Procurement Plan

I. General Public Disclosure Authorized

1. Bank’s approval Date of the procurement Plan [Original: December16, 2016: 1stRevision: June 28, 2017, 2nd Revision: August 18, 2017, 3rd Revision: August 14, 2018, 4th Submission for Mizhi County: August 23, 2018] 2. Date of General Procurement Notice: Jan 24, 2017 3. Period covered by this procurement plan: 2016-2022

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Public Disclosure Authorized Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary]

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. Public Disclosure Authorized 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual]

4. Reference to (if any) Project Operational/Procurement Manual: Yes

5. Any Other Special Procurement Arrangements: no

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

Public Disclosure Authorized 1 2 3 4 5 6 7

Ref. No. Description Estimated Packages Domestic Review Comments Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of 3.543 18 No Post the Shopping (Works) Summary of the ICB (Non- Consultant Services)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 1 million 2. Single Source (Firms) Above US$ 1 million 3. Individual Above US$ 300,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6 Ref. Description of Estimated Packages Review Comments No. Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods

PROCUREMENT : Poor Rural Areas Community Development Project PLAN General Information

Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-03-20 Revised Plan Date(s): (comma delineated, leave blank if none)2018-08-28 Project ID: P153541 GPN Date: 2017-01-24 Project Name: Shaanxi Poor Rural Areas Community Development Project Loan / Credit No: IBRD / 86840 Executing Agency(ies): Shaanxi Poor Rural PMO

WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

W/YA/YCH/2017/01 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 55,582.83 Completed 2017-04-06 2017-06-01 2018-02-01 construction Quotations Envelope

W/YA/Y/G/2017/01 / Apple Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-21 2018-03-20 cold storage civil (4000 tons) Envelope

W/YU/D/Y/2017/02 / Peasant Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-07-25 2017-09-19 2018-03-18 household sheep shed Envelope

W/YU/D/Y/2018/01 / Peasant Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30 household sheep shed Quotations Envelope

W/W/B/J/2018/02 / Hail net Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30 225 mu Envelope

W/YU/D/Y/2018/02 / Peasant Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-02-01 2018-02-06 2018-03-20 2018-04-19 2018-05-24 2018-11-20 household sheep shed Envelope

W/YU/D/Y/2018/03 / Peasant Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30 household sheep shed Quotations Envelope

W/W/B/F/2018/01 / Hail net Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28 258 mu Envelope

W/B/LX/QQ/2017/02 / Pepper Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20 seedling greenhouse 6 Envelope

W/W/H/2017/06 / Village Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 road 0.85km Quotations Envelope

W/YU/M/2017/07 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-02-01 construction Quotations Envelope

W/YU/M/2017/06 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 construction Quotations Envelope

W/YA/YC/2017/08 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 hardening 2.9km Quotations Envelope

W/YA/YC/2017/03 /

Yanchuan county.

Constructed 5 bridges Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-07-15 2018-09-09 2019-03-08 cemented with M10 masonry Quotations Envelope and the wall is based on

M12.5 fine stone materials.

W/YA/YC/2017/04 /

Yanchuan county.

Constructed 3 bridges Request for Single Stage - One IBRD / 86840 Prior Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 cemented with M10 masonry Quotations Envelope and the wall is based on

M12.5 fine stone materials.

W/YA/YC/2017/01 /

Yanchuan county. Gaojiageta Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-07-25 2018-08-29 2018-11-29 village, road hardening Quotations Envelope

0.875km

W/YA/YC/2017/02 /

Yanchuan county. Production Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-08-04 2018-09-09 2019-03-08 road 4.95km resurfacing with Quotations Envelope sand.

W/YA/YC/2017/05 /

Yanchuan county. 300 sets Request for Single Stage - One of soft rainwater cellars. IBRD / 86840 Post Open - National 0.00 Canceled 2018-08-04 2018-09-29 2019-03-28 Quotations Envelope Diameter: 3m and depth:

3m.

W/YA/YC/2017/06 /

Yanchuan county. Road Request for Single Stage - One hardening 2.032km. Shiyao IBRD / 86840 Post Open - National 0.00 Canceled 2018-08-04 2018-09-29 2019-03-28 Quotations Envelope village 1.282km and

Fanjiachuan village 0.75km

Page 1 W/YA/Y/2017/03 / Yanchang

County, rainwater cellar Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 construction in the Farming Quotations Envelope

Orchard, Leichi Town.

W/YA/Y/2017/04 / : road construction in

5 communities including Request for Single Stage - One Jing'gou, Xinglie, Jiechu, IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope Zhongliang and Houlie of

Leiduo village in Leichi township.

W/YA/Y/2017/05 /

Yangchang county, 3.448km road construction of

Niangeda and Caiziliang Request for Single Stage - One communities of Xiadaya IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope village in Leichi township, and 0.285km road resurfacing and construction of Shiganliang community

W/YA/Y/2017/06 / Yanchang county, 1.15km road Request for Single Stage - One construction of Zhangtao and IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope Shentou communities in

Leichi township.

W/YA/Y/2017/07 / Yanchang Pending Request for Single Stage - One county, 1.75km productive IBRD / 86840 Post Limited 0.00 Implementati 2018-07-16 2018-09-10 2019-03-09 Quotations Envelope road for Leichi township. on

W/YA/Y/2017/02 /

Residential road hardening Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 from Leichi township to Quotations Envelope

Wapenyaozi village.

W/W/F/2017/01 / Fuping

County, asphalt road Pending Single Stage - One construction with 3.3 IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2017-04-01 2017-04-06 2017-05-18 2017-06-17 2017-07-22 2018-01-22 Envelope kilometers in width and 6 on meters in length

W/W/F/2017/02 / Fuping county, 5.47km road Pending construction in which 3.5m Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2018-04-19 2018-04-24 2018-06-05 2018-07-05 2018-08-09 2019-03-31 width of road for out use Envelope on and 3m width for residence use.

W/W/F/2017/03 / Fuping county, 11.1km length and Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-04-01 2018-04-06 2018-05-18 2018-06-17 2018-07-22 2018-12-31 3m width of road Envelope construction.

W/W/F/D/2017/01 / Fuping county, construction of peeling factories of 1,000 square meters, cold storage Pending building of 500 tons and 500 Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2018-04-19 2018-04-24 2018-06-05 2018-07-05 2018-08-09 2019-02-28 square meters, peeling Envelope on factories of 2400 square meters , drying rooms of 400 square meters and 1500 square meters.

W/W/B/2017/03 / , 3.2km residential Request for Single Stage - One road construction in Zhaoyao IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope community in Lingao project area.

W/W/B/2017/04 / Baishui county. One cement concrete road from Xiguojiashan village to Xiyou village Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 1.8km, another road from Quotations Envelope

Guojiashan village to

Dongsunjiashan village

1.1km, together is 2.9km.

W/W/B/2018/12 / Baishui Pending county. 2.2km road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-07-17 2018-09-11 2019-03-10 hardening for Lingao Quotations Envelope on community.

W/W/B/2018/14 / Baishui Pending Request for Single Stage - One village. 1.27km road IBRD / 86840 Post Limited 0.00 Implementati 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope hardening for Gaoxi village. on

W/W/B/2018/15 / Baishui Pending Request for Single Stage - One county. 3.38km productive IBRD / 86840 Post Limited 0.00 Implementati 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope road for Wuyao village. on

W/W/B/2018/17 / Baishui Request for Single Stage - One county. 0.9km productive IBRD / 86840 Post Limited 0.00 Canceled 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope road for Gaoxi village.

Page 2 W/W/B/2018/18 / Baishui county. Repair 1 well for

Pujun village and drill 3 Pending Request for Single Stage - One well for the following palces: IBRD / 86840 Post Limited 0.00 Implementati 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope Lingao community, Wuyao on village and Taowa village, 1 for each.

W/W/B/2018/19 / Baishui county, 200 square meters Pending Request for Single Stage - One biological fermented fertilizer IBRD / 86840 Post Limited 0.00 Implementati 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope pits construction in Lingao on project area.

W/B/LX/2017/01 / Long county, construction of 4 wells in which 2 well constructed in Liujiazu community, 1 well Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 constructed in Hujiazhuang Quotations Envelope community and 1 well construction on Shangliang community with 150 meters depth respectively.

W/B/LX/2017/02 / Long county, new construction of

8.123 km diversion canal, in which 3.523 km in the crossing of Liangfuhe Request for Single Stage - One community in Shangliang IBRD / 86840 Post Open - National 0.00 Canceled 2017-08-01 2017-08-22 2018-02-18 Quotations Envelope village and Xialiang village,

1.1 km in Liujiazui village, and 3.5 km between tanyuanpo community in

Liujiazui and railway.

W/B/LX/2017/03 / Long county, construction of 3 bridges, in which 1 bridge between Hujiazhuang community and Liujiazui Request for Single Stage - One community, 1 bridge in IBRD / 86840 Post Open - National 0.00 Canceled 2017-09-06 2017-11-01 2018-04-30 Quotations Envelope Yinqigou community in

Sanjiaodian village, and 1 bridge in Duimianqiao community in Sanjiaodian village.

W/YU/D/2017/03 / , construction of 1 300 meters-deep water well for Request for Single Stage - One farming use (equipped with IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-04-01 Quotations Envelope pump, high- and low voltage wire, transformer, water collection pool).

W/YU/D/2017/01 / Dingbian county, 7 km residential Pending concrete road construction Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2018-07-24 2018-07-29 2018-09-09 2018-10-09 2018-11-13 2019-05-16 Road construction from Envelope on Shangendi village to No. 303 provincial road of Shaanxi.

W/YU/D/2017/02 / Dingbian county, 5.4 km residential road from Xiaoqu community to Tuwozi community, which is divided into 2 parts: the Pending Single Stage - One first part is 1.9 km from IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2018-04-19 2018-04-24 2018-04-29 2018-05-04 2018-05-30 2018-12-28 Envelope Xiaoqu community to a on triple path, and the second part is 3.5 km from Liwazi community to Tuwozi community.

W/YU/D/Y/2017/01 /

Dingbian county. 5700 Request for Single Stage - One square meter of peasant IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope household sheep shed for

Yangwan village.

W/YU/D/2017/04 / Dingbian county, construction of sheep trading market covering Request for Single Stage - One 5,000 square meters, brick IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-04-01 Quotations Envelope floor, 0.5 meter high wall on which welded 1 meter iron column.

W/YU/M/2018/01 / Mizhi Pending Request for Single Stage - One county. 1.4km road IBRD / 86840 Post Limited 0.00 Implementati 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope hardening for Aijiawa village. on

W/YU/M/2018/03 / Mizhi Pending county. Middle part of Long Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-07-18 2018-09-12 2019-03-11 town. Management of land Quotations Envelope on and terrace for 125 Mu.

W/B/LY/2017/03 / , 2.2km road Request for Single Stage - One hardening in the first, IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope second and fourth group of

Sujia village.

Page 3 W/YU/M/2018/02 / Mizhi

County, land management Pending Request for Single Stage - One and terracing in the front IBRD / 86840 Post Limited 0.00 Implementati 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope part of Long Township, with on a total dimension of 543 mu.

W/B/LY/2017/04 / Linyou county, 2.3km road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-08-06 2017-10-01 2018-03-30 hardening in Aoli community Quotations Envelope in Changfeng village.

W/B/LY/2017/05 / Linyou county, 3km road hardening Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 from Guanzhuang village to Quotations Envelope

Zhujiayuan community.

W/YU/M/2018/05 / Mizhi county. Water tower for Pending Request for Single Stage - One orchard irrigation. 10 high IBRD / 86840 Post Limited 0.00 Implementati 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope water tower and 1 low on water tower.

W/YU/M/2018/04 / Mizhi

County, land management Pending Request for Single Stage - One and terracing at the rear of IBRD / 86840 Post Limited 0.00 Implementati 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope Long Town, with a total on dimension of 432 mu.

W/B/LY/2017/06 / Linyou county, 1.7km road Request for Single Stage - One hardening from Shenjia IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 Quotations Envelope community to Xizhuang community.

W/B/LY/2017/01 / Linyou county, 3.75km road Pending Single Stage - One hardening from Changfeng IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2017-04-01 2017-04-06 2017-05-18 2017-06-17 2017-07-22 2018-02-21 Envelope township to Shenjia on community.

W/YU/M/2018/06 / Mizhi Pending Request for Single Stage - One county. 10 well house for IBRD / 86840 Post Limited 0.00 Implementati 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope orchard irrigation. on

W/B/LY/2017/02 / Linyou Pending county, 4.9km road Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2017-05-01 2017-05-06 2017-06-17 2017-07-17 2017-08-21 2018-03-21 hardening from Changfeng Envelope on township to Wushen village.

W/YU/M/2018/07 / Mizhi county. Water tower for Pending Request for Single Stage - One orchard irrigation and IBRD / 86840 Post Limited 0.00 Implementati 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope ancillary facility engineering on with a total number of 10.

W/YU/M/2017/13 / Mizhi

County, Irrigation pipeline Request for Single Stage - One construction in the orchard IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope garden with a total dimension of 550 mu.

W/YU/M/2018/08 / Mizhi Pending county. Pipeline for orchard Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-07-18 2018-09-12 2019-03-11 irrigation. The depth is 1m, Quotations Envelope on and the material is PE.

W/YU/M/2017/14 / Mizhi

County, irrigation and outlet Request for Single Stage - One pile construction in the IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope orchard garden with 1000 water piles.

W/B/LY/2017/07 / Linyou county, 5.775km road Request for Single Stage - One resurfaced with sand in the IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope farmland of in Changfeng village and Changle village.

W/B/LY/2017/08 / Linyou county, construction of 4.5km Request for Single Stage - One water pipelines from the IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope water factory in Changfeng village to Changle village.

W/W/H/2017/01 / Heyang Request for Single Stage - One County, 2 wells in Xiyang IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-25 2017-09-19 2018-03-18 Quotations Envelope and Diantou Village.

W/W/H/2017/03 / Heyang

County, 2 wells in Xiao Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 Community and Meng Quotations Envelope

Community.

W/W/H/2017/02 / . 1 well for Xiangong Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-05 2017-08-30 2018-02-26 village and another well for Quotations Envelope

Chengcun village.

Page 4 W/W/H/2017/07 / Heyang

County, production of 5 Request for Single Stage - One roads with a total length of IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 Quotations Envelope 6060 meters in Diantou

Village.

W/W/H/2017/08 / Heyang county, 2.57km road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 construction in Xiaocun Quotations Envelope community.

W/W/H/2017/09 / Heyang Request for Single Stage - One county, 4.97km in Xiangong IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 Quotations Envelope village.

W/X/C/2017/01 / . Road hardening. The Single Stage - One total length is 5298m: IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-05-01 2017-05-06 2017-06-17 2017-07-17 2017-08-21 2018-06-21 Envelope 3919m for Santai village and

1379m for Fanluo village.

W/X/C/2017/02 / Changwu county. Road hardening . Single Stage - One The total length is 2562m: IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-05-01 2017-05-06 2017-06-17 2017-07-17 2017-08-21 2018-02-21 Envelope 2111m for Santai village and

451m for Fanluo village.

W/X/C/2017/03 / Changwu county. Associated drainage channel of hardening road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-08-01 for Santai village and Quotations Envelope

Fanluo village, the total length is 3678m.

W/W/H/2017/05 / Heyang Pending Single Stage - One county. 5.8km village road IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20 Envelope for Xiaocun community. on

W/W/H/2017/04 / Heyang Pending county, 6.7km road Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20 construction in Diantou Envelope on village.

W/X/C/L/2017/01 / Changwu county. Controlling office area of 5650sqm, Cold storage refrigeration to build

2000t, fence engineering Pending Single Stage - One 315m, refrigeration room IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20 Envelope door and controlling area, on equipment room 400sqm, housing construction 300sqm, workshop 300sqm and 2 bathroom.

W/W/F/2017/03A / Fuping Pending county, 11.1km length and Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 3m width of road Quotations Envelope on construction.

W/X/C/2017/01A / Changwu county. Road hardening. The Pending Request for Single Stage - One total length is 5298m: IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope 3919m for Santai village and on

1379m for Fanluo village.

W/X/C/2017/02A / Changwu county. Road hardening . Pending Request for Single Stage - One The total length is 2562m: IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope 2111m for Santai village and on

451m for Fanluo village.

Pending W/YA/YCH/2017/06A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 hardening Quotations Envelope on

W/YA/YCH/2017/15A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 gravel road of Shuangquan Quotations Envelope on Villege in Macha is 3.9km

W/B/LY/2017/03A / Linyou county, 2.2km road Pending Request for Single Stage - One hardening in the first, IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope second and fourth group of on

Sujia village.

W/YA/YCH/2017/14A / 1 hallucinogenic water stone Pending Request for Single Stage - One bridge and the total length IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope of hardening road of on

Shimengou is 0.2 km

Page 5 W/YU/D/2017/04A /

Dingbian county, construction of sheep trading market Pending Request for Single Stage - One covering 5,000 square IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope meters, brick floor, 0.5 meter on high wall on which welded 1 meter iron column.

Pending W/B/LX/QQ/2017/02A / Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2018-08-02 2018-08-07 2018-09-18 2018-10-18 2018-11-22 2019-05-21 Pepper seedling greenhouse 6 Envelope on

Pending W/W/B/2018/11A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road 2.68km Quotations Envelope on

Pending W/YA/YCH/2017/09A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 hardening Quotations Envelope on

Pending W/YU/M/2017/01A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Hardened Road Quotations Envelope on

Pending W/W/B/2017/01A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road 1.5km Quotations Envelope on

Pending W/W/B/2017/07A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Production of road 5.25km Quotations Envelope on

W/YA/YCH/2017/31A / Pending Request for Single Stage - One Construction of revetment: IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope 800 m3 on

Pending W/W/B/2018/10A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road 0.99km Quotations Envelope on

W/B/LY/2017/07A / Linyou county, 5.775km road Pending Request for Single Stage - One resurfaced with sand in the IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope farmland of in Changfeng on village and Changle village.

W/YA/Y/2017/06A /

Yanchang county, 1.15km Pending road construction of Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Zhangtao and Shentou Quotations Envelope on communities in Leichi township.

W/YU/D/2017/03A /

Dingbian county, construction of 1 300 meters-deep water Pending well for farming use Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 (equipped with pump, high- Quotations Envelope on and low voltage wire, transformer, water collection pool).

W/YU/M/2017/13A / Mizhi

County, Irrigation pipeline Pending Request for Single Stage - One construction in the orchard IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope garden with a total on dimension of 550 mu.

Pending W/YA/YCH/2017/03A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 hardening Quotations Envelope on

Pending W/W/B/2018/02A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Production of road 6.38km Quotations Envelope on

Pending W/W/B/2018/04A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road 3.2km Quotations Envelope on

W/YA/Y/2017/03A /

Yanchang County, rainwater Pending Request for Single Stage - One cellar construction in the IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Farming Orchard, Leichi on

Town.

W/YA/YC/2017/01A / Pending Yanchuan county. Gaojiageta Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 village, road hardening Quotations Envelope on 0.875km

Pending W/W/B/2018/03A / Water Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 diversion canal 12 km Quotations Envelope on

Pending W/YA/YC/2017/07A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 hardening 2.9 km Quotations Envelope on

Page 6 W/YA/YCH/2017/19A / The Pending Request for Single Stage - One total length of IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope hardening0.81.0 km on

W/B/LY/2017/04A / Linyou Pending county, 2.3km road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 hardening in Aoli community Quotations Envelope on in Changfeng village.

W/W/H/2017/08A / Heyang Pending county, 2.57km road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 construction in Xiaocun Quotations Envelope on community.

Pending W/W/B/2018/01A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 1.2km Quotations Envelope on

W/YA/YCH/2017/23A / The Pending Request for Single Stage - One total length of hardening IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope road of Machagou is 0.3 km on

W/YA/YC/2017/06A /

Yanchuan county. Road Pending Request for Single Stage - One hardening 2.032km. Shiyao IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope village 1.282km and on

Fanjiachuan village 0.75km

W/W/H/2017/02A / Heyang Pending county. 1 well for Xiangong Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 village and another well for Quotations Envelope on Chengcun village.

W/B/LY/2017/08A / Linyou county, construction of 4.5km Pending Request for Single Stage - One water pipelines from the IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope water factory in Changfeng on village to Changle village.

W/W/H/2017/09A / Heyang Pending Request for Single Stage - One county, 4.97km in Xiangong IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope village. on

W/X/C/2017/03A / Changwu county. Associated drainage Pending channel of hardening road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 for Santai village and Quotations Envelope on Fanluo village, the total length is 3678m.

W/B/LX/2017/03A / Long county, construction of 3 bridges, in which 1 bridge between Hujiazhuang community and Liujiazui Pending Request for Single Stage - One community, 1 bridge in IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Yinqigou community in on

Sanjiaodian village, and 1 bridge in Duimianqiao community in Sanjiaodian village.

W/YA/YCH/2017/17A / 2 Pending Request for Single Stage - One hallucinogenic water stone IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope bridges in Machagou on

W/YA/Y/2017/05A /

Yanchang county, 3.448km road construction of

Niangeda and Caiziliang Pending Request for Single Stage - One communities of Xiadaya IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope village in Leichi township, on and 0.285km road resurfacing and construction of Shiganliang community

W/W/H/2017/01A / Heyang Pending Request for Single Stage - One County, 2 wells in Xiyang IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope and Diantou Village. on

Pending W/W/B/2018/08A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road 3.5km Quotations Envelope on

W/YA/YCH/2017/18A / total Pending Request for Single Stage - One length of hardening road of IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Machagou is 1.0 km on

Pending W/YA/YCH/2017/07A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Gravel road construction Quotations Envelope on

Pending W/W/B/2018/05A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road 1.57km Quotations Envelope on

Page 7 W/YA/YCH/2017/13A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 gravel road of Shimengou is Quotations Envelope on 3.0 km

Pending W/W/B/2018/06A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 0.68 Km Quotations Envelope on

W/YA/YCH/2017/25A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road of Machagou is 1.0 Quotations Envelope on km

W/YA/YCH/2017/26A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road of Xinzhaigou Villege Quotations Envelope on is 0.5 km

W/YA/YCH/2017/30A / The Pending Request for Single Stage - One total length of hardening IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope road of Machagou is 1.0 km on

W/YA/YCH/2017/22A / 2 Pending Request for Single Stage - One hallucinogenic water stone IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope bridges in Shitaisi on

Pending W/W/B/2018/09A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road 3.5km Quotations Envelope on

W/W/H/2017/03A / Heyang Pending County, 2 wells in Xiao Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Community and Meng Quotations Envelope on Community.

W/B/LY/2017/06A / Linyou county, 1.7km road Pending Request for Single Stage - One hardening from Shenjia IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope community to Xizhuang on community.

W/YA/YCH/2017/10A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 gravel road of Liuchagou is Quotations Envelope on 5.0 km

W/YA/YCH/2017/24A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road of Xinzhaigou Villege Quotations Envelope on in Shike is 2.7 km

W/YA/YCH/2017/20A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road of Guanshang Villege Quotations Envelope on is 0.6km

W/YA/YCH/2017/28A / 2 Pending Request for Single Stage - One hallucinogenic water stone IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope bridge in Yadi Villeges on

W/B/LX/2017/01A / Long county, construction of 4 wells in which 2 well constructed in Liujiazu Pending community, 1 well Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 constructed in Hujiazhuang Quotations Envelope on community and 1 well construction on Shangliang community with 150 meters depth respectively.

W/YA/YC/2017/04A /

Yanchuan county. Pending Constructed 3 bridges Request for Single Stage - One IBRD / 86840 Prior Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 cemented with M10 masonry Quotations Envelope on and the wall is based on

M12.5 fine stone materials.

W/B/LX/2017/02A / Long county, new construction of

8.123 km diversion canal, in which 3.523 km in the crossing of Liangfuhe Pending Request for Single Stage - One community in Shangliang IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope village and Xialiang village, on

1.1 km in Liujiazui village, and 3.5 km between tanyuanpo community in

Liujiazui and railway.

W/YU/D/Y/2017/01A /

Dingbian county. 5700 Pending Request for Single Stage - One square meter of peasant IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope household sheep shed for on

Yangwan village.

W/YA/YCH/2017/21A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 gravel road road of Quotations Envelope on Machagou is 5.1 km

Page 8 W/YU/M/2017/14A / Mizhi

County, irrigation and outlet Pending Request for Single Stage - One pile construction in the IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope orchard garden with 1000 on water piles.

W/W/B/2017/04A / Baishui county. One cement concrete road from Xiguojiashan Pending village to Xiyou village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 1.8km, another road from Quotations Envelope on Guojiashan village to

Dongsunjiashan village

1.1km, together is 2.9km.

W/YA/Y/2017/04A /

Yanchang county: road construction in 5 Pending communities including Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Jing'gou, Xinglie, Jiechu, Quotations Envelope on Zhongliang and Houlie of

Leiduo village in Leichi township.

W/YA/YCH/2017/16A / The total length of production Pending Request for Single Stage - One gravel road of Nanwan IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Village in Guanshang is 3.0 on km

W/YA/YC/2017/03A /

Yanchuan county. Pending Constructed 5 bridges Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 cemented with M10 masonry Quotations Envelope on and the wall is based on

M12.5 fine stone materials.

W/YA/YC/2017/02A / Pending Yanchuan county. Production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road 4.95km resurfacing with Quotations Envelope on sand.

W/YA/YCH/2017/27A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road of Machagou is 5.5 Quotations Envelope on km

W/B/LY/2017/05A / Linyou Pending county, 3km road hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 from Guanzhuang village to Quotations Envelope on Zhujiayuan community.

W/YA/YCH/2017/29A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 gravel road of Yadi Village Quotations Envelope on is 1.0 km

W/YA/YCH/2017/11A / 2 Pending Request for Single Stage - One hallucinogenic water stone IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope bridges in Liuchagou on

W/YA/YCH/2017/32A / Pending Request for Single Stage - One Construction of irrigation IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope canals:600m on

W/W/B/2017/03A / Baishui county, 3.2km residential Pending Request for Single Stage - One road construction in Zhaoyao IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope community in Lingao project on area.

Pending W/W/B/2018/07A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 road 3km Quotations Envelope on

W/YA/Y/2017/02A / Pending Residential road hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 from Leichi township to Quotations Envelope on Wapenyaozi village.

W/YA/YC/2017/05A /

Yanchuan county. 300 sets Pending Request for Single Stage - One of soft rainwater cellars. IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Diameter: 3m and depth: on

3m.

W/W/H/2017/07A / Heyang

County, production of 5 Pending Request for Single Stage - One roads with a total length of IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope 6060 meters in Diantou on

Village.

Pending W/YA/YCH/2017/02A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 construction. Quotations Envelope on

W/YA/YCH/2018/07 / Pending Yichuan county. The 2km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 harden road for Mashan Quotations Envelope on village and Lijialing village.

Page 9 W/YA/YCH/2018/08 / Pending Yichuan county. 2 bridges Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 for Miaogoukou and Quotations Envelope on Yunwanggou. And 1 culvert.

W/YA/YCH/2018/09 / Pending Yichuan county. 1.4km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 hardening road and 1.7km Quotations Envelope on new drainage ditch.

W/YA/YCH/2018/10 / Pending Yichuan county. 10km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 productive road for Ruyi Quotations Envelope on village.

W/YA/YCH/2018/11 /

Yichuan county. 2.6km Pending hardening road for Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Shijiazhuang village, as well Quotations Envelope on as 0.7km new drainage ditch.

W/YA/YCH/2018/12 / Pending Request for Single Stage - One Yichuan county. 1 water well IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope for Shijiazhuang village. on

W/YA/YCH/2018/13 / Pending Yichuan county. 8.05km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 productive road for Quotations Envelope on Shijiazhuang village.

W/YA/YCH/2018/14 / Pending Request for Single Stage - One Yichuan county. 10km gravel IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope road for Shijiazhuang village. on

W/YA/YCH/2018/15 / Pending Yichuan county. 9.5km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 gravel road for Guantou and Quotations Envelope on Shijiazhuang village.

W/YA/YCH/2018/16 / Pending Yichuan county. 4 bridges. 2 Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 for Shishao village and other Quotations Envelope on 2 for Taiping village.

W/YA/YCH/2018/17 / Pending Yichuan county. 9km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 productive road and 7 Quotations Envelope on culvert for Shishao village.

W/YA/YCH/2018/18 /

Yichuan county. 0.825km Pending Request for Single Stage - One hardening road and 0.5km IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope drainage ditch for Shishao on village.

W/YA/YCH/2018/19 / Pending Yichuan county. 1.8km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 hardening road for Nanbutou Quotations Envelope on village.

W/YA/YCH/2018/20 /

Yichuan county. 11km Pending Request for Single Stage - One productive road and 2 IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope culvert for Nanbutou village on and Yanqu village.

W/YA/YCH/2018/21 /

Yichuan county. 8km Pending productive road for Nanbutou Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 village, 0.5km road for Quotations Envelope on Guanzhuan village and 2km road for Mayuan.

W/YA/YCH/2018/22 /

Yichuan county. 2 bridges Pending Request for Single Stage - One for Zuishang and Yadi IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope village, 2 culverts for on

Guanzhuang village.

W/YA/YCH/2018/23 /

Yichuan county. 5km Pending Request for Single Stage - One productive road for Nantou IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope village and 3km road for on

Dahumiao village.

W/YA/YCH/2018/24 / Pending Yichuan county. 10km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 productive road for Nantou Quotations Envelope on village.

W/YA/YCH/2018/25 /

Yichuan county. 4 watering place for 4 villages, Pending Request for Single Stage - One Zuishang, Taiping, IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope Shijiazhuang and Heling on village. 1km drainage ditch for Lingshang village.

Page 10 W/YA/YCH/2018/26 / Pending Request for Single Stage - One Yichuan county. Gravel road IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope for Taiping village. on

W/YA/YCH/2018/27 / Pending Request for Single Stage - One Yichuan county. bridge for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope Nanbutou village. on

W/YU/M/2018/09 / Mizhi Pending Request for Single Stage - One county. Road hardening for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Yangjiagou village. on

W/YU/M/2018/10 / Mizhi Pending Request for Single Stage - One county. Hardened Road for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Sigou village. on

W/YU/M/2018/11 / Mizhi Pending Request for Single Stage - One county. Hardened Road for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Gongjiagou village. on

W/YU/M/2018/12 / Mizhi Pending Request for Single Stage - One county. Hardened Road for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Gongjiagou village. on

W/YU/M/2018/13 / Mizhi Pending Request for Single Stage - One county. Hardened Road for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Li village. on

W/YU/M/2018/14 / Mizhi Pending Request for Single Stage - One county. Hardened road for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Yuejiacha village. on

W/YU/M/2018/15 / Mizhi Pending Request for Single Stage - One county. Hardened road for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Yuejiacha village. on

W/YU/M/2018/16 / Mizhi Pending Request for Single Stage - One county. Hardened road for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Majiaxiaogou village. on

W/YU/M/2018/17 / Mizhi Pending Request for Single Stage - One county. Hardened road for IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Houjiagou village. on

Pending W/YU/M/2018/18 / Mizhi Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 county. Land governance. Quotations Envelope on

W/YU/M/2018/19 / Mizhi county. Well engineering for Pending Request for Single Stage - One Yangjiagou village, IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Gongjiagou village and Li on village.

Pending W/YU/M/2018/20 / Mizhi Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 county. Well engineering Quotations Envelope on

W/YU/M/2018/21 / Mizhi Pending Request for Single Stage - One county. Water storage IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope engineering. on

W/YU/M/2018/22 / Mizhi Pending Request for Single Stage - One county. Water supply IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope irrigation. on

W/YU/M/2018/23 / Mizhi Pending Request for Single Stage - One county. Water supply IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Engineering. on

W/YU/M/2018/24 / Mizhi Pending Request for Single Stage - One county. Drainage system IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope construction service. on

W/YU/M/2018/25 / Mizhi Pending Request for Single Stage - One county. Environmental IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope engineering. on

Pending W/YU/M/2018/26 / Mizhi Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-28 2018-10-23 2019-04-21 county. Market construction. Quotations Envelope on

GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

G/YA/YCH/F/2017/04 / Request for Single Stage - One Provide 1400 sheep(70 poor IBRD / 86840 Post Open - National 216,070.23 Signed 2017-07-06 2017-08-31 2018-02-27 Quotations Envelope Families)

Page 11 G/YA/YC/C/2017/01 / 342 Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-10-06 2017-12-01 2018-05-30 heads of moggy Quotations Envelope

G/B/LY/CF/SYJ/2017/03 / associated equipment of spawn production Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 baseautoclave equipment of Quotations Envelope culture room sun shading facilities

G/YA/YC/C/2018/01 / 342 Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 heads of moggy Quotations Envelope

G/YA/YC/C/2018/03 / 342 Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-10-06 2018-12-01 2019-05-30 heads of moggy Quotations Envelope

G/YA/YC/C/2019/01 / 342 Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2019-06-06 2019-08-01 2020-01-28 heads of moggy Quotations Envelope

G/W/F/D/2018/02 / 1 set of Request for Single Stage - One cold storage refrigeration IBRD / 86840 Post Open - National 0.00 Canceled 2018-04-01 2018-04-22 2018-10-19 Quotations Envelope equipment

G/W/F/D/2017/05 / Stainless steel workbench, persimmons Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-09-01 2017-09-22 2018-03-21 hang 30 square meters, Quotations Envelope

2.189 million

G/YA/Y/Z/2017/02 / Carrier Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 (4) Quotations Envelope

G/W/F/D/2017/03 / Drying Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-08-06 2017-10-01 2018-03-30 shed 6020 square meters Quotations Envelope

G/W/F/D/2017/01 /

Automatic peeling machines, IBRD / 86840 Post Direct Selection Direct 0.00 Canceled 2017-04-01 2017-04-06 2017-05-11 2017-12-11 drying machines, drying trolleies

G/W/B/F/2018/01 / A cold Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-03-01 2018-03-22 2018-09-18 storage equipment Quotations Envelope

G/YU/D/Y/2017/02 / little Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-10-06 2017-12-01 2018-05-30 ewes Quotations Envelope

G/YU/D/Y/2018/01 / little Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-09-06 2018-11-01 2019-04-30 ewe Quotations Envelope

Request for Single Stage - One G/YU/M/L/2018/01 / donkeys IBRD / 86840 Post Open - National 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30 Quotations Envelope

Request for Single Stage - One G/YU/M/L/2017/01 / donkeys IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 Quotations Envelope

G/YA/YC/2018/01 /

Yanchuan county. laptop computer3, computer 5, Pending Request for Single Stage - One printer 3, copier 1, camera IBRD / 86840 Prior Limited 0.00 Implementati 2018-07-20 2018-09-14 2019-03-13 Quotations Envelope 1, fax machine 1, video on camera 1, projector 1, scanner 1, office software 8

G/YA/Y/2018/01 / Yanchang

County, 10 kinds of office suppliers including desktop computers 5, notebook Pending computers 3, laser printers Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-07-16 2018-09-10 2019-03-09 3, photocopier 1, laser fax Quotations Envelope on machine 1, video projector 1, scanner 1, digital camera 1, video camera 1, and office suite software.

G/W/B/2018/01 / Baishui county, 2 sets of equipment Pending Request for Single Stage - One for biological fermented IBRD / 86840 Post Limited 0.00 Implementati 2018-07-19 2018-08-06 2018-09-06 Quotations Envelope fertilizer in Shiguan project on area.

G/W/B/2018/02 / Baishui Pending county, 1 set of equipment Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-07-17 2018-09-11 2019-03-10 for fermented fertilizer pits Quotations Envelope on in Lingao project area.

G/B/LX/2017/01 / Long county, 3 laptop computers,

5 desktop computers, 3 laser Pending printers, 1 photocopier, 1 Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-07-17 2018-09-11 2019-03-10 digital camera, 1 laser fax Quotations Envelope on machine, 1 video camera, 1 video projector, 1 scanner, 8 suites of office software.

G/YU/D/2017/01 / Dingbian county, 3 laptop computers,, Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 1 camera, 8 suites of office Quotations Envelope software.

Page 12 G/B/LY/2017/01 / Linyou county, 3 laptop computers,

5 desktop computers, 3 laser Request for Single Stage - One printers, 1 photocopier, 1 IBRD / 86840 Post Open - National 0.00 Canceled 2017-03-06 2017-05-01 2017-10-28 Quotations Envelope digital camera, 1 laser fax machine, 1 video camera, 1 video projector, 1 scanner.

G/W/H/2017/01 / Heyang

County, Notebook computers

3, Desktop computers 5,

Scanner 1, Office suite Request for Single Stage - One softwares 8, Photocopiers 1, IBRD / 86840 Post Open - National 0.00 Canceled 2017-04-06 2017-06-01 2017-11-28 Quotations Envelope Digital camera 1, Laser printer 3, Video projector 1,

Digital voice recorder 1,

Laser fax machine 1.

G/W/H/J/2018/01 / Heyang county. 1050mu of drip irrigation: 300mu for Diantou Request for Single Stage - One village, 150mu for Chengcun IBRD / 86840 Post Open - National 0.00 Canceled 2018-01-25 2018-03-22 2018-09-18 Quotations Envelope village, 100mu for Xiaocun village and 500mu for

Mengcun village.

G/W/H/J/2018/02 / Heyang Pending Single Stage - One county. 557 acres of new IBRD / 86840 Post Request for Bids Open - National 0.00 Implementati 2018-12-01 2018-12-06 2019-01-17 2019-02-16 2019-03-23 2019-09-19 Envelope varieties of apple tree. on

G/W/F/D/2017/01A / Pending Automatic peeling machines, IBRD / 86840 Post Direct Selection Direct 0.00 Implementati 2018-08-02 2018-08-07 2018-09-11 2019-04-13 drying machines, drying on trolleies

Pending G/SH/2018/01A / Office Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 equipment 176 set Quotations Envelope on

G/W/H/2017/01A / Heyang

County, Notebook computers

3, Desktop computers 5,

Scanner 1, Office suite Pending Request for Single Stage - One softwares 8, Photocopiers 1, IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Digital camera 1, Laser on printer 3, Video projector 1,

Digital voice recorder 1,

Laser fax machine 1.

G/W/H/J/2018/01A / Heyang county. 1050mu of drip irrigation: 300mu for Diantou Pending Request for Single Stage - One village, 150mu for Chengcun IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope village, 100mu for Xiaocun on village and 500mu for

Mengcun village.

Pending G/YA/YCH/F/2018/01A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Providing 2130 sheep Quotations Envelope on

G/YU/D/2017/01A / Dingbian Pending county, 3 laptop computers,, Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 1 camera, 8 suites of office Quotations Envelope on software.

Pending G/YA/YCH/F/2017/02A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Livestock breeding: 100 rams Quotations Envelope on

G/B/LY/2017/01A / Linyou county, 3 laptop computers,

5 desktop computers, 3 laser Pending Request for Single Stage - One printers, 1 photocopier, 1 IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope digital camera, 1 laser fax on machine, 1 video camera, 1 video projector, 1 scanner.

G/W/B/2017/01A / Notebook computers, Desktop computers, Scanners, Office Pending Request for Single Stage - One suite software, Digital IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope cameras, Video projectors, on

Printers, Fax machines,

Copiers

Pending G/YA/YCH/F/2017/06A / 100 Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementati 2018-08-07 2018-10-02 2019-03-31 rams (demonstration farms) Quotations Envelope on

NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Page 13 CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Request for Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

C/SH/2018/02 / studies on Consultant sustainable development Pending IBRD / 86840 Post Qualification Open - National 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 under the background of Implementation Selection relative poverty

Consultant C/SH/2017/07 / Project Under IBRD / 86840 Post Qualification Open - National 0.00 2017-10-20 2017-11-10 2017-12-24 2018-01-23 2018-03-07 2018-03-07 purchasing agent Implementation Selection

C/SH/2017/05 / studies on Consultant Pending cooperatives and ways of IBRD / 86840 Post Qualification Open - National 0.00 2018-06-30 2018-07-21 2018-09-03 2018-10-03 2018-11-07 2019-11-07 Implementation poverty alleviation Selection

Consultant C/SH/2018/04 / Entrust IBRD / 86840 Post Qualification Open - National 0.00 Canceled 2018-05-31 2018-06-21 2018-08-04 2018-09-03 2018-10-08 2019-10-08 training and investigation Selection

C/SH/2017/06 / studies on Consultant ways for supporting inclusive IBRD / 86840 Post Qualification Open - National 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-05 2018-01-09 2018-07-08 finance (including insurance) Selection in poor areas

C/SH/2018/01 / studies on Consultant city and countryside IBRD / 86840 Post Qualification Open - National 0.00 Canceled 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 integration of poor areas Selection

C/SH/2018/03 / studies on Consultant value chain and IBRD / 86840 Post Qualification Open - National 0.00 Canceled 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 industrialization poverty Selection alleviation in poor areas

C/SH/2017/02 / project Quality And Cost- Pending IBRD / 86840 Post Open - National 0.00 2018-12-01 2018-12-22 2019-02-04 2019-03-04 2019-04-03 2019-05-08 2019-06-12 2020-06-11 monitoring and evaluation Based Selection Implementation

INDIVIDUAL CONSULTANTS

Page 14