Khaled M. Yousef, Civil Engineer Project Engineer 419.215.1411
Total Page:16
File Type:pdf, Size:1020Kb
Khaled M. Yousef, Civil Engineer [email protected] Project Engineer 419.215.1411
PROFESSIONAL EXPEREINCE Past positions include Project Manager/Engineer, Owner Representative; including Private and Public Entities. Local, State, Federal and International environmental permitting, Site Selection & Design, Construction Documents’ Development, on-site inspection, Business Development, ISO 9001 Quality Assurance, Six Sigma Green Belt Certified, Manufacturing Facilities Design-Bid-Build & Design/Build Contract Documents’ Preparation, and International Multi-Discipline work flow coordination across multiple fields.
Accomplishments Statements
Construction Mechanic (Seabee) U.S. Navy Reserve Port Hueneme, CA 09/12-Current 1. Repair and maintain diesel and gasoline engines, and adjust and repair ignition, fuel, electrical, hydraulic and steering systems. 2. Repair and maintain heavy construction and automotive equipment including, buses, dump trucks, bulldozers, rollers, cranes, backhoes, pile drivers, and tactical vehicles 3. Perform shop management functions such as maintenance scheduling and spare parts inventory control; and make estimates of material, labor, and equipment requirements. 4. Work with hoisting and jacking equipment, power tools, measuring instruments, gauges and meters, lubricating equipment, and maintain and repair tires, batteries, brakes and valves.
Self-Employed Corning, NY 08/10-Current Residential and Commercial Design & Renovations. a. Evaluate the job and provide cost estimates and projected schedule. b. Perform painting, carpentry, and plumbing duties as required. c. Hire electrical subcontractors and inspect the work site to ensure work is proceeding in a timely and orderly fashion.
Facilities Project Engineer Corning Incorporated Corning, NY 07/08 – 08/10 1. Facility Expansion, Corning, NY a. Saved the project approximately 3 weeks by publishing a draft Request For Quotation (RFQ), including specifications and preliminary layouts, and meeting with general contractors prior to the RFQ milestone. b. Self-Performed temporary office relocation, saving the project approximately $100K & 3 weeks. c. Completed Site Plan preparation and permitting prior to Award of Project, saving the project approximately $50K and 4-6 weeks. d. Led the discussions with U. S. Green Building Council in preparation for acquiring a project LEED certificate.
2. Melting Services Equipment Installation, Shizuoka, Japan a. Led the preparation of Scope, Schedule & Budget for six additional melting lines in the facility resulting in setting the ground work for project negotiations in coordination with capital procurement.
3. Tunnel Kiln Installation Corning, NY a. Manage Tunnel Kiln Installation schedule to meet internal customer’s requirements. Responsibilities included coordination between General contractor and all subcontractors to ensure progress meets or exceeds owner’s requirements. Review of construction plans to ensure installation meets engineering specifications. Support onsite safety representative ensuring zero recordable accidents during the lifetime of the project.
4. Lab Expansions/Facility Renovations Corning, NY a. Review of Civil, Structural & Architectural Design Plans to ensure design and owner’s specifications meet on- site construction resulting in avoidance of multiple installation problems and continual responsiveness.
CONFIDENTIAL Page 1 of 2 Khaled M. Yousef, Civil Engineer [email protected] Project Engineer 419.215.1411
Project Manager, Associate SSOE, Inc. Toledo, Ohio 02/06 – 07/08 1. Section Manager, Shanghai, China a. Business start-up. Coach, direct, coordinate, facilitate and supervise section personnel, including all employment and employee relations activities. Ensure the technical competency and quality of work performed by staff. 2. Implementation of Facilities Siting Feasibility Study-Petrochemical, Detroit, Michigan a. Allocated refinery buildings to significantly reduce severe personnel injury in the event of Vapor Cloud Explosion (VCE). 3. Extensive experience in calculating storm water run-off coefficients and retention requirements of specific open graded ground covers and all related tasks for residential subdivisions up to 100 acres and commercial subdivision for large retail developments.
Project Engineer Feller, Finch & Associates, Inc. Maumee, Ohio 02/03 - 02/06 a. Governmental – Village Engineer Haskins, Ohio Responsible for identifying community development needs in coordination with Village Administrators and Mayor. Identify, prepare and submit grant applications in support of development plans. Prepare Bid & construction documents, attend and administer, bid openings and project meetings. Approve contractor drawings, prepare and execute project punch list and ensure O&M Procedures in place. b. Land Development utilizing AutoCAD and/or Microstation to develop plans detailing water, wastewater, drainage and storm water retention plans.
Business Instructor Stautzenberger College Toledo, Ohio 02/02 - 02/03 a. Lectured in Basic Economics and Small Business Development resulting in increased awareness of coaching responsibilities & duties.
Education Bachelor of Science in Civil Engineering University of Toledo Toledo, Ohio 1999 – 2001
Certifications OSHA Construction & Safety Certification Six Sigma Green Belt Certification
Computer Skills AutoCAD & AutoCAD 3D, Microstation, MS Professional – MS Project Manager – MS SharePoint, Primavera, Acrobat Professional & Applications.
Affiliation Sylvania Township Zoning Commission Board – Board Member Sylvania Twp., Ohio 2007-2012 Sylvania Township Land Use Update Steering Committee Sylvania Twp., Ohio 2007 Toledo Metropolitan Area Council of Government (TMACOG) Toledo, Ohio 2004-2008 TMACOG – Finance & Audit Committee Toledo, Ohio 2006-2008 USGBS 2009 - Current
Languages English: Fluent, Arabic: Fluent
Special Attributes Exceptionally adaptive, International Business Experience, Sales and Client Relations’ Development, Multidiscipline Design and Construction Capabilities & Site Selection.
CONFIDENTIAL Page 2 of 2