RESULT OF VOTING ON NEW WORK ITEM PROPOSAL

Date ISO/TC 67 / SC 4 2006-11-20 N 361

Title of TC/SC concerned Drilling and production equipment To be completed by the secretariat and sent to the ISO Central Secretariat and to all P- and O-members of the TC or SC concerned, with a copy to the TC secretariat in the case of a subcommittee. Proposal ISO/TC 67/SC 4 N 354 Circulation 2006-08-14 Deadline 2006-11-14 Title (new title if appropriate; French title to be indicated in all cases, even when no French version is envisaged) English title Petroleum and natural gas industries -- Downhole equipment -- Subsurface Tubing Mounted Formation Barrier Valves and related Equipment French title

Results (the compilation of results is given as an annex) The following criteria for acceptance have been met: Approval by a simple majority of the voting P-members 5 or more P-members voting approval have agreed to participate in the development of the project and have nominated an expert

Average points (y/x) awarded by P-members for market relevance (score as calculated in annex) 12.875 Note: This SVAT score is not intended to be the principle criterion upon which a decision is based, but rather is additional support for determining the best action. Nevertheless, if the average points scored is less than 15 consideration should be given to disapproval.

In the light of results, the proposal is therefore: Approved (all approval criteria met) Not approved (one or more approval criteria not met) Associated draft no draft was associated with this ballot. A first draft is expected by (give date) the associated draft is adopted as a working draft (WD) the associated draft is approved as a Committee draft (CD) the associated draft is approved as the proposed Draft International Standard (DIS)

Further procedures (attribution to TC/SC/WG, Project Leader, development procedure, meetings, etc.) The project is to be first registered as a Preliminary Work Item (stage 00.60) The project is to be immediately registered as an active work item Other:

Experts (give details below, or as a separate annex) See below.

Documents to be considered (give details below, or as a separate annex)

Proposed development track  1 (24 months) 2 (36 months - default)  3 (48 months) Note: Selection of a development track will automatically associate default target dates with critical stages. If you envisage that you can advance a project quicker than the default target dates you may indicate your preferred earlier target dates in the field "Target date for submission'. Important! Quoting earlier target dates implies a commitment to meeting these dates If you do not want to change the defaults to earlier dates do not put anything in the "Target date for submission" fields. Target date for as a CD: as a FDIS: submission: as a DIS: for publication:

FORM 6 (ISO) v.2005.3 Page 1 of 11 1 MB = Member body (enter the ISO 3166 two-letter country code, e.g. CN for China; comments from the ISO/CS editing unit are identified by **) 2 Type of comment: ge = general te = technical ed = editorial NOTE Columns 1, 2, 4, 5 are compulsory. Secretariat Secretary Registration by the Central Secretariat Date Allocated project number API for Andy Radford ANSI Other information, comments, etc. appended

FORM 6 (ISO) Page 2 of 11 Compilation of the results of voting on ISO/NP s s . a a n

n

n s + i d ) o n d )

o t d y d r i l l i e l s e t o e t n m t e e a ( s i a t t p a t t a e a o s n b v u p r e p p a c t n o o r i o i N e e m i e i l

m Vote a u f t r c c + l i t p c c e i o . p t m p m c t a s t c x n n o s r o r p

Member body M o v ( A E e A a u a n C A E S J D P I P C D Q. 2 Q. 3.1 Q. 3.2 3.1+ 3.2 Q. 3.3 P/O Points Y/N Yes No Abst. Y/N Y/N Y/N Y/N Y/N Argentina (IRAM) P X Brazil (ABNT) P 20 Y X Y Y Y X Canada (SCC) P X France (AFNOR) P 21 Y X Y Y Y Y N X Germany (DIN) P 16 Y X Y N Indonesia (BSN) P X Italy (UNI) P X Korea, Republic of P Y X N (KATS) The Netherlands (NEN) P 25 Y X Y Y Y N N X Norway (SN) P X Poland (PKN) P X United Kingdom (BSI) P 21 Y X Y Y Y X United States (ANSI) P X Y Y Y X

Totals (P-members only) 13 103 6 7 1 Y=6 Y=5 Y=5 Y=1 Y=0 5 5 N=1 N=0 N=0 N=2 N=2 Abstentions and incomplete votes are not counted Total number of points awarded by voting P-members (y): 103 Total of P-members voting (x): 8 Average points per P-member voting (y/x): 12.875

FORM 6 (ISO) v.2005.3 Page 3 of 11 1 MB = Member body (enter the ISO 3166 two-letter country code, e.g. CN for China; comments from the ISO/CS editing unit are identified by **) 2 Type of comment: ge = general te = technical ed = editorial NOTE Columns 1, 2, 4, 5 are compulsory. Result of voting on new work item proposal Comments on NWIP N354

Brazil (ABNT) Mr. Paulo Roberto Santos Pinto da Fonseca Company: Petrobras Address: Av. Republica do Chile, 65 - 17º Andar - Sala 1703 20035-900 - Rio de Janeiro - RJ - Brazil Tel.: (+55) 21 3224-2958 Fax: (+55) 21 3224-2288 Electronic mail: [email protected]

France (AFNOR) Mr Bernard YERLE TOTAL DGEP/TDO/FP/MTH CSTJF PAU (FRANCE) Tel: +33(0)5 59 83 66 21 Fax: +33(0)5 59 83 54 40 Mail: [email protected]

The Netherlands (NEN) Mr. Rod Fors Shell Exploration and Production Company P.O. Box 61933 New Orleans, LA 70161-6001 USA email: [email protected] Tel: 1 504 728 6766 mobile: 1 504 338 6766

United Kingdom (BSI) Mr J Peters E-mail: [email protected]

United States (ANSI) David McCalvin (PL) Schlumberger e-mail: [email protected] Tel: 281-235-0330

FORM 6 (ISO) Page 4 of 11 Template for Comments and Secretariat Observations Date: April 23, 2018 Document: Petroleum and natural gas industries- Country codes (per ISO 3166): FR – France US – United States Downhole equipment-Subsurface Tubing Mounted Formation Barrier Valves and related Equipment

1 2 (3) 4 5 (6) (7)

MB1 Clause No./ Paragraph/ Type of Comment (justification for change) by the MB Proposed change by the MB Secretariat observations Subclause No./ Figure/Table/Note comment2 on each comment submitted Annex (e.g. Table 1) (e.g. 3.1)

FR 1 ge (Mentioned in the Draft) Why in the same paragraph “Sliding What is not covered. Sleeves” is mentioned twice for the same application . Flow Control Valves / Down hole chokes, Sliding Sleeves ?? – Tubing to Annulus One “ Sliding Sleeves ” need to be Subsurface Safety Valves or any valves covered under removed . ISO 10432 Casing mounted safety / flow valves Injection Valves Well Condition / Flow / Time activated valves Bridge Plugs, or any tools covered in the locks and nipples standard Chemically activated Sliding Sleeves ?? Control system such as computers, control lines, connectors, JS to provide further detail

FR 3.22 to 3.37. ge Wrong numbering system Numbering system need to be 6.2.2.1 to updated following cancellations or 6.2.2.10 some typing errors in the following paragraphs. 6.2.5.2.1 to 6.2.5.2.3

FR 4 te (Mentioned in the Draft) Abbreviated terms Abbreviated terms  AQL Acceptance quality  AQL Acceptance quality limit limit  NDE Non-destructive examination  NDE Non-destructive

FORM 6 (ISO) v.2005.3 Page 5 of 11 1 MB = Member body (enter the ISO 3166 two-letter country code, e.g. CN for China; comments from the ISO/CS editing unit are identified by **) 2 Type of comment: ge = general te = technical ed = editorial NOTE Columns 1, 2, 4, 5 are compulsory. Template for Comments and Secretariat Observations Date: April 23, 2018 Document: Petroleum and natural gas industries- Country codes (per ISO 3166): FR – France US – United States Downhole equipment-Subsurface Tubing Mounted Formation Barrier Valves and related Equipment

1 2 (3) 4 5 (6) (7)

MB1 Clause No./ Paragraph/ Type of Comment (justification for change) by the MB Proposed change by the MB Secretariat observations Subclause No./ Figure/Table/Note comment2 on each comment submitted Annex (e.g. Table 1) (e.g. 3.1)

examination  F A T Factory Acceptance Test . (Need to be added) .

FR 5.2 ge (Mentioned in the Draft) Functional test during FAT: Functional test FAT; 1 document with separate One document with separate sections covering A, AA etc with specific sections covering A, AA etc with functional test. Body, control system etc. specific functional test. Body, control system etc.

FR 6.2.3 te (Mentioned in the Draft) Working pressure de-rating allowed ONLY if less than the working pressure . Working pressure de-rating

FR 6.3 te (Mentioned in the Draft) Design verification shall be performed Design verification shall be performed to ensure that to ensure that each sub-surface each sub-surface tubing barrier valve design meets the tubing barrier valve design meets the supplier’s/manufacturer’s technical specifications with supplier’s/manufacturer’s technical documented safety factors of a minimum 110%. specifications with documented safety factors of a minimum 150% +/- 5 %.

FR 6.4.1(b) te (Mentioned in the Draft) Substantive changes to the validation test (specified herein) shall require re FORM 6 (ISO) Page 6 of 11 1 MB = Member body (enter the ISO 3166 two-letter country code, e.g. CN for China; comments from the ISO/CS editing unit are identified by **) 2 Type of comment: ge = general te = technical ed = editorial NOTE Columns 1, 2, 4, 5 are compulsory. Template for Comments and Secretariat Observations Date: April 23, 2018 Document: Petroleum and natural gas industries- Country codes (per ISO 3166): FR – France US – United States Downhole equipment-Subsurface Tubing Mounted Formation Barrier Valves and related Equipment

1 2 (3) 4 5 (6) (7)

MB1 Clause No./ Paragraph/ Type of Comment (justification for change) by the MB Proposed change by the MB Secretariat observations Subclause No./ Figure/Table/Note comment2 on each comment submitted Annex (e.g. Table 1) (e.g. 3.1)

Substantive changes to the validation test (specified herein) shall require re qualification of a previously qualification of a previously qualified qualified sub-surface tubing barrier valve within three sub-surface tubing barrier valve within years of the effective date of the change. one year of the effective date of the change.

FR 6.6 te (Mentioned in the Draft) Each sub-surface tubing barrier valve shall be tested in accordance with the Each sub-surface tubing barrier valve shall be tested in API 14A/ISO 10432 – paragraph 7 accordance with Annex ??. “testing”

FR “A” A1 ge (Mentioned in the Draft) The information related to : Normative The test facility shall conduct validation tests as -The manufacturer's test application . specified on the manufacturer's test application in Chapter (D.1.1). D.1.1 and record the results of the validation test as The results records of the validation specified in D.1.13. The content of Annex D, as test as specified in Chapter (D.1.13 ). applicable, is a minimum data requirement for the documentation specified in this sub clause. The test All these information needs to be facility shall supply a copy of the validation test report provided in the Annex “D” , it is not to the manufacturer within thirty days of the completion the case now, this annex ”D” needs to of the test. This report shall be retained by the be completed . manufacturer and by the test agency, and shall be available to the user/purchaser upon request to the manufacturer.

FORM 6 (ISO) Page 7 of 11 1 MB = Member body (enter the ISO 3166 two-letter country code, e.g. CN for China; comments from the ISO/CS editing unit are identified by **) 2 Type of comment: ge = general te = technical ed = editorial NOTE Columns 1, 2, 4, 5 are compulsory. Template for Comments and Secretariat Observations Date: April 23, 2018 Document: Petroleum and natural gas industries- Country codes (per ISO 3166): FR – France US – United States Downhole equipment-Subsurface Tubing Mounted Formation Barrier Valves and related Equipment

1 2 (3) 4 5 (6) (7)

MB1 Clause No./ Paragraph/ Type of Comment (justification for change) by the MB Proposed change by the MB Secretariat observations Subclause No./ Figure/Table/Note comment2 on each comment submitted Annex (e.g. Table 1) (e.g. 3.1)

FR “A” A1(5) te (Mentioned in the Draft) An acceptable testing facility shall Normative An acceptable testing facility shall contain all the contain all the equipment required to equipment required to achieve the defined testing achieve the defined testing parameters for the specific product and to measure the parameters for the specific product stated acceptance parameters to an accuracy that and to measure the stated meets or exceeds the accuracy required by the defined acceptance parameters to an requirements. Each measurement system used for accuracy that meets or exceeds the final acceptance shall have calibration records accuracy required by the defined supporting its accuracy. Special focus shall be applied requirements. Each measurement to the fluids used in the testing and cleanliness of the system used for final acceptance fluids used in the testing shall have calibration records supporting its accuracy. Special focus shall be applied to the fluids used in the testing and cleanliness of the fluids used in the testing referring to the following specifications: NAS: 1638 – class “6” ARP (SAE) 598A, NS 5910

FR “B” B.4.3 & te (Mentioned in the Draft) Wait for a minimum of 5 min after Normative B.5.3 Wait for a minimum of 3 min after applying liquid applying liquid pressure before pressure before beginning collection of leakage and beginning collection of leakage and continuously measure leakage (if any) for a period continuously measure leakage (if of 5 min. any) for a period of 5 min. Wait for a minimum of 6 min after applying gas Wait for a minimum of 5 min after pressure, and continuously measure leakage (if any) applying gas pressure, and

FORM 6 (ISO) Page 8 of 11 1 MB = Member body (enter the ISO 3166 two-letter country code, e.g. CN for China; comments from the ISO/CS editing unit are identified by **) 2 Type of comment: ge = general te = technical ed = editorial NOTE Columns 1, 2, 4, 5 are compulsory. Template for Comments and Secretariat Observations Date: April 23, 2018 Document: Petroleum and natural gas industries- Country codes (per ISO 3166): FR – France US – United States Downhole equipment-Subsurface Tubing Mounted Formation Barrier Valves and related Equipment

1 2 (3) 4 5 (6) (7)

MB1 Clause No./ Paragraph/ Type of Comment (justification for change) by the MB Proposed change by the MB Secretariat observations Subclause No./ Figure/Table/Note comment2 on each comment submitted Annex (e.g. Table 1) (e.g. 3.1)

for a period of 5 min continuously measure leakage (if any) for a period of 5 min. Tests d uration need to be the same to avoid any mistake and to have an homogenization between the hydraulic and gas test.

FR “B” B.8.1 te (Mentioned in the Draft) Apply pressure of 25 % of the rated Normative Apply pressure of 25 % of the rated operating operating pressure (20 % - 30 % pressure (20 % - 30 % allowable) of the test valve to allowable) of the test valve to the the entire test valve ID. Record the test valve bore entire test valve ID. Record the test pressure (base pressure) valve bore pressure (base pressure) Poor explanation , more technical information are required.

FR “B” B.8.3 te (Mentioned in the Draft) Repeat B.8.1 and B.8.2 at 75 % of Normative Repeat B.8.1 and B.8.2 at 75 % of the rated working the rated working pressure (70 % – pressure (70 % – 80 % allowable) 80 % allowable) Poor explanation , more technical information are required.

FR 1 ge (Mentioned in the Draft) Why in the same paragraph “Sliding What is not covered. Sleeves” is mentioned twice for the same application . FORM 6 (ISO) Page 9 of 11 1 MB = Member body (enter the ISO 3166 two-letter country code, e.g. CN for China; comments from the ISO/CS editing unit are identified by **) 2 Type of comment: ge = general te = technical ed = editorial NOTE Columns 1, 2, 4, 5 are compulsory. Template for Comments and Secretariat Observations Date: April 23, 2018 Document: Petroleum and natural gas industries- Country codes (per ISO 3166): FR – France US – United States Downhole equipment-Subsurface Tubing Mounted Formation Barrier Valves and related Equipment

1 2 (3) 4 5 (6) (7)

MB1 Clause No./ Paragraph/ Type of Comment (justification for change) by the MB Proposed change by the MB Secretariat observations Subclause No./ Figure/Table/Note comment2 on each comment submitted Annex (e.g. Table 1) (e.g. 3.1)

Flow Control Valves / Down hole chokes, Sliding One “ Sliding Sleeves ” need to be Sleeves ?? – Tubing to Annulus removed . Subsurface Safety Valves or any valves covered under ISO 10432 Casing mounted safety / flow valves Injection Valves Well Condition / Flow / Time activated valves Bridge Plugs, or any tools covered in the locks and nipples standard Chemically activated Sliding Sleeves ?? Control system such as computers, control lines, connectors, JS to provide further detail

FR 3.22 to 3.37. ge Wrong numbering system Numbering system need to be 6.2.2.1 to updated following cancellations or 6.2.2.10 some typing errors in the following paragraphs. 6.2.5.2.1 to 6.2.5.2.3 US Title, Scope, Technical 1. We have a problem with the use of the term “barrier” 1. a) We propose replacing "barrier and when applied to this equipment and feel the term valve" with “fluid loss control valve” application “barrier valve” carries with it certain legal connotations which is commonly used. If the word that may hinder the uptake of this specification or at “loss” is too narrow, I would then the worst assign liability to API/ISO for this type of propose to use the term “fluid control device. Additionally, no other API specification or Code valve” to cover products that hold in of Federal Regulations use this term so it would have both directions. to stand on it's own.

1. b) Rewrite the scope to cover

FORM 6 (ISO) Page 10 of 11 1 MB = Member body (enter the ISO 3166 two-letter country code, e.g. CN for China; comments from the ISO/CS editing unit are identified by **) 2 Type of comment: ge = general te = technical ed = editorial NOTE Columns 1, 2, 4, 5 are compulsory. Template for Comments and Secretariat Observations Date: April 23, 2018 Document: Petroleum and natural gas industries- Country codes (per ISO 3166): FR – France US – United States Downhole equipment-Subsurface Tubing Mounted Formation Barrier Valves and related Equipment

1 2 (3) 4 5 (6) (7)

MB1 Clause No./ Paragraph/ Type of Comment (justification for change) by the MB Proposed change by the MB Secretariat observations Subclause No./ Figure/Table/Note comment2 on each comment submitted Annex (e.g. Table 1) (e.g. 3.1)

“Completion Fluid Control Valves”. This would cover a much broader application of other products and categories in the industry of which “barrier valves” could be a separate “category” or “subset”. US

FORM 6 (ISO) Page 11 of 11 1 MB = Member body (enter the ISO 3166 two-letter country code, e.g. CN for China; comments from the ISO/CS editing unit are identified by **) 2 Type of comment: ge = general te = technical ed = editorial NOTE Columns 1, 2, 4, 5 are compulsory.