AGENDA Meeting API Subcommittee17 - Subsea Production Equipment British Petroleum, 501 Westlake Park Blvd (Westlake 1 Bldg), Houston, TX 77079 Tuesday, January 18, 2011 API Subcommittee 17 Chair: John Bednar API Subcommittee 17 Vice-Chairs: Ross Frazer, Gary Hurta and Brian Skeels API Subcommittee 17 Secretary: John McManus

Start Time: Promptly at 8:00 AM (Break[s] at Chair’s Discretion) Meeting Site: Westlake 1 – Terrace Room

1. Meeting Opening/Safety Issues 2. Adoption of Proposed Agenda 3. Attendance and Rosters a. Attendance Sheets b. Review API WG / ISO PL Contacts Table c. Review SC17 Voting Roster 4. Adoption of the Minutes from June 2010 Meeting (Washington, DC) 5. Summary Status of Work - Work Matrix Review 6. Task Group Chair/Project Group Leader reports with Review of Action Items: a. API 2RD/ISO 13628-12 --- Dynamic Risers for Floating Production b. API 17A/ISO 13628-1 --- Subsea Production Systems i. Subsea Materials Task Group c. API 17B/ISO 13628-11, API 17J/ ISO 13628-2, API 17K/ISO 13628-10 --- Flexible Pipe d. API 17L1/ISO 13628-16, API 17L2 /ISO 13628-17 --- Ancillary Equipment for Flexible Pipe e. API 17C/ISO 13628-3 --- TFL Systems f. API 17D/ISO 13628-4 --- Subsea Wellheads and Trees g. API 17E/ISO 13628-5 --- Production Umbilicals h. API 17F/ISO 13628-6 --- Production Controls i. API 17G/ISO 13628-7 --- Completion/Workover Risers j. API 17H/ISO 13628-8 --- ROV Interfaces & ROT Intervention Systems k. API 17N --- Subsea Reliability and Technical Risk Management l. API 17O/ISO 13628-14 --- High Integrity Pressure Protection System (HIPPS) m. API 17P/ISO 13628-15 --- Templates and Manifolds n. API 17Q --- Subsea Qualification o. API 17R --- Flowline Connection Systems p. API 17S --- Subsea Metering q. API 17U --- Insulation Buoyancy r. API 17TR4 --- Equipment Pressure Ratings s. API 17TR5 --- Avoidance of Blockages in Production Control Systems t. API 17TR6 --- Attributes of Production Chemicals in Subsea Production Systems u. API 17TR7 --- Connectors v. API 17TR8 --- HPHT Guidelines 7. Other/New Business: a. PER 15K b. Standard Definitions used in SC 17 / ISO Documentation c. Nuts and bolting issues 8. Review of Open Action Items (not covered in Section 6) 9. Next Meetings: a. 2011 E&P API Summer Conference in San Francisco (June 27-July 1) b. 2012 Winter Meeting in Houston, TX (January – Date to be Determined) 10. Adjournment

Page 1