Grant Summary s2

Total Page:16

File Type:pdf, Size:1020Kb

Grant Summary s2

GRANT SUMMARY

Completed Grant Summaries are made available to the public on the State Water Resources Control Board’s (SWRCB) website at http://www.swrcb.ca.gov/nps/formsandsummaries.html.

Use the tab and arrow keys to move through the form. If field is not applicable, please put N/A in field.

Date filled out: November 22, 2004

Grant Information: Please use complete phrases/sentences. Fields will expand as you type.

1. Grant Agreement Number: 04-091-554-0

2. Project Title: Dominguez Gap Wetlands Multiuse Project 3. Project Purpose – Problem Being Addressed: Southern California imports hundreds of thousands of acre-feet of water each year from outside sources including the Bay-Delta area. Maintaining high quality local water supply is essential to reducing long-term dependence on imported supplies.

The Dominguez Gap Wetlands Multiuse Project will improve the quality of water recharged to the aquifer by converting the East Basin into a treatment wetlands. The East Basin has a very low percolation rate due to a clay soil layer, so convering its use will not significantly diminish the recharge capacity of the Spreading Grounds. Water passing through the East Basin will be treated by the wetlands, improving water quality for groundwater infiltration. As high quality groundwater is recharged into the aquifer, it will improve the overall water quality in the acquifer, ultimately improving the drinking water quality at the tap for thousands of local residents who use a combination of local groundwater and imported water for their domestic supply. The basins will aslo be developed with passive multiuse amenities including trails, shade structures, and interpretive signage.

4. Project Goals

a. Short-term Goals: Design and construct the Dominguez Gap Wetlands Multiuse Project.

b. Long-term Goals: Effectively monitor and maintain the project to ensure long-term effectiveness.

5. Project Location: (lat/longs, watershed, etc.) City of Long Beach, Los Angeles River Watershed

a. Physical Size of Project: (miles, acres, sq. ft., etc.) 37 acres

b. Counties Included in the Project: Los Angeles

c. Legislative Districts: (Assembly and Senate) 55 (Assembly) and 25 (Senate)

6. Which SWRCB program is funding this grant? Please “X” box that applies. Prop 13 Prop 40 Prop 50 EPA 319(h) Other

Grant Contact: Refers to Grant Project Director.

Name: Vik Bapna Job Title: Los Angeles River Watershed Manager

Organization: Los Angeles County Flood Control District Webpage Address: http://ladpw.com/wmd/watershed

Address: 900 S. Fremont Avenue, Alhambra, CA 91803

Phone: (626) 458-4363 Fax: (626) 457-1526

E-mail: [email protected]

Grant Time Frame: Refers to the implementation period of the grant. From: November 15, 2005 To: March 31, 2007 Project Partner Information: Name all agencies/groups involved with project. California State Coastal Conservancy, San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy, Water Replenishment District, City of Long Beach. Nutrient and Sediment Load Reduction Projection: (If applicable) N/A

Please provide a hard copy to your Grant Manager and an electronic copy to your Program Analyst for SWRCB website posting. All applicable fields are mandatory. Incomplete forms will be returned.

Recommended publications