Note: This Template Can Be Used for Ctps, Ptss, Or Ofas s1

Total Page:16

File Type:pdf, Size:1020Kb

Note: This Template Can Be Used for Ctps, Ptss, Or Ofas s1

***Note: This template should be used by CTPs submitting an application for an award to complete mapping or Flood Risk Product activities for a flood risk project. The CTP should complete the fields for all sections of this template relevant to the activities deemed applicable to the project; activities not applicable to the project should be deleted. This note should be deleted prior to application submission. ***

COOPERATING TECHNICAL PARTNERS (CTP) FLOOD RISK PROJECT MAPPING ACTIVITY STATEMENT (MAS) Mapping Activity Statement No. {Insert Mapping Activity Statement Number } The Flood Risk Project described in this MAS dated {Insert MAS date} shall be completed in accordance with the CTP Partnership Agreement dated {insert name of community(ies) or county} between {insert na me of community(ies) or county} (herein referred to as “CTP”) and the Federal Emergency Management Agency (FEMA).

National FY16 Flood Risk Project MAS Template Version 1.0 Mapping Activity Statement No. {MAS No.} 1 of 4 CONTENTS

National FY16 Flood Risk Project MAS Template Version 1.0 Mapping Activity Statement No. {MAS No.} 2 of 4 SECTION 1—OBJECTIVE AND SCOPE

The objective of the Flood Risk Project documented in this MAS is to develop and/or support flood hazard data and program-related tasks through completing technical risk analysis and mapping activities. These activities may or may not result in a new or updated Flood Insurance Rate Map (FIRM) and Flood Insurance Study (FIS) report for one or more communities within the project area.

The watersheds and jurisdictions, in which Flood Risk Projects will be performed, as well as their applicable project type/activities, are summarized in Table 1.1—Flood Risk Project Watersheds and Jurisdictions. All applicable project activities should be identified in the last column of the table for each watershed, county/parish or community listed in Table 1.1 (e.g., Discovery only, Discovery and Flood Risk Products, FIRM/FIS updates, Prelim Distribution, Post-Preliminary Processing). Watershed Reports will be created and distributed to counties/parishes and communities identified as including Discovery in the Project Type. Table 1.1: Flood Risk Project Watersheds and Jurisdictions Watershed Geographic Footprint Counties/Parishes Project Type and Communities Included in Project

Additionally, the CTP involved in this project will develop new and/or updated flood hazard data as summarized in Table 1.2: Total Stream Mile Counts by Type of Study. The FIRM and FIS report for the watersheds and areas identified in Table 1.2 will be produced in the North American Vertical Datum of 1988 (NAVD88).

Table 1.2: Total Stream Mile Counts by Type of Study] Type of Watershed or Coastal Detailed Type of Watershed Coastal Detailed Study* Jurisdiction Study* or Jurisdiction Effective Flood Insurance Study

Updated Wave = New = ## AE = ## AE = ## AE = ## Effective

National FY16 Flood Risk Project MAS Template Version 1.0 Mapping Activity Statement No. {MAS No.} 3 of 4 Type of Watershed or Coastal Detailed Type of Watershed Coastal Detailed Study* Jurisdiction Study* or Jurisdiction Studies ##

Updated Surge = Leveraged Effective A = ## A = ## A = ## ## = ## Studies

New Wave = Studies New = ## AE = ## ## Identified

New Surge = Leveraged Studies A = ## ## = ## Identified

*Details on type of study are documented in the Flood Risk Project recommendations section of the Discovery Report Deliverable. This Flood Risk Project will be completed by the following entities:  {insert names of SC, CTC, and/or MCC that will participate in this project};

National FY16 Flood Risk Project MAS Template Version 1.0 Mapping Activity Statement No. {MAS No.} 4 of 4

Recommended publications