Request for Proposal s46
Total Page:16
File Type:pdf, Size:1020Kb
Page 1 ______
SCHEDULE I
BIDDERS SUBMISSION CHECKLIST
REQUEST FOR PROPOSAL RFP15-1519 ______
Your submission must be submitted on time as per section 1.6. The proposal submissionmust include the following: YES 1. SCHEDULE II – Itemized Price List ____ 2. SCHEDULE II (A) – Proposal Response Form ____ 3. SCHEDULE II (B) – Proposal Signature(s) ____ 4. SCHEDULE III – Sub-contractors ____
FAILURE TO SIGN YOUR PROPOSAL WILL RESULT IN AN AUTOMATIC REJECTION. Page 2 ______
SCHEDULE II ITEMIZED PRICE LIST
Proposals shall be itemized as indicated. The University of Northern British Columbia reserves the right to increase or delete any item or number of items shown hereunder.
NOTE 1: Pricing below must be submitted in Canadian Funds, landed, taxes out.
NOTE 2: All cost must be listed below. The University will not pay for any charges not included in the respondent’s proposal.
NOTE 3: Prices below are to reflect the work as outlined in Attachments A and B. Schedule represents each year of the contract.
NOTE 4: Even though the number of devices is an estimate, the Contract Price is to be based on this quantity.
NOTE 5: In the event of a discrepancy between the written and numerical amounts of any price quoted, the written amount shall prevail.
NOTE 6: Having examined all of the Proposal documents and all addendums, if any, and reviewed the site and heard the explanation at the mandatory site visit, the signatory (Contractor) offers to the University of Northern British Columbia (University) to execute the Work for the Project as listed herein for total amount of quotation.
NOTE 7: Each line item below is to be invoiced separately and submitted in conjunction with the required report by deadline noted. To further clarify, a separate invoice and report is required for each system/type and each building.
NOTE 8: Below pricing will remain firm through the first year of the contract.
The contractor is to indicate and substantiate in writing to the attention of the UNBC Director Facilities Management a minimum of 120 days prior to the end of a term any proposed market driven price increases or decreases for the following term. If no such notice is received by the University the proposed pricing will remain in effect for the remainder of the contract.
The University’s acceptance of the proposed price or any other agreed upon price will be done so in writing. If the contractor and University are unable to come to agreement on pricing before the end of the term, then the contract resulting from this tender will end and the contractor’s services will no longer be required or paid for under the said contract. Page 3 ______
Fire System Inspection, Test and Verification
Work completed between May 1 and May 31. Report and invoice due by June 15, of the same year.
Building System Type Total
1. Agora Kitchen Hood Suppression $______2. Kitchen Duct Clean $______
3. Administration - Server Fire Alarm Devices $______4. Room Suppression Fire Signalling/Control $______
5. Conference/NUSC Kitchen Hood Suppression $______6. Kitchen Suppression Kitchen Duct Clean $______
7. Research Lab-CO2 Fire Alarm Devices $______8. Suppression Fire Signalling/Control $______
Work completed between June 1 and June 30. Report and invoice due by July 15 of the same year.
Building System Type Total
9. Geoffrey R. Weller Fire Alarm Devices $______10. Library Fire Signalling/Control $______11. Sprinkler – Wet $______
12. Teaching Lab Fire Alarm Devices $______13. Fire Signalling/Control $______14. Sprinkler – Wet $______
Work completed between July 1 and July 31. Report and invoice due by August 15, of the same year.
Building System Type Total
15. Dr Donald Rix Northern Fire Alarm Devices $______16. Health Sciences Centre Fire Signalling/Control $______17. (Medical) Sprinkler – Wet $______18. Sprinkler – Dry $______
19. Agora Fire Alarm Devices $______Page 4 ______
20. Fire Signalling/Control $______21. Sprinkler – Wet (3) $______
Work completed between August 1 and August 31. Report and invoice due by September 15, of the same year.
Building System Type Total
22. Residence #1 Fire Alarm Devices $______23. Fire Signalling/Control $______24. Sprinkler – Wet $______
25. Residence #2 Fire Alarm Devices $______26. Fire Signalling/Control $______27. Sprinkler – Wet $______
28. Terrace Campus Fire Alarm Devices $______4817 Keith Av Fire Signalling/Control $______Terrace BC
Work completed between September 1 and September 30. Report and invoice due by October 15, of the same year.
Building System Type Total
29. BioEnergy Plant Dry Sprinkler System $______
30. Daycare Dry Sprinkler System $______
31 Research Lab Dry Sprinkler System $______
Work completed between October 1 and October 31. Report and invoice due by November 15, of the same year.
Building System Type Total
32. I.K. Barber Enhanced Fire Alarm Devices $______Forestry Lab (EFL) Fire Signalling/Control $______
33, Daycare Fire Alarm Devices $______34. Fire Signalling/Control $______35. Sprinkler $______Page 5 ______
36. Maintenance Shop Fire Alarm Devices $______37. Fire Signalling/Control $______
38 Power Plant Fire Alarm Devices $______39. Fire Signalling/Control $______40. Sprinkler – Wet $______
41. Administration Fire Alarm Devices $______42. Fire Signalling/Control $______43. Sprinkler – Wet $______
Work completed between November 1 and November 30. Report and invoice due by December 15, of the same year.
Building System Type Total
44. Conference/NUSC Fire Alarm Devices $______45. Fire Signalling/Control $______46. Sprinkler – Wet $______
47. Research Lab Fire Alarm Devices $______48. Fire Signalling/Control $______49. Sprinkler – Wet $______
50.. Agora Kitchen Hood Suppression $______51. Kitchen Duct Clean $______
52. Administration - Server Fire Alarm Devices $______53. Room Suppression Fire Signalling/Control $______
54. Conference/NUSC Kitchen Hood Suppression $______55. Kitchen Suppression Kitchen Duct Clean $______
56. Research Lab-CO2 Fire Alarm Devices $______57. Suppression Fire Signalling/Control $______
Work completed between December 1 and December 31. Report and invoice due by January 15, of the following year.
Building System Type Total
58. Teaching & Learning Fire Alarm Devices $______59. Centre Fire Signalling/Control $______60. Sprinkler – Wet $______Page 6 ______
61. BMO Building Fire Alarm Devices $______62. 1310 3rd Av Fire Signalling/Control $______Prince George BC
63. BioEnergy Plant Fire Alarm Devices $______64. Fire Signalling/Control $______
65. Charles Jago Northern Fire Alarm Devices $______66. Sport Centre (NSC) Fire Signalling/Control $______67. Sprinkler – Wet $______
Work completed between January 1 and January 31. Report and invoice due by February 15, of the same year.
79. Main Campus CHUBB/Edwards Site Visit $______
Other costs (if any):
Sub-total of entire work $______GST $______
Total for first term of contract $______Page 7 ______
SCHEDULE II (A) PROPOSAL RESPONSE FORM
REQUEST FOR PROPOSAL RFP15-1519 ______
This proposal response form must be completed by each Proponent and forwarded to The University of Northern British Columbia. All requirements outlined in the Request for Proposal with their submission and any other documentation requested by UNBC, and any important information developed by the Proponent as part of its presentation, must accompany this form.
PROPOSAL
We, ______, having examined the Request for Proposal and all other information and documents included in the Request for Proposal, do hereby offer and agree to furnish ______as described.
1. Receipt of the following addenda is acknowledged: Addendum No.______Date: ______Addendum No.______Date: ______Addendum No.______Date: ______
2. The University reserves the right to waive irregularities and informalities, to reject proposals from Proponents found not to be responsive according to the terms of the invitation, and the right to reject all proposals. Page 8 ______
SCHEDULE II (B)
PROPOSAL SIGNATURE(S)
REQUEST FOR PROPOSAL RFP15-1519 ______
The undersigned agrees not to withdraw or modify this Proposal for a period of ninety (90) days from submission deadline.
NAME OF FIRM: ______
AUTHORIZING SIGNATURE: ______
______Print Name Official Capacity: ______
Address: ______
City: ______
Province or State: ______Postal or Zip Code: ______
Date: ______
Telephone: ______Fax:______
Duly authorized officers of the Proponent(s) shall properly execute the Proposal as follows: If the Proponent is a corporation, the proposal shall be signed in the name and under the seal of the corporation by a duly authorized officer of the corporation, with the designation of hislher official capacity, and attested properly. The proposal shall show the place in which the corporation is chartered.
If the Proponent is an individual, he or she shall sign the proposal in person or by representative and be witnessed, stating the name or style, if any, under which he or she is doing business. If the signing is by representative, his or her power of attorney or other authorization shall be stated, and a certified copy thereof shall be attached to the Proposal.
If the Proponent is a joint venture or partnership, the proposal shall be signed by each of the persons or firms, which is a party to the joint venture agreement. A certified copy of the joint venture agreement shall be attached to the Proposal. A joint venture will not be accepted unless the joint venture agreement or some other signed and legally binding instrument is certified and attached to the proposal, containing provisions for one of the parties to the joint venture to be in full direction of the project and to exercise this direction through a single individual, to be appointed Manager of Operations with the consent of all parties to the joint venture agreement. Page 9 ______
SCHEDULE III
PROPOSED WORK SCHEDULE
REQUEST FOR PROPOSAL RFP15-1519 ______
1. Please include a proposed list of any sub-contractors you may be hiring to assist in the completion of this project.
1) The Contractor shall maintain and require Subcontractor(s) to maintain Workers’ Compensation coverage. 2) The subcontractor will indemnify and save the University of Northern BC harmless from any and all claims against the University arising out of the performance of the Contractor’s and subcontractor’s services under this agreement 3) The contractor warrants that the subcontractor is fully insured and that the insurance is adequate to provide coverage for any injuries sustained by any person on the worksite or for any property damages occurring as a direct result of the work done under this contract.