ARC 414: ENVIRONMENTAL CONTROL SYSTEMS SPRING SEMESTER 2003

CALENDAR (version3) as of Wednesday - February 26, 2003

M W MONDAY TU WEDNESDAY TH FRIDAY SA SU Jan I 6 7 8 9 10 11 12

Jan II 13 14 15 16 17 18 19

Jan III 20 21 22 23 24 25 26 MLK Jr. DAY Jan IV 17 28 29 30 31 1 2 Feb

Feb V 3 4 5 6 7 8 9

Feb VI 10 11 12 13 14 15 16

Feb VII 17 18 19 20 21 22 23

Feb VIII 24 25 26 27 28 1 2 H.V.A.C. (I) H.V.A.C. (II) H.V.A.C. (III)

Introduction; definitions; System components; energy Refrigeration process. classification. sources; heating. Mar Mar IX 3 4 5 6 7 8 9 H.V.A.C. (IV) H.V.A.C. (V) H.V.A.C. (VI)

Distribution systems. Distribution systems District Heating and Cooling. (continued). System Phase Two due. Mar BR. 10 11 12 13 14 15 16 SPRING BREAK VACATION

Mar X 17 18 19 20 21 22 23 HISTORY OF GLAZING & WATER & WASTE I MID TERM EXAM ONE BUILDING CONDITIONING Water supply sources and Covers all the material up to Historic development of systems. this point. Glazing and HVAC systems and their impact on buildings. Case Study (Trial) due Mar XI 24 25 26 27 28 29 30 VERTICAL WATER & WASTE II WATER & WASTE III TRANSPORTATION I Sewage systems in buildings. Systems operation and types. Elements of water distribution Storm water systems. in buildings. System Phase Three due Apr Timeline Project Due Apr XII 31 1 2 3 4 5 6 VERTICAL ARCHITECTURAL HISTORY OF PLUMBING TRANSPORTATION II ACOUSTICS I and VERTICAL TRANS. Design implications and system estimation. Physical characteristics of Development and impact of sound. plumbing and vertical transportation in buildings.

Case Study (Actual) due Timeline Project on the web Apr XIII 7 8 9 10 11 12 13 ARCHITECTURAL ARCHITECTURAL FIELD TRIP ACOUSTICS II ACOUSTICS III Memorial Auditorium (BTI Sound measurement and the Sound in enclosed spaces; Center). Decibel scale. geometry of acoustics.

Apr XIV 14 15 16 17 18 19 20 ARCHITECTURAL ACOUSTICS IV SPRING HOLIDAY SPRING HOLIDAY Noise and vibration problems / solutions. Apr XV 21 22 23 24 25 26 27 FIRE SAFETY & FIRE SAFETY & HISTORY OF ACOUSTICS PROTECTION II PROTECTION I and FIRE PROTECTION SYSTEMS Means of egress; fire Goals and objectives of suppression and safety and protection. Development and impact of compartmentalization. knowledge of acoustics on architecture. Historical influences of fire danger on architecture.

System Phase Four due Apr XVI 28 29 30 1 2 3 4 FIRE SAFETY & FIRE SAFETY & COURSE WRAP-UP May PROTECTION II PROTECTION III Course / Instructor Fire detection systems. Fire suppression and evaluations. compartmentalization.

May FIN. 5 6 7 8 9 10 11

Y FIN. 12 13 14 15 16 17 18 MID TERM EXAM TWO Covers all the material since the first Midterm Exam.