Government of

United Nations Development Programme (UNDP)

Project Document

National Environment Youth Project (December 2008-December 2011)

Brief Description

The project will focus on protecting the banks and catchment areas of Nyabarongo river system from land degradation and solid waste pollution while creating employment opportunities for the youth in both rural and urban Districts. The project will promote a wide range of income generating environmental activities and these will include terracing, nursery development, tree planting and rehabilitation of degraded areas; waste collection and recycling particularly transforming some of these materials to produce fertilizer for farmers and briquettes for cooking and other uses. Youth associations, local communities, District and Sector leadership, environmental NGOs and schools will be encouraged to actively participate in environmental awareness programmes and demonstrate practical self help measures of environmental management.

With the support of the Rwanda Environment Management Authority (REMA), Ministry of Natural Resources (MINIRENA) and the National Youth Council, the project will be enabled to mobilize youth associations to establish pilot projects where the youth will be directly involved in rehabilitating, conserving, protecting and sustainably managing the natural resources. In the process viable income generating projects will be established in an effort to create employment and alleviate poverty among the Youth.

The project will build capacities for youth in income generating activities with a viewi to turning their life into a more attractive one through environmental conservation.

SIGNATURE PAGE

Country: RWANDA

UNDAF Outcome(s)/ Indicator(s ):

Management of environment, natural resources and land is improved in a sustainable way.

Expected Outcome(s) Indicators The youth and communities in the project area are using capacity built in sustainable management of environment and natural resources along Nyabarongo River System. Nyabarongo river system waters are clean and free from water hyacinth city and towns along Nyabarongo river system are clean through improved solid waste management. The Youth and communities in the Districts along the Nyabarongo River System through sustainable management of environment and natural resources have enhanced their livelihoods. Improved productivity restored to previously degraded land. Project effectively managed, monitored, evaluated and reported

Expected Outputs/ Annual Targets : The Nyabarongo River System catchments high altitude areas have been terraced with radical terracing for management of soil conservation (ha). The Nyabarongo River System catchments in lower altitude areas have been terraced with progressive terraces The banks of Nyabarongo River System have been protected through improved management of the river buffer zone.

Executing Agency: Rwanda Environmental Management Authority (REMA)

Implementing agencies: United Nations Development Programme (UNDP)

Programme Period: December 2008 – December 2011 Estimated Budget: US$ 6.000,000

Programme Component: Land Degradation Allocated Resources : US$ 5,298,000 (one fund)

Project Title: National Environment Youth Project In kind contribution : US$ 402.000 (GoR) Project ID: 000880 UNDP TRAC : UNDP Rwanda: 300,000 US$) Project Duration: Three Years (starting from Dec. 2008)

Management Arrangement : National Execution (NEX)

Agreed by

On behalf of: Signature Date Name/Title MINIRENA Hon. Vincent Karega Minister of State in charge of Environment, Water and Mines MINIYOUTH Hon. Protais Mitali Minister of Youth MINECOFIN Hon. James Musoni Minister of Finance and Economic Planning UNDP Mr. Aurélien A. Agbénonci Resident Representative

ii Country: REPUBLIC OF RWANDA

UNDAF Outcome(s)/Indicator(s): Management of environment, natural resources and land is improved in a sustainable way

Expected Outcome(s)/Indicator(s):

 The youth and communities in the project area are using capacity built in sustainable management of environment and natural resources along Nyabarongo River System.  Nyabarongo river system waters are clean and free from water hyacinth  Kigali city and towns along Nyabarongo river system are clean through improved solid waste management.  The Youth and communities in the Districts along the Nyabarongo River System through sustainable management of environment and natural resources have enhanced their livelihoods.  Improved productivity restored to previously degraded land.  Project effectively managed, monitored, evaluated and reported

Expected Output(s)/Annual Targets:

 The Nyabarongo River System catchments high altitude areas have been terraced with radical terracing for management of soil conservation (ha).  The Nyabarongo River System catchments in lower altitude areas have been terraced with progressive terraces  The banks of Nyabarongo River System have been protected through improved management of the river buffer zone  Filtering and sinking of soil sediments has been enhanced through a forestation and rehabilitation of forests on river catchment areas  Nyabarongo River System have been protected and freed from attack by water hyacinth  The Capacity of youth and management in Kigali and towns along Nyabarongo River System has been enhanced  The youth) have been organized, supported and strengthened for the protection of bank and catchment areas of Nyabarongo River System bank and catchment areas  The youth have been supported and strengthened in waste management in Kigali and towns along the Nyabarongo river system  The capacity of youth in environment and waste management techniques has enhanced through training in cooperative principles, techniques of soil conservation, agro forestry, forestry, land use and integrated approach  Project implementation Unit (PMU) in place and strengthened

iii

Implementing Partner: Rwanda Environment Management Authority (REMA ) Responsible Parties : UNDP

iv

Table of Contents

ABBREVIATIONS AND ACRONYMS...... VII LIST OF TABLES...... VIII LIST OF FIGURES...... VIII LIST OF MAPS ...... VIII 1.0. BACKGROUND AND CONTEXT...... 1 2.0. SITUATION ANALYSIS...... 2 2.1. GEOGRAPHICAL FEATURES ...... 2 2.2. SOCIAL ECONOMIC CONTEXT ...... 3 2.2.1. Reflection on the Youth...... 7 2.3. DESCRIPTION OF THE PROJECT AREA ...... 10 2. 3.1. Project location ...... 10 2. 3. 2. The Rwandan Akagera Watershed and Nyabarongo River System ...... 11 2.3.3. Hydrology...... 11 2.3.4 Nyabarongo river basin...... 12 2.3.5 Hydrology...... 12 3.0. PROJECT STRATEGY...... 14 3.1. DEVELOPMENT GOAL ...... 14 3.2. PROJECT OBJECTIVES ...... 14 3.3. PROJECT RATIONALE ...... 15 3.3.1. Stakeholder Participation...... 20 3.4. LINKING WITH PRIOR , ON-GOING PROCESSES AND PROGRAMMES ...... 22 3.5. Government Youth Policy and Strategy...... 24 4.0. CHALLENGES AND OPPORTUNITIES...... 28 4.1. CHALLENGES ...... 28 4.1.1. Rehabilitation of Land degradation...... 28 4.1.2. Population Pressure on Natural Resources...... 29 4.1.3. The Solid waste management...... 30 4.2. OPPORTUNITIES ...... 31 4.2.1. Political will ...... 31 4.2.2. On-going Processes...... 31 4.2.3. DEMP Phase 1...... 32 4.2.4. Donor goodwill...... 32 4.3. SUSTAINABILITY ...... 32 4.4. REPLICABILITY ...... 33 5.0. RESULTS AND RESOURCE FRAMEWORK...... 34 6.0. MANAGEMENT ARRANGEMENTS...... 45 6.1. PROJECT IMPLEMENTATION ...... 45 6.2. GENERAL FRAMEWORK ...... 45 6.3. PROJECT MANAGEMENT UNIT (PMU):...... 45 6.4. NATIONAL PROJECT STEERING COMMITTEE (NPSC) ...... 46 6.5. DISTRICT ADVISORY TECHNICAL COMMITTEE (DATC)...... 46 7.0. FINANCIAL ARRANGEMENT...... 46

v 7.1. AUDIT REQUIREMENTS ...... 47 7.2. GUIDELINES FOR PAYMENT OF ALLOWANCES ...... 47 8.0. PROJECT SUMMARY BUDGET AND ANNUAL WORK PLANS...... 47 8.1 PROJECT SUMMARY BUDGET...... 47 9.0. MONITORING AND EVALUATION, INCLUDING AWP MONITORING TOOL...... 95 10.0. FINAL PROJECT EVALUATION ...... 97 11.0. LEGAL CONTEXT...... 97 ANNEXES...... 101 ANNEX 1: PROFITABILITY OF FERTILIZER AND BRIQUETTES MADE FROM SOLID WASTES (IN US$) ...... 101 ANNEX 2: GENERAL PROJECT BENEFITS FROM INTERVENTIONS FOR FARMERS IN THE PROJECT AREA ...... 102 ANNEX 3: SOIL CONSERVATION TECHNIQUES WHICH CAN BE USED IN TERRACING (A DAPTED FROM SMS-MSP CAPACITY BUILDING PROJECT .) ...... 105 ANNEX 6: THE DUTIES AND RESPONSIBILITIES OF PROJECT STAFF ...... 125 ANNEX 7: DUTIES AND RESPONSIBILITIES FOR THE NATIONAL PROJECT COMMITTEE (NPSC) AND DISTRICT ADVISORY TECHNICAL COMMITTEE (DATC) ...... 133 ANNEX 8: PRELIMINARY TERMS OF REFERENCE OF PROJECT IMPLEMENTATION PROCEDURES ...... 134 ANNEX 9 : NOTES ...... 135 ANNEX 10 : LPAC meeting minutes……………………………………………………………………………….138 ANNEX 11 : Harmonization modality between the National Environment Youth Project and the Joint Youth Program………………………………………………………………………………………………………...……140

vi Abbreviations and Acronyms

AIDS - Acquired Immune Deficiency Syndrome CCA - Common Country Assessment CBD - International Convention on Biodiversity COPED - Compagnie pour l’Environnement et Développement DATC - District Advisory Technical Committee DHS - Demographic and Health Survey EDPRS - Economic Development and Poverty Reduction Strategy EIC - Education, Information and Communication EICV - Enquête Intégrale sur les Conditions de Vie des Ménages GDP - Gross Domestic Product GEF - Global Environment Facility GOR - Government of Rwanda HIV - Human Immunodeficiency Virus ISAR - Institut des Sciences Agronomiques du Rwanda MSP - Medium Sized Project MDG - Millennium Development Goal MIFOTRA - Ministry of Public Services, Skills Development, Vocational Training and Labor. MINAGRI - Ministère de l’Agriculture et des Ressources Animales MINALOC - Ministry of Local Government, Good governance, Community Development and Social Affairs MINECOFIN - Ministry of Finance and Economic Planning MININFRA - Ministry of Infrastructure MINIRENA - Ministry of Natural Resources NPSC - National Project Steering Committee NBI - Basin Initiative NEX - National Execution NGO - Non-Government Organization

vii NRM - Natural Resources Management NTEAP - Nile Trans-boundary Environmental Action Project ORTPN - Office Rwandais de Tourisme et des Parcs Nationaux PAFOR - Projet d’Appui à L’Aménagement des Forêts PC - Project Coordinator PMU - Project Management Unit PSTA Plan Stratégique de Transformation Agricole RADA - Rwanda Agricultural Development Authority RARDA - Rwanda Animal Resources Development Authority REMA - Rwanda Environment Management Authority RSSP - Rural Sector Support Project SMS - Small Medium States SMS-MSP - Small Medium State-Medium Sized Programme SGP - Small Grant Programme TAMP - Programme for the Akagera River Basin UNDP - United Nations Development Programme USD - United States Dollar

List of Tables Table 1: Literacy level (%) by sex among those less than 35 years Table 2: Stakeholder Interests and Expected Level of Participation Table 3: Erosion risk categories

Table 4: Project Results and Resources Framework Table 5: Project summary budget (in USD)

List of Figures Figure 1: Agriculture activities along Mukungwa river bank in Musanze District Figure 2: COPEED waste recycling factory under construction Figure 3: Part of Nyabarongo River System which is bare due to erosion Figure 4 : Nyanza Waste Dumping Area

List of Maps

Map 1:Nyabarongo River System Catchment Area

Map 2: Hydrological Network of Rwanda

viii The Nyabarongo River Basin

Source: Adapted from Capacity Building Network (NBCN), Flood Management, Research Cluster, group II, 2005

ix 1.0 . Background and Context

The 1994 war and genocide have had profound negative effects on the environment. During and after the genocide, there was extensive cutting of forests for both construction of houses and fuel wood for displaced people. The genocide destroyed ecosystems, infrastructure and human resources, including those who worked on environment related sectors. The situation was aggravated by the return of refugees from their countries of exile who were resettled in forest areas. There was a serious land problem and the Government had to de-gazette some of the park areas and even partition land belonging to state owned projects to make space for resettlement. Reports indicate that two thirds of the Akagera National Park, and almost all the Gishwati Mountain Forest as well as some parts of the Mutara Game Reserve forests were allocated for refugee resettlement. The outstanding genocide consequences are:

• Environmental destruction by massive movement of displaced people • Heavy impact on children and vulnerable groups.

The unsustainable use of natural resources in the past has resulted in unprecedented rates of environmental degradation that have been a threat to economic growth and poverty reduction. Thus, the EDPRS stresses the need to incorporate issues of sustainable natural resources management in sectoral policies and legislation, plans and programmes in recognition of the cross cutting nature of environment. The National Environmental Policy and the subsequent Organic Law 04/2005 also emphasize the need to integrate environment in the development process for sustainable development. The National Environment Policy sets out overall and specific objectives as well as fundamental principles for improved management of the environment, both at the central and local level. It lays a solid foundation for the establishment of a legal framework for improved management of the environment, as well as the right principles for the participation of the population in general, and women and the youth in particular

These instruments recognise the imperative need of better management of natural resources towards economic growth and poverty reduction. Through the EDPRS process and other initiatives undertaken by Ministry of Natural Resources (MINIRENA) and the Rwanda Environment Management Authority (REMA), it is hoped that other sectoral policies and strategies will integrate natural resources management and environmental conservations measures for sustainable development.

The Vision 2020 recognizes the fact that the high demographic pressure has increasingly led to the occupation of marginal areas and to the rapid and continuous soil degradation of the fragile ecosystems of the country. The Vision 2020 notes the fact that for Rwanda to ensure sustainable development, it has to implement adequate land and water management techniques, coupled with a sound biodiversity policy. The EDPRS targets to map, assess and rehabilitate five ecosystems from current 50% to 80% by 2012. It has priority also to protect biodiversity and to reduce soil erosion and declining soil fertility (EDPRS, July 2007).

1

Rwanda has ratified several international conventions and agreements relating to environmental protection and sustainable natural resources management, including: the MDGs, The United Nations Convention on Combating Desertification (UNCCD), the International Convention on Biological Diversity (CBD) the UN-Framework Convention on Climate Change (UNFCCC), The Stockholm Convention on Persistent Organic Pollutants, and others.

Of the total population of Rwanda of 8,128,533, 49% is under 14 years old and 60% less than 20 years old (NSTIP, 2005). In general 67% of the total population is below the age of 25 and unfortunately most of these are unemployed (National Census, 2002). The Youth Strategy has fixed the age of the youth to be between 14 and 35 years old. This clearly indicates that the majority of the population in Rwanda is predominantly young. Thus, the country’s hope lies in the contribution of particularly the youth who represents the majority of the country’s active labour force.

Thus, the youth are being encouraged to take a more direct and active interest in providing solutions to some such environmental issues and problems as a contribution to the aspirations of Vision 2020, MDGs and EDPRS. Vision 2020 envisages Rwanda as a country where the natural resources will be rationally managed and the land protected from erosion and any form of degradation by 2020. This calls for various initiatives to make this a reality. The Economic Development and Poverty Reduction Strategy (EDPRS) is one of the practical processes which has positively responded to Vision 2020 and the Millennium Development Goals (MDGs) with a view to reducing extreme poverty and acknowledging the current environment-poverty linkage which underpins the socio-economic situation. It is crucial to realise the potential contribution of the environment and natural resources to economic growth of the country. The EDPRS appreciates this significant contribution of natural resources management towards poverty reduction and economic development .

2.0. Situation Analysis

2.1. Geographical Features

Rwanda has a mountainous and sloppy or hilly landscape ranging from 900 m to 4500 m above the sea level with an area of 26,238 square km. Rwanda is known to be a country of a “Thousand Hills” reflecting such mountainous and hilly nature of the country. There are volcanic and mountainous highland areas in the North and North West of the country (4500 m) The low lands to the East and South East are about 900 m above the sea level while the central plateau do rise up to 2000 m above the sea level. This diverse terrain makes the country susceptible to land degradation due to soil erosion emanating from heavy rains and poor cultivation methods.

Rwanda has a stable tropical temperate climate with average temperature of 20 oC. The annual temperatures in North and North-West range from 16 o-17 oC while in the central

2 plateau, the temperature do range from 18 oC to 20 oC and eastern and southern lowlands temperatures range from 20 o to 24 oC annually.

Rwanda has bimodal rainfall regime with average rainfall of 1000 mm annually. The rainfall pattern is characterized by a short rainy season from September to November and a longer season between February and May. Between these seasons are two dry periods, a short one between December and January and a long one from June to September. Generally the rainfall is abundant with an average of 1000 m annually but rainfall ranges from about 900 mm in East and South-East to 1500 mm to the North and North-West volcanic highland areas. However, the rains have recently become unreliable and unstable to the extent that some areas are becoming relatively warmer than expected. Indeed, in the last 30 years, Rwanda has experienced climate changes, with regards to frequencies, intensity and persistence of extremes like heavy rainfalls, waves of heat, drought and climatic variables.

Rwanda has a natural good drainage system composed of the Congo and Nile river basins with well distributed rivers streams, lakes and marshlands networks which could ensure adequate rainfall in the country. The Nile basin covers 67% of the natural territory and the Western covers 33%. The Congo basin consists of insignificant and short rivers which flow into . The Rusizi River is its outflow into Lake Kivu . The wetlands related to these basins are not well utilized and this underpins the need to manage them to ensure sustainability of the drainage systems

2.2. Social Economic Context

Rwanda is one of the poorest countries in the world, with an average per capita income of 220 USD and with about 57% of the entire population living under the poverty line. However, poverty levels declined from around 70% in 1994 to under 57% in 2006 1. The Economic Development and Poverty Reduction Strategy (EDPRS, July, 2007) and the EICV (2006) put Rwanda’s poverty at 56.9% and 36.9% of its population in extreme poverty. Rural areas are relatively poorer than urban areas. Poverty in rural areas is 62.5% compared to 13% for Kigali City and 41.5% for other towns. Extreme poverty in rural areas is 40.9% of the population (EICV, 2006). Households that live below the poverty line represent 65.7% in rural areas as opposed to 14.3% in urban areas. Poverty strikes also hard in rural areas where 45% cannot meet their food needs (National Youth Policy, 2005). About 90% of people are below poverty line and 43% of the population is in extreme poverty (PRS Annual Report, 2005).

Rwanda economy is primarily dependent on natural resources. Over 87% of Rwandans depend on subsistence agriculture for their livelihood. Agriculture (and food crops in particular) remains a major component of GDP and provides most employment (EDPRS, July, 2007)”. Agricultural sector accounts for about 36.4% of GDP and service sector that account for 43.8%. The industrial sector accounts for 14.2 % of GDP (EDPRS, July, 2007). The agriculture sector is still important as about 80% of

1 Household Living Conditions Survey (EICV), 2007

3 employment for working adults comes from agricultural sector (Integrated Living Conditions Survey, 2006). The government is currently undertaking investments to improve farm productivity and intensification of agriculture with increased use of improved seeds and husbandry practices.

Basically 52% of the country is suitable for arable farming, representing approximately 1,385,000 hectares. Marshland is estimated to be about 165,000 hectares and only 93,000 ha are cultivated (i.e. 57 % of the total area) with only about 5,000 ha reclaimed and prepared for water retention. About 88, 754 ha of marshlands are partly reclaimed, without prior technical studies, by peasants grouped in associations or cooperatives (NTEAP, 2006). This kind of reclamation tends to be detrimental to the harmony and ecological equilibrium of fragile ecosystems of these areas. The marshlands form wetlands of lakes andNyabarongo River System and continuous cultivation of these marshlands without mitigation measures is leading to soil infertility, falling water table levels and changing ecological nature of the marshlands. The rest is classified to preserve the hydrological cycle, ecological-climatic balance as well as biodiversity (National Land Policy, 2004).

Increased agricultural and livestock activities has lead to deforestation and overgrazing cause soils to be exposed to water and wind erosion. Inappropriate cultivation methods on hill slopes, done without terracing or improper terracing has aggravated the situation and has led to unsustainable agriculture. The unsustainable agriculture remains the major problem resulting in a serious level of land degradation throughout the country. Unsustainable agriculture in Rwanda causes: (i) soil erosion and (ii) loss of soil fertility. Soil erosion in Rwanda is a result of a combination of several factors, namely: extremely steep slopes, non-application of soil protection measures, application of inappropriate soil conservation techniques, unreliable heavy rains and the general low level of awareness of both the farmers and local leaders on the economic benefits of soil protection investments. Continued decline in soil fertility is mainly a result of “soil mining”, that is continued cultivation without replenishing soil fertility with plant nutrients through application of organic manure or/and mineral fertilizers. The increasing levels of soil erosion and reducing soil fertility in the acid-soil mountainous areas of Rwanda have resulted in ecosystem degradation, lowered agricultural yields, severely impacted on rural livelihoods and the national economy. Ecosystem integrity has been compromised, river banks have been eroded and siltation has caused nutrient loading in water bodies, mainly theNyabarongo River System and associated wetlands.

4

Figure 1: Agriculture activities along Mukungwa river bank in Musanze District

Rwanda is experiencing increasing population growth, rapid urbanization, increasing unemployment, poverty, risk of worsening HIV/AIDS issues, and natural resources depletion leading to various environmental problems. Natural resource degradation and depletion has significantly contributed to the low productivity of the primary sectors particularly agriculture. In Rwanda crop farming is undertaken in all areas including mountain slopes and tops, valleys and plains. Competition for limited land resources is intense, productivity is generally low and massive erosion is common. Over cultivation, inappropriate agricultural practices, overgrazing and deforestation have been identified as the major causes of land degradation

At the same time, urban population has increased from 7% in 1993 to 18% of the total population in 2002. It is even estimated that by 2020 the population will increase to 30% (Environmental Policy, 2003). The challenge is how to cope with emerging urban environmental problems with the prevailing infrastructure.

The population of Rwanda is 8,128,533 (Population Census, 2002) and about 83% of the population is rural with an annual growth rate of 2.6. Out of that population 3,488,612 (49%) are male while 3,668,939 (52.29%) are female and sex ratio of 91 for men and 100 for women. The country has the highest population density in Africa with an average of 321 inhabitants per km 2 (Population Census, 2002). However, Rwandan population’s life expectancy has fallen from 54 years in 1991 to 40 years in 2003 and 44 years in 2005 (DHS,2005). The overpopulation has led to excessive environmental degradation due to exploitation of natural resources, on which the development of Rwanda is largely dependent, particularly agriculture and tourism.

There is a growing competition for access to land due to the combined effects of land scarcity, population growth, and the high number of landless people, the livestock crisis, and the increasing hold of the urban elite over rural land (National Land Policy, 2004). Soil erosion has worsened due to continuous and uncontrolled cultivation, exploitation of marginal land that is unsuitable for agriculture and the lack of reliable soil conservation methods” (Ibid pg 7). In addition, the number of those who are landless has tremendously increased leading to acute poverty. Thus, lack of infrastructure in

5 rural areas encourages youth to migrate to urban areas intensifying the problem of unemployment in urban areas. Generally neither the Government nor the private sector is able to absorb this big group in the employment sector

Yet agriculture and related activities employ the bulk of the labour force in the country. Reducing the levels of poverty and improving livelihoods would depend on how agriculture is exploited and how environment is harnessed for improved welfare without damaging it (UNDP/UNEP, 2006).

As a result of the high population pressure, there is a rapid reduction of the size of farmland for families. Available cultivable land per family is about 0.6 ha. (MINAGRI, 2000).The land size vary with regions in the country; the highest land size is in Umutara with 1.14 ha, followed by Gitarama with 1.09 ha, Byumba has 1.04 ha, Butare has 0.36 ha and the loWest is 0.34 ha for Cyangugu (Agricultural survey, 2006).There are also regional disparities concerning the availability of arable land which varies from <0.25 ha to>2 ha. The average farm size is 0.72 ha/household but some Provinces (Gisenyi, Cyangugu, Gikongoro and Butare) have already reached the average of 0.50 ha per household (Agricultural survey, 2006). The number of families with non-economical parcels of land continues to rise. About 40% of all households own land less than 0,5ha, a significant increase from 25% in 1986 2.

Biomass is the principal source of energy since it meets 96.2% of national needs. Fuel wood, shrubs and plant residues are used for cooking and cottage industries as a source of primary energy (Rwanda Development Indicators, 2004) The increasing demand of the modern sector has necessitated searching for other sources such as the hydro-potential, solar energy and methane gas.

As in many other developing countries, there has been a dramatic expansion in urban areas in recent years, but most of that growth has been unplanned and urban management and services are rudimentary. Industrial development has been actively promoted in and around major urban centres to generate local opportunities for employment. However, industries in Rwanda are not many and most of these are agriculturally based. The most important ones include : textiles, breweries, flour milling, tanning, wood and chemical industries

Services such as water and electricity supply, sewage and refuse collection are inadequate. Environmental health and the control of industrial pollution are issues of increasing concern.

2 PSTA, MINAGRI, 2004

6 2.2.1. Reflection on the Youth

Rwanda formulated the National Youth Policy in 2006 to tackle the many challenges facing the youth in different fields such as management of direct or indirect consequences of genocide, employment, fighting against HIV/AIDS, hunger and poverty, illiteracy and limited possibilities of accessing education, deterioration of the environment etc. as a result of past and current social and economic situation of the country. Not only such challenges prevent the youth from improving their wellbeing but also jeopardize their future.

As cited above, Rwanda has 49% of its population (8,128,533) being under 14 years old and 60% less than 20 years old. In general 67% of the total population is below the age of 25 and unfortunately most of these are unemployed (National Census, 2002). The Youth Strategy has fixed the age of the youth to be between 14 and 35 years old.

This clearly indicates that the majority of the population in Rwanda is predominantly young. According to the National Youth Policy, 42% of the youth are either unemployed or work on seasonal small scale agriculture. Obviously, there is a high level of young people who discontinue at primary education and have to seek employment because of limited chances at high level education.

The unemployment rate continues to rise and sources of monthly income are increasingly becoming rare. Economic conditions of the population are improving but issues caused by extreme poverty are not eradicated (EDPRS, July, 2007; EICV, 2006). According to the National Youth Policy, 42% of the youth are either unemployed or work on seasonal small scale agriculture. Obviously, there is a high level of young people who discontinue at primary education and have to seek employment because of limited chances at high level education.

The problem of unemployment is characterized by lack of job opportunities both in rural and urban areas. Rwanda experiences an acute shortage of land and presently available cultivable land per household is 0.6 hectares which is, in most cases, not viable. According to the FAO a cultivation plot should be at least 0.90 ha to be economically viable for a family (National Land Policy, 2004).

Unemployment and underemployment of youth are the major problems that have to be seriously addressed. Unemployment has strongly negative impact on youth. It is important to create conducive conditions and an enabling environment for the youth by effectively involving them in development activities such as environmental rehabilitation and urban improvement programmes.

The Country’s Economic Development and Poverty Reduction Strategy (EDPRS) is one of important undertaking geared to fulfilling the objectives of Vision 2020. The Strategy is to ensure all stakeholders including the youth formulate poverty reduction programmes and projects for an improved livelihood.

7 This project is therefore meant to enable the youth play a key role in employing techniques which would add value to the environment through income generating activities in order to clearly improve their living conditions.

The following are socio-economic factors that cause youth unemployment in Rwanda:

(i) Lack of job opportunities both in rural and urban areas

The problem of unemployment is characterized by lack of job opportunities both in rural and urban areas. Rwanda experiences an acute shortage of land and, the number of those who are landless has tremendously increased leading to acute poverty. The lack of land in rural areas encourages youth to migrate to urban areas intensifying the problem of unemployment in urban areas. Generally neither the Government nor the private sector is able to absorb this big group in the employment sector.

(ii) Weak capacities for employment creation

The Rwandan economy is faced by weak industrialization and weak enterprise creation capacities to facilitate creation of jobs. The enterprises have weak internal savings and there are few Rwandan promoters. The participation of nationals is limited to the creation of small and medium enterprises with inadequate productive capacity. A study on employment opportunities show that out of 895 investigated enterprises, 408 enterprises had less than 10 jobs, 325 enterprises had 10 to 50 jobs and 162 enterprises only had more than 50 jobs 3 .

(iii) Youth have insufficient professional training and professional experience and as a result can not be competitive on the job market.

(iv) High illiteracy rate among the youth;

About two-thirds (65.5%) of people aged 15 and above are literate out of which 62.5 % is for rural areas, 86.5% for City of Kigali and 70.5% for other towns. The literacy rate increases to 76.8 % for people aged between 15 and 24. The latter is based on reported literacy rather than tested literacy (EICV2). The table below on literacy level (%) by sex among those less than 35 years shows that a quarter of the youth less than 35 years can not read or write and more than two thirds are literate.

3 Five year Action Plan for youth Employment promotion, October 2005.

8 Table 1: Literacy level (%) by sex among those less than 35 years

Male Female Total Neither read nor 10.7 13.8 24.5 write Only read 2.0 2.3 4.3 Read and write 32.7 36.8 69.5 Undetermined 0.8 0.9 1.7 Total 46.2 53.8 100

Source: Five Year Action Plan for Youth Employment Promotion (provisional final version October, 2005).

The high illiteracy rate not only puts the youth at disadvantage to compete and get employed jobs, but it also denies them the capacity to create self- employment.

(v) Besides the above causes of unemployment and job insecurity of the youth, there are other factors which contribute to hinder self employment among youth in the country, namely;

 Lack of initiative and creativity by youth  Absence of data and information about employment opportunities  Difficulty of access to start-up funds  Poor knowledge about Rwandan economic situation  Inadequate relationship between education curriculum and employment  Lack of access to capital  Absence of legal framework for the promotion of youth employment  Limited market of Rwandan population  Inadequate purchasing power of the rural people.

Youth unemployment and underemployment are major problems that have to be seriously addressed. Unemployment has strongly negative impact on youth and it is important to create conducive conditions and an enabling environment for the youth by effectively involving them in development activities such as environmental rehabilitation and urban improvement programmes.

9 2.3. Description of the Project Area

2. 3.1. Project location

The project location will be within the Nyabarongo River System involving 17 Districts 4 in the country. The map bellow shows the allocation of Nyabarongo River System catchment areas within which the project is located.

Map 2 Nyabarongo River System Catchment Area

The boundaries of Nyabarongo River System catchment areas.

The land on catchment areas of Nyabarongo River System is owned by smallholder farmers. These are areas highly degraded that will involve more than 900,000 youth in soil conservation activities. The farming communities will engage the youth to carry out the terracing and afforestation works on their lands. The smallholder farmers will get micro-grant credit from the project and will hire the youth to carry out soil conservation activities and pay them from the micro-grants. The payment will be done through their youth committees. The farmers will be mobilized by the local leaders, MINIRENA, MINAGRI and the

4 i.e. whole 8 districts of the Southern Province (Muhanga, Kamonyi, Ruhango, Nyanza, Nyamagabe, Huye, Nyaruguru, Gisagara) + whole 5 districts of the Northern Province (Musanze, Burera, Gakenke, Rulindo, Gicumbi) + whole 3 districts of Kigali City (Gasabo, Nyarugenge, Kicukiro) + 1 district from the Eastern Province (Bugesera)

10 project management to have the lands terraced, planted with forests and rehabilitation of existing ones.

2. 3. 2. The Rwandan Akagera Watershed and Nyabarongo River System 5

The Rwandan Akagera Watershed is along the Equator between 1º04’ and 2º51’ latitude South and 28º53’ and 30º53’ longitude East. From West to East, the watershed stretches from the high Congo-Nile hill ranges (that divide the Congo and the Nile waters) up to the border with (Ngara and Karagwe Districts). In the North, it borders with Uganda (Kabale and Ntungamo Districts), and, in the South, with (Kirundo and Kayanza Communes).

The Akagera watershed covers 20,550 sq km, which is about 80% of Rwanda (the remaining 20 % is in the catchment area of the Congo River waters). The watershed includes three different altitude areas, namely: • Low altitudes under 1500 m in the East of Rwanda from the border with Tanzania up to the Rwandan Central plateaux. • Medium altitudes (1500 m –1900m) that include the Central plateaux in the centre of Rwanda. • The area of high altitudes above 1900 m from the centre up to the Congo-Nile high hill ranges in the West of the Akagera watershed.

The landscape of the country is characterized by very steep hills and high mountains, with an average altitude of around 1,800m above sea level.

2.3.3. Hydrology

There are two major hydrological basins in Rwanda divided by a vertical line running from North to South. The Eastern part forms the Nile catchment that occupies 67% of Rwanda and drains 90% of the country’s waters into the Nile through Akagera River. The Western part is the Congo catchment; it occupies 33% of Rwanda and drains only 10% of Rwanda’s water into the Congo basin.

The watershed has an abundant water network that is made of rivers (7,260 ha), wetlands (77,000 ha) and lakes (128,190 ha). Three main rivers, namely Akanyaru in the South, Nyabarongo in the center, and Kagitumba in the North drain the numerous tributaries from all over the watershed to the Akagera River that, in turn, leads to . These rivers and tributaries are closely associated with vast marshes and shallow lakes all along their courses. The map below shows the Rwanda hydrological network.

5 Adapted from Nile Basin Capacity Building Network (NBCN), Flood Management, Research Cluster, Group II, 2005

11 Map 3: Hydrological Network of Rwanda RWANDA HYDROLOGICAL NETWORK

Source: Adapted from Nile Basin Capacity Building Network (NBCN), Flood Management, Research Cluster, Group II, 2005

2.3.4 Nyabarongo river basin

Nyabarongo River is called Akagera River in its down stream stretches when it is discharging into Lake Victoria. The Nyabarongo River is the source of the and crosses all the Provinces of Rwanda. The Nyabarongo river basin has a catchment area of 8,900 sq km, an annual rainfall of about 1,350m and its altitude varies between 3000m upstream and 1,350m downstream, with an average altitude of 2,176m. The river has a slope of about 0.8% with an annual average discharge of 83% m 3/s. The basin runoff coefficient is about 22% and the specific discharge 9.31/s/km.

2.3.5 Hydrology

The Nyabarongo river basin is within the Rwandan Nile catchment that occupies 67% of Rwanda and drains most of the countries waters into the Nile through Akagera River.

In 2003 (29 th April, 2003) the water level of Nyabarongo River was measured at hydrological station in Kigali and the maximum recorded level since 1972 , the

12 gauge showed a level of 4607m which corresponds with a flow of 283 cubic m per second.

The river basin does not experience cold season, except in the Northwest part of the country where the sub catchment of the river (Mukungwa River) are situated in the volcanoes area with altitudes higher than 2, 500m. There are no marked differences in rainy and dry seasons while the special variation of rain is heterogeneous and precipitation pattern are characterized by thunderstorms, due to slowly moving humid air masses climbing against the hilly terrain. Temperatures and air humidity create an intense evaporation, which sometimes leads to drought in several parts of the river basin.

Major Nyabarongo river tributaries are from North West and Mukungwa River from North in the volcanoes.

Map 4: The Nyabarongo River Basin

Source: Adapted from Nile Basin Capacity Building Network (NBCN), Flood Management, Research Cluster, group II, 2005

13 3.0. Project Strategy

3.1. Development Goal

The Development goal of the project is to achieve a level of sustainable management of natural resources and solid waste while improving the living standard of youth and communities at large along the Nyabarongo River System.

3.2. Project Objectives

A distinctive feature of this project is that it will be specifically targeted at the Youth with the intention of mobilising a youth service for environmental rehabilitation and urban centres clean up. The objective being to organise and direct the energy and enthusiasm of young people into constructive and rewarding activities of benefit, both to themselves and the community at large. The project is meant to empower the youth to engage in employment and income creating activities through sustainable environment management of the Nyabarongo catchment areas. The project will aim at rehabilitating degraded lands, collection of rubbish and its consolidation in designated areas for soil composting and recycling of materials creating employment and generating income for the youth, removing the youth from crime, and eradicating poverty among the affected communities. It will not only enhance awareness of a wide range of environmental concerns, but will also demonstrate appropriate, practical and sustainable means of local self-help and community action. The Environment Youth Project is intended to address the most significant, yet manageable environment problems within the country by providing experience and employment opportunities for an age group of which there is a disproportionate number entering the labour force. The National Youth Policy, 2006 articulates the significance of building capacities for youth by identifying opportunities through small scale projects. The overall project objectives will be:

• Creating tangible mechanisms whereby people can participate directly in creating a more healthy environment, raise moral and respond to local and national environmental problems;

• Enhancing opportunities for young people to participate in activities, which will increase their skills and improve their prospects of employment through on- the-job training and vocational training;

• Educating the youth on the importance of environmental conservation. This means the project will increase the number of young people with basic training in natural resource management and conservation in Rwanda by

14 training them as trainers, or making them “contact persons” on environmental issues;

• Providing labour for conservation work, which would otherwise be unavailable;

• Enhancing awareness of the importance of conservation and natural resources management needs;

• Providing more opportunities in conservation and natural resource management at the village level;

• Curtailing rural-urban youth migration;

• Building indigenous capacities in the area of natural resource management at village level; and

• Improving welfare of the youth through the promotion of youth initiatives and income generating activities.

3.3. Project Rationale

The rationale for the project is justified by the importance and benefit of theNyabarongo River System to Rwanda and the countries in the Nile basin. The following section provides a review of the major benefits and importance of the Nyabarongo River System that will be enhanced by this project through promotion of soil conservation techniques to protect the river banks, the river catchment areas and cleaning river wetlands of water hyacinth and solid pollution.

Nyabarongo river basin has most of Rwanda’s wetland marshes and rivers, particularly the marshes and associated rivers of Nyabarongo, Akanyaru, part of Akagera and Rugezi. These wetlands are beneficial not only to Rwanda but also to the countries in the Nile basin. Protecting and managing Nyabarongo river basin is paramount to sustain the benefits from these wetlands. The following are major benefits from wetlands of Nyabarongo river basin.

 The Nyabarongo River System wetlands act as a buffer or store of water. In this way it reduces the maximum flow during the rainy season and maintains relatively high flow during the dry season. The project will clean the Nyabarongo River System of water hyacinth and stabilize river banks by protecting it from erosion. This will ensure stable flow of the rivers in the Nyabarongo River System and preventing or slowing down flooding.

 The wetlands in the river basin do provide a spawning habitat for fish. Cleaning the river basin of water hyacinth and prevention of

15 river and swamp water siltation will make fish habitat safe and encourage the multiplication of fish.

 The project will protect the wetlands from solid waste pollution and contribute to maintaining the soil fertility and thus increasing productivity of maize, beans and sweat potatoes grown in these wetlands.  Nyabarongo river basin wetlands are of great biodiversity conservation

 They are useful as a source of raw materials e.g. collection of papyrus leaves for making handcrafts and bricks.

 Sustainable management of Nyabarongo river watersheds would prevent pollution and siltation with eventual stabilization of the river banks

As already stated above, Rwanda crop farming is undertaken in all areas including mountain slopes and tops, valleys and plains. Competition for limited land resources is intense, productivity is generally low and massive erosion is common. Over cultivation, inappropriate agricultural practices, overgrazing and deforestation have been identified as the major causes of land degradation. The EDPRS has considered sustainable land use management and specifically soil protection as critical for the country’s long-term development. The National Environment Youth Project will support and contribute to implement the EDPRS strategy on environment through soil conservation measures, organize and provide capacity to unemployed youth in soil conservation techniques to be used in establishing environment stability of the Nyabarongo River System.

As observed, school leavers (primary education) are in big numbers and have not been followed by a corresponding expansion of secondary education. By the time the youth complete primary education they do not have adequate skills to start self employment activities. At the same time, the employment sector is very limited and it normally looks for skilled labour. Worse still, youth unemployment is rising and the problem is exacerbated by having a big group which is landless.

Thus, school leavers have a hard time finding work because of their comparative inexperience and lack of skills. Youth unemployment is much higher than the national figure would suggest and is set to rise as their numbers swell through population growth.

The Government through the Ministry of Education has extended the present six (6) years primary/basic education to nine (9) years in order to enable school leavers become mature and acquire relevant skills to initiate various enterprises or find employment. This new approach will encourage primary education leavers to be innovative and be able to work independently without necessarily moving around in search of employment opportunities. The number of youth with

16 employment will increase leading to the improvement of their welfare and contributing to poverty reduction. It will also be in conformity with one of the MDGs objectives, which emphasizes the importance of Universal Primary Education for all and the rectification of gender-based disparities, in particular.

The Government has established the Rwanda Environment Management Authority (REMA) to oversee environmental management in the country. The establishment of the Youth Project will be an important initiative in support to the objectives of REMA. The project will provide employment opportunities for the unemployed youth, whilst addressing the serious problem of land degradation in the context of implementing the United Nations Convention to Combat Desertification (UNCCD). As already noted, pressure on land resources has resulted in habitat and species losses as well as habitat degradation. The overexploitation on natural resources and marginal lands particularly the misuse of wetlands and encroachment of Protected Areas have led to the loss of biodiversity. The National Youth Project is consistent with the objectives of the Convention of Biodiversity (CBD) and the National Environmental Policy which emphasize the importance of safeguarding human welfare, utilising natural resources sustainably, protecting and managing ecosystems for sustainable development . The project is going to address the critical unemployment problem facing the youth in Kigali and towns along the Nyabarongo River System.

The project is also within the framework of the UN Millennium Development Goals (MDGs) especially goal 8 which is emphasizing global partnership as well as mainstreaming youth issues in all MDGs and the first and seventh MDGs on eradication of extreme poverty and hunger and that on ensuring environmental sustainability.

Unemployment and underemployment of youth is an area of policy concern that should be addressed by the creation of income generating activities other than agricultural ones (National Youth Policy, 2006). Presently, there are few economic opportunities in rural areas. Vision 2020 aims at creating off-farm employment both in rural and urban areas in order to reduce dependency on agriculture by 50%. The target of reducing the proportion of population engaged in agriculture to about half needs to be complemented by clear strategies including creating opportunities of those moving out of agriculture. The creation of off-farm jobs is critical to transformation of the economy and is seen to be central to the poverty reduction strategy. While efforts are focused on improved agriculture, it will be crucial that jobs outside agriculture are created. Otherwise, the agricultural sector cannot continue to bear such pressure which has led to massive destruction.

Recognizing that these complex interrelated issues are of fundamental importance to the future course of development, the project identified two major priority problems to be addressed, namely:

17 • Rehabilitation of degraded land and general protection of the environment with particular reference to mountain tops, major river courses and improving terracing techniques.

• Improving the youth welfare through the promotion of youth initiatives and income generating activities by creating employment opportunities.

Thus, it is crucial to sensitize the youth through their Associations to take interest in environmental management and in the process to improve their livelihoods.

The major problem facing the environment lies in the imbalance between population and natural resources (land, water, flora and fauna and non renewable resources) which have been deteriorating since decades. (Vision 2020 . The search for fertile lands by the increasingly growing population leads to rapid and continued destruction of soil and ecosystem. Remedial measures are required to improve land management through soil and water conservation programmes and collection of waste materials and recycling.

Vision 2020 stipulates “Land use management is a fundamental tool in development. Presently, land in Rwanda is characterized by acute shortage which necessitates preparing land use plans to ensure its optimal utilization in urban and rural development. Currently, Rwanda’s land resources are utilized in an inefficient and unsustainable manner, which limits the profitability of land and infrastructure. As a result, land and soil losses are enormous. Land has continued to be badly managed and soil erosion has worsened due to poor and inappropriate farming methods. This includes cultivation on marginal lands which are unsuitable for agriculture without taking into consideration soil and water conservation techniques. Lack of enough knowledge in agricultural techniques, has contributed immensely to environmental degradation and very low level of productivity.

The main challenge lies in devising and setting up a system of agricultural production, waste collection and recycling that can generate a long term employment, income and sustainable development. Agricultural development will only be efficient if the Government adopts coherent strategies which will guarantee better land use management to ensure economic growth (Rwanda Development Indicators, 2002). The Youth are expected to act as driving force for the activities meant for environment conservation. The National Youth Council will need to motivate the Youth to initiate activities under this project for sound environment management both in rural and urban areas.

The promotion of youth employment in rehabilitation of land in rural areas as well as waste collection and recycling in urban areas becomes paramount. The youth have to be assisted in project planning and implementation with a view to improving employment opportunities for an enhanced livelihood. It is true that protecting environment is the responsibility of every stakeholder in the society but

18 the youth’s role in safeguarding the environment is particularly essential as they are the same youth that will inherit it.

Once the Youth have been trained and have acquired relevant skills it will be expected to assist women groups, among others, in the agricultural sector in rural areas. Such an approach will transform rural areas through conservation for improved productivity. This will be a unique opportunity to transform traditional farming systems to modern farming which would guarantee high yield and improved livelihood

The envisaged project will provide training, create employment opportunities and generate income for the youth through environmental rehabilitation activities in rural areas and cleaning and recycling in Kigali city and towns along Nyabarongo River System. The project will promote environmental education and awareness programmes and seek the active support and participation of NGOs, local communities and the private sector. This process will enhance capacity building of youth by actively participating in income generating environmental activities. The project will improve farming techniques for enhanced productivity which will in turn guarantee income for the youth.

In this regard, the involvement of the youth, supported by various stakeholders, NGOs, CBO, government institutions, the private sector among others, will be an important initiative, and a key component of a cross-sectoral strategy to mobilize national and international support, natural resource management and poverty eradication for sustainable development in the country.

Similar projects were initiated elsewhere and the outcome was a success. In 1996 the Government of Lesotho and the United Nations Development Programme (UNDP) undertook a joint initiative establishing National Environment Youth Corps Project (NEYC) in Lesotho to provide employment opportunities for the unemployed youth, whilst also addressing the serious problem of land degradation in the context of implementing the UNCCD. The evaluation report on the project implementation noted that most objectives of the programme had a resounding success and most importantly it was strongly recommended to be replicated in other countries using the lessons learnt in Lesotho. The project has also been replicated in Cape Verde, Ethiopia, Eritrea, Zambia and Zimbabwe addressing the issue of youth unemployment and land degradation and has registered successes. Rwanda has been facing increasing urbanization. The urban population has increased from 7% in 1993 to 18% of total population in 2002. The urbanization is estimated to grow by 30% by year 2020 (EDPRS, 2007). The increase in urban population has been accompanied with urban environmental problems, particularly the problem of solid wastes. The extent of waste management in Rwanda, including the City of Kigali, other towns and rural areas is worthy mentioning. It has been reflected that between 125 to 200 tonnes of solid waste is collected in Kigali daily and dumped at Nyanza dumping areas without treatment. The remaining garbage waste in the City of Kigali is dumped with all

19 the disease risks inherent. The situation in other towns, including those along the Nyabarongo River System is not any better. Public collection in towns other than the City of Kigali is only 9.5% of garbage waste.

The National Environment Youth Project will complement the existing effort to manage solid waste in Kigali city and towns along Nyabarongo River. The project will give capacity and organize the unemployed youth around solid waste collection, sorting and recycling to make fertilizers for agricultural sector and briquettes for cooking to reduce using firewood and contribute to environment protection.

In this regard, the involvement of the youth, supported by various stakeholders, NGOs, CBO, government institutions, the private sector among others, will be an important initiative, and a key component of a cross-sectoral strategy to mobilize national and international support, natural resource management and poverty eradication for sustainable development in the country.

Similar projects were initiated elsewhere and the outcome was a success. In 1996 the Government of Lesotho and the United Nations Development Programme (UNDP) undertook a joint initiative establishing National Environment Youth Corps Project (NEYC) in Lesotho to provide employment opportunities for the unemployed youth, whilst also addressing the serious problem of land degradation in the context of implementing the UNCCD. The evaluation report on the project implementation noted that most objectives of the programme had a resounding success and most importantly it was strongly recommended to be replicated in other countries using the lessons learnt in Lesotho. The project has also been replicated in Cape Verde, Ethiopia, Eritrea, Zambia and Zimbabwe addressing the issue of youth unemployment and land degradation and has registered positive successes.

3.3.1. Stakeholder Participation

The Ministry of Natural Resources (MINIRENA) now has a stronger grip and leverage in policy matters related to management of resources while the newly created Ministry of Youth has a mandate of designing national policies, strategies and programs for the youth as stipulated in EDPRS. Nevertheless, there are still several other key players in resource management and sustainable land use management both at central and decentralized levels. At the central level, the concerned government ministries include, MINAGRI and its semi-autonomous agencies (RADA and RARDA), in charge of agriculture and livestock, MINALOC, responsible for decentralization and community development activities, MINECOFIN, in charge of finance and economic planning. The Rwanda Environment Management Authority (REMA), a semi-autonomous agency under MINIRENA, is a key player in its regulatory and supervisory role in all matters related to land degradation and environmental protection in general.

20 The local authorities at the decentralized administrative levels are responsible for all activities of planning, implementing, coordination and monitoring of environment related activities on the ground. Since the territorial administrative reforms in January 2006 6, the Sectors are the centers for service delivery, the districts are in charge of planning and coordination of socio-economic development actions, and the Provinces are responsible for ensuring conformity of actions at decentralized levels with Government policies.

The national policy for soil management and conservation involves all institutions of the country. However, the main stakeholders are MINAGRI in charge of agriculture and animal resources, MINIRENA in charge of lands management in rural and urban areas apart from Kigali City, MININFRA in charge of management of plots in urban areas apart from Kigali City and finally MINALOC which represents all ministries at decentralized level.

As MINAGRI deals only with formulation of policies, strategies and programmes of soil and water conservation, MINALOC must play an important role in implementing programmes defined by MINAGRI. This must be achieved through local decentralized structures, NGOs and CBOs.

The youth Associations will be involved in awareness raising and mobilization of youth to join the project. Besides, the youth Associations in Districts will prepare small projects within the framework of the project and these small projects will be submitted to the project headquarter at REMA where they will be screened and approved before they are submitted to UNDP for fund release to youth committees.

Table 2: Stakeholder Interests and Expected Level of Participation STAKEHOLDERS Level of involvement MINIRENA Ministry responsible for environmental policy formulation and monitoring.

REMA Overall national authority with responsibility for protection and conservation of environment, responsible for overseeing the implementation of the Youth Project. MINAGRI MINAGRI sets national policies on agriculture and livestock, provides guidelines and standards for land use management including terracing RARDA Provides technical support and regulatory oversight in the procurement and distribution of livestock for beneficiary

6 After the territorial administrative reforms of January 2006, the number of provinces was reduced from 12 to 4 rural provinces (Eastern, Western, Northern and Southern) and the City of Kigali, the Districts were reduced from 106 to 30 and Sectors from 1,545 to 416. After the reforms, the sectors are currently divided in a total of 2148 Akagari (It is the basic politico- administrative unit of the country and closest to the grass root people), reduced down from the former number of 9,165. Smaller administrative units called “ Umudugudu – pl. Imidugudu ”, comprising 50 Households, were established in every Akagari after the elections of March 2006.

21 communities. RADA Provides extensive services in terracing and provision of quality seeds.

MINALOC Responsible for all activities of planning, implementing, coordination and monitoring of environment related activities at a local level. MINECOFIN In charge of finance and economic planning Local NGOs and CBOs to mobilize the youth, undertake Local NGOs and CBOs training and raising awareness programmes Kigali City, MININFRA Have some responsibility in the management of plots in urban areas Youth Associations Involved in awareness raising and mobilization of youth to join the project. UNDP Funding

3.4. Linking with Prior, On-going Processes and Programmes

The project will complement and build synergies with other several on-going initiatives to implement the Government’s strategies under Economic Development and Poverty Reduction Strategy (EDPRS) in the sustainable livelihood area, particularly in sustainable natural resource and environmental management. The project will work closely with national Youth Council will further build synergies with a number of other projects and programmes, particularly those dealing with land degradation issues and environment management. The following are, but a few examples of such initiatives and programmes:

The Decentralisation and Environment Management Project (DEMP) is a UNDP assisted initiative designed to strengthen capacity of Districts in the Western Province to integrate environment into Development Plans and budgeting let alone support to Rwanda Environment Management Authority (REMA). It also supports MINIRENA to implement environmental policies. The phase I of the project focused on the implementation of soil conservation techniques to manage the catchment areas of Lake Kivu and Phase II is under preparation. The lessons learnt from the implementation of this project will be useful to the implementation of National Youth Environment Project

The Poverty Environment Initiative project : (PEI) Support to the Economic Development and Poverty Reduction Strategy (EDPRS) through Poverty Environment Initiative; a collaborative endeavour between UNDP and UNEP to integrate environment into economic development programmes. In addition, it includes promotion of alternative energy sources to replace the use of biomass energy, protection of the remaining natural forests as well as institutional capacity building for sustainable management of environmental resources.

22 The GEF Strengthening Biodiversity Conservation Capacity in the Forest Protected Areas in Rwanda is another initiative towards environmental management. The montane forest encompassing the Volcanic National Park and the newly created Nyungwe Park have both national and global importance for the biodiversity and endemism values and ecological services. At the same time economic benefits accrued from tourism contributes immensely to the national economy.

MIFOTRA and Ministry of Youth , besides setting employment policy and strategy for the youth, they do also conduct research and data management on youth problems and employment opportunities.

MINAGRI provides training on best practices in soil management and extension on sustainable land management for agricultural development. MINECOFIN will participate in funding the project in kind and through CEPEX will be involved in monitoring and evaluation of the project. The development partners, particularly UNDP will participate in financing, monitoring and evaluation of the project

Rural Sector Support Project (RSSP) : The main purpose of the Rural Sector Support Program (RSP) is to significantly contribute to the efforts of the Government of Rwanda to achieve its strategic goal of revitalizing the rural economy and thereby increasing rural incomes, reducing poverty, and reinforcing national stability. The RSSP has the following major components:

 Agricultural services delivery systems ;  Small-scale rural infrastructure development and maintenance ;  Rehabilitation of marshland and hillside farming ;  Promotion of traditional and alternative export agriculture:  Diversification of economic activities in the off-farm sector of the rural areas.

The RSSP component on hillside terracing will cost about 5 million USD. Rehabilitation work on farmed hillside areas would include two basic interventions: (i) progressive terracing, and (ii) radical terracing. The former would be considered only on slopes of less than 12 percent. The National Youth Environment Project will learn from the experiences of the implementation of RSSP but will also complement the efforts of the project in the areas of terracing techniques.

The GEF Small Grants Programme (GEF/SGP) : The Programme aims at encouraging communities to play an active role in global environment protection through local initiatives. GEF/SGP is a porthole of demonstration and dissemination of innovations experimented in the field to be replicated at larger scale by other partners. This program has boosted the NGOs and local communities’ capacities to address global environment issues at the local level and to improve their living conditions as well. The National Youth Environment

23 Project will learn from the integrated approach and best conservation practices being promoted by this programme.

The National Environment Youth Project is meant to generate employment opportunities through environmental rehabilitation activities in both rural and urban areas. It has to position itself to take advantage of the above cited initiatives in undertaking its activities.

National Youth Centre The project will learn from the National youth centres in Rwanda which promote the youth employment through financing specific development micro grants such as Environment related projects. Those structures at district levels will be useful tool in supporting the implementation of the project.

3.5. Government Youth Policy and Strategy Rwanda formulated the National Youth Policy in 2006 to tackle the many challenges facing the youth in different fields such as management of direct or indirect consequences of genocide, employment, fighting against HIV/AIDS, hunger and poverty, illiteracy and limited possibilities of accessing education, deterioration of the environment etc. as a result of past and current social and economic situation of the country. Not only such challenges prevent the youth from improving their wellbeing but also jeopardize their future. It was crucial to have the National Youth Policy because the youth constitute an age group which is large in the population (67% of the total population is below the age of 25) and the youth policy would direct the activities of the youth in the country to tackle the many challenges facing the youth.

In 2003, the Ministry of Youth, Culture and Sports, in collaboration with the GTZ youth training support project, conducted a survey in order to take into account views, priorities, problems, issues and wishes of the youth. The survey of 1,000 youth between 14 and 35 years from rural and urban areas, among other things, indicated that 98% had no property by any standards and 21% had no regular work. This group was facing abject poverty and needed immediate assistance.

The government formulated the Youth Strategy in 2005. According to the Strategy 31.6% of youth of less than 26 years old are orphans, having lost at least one of the parents. More importantly, about 200,000 youth of less than 20 years old were head of households on an average size of 4.5 people. This group needs help to be able to support other members of their households.

Therefore, the Ministry of Youth, Culture and Sports in conjunction with the National Youth Council have a mammoth task of mobilising and organising youth associations, who are poor and desperate, to form economic groups of interest. It is crucial to sensitize the youth to undertake productive activities with the view to contributing to the overall development of the country. It is also a challenge to build Youth capacities through their Youth Associations in order to be productive.

24 The Youth Strategy identified three major programmes which are currently being addressed:

• Mobilisation and training of the youth • Support of youth initiatives • Cooperation and networking among the youth

Through these programmes various activities have been undertaken as shown below:

• Preparing brochures about issues of health and environment • Training modules for the youth • Developing a data base on existing youth activities in Rwanda • Sensitizing the youth on modern productive methods • Coordinated programmes on improving capacities and access to economic opportunities • Supporting one new project per District • Identifying bankable projects and soliciting for funding

This project is tailored in a manner in which it will support the country’s youth programme by creating employment for the youth and designing activities which will ultimately generate income and promote environmental management for sustainable development.

An integrated approach of environment protection and income generating activities for the youth will be used in this project. This means that agro forest trees and grass/pasture, etc to be used for environment protection will also provide products for sale for the youth to generate income and wealth. Livestock will be integrated in the project activities not only to use the planted pasture for erosion control but also to provide organic manure and milk to the household to consume or to sale to get income. The project activities will be geared to three important intervention strategies, namely;

i. Control the land degradation of the Nyabarongo river catchment areas and its banks through rehabilitation activities such as terracing and contouring, afforestation and planting grasses/pasture, shrubs, agro forestry and trees, restoration of fertile soils, filter and prevent soil and sediments entering the Nyabarongo River System. ii. Improved solid waste management in Kigali city and towns around Nyabarongo River System to protect the environment and ecosystem through stopping pollution but also making the Kigali city and other towns clean. iii. The project will create a source of employment and income for the youth in concerned Districts around Nyabarongo River System: This means that project activities have to be mostly income generating and owned by the youth even after the project

25 completion. The youth will be organized in cooperatives/ associations around the project activities.

The technologies considered under this project proposal includes physical soil conservation measures such as radical and progressive terracing on the Nyabarongo river catchment hillsides; planting grasses/pasture on the contour bands and terraces to prevent surface run-off and erosion. The project will also promote reforestation and rehabilitation of forests on the catchment hillsides. The activities will be implemented by the youth but the decision of what and where to terrace, plant forests or rehabilitate, etc will have to be participatory and having consent of the owners of land (farmers) as the latter will have to pay for the work done from grant funds from the project.

The stabilization of river banks will entail planting shrubs and grasses/ pasture and agro-forest trees to generate income for the youth near the river. The management of river banks will be restricted to a band of up to 50 m from the river banks. The forestation near the river bank (about 6m) will focus on shrubs that do not mine the river’s water.

Project activities will also involve collecting the garbage wastes from households, sorting it to separate plastics to get material waste for making fertilizers and briquettes. The plastic materials will be sold to the COPED plastic recycling factory. Given the fact that the youth will be just starting business, the foregoing activities will be the focus in managing the wastes in the City of Kigali and towns along the Nyabarongo River System. The technology of transforming the wastes (recycling) into fertilizer and briquettes is simple and cheap. While it was found that recycling plastics is feasible and profitable (see literature review document), it is advisable for the youth not go into it now until such time they will have got experience and capital to invest in plastic recycling. Currently the COPED is constructing a plastic recycling factory at Butamwa, North-West of Kigali (see photo bellow). Operational experience from this factory is indispensable before the youth can venture into plastic recycling business.

Figure 2: COOPED waste recycling factory under construction

The project will use the following best practices in rehabilitation and management of the river’s catchments and banks:

26 • Protection of catchments areas and river banks through construction of radical and progressive terraces. • Planting shrubs (e.g. bamboos and other shrubs) and agro forestation that do not mine water and allow drainage for protection of river banks and trees to protect the catchments. • Integrating livestock in the soil conservation and planting grass and pasture to feed livestock • Collecting water hyacinth for making fertilizers and baskets • Alternative sources of energy for cooking instead of relying on fuel wood. Beneficiaries will be trained in making briquettes from wastes.

There is a wide range of soil conservation techniques one can choose from to control surface run off, retain water or allow drainage, particularly for slopes up to 30 degrees (see annex 3) The application of any of the technique will depend on the sloppiness of the area, whether one is constructing the radical or progressive terraces, the seriousness of the run-off, labor requirements and the government policy.

The farmers will get micro grant funds from the project to finance terracing and afforestation activities on their farms and will pay back the funds to the project. The project will have also to assess ways of how the farmers could also pay in kind, like offering their labor for terracing or/and reforestation. Labor will be supplied by the youth who will be paid from project grants to the farmers.

In case of river bank stabilization and waste management activities where the youth will own the income generating activities, the youth will be paid from the project funds to establish the activities.

27 4.0. Challenges and Opportunities

4.1. Challenges

4.1.1. Rehabilitation of Land degradation

Rwanda has been facing a big challenge of arresting land degradation that leads to loss of soils and leaving infertile soils that are responsible for unproductive agricultural farming. Land degradation appears in form of deforestation and unsustainable use of forests, poor cultivation practices accompanied with overgrazing of rangelands that have led to unsustainable agriculture in the country.

Some 77% of all cultivated land in Rwanda have slopes between 13% and 55% and are classified under the category of “moderate to high erosion risk soils”. In some cases, land with a slope of over 80% is put under cultivation as a result of land scarcity. In fact, 39% of all cultivated land in Rwanda fall under the high erosion risk categories, 37,5% in the middle risk category and only 23.4% are classified under the “low erosion risk’’ and ‘’very low risk” categories 7 (see table1).

Table 3: Erosion risk categories

No Parameter % ‘000 Slope Class area ha 1 Very High Erosion Risk 17.6 358 Slopes class over 55% 2 High Erosion Risk 21.5 437 Slope classes 25-55% 3 Average Erosion Risk 37.5 763 Slope classes 13- 25% 4 Low Erosion Risk 16.7 340 Slope classes 6-13% 5 Very Low Erosion Risk 6.7 137 Slope classes less than 6% Source: PSTA, MINAGRI, 2004

The amount of plant nutrients lost annually is about 945,200 tons of organic matter, 41,210 tons of nitrogen, 280 tons of phosphorus and 3,055 tons of potash (PSTA, MINAGRI, 2004 and NTEAP, Soil Study, February, 2006). The Strategic Plan for Agricultural Transformation (PSTA) estimates a total soil loss of about 15 Million tones per year, equivalent to loss of the capacity to feed 40,000 people annually. Soil erosion causes denudation of mountain and hill tops, decreases the soil depth, alters the soil structure and decreases the soil organic matter resulting in reducing the water holding capacity with consequent leaching of nutrients and associated acidification of the soil. Heavy rains frequently occur in the mountainous regions of the country and cause serious erosion and

7 PSTA, MINAGRI, 2004

28 subsequent soil sedimentation in the lower parts of the hillsides, often causing significant damage to crops and destruction of infrastructure such as roads and polluting the rivers

Figure3: Part of Nyabarongo River System which is bare due to erosion

The decrease in soil productivity and yields as a consequence of continued land degradation in Rwanda is a serious threat to sustainable livelihoods for the rural population and is a major factor of the high level of poverty in the countryside. Land degradation contributes significantly to poor performance of the agricultural sector upon which more than 80% of population depends. Environmental deterioration, particularly land degradation caused by soil erosion has serious adverse implications not only to agriculture productivity but also to Nyabarongo River System. The Nyabarongo River is heavily polluted with siltation through soil erosion from upstream hillsides in the country.

4.1.2. Population Pressure on Natural Resources

Rwanda still experiences remarkable challenges to environmental conservation, particularly in the areas of population pressure on natural resources and associated severe incidents of soil erosion, massive deforestation and reclamation of wetlands. High population densities still fuel land degradation given the fragility of the ecology, the predominance of traditional agricultural technologies, high dependence of the population on biomass energy (94%) and very limited opportunities for employment outside agriculture. 8 Thus, reducing population pressure on natural resource requires innovative approaches to natural resources and environmental management.

8 DEMP Project Document 2004

29 4.1.3. The Solid waste management

Solid wastes include household garbage, commercial wastes and public wastes (municipal wastes). Solid waste disposal is a major problem in Kigali city and the country at large. In Kigali about 37.3% of households dispose their rubbish by means of public collection and in other towns it is 9.5% while in rural areas this comes only to 0.3% of households. About 70% of rural population and 67.3% of rural towns, including the towns along Nyabarongo River System, dump their waste and this is a high percentage compared to Kigali’s 50.7% households who dump their waste. The latter is a reflection of the level of development in terms of availability of appropriate infrastructures and means to dispose the waste (EICV, 2000-2001).

It is estimated that between 125 to 200 tonnes of solid waste is collected in Kigali daily and dumped at Nyanza dumping area (see photo bellow). The latter is about a half of rubbish at household level in Kigali city. The composition of the waste is: organics materials 70%, textiles 10%, veers 5%, plastics materials 5%, papers materials and other constituents 10%. However, this is still inadequate to solve the problem of solid waste in Kigali as this is about 60% of solid waste.

Figure 4 : Nyanza Waste Dumping Area

The District municipalities in Kigali city and town municipalities in rural areas are responsible for solid waste collection and dumping. In Kigali city, attempts have been made to work with the private sector in waste management. There are about 18 associations in Kigali city who are practicing waste collection and dumping the waste at Nyanza dumping area. has 5 associations; Nyarugenge District, 9 associations and Kicukiro District, 4 associations in the waste management business. The largest associations/company in business are COOPED and three women associations, namely; DUSABANE, SAMU and TWIZERE. Despite some effort of the Kigali city and town municipalities the problem of solid wastes still persists. There is little, if any, biological treatments, inadequate composting, animal manure spreading and landfill. The partnership with the

30 private sector environment associations and cooperatives seem also not to have resolved the problem. The literature review for the National Youth Environment project has shown clearly that the solid waste business is feasible and profitable. Then why is there a status quo in waste management? The persistence of the problem of solid waste disposal and the prevailing status quo in solid waste management can be explained by the following factors: • The Kigali city and Town municipalities have inadequate physical and financial resources to put in place necessary infrastructure and facilities for waste management. They have few vehicles to collect the solid waste and can not afford the big investment in solid waste treatment. • Despite the private sector starting to venture into solid waste management business, it also does not have adequate capital for investment in solid waste collection and recycling. The private sector also lack information on the feasibility and profitability of solid waste disposal and recycling business and the technology involved. • Lack of government assistance and motivation to the private sector to invest in solid waste management. • Industries have had environment not mainstreamed in their business and industrial production. There are no incineration mechanisms, thermal plasma, cracking and nitrification. Recycling, treatment and reuse of wastes is not practiced. • There is inadequate application of existing laws and in other cases there are no regulating laws to control and reduce such wastes. There is need for such laws and regulations to give incentive to control solid wastes.

4.2. Opportunities

4.2.1. Political will

Government has committed itself to support environmental management in the country. Environmental issues have been put on the mainstream of the political agenda. The current debate on EDPRS has clearly given environmental issues a high profile particularly in consideration of the ultimate goal of attaining sustainable development.

4.2.2. On-going Processes

There are several on-going processes which are of relevance to the national youth project. The project could easily borrow a leaf from these processes and make it meaningful. The ongoing EDPRS processes which is the centrepiece of development policy for Rwanda, explicitly focuses on sustainable development as the underlying

31 principle and emphasizes the environment as the foundation for sustainable growth and poverty reduction.

4.2.3. DEMP Phase 1.

DEMP Phase 1 made an attempt to involve various communities in income generating activities through environmental conservation. This is an opportunity to take advantage of the DEMP examples which are of relevance to the youth project.

4.2.4. Donor goodwill

The donor goodwill is still a very important opportunity in support of environmental issues in the country. UNDP is ready to look for supporters of this project. Many other donors are either already involved in natural resources management or have given indication to support various aspects of environmental management. In addition, the government collaborates very well with donors which are an added advantage to environmental management.

4.3. Sustainability

Sustainability has been a major consideration throughout the development of this project. The design of the project centres on control of soil erosion to restore agriculture productivity in the catchment areas of Nyabarongo System River and stabilizing the river banks of Nyabarongo River System. An integrated approach has been adopted to ensure that the youth and small farmers undertake income generating activities to improve their livelihood and to be able to continue performing after project completion. The project will make most of the activities in the buffer zone (except the 16 m from river bank with protective reeds and shrubs) to be owned and managed by the Youth. During project implementation, the youth will have opportunity to asses any other profitable income generating activities they can undertake and get financed within the project framework.

The project advocates participatory approach in designing and implementation of project activities and the various technologies utilized will have to take into account the prevailing diversity of situations in the project area.

Linkages with other related projects will have to be created to ensure lessons are learnt from them and project management will have to ensure synergies and linkage with other policy and strategic developments in environment sector.

However, the long time sustainability of the project depends on the ability of the youth and farmers to pay for the costs and make profit and savings to continue their activities and for further investments in soil conservation activities, farming and waste management activities and related businesses. Annex 1(a) and 1(b)

32 shows a budget for recycling solid waste into fertilizer and briquettes (based on 1ton of fertilizer and briquettes). The budgets show positive benefit of USD 40.25 and USD 119.9 for fertilizer and briquettes respectively. Solid waste recycling business is viable and profitable and self sustaining. The business is still profitable even after tax as shown by annex 1. The profitability of waste management services will not only ensure the youth remain in the business but also will attract other investment in waste management to take advantage of this viable business. There will, however, need for the government to ensure cheap micro-credit and information on the techniques and on profitability of waste management services are accessible to the private sector

Annex 2 estimates project benefits from soil conservation activities expected for farmers and youth in rural areas 9. In case of farmers, the total benefits are worth USD 5,698,427.62 and for the youth, the benefits are USD 3,616,366.73 at the end of three years of the project. The total benefits of the project to the rural areas from implementing soil and water conservation techniques to protect the Nyabarongo River System banks and its catchment areas is USD 9,314,794.35. The benefits are incremental, that is added value from project implementation. The project is, therefore, beneficial to the farmers and the youth and a profitable venture. The rural communities (farmers) will have funds not only to pay back the micro grants they will be getting from the project but also to sustain the conservation activities and farming after the completion of the project. The rural youth managing the river banks and cleaning the rivers of water hyacinth will also have adequate funds to be able to sustain their activities after project completion.

4.4. Replicability

The project promotes soil conservation measures with strong linkages to EDPRS environment programmes and environment policy. The employment strategy of the project is linked to the Five Year Action Plan for Youth Employment promoted by MIFOTRA and the Youth Policy and Strategy of Ministry of Youth. The project will incorporate lessons from projects in the country such as DEMP, RSSP, GEF micro grant projects, etc. Its management will document the lessons of integration approach adapted to deal with land degradation and poverty by establishing income generating activities and widely share them nationally and in the region. The project will provide lessons to other programmes, Districts, the country and the region of how youth can be used to restore ecosystem and protect the environment while the ecosystem services create wealth and provide employment to the unemployed youth to improve their livelihoods.

9 Research results have shown that yield increases due to soil and conservation ranges between 45 and 216%. There is agreement that quantification is less than it really is because many of the current models do not take intangible benefits into account (land husbandry, water harvesting a hillside irrigation programme, 2008-2014). However, to be realistic, this project assumes an average increase of 50%. While production per hectare ranges between 10-3otons for fruits and 1.2 -1.6 tons for cereals, this project has, in calculation of benefits, has used 10tons for fruits and 3tons for cereals.

33 5.0. Results and Resource Framework

With the support of the Rwanda Environment Management Authority (REMA), the Ministry of Natural Resources (MINIRENA) and the National Youth Council, the project will be enabled to mobilize youth associations to establish pilot projects where the youth will be directly involved in rehabilitating, conserving, protecting and sustainably managing the natural resources. In the process viable income generating projects will be established in an effort to create employment and alleviate poverty among the Youth. The project activities will be implemented in accordance with provisions of the Organic Law 4/2005 that determines the modalities of protection, conservation and promotion of environment in Rwanda.

The environmental NGOs will participate in training on best practices in soil management. The training will involve skilled and experienced environment conservation NGOs and associations who already have experience in terracing and afforestation and soil and water conservation at large. These NGOs will also be hired to supervise works on the catchments areas.

Component 1 : Building and strengthening capacity of Youth associations, CBOs/NGOs and other local entities to undertake conservation of theNyabarongo River System

Under this component the following interventions will be undertaken.

 Mobilizing the youth in cooperatives and associations  Establishing and strengthening NGOs/ CBOs in the project area  Introducing a dynamic outreach programme on natural resources, environmental management, and waste management  Providing Youth Associations, CBOs/NGOs and other local entities with skills to enable them to participate in improved natural resources management  Construction of youth centre in each District  Equipping the youth centre (computer and accessories, and furniture)  Improving availability of environmental information to respective Districts  Producing and disseminating technical information on terracing, urban clean up and recycling and trees in environment protection  Training in environmental issues to enable the Youth cope with the prevailing situation.  Disseminating technical know how to respective communities and Villages

34  Training in soil and water conservation techniques and income generating activities  Providing a forum for discussion and coordination of its activities  Training Youth Associations in constructing contours, terracing and hedges.

Component 2: Conserving and managing the Nyabarongo River System using appropriate technologies.

This component gives protection to river bank and catchment areas of Nyabarongo River System to provide clean water in the Districts along Nyabarongo River System. This component is linked to the management of the river banks and catchment areas of the river Nyabarongo catchment areas over three years in 17 Districts along Nyabarongo River System. The Nyabarongo river basin has a catchment area of 8900 square Kms and the project component will cover the degraded areas of this catchments including removal of water hyacinth from Nyabarongo River System

The project will support Youth Associations and CBOs/NGOs in constructing contours, ridges and hedges to control rain water run-off and the resultant soil erosion; and improving terracing techniques. The assumption is that they would be hired by farmers associations to construct and train them in proper construction of terraces etc. on a labour cost recovery basis:

Under this component the following interventions will be undertaken:

 Supporting environmental conservation activities to control soil erosion along Nyabarongo River  Rehabilitating and greening activities of Villages, schools and their surroundings  Planting pasture (Cameroon French) on hill sides and along the river banks.  Rehabilitating, protecting and conserving of degraded lands along Nyabarongo River  Supporting Farmers Associations in constructing contours, ridges and hedges to control rain water run-off and the resultant soil erosion  Introducing and popularizing of agro-forestry techniques in the catchment area of the Nyabarongo River System  Developing and implementing MOUs with Farmers associations/cooperatives/NGOs/CBOs to sustainably manage and monitor these ecosystems  Protecting river banks by introducing buffer zones  Establishing afforestation programmes  Controlling of water hyacinth

35

Component 3: Waste management in Kigali and towns along Nyabarongo River System . This component is linked to the Kigali city and towns along the Nyabarongo River System to make them clean through improved management of solid waste. This will provide employment for a bout 30,000 unemployed youth in Kigali city and towns along Nyabarongo River Basin

Youth Associations will work closely with the Kigali City Council and other major urban centres within the Nyabarongo River System to ensure that rubbish is collected and consolidated in designated areas for soil composting;

Technical services will be provided to the project Youth Associations. Youth Associations will be assisted by identifying specialists who will work with them to facilitate delivery of activities. This requires establishment of local recycling and consolidation activities to utilise such materials. Materials to be collected include paper, plastic containers, scrap metal, used engine oils etc. Under this component the following interventions will be undertaken:

 Identifying specific urban areas for waste material collection.  Identifying specialists to work with Youth Associations to facilitate delivery of activities.  Commissioning of the recycling feasibility study.  Initiating cleaning and recycling of waste materials in urban areas  Procuring of equipment.  Establishing centres for storage of recycled materials  Collecting of solid waste materials  Sorting and cleaning  Processing fertilizers and briquettes  Marketing of fertilizer and briquettes  Purchase of 3 ton truck

Component 4: Support to livelihood activities through natural resources and environmental management

The component is related to the youth and community in the project area being able to use capacity built in sustainable management of environment and natural resources while enhancing their livelihoods. This project envisages providing employment to about 1,395,600 youth

Under this component the following interventions will be undertaken:

 Training on extension of land use and integrated production system of agro forestry, crops and livestock

36  Establishing Youth Associations’ Nurseries for sale to run afforestation and agro-forestry activities

 Establishing and managing woodlots along the river banks and at mountain tops in identified Districts/ Villages along the Nyabarongo River System. Youth Associations will seek the support of the Institute of Agro- Research (ISAR), Department of Forestry and Forest Research Institutions in identifying the right tree species for planting.

The detailed design of the desired outputs, activities and required inputs, are presented in the table below.

37 Table 4: Project Results and Resources Framework

UNDAF Result 4: Management of environmental, natural resources and land is improved in a sustainable way. UNDAF Outcome 2: Capacity at national, district and community levels to restore and protect ecosystems of national and global importance against potential degradation strengthened. COD Output 2.1: Strategies and action plans for rehabilitation of critical ecosystems developed, operationalized, and available to local Governments COD key activities 2.1.3: Support of formulation of strategies and action plans both at the national and decentralized levels and of advocacy towards protection and rehabilitation of valuable ecosystems Partnership Strategy: EDPRS (2008-2012 ) Project title and ID (ATLAS Award ID): National Environment Youth Project nº 00060880

Intended Outputs Output Targets for Indicative Activities Responsible parties Inputs (years) Mobilize the youth in cooperatives and Youth Council, Youth Consultants & The youth, CBOs/NGOs and associations Committees, Environment Trainers 1.0. Strengthening the capacity of youth local entities have been trained Conservation CBOs/NGOs , Training modules (1,395,600) and CBOs/NGOs in in soil and water conservation Establish and strengthen NGOs/ CBOs PMU,REMA, MINIRENA sustainable environmental management techniques by 2009 in the project area UNDP, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, ullfil its Level of skills and technical Promote awareness of natural MINECOFIN. information on terracing, urban resources to Youth Associations, clean up and recycling and CBOs/NGOs and other local entities in environmental conservation the project area enhanced by 2009 Provide Youth Associations, . CBOs/NGOs and other local entities with skills to enable them to participate in improved natural resources management Construct youth centre in each District

Equip the youth centre (computer and accessories, and furniture) Improve availability of environmental information to respective Districts

Produce and disseminate technical

9 information on terracing, urban clean up, recycling and environmental conservation

Train in soil and water conservation techniques and income generating activities

1.1. Capacity of local entities in Districts Local entities aware of the need Raise environmental management PMU,REMA, MINIRENA Local along Nyabarongo River System to conserve and keep the cities awareness to local entities UNDP, MINALOC, Ministry of Consultants enhanced clean by 2011 Youth , MIFOTRA, MINAGRI, Acquire technical skills in environmental MINECOFIN Workshops management including urban clean up

Take part in awareness activities 1.2 Capacity of other groups e.g women Women Associations involved in Train Women Associations in natural PMU, REMA, MINIRENA Local associations and farmers increased environmental management and resources and environmental UNDP, MINALOC, MINAGRI, Consultants urban clean up by 2011. management including urban clean up MINECOFIN and recycling Workshops

Outcome 2: Conserving and managing the Nyabarongo River System using appropriate technologies.

Outcome indicators: The youth and communities participating fully in conservation activities along Nyabarongo River System Applicable MYFF Service Line: Partnership Strategy Project title and ID (ATLAS Award ID):

Intended Outputs Output Targets for (years) Indicative Activities Responsible parties Inputs

2.0 Nyabarongo River Youth Associations and CBOs/NGOs guiding Support environmental conservation PMU Consultants & System protected and well women Associations and farmers in activities along Nyabarongo River REMA, MINIRENA UNDP, managed. conservation activities by 2010 MINALOC, MINAGRI, Trainers Plant pasture (Cameroon French) on hill MINECOFIN Schools and Villages involved tree planting in sides and along the river banks. Staff time their respective areas by 2010. Rehabilitate, protect and conserve Funds New technologies in environmental degraded lands along Nyabarongo River

39 conservation introduced by 2010 Contractual Introducing and popularizing of agro- Services forestry techniques in the catchment area of the Nyabarongo River System

Establishing afforestation programmes Undertake zoning of various activities in respective areas

Develop and implement MOUs with community associations/cooperatives to sustainably manage natural resources 2.1 The All Nyabarongo The Nyabarongo river protected from water Identify proper methods of removal e.g. Youth, Youth Committees, Consultants & River System protected hyacinth by 2011. mechanical or biological Environment Conservation and freed from water NGOs , PMU,REMA, Trainers hyacinth Collection of water hyacinth MINIRENA UNDP,

MINALOC, Ministry of Staff time Protect and conserve threatened Youth , MINAGRI, ecosystems identified in the project area Funds

Mobilise and sensitise CBOs/NGOs and Contractual communities on sustainable natural Services resource management

Control of water hyacinth

2.2:Youths and along the Schools and communities well integrated in Sensitise and train Schools and Youth, Youth Committees, Consultants & Nyabarongo River System the programme by 2011. communities in sustainable natural Steering Committee; participating actively in resources management Environment Conservation Trainers environmental conservation NGOs Rehabilitate and green activities of Staff time Villages, schools and their surroundings Funds Introducing and popularizing of agro- forestry techniques in schools and Contractual communities Services

40

Outcome 3: Waste management in Kigali and towns along Nyabarongo river system Outcome indicators; Youth Associations and communities along the Nyabarongo River System committed to remove all forms of wastes in towns /cities Applicable MYFF Service Line: Partnership Strategy Project title and ID (ATLAS Award ID):

Intended Outputs Output Targets for (years) Indicative Activities Responsible Inputs parties

3.0:Youth in town/cities along Centres for collection of wastes Identifying specific urban areas for waste Youth labour Nyabarongo River System mobilised identified 2011. material collection . Youth Committees, and sensitised in waste Environment Local consultants to management Recycling of wastes initiated by Conservation NGOs , supervise the works 2010 Commissioning of the recycling feasibility PMU,REMA, UNDP, study . MINIRENA Office supplies for MINALOC, Ministry equipments and Initiating cleaning and recycling of waste of Youth , MIFOTRA, facilities (picks, etc materials in urban areas MINAGRI, Funds, MINECOFIN . Procuring of equipment. Technical staff Establishing centres for storage of recycled materials

Sorting and cleaning

Develop and implement MOUs with community associations to collect and recycle wastes in towns and cities

3.1 Wastes processed into fertilizers No. of smallholder farmers practicing Youth Committees, Funds and briquettes environmentally sustainable farming Organise study tours for communities to Environment by 2009 realise the gravity of wastes in the country Conservation NGOs ,

41 PMU,REMA, UNDP, Study Tours District set aside budgets for Conduct training programmes in waste MINIRENA environmental competitions among management MINALOC, Ministry Technical staff farmers every year of Youth , MIFOTRA, Collect solid waste materials MINAGRI, MINECOFIN Process wastes into fertilizers and briquettes

Sensitize and train Youth on techniques of solid waste collection, sorting, transforming into fertilizer and briquettes

Outcome 4: Support to livelihood activities through natural resources and environmental management Outcome indicators: Communities involved in sustainable livelihood activities Applicable MYFF Service Line: Partnership Strategy Project title and ID (ATLAS Award ID):

Intended Outputs Output Targets for Indicative Activities Responsible parties Inputs (years) Mobilise and train communities in Youth, Youth Committees Consultants & 4.0. Youth Associations, communities 80% of the target groups in the sustainable NRM based livelihood. Environment Conservation sensitised and trained in sustainable project area trained in NRM by CBOs/NGOs , PMU,REMA, Trainers NRM based livelihoods 2011. Develop and implement MOUs with MINIRENA, UNDP, MINALOC, community associations/ to sustainably Ministry of Youth, MIFOTRA, Training modules manage these ecosystems MINAGRI, MINECOFIN. Funds Establish and manage woodlots along the river banks and at mountain tops in identified Districts/ Villages along the

Nyabarongo River System . .

4.1. Youth Associations, communities New technologies in natural Organise study tours for communities PMU,REMA, MINIRENA Local

42 and CBOs/NGOs trained in resource and environmental and local entities to Districts along the UNDP, MINALOC, Ministry of Consultants sustainable NRM based livelihood management in place by 2014 Nyabarongo River System, to learn how Youth, MIFOTRA, MINAGRI, technologies environmentally friendly based income MINECOFIN Workshops generating activities are undertaken. Funds Train on extension of land use and integrated production system of agro forestry and crops

Establish Youth Associations’ Nurseries for sale to run afforestation and agro- forestry activities

Introduce terracing technologies for of soil conservation

4.2 Youth Associations ,Local NGOs, Youth Associations and CBOs/ Provide micro-grants to organised PMU, REMA, MINIRENA Local CBOs, & Associations NRM-based NGOs established in women and youth associations involved UNDP, MINALOC, MINAGRI, Consultants enterprises established and environmentally sustainable in natural resources management MINECOFIN strengthened business by 2010; based income generating activities; Workshops

Funds Natural resource based non Train these local organised groups in agricultural income generating income generating activities; projects set-up by 20012 Planting trees and agro-forestry trees in the catchment areas

43

Outcome 5: Project effectively managed, monitored, evaluated and reported.

Outcome indicators and targets: Project Management Systems in place

Applicable MYFF Service Line: Partnership Strategy Project title and ID (ATLAS Award ID):

Intended Outputs Output Targets for Indicative Activities Responsible parties Inputs (years) Project management systems Quarterly reports produced Undertake Regular PMU Funds, established and maintained by Project Management on monitoring of on-going time activities Youth Council Consultants & Trainers Project monitored and evaluated; Project reviews undertaken Prepare quarterly reports REMA Technical Staff

quarterly Project strategic and annual work Organize Mid-Term Reviews UNDP planning completed Flow of funds monitored Undertake External Project reports produced, reviewed and Field Tours implemented as Evaluation disseminated; planned.

44 6.0. Management Arrangements

6.1. Project Implementation

The Youth Environmental Project will be established as one of the executive arm of REMA and will be based in Kigali. The project administration will be decentralised as far as possible at the districts. However, at the headquarters there will be a Project Manager who will coordinate the activities of the project.

The project implementation will involve different stakeholders, including Government institutions, particularly MINIRENA, MINECOFIN, MINALOC, MIFOTRA, Ministry of Youth, MINICOM, MINAGRI, REMA, District and Sector leadership, Development partners, particularly UNDP, Youth Committees, Youth Associations, Environment conservation NGOs and the Local Communities. It will be implemented as a National Execution (NEX) project under REMA. UNDP will be the Executing Agency and REMA, the Implementing Agency.

The ultimate stakeholder beneficiaries are the unemployed youth and small holder farming households, struggling to make a living on small patches of steep arable land on the catchments of Nyabarongo River System.

6.2. General Framework

The project will be implemented over a period of three years with a start-up and wind- down period at onset and near closure respectively. The UNDP Execution Agency for the project will be the UNDP Rwanda Country Office and the project will be executed under UNDP National Execution (NEX) procedures. The lead Government Institution with the overall responsibility for the project will be the Ministry in charge of Natural Resources, MINIRENA. The Rwanda Environment Management Authority (REMA)) will be the Government implementing agency for the project, in charge of oversight for the project implementation.

6.3. Project Management Unit (PMU):

A Project Management Unit PMU will be established under REMA and will be responsible for the day-to-day implementation of the project. Technical Ministries will be actively involved in different project activities in the phases of planning, execution and monitoring and evaluation but major government institutions that will be involved include MINIRENA. MINALOC, Ministry of Youth, MIFOTRA, MINICOM, MINAGRI and MINECOFIN.

The Project Management Unit (PMU) will be headed by a Project Coordinator. He/she will be a national professional recruited for the three year duration of the project. The Project coordinator will work under direct supervision of the Director General of REMA. He/she will be responsible for the application of all UNDP administrative and financial

45 procedures and for the use of UNDP funds. The Project Coordinator will be assisted by a Project Officer, Monitoring and Evaluation officer; an Administrative and Finance officer and District Project Liaison Officer (see Annex 4 on their duties and responsibilities). The District Liaison Project Officer will be selected among the youth representatives of the 17 Districts to coordinate project activities in Districts. He or she will be accountable to the District Project Advisory Committee and Project Coordinator. The project will not have a permanent vehicle at its disposal in conformity with Government policy but will have resources in the budget for hiring vehicles as deemed necessary. The PMU will have overall responsibility for project management for all administrative and technical issues as well as financial reporting. The PMU will coordinate the selection process for all local contracts and recruitment of local consultants – this will be done in close consultation with the other concerned executing agencies and will have approval of the Director General of REMA. The PMU will manage and coordinate the execution of all local contracts.

6.4. National Project Steering Committee (NPSC)

A National Project Steering Committee is composed of representative of government institutions, namely; REMA (Chairperson) MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINICOM, MINECOFIN , the Youth Council and donor representatives will be established to provide assistance to the PMU for smooth project implementation (see annex 5 for its terms of reference).

6.5. District Advisory Technical Committee (DATC)

A District Advisory Technical Committee is composed of the Vice Mayor in charge of Finance, Economics and Development (Chairperson), Director of planning, staff in charge of environment, in charge of cooperatives, representative of Youth Committee, Agriculturalist, Project representative from project head office and District liaison project officer (secretary). The DATC will provide guidance to project implementation in the Districts and ensure that the project is implemented as planned and help to take decisions that keep project implementation on tract to achieve project outputs.

7.0. Financial Arrangement

The Project Management Unit will manage the funds for the functioning of the project. UNDP will advance funds in installments. The PMU will submit justification for expenses incurred and the funds replenished accordingly.

Criteria and procedures will be developed for performance-based contracts with service providers. Under performance-based contracts, the service provider will be paid only for work completed. Work partially completed will be paid on a pro rata basis.

The project will comply with UNDP’s monitoring, evaluation and reporting requirements as spelled out in the UNDP Programming Manual , M&E Tool Kit and to be also spelled

46 out in project implementation procedures to be prepared by PMU (see Annex 6 for its terms of reference). The Coordinator will have lead responsibility for reporting to UNDP.

7.1. Audit requirements

The project will be audited on a yearly basis for financial year as per NEX procedures. The Government will provide the Resident Representative with certified periodic financial statements, and with an annual audit of the financial statements relating to the status of UNDP funds according to the established procedures set out in the Programming and Finance manuals. The Audit will be conducted by the legally recognized auditor of the Government, or by a commercial auditor engaged by the Government

7.2. Guidelines for payment of Allowances

It is understood that most Villages will have Youth Associations involved in rehabilitation. These associations will be allocated land in respective areas identified where income generating activities will be undertaken

It is extremely important to have the youth participate in the implementation of specific activities identified in order to provide them with maximum opportunities to become actors of change in identified localities.

8.0. Project summary budget and Annual Work plans

8.1 Project summary budget

The project cost is 6,000,000 USD of which USD 300,000 is from UNDP; USD 5298,000 is from ONE UN and USD 402,000 is from the government of Rwanda. Table 5 below presents a project summary budget by project outputs. The Summary budget is organized by the annual work plans and the budget is set against the outputs. The annual work plans in table 6 shows the budget by project outputs and activities while annex 4 shows details of the Annual work plan costs by quarters.

Table 5: Project summary budget (in USD)

Year 2008 2009 2010 2011 Total OUTPUTS Out put: 1 The Nyabarongo River System catchments high altitude areas have been terraced with radical terracing for management of soil conservation (ha). 0 848,119.70 747,993.60 520,905.58 2,117,018.96 Output :.2.The Nyabarongo River System catchments in lower altitude areas have been terraced with progressive terraces 0 796,433.80 394,349.30 179,271.71 1,370,054.74

47 Output. 3: The banks of Nyabarongo River System have been protected though improved management of the river buffer zone 0 131,280.00 84,176.00 56,368.00 271,824.00 Output: 4: Filtering and sinking of soil sediments has been enhanced through a forestation and rehabilitation of forests on river catchment areas. 0 66,031.70 179,263.70 88,145.20 333,440.60 Output 5 :Nyabarongo River System have been protected and freed from water hyacinth 0 69,700.00 42,670.00 19,142.00 131,512.00 Output 6: Waste management in Kigali and towns along Nyabarongo River System has been enhanced. 0 40,705.20 26136 11,684.40 78,525.60

OUTPUT 7: The youth) have been organized, supported and strengthened for the protection of bank and catchment areas of Nyabarongo River System bank and catchment areas 37,907.70 156,999.50 59,313.01 72,930.90 327,151.11 Output 8: The capacity of Youth and farmers has been strengthen through training in cooperative principles, techniques of soil conservation, agro forestry, forestry, land use and integrated approach. 35,400.10 177,188.50 77,714.70 23,457.30 313,760.57 Output 9: The youth have been supported and strengthened in waste management in Kigali and towns along the Nyabarongo river system. 32,000.00 52,000.00 29,000.00 29,000.00 142,000.00 Output 10: The capacity of youth in environment and waste management techniques has enhanced through been training 22,142.70 160,000.00 23,000.00 15,000.00 220,142.70 Output 11 Project implementation Unit (PMU) in place and strengthened 108,080.90 246,395.10 193,450.22 146,643.47 694,569.72 Total 235,531.44 2,744,853.50 1,857,066.50 1,162,548.56 6,000,000.00

The GOR’s contribution will mainly be in kind to cover the cost of staff participating in the project, cost of renting and maintenance of the project’s facilities and cost of logistics for conducting several different workshops and training sessions as well as review meetings and mobilization of farmers and youth to participate in the project.

48 Table 6 Annual Work Plan Budget 2008 EXPECTED KEY ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) OUTPUTS&MONITORING INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount of funds Description 1.1 Mobilization youth and OUTPUT 1:The farmers, in collaboration Youth, Youth Communities and youth with committees in Committees, Steering (1,395,600) in Districts, in cooperatives Committee, Environment ONE UN 8,864.28 town/cities along and associations Conservation NGOs, Nyabarongo River PMU, REMA, UNDP, System mobilized and MINIRENA, MINALOC, their capacity Ministry of Youth, strengthened × MINAGRI, MINECOFIN GOV 4,821.43 1.2 Construction of youth centre for administrative Youth, Youth and cooperative affairs in Committees, Steering Districts Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, 17,686.0 × MINAGRI, MINECOFIN ONE UN 0 1.3 Preparations for 6,536 production and distribution technical pamphlet on the Youth, Youth role of terracing and trees Committees, Steering in environment protection Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × MINAGRI, MINECOFIN ONE UN

49 EXPECTED OUTPUTS& KEY ACTIVITIES TIMEF RESPONSIBLE PARTY MONITORING RAME PLANNED INDICATORS BUDGET(In US$) Q1 Q2 Q3 Q4 Source Budget Amount of funds Description Output 2: Youth trained 2.1 Training youth and Youth, Youth in cooperative farmers in cooperative Committees, Steering principles, techniques of principles committee, Environment soil conservation, agro Conservation NGOs, forestry, forestry, land PMU, REMA, UNDP, use and integrated MINIRENA, MINALOC, approach. Ministry of Youth, × MINAGRI, MINECOFIN ONE UN 5,485.70 2.2 Sensitization and Youth, Youth training on techniques of Committees, Steering soil protection (terracing, a Committee, Environment forestation, etc) Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × MINAGRI, MINECOFIN ONE UN 5,485.70 2.3 Sensitization and Youth, Youth training on techniques to Committees, Steering produce and maintenance Committee, Environment agro forest trees Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × MINAGRI, MINECOFIN. One UN 5,485.70 2.4. Training on production Youth, Youth of forest plants, fruits and Committees, Steering agro forest in nurses and Committee, Environment multiplication of soil Conservation NGOs, nitrogen fixing shrubs PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × MINAGRI, MINECOFIN. One UN 5,485.70

50 EXPECTED OUTPUTS& KEY ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) MONITORING INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount of funds Description 2.5 Training on extension Youth, Youth of land use and integrated Committees, Steering production system of agro Committee, Environment forest, crops and livestock Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × One UN 13,457.3 Output 3 : The youth 3.1 Mobilization youth in Youth, Youth have been organized cooperatives and Committees, Steering and strengthened for association for waste Committee, Environment waste management in management Conservation NGOs, Kigali and towns along PMU, REMA, UNDP, Nyabarongo River MINIRENA, MINALOC, System Ministry of Youth, MINAGRI, MINECOFIN. × ONE UN 12,000.00 3.2 Construction of youth Youth, Youth centre for administrative Committees, Steering cooperative and cultural Committee, Environment affairs for youth in Kigali Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN.

× ONE UN 7,000.00

51 EXPECTED OUTPUTS& KEY TIMEFRAME RESPONSI PLANNED BUDGET(In MONITORING ACTIVITIES BLE US$) INDICATORS PARTY Q1-2 Q3 Q4 Source Budget of funds Description 3.5 Produce and Youth, Youth ONE UN distribute technical Committees, Steering pamphlet on the waste Committee, Environment management Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × MINAGRI, MINECOFIN 13,000.00 Output 4: Youth have 4.1 Training the youth in Youth, Youth been trained in waste management in Committees, Steering environment and cooperative principles Committee, Environment waste management Conservation NGOs, techniques PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × MINAGRI, MINECOFIN. ONE UN 10,000.00 4.2 Sensitization and Youth, Youth training on techniques Committees, Steering of solid waste collection, Committee, Environment sorting, transforming Conservation NGOs, into fertilizer and PMU, REMA, UNDP, briquettes MINIRENA, MINALOC, Ministry of Youth, × MINAGRI, MINECOFIN. ONE UN 12,142.70 Output 5 Project 5.1 Salary for project REMA, UNDP, 9,000 implementation Unit coordinator MIFOTRA, MINECOFIN. (PMU) in place and strengthened × UNDP 5.2 Project officer REMA, UNDP, 7,200 × MIFOTRA, MINECOFIN. UNDP 5.3 Salary for REMA, UNDP, 7,200 Monitoring and MIFOTRA, MINECOFIN. evaluation officer × UNDP 5..4 Salary for REMA, UNDP, × UNDP 4,200.00

52 Administrative assistant MIFOTRA, MINECOFIN. 5.6 equipments and REMA, UNDP, furniture × MIFOTRA,MINECOFIN. UNDP 42,400.00 5.7 Office space, REMA, UNDP, maintenance and MIFOTRA,MINECOFIN. coordination × GOV 8080.9 5.8 Monitoring and Youth, Youth evaluation Committees, Steering Committee; NGOs in environment , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, × MINECOFIN. UNDP 30,000 Total 235,531.40

53 Annual Work Plan Budget Sheet 2009

EXPECTED KEY ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) OUTPUTS&MONITORING INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount of funds Description

Out put: 1 The Nyabarongo 1.1 Digging and removing × × × × Youth, Youth Committees, ONE UN River System catchments high the top fertile soil Steering Committee, altitude areas have been Environment Conservation terraced with radical terracing NGOs, PMU, REMA, UNDP, for management of soil MINIRENA, MINALOC, conservation (ha). Ministry of Youth, MINAGRI, MINECOFIN. 348,512.84 1.2 Establishing and × × × × Youth, Youth Committees, ONE UN reinforcement of Steering Committee, embankment (contour Environment Conservation ridges) NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINECOFIN. 226,175.80 1.3 Restoring and leveling × × × × Youth, Youth Committees, ONE UN top fertile soil on high river Steering Committee, catchment areas Environment Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth , MINAGRI, MINECOFIN. 178,878.10 Youth, Youth Committees, Steering Committee, Environment Conservation NGOs , PMU,REMA, UNDP, 1.4 Planting trees and MINIRENA, MINALOC, agro-forestry trees in the Ministry of Youth, catchment areas MIFOTRA, MINAGRI, (seedlings) × × × × MINECOFIN. GOV 41,762.0

54 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED &MONITORING INDICATORS BUDGET

Q1 Q2 Q3 Q4 Source of Budget Amount funds Description 1.5 Plant pasture × × × Youth, Youth Committees, ONE UN (French Cameroon) on Steering Committee, radical terraced hill Environment sides Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINECOFIN. 26,525.00 1.6 Production of × × × × Youth, Youth Committees, ONE UN composite organic/ Steering Committee, green fertilizer for Environment project Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINECOFIN. 26,266.00 Output :.2.The Nyabarongo 2.1 Digging of contour × × × × Youth, Youth Committees, ONE UN River System catchment trenches for erosion Steering Committee, lower altitude areas have control Environment been terraced with Conservation NGOs, progressive terraces PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN.

97,429.00

55 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET &MONITORING INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount Description 2.2 Digging anti-erosion × × × × Youth, Youth Committees, ONE UN trenches Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. 53,376.74 2.3 Digging ditches to Youth, Youth Committees, ONE UN retain water Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 75,330.34 2.4 Digging Youth, Youth Committees, ONE UN discontinued water Steering Committee, ways Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 96,078.08 2.5 Establishment of Youth, Youth Committees, ONE UN nurseries to produce Steering Committee, tree plants Environment Conservation NGOs, PMU, REMA, UNDP, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × × × × 290,955

56 EXPECTED OUTPUTS & PLANNED ACTIVITIES RESPONSIBLE PARTY PLANNED BUDGET MONITORING INDICATORS

Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

2.6 Planting of Youth, Youth Committees, ONE UN grasses/pastures(Fresh Steering committee, Cameroon) Environment Conservation NGOs, PMU, REMA, UNDP, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. 15,684.40 2.7 Planting trees/agro- Youth, Youth Committees, ONE UN forestry on the contours Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 41,762.0 2.8 Purchase of dairy Youth, Youth Committees, ONE UN cattle (10 cows for each Steering Committee, District) for farmers Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 125,818.00

57 EXPECTED OUTPUTS & PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET MONITORING INDICATORS

Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

Output. 3: The banks of 3.1 Establish Nurseries Youth, Youth Committees, ONE UN ONE UN Nyabarongo River System for forest ,fruits and Steering Committee, have been protected though agro forest trees(Plants) Environment improved management of Conservation NGOs, the river buffer zone PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 20,280.00 Output. 3: The banks of 3.2 Planting reeds within Youth, Youth Committees, ONE UN ONE UN Nyabarongo River System 6m from river bank Steering Committee, have been protected though Environment improved management of Conservation NGOs, the river buffer zone PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 6,600.00 3.3 Planting grass and Youth, Youth Committees, ONE UN shrubs within next 10 m Steering Committee, band from the reeds Environment band Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. ONE UN 34,000.00 3.4 Planting grass and Youth, Youth Committees, ONE UN Agro forestry within next Steering Committee, 10 m band from the Environment grass and shrubs Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 20,000.00

58 EXPECTED OUTPUTS & PLANNED ACTIVITIES RESPONSIBLE PARTY PLANNED BUDGET MONITORING INDICATORS

Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description 3.5 Progressive Committees, Steering ONE UN ONE UN terracing of 24m of Committee, Environment upper reaches of 24m of Conservation NGOs , the buffer zone PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN × × × × 26,400.00 3.6 Plant agro forestry Youth, Youth Committees, ONE UN (24m of buffer zone Steering Committee, (plants ) Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. ONE UN 24,000.00 Output: 4: Filtering and 4.1 Forestation of forest Youth, Youth Committees, ONE UN sinking of soil sediments site in the Districts Steering Committee, has been enhanced through (Plants) Environment a forestation and Conservation NGOs , rehabilitation of forests on PMU,REMA, UNDP, river catchment areas. MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN ONE UN 57,352.20 4.2 Rehabilitation of Committees, Steering ONE UN forests in the Districts Committee, Environment Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN × × × × ONE UN 8,679.50

59 EXPECTED OUTPUTS PLANNED ACTIVITIES RESPONSIBLE PARTY PLANNED BUDGET (In US$) &MONITORING TIMEFRAME INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

Output 5 5.1 Control of water Youth, Youth Committees, ONE UN :Nyabarongo River hyacinth Steering Committee, System have been Environment Conservation protected from NGOs, PMU, REMA, UNDP, attack by water MINIRENA, MINALOC, Ministry of Youth, MINAGRI, hyacinth × × × × MINECOFIN. 42,500.00 5.2 Production of handicraft Youth, Youth Committees, materials such as baskets, Steering Committee, hats, chairs etc Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × × × × ONE UN 10,200.00 5.3 Making fertilizer from Youth, Youth Committees, water hyacinth Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. 17,000.0 Output 6: Waste 6.1Collection solid waste Youth, Youth Committees, ONE UN 5,060 management in materials Steering Committee, Kigali and towns Environment Conservation along Nyabarongo NGOs, PMU, REMA, UNDP, River System has MINIRENA, MINALOC, Ministry of Youth, MINAGRI, been enhanced. MINECOFIN.

× × × ×

60 EXPECTED OUTPUTS & PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET (In US$) MONITOTING INDICATORS

Q1 Q2 Q3 Q4 Source Budget Amount Description of Funds 6.2 Sorting and cleaning Youth, Youth Committees, ONE UN Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. ONE UN 5,060 6.3 Processing fertilizer Youth, Youth Committees, ONE UN Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × × × × 9,318.40 6.4 Processing Youth, Youth Committees, ONE UN briquettes Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × × × × 5,266.80 6.5 Marketing of Youth, Youth Committees, ONE UN fertilizer and briquettes Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. 1,000.00

61 EXPECTED OUTPUTS & PLANNED ACTIVITIES TIMEFRAMME RESPONSIBLE PARTY PLANNED BUDGET MONITORING INDICATORS

Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

6.6 Purchase of 3 ton Youth, Youth, Youth truck Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × MINAGRI, MINECOFIN. ONE UN 15,000 7.1 Mobilization youth, OUTPUT 7: The youth with collaboration with Youth, Youth Committees, (1,395,600) have been committees in Districts, Steering Committee, ONE UN 18,393.0 organized and strengthened in cooperatives and Environment Conservation for the protection of bank associations NGOs, PMU, REMA, UNDP, and catchment areas of MINIRENA, MINALOC, Nyabarongo River System Ministry of Youth, MINAGRI, bank and catchment areas × × × × MINECOFIN GOV 1321 7.2 Construction of Youth, Youth Committees, youth centre for Steering Committee, administrative, Environment Conservation cooperative and cultural NGOs, PMU, REMA, UNDP, affairs in each District MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN ONE UN 110,885.50 7.3.1 Equipping the Youth, Youth Committees, youth centre (computer Steering Committee, and accessories Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN ONE UN

62 EXPECTED OUTPUTS & PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) MONITORING INDICATORS

Q1 Q2 Q3 Q4 Source Budget Amount Description 7.3. 2 Furniture Youth, Youth Committees, Steering Committee, Environment Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN ONE UN 7.4 Produce and Youth, Youth Committees, distribute technical Steering Committee, pamphlet on the role of Environment Conservation terracing and trees in NGOs, PMU, REMA, UNDP, environment protection MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. ONE UN 26,400.00

63 EXPECTED OUTPUTS & PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) MONITORING INDICATORS

Q1 Q2 Q3 Q4 Source Budget Amount Description Output 8: Youth trained in 8.1 Training them in Youth, Youth Committees, cooperative principles, cooperative principles Steering committee, techniques of soil Environment Conservation conservation, agro forestry, NGOs, PMU, REMA, UNDP, forestry, land use and MINIRENA, MINALOC, integrated approach. Ministry of Youth, MINAGRI, × × × × MINECOFIN... ONE UN 32,914.30 8.2 Sensitization and Youth, Youth Committees, training on techniques of Steering Committee, soil protection Environment Conservation (terracing, a forestation, NGOs, PMU, REMA, UNDP, etc) MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN ONE UN 32,914.80 8.3 Sensitization and Youth, Youth Committees, training on techniques to Steering Committee, produce and Environment Conservation maintenance agro forest NGOs, PMU, REMA, UNDP, trees MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. ONE UN 32,914.80 8.4. Training on Youth, Youth Committees, production of forest Steering Committee, plants, fruits and agro Environment Conservation forest in nurses and NGOs, PMU, REMA, UNDP, multiplication of soil MINIRENA, MINALOC, nitrogen fixing shrubs Ministry of Youth, MINAGRI, × × × × MINECOFIN. ONE UN 32,914.80

64 EXPECTED PLANNED ACTIVITIES TIMEFRAMME RESPONSIBLE PARTY PLANNED BUDGET(In US$) OUTPUTS & MONITOROI NG INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description 8.5 Training on extension of Youth, Youth Committees, land use and integrated Steering Committee, production system of agro Environment Conservation forest, crops and livestock NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. ONE UN 45,528.92 Output 9 : The 9.1 Mobilization youth in Youth, Youth Committees, youth have been cooperatives and association Steering Committee, organized and Environment Conservation strengthened for NGOs, PMU, REMA, UNDP, waste MINIRENA, MINALOC, management in Ministry of Youth, MINAGRI, Kigali and towns MINECOFIN. along Nyabarongo River System × × × × ONE UN 4,000.00 9.2 Construction of youth Youth, Youth Committees, centre for administrative Steering Committee, cooperative and cultural affairs Environment Conservation in Kigali NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. ONE UN 23,000.00 9.3 Equipping the youth centre Youth, Youth Committees, (computer and accessories) Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. UNDP

65 EXPECTED PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET OUTPUTS & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description 9.4 Equipping the youth centre Youth, Youth Committees, . ONE UN with furniture, etc. Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, - - - - MINECOFIN 9.5 Produce and distribute Youth, Youth Committees, ONE UN technical pamphlet on waste Steering Committee, management Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN 25,000.00 Output 10: Youth 10.1 Training the youth in Youth, Youth Committees, have been trained waste management on Steering Committee, in environment and cooperative principles Environment Conservation waste NGOs, PMU, REMA, UNDP, management MINIRENA, MINALOC, techniques Ministry of Youth, MINAGRI, × × × × MINECOFIN. ONE UN 80,000.00 10..2 Sensitization and training Youth, Youth Committees, on techniques of solid waste Steering Committee, collection, sorting, transforming Environment Conservation into fertilizer and briquettes NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. ONE UN 80,000.00

66 EXPECTED PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY OUTPUTS & MONITORING INDICATORS PLANNED BUDGET Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description Output 11 Project 11.1 Salary for project REMA, UNDP, MIFOTRA, 18,000 implementation coordinator MINECOFIN. Unit (PMU) in × × × × place and 11.2 Project officer REMA, UNDP, MIFOTRA, strengthen × × × × MINECOFIN. UNDP 14,400.00 11.3 Salary for Monitoring and REMA, UNDP, MIFOTRA, evaluation officer × × × × MINECOFIN. UNDP 14,400.00 11..4 Salary for Administrative REMA, UNDP, MIFOTRA, assistant × × × × MINECOFIN. UNDP 8,400.00 11.6 equipments and furniture REMA, UNDP, MIFOTRA, × × × × MINECOFIN. UNDP 26,174.00 11.7 Office space, REMA, UNDP, MIFOTRA, maintenance and coordination × × × × MINECOFIN. GOV 155,021.13 11.8 Monitoring and evaluation Youth, Youth Committees, 10,000.00 Steering Committee; NGOs in environment , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, × × × × MINECOFIN. UNDP Total 2,744,853. 5

67 Annex 8: Annual Work Plan Budget Sheet 2010

EXPECTED OUTPUTS KEY ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) &MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount funds Description of Funds Out put: 1 The 1.1 Digging and removing × × × × Youth, Youth Committees, ONE UN Nyabarongo River the top fertile soil Steering Committee, System catchment high Environment Conservation altitude areas have been NGOs, PMU, REMA, UNDP, terraced with radical MINIRENA, MINALOC, terracing for management Ministry of Youth, MINAGRI, of soil conservation (ha). MINECOFIN. 325,873.62 1.2 Establishing and × × × × Youth, Youth Committees, ONE UN reinforcement of Steering Committee, embankment (contour Environment Conservation ridges) NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINECOFIN. 176,331.78 1.3 Restoring and leveling × × × × Youth, Youth Committees, ONE UN top fertile soil on high river Steering Committee, catchment areas Environment Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth , MINAGRI, MINECOFIN. 147,749.62 Youth, Youth Committees, Steering Committee, Environment Conservation NGOs , PMU,REMA, UNDP, 1.4 Planting trees and MINIRENA, MINALOC, agro-forestry trees in the Ministry of Youth, catchment areas MIFOTRA, MINAGRI, (seedlings) × × × × MINECOFIN. GOV 56,463.60

68 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET &MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount funds Description

1.5 Plant pasture (French × × Youth, Youth ONE UN Cameroon) on radical Committees, Steering terraced hill sides Committee, Environment Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINECOFIN.

21,220.00 1.6 Production of × × × × Youth, Youth ONE UN composite organic/ green Committees, Steering fertilizer for project Committee, Environment Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINECOFIN. 20,355.00 Output :.2.The 2.1 Digging of contour × × × × Youth, Youth ONE UN Nyabarongo River trenches for erosion Committees, Steering System catchment control Committee, Environment lower altitude areas Conservation NGOs, have been terraced PMU, REMA, UNDP, with progressive MINIRENA, MINALOC, terraces Ministry of Youth, MINAGRI, MINECOFIN. 85,238.20

69 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET &MONITORING INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount Description 2.2 Digging anti-erosion × × × Youth, Youth ONE UN trenches Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. 33,607.50 2.3 Digging ditches to Youth, Youth ONE UN retain water Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 47,430.30 2.4 Digging discontinued Youth, Youth ENE UN water ways Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 58,714.40 2.5 Establishment of Youth, Youth ONE UN nurseries to produce tree Committees, Steering plants Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. 97,178.60

70 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description 2.6 Planting of Youth, Youth ONE UN grasses/pastures(Fresh Committees, Steering Cameroon) committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINALOC, Ministry of Youth, MINAGRI, × × × × MINECOFIN. 5,733.50 2.7 Planting trees/agro- Youth, Youth ONE UN forestry on the contours Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × × × × 16,705.00 2.8 Purchase of dairy Youth, Youth ONE UN cattle (10 cows for each Committees, Steering District) for farmers Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 49,742.00 Output. 3: The banks 3.1 Establish Nurseries Youth, Youth ONE UN of Nyabarongo River for forest ,fruits and agro Committees, Steering System have been forest trees(Plants) Committee, Environment protected though Conservation NGOs, improved management PMU, REMA, UNDP, of the river buffer zone MINIRENA, MINALOC, Ministry of Youth, × × × MINAGRI, MINECOFIN. 5,376.00

71 EXPECTED OUTPUTS PLANNED ACTIVITIES RESPONSIBLE PARTY PLANNED BUDGET & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description Output. 3: The banks 3.2 Planting reeds within Youth, Youth ONE UN of Nyabarongo River 6m from river bank Committees, Steering System have been Committee, Environment protected though Conservation NGOs, improved management PMU, REMA, UNDP, of the river buffer zone MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 8,640.00 3.3 Planting grass and Youth, Youth ONE UN shrubs within next 10 m Committees, Steering band from the reeds band Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. 34,000.00 3.4 Planting grass and Youth, Youth ONE UN Agro forestry within next Committees, Steering 10 m band from the grass Committee, Environment and shrubs Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × × × × 6,000.00 3.5 Progressive terracing Committees, Steering of 24m of upper reaches Committee, Environment of 24m of the buffer zone Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN ONE UN 10,560.00

72 EXPECTED OUTPUTS PLANNED ACTIVITIES RESPONSIBLE PARTY PLANNED BUDGET & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

3.6 Plant agro forestry Youth, Youth ONE UN (24m of buffer zone Committees, Steering (plants ) Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × × × × 19,600.00 Output: 4: Filtering and 4.1 Forestation of forest Youth, Youth ONE UN sinking of soil site in the Districts Committees, Steering sediments has been (Plants) Committee, Environment enhanced through a Conservation NGOs , forestation and PMU,REMA, UNDP, rehabilitation of forests MINIRENA, MINALOC, on river catchment Ministry of Youth, areas. MINAGRI, MINECOFIN × × × × 170,584.20 4.2 Rehabilitation of Committees, Steering ONE UN forests in the Districts Committee, Environment Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN

× × × × 8,679.50

73 EXPECTED OUTPUTS PLANNED ACTIVITIES RESPONSIBLE PARTY PLANNED BUDGET & MONITORING INDICATORS

Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description Output 5 5.1 Control of water Youth, Youth ONE UN :Nyabarongo River hyacinth Committees, Steering System have been Committee, Environment protected from attack Conservation NGOs, by water hyacinth PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × MINAGRI, MINECOFIN. 22,950.00 5.2 Production of Youth, Youth ONE UN handicraft materials such Committees, Steering as baskets, hats, chairs Committee, Environment etc Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × MINAGRI, MINECOFIN. 10,200.00 5.3 Making fertilizer from Youth, Youth ONE UN water hyacinth Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN.

× × × × 9520

74 EXPECTED OUTPUTS PLANNED ACTIVITIES RESPONSIBLE PARTY PLANNED BUDGET (In US$) & MONITORING TIMEFRAME INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount Description 6.1Collection solid waste Youth, Youth ONE UN 4,600 materials Committees, Steering Committee, Environment Conservation NGOs, Output 6: Waste PMU, REMA, UNDP, management in MINIRENA, MINALOC, Kigali and towns Ministry of Youth, along Nyabarongo MINAGRI, MINECOFIN. River System has been enhanced. × × × × 6.2 Sorting and cleaning Youth, Youth ONE UN Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × × × × 4,600 6.3 Processing fertilizer Youth, Youth ONE UN Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN.

× × × × 11,648.00

75 EXPECTED PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET OUTPUTS & MONITOTING INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount Description 6.4 Processing briquettes Youth, Youth Committees, Steering Committee, ONE UN Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry × × × × of Youth, MINAGRI, MINECOFIN. 4,788.00 6.5 Marketing of fertilizer Youth, Youth Committees, Steering Committee, ONE UN and briquettes Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry × × × × of Youth, MINAGRI, MINECOFIN. 500 6.6 Purchase of 3 ton Youth, Youth, Youth Committees, Steering truck Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × × × × ONE UN - OUTPUT 7: The 7.1 Mobilization youth, with Youth, Youth Committees, Steering Committee, youth (1,395,600) collaboration with Environment Conservation NGOs, PMU, have been committees in Districts, in REMA, UNDP, MINIRENA, MINALOC, Ministry organized and cooperatives and of Youth, MINAGRI, MINECOFIN strengthened for associations the protection of bank and ONE UN 17,993.6 catchment areas of Nyabarongo River System bank and catchment areas × × × × GOV 1,292.1 7.2 Construction of youth centre for administrative, cooperative and cultural affairs in each District Youth, Youth Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry × × of Youth, MINAGRI, MINECOFIN ONE UN 17,686.00

76 EXPECTED PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) OUTPUTS & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount Description 7.3.1 Equipping the youth Youth, Youth Committees, Steering Committee, centre (computer and Environment Conservation NGOs, PMU, accessories REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN

ONE UN 1341.3 7.3. 2 Furniture Youth, Youth Committees, Steering Committee, 11,000 Environment Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN

× ONE UN 7.4 Produce and distribute Youth, Youth Committees, Steering Committee, technical pamphlet on the Environment Conservation NGOs, PMU, role of terracing and trees REMA, UNDP, MINIRENA, MINALOC, Ministry in environment protection of Youth, MINAGRI, MINECOFIN.

× ONE UN 10,000.00

77 EXPECTED PLANNED RESPONSIBLE PARTY OUTPUTS & ACTIVITIES MONITOROI NG INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

Output 8: Youth 8.1 Training Youth Youth, Youth Committees, Steering trained in in cooperative committee, Environment Conservation cooperative principles NGOs, PMU, REMA, UNDP, MINIRENA, principles, MINALOC, Ministry of Youth, MINAGRI, techniques of soil MINECOFIN... conservation, agro forestry, forestry, land use and integrated approach.

× × × × ONE UN 3,485.70 8.2 Sensitization Youth, Youth Committees, Steering and training on Committee, Environment Conservation techniques of soil NGOs, PMU, REMA, UNDP, MINIRENA, protection MINALOC, Ministry of Youth, MINAGRI, (terracing, a MINECOFIN forestation, etc) × × × × ONE UN 3,485.70 8.3 Sensitization Youth, Youth Committees, Steering and training on Committee, Environment Conservation techniques to NGOs, PMU, REMA, UNDP, MINIRENA, produce and MINALOC, Ministry of Youth, MINAGRI, maintenance agro MINECOFIN. forest trees

× × × × ONE UN 3,485.70

78 EXPECTED PLANNED TIMEFRAME RESPONSIBLE PARTY OUTPUTS & ACTIVITIES MONITORING INDICATORS PLANNED BUDGET Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

8.4. Training on Youth, Youth Committees, Steering production of Committee, Environment Conservation forest plants, fruits NGOs, PMU, REMA, UNDP, MINIRENA, and agro forest in MINALOC, Ministry of Youth, MINAGRI, nurses and MINECOFIN. multiplication of soil nitrogen fixing shrubs

× × × × ONE UN 3485.7 8.5 Training on Youth, Youth Committees, Steering extension of land Committee, Environment Conservation use and integrated NGOs, PMU, REMA, UNDP, MINIRENA, production system MINALOC, Ministry of Youth, MINAGRI, of agro forest, MINECOFIN. crops and livestock

× × × × ONE UN 55,528.92

79 EXPECTED PLANNED TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET OUTPUTS & ACTIVITIES MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

Output 9 : The 9.1 Mobilization Youth, Youth Committees, Steering youth have been youth in Committee, Environment Conservation organized and cooperatives and NGOs, PMU, REMA, UNDP, MINIRENA, strengthened for association MINALOC, Ministry of Youth, MINAGRI, waste MINECOFIN. management in Kigali and towns along Nyabarongo River System × × × × - 9.2 Construction of Youth, Youth Committees, Steering youth centre for Committee, Environment Conservation administrative NGOs, PMU, REMA, UNDP, MINIRENA, cooperative and MINALOC, Ministry of Youth, MINAGRI, cultural affairs MINECOFIN. × × ONE UN - 9.3 Equipping the Youth, Youth Committees, Steering youth centre Committee, Environment Conservation (computer and NGOs, PMU, REMA, UNDP, MINIRENA, accessories) MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. × ONE UN 18000

80 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description 9.4 Equipping the youth centre Youth, Youth UNDP with furniture, etc. Committees, Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. 11,000.0 Youth, Youth Committees, Steering Committee, Environment 9.5 Produce and distribute Conservation NGOs, technical pamphlet on the role PMU, REMA, UNDP, of tracing solid waste MINIRENA, MINALOC, management for environment Ministry of Youth, protection × × × × MINAGRI, MINECOFIN. ONE UN 11,000.0 Output 10: Youth have 10.1 Training the youth in Youth, Youth been trained in waste manegement on Committees, Steering environment and waste cooperative principles Committee, Environment management Conservation NGOs, techniques PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. ONE UN 40,000 10..2 Sensitization and training Youth, Youth on techniques of solid waste Committees, Steering collection, sorting, transforming Committee, Environment into fertilizer and briquettes Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × × × MINAGRI, MINECOFIN. ONE UN 23,142.70

81 EXPECTED OUTPUTS & PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET MONITORING INDICATORS Q1 Q2 Q3 Q4 Output 11 Project 11.1 Salary for project REMA, UNDP, MIFOTRA, 18,000 implementation Unit coordinator MINECOFIN. (PMU) in place × × × × UNDP 11.2 Project officer REMA, UNDP, MIFOTRA, × × × × MINECOFIN. UNDP 14,400.00 11.3 Salary for Monitoring REMA, UNDP, MIFOTRA, and evaluation officer × × × × MINECOFIN. UNDP 14,400.00 11.4 Salary for REMA, UNDP, MIFOTRA, UNDP Administrative assistant × × × × MINECOFIN. 8,400.00 11.6 equipments and REMA, UNDP, MIFOTRA, furniture × × × × MINECOFIN. UNDP 11,184.00 11.7Office space, REMA, UNDP, MIFOTRA, maintenance and MINECOFIN. coordination × × × × GOV 117,066.23

11.8 Monitoring and Youth, Youth Committees, evaluation Steering Committee; NGOs in environment , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, × × × × MINECOFIN. UNDP 10,000.00

1,857,066.5 Total

82 Annex 8: Annual Work Plan Budget Sheet 20011

EXPECTED KEY ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) OUTPUTS &MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount funds Description Out put: 1 The 1.1 Digging and removing × × Youth, Youth Committees, ONE UN Nyabarongo River the top fertile soil Steering Committee, Environment System catchment Conservation NGOs, PMU, high altitude areas REMA, UNDP, MINIRENA, have been terraced MINALOC, Ministry of Youth, with radical terracing MINAGRI, MINECOFIN. for management of soil conservation (ha). 207,725.3 1.2 Establishing and × × Youth, Youth Committees, ONE UN 167,080.8 reinforcement of Steering Committee, Environment embankment (contour Conservation NGOs , ridges) PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINECOFIN. 1.3 Restoring and leveling × × Youth, Youth Committees, ONE UN top fertile soil on high river Steering Committee, Environment catchment areas Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth , MINAGRI, MINECOFIN. 95,848.7 Youth, Youth Committees, Steering Committee, Environment Conservation NGOs , PMU,REMA, UNDP, 1.4 Planting trees and MINIRENA, MINALOC, agro-forestry trees in the Ministry of Youth, MIFOTRA, catchment areas × × MINAGRI, MINECOFIN. ONE UN 39,856.80

83 EXPECTED OUTPUTS PLANNED TIMEFRAME RESPONSIBLE PARTY PLANNED &MONITORING ACTIVITIES BUDGET INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount Descripti of Funds on 1.5 Plant pasture × × Youth, Youth Committees, . ONE UN (French Steering Committee, Cameroon) on Environment Conservation radical terraced NGOs , PMU,REMA, UNDP, hill sides MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINECOFIN 1.6 Production of × × Youth, Youth Committees, ONE UN composite organic/ Steering Committee, green fertilizer for Environment Conservation project NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINECOFIN. 5,089.00 Output :.2.The 2.1 Digging of × × Youth, Youth Committees, NE UN Nyabarongo River contour trenches for Steering Committee, System catchment erosion control Environment Conservation lower altitude areas NGOs, PMU, REMA, UNDP, have been terraced MINIRENA, MINALOC, with progressive Ministry of Youth, MINAGRI, terraces MINECOFIN. 21,746.10 2.2 Digging anti- × × Youth, Youth Committees, ONE UN erosion trenches Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. 12,849.98

84 EXPECTED OUTPUTS PLANNED TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) &MONITORING ACTIVITIES INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount funds Descripti on 2.3 Digging ditches Youth, Youth Committees, ONE UN to retain water Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 18,135.10 2.4 Digging Youth, Youth Committees, ONE UN discontinued water Steering Committee, ways Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 23,129.9 2.5 Establishment of Youth, Youth Committees, ONE UN nurseries to produce Steering Committee, tree plants Environment Conservation NGOs, PMU, REMA, UNDP, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 86,420.15 2.6 Planting of Youth, Youth Committees, ONE UN grasses/pastures(Fr Steering committee, esh Cameroon) Environment Conservation NGOs, PMU, REMA, UNDP, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 2,866.50

85 EXPECTED OUTPUTS PLANNED TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) & MONITORING ACTIVITIES INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount funds Description 2.7 Planting Youth, Youth Committees, ONE UN trees/agro-forestry Steering Committee, on the contours Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 8,352.5 2.8 Purchase of Youth, Youth Committees, GOV dairy cattle (10 cows Steering Committee, for each District) for Environment Conservation farmers NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 24,871.00 Output. 3: The banks 3.1 Establish Youth, Youth Committees, ONE UN of Nyabarongo River Nurseries for forest Steering Committee, System have been ,fruits and agro Environment Conservation protected though forest trees(Plants) NGOs, PMU, REMA, improved UNDP, MINIRENA, management of the MINALOC, Ministry of river buffer zone Youth, MINAGRI, × MINECOFIN. 6,168.00 Output. 3: The banks 3.2 Planting reeds Youth, Youth Committees, ONE UN of Nyabarongo River within 6m from river Steering Committee, System have been bank Environment Conservation protected though NGOs, PMU, REMA, improved UNDP, MINIRENA, management of the MINALOC, Ministry of river buffer zone Youth, MINAGRI, × × MINECOFIN. 3,960.00

86 EXPECTED OUTPUTS PLANNED TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) & MONITORING ACTIVITIES INDICATORS

Q1 Q2 Q3 Q4 Source of Budget Amount funds Description

3.3 Planting grass Youth, Youth Committees, ONE UN and shrubs within Steering Committee, next 10 m band Environment Conservation from the reeds band NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 20,000.00 3.4 Planting grass Youth, Youth Committees, ONE UN and Agro forestry Steering Committee, within next 10 m Environment Conservation band from the grass NGOs, PMU, REMA, and shrubs UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 6,000.00 3.5 Progressive Committees, Steering terracing of 24m of Committee, Environment upper reaches of Conservation NGOs , 24m of the buffer PMU,REMA, UNDP, zone MINIRENA, MINALOC, Ministry of Youth, × × MINAGRI, MINECOFIN ONE UN 15,840 3.6 Plant agro Youth, Youth Committees, ONE UN forestry (24m of Steering Committee, buffer zone (plants ) Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 4,400.00

87 EXPECTED OUTPUTS PLANNED RESPONSIBLE PARTY PLANNED BUDGET & MONITORING ACTIVITIES INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description Output: 4: Filtering 4.1 Forestation of Youth, Youth Committees, ONE UN and sinking of soil forest site in the Steering Committee, sediments has been Districts (Plants) Environment Conservation enhanced through a NGOs , PMU,REMA, forestation and UNDP, MINIRENA, rehabilitation of MINALOC, Ministry of forests on river Youth, MINAGRI, catchment areas. × × MINECOFIN 49,056.7 4.2 Rehabilitation of Committees, Steering ONE UN forests in the Committee, Environment Districts Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, × × MINAGRI, MINECOFIN 39038.5 Output 5 5.1 Control of water Youth, Youth Committees, ONE UN :Nyabarongo River hyacinth Steering Committee, System have been Environment Conservation protected from NGOs, PMU, REMA, attack by water UNDP, MINIRENA, MINALOC, Ministry of hyacinth Youth, MINAGRI, × × MINECOFIN. 11,050.00 5.2 Production of Youth, Youth Committees, ONE UN handicraft materials Steering Committee, such as baskets, Environment Conservation hats, chairs etc NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 5,100.00

88 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET(In US$) & MONITORING INDICATORS

Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description 5.3 Making fertilizer Youth, Youth Committees, Steering ONE UN from water hyacinth Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 2992 Output 6: Waste 6.1Collection solid Youth, Youth Committees, Steering ONE UN 1,380 management in waste materials Committee, Environment Kigali and towns Conservation NGOs, PMU, REMA, along Nyabarongo UNDP, MINIRENA, MINALOC, River System has Ministry of Youth, MINAGRI, MINECOFIN. been enhanced. × × 6.2 Sorting and cleaning Youth, Youth Committees, Steering ONE UN Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 1,380.00 6.3 Processing fertilizer Youth, Youth Committees, Steering ONE UN Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 6,988.00 6.4 Processing Youth, Youth Committees, Steering ONE UN briquettes Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 1,436.40

89 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

6.5 Marketing of Youth, Youth Committees, Steering ONE UN fertilizer and briquettes Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × × MINECOFIN. 500 6.6 Purchase of 3 ton Youth, Youth, Youth Committees, truck Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN. ONE UN - - OUTPUT 7: The 7.1 Mobilization youth, youth (1,395,600) with collaboration with have been organized committees in Districts, and strengthened for in cooperatives and Youth, Youth Committees, Steering the protection of associations Committee, Environment bank and catchment Conservation NGOs, PMU, REMA, areas of Nyabarongo UNDP, MINIRENA, MINALOC, River System bank Ministry of Youth, MINAGRI, and catchment areas MINECOFIN ONE UN 6686 7.2 Construction of Youth, Youth Committees, Steering youth centre for Committee, Environment administrative, Conservation NGOs, PMU, REMA, cooperative and cultural UNDP, MINIRENA, MINALOC, affairs in each District Ministry of Youth, MINAGRI, MINECOFIN - 7.3.1 Equipping the Youth, Youth Committees, Steering youth centre (computer Committee, Environment and accessories Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × MINECOFIN ONE UN 60,244.90

90 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAME RESPONSIBLE PARTY PLANNED BUDGET & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source Budget Amount Description 7.3. 2 Furniture Youth, Youth Committees, Steering - Committee, Environment Conservation NGOs , PMU,REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN 7.4 Produce and Youth, Youth Committees, Steering distribute technical Committee, Environment pamphlet on the role of Conservation NGOs, PMU, REMA, terracing and trees in UNDP, MINIRENA, MINALOC, environment protection Ministry of Youth, MINAGRI, × × MINECOFIN. ONE UN 6,000.00 Output 8: Youth 8.1 Training them in Youth, Youth Committees, Steering trained in cooperative cooperative principles committee, Environment principles, techniques Conservation NGOs, PMU, REMA, of soil conservation, UNDP, MINIRENA, MINALOC, agro forestry, Ministry of Youth, MINAGRI, forestry, land use and MINECOFIN... integrated approach. × × 8.2 Sensitization and Youth, Youth Committees, Steering training on techniques of Committee, Environment soil protection Conservation NGOs, PMU, REMA, (terracing, a forestation, UNDP, MINIRENA, MINALOC, etc) Ministry of Youth, MINAGRI, × × MINECOFIN ONE UN 8.3 Sensitization and Youth, Youth Committees, Steering training on techniques to Committee, Environment produce and Conservation NGOs, PMU, REMA, maintenance agro forest UNDP, MINIRENA, MINALOC, trees Ministry of Youth, MINAGRI, MINECOFIN. ONE UN

91 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAMME RESPONSIBLE PARTY PLANNED BUDGET(In US$) & MONITOROI NG INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description 8.4. Training on Youth, Youth Committees, Steering production of forest Committee, Environment plants, fruits and agro Conservation NGOs, PMU, REMA, forest in nurses and UNDP, MINIRENA, MINALOC, multiplication of soil Ministry of Youth, MINAGRI, nitrogen fixing shrubs MINECOFIN. ONE UN 8.5 Training on Youth, Youth Committees, Steering extension of land use Committee, Environment and integrated Conservation NGOs, PMU, REMA, production system of UNDP, MINIRENA, MINALOC, agro forest, crops and Ministry of Youth, MINAGRI, livestock MINECOFIN. ONE UN 23,457.3 Output 9 : The youth 9.1 Mobilization youth in Youth, Youth Committees, Steering have been organized cooperatives and Committee, Environment and strengthened for association Conservation NGOs, PMU, REMA, waste management UNDP, MINIRENA, MINALOC, in Kigali and towns Ministry of Youth, MINAGRI, along Nyabarongo MINECOFIN. River System ONE UN 0 9.2 Construction of Youth, Youth Committees, Steering youth centre for Committee, Environment administrative Conservation NGOs, PMU, REMA, cooperative and cultural UNDP, MINIRENA, MINALOC, affairs Ministry of Youth, MINAGRI, MINECOFIN. - 9.3 Equipping the youth Youth, Youth Committees, Steering centre (computer and Committee, Environment accessories) Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, MINECOFIN.

92 EXPECTED OUTPUTS PLANNED ACTIVITIES TIMEFRAMME RESPONSIBLE PARTY PLANNED BUDGET & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description 9.4 Equipping the youth Youth, Youth Committees, ONE UN centre with furniture Steering Committee, Environment Conservation NGOs, PMU, REMA, UNDP, MINIRENA, MINALOC, Ministry of Youth, MINAGRI, × MINECOFIN. 11,000 9.5 Produce and Youth, Youth Committees, distribute technical Steering Committee, Environment pamphlet on the role of Conservation NGOs, PMU, REMA, tracing solid waste UNDP, MINIRENA, MINALOC, management for Ministry of Youth, MINAGRI, environment protection × × MINECOFIN. ONE UN 18,000.00 Output 10: Youth 10.1 Training them in Youth, Youth Committees, have been trained in cooperative principles Steering Committee, Environment environment and Conservation NGOs, PMU, REMA, waste management UNDP, MINIRENA, MINALOC, techniques Ministry of Youth, MINAGRI, × × MINECOFIN. - 10..2 Sensitization and Youth, Youth Committees, training on techniques of Steering Committee, Environment solid waste collection, Conservation NGOs, PMU, REMA, sorting, transforming UNDP, MINIRENA, MINALOC, into fertilizer and Ministry of Youth, MINAGRI, briquettes × × MINECOFIN. ONE UN 15,000 Output 11 Project 11.1 Salary for project REMA, UNDP, MIFOTRA, 9000 implementation Unit coordinator MINECOFIN. (PMU) in place × × 11.2 Project officer REMA, UNDP, MIFOTRA, × × MINECOFIN. 7200 11.3 Salary for REMA, UNDP, MIFOTRA, Monitoring and MINECOFIN. evaluation officer × × 7200 11..4 Salary for REMA, UNDP, MIFOTRA, Administrative assistant × × MINECOFIN. 4,200.00

93 EXPECTED OUTPUTS PLANNED ACTIVITIES RESPONSIBLE PARTY PLANNED BUDGET & MONITORING INDICATORS Q1 Q2 Q3 Q4 Source of Budget Amount Funds Description

11.6 equipments and REMA, UNDP, MIFOTRA, furniture × × MINECOFIN. 11.7Office space, REMA, UNDP, MIFOTRA, maintenance and MINECOFIN. coordination

GOV 114,401.47 11.8 Monitoring and 4,642 evaluation

× × × × UNDP

1,162,548.6 Total

94 9.0. Monitoring and Evaluation, including AWP monitoring tool

Project monitoring and evaluation is important process for the successful implementation and performance of the project as it enables the management to get feedback on project implementation and performance and to take quick decision to solve problems and adjust project implementation priorities accordingly. Project monitoring and evaluation will be conducted in accordance with established UNDP procedures. Annex 5 is the Annual Work-plan Moninitoring Tool (AWP) of the project. It shows project planned costs and physical results set against project outputs and activities. The Annual Work Plan (AWP) Monitoring Tool is important for monitoring and evaluation. It provides performance and impact indicators for project implementation. These will form the basis on which the project's Monitoring and Evaluation system and Action plan will be built.

The PMU will monitor activities to ensure that they are carried out appropriately and in a timely manner as per the work plan and budget. The Annual Work plan, with a detailed M&E Strategy, will be presented at the Inception/ Appraisal Workshop at project start- up, and the inception/ appraisal report prepared after the workshop but not later then 3 months after project start-up. The PMU will also ensure that planned evaluations are undertaken as scheduled. It is the responsibility of the project coordinator to do day to day monitoring of the project basing on the project's Annual Work Plan and its indicators. The Project coordinator will inform the PMU, REMA and UNDP of any delays or difficulties faced during implementation so that the appropriate support or corrective measures can be adopted in a timely and remedial fashion.

Monitoring responsibilities and events The following are monitoring responsibilities and events which will need close follow-up from project management and development partners: • Project Inception Phase: Project Inception/ Appraisal Workshop will be conducted with project team, relevant government counterparts and development partners. The objective of Inception Workshop will be to assist the project team to understand and take ownership of the project’s goals and objectives, as well as finalize preparation of the project's first annual work plan on the basis of the project's Annual Work Plan ( AWP) Monitoring Tool. The inception/Appraisal workshop is important to (i) introduce project staff with the UNDP, GOV team and other project stakeholders involved in the financing and implementation of the project. (ii) Detail the roles, support services and complementary responsibilities under the UNDP NEX procedures. This will be an opportunity for all parties to understand their roles, functions, and responsibilities within the project's decision-making structures, including reporting and communication lines, and conflict resolution mechanisms. (iii) provide a detailed overview of UNDP reporting and monitoring and evaluation (M&E) requirements, with particular emphasis on the Annual Project Implementation Reviews (PIRs) and related documentation, the Annual Project Report (APR), Tripartite Review

95 Meetings, as well as mid-term and final evaluations. (iv) provide an opportunity to inform the project team on UNDP project related budgetary planning, budget reviews, and mandatory budget rephrasing. • A detailed schedule of project reviews meetings will be developed by the project management, in consultation with project implementation partners and stakeholder representatives and incorporated in the Project Inception Report. Such a schedule will include: (i) tentative time frames for Tripartite Reviews, Steering Committee Meetings, (or relevant advisory and/or coordination mechanisms) and (ii) project related Monitoring and Evaluation activities. • Periodic monitoring of implementation progress will be undertaken by the UNDP and REMA through quarterly meetings or more frequently as deemed necessary. This will allow parties to take stock and to troubleshoot any problems pertaining to the project in a timely fashion to ensure smooth implementation of project activities. • UNDP Country Offices and REMA will conduct yearly field visits, or more often based on an agreed upon scheduled to be detailed in the project's Inception Report(Appraisal Meeting report) / Annual Work Plan to assess first hand project progress. • Annual Project Review (APR) will be conducted under the auspices of CEPEX, a government semi-autonomous institution responsible for coordination project implementation, with all stakeholders directly involved in the implementation of a project. The Programme Coordinator will prepare an annual project report and submit it to UNDP at least two weeks prior to the APR for review and comments. • Terminal Tripartite Review (TTR): The terminal tripartite review will be held on the last month of project operations. The terminal tripartite review considers the implementation of the project as a whole, paying particular attention to whether the project has achieved its stated objectives and contributed to the broader environmental objective. It decides whether any actions are still necessary, particularly in relation to sustainability of project results, and acts as a vehicle through which lessons learnt can be captured to feed into other projects under implementation or formulation. • Project Monitoring Reporting The Project Coordinator will be responsible for the preparation and submission of the following reports that form part of the monitoring process: Inception/Appraisal report, annual project report, Implementation review report, quarterly progress reports, project terminal report and technical reports prepared by the project.

96 10.0. Final project Evaluation

The project will be subjected to at least two independent external evaluations as follows:

Mid-term Evaluation An independent Mid-Term Evaluation will be undertaken at the mid-point of implementation. The Mid-Term Evaluation will:

• Determine progress being made towards the achievement of outcomes and will identify course correction if needed. It will focus on the effectiveness, efficiency and timeliness of project implementation; • Highlight issues requiring decisions and actions; and will present initial lessons learned about project design, implementation and management. • Findings of this review will be incorporated as recommendations for enhanced implementation during the final half of the project’s term. The organization, terms of reference and timing of the mid-term evaluation will be decided after consultation between the parties to the project document. The Terms of Reference for this Mid-term evaluation will be prepared by REMA and UNDP.

Final Evaluation An independent final evaluation will take place three months prior to the terminal tripartite review meeting, and will focus on the same issues as the mid-term evaluation. The final evaluation will also look at impact and sustainability of results and the achievement of global environmental goals. The Final Evaluation should also provide recommendations for follow-up activities. The Terms of Reference for this evaluation will be prepared by REMA and UNDP.

11.0. Legal Context

This project document shall be the instrument referred to as …………….between the Government of Rwanda and the United Nations Development Programme (UNDP. The following types of revisions may be made to this project document with the signature of the UNDP Resident Representative only, provided he or she is assured that the other signatories of the project document have no objections to the proposed changes:

(a) Revisions in, or addition of, any of the annexes of the project document (with the exception of the Standard Legal Text for non-SBAA countries which may not be altered and the agreement to which is a precondition for UNDP assistance).

97 (b) Revisions which do not involve significant changes in the immediate objectives, outputs or activities of a project, but are caused by rearrangement of inputs agreed to or by cost increases due to inflation; and

(c) Mandatory annual revisions, which rephrase the delivery of agreed project inputs or increased expert or other costs due to inflation or take into account agency expenditure flexibility.

12. Risk Analysis and Control Measures

The matrix below shows potential environmental risks, causes, impacts and risk control measures integrated in the project and government policy.. The project will coordinate with the MINITERE, local leaders and communities to sensitize them and deal with likely project environmental social impact and how to mitigate and manage those impacts. In particular, the project will support implementation of soil conservation measures and good best practices to mitigate against risks. Farmers and youth will be trained and mobilized to create awareness to support efforts to protect the environment and develop the catchments of River Nyabarongo and to carry out waste management in Kigali city and Towns along River Nyabarongo system.

Risk Cause Impact Control Measures 1. Soil • Land limited due • Deterioration of • The project is erosion overpopulation soil structure putting up soil • Existing few non- and decline of conservation agricultural soil fertility and measures opportunities for productivity • Development and income generation management of • Land river Nyabarongo fragmentation and • Cultivation of catchments for cultivation of steep marginal lands agricultural hill slopes production and soil • Non-recuperation erosion control of soil fertility measures e.g afforestation ,terracing and use of composite manure • Land policy and law under implementation will prevent land fragmentation and promote

98 investment in soil conservation measures

2. Pollution of • Soil from erosion • Decrease of • Project promotes rivers, • Wastes from Kigal river water waste management wetlands and City and towns a levels in Kigali city and City/ Towns long Nyabarongo • Loss of towns river cultivable land • Terracing hillsides in wetlands and for soil control and decrease of agricultural productivity development • Loss of biodiversity • Diseases 3. River bank • Cultivation of river • River water • Project manages erosion banks pollution the 50 meters from • Un controlled • Decrease of river banks through rainfall run-off water levels of agro forestation. water rivers and Grass/shrub wetlands planting • Menace of floods 4. Lack of • Limited land • Youth may be • Farmers use and land for youth available not motivated pay use for the to cultivate • Existing land for to participate in services carried out cultivation owned the project to implement soil by farmers conservation measures • Youth to own products cultivated on a part of the 50meters from the river banks 5. limited • Youth and farmers • Decrease of • Project will provide knowledge not trained in soil agricultural training in related on conservation productivity areas agricultural measures • Continued soil and soil • Limited extension erosion due to conservation services at farmer badly measures level implemented soil conservation measures

99 6. Farmers • Expensive soil • Project not well • The project will and Youth conservation implemented provide micro-grants unable to techniques to farmers and adopt soil • Low incomes and youth managing conservation poverty wastes measures • Mobilisation of continuously farmers and youth • Youth will be paid for services carried out

100 ANNEXES

Annex 1: Profitability of Fertilizer and Briquettes Made from Solid Wastes (in US$)

(a) A budget for Fertilizer(1ton) US$ b) A budget for Briquettes (1ton) US$ 1.Revenue 73.13 1. Revenue 146.3 2. Less production costs 2.Less production costs

2.1 Collection solid waste 4.6 2.1 Collection solid waste materials 4.6 materials 4.6 2.2 Sorting and cleaning 4.6 2.2 Sorting and cleaning 13.3 2.3 processing fertilizer 18.2 2.3 Processing briquettes 2.5 Marketing fertilize and 2.4 Marketing fertilize 5.48 briquettes 4.5 27 Total production costs 32.88 Total production costs 119.3 Net benefit before tax 40.25 Net benefit before tax 35.79 Income tax (30%) 12.075 Income tax (30%) 83.51 Net benefit after tax 28.175 Net benefit after tax

101

Annex 2: General project benefits from interventions for farmers in the project area Annex 2 (i) Smallholder farmers cultivating high level hillsides

1.Radical terracing ( above slope of 25 degrees) Major land use Source of income from the Area Productio Estimated % Unit price Value in Project intervention cultivated n/ha increase in US$ increases of in ha from yield interventions 1. Yield increment from annual 1,974 3tons 50 200 592,200 Annual and perennial crops crops. 2. Yield increment from 1,974 10 tons 50 150 1,480,500 Grasses/ pasture/ legumes perennial crops. 3. Planting trees/ shrubs along 1,661 2.3m3 50 10 19,101.5 the lower side supporting the bund. 4. Tree planting 483 2.2 m3 50 10 5,554.5 (afforestation/rehabilitation). 2. Progressive Terracing (cultivating lower sides of the catchment areas)

1. Yield incremental from 3tons 50 200 annual crops. 3,410.18 1,023,053.28 2. Yield incremental from 10 tons 50 150 perennial crops. 3,410.18 2,557,633.19 3. Planting trees/ shrubs along 2.3m3 50 10 the lower side supporting the 937.37 10,779.81 bund. 4. Tree planting (a forestation/rehabilitation). 835.25 2.3 m3 50 10 9,605.33

NETBENEFIT 5,698,427.62

102

Annex 2(ii) : Benefits for youth in rural areas from the project (managing the river banks and water hyacinth) Major land use Source of income area Production/ man-day/ha No. of Man Estimated % Unit Value in from the Project cultivated/ ha days/tons/ increase price increases of intervention forested/ha baskets from in yield interventions US$ 1 Planting trees/ shrubs along the Annual and 10m supporting the perennial crops bund. 200 2.3m3 50 10 230,000.00 Grasses/ pasture/ 2. Income from legumes terracing. 6,611.58 136.00 901502 - 1.83 1,649,748.66 3. Income from a forestation 9,884.57 50 494,229 - 1.83 904,439.07 4. Yield increment from annual crops from 24 m bund with progressive terraces (area cultivated). 240 3 tons - - 50 200 72,000 5. Yield increment from perennial crops (fruits). 240 10tons - - 50 150 180,000.00 6. Income from sales of fertilizer from water hyacinth (assumption make average of 300 tons annually(tons). - - - 300 tons 1 73.13 21,939.00

103

7. Income from sales of handcrafts (1% of employed youth will be employed in hyacinth collection, making fertilizer and handcrafts; this is equivalent to 13,956 youth and each making 4 baskets per month. - - - 55,824 1 10 558,240.00

BENEFIT 3,616,366.73

TOTAL BENEFIT FOR FARMERS AND YOUTH IN RURAL AREAS 9,314,794.35

104

Annex 3: Soil conservation techniques which can be used in terracing (Adapted from SMS-MSP capacity building project.)

• Contouring: Carrying out ploughing, planting and cultivation on the contour can reduce soil loss from slopping land compared with cultivation up-and down the slope. • Contour bunds: Contour bunds are earth banks 1.5 to 2 m wide thrown across the slope to act as a barrier to run off, to form a water storage area on their up slopes sides and to break – up a slope into segments shorter in length than is required to generate over land flow. • Terraces: Terraces are earth embankments constructed across the slope to intercept surface run-off and convey this rain run-off into a stable outlet at non-erosive velocity, and to shorten slope length. Thus terraces perform similar functions to contour bunds. They differ from bunds in that they are much larger and designed to more stringent specifications, decisions are required on the spacing and length of the terraces, the location of terrace outlets, the gradient and dimensions of the terrace channel and the layout of the terrace system. • Bench terraces (radical terracing) consist of a series of alternating shelves and risers are employed. Where steep slopes, up to 30 degrees, need to be cultivated, the riser is more vulnerable to erosion, and is protected by more vegetation cover and sometimes faced with stones and concretes. There is no channel as such, but a water storage area is created by sloping the shelves into the hill side. Bench terraces can to be reasonably satisfactory as a conservation measure over a wide range of conditions, provided sufficient labor is available for construction and maintenance. But their construction can expose the relatively in-fertile sub-soil, and they require a high a labor input for construction and maintenance, and they can hold back so much water on the hill side that the soils became saturated and land sliding can be induced. As an alternative conservation measure, “fanya-juu” terraces were recommended. Various modifications to permit inward-slopping shelves for grater water storage or protection of very steep slopes or to allow cultivation of tree crops and market garden crops are used.

• Fanya-juu Terraces consists of narrow shelves constructed by digging the contour and throwing the soil up slope to form embankments which is later stabilized by planting grass. During cultivation, vegetation and crops residues are spreads over the shelves. Over time, redistribution of soil within the inner inter–terraces causes the inter-terrace slope to decline in angel and bench like features to develop. • Retention Terraces : These are level terraces; used where water must be conserved by storage on the hillside.

105

ANNEX 4 : ANNUAL WORK PLAN COSTS BY QUARTERS 2008-2011

Year 2008 2009 2011 Quarters Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Total

1. Radical Terracing

1.1 Digging and removing the top 69,702 348,51 97,762 130,34 325,873 124,635. fertile to soil - - - .6 104,553.9 139,405.1 34,851.3 2.84 65,174.7 .1 9.4 32,587.4 .62 83,090.1 2 207,725.3 1.2 Establishing 167,080.8 and reinforcement of embakment (contour ridges) to hold soil and 45,235 226,17 52,899 70,532 176,331 100,248. separate terraces - - - .2 67,852.7 90,470.3 22,617.6 5.80 35,266.4 .5 .7 17,633.2 .80 66,832.3 5 1.3 Restoring and leveling to fertile soil high river catchment 35,775 178,87 44,324 59,099 147,749 areas - - - .6 53,663.4 71,551.2 17,887.8 8.1 29,549.9 .9 .8 14,775.0 .62 38,339.5 57,509.2 95,848.69

1.4 Planting trees/ 8,352. 41,762 16,939 22,585 56,463. agro forestry - - - 4 12,528.6 16,704.8 4,176.2 .0 11,292.7 .1 .4 5,646.4 60 15,942.7 23,914.1 39,856.80 1.5 Plant pasture(Cameroon fresh) on radical terraced 5,305. 26,525 6,366. 8,488. 21,220. hills(pieces) - - - 0 7,957.5 10,610.0 2,652.5 .00 4,244.0 0 0 2,122.0 00 2,122.0 3,183.0 5,305 1.6 Production of composite organic/ green fertilizer for nurseries and pasture and income generating agro 5,253. 26,266 6,106. 8,142. 20,355. activities - - - 2 7,879.8 10,506.4 2,626.6 .00 4,071.0 5 0 2,035.5 00 2,035.6 3,053.4 5,089.00

106 2008 Year 2009 2010 2011 Tot Quarters Q3 Q4 al Q1 Q2 Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Total

254,435. 339,247. 848,119. 149,598. 224,398. 747,993 208,362. 312,543. Subtotal - - - 169,623.9 9 9 84,812.0 7 7 1 299,197.5 74,799.4 .6 2 3 520,905.6 2.0 Progressive terracing of lower hill catchment areas - - - 2.1 Preparing contour for erosion control for progressive teraces on 97,429.0 85,238. the lower reaches on hill - - - 19,485.8 29,228.7 38,971.6 9,742.9 0 17,047.6 25,571.4 34,095.2 8,523.8 0 8,698.4 13,047.6 21,746.1

2.2 Digging anti-erosion 53,376.7 33,607. trenches - - - 10,675.3 16,013.0 21,350.7 5,337.7 4 6,721.5 10,082.3 13,443.0 3,360.8 5 5,140.0 7,710.0 12,850.0

2.3 Digging diches to 75,330.3 47,430. retain water - - - 15,066.1 22,599.1 30,132.1 7,533.0 4 9,486.1 14,229.1 18,972.1 4,743.0 3 7,254.1 10,881.1 18,135.1

2.4 digging discontinued 96,078.0 58,714. water ways - - - 19,215.6 28,823.4 38,431.2 9,607.8 8 11,742.9 17,614.3 23,485.7 5,871.4 4 9,251.9 13,877.9 23,129.9

2.5 Establishment of nurseries to produce tree 116,382. 97,178. plants(No. seedling ) - - - 58,191.0 87,286.6 1 29,095.5 290,955 19,435.7 29,153.6 38,871.4 9,717.9 6 34,568.1 51,852.1 86,420.15 2.6 Planting of grasses/pasture(french 15,684.4 cameroune) on ridges - - - 3,136.9 4,705.3 6,273.8 1,568.4 0 1,146.7 1,720.1 2,293.4 573.4 5,733.5 1,146.6 1,719.9 2,866.5

2.7 Planting trees/agro- 16,705. forestry on the contours - - - 8,352.4 12,528.6 16,704.8 4,176.2 41,762.0 3,341.0 5,011.5 6,682.0 1,670.5 0 3,341.0 5,011.5 8,352.5

107 2008 Year 2009 2010 2011 Tot Quarters Q3 Q4 al Q1 Q2 Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Total

2.8 Purchase of dairy 125,818. 19,896. 49,742. cattle - - - 25,163.6 37,745.4 50,327.2 12,581.8 0 9,948.4 14,922.6 8 4,974.2 0 9,948.4 14,922.6 24,871.0

159,286. 796,433. 118,304. 157,739 394,349 107,563. Subtotal - - - 8 238,930.1 318,573.5 79,643.4 8 78,869.9 8 .7 39,434.9 .3 71,708.7 0 179,271.7 3.0 Protection of river banks - - - 3.1 Establish Nurseries for forest ,fruits and agro forest trees(Plants) - - - 4,056.0 6,084.0 8,112.0 2,028.0 20,280.0 1,075.2 1,612.8 2,150.4 537.6 5,376.0 2,467.2 3,700.8 6,168.0 3.2 Planting reeds within 6m from river bank - - - 1,320.0 1,980.0 2,640.0 660.0 6,600.0 1,728.0 2,592.0 3,456.0 864.0 8,640.0 1,584.0 2,376.0 3,960.0 3.3 Plantintng grass and shrubs within 10 meter band from the 13,600. 34,000. river bank - - - 6,800.0 10,200.0 13,600.0 3,400.0 34,000.0 6,800.0 10,200.0 0 0 8,000.0 12,000.0 20,000.0 3.4 Planting small grass and agro-forestry trees within a band of 10mto protect river 6,000.0 banks and buferzone - - - 4,000.0 6,000.0 8,000.0 2,000.0 20,000.0 1,200.0 1,800.0 2,400.0 600.0 0 2,400.0 3,600.0 6,000.0 3.5 Progressive terracing of 24m of upper reaches of 24m of the buffer sone - - - 5,280.0 7,920.0 10,560.0 2,640.0 26,400.0 2,112.0 3,168.0 4,224.0 1,056.0 10,560 6,336.0 9,504.0 15,840.0 3.6 Plant agro forestry- friuts,etc on 24m of 19,600. buffle zone(plants) - - - 4,800.0 7,200.0 9,600.0 2,400.0 24,000.0 3,920.0 5,880.0 7,840.0 1,960.0 0 1,760.0 2,640.0 4,400.0

131,280. 33,670. 84,176. Subtotal - - - 26,256.0 39,384.0 52,512.0 13,128.0 0 16,835.2 25,252.8 4 5,017.6 0 22,547.2 33,820.8 56,368.0

4.0 Aforestation and Rehabilitation of forests - - - 4.1aforrestation of forest site in the 57,352.2 68,233. 170,584 districts(Plants) - - - 11,470.4 17,205.7 22,940.9 5,735.2 0 34,116.8 51,175.3 7 17,058.4 .20 19,622.7 29,434.0 49,056.7

108 2008 Year 2009 2010 2011 Quarters Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Total 4.2 Rehabilitation of forest in the catchment areas(20%of forestation) - - - 1,735.9 2,603.9 3,471.8 868.0 8,679.50 1,735.9 2,603.9 3,471.8 868.0 8,679.5 15,635.4 23,453.1 39,088.5

179,263. Subtotal - - - 13,206.3 19,809.5 26,412.7 6,603.2 66,031.7 35,852.7 53,779.1 71,705.5 17,926.4 7 35,258.1 52,887.1 88,145.2 5 Collection of water hyacinth from rivers - - - 5.1 Control of water hyacinth - - - 8,500.0 12,750.0 17,000.0 4,250.0 42,500.0 4,590.0 6,885.0 9,180.0 2,295.0 22,950.0 4,420.0 6,630.0 11,050.0 5.2 Production of handicraft materials such as baskets, hats, chairs - - - 2,040 3,060 4,080.0 1,020.0 10,200.0 2,040.0 3,060.0 4,080.0 1,020.0 10,200.0 2,040.0 3,060.0 5,100.0 5.3 Making fertilizer from water hyacinth - - - 3,400 5,100 6,800.0 1,700.0 17,000.0 1,904.0 2,856.0 3,808.0 952.0 9520.0 1,196.8 1,795.2 2,992.0

Subtotal - - - 13,940.0 20,910.0 27,880.0 6,970.0 69,700.0 8,534.0 12,801.0 17,068.0 4,267.0 42,670.0 7,656.8 11,485.2 19,142.0 6.0 Waste management in Kigali city and towns - - - 6.1 Collection solid waste materials - - - 1,012.0 1,518.0 2,024.0 506.0 5,060.0 920.0 1,380.0 1,840.0 460.0 4,600 552.0 828.0 1,380.0 6.2 Sorting and cleaning - - - 1,0120 1,518.0 2,024 506.0 5,060.0 920.0 1,380.0 1,840.0 460.0 4,600.0 552.0 828.0 1,380.0 6.3 processing fertilizer - - - 1,863.7 2,795.5 3,727.4 931.8 9,318.4 2,329.6 3,494.4 4,659.2 1,164.8 11,648 2,795.2 4,192.8 6,988.0 6.4 Processing briquettes - - - 1,053.4 1,580.0 2,106.7 526.7 5,266.8 957.6 1,436.4 1,915.2 478.8 4,788 574.6 861.8 1,436.4 6.5 Marketing fertilize and briquettes - - - 200.0 300.0 400.0 100.0 1,000.0 100.0 150.0 200.0 50.0 500.0 200.0 300.0 500.0 6.6 Purchase of 3 ton truck - - - 15,000 - - - 15,000.0 ------

Subtotal - - - 20,141.0 7,711.6 10,282.1 2,570.5 40,705.2 5,227.2 7,840.8 10,454.4 2,613.6 26,136.0 4,673.8 7,010.6 11,684.4

109 2008 Year 2009 2010 2011

Quarters Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Total 7.0 Strengthening capacity of youth in Protection of river bank and cachment areas of river Nyabarongo system ------7.1 Mobilization youth, with collabollation with committees in districts , in cooperatives and 13,685 13,6 associations .7 85.7 3,942.8 5,914.2 7,885.6 1,971.4 19,714.0 3,857.1 5,785.7 7,714.3 1,928.6 19,285.7 2,674.4 4,011.6 6,686.0 7.2 Construction of youth centre for administrative cooperative and 17,6 cultural affairs in 17,686 86.0 110,885.5 17,686.0 each district .00 0 22,177.1 33,265.7 44,354.2 11,088.6 0 8,843.0 8,843.0 - 0 - - - 7.3 Equipping the youth centre - - - 7.3.1 Computer and accessories ------1341.3 - - 1341.3 24,098.0 36,146.9 60,244.90

7.3.2 Furniture - - - 11,000.0 - - - 11,000.0 - - 7.4 Produce and 6,53 distribute technical 6 pamphlet on the role of tracing and trees in environment 10,000.0 protection 6,536 5,280.0 7,920.0 10,560.0 2,640.0 26,400.00 10,000.0 - - - 0 2,400.0 3,600.0 6,000.0

37,907 37,9 Subtotal .7 07.7 31,399.9 47,099.9 62,799.8 15,700.0 156,999.5 35,041.4 14,628.7 7,714.3 1,928.6 59,313.0 29,172.4 43,758.5 72,930.9

110 2008 Year 2009 2010 2011 Quarters Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Total 8.0 Training the youth(sessions) ------

8.1Training them in 6,582. 3,291. 3,485.7 cooperative principles 5485.7 5,485.7 9 9,874.3 13,165.7 4 32,914.3 697.1 1,045.7 1394.28 348.6 0 - - - 8.2 Sensitization entraining on techniques of soil protection( terracing, 5,485. 6,583. 3,291. 3,485.7 aforestation,ect) 7 5,485.7 0 9,874.4 13,165.9 5 32,914.8 697.1 1,045.7 1394.28 348.6 0 - - - 8.3 Sensitization and training on techniques to produce and maintainace 5,485. 6,583. 3,291. 3,485.7 agro forest trees 7 5,485.7 0 9,874.4 13,165.9 5 32,914.8 697.1 1,045.7 1394.28 348.6 0 - - - 8.4 Training on production of forest plants, fruits and agro forest in nursery and multiplication of soil 5,485. 6,583. 3,291. 11,728. nitrogen fixing shrubs 7 5,485.7 2 9,874.7 13,166.3 6 32,915.8 2,345.7 3,518.6 4,691.46 1,172.9 65 - - - 8.5 Training on extension of land use and integrated production system of agro forest, 33,457 9,105. 4,552. 55,528. 9,382. 23,457 crops and livestock .3 33,457.3 8 13,658.7 18,211.6 9 45,528.92 11,105.8 16,658.7 22,211.6 5,552.9 92 9 14,074.4 .3

35,400 35,437 17,718 77,714. 9,382. 23,457 Subtotal .1 35,400.1 .7 53,156.5 70,875.4 .8 177,188.5 15,542.9 23,314.4 31,085.9 7,771.5 7 9 14,074.4 .3 9.0 Strengthening capacity of youth for waste management in Kigali and towns along the Nyabarongo river 85,542 68,434 system 65,515.0 .85 22764.5 75528.9 .3 9.1 Mobilisation youth, with collabollation with commitees in districts , in cooperatives and 12,000 associations (meetings) .0 12,000.0 800.0 1,200.0 1,600.0 400.0 4,000.0 ------

111 2008 Year 2009 2010 2011

Quarters Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Total 9.2 Construction of youth centre for administrative cooperative and cultural 7,000. 2,300. 23,000. 1800 affairs in each district 7,000.00 00 4,600.0 6,900.0 9,200.0 0 0 18000 - - - 0 - - - 9.3 Equipping the youth centre with 2 computer and accessories ------9.4 Equipping the youth 11,000 11,000 11,000 centre with furniture,etc.) ------11,000.0 - .00 .00 - .00 9.5 Produce and distribute technical pamphlets on the role of tracing solid waste management for 13,000.0 13,000 2,500. 25,000. 18,000 environment protection 0 .00 5,000.0 7,500.0 10,000.0 00 00 3600.0 5,400.0 1,800.0 .00 7200 10800 18,000

32,000 5,200. 52,000. 29,000 18,200 29,000 Subtotal 32,000.0 .0 10,400.0 15,600.0 20,800.0 00 00 14,600.0 5,400.0 1,800.0 .0 .0 10,800.0 .0 10.0Training the youth

10.1 Training them in 10,000.0 10,000 8,000. 80,000. 16,000 cooperative principles 0 .00 16,000.0 24,000.0 32,000.0 0 0 8,000.0 12,000.0 .0 4,000.0 40,000 - - - 10.2 Sensitization and training on techniques of solid waste collection ,sorting, transforming into 12,142.7 12,142 8,000. 80,000. 9,200. 6,000. fertilizer and briquettes 0 .70 16,000.0 24,000.0 32,000.0 0 0 4,600.0 6,900.0 0 2,300.0 23,000 0 9,000.0 15,000

22,142.7 22,142 16,000 160,000 25,200 23,000 6,000. 15,000 Subtotal 0 .70 32,000.0 48,000.0 64,000.0 .0 .0 12,600.0 18,900.0 .0 6,300.0 .0 0 9,000.0 .0 11.0 Project management Unit ------

11.1 Salary for project 9,000. 4,500. 18,000. 4,500. 18,000 4,500. 9,000. manager 9,000.0 0 4,500.0 4,500.0 4,500.0 0 0 4,500.0 4,500.0 0 4,500.0 .0 0 4,500.0 0

11. 2 Salary of project 7,200. 3,600. 14,400. 3,600. 14,400 3,600. 7,200. officer 7,200.0 0 3,600.0 3,600.0 3,600.0 0 0 3,600.0 3,600.0 0 3,600.0 .0 0 3,600.0 0

11.3 Monitoring and 3,600. 7,200. evaluation officer 7,200 7,200 3,600.0 3,600.0 3,600.0 3,600 14,400 3,600.0 3,600.0 3,600 3,600.0 14,400 0 3,600.0 0

112 2008 Year 2009 2010 2011 Quarters Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Q3 Q4 Total Q1 Q2 Total

11.4 .Salary for 4,200. 2,100. 2,100. 8,400. 2,100. 4,200. Administrative assistant 4,200.0 0 2,100.0 2,100.0 2,100.0 0 8,400.0 2,100.0 2,100.0 0 2,100.0 0 0 2,100.0 0

11.6 Equipments and 42,400.0 42,400 2,617. 26,174. 11,184.0 11,184 furniture - 0 .00 5,234.8 7,852.2 10,469.6 4 00 0 - - - .00 - - - 11.7 Office space, maintenance and 15,502 155,021 46,826 117,06 45,760 114,40 coordination 8080.9 8080.9 31,004.2 46,506.3 62,008.5 .1 .13 23,413.2 35,119.9 .5 11,706.6 6.23 .6 68,640.9 1.47 10,000. 10,000 4,642 11.8 Monitoring and 1,000. 00 4,000. .00 1,856. evaluation costs 30,000 30,000 2,000.0 3,000.0 4,000.0 0 2,000.0 3,000.0 0 1,000.0 8 2,785.2 193,45 108,080. 108,08 32,919 246,395 64,626 0.23 61,417 146,64 9 0.9 52,039.0 71,158.5 90,278.1 .5 .1 50,397.2 51,919.9 .5 26,506.6 .4 85,226.1 3.5

235,531. 235,53 563,730. 816,196. 1,083,66 281,26 2,744,8 423,099. 556,539. 718,46 188,365. 1,857, 474,37 688,169. 1,162, Grand total 4 1.4 7 0 1.4 5.3 53.5 3 6 2.1 5 066.5 9.4 1 548.6

113 Annex 5:The Annual Work Plan (AWP) Monitoring Tool Year: 2008-2011 Executing Entity : UNDP______EXPECTED ANNUAL TARGET PLANNED PLANNED ANNUAL COSTS (EXPENDITURE) PLANNED RESULTS OF ACTIVITIES OUTPUTS AND ACTIVITIES MONITORING INDICATORS 2008 2009 2010 2011 2008 2009 2010 2011 Total Unit of 2008 2009 2010 measure 2011 Output target 1: 1.1 Digging and Radical removing the top 348,512.8 325,873.6 207,725. 882,11 198360 terracing(ha) 3,306 1,983.50 1,322 fertile to soil - 4 2 30 2 m3 396,721 991,804 595,082 .5 1.2 Establishing and reinforcement of embankment (contour ridges) to hold soil and separate 226,175.8 176,331.8 167,080. 569,58 terraces - 0 0 88 8 m 303,230 758,074 454845 1.3 Restoring and leveling top fertile soil high river catchment 147,749.6 32,848.6 359,47 119,819. 299,548. 179,728. 59909. areas. - 178878.1 2 9 6 m3 18 10 78 59 1.4 Planting trees and agro- forestry trees in the catchment areas 39,856.8 138,08 2,421,72 1,453,03 (seedlings) - 41,762.00 56,463.60 0 2 No. 968,940 0 2 484470 1.5 Plant pasture (Cameroon fresh) on radical terraced hill sides (pieces) - 26,525.00 21,220 5,305 53,050 No. 230,652 576,630 345,978 115326 Output target 2 1.6 Production of :Composite composite manure/green organic/ green fertilizer 1,413, 565,38 fertilizer for 1,413,47 produced(Kg) 472 848,084 8 project - 26,266 20,355 5,089.00 25,444 Kg 565,388 2 848,084 282694 Subtotal 722,044.0 654,952.5 457,905. 1,713,, - 0 0 60 230

114 EXPECTED ANNUAL TARGET PLANNED PLANNED ANNUAL COSTS (EXPENDITURE) PLANNED RESULTS OF ACTIVITIES OUTPUTS AND ACTIVITIES MONITORING INDICATORS 2008 2009 2010 2011 2008 2009 2010 2011 Total Unit of 2008 2009 2010 measure 2011 Output2:TheNyabar 2.1 Preparing ongo River System contours for catchment lower erosion control altitude areas have been terraced with progressive terraces 21,746.1 204,41 (ha) - 97429 85,238 0 3 m 1,977 4,942 2,965.37 988.5 Output target 1: 2.2 Digging anti- Progressive erosion trenches 1,976,91 4,942,28 2,965,37 terraces constructed 1,977 4,942 2,965 - 53,376.74 33,607.50 12,850 99,834 m 4 5 1 988457 2.3 Digging ditches to retain 18,135.1 140,89 1,983,50 4,958,76 2,975,25 water - 75330.34 47,430.30 0 6 m3 4 0 6 991752 2.4 Digging Discontinued 23,129.9 177,92 1,729,80 1,037,88 water ways - 96,078.08 58,714.40 0 2 No. 691,920 0 0 345960 2.5 Establishment of nurseries for the Output target 2: project Nurseries established (No. of 481,38 1,203, 86,420.1 474,55 3,272,71 1,963,12 seedling) 4 452 722,068 - 290,955 97,178.60 5 4 No. 1308334 7 8 654167 2.6 Planting of grasses/pasture French No. of 155000 Cameroon) - 15684.4 5,733.50 2,866.50 24,284 pieces 310,001 775,003 465,002 .5 2.7 Planting trees/agro- forestry on the No. of 1,200,00 contours - 41,762 16,705 8352.5 66,820 pieces 334,098 0 501,148 167049 2.8 Purchase of dairy cattle (10 Output target cows for each 3:Distribute 170 District) for the 175,56 cows to farmers 34 86 50 project - 125,818 49,742 24,,871 0 No. 34 86 50 17 Subtotal

394,349.3 179271. 1,190,7 - 796,433 0 7 82

115 EXPECTED ANNUAL TARGET PLANNED PLANNED ANNUAL COSTS (EXPENDITURE) PLANNED RESULTS OF ACTIVITIES OUTPUTS AND ACTIVITIES MONITORING INDICATORS 2008 2009 2010 2011 2008 2009 2010 2011 Total Unit of 2008 2009 2010 measure 2011 Output 3: The banks of Nyabarongo River System have been protected though improved management of the river buffer zone(ha) 240 600 360 Output target 1: Managing the 6m 3.1 Planting from river bank with reeds within 6m reeds(ha) 24 60 36 from river bank - 20,280 5,376 6,168 31,824 ha 24 60 36 12 3.2 Planting Output target 2: grass and The first 10 m from shrubs within 10 river bank managed m band from the with shrubs(ha) 80 200 300 river bank - 6,600 8,640 3,960.00 19,200 ha 80 200 120 40 Output Target 3: 3.3 Planting The next 10metres small grass and managed with grass agro-forestry and agro forestry trees within a (ha) band of 10m to protect river banks and buffer 40 100 200 zone - 34,000 34,000 3,960 71,960 ha 40 100 60 20 Output target 4: the last 24m of the 3.4 Progressive buffer zone. terracing of 24m Terraced and of upper reaches planted with fruits of 50m of the and legumes baffler zone - 20,000 6,000 6,000.00 32,000 ha 96 240 144 48 3.5 Plant fruits and legumes on the 24 m of upper reaches of 50m of buffer zone(plants) - 26,400 10,560 15,840 52,800 No. 192,000 480,000 288,000 96000

116 EXPECTED ANNUAL TARGET PLANNED PLANNED ANNUAL COSTS(EXPENDITURE PLANNED RESULTS OF ACTIVITIES OUTPUTS AND ACTIVITIES EXPECTED OUTPUT AND MONITORING INDICATORS

2008 2009 2010 2011 2008 2009 2010 2011 Total Unit of 2008 2009 2010 2011 measure

3.6 Plant agro forestry, fruits, etc on 24m of buffer zone(plants) - 192,000 Output 4: Filtering and sinking of soil sediments to prevent rainfall water run-off has been enhanced through a forestation and rehabilitation of forests on river 12839. catchment areas. 5135.8 5 7703.7 Output target 1: New 4.1 Afforestation a forestation 22940 57352 of forest site in 170,584.2 276,99 2,294,08 5,735,22 3,441,13 114704 established 88.8 22 3441133 the Districts - 57,352.20 0 49,056.7 3 No. 9 2 3 4.5 Output target 2: 4.2 Rehabilitation of Rehabilitation of forests done forests in the Districts planting agro-forestry trees in the 22940 57352 344113. catchment areas 39088.5 56447. 229,408. 573,522. 344,113. 114704 8.9 2.2 3 of forestation - 8679.5 8679.5 5 55 No. 90 20 30 .45 `179,263. 111,145. 177,17 Subtotal - 66,031.70 7 20 7 Output 5:Nyabarongo River System have been protected from attack by water hyacinth

117 EXPECTED ANNUAL TARGET PLANNED PLANNED ANNUAL COSTS(EXPENDITURE PLANNED RESULTS OF ACTIVITIES OUTPUTS AND ACTIVITIES EXPECTED OUTPUT AND MONITORING INDICATORS 2008 2009 2010 2011 2008 2009 2010 2011 Total Unit of 2008 2009 2010 2011 measure

5.1 Control of water hyacinth

11,050.0 - 42,500 22,950 0 76,500 % 20 50 30 10

Output target 3: 5.3 Making Production of fertilizer fertilizer from from water hyacinth water hyacinth - 17,000 9520 2992 29,512 % 20 50 30 10 496,40 Subtotal - 69,700 426,708 19,142 8 Output target 2: 2400 6.2 Sorting and tons of waste garbage cleaning sorted and cleaned. 600 800 1,000 - 5060 4600 1,380.00 11040 tons 600 800 1,000 300 6.3 Processing Output target 3: 1536 fertilizer tons of fertilizer 27,954. produced. 384 512 640 - 9,318.40 11,648 6,988.00 40 tons 384 512 640 192 Output target 4: 864 6.4 Processing tons of briquettes briquettes 11,491. produced. 216 288 360 - 5,266.80 4,788 1,436.40 20 tons 216 288 360 108 Output target 5: A 3 1 6.5 Marketing ton truck Purchased. fertilize and briquettes - 1,000 500 500 2,000 % 25 50 25 12.5 6.6 Purchase of 3 ton truck - 15,000 0 0 15,000 % 100 100 11,684.4 78,525. Sub total - 40,705.20 26,136.00 0 60 No.

118 EXPECTED ANNUAL TARGET PLANNED PLANNED ANNUAL COSTS(EXPENDITURE PLANNED RESULTS OF ACTIVITIES OUTPUTS AND ACTIVITIES EXPECTED OUTPUT AND MONITORING INDICATORS

2008 2009 2010 2011 2008 2009 2010 2011 Total Unit of 2008 2009 2010 2011 measure

7.1 Mobilization of youth and farmer communities in Output 7: The youth collaboration have been organized with Youth and strengthened for committees in the protection of Districts and bank and catchment local leaders, in areas of Nyabarongo cooperatives and 13,685.7 39,657. 13956 River System. associations 0 19, 714 19,285.70 6,686 40 279, 120 697 800 418680 0 Output Target 1: 7.2 Construction Youth mobilized of youth centre for administrative cooperative and 27912 69780 cultural affairs in 110,885.5 146,25 0 0 418680 each District 17,686 0 17,686 8 No. 14 Output target 2: Youth 7.3 Equipping centre constructed the youth centre (computer and accessories, and 18 furniture, etc.) - - 18000 - 18000 % 100 Output target 3: Youth 7.3.1 Computer 61593. centre equipped 1 and accessories - - 1349.3 60,244 3 No. 14 Output target 4: 1,395,600 pamphlets distributed 27912 69780 0 0 418680 7.3 .2 furniture - - 11,000 - 11,000

119 EXPECTED ANNUAL TARGET PLANNED PLANNED ANNUAL COSTS(EXPENDITURE) PLANNED RESULTS OF ACTIVITIES OUTPUTS AND ACTIVITIES INDICATORS

2008 2009 2010 2011 2008 2009 2010 2011 Total Unit of 2008 2009 2010 2011 measure 7.4 Produce and distribute technical pamphlet on the role of terracing and trees in environment protection 6536 26,400 10,000 6,000.00 48,936.00 No. 279,120 697,800 418,680 139560 37,907.7 156,999.5 72,930. 254,220.2 Subtota 0 0 59,313 1 0 Output 8: Youth 8.1 Training in trained in cooperative cooperative principles principles, techniques of soil conservation, agro forestry, forestry, land use and integrated approach. 5,485.70 32,914.30 3485.7 - 41,885.70 8.2 Sensitization and training on techniques of Output Target 1: soil protection 1395,600 trained in (terracing, a cooperative 27912 69780 forestation, etc) No. of principles, 0 0 418680 5,485.70 32,914.80 3485.7 - 41,886.20 Sessions 13 32 19 6.5 techniques of soil 8.3 Sensitization conservation, agro and training on forestry, forestry, techniques to land use and produce and integrated maintenance No. of approach. agro forest trees 5,485.70 3485.5 3485.7 - 12,456.90 Sessions 13 32 19 6.5

120 EXPECTED ANNUAL TARGET PLANNED ACTIVITIES PLANNED ANNUAL COSTS(EXPENDITURE) PLANNED RESULTS OF ACTIVITIES OUTPUTS AND INDICATORS 2008 2009 2010 2011 2008 2009 2010 2011 Total Unit of 2008 2009 2010 2011 measure 8.4. Training on production of forest plants, fruits and agro forest in nurses and multiplication of soil 41,886. No. of nitrogen fixing shrubs 5,485.70 32,914.80 3485.7 - 20 Sessions 13 32 19 8.5 Training on extension of land use and integrated production system of agro forest, crops and 33,457.3 No. of livestock 0 45,528.92 55,528.92 Sessions 13 32 10 6.5 35,400.1 197,174.5 Subtotal 0 0 17,400.10 3,457.3 Output 9: Youth 9.1 Mobilization youth have been and farmers in mobilized , cooperatives and trained and use associations capacity for No. waste Meetings/ management 12,000 4,000 - = seminars 22,500 7,500 9.2 Construction of Output target : youth centre for 1Youth have administrative been mobilized cooperative and cultural and equipped 22,500 7,500 affairs in each District 7,000 23,000 - - 1 Output target 9.3 Equipping the youth :2:Youth Centtre centre (computer and constructed 1 accessories - - 18000 18000 % 100 9.4 Equipping the youth centre with furniture, etc. - - 11,000 11,000 22,000 % 100 Output target 3 ; 9.5 Produce and distribute technical pamphlet on the role of tracing solid waste management for 18,000.0 22,500 7,500 environment protection 13,000 25,000 18,000 0 74,000 No. 22,500 7,500 148,000 11250 113,00 Subotal 32,000 52,000 29,000 29,000 0

121 EXPECTED ANNUAL TARGET PLANNED PLANNED ANNUAL COSTS(EXPENDITURE) PLANNED RESULTS OF ACTIVITIES OUTPUTS AND ACTIVITIES MONITORING INDICATORS

2008 2009 2010 20 2008 2009 2010 2011 Total Unit 2008 2009 2010 2011 11 of meas ure Output 10: Youth 10.1 Training have been trained in youth in environment and cooperative No of waste management principles sessio techniques 10,000 80,000 40,000 - 130,000 ns 60 15 Output target 1: 10..2 Sensitization 30,000 Youth and training on trained in techniques of solid cooperative waste collection, principles and sorting, techniques of waste transforming into No of management fertilizer and 12,142 130,142. sessio 22,500 7,500 briquettes .70 80,000 23,000 15,000 70 ns 60 15 No of 22,142 182,142. sessio Subtotal .70 160,000 63,000 15,000 70 ns 50 15 Output 11: Project implementation 11.1 Project Unit(PMU) in place coordinator 9,000 18000 18000 9000 54000 No. 1 1 1 11.2 Project officer 7,200 14400 14400 7200 43200 No. 1 1 1 Output target 1: 11.3 Monitoring Project and evaluation management and officer staff recruited 7,200 14400 14400 7200 43200 No. 1 1 1 11.4 Administrative assistant 8400 8400 8400 4,200 29400 No. 1 1 1 Output target 2: 11..5 Equipment PMU equipped with and furniture computers and furniture 42,400 26,174 11,984 50,000 130,558 % 33.33 33.33 11.6 Office space, maintenance and 117,066. coordination 8080.9 155,021.13 23 114,401.47 277503.5

122

EXPECTED ANNUAL TARGET OUTPUTS AND MONITORING PLANNED INDICATORS ACTIVITIES PLANNED ANNUAL COSTS(EXPENDITURE PLANNED RESULTS OF ACTIVITIES 2008 2009 2010 2011 Total

11.7 Putting in place Monitoring 2008 2009 2010 2011 and N0. evaluation 30,000 10,000 10,000 4642 44,642 Unit of 12 10 2008 2009 2010 2011 Total measure 2008 2009 2010 2011

108,08 Subtotal 0.90 246,395.10 193,450.23 146,643.5 547,926

235,53 2,744,853.4 1,834,066.5 6,000,00 Grand Total 1.40 9 2 1185548.6 0

123 124 Annex 6: The Duties and Responsibilities of Project Staff

1. Project Coordinator

The Project Coordinator (PC) will head the Project Management Unit. The PC will be fully accountable to the Director General of REMA and to the National Steering Committee for satisfactory implementation of the entire project. He/She will be responsible for the implementation of the project, including the mobilization of all project inputs, supervision over project staff, consultants and sub-contractors. The PMU will have operational and financial autonomy. The PC shall perform a liaison role with government, UNDP, and all stakeholders involved in the project.

Duties and Responsibilities

 Overall management of the project, including the supervision and coordination of project outputs as per the project document;  Mobilize all project inputs in accordance with UNDP procedures for nationally executed projects and government procurement procedures; including finalizing the TOR for consultants and equipment procurement;  Ensure criteria for analysis of small projects from Districts developed within the framework of the project is established and communicated to the project liaison officers in the Districts along Nyabarongo River System;  Ensure that project implementation procedures are developed and implemented to facilitate project execution and management;  Coordinate the recruitment and selection of project personnel;  Prepare and revise project work and financial plans to guide project implementation and as required by Government and UNDP;  Ensure proper management of funds consistent with UNDP requirements, and budget planning and control; and arrange for Audit inputs.  Establish project monitoring and reporting for the project;  Work closely with project partners to closely coordinate all the actors involved with achieving Project Outcomes, Outputs and implementation of Activities ;  Prepare and ensure timely submission of quarterly physical and financial consolidated reports, quarterly progress reports, mid-term reports, and other reports as may be required by UNDP and government of Rwanda.  Disseminate project reports to and respond to queries from concerned stakeholders;  Report progress of project to Director General of REMA and the Project Steering Committee.

125  Oversee the exchange and sharing of experiences and lessons learned with relevant conservation and development projects nationally and internationally.

Qualification and Experience

 Core Competencies

Theoretical knowledge and understanding of agricultural and environment practices, project planning and management, has leadership and management abilities and has had management experience of multi- sectoral and complex projects.

 Education

Advanced university degree (Master's or equivalent) in agriculture, environment management, agricultural economics, agricultural extension, development studies with specialization in planning , Development economics and post graduate training in project planning and management

Work Experience

Five years of working experience two of which in environmental programme management, project planning and management, development and evaluation.

 Languages

Fluency in English or French both written and spoken required; working knowledge of either of the two languages is an advantage.

Other Desirable Skills

 Leadership and management ability, team work and ability to prepare feasibility studies and project appraisal and preparation of project reports. Ability to manage conflicts and work under pressure. Ability to plan own work and manage conflicting priorities. Knowledge of government development policies and strategies. Knowledge of modern computer applications and software , particularly excel, word processing and power point

126 2. The Project Officer

Duties and responsibilities of Project officer

Under the overall guidance of the project coordinator, the Project Officer will support the Project Coordinator to provide guidance on the preparation, analysis and approval of small projects for the Districts along Nyabarongo River System.

Specific duties and responsibilities of Project officer

 Develop guidelines for project document structure of small projects  Develop criteria for analysis and approval of small projects  Appraise the small projects and provide advice on their approval before fund release.  Prepare reports on small projects’ submitted, appraised, approved, not approved and those that require improvement.  Liaise with District project liaison officers on preparation, submission and improvement of project documents for small projects

Qualification and Experience

 Core Competencies

Theoretical knowledge and understanding of agricultural and environment practices, project planning and management.

 Education Advanced university degree (Master's or equivalent) in agricultural Economics, agriculture with training in project planning and management and environment with training in project planning and management.

 Work Experience

Five years of working experience three of which in environmental program management, project planning, development and evaluation.

 Languages

Fluency in English or French both written and spoken required; working knowledge of either the two languages is an advantage.

Other Desirable Skills

 Ability to prepare feasibility studies and project appraisal and preparation of project reports. Ability to apply good judgement in the context of assignments given. Ability to plan own work and manage conflicting

127 priorities. Knowledge of modern computer applications and software , particularly excel, word processing and power point

3. The Project Monitoring and Evaluation Officer

Duties and Responsibilities of Project Monitoring and Evaluation Officer

Under the overall guidance of the project coordinator, the Monitoring and Evaluation Officer will be charged with responsibility of monitoring and evaluation of project activities, reporting on project implementation and performance .

Specific duties and responsibilities

The specific duties and responsibilities of the Monitoring and evaluation officer will be:

 Provide management advice on monitoring and evaluation issues on the implementation of the project:  Ensure Preparation and implementation of Project Monitoring and Evaluation System:  Prepare a monitoring and evaluation plan:  Follow –up project implementation and preparation of progress reports( quarterly, mid-year and annual progress reports):  Establish and update a solid roster of consultants to be selected in consultation with the project officer and project coordinator for evaluation of the project  Ensure that mid-term reviews and final evaluations of the project are properly conducted, including finalization of Terms of Reference in consultation with the Project Officer and project coordinator  Take part in the evaluation and project supervision  Review and provide comments on the project evaluation , to the relevant project implementers, with suggestions for preparing an Implementation Plan and follow-up action for future programming reports Ensure communication of valuation recommendations in particular mid-term review recommendations, once approved;  Maintain database on project implementation, the implementation of evaluation recommendations and lessons learnt on project implementation and performance ;

128 Qualifications for Monitoring and Evaluation Officer

 Core Competencies

Theoretical knowledge and understanding of monitoring and methodologies and methods and the results-based management approach. Must have strong analytical skills or training, good problem- solving skills and ability to think creatively.

 Education

Advanced university degree (Master's or equivalent) in environmental science, project planning and management and social sciences:

Work Experience

Five years of working experience three of which in environmental program management, rural development management, project planning and management:

 Languages

Fluency in English or French both written and spoken required; working knowledge of either language is an advantage.

 Other Desirable Skills

Ability to prepare and edit a variety of written reports in a clear concise style. Ability to apply good judgment in the context of assignments given. Ability to plan own work and manage conflicting priorities. Knowledge of modern computer applications and software, particularly excel and word processing.

4. The Project administrative and Finance officer

Duties and Responsibilities of Project Administrative and Finance Officer

Under the direct supervision of the Project Coordinator, he/she will assist the project coordinator in administrative and financial issues of the project.

Specific duties and responsibilities

The Administrative and Finance officer will undertake for following specific duties :

129  Assist the Project Coordinator in performance of his functions in the administrative and financial matters.

 Be responsible for administrative, procurement, human resources, and financial aspects of the Project

 Supervise and ensure the recruitment and management of project staff, and any other contractual arrangements are in compliance with procedures of UNDP and government of Rwanda:

 Be responsible for the preparation, implementation and monitoring and evaluation of the work plan for the Administration and Finance of the project, and assist, with other project office staff, the Project Coordinator to prepare consolidated work plans especially in the planning and costing the planned interventions:

 Be responsible for the preparation, the execution, and for the monitoring and reporting on the project budget as well as on specific budgets of different Districts:

 Be responsible for preparation of financial management procedures manual and supervise its implementation, ensure that regular work is adequately and carried-out in a timely manner. Ensure budget management and this to include monitoring and reporting, preparation/submission of different reports on funds allocation, expenses, implementation progress status of the Program budget and work plan:

 Ensure that the procurement of goods, services, and where required, civil works is carried-out in compliance with procedures of NDP and Government of Rwanda:  Ensure that the Program bank accounts and transactions (payment; reconciliations; disbursements, replenishment from UNDP, other donors and government are in compliance with procedures of UNDP and government of Rwanda:  Ensure that Districts project offices are administratively and financially operated as per UNDP procedures under NEX modalities. To this effect, ensure proper training, control and proper backstopping:

 Ensure that administrative, logistic and other technical support necessary for meetings; seminars, and workshops; travels etc. are adequately provided when and where required;

 Perform any other duties as may be required by the project coordinator

130 Qualification and Experience Required

 Have a Bachelors degree in Business Administration, Human Resource, and/or Financial Management & Accounting;  Have at least three (3) years’ working experience;  Working experience with multilateral organizations or/and UN and government in the areas of administration, finance, budgeting, human resources, project management, and procurement is an added advantage;  Have analytical and a strong written and verbal communication skills in either English or French and working knowledge of either is an added advantage,  Has networking capacity;  Be a team player and able to work under pressure;  Have solid experience in drafting, negotiating, monitoring and reporting on matters pertaining to administration and finance;  Be able to travel to and within District covered by project.

5. The District Project Liaison Officer

Duties and Responsibilities of the District Liaison Officer

The liaison officer will be selected among the youth representatives of the 17 Districts. He/she will coordinate project activities in the Districts. He/she will be secretary to the District advisory Technical Committee. The Liaison officer will be accountable to the District Advisory Technical Committee (DATC) and the Project Coordinator.

Specific duties and responsibilities

 Coordinate project activities in Districts;  Secretary to the District Advisory Technical Committee;  Collect small project proposals from various Districts and submit head office;  Maintains active contacts with youth committees in the Districts, District administration, NGOs dealing with soil conservation in project activities at District level and project head office;  Assist the chairman of DATC in the preparation of meetings of DATC and assist head office in preparing project meetings in the District.

131 Qualification and Experiences

Competencies

 Knowledge of youth needs and priorities in the Districts;  Good administrative knowledge of the functioning of Districts and ministries and decentralization policy  Demonstrated ability to work in harmony with youth committees.  Leadership qualities with ability to work in team.

Education

A bachelor degree or equivalent in social sciences or business administration.

Work Experience

Five years of working experience three of which are in youth activities and management. He/she is one of youth representatives of youth in one of the project Districts.

Languages

Fluency in English or French both written and spoken required; working knowledge of either language is an advantage.

132 Annex 7: Duties and Responsibilities for the National Project Committee (NPSC) and District Advisory Technical Committee (DATC)

1. National Project Steering Committee (NPSC)

A National Project Steering Committee(NP SC) will be composed of the Director General of REMA (chairperson) , representatives of MINIRENA (co-chairperson), MINALOC, Ministry of Youth, MIFOTRA, MINAGRI, MINICOM, MINECOFIN, the Youth Council and Donor representatives will be established to provide assistance to the PMU for smooth project implementation.

Duties and Responsibilities

The principal duties and responsibilities of the NSC are the following:  Provide high level orientation and guidance for the project implementation;  Ensure that the project develops in accordance with national development objectives, goals and polices;  Approve Annual Project Work plan and Budget for the project;  Ensure collaboration between institutions and free access on the part of project actors to key documents and information systems, etc.;  Ensure post-project sustainability of activities developed by the project;  Ensure the integration and coordination of project activities with other related government and donor-funded initiatives.

2. District Advisory Technical Committee

A District Advisory Technical Committee will be composed of the following:

 The Vice Mayor in charge of Finance, Economics and Development (Chairperson).  Director of planning.  In charge of environment.  Representative of project head office.  Representative of Youth Committee.  District Agriculturalist.  In charge of cooperatives.

Duties and Responsibilities of District Advisory Technical Committee

 Provide oversight on project orientation at District level.  Approve Annual Project Work Plans and Budgets.  Coordination of Project implementation at District level.  Ensure the integration and coordination of project activities with other related development partners.

133 Annex 8: Preliminary terms of reference of project implementation procedures

The following are proposed preliminary terms of reference for project implementation procedures. The project management will need to expand and make improvement on them. The TOR for implementation procedures relate to following areas, namely;

 Clear definition and summary of the project and its financing in clear terms.  Review of organizational structure and staffing of the project and establish staff procedures taking account of the type and number of project personnel, their duties, remunerations and leave schedule.  Prepare mechanism for preparation and approval of the work plan for project implementation.  Prepare financial management procedures for monitoring and evaluation taking account of accounting system, budget, procurement, stock control policy and procedures, payment procedures, fund control, reporting requirements and internal controls.  Prepare monitoring and evaluation procedures taking account of reporting system, the types of monitoring and evaluation reports to be prepared, their format, frequency and their distribution.

134 Annex 9 : Notes

In case of government cost-sharing through the project which is not within CPAP, the following clauses should be included:

1. The schedule of payments and UNDP bank account details.

The value of the payment, if made in a currency other than United States dollars, shall be determined by applying the United Nations operational rate of exchange in effect on the date of payment. Should there be a change in the United Nations operational rate of exchange prior to the full utilization by the UNDP of the payment, the value of the balance of funds still held at that time will be adjusted accordingly. If, in such a case, a loss in the value of the balance of funds is recorded, UNDP shall inform the Government with a view to determining whether any further financing could be provided by the Government. Should such further financing not be available, the assistance to be provided to the project may be reduced, suspended or terminated by UNDP.

3. The above schedule of payments takes into account the requirement that the payments shall be made in advance of the implementation of planned activities. It may be amended to be consistent with the progress of project delivery.

4. UNDP shall receive and administer the payment in accordance with the regulations, rules and directives of UNDP.

5. All financial accounts and statements shall be expressed in United States dollars.

6. If unforeseen increases in expenditures or commitments are expected or realized (whether owing to inflationary factors, fluctuation in exchange rates or unforeseen contingencies), UNDP shall submit to the government on a timely basis a supplementary estimate showing the further financing that will be necessary. The Government shall use its best endeavors to obtain the additional funds required.

7. If the payments referred above are not received in accordance with the payment schedule, or if the additional financing required in accordance with paragraph []above is not forthcoming from the Government or other sources, the assistance to be provided to the project under this Agreement may be reduced, suspended or terminated by UNDP.

8. Any interest income attributable to the contribution shall be credited to UNDP Account and shall be utilized in accordance with established UNDP procedures. In accordance with the decisions and directives of UNDP's Executive Board:

135

The contribution shall be charged:

(a) [7%]cost recovery for the provision of general management support (GMS) by UNDP headquarters and country offices (b) Direct cost for implementation support services (ISS) provided by UNDP and/or an executing entity/implementing partner.

9. Ownership of equipment, supplies and other properties financed from the contribution shall vest in UNDP. Matters relating to the transfer of ownership by UNDP shall be determined in accordance with the relevant policies and procedures of UNDP.

10.”The contribution shall be subject exclusively to the internal and external auditing procedures provided for in the financial regulations, rules and directives of UNDP”.