Detour Need Determination Report

Total Page:16

File Type:pdf, Size:1020Kb

Detour Need Determination Report

DETOUR INFORMATION REPORT Date Prepared: MMM-DD-YYYY Prepared by: Joe Smith, ODOT Design Information

Project: CCC-RRR-SS.SS PID #: XXXXXX Sale Date: MMM-DD-YYYY Begin Construction Date: MMM-DD-YYYY Estimated Construction Cost: $xxx,xxx,xxx Project Description: Brief project description goes here

Closure Location: Location description here

Current Traffic Data: ADT XXXXX Percentage Trucks XX%

Proposed Detour Route: Official turn-by-turn directions of the posted detour around the closure point goes here

Estimated Additional Travel Time: xx minutes (this can be estimated easily using Bing Maps)

Detour Map: Add map of closure location and detour route.

Construction Information (to be provided by Project Engineer)

Is the location as described above? Yes No ______Is the detour as described above? Yes No ______

Date of Closure: ______Date of Reopening: ______Time of Closure: ______Time of Reopening: ______Duration of Closure: ____ Days

OTHER: ______

______

Recommended publications