for the Aspen Private Laboratories Pvt. Hospitals.. Ltd. was also found operating which imports drugs/ Testing kits used for HIV etc. and generates Bio- Medical Waste & having agreement with one of the Common Operators for BMW Treatment & disposal Deficiencies observed w.r.t compliance of BMW Rules. ( Proper segregation, storage & labeling of Bio- Hazard etc. were not observed.) . This unit has applied for authorization under the BMW Rules to DPCC. Action taken w.r.t. decision taken in the meeting on 27.08.08 : As decided, a letter has been issued to M/s Aspen Laboratories Pvt. Ltd. which was found operating in the same premises and generating Bio- Medical waste for applying for CTE & for correction of the deficiencies observed during the inspection on 20.08.08. .