55’ 40’ 45’ 55’ 40’ 55’ 40’ 40’ 55’ 45’ 40’ 55’
OCCUPANCY: IMMEDIATE 35’ #101 #105 #109 #113 #117 #121 #129 #133 #137 #141 #145 #149 SHOW Show Suite now BUILDING 1 SUITE open. 7850 66TH STREET SE 40’ 115,825 SF SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. 40’ 205’ SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. 66 ST SE 40’ 8,249 8,249 11,343 11,343 9,280 9,280 8,249 8,249 8,249 8,249 10,972 7,925 11,343 11,343 11,343 11,343 11,343 BUILDING 1 BUILDING
50’ A B C D E F G H I J K L
DOCK DOCK DOCK DOCK 55’ 55’ RAMP RAMP RAMP RAMP BUILDING 2 RAMP 7880 66THTH STREET SE 89,250 SF 70’ 70’ 70’ 68 ST68 SE 66 ST SE
DOCK DOCK DOCK DOCK 55’ 55’ RAMP RAMP RAMP RAMP RAMP
40’ 40’ 40’ 40’ 40’ 45’ 40’ 40’ 40’ 40’ 40’ 40’ 40’
50’ A B C D E F G H I J K L M 40’ 170’ SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. Upgraded SQ. FT.
Intersection 66 ST SE 2021 40’ 7,339 7,339 6,528 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 BUILDING 2 BUILDING 40’ #102#102 #106 #110 #114 #118 #122 #130 #134 #138 #142 #146 #150 #154 45’
LEASING MAP ENRIGHTCAPITAL.COM
BUILDING 1 BUILDING 2
BAY(S) LOADING AREA SF RATE OFFICE OP COST 2021 EST BAY(S) LOADING AREA SF RATE OFFICE OP COST 2021 EST Single Dock and Grade 7,925 - 11,343 $10.75 10% OPC $0.99 Single Dock and Grade 6,528 - 6,853 $12.25 15% OPC $1.01 Single Dock Only 8,249 - 11,343 $10.25 10% MGT FEE $0.49 Single Dock Only 6,853 - 7,339 $11.50 15% MGT FEE $0.49 Double Dock and Grade 16,174 - 20,623 $10.00 10% *REAL ESTATE TAX $2.25 Double Dock and Grade 13,704 - 13,868 $11.25 15% *REAL ESTATE TAX $2.29 Double Dock Only 19,592 $9.75 10% Total $3.72 Double Dock Only 13,706 - 14,192 $10.75 15% Total $3.79 *Based on City of Calgary 2020 Mill Rate *Based on City of Calgary 2020 Mill Rate Address: 7850 66TH STREET SE Address: 7880 66TH STREET SE Area: 115,825 SF Area: 89,250 SF Depth: 205’ Depth: 170’ Bay Size: 8,249 SF (205’x40’), 9,280 SF (205’x45’), 11,343 (205’x55’) Bay Size: 6,853 SF (170’x40’), 7,339 SF (170’x45’)
Staging 50’ Staging Bay Depth: Bay Depth: 50’ Parking: 109 stalls (1.0 stall/1,000 SF) Parking: 94 stalls (1.1 stall/1,000 SF) Loading 20 manual dock doors, 9’x10’ with 40,000 lb mechanical levelers, Loading 18 manual dock doors, 9’x10’ with 40,000 lb mechanical levelers, doors: (1 per 5,791 SF), 8 electric grade doors, 12’x14’ (1 per 18,762 SF) doors: (1 per 4,959 SF), 8 electric grade doors, 12’x14’ (1 per 11,156 SF) Floor: 7” slab, est. uniform load capacity of 850 lbs p.s.f., floors to be saw cut and sealed Floor: 6” slab, est. uniform load capacity of 750 lbs p.s.f., floors to be saw cut and sealed ESFR, K factor of 16.8 (IMPERIAL), 80 PSI, designed for single, double or multi row racking, Sprinkler: ESFR, K factor of 16.8 (IMPERIAL), 80 PSI, designed for single, double or multi row racking, 27’ max height storage of Class I to IV commodity Sprinkler: 27’ max height storage of Class I to IV commodity Zoning: IG, General Industrial Zoning: IG, General Industrial
Clear Height: 28’ to underside of joists Clear Height: 28’ to underside of joists
Walls: 9” thick insulated (R-15 insulation) pre-cast concrete sandwich panels on all four walls Walls: 9” thick insulated (R-15 insulation) pre-cast concrete sandwich panels on all four walls
Electricity: 2,000 amp, 347/600 volt, 3 phase, 200 amp service provided to individual bays Electricity: 2,000 amp, 347/600 volt, 3 phase, 200 amp service provided to individual bays
Truck Court: 180’ shared truck court, 55’ deep continuous concrete dolly pad Truck Court: 180’ shared truck court, 55’ deep continuous concrete dolly pad
Heating: Gas fired unit heaters in warehouse Heating: Gas fired unit heaters in warehouse Warehouse LED highbay interior lighting with motion sensors (35 ft. candles at eye level) Warehouse LED highbay interior lighting with motion sensors (35 ft. candles at eye level) Lighting: Lighting: Window: Clerestory windows at rear of each bay Window: Clerestory windows at rear of each bay
Roof: EPDM with R-25 insulation Roof: EPDM with R-25 insulation
Dock Height: 50” Dock Height: 50” 10-22-20
LANDLORD’S WORK AMENITIES • Supply and install new 200 amp, 600 volt, 3 phase service with panel • Telus Fibre and TeraGo Internet Services to both buildings • 45 KVA transformer, 120/208 volt subpanel • Numerous restaurants in area along 52nd Street • Connect existing base building equipment into new electrical service • Area serviced by bus route 148 (66 St. & 76 Ave) and 23 (52nd Street) • Full height insulated demising wall, one-hour fire rating • Route 148 connects with Route 23 and 302 BRT • Provide and install RTU unit to service the office premises
SPECIFICATIONS ENRIGHTCAPITAL.COM BUILDING 1 7850 66TH STREET SE 115,825 SF
55’ 40’ 45’ 55’ 40’ 55’ 40’ 40’ 55’ 45’ 40’ 55’ 35’ #101 #105 #109 #113 #117 #121 #125 #129 #131 #135 #139 #143 SHOW SUITE 40’ SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. 40’ 205’ SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. 66 ST SE 40’ 8,249 8,249 11,343 11,343 9,280 9,280 8,249 8,249 8,249 8,249 8,249 8,249 10,972 7,925 11,343 11,343 11,343 11,343 11,343 11,343
50’ A B C D E F G H I J K L
DOCK DOCK DOCK DOCK 55’ 55’ RAMP RAMP RAMP RAMP RAMP
DOCK DOCK DOCK DOCK 55’ 55’ RAMP RAMP RAMP RAMP RAMP
LEASING MAP 40’ 40’ 40’ 40’ 40’ 45’ 40’ 40’ 40’ 40’ 40’ 40’ 40’
50’ A B C D E ENRIGHTCAPITAL.COMF G H I J K L M 40’ 170’ SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. 66 ST SE 40’ 7,339 7,339 6,528 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 40’ #102 #106 #110 #114 #118 #122 #126 #130 #134 #138 #142 #146 #150 45’ 55’ 40’ 45’ 55’ 40’ 55’ 40’ 40’ 55’ 45’ 40’ 55’ 35’ #101 #105 #109 #113 #117 #121 #125 #129 #131 #135 #139 #143 SHOW SUITE 40’ SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. 40’ 205’ SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. 40’ 8,249 8,249 11,343 11,343 9,280 9,280 8,249 8,249 8,249 8,249 10,972 7,925 11,343 11,343 11,343 11,343 11,343
50’ A B C D E F G H I J K BUILDINGL 2 7880 66TH STREET SE DOCK DOCK DOCK DOCK 55’ 55’ 89,250 SF RAMP RAMP RAMP RAMP RAMP
DOCK DOCK DOCK DOCK 55’ 55’ RAMP RAMP RAMP RAMP RAMP
40’ 40’ 40’ 40’ 40’ 45’ 40’ 40’ 40’ 40’ 40’ 40’ 40’
50’ A B C D E F G H I J K L M 40’ 170’ SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. 66 ST SE 40’ 7,339 7,339 6,528 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 6,853 40’ #102 #106 #110 #114 #118 #122 #126 #130 #134 #138 #142 #146 #150 45’
LEASING MAP ENRIGHTCAPITAL.COM CANLAN ICE SPORTS
AREA MAP ENRIGHTCAPITAL.COM 76 AVE SE
N 57 ST57 SE 62 ST SE 66 ST SE
BUS ROUTE 79 AVE SE 148
BUS STOP 68 ST SE
GLENMORE TRAIL
NEW INTERSECTION COMPLETION: 2021
SITE MAP ENRIGHTCAPITAL.COM 1A
N
L I A R T L I D A O R E T L PEIGAN TRAIL
C T
A O
M O F K
C 50 AVE SE A L
B L I A L
R I E
T A S
T R T T
O S
O Y
F E
R OG 68 N E
E O
D E D T E S N S T
R S O 2 A 5 D
GLENMORE TRAIL
LOCATION MAP ENRIGHTCAPITAL.COM To Saddletowne
58 Av SE 61 Av SE
68 Av SE
Chinook 148 57 St SE
M G le
acleod n m Barl o 44 St SE 52 St SE o re T O 72 Av SE r g 68 St SE S d w E e
T n T r
Heritage Dr SE R r SE d 76 Av SE
S
18 StSE 76 Av SE
E 148 148
Heritage Dr SE Glenmore Tr SE 148 23 18 St SE
24 St SE To McKenzie Towne
148 Great Plains CTrain Line MT MAX Teal Intersecting Bus Route N
23 52nd Street East CTrain Station MAX Station Bus Terminal or Hub
TRANSIT SERVICE ENRIGHTCAPITAL.COM