Meeting Activity Log

Attendees: Seaver Wrisley Zak Novak John Chiu Felix Liu

Current Meeting Next Meeting Location: Robotics Lab/Mat-Sci Lab Location: TBD Start Time: 3:30PM Start Time: End Time: 6:00PM End Time: Meeting Date: 9/19 & 9/24 Meeting Date:

Old Business Items: - Risk Assessment - Concept Generation - Pew Analysis

New Business Items:

- Continued work on Risk Assessment

- Continued concept generation/sketching/brainstorming o Started to get more in depth with designs to discuss feasibility (detailed design)

- Performed pew analysis on the following concepts o Essex (Datum) o Salmonoid (Tethered) o Salmonoid (Untethered) o Manta Rae (Tethered)

- System Design Review o Discussion on what content/slides will be included . Used the example in class to come up with general ideas for slides and divided them equally among members to work on individually o Decided we need to meet with KLK to make sure direction is acceptable

Items Left Outstanding: - Still waiting to hear back from KLK about pre-SDR meeting date and time - Pew analysis (changing datum) - Selecting final concept to pursue (still need to brainstorm more ideas to benchmark)

Form Revision: B Last Edited: 1/9/2018 9:43:15 AM Meeting Activity Log

- Need to revisit risk assessment work done thus far as a team to make sure no possibilities were overlooked

Assigned Tasks:

 Team Tasks o Update Logbooks  Seaver Wrisley o Update customer requirements and engineering specs with feedback gathered after project review o Use these updated documents to construct HOQ  Zak Novak o Continue corrosion testing research o Market Analysis o Engineering Analysis Needed o Fill out Meeting Forms o Update Schedule Form  John Chiu o Draft simplified SolidWorks models of what each design might look like (visual aids) to help explain concepts o Architecture (Flow Chart) – process flow at a high enough level that will work for all possible concepts  Felix Liu o Continue Benchmarking work for background information to put in SDR o SDR Tasks . Alternatives Considered . Pew Chart Analysis . Final Selected Concept

Meeting Notes:

SDR is scheduled for October 8th, have a TON of work to do to prepare. Need to keep in mind that if we want an A, we are going to NEED to go above and beyond. Still need to do more work on concept creation/pew analysis/selecting a final concept, which will be the focus of the next meeting(s) until that is nailed down.

Form Revision: B Last Edited: 1/9/2018 9:43:15 AM