Profile Summary s1

Total Page:16

File Type:pdf, Size:1020Kb

Profile Summary s1

JACKY JINDAL P ERMANENT A DDRESS : C/o Raj Kumar, QUALIFICATION : R.V.Shanti Nagar,Street No.4 MBA (Project Management) Near Temple,Gangsar Jaitu B.TECH (Mechanical) Distt. Faridkot. Pincode:151202 E-MAIL : Punjab. jindal. [email protected]  +91-9814893940(Mob.) jindal. [email protected] +91-7986128324(Mob.)

S ENIOR E NGINEER (MECHANICAL )

P ROFILE SUMMARY A self-managed and result-oriented Project Engineer with Nine years (9.0+) of experience in Project Management, Piping/Site Engineering for Large Size Lump Sum Turnkey, Refinery & Petrochemical Based EPC Projects .Proven ability management in Piping Job starting from engineering stage to Handover stage to achieve successful completion of Project in terms of Quality, Cost & Time. Strategic engineer with strong interpersonal, communication, problem solving and decision making skills. Ability to establish and maintain strong alliances, drives projects to successful completion; convey complex technical requirements/data, exceed customer expectations and achieve fiscal bottom-line results.

CORE COMPETENCIES Project Management/Control & Site Engineering, Maintenance, Fabrication,Erection &Pre- Commissioning of Mechanical Projects (Process Piping/Structural Works), Materials Controlling/Handling, Billing, Resource Optimization, Quality Assurance, Inspection & Testing, Negotiations & Contracts, Site Coordination, Team Management.

PROFESSIONAL EXPERIENCE

GANNON DUNKERLEY & CO., LIMITED Senior Engineer Jul-2015 to Present

Project: MOU-A/G Piping, Structural & Equipments’ Works for SEZ Os ’ & Us, ’ J3-RIL, Jamnagar Mechanical Works Comprising Erection of Mechanical Equipments,’ Fabrication & Erection of Unit Pipings’ & Offsite Pipings ’ (Rack, Sleeper, Track & Flare) & Other Process Units besides Under-Ground Piping. , Painting and Other Civil &Structural Works in Utilities & Off-Sites of Existing Refinery area. Client: M/s Reliance Industries Limited, Jamnagar Senior Engineer Jun-2012 to Jun-2015

Project: UG/AG Offsite Pipings’ (Rack, Sleeper & Flare), Structural & Equipment Works for Sez & Non-Sez of Aromatics Complex Project, OMPL Site Mangalore This project involved 4.5Lacs Inch Dia ,14.5 Lacs Inch meter and 2000MT Equipment erection including Knock out Drum & Vertical vessels(Static and Rotary) equipment and The total contract of mechanical piping works, structural and equipment are 350 Crore.

Client: M/s OMPL-ONGC Mangalore Refinery & Petrochemical Limited, Mangalore (Karnataka) PMC: M/s Toyo Engineering India Limited Engineer-II (Piping-Execution) Jul-2010 to May-2012

Project: Above Ground/Under Ground Offsite Pipings’ (Rack, Sleeper & Flare), Structural & Equipments’ Works, HMEL Site, Bathinda Client: M/s HMEL-Mittal Energy Limited, Bathinda (Punjab) PMC: M/s Engineers India Limited PETRON ENGINEERING CONSTRUCTION LIMITED Piping Engineer (Execution) Oct-2009 to Jun-2010

Project: NHT & DHDT Extension Unit at CPCL Refinery, Chennai Mechanical Works Comprising Erection of Mechanical Equipments,’ Fabrication and Erection of Unit process piping lines, Steam-Tracing, Vessel Trimmings, Painting and Other Related Civil & Structural Works in Utilities & Off-Sites of Existing Refinery area, & most delicate piping work in construction field. The Only agency Carrying out the Entire structural, Under Ground & Above ground Piping work and Equipment Erection Including 400 MT for NHT & DHDT Extension Unit at CPCL Refinery ,Chennai Client: M/s Chennai Petroleum Corp. Limited. Refinery, Chennai PMC: M/s Engineers India Limited Piping Engineer (Execution) Jul-2008 to Sept-2009

Project: NCU & MEG-Naphtha Cracker Project, IOCL Refinery, Panipat Mechanical Works Comprising of Fabrication & Erection of P-91 Pipes, and other Unit process piping Lines, one of the most delicate piping work in construction field. The Only agency Carrying out the Entire structural, Under Ground & Above ground Piping work and Equipment Erection Including 890 MT and 92 mtrs height of Wash Tower for MEG Project at IOCL Panipat which is incidentally one of the most heaviest one in the IOCL Panipat Refinery. Client: M/s Indian Oil & Petroleum Corp. Limited. Refinery, Panipat, (Haryana) PMC: M/s Engineers India Limited P&R INFRAPROJECTS LIMITED, CHANDIGARH Mechanical Engineer (Execution) Jul-2008 to Sept-2009

Project: 192 MW Allain Duhangan Hydropower Electric Project, Manali, Himachal Pradesh Mechanical Works Comprising of Fabrication, Erection, supply, transportation & testing of Penstock Steel Liners 2.2 mtrs Dia & 4500 MT and other piping works Client: M/s A.D.Hydropower Limited

WORKING PROFILE

Fabrication, erection, inspection, testing of various systems in Unit piping, Offsite Pipings’ (Rack, Sleeper, Track & Flare) Vessel Trimmings, Steam Tracing, Piping Supports, and Vessel Platforms Ladders & other misc. Structural works, Erection of Static and Rotary equipments’ with alignments related to refinery as per isometrics and GA drawings. To execute overall on plot piping fabrication and erection works include identification of materials, coordination for the qualification of welders, inspection of site as per isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding, coordination for the NDT, installation of piping, preparation of as built drawing and test pack, preparation of mechanical punch list, hydro testing, Flange Management and box up activities as per applicable codes, procedure and standards. Preparation of construction method statements and procedures like procedures for fabrication of piping, installation and testing of piping and structures,’ installation of equipments etc. To liaise with engineering team for the completion of approved construction (AFC) drawing and ensure complete transmittal of the same in to site To check the Bill of Material (Material Take Off) as per drawing for ensuring requirements are realistically quantified as per scope and budget and follow up the delivery of the project/construction materials and to liaise with procurement and material management team to ensure the project piping material delivery are in time as per planned schedule to site. Site Planning, materials Co-ordination, preparation of reports/documents related to QA/QC and Erection as per P&IDs’ and Isometric drawings along with ensuring safe work practices at Job site.

Creating and monitoring of front available and Attend progress review meetings.

Manage all site fabrication and erection activities as per International Codes and Standards and Welding Procedure Specification approved by the Client.

Make planning/scheduling & monitoring for execution/progress at site works. Develop a test package for piping and coordinate with clients to preparing and maintaining various QA/QC documents and above ground (A/G) piping Test Package and assist in preparation of test packages for Pneumatic tests and Hydrostatic tests and line check, including system limit on P&ID and piping Isometrics and Verification of isometric drawing with respect to P&ID.

Preparing the punch list items as per P&ID and Isometric such as, Pipe supports, Valves, Guides, Shoe supports and NDT completion and approving/ releasing packages for hydro test and assures that all joints are exposed for examination during the pressure test and Raising MTO(s) for all materials required to additional materials for hydro test etc. Preparation of Resource allocation chart / Bulk MTOs/BOQs/Running’ ’ bills and Final bills and Inspection, procurement & fulfillment of materials such as plates, gratings, structural items, pipes, valves, fittings, instruments, equipments,’ vessels etc. Responsible for carrying out MCC (Mechanical completion certificate), Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project and Witness of alignment, orientation and dimensions of installed piping. Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical. Confirm repairs, re-testing and re-inspection in accordance with specifications. Making a re-instatement punch list and clearing the items and Witnessing of Flange joint assembly and bolt torque. Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per the latest drawing for construction, codes and specification standards. Preparation of Reconciliation statements after box-up and Managing work related all reports, documents, and statistics in computer database system. Preparation of different types of work permits for the mechanical activities, attend the Permit To Work training classes, identify and control the hazards, site visit with client, preparation for site audit etc. and Conversant with Permit system and Safe Work Practices as per HSE guidelines at job site.

ADDITIONAL INFORMATION To read isometric drawings with MTO & Supports and work accordingly Familiar with International Design code like ASME, ANSI, API Experienced in construction activities of metallic pipes. Familiar with AutoCAD Familiar with software packages like windows, MS Word, EXCEL.

EDUCATION MBA-PROJECT MANAGEMENT Sinesoft Education Institute, Bathinda affiliated to Sikkim Manipal University through Distance Education securing 60 % completed in June-2013. B.TECH-MECHANICAL ENGINEERING Malout Institute of Management & Information Technology, Malout (undertaking by Govt. of Punjab) affiliated to Punjab Technical University securing 79.9 % completed in May-2007 12th Science-Non Medical Govt.H.S.N.Sen.Sec.School, Faridkot (undertaking by Govt. of Punjab) affiliated to Punjab School Education Board, Manali securing 72 % completed in March 2003 10th -General Saraswati Sen.Sec.School, Faridkot affiliated to Punjab School Education Board, Manali securing 76 % completed in March 2001

ACADEMIC HIGHLIGHTS Project Undertaken Computer aided control of Robotic Arm during 8th semester (Final Project) Designing and Manufacturing of Flange/Fitting forging through CAD/CAM softwares’ with ISO programming after six months industrial training. Industrial Training Six Months Industrial Training completed along with exposure of CAD/CAM at Research and Development Centre of GNA Dura parts Limited, Hoshiarpur (Punjab) in Jun-2006 to Dec-2006 Two Month Industrial Training completed at Guru Nanak Dev Thermal Plant, Bathinda (Punjab) in Jun-2005 to Jul-2005

GENERAL INFORMATION Fathers’ Name : Sh.Raj Kumar

Date of Birth : 30th Dec., 1986

Marital Status : Married

Nationality : Indian

Blood Group : B (+Ve)

Passport No : G7892622, Date of Issue: 08/4/2008, Date of Expiry: 07/4/2018

Pan Card No. : ALVPJ4911D

Voter Card No : FWR2561801

AADHAR Card No : 8924 8369 8509

Hobbies : Internet surfing, Listening Music, Travelling

Willing to Travel : Anywhere in India & Abroad /relocate

Notice Period : One Month

Salary/CTC Drawn : 6.10 Lacs per annum

Salary Expected : Negotiable

Declaration : I assure you that above provided information are true and correct in my knowledge.

Place: Faridkot (Punjab) (Jacky Jindal)

Recommended publications