Safety Management Manual Safety Management Manual for TDI-Brooks International

Table of Contents (Rev. 01 Feb 2017) Chapters 1. Safety Management System 2. Safety and Environmental Protection Policy 3. Company Responsibility and Authority 4. Designated Person 5. Master’s Responsibility and Authority 6. Resources and Personnel 7. Shipboard Operations 8. Emergency Preparedness 9. Non-Conformities 10. Maintenance of Ships and Equipment 11. Document Control and Distribution 12. Company Verification, Review and Evaluation 13. General Policies 14. Risk Assessment and Hazard Mitigation

General Standard Operating Procedures (SOPs) SOP-GEN-007A Bridge Procedures SOP-GEN-007C Party Chief Responsibilities SOP-GEN-007D Chief Engineer’s Standing Orders SOP-GEN-007E Engineering Staff Responsibilities SOP-GEN-007F Communications SOP-GEN-007G Confined Space Entry SOP-GEN-007I Energy Isolation SOP-GEN-007L Incident Reporting and Investigation SOP-GEN-007M Waste Oil, Sewage and Trash SOP-GEN-007S Bunkering SOP-GEN-007U Working at Heights SOP-GEN-007X Crane and Winch Operations SOP-GEN-007Y Small Boat Operations SOP-GEN-008B Medical Emergency/ MEDEVAC SOP-GEN-008E Emergency Response Plan SOP-GEN-011B Electric Safety Program SOP-GEN-011C Power and Hand Tools SOP-GEN-011D Compressed Gas Cylinders SOP-GEN-011E Respiratory Protection Program SOP-GEN-012A Management of Change SOP-GEN-012B Permit to Work System SOP-GEN-013A Lifting Gear SOP-GEN-013B Hazard Communication Program SOP-GEN-2014B Bloodborne Pathogens Exposure Control Plan SOP-GEN-2014C Health, Safety and Environmental Officer SOP-GEN-2014D Galley Health and Safety SOP-GEN-2015A STCW Rest Hours Tracking SOP-GEN-2015B On Board Complaint Procedures for ILO MLC 2006 SOP-GEN-2015C Hot Work & Welding SOP-GEN-2015D Contractors SOP-GEN-2016A Crew Management SOP-GEN-2016B Mosquito Borne Illness Prevention

Vessel Specific Standard Operating Procedures

SOP-BMC-007N BMC- Ballast Water Management Plan SOP-BMC-007O BMC- Bilge and Ballast Handling Operations SOP-BMC-007P BMC- Loss of Steering SOP-BMC-007Q BMC- Equipment to Re-set after Power Loss SOP-BMC-007R BMC- Auxiliary Plant Operations SOP-BMC-2016B BMC- Critical Equipment SOP-BMC-2016C BMC- Confined Spaces

SOP-GYRE-007N GYRE- Ballast Water Management Plan SOP-GYRE-007O GYRE- Bilge and Ballast Handling Operations SOP-GYRE-007P GYRE- Loss of Steering SOP-GYRE-007Q GYRE- Equipment to Re-set after Power Loss SOP-GYRE-007R GYRE- Auxiliary Plant Operations SOP-GYRE-2016B GYRE- Critical Equipment

SOP-PRT-007N PRT- Ballast Water Management Plan SOP-PRT -007O PRT- Bilge and Ballast Handling Operations SOP-PRT-007P PRT- Loss of Steering SOP-PRT-007Q PRT- Equipment to Re-set after Power Loss SOP-PRT-007R PRT- Auxiliary Plant Operations SOP-PRT-2016B PRT- Critical Equipment