ON RAMP CLOSED DRY CREEK PORT RIVER EXPRESSWAY SALISBURY HWY
N
W E HINES RD S
NORTH TCE WING ST WING ST
NINTH TCE
WINGFIELD RD SOUTH ROAD SUPERWAY TRAFFIC CHANGES
PHILLIS ST SOUTH ROAD SOUTH
HANSON RD
MILLERS RD
STAITE ST STAITE Major traffic change South RoadSOUTH TCE SOUTH TCE SOUTH TCE
The construction of the South Road Superway CORMACK RD includes a new roadway underneath the elevated structure. To maintain traffic flow and access to CORMACK RD CORMACKAccess to RDbusinesses on South Road while construction is TOLL and underway, the roadway is being reconstruction in two Senna Rd halves.
40 maintained In February 2013, traffic on South Road between 328 c 328 HAKKINEN RD Grand Junction Road and Kateena Street was SENNA RD moved to the western side of the roadway to enable PLYMOUTH RD
Vest Logo construction of the new road on the eastern side. Shirt Logo Shirt
This work is almost complete and traffic will be T oll People oll moved to the new sectionWINGFIELD of roadway so construction No Right ST DAVIS Toll People can begin on the western side. 1300 769 875 Turn ST DAVIS
WINGFIELD RD From 6.30pm on Sunday 12 May all traffic on South
BOWYER RD Road between Grand Junction Road and Days Road ALBION ST FRANCIS RD
CAPELLI RD FRANCIS RD FRANCIS RD will travel on the new southbound carriageway. This FRANCIS ROAD section of road will continue to be one lane in each
HANSON RD direction. SIXTH ST
LAFITTE RD Motorists are reminded that the area is a construction
FIFTH ST zone andJOHANSSON RD the speed limit is 40km/h. Drivers should
CHURCHILL RD NORTH CHURCHILL EXIT take extra care when driving through the area and 40 FOURTH ST PLYMOUTH RD ROSBERGROSBERG RD RD ENTRY take note of changes around intersections of Angle MORGAN ST Road, Kateena Street and Days Road. This includes: THIRD ST • The left in, left out turning movements at Angle
SECOND ST ST DAVIS STREIFF RD Road will be maintained. It will not be possible to turn right at this intersection. FIRST ST ST DAVIS • The right turn from South Road to Kateena
DUNSTAN RD DUNSTAN
HILL RD
WINGFIELD RD
PRODUCTION RD Street will be maintained, however the queue
PENLEYAVE GRAHAM ST length will be shortened. GRANDGRAND JUNCTION JUNCTION RD RD • In line with the final design of the project, the GRAND JUNCTION RD GRAND JUNCTIONright turn lane from RD South Road to Days Road will be located on the eastern side of the pier. All usual turning movements at the intersection Access to USW of Grand Junction Road and South Road will be ANGLEPrecast Yard and maintained with these changes. SA Power Networks This traffic change is ONEexpected WAY to be in place until RICHARD ST maintained via PARK Sunday 30 June 2013*. temporary driveway DUDLEY ST Night works WIRRIGA ST WIRRIGA ST ANGLE RD Each night between 6.30pm and 6.30am traffic is detoured from South Road between the Port River Expressway and Grand Junction Road while ANGLE RD REGENCYconstruction of the elevated roadway continues. At night, access to the Caltex Service Station on South HANSON RD PARK Road is via Davis Street and Francis Road. CARDIGAN ST N KATEENA ST At times southbound traffic on South Road is Access to BP KATEENAKATEENA ST ST also detoured between Grand Junction Road and W E maintained Right turn Regency Road to enable night time construction
to Days RD NAWEENA WILSON ST S activity.
TRAFFORD ST Road Further information COWAN ST For more information about this traffic change or any
GALLIPOLI DR 40 aspect of the South Road Superway, call 1300 638 789 or email [email protected] DAYS RD TAMINGA* Inclement STweather may alter this date Construction area * This map is indicative only and not to scale Urban Superway, comprising John Holland Pty Ltd and Leed Engineering and Construction Pty Ltd, is the design and construction contractor delivering the $842 million Australian and South Australian government funded South Road Superway with the Department of Planning, Transport and Infrastructure.
DAYS RD DAYS TRAFFORD ST 08052013 RIDLEY GROVE RIDLEY GROVE ARUMAARUMA ST STST FERRYDEN RD CHURCHILL PARK
CAMIRA ST
NAWEENA RD NAWEENA
LIBERTY GROVE LIBERTY TIKALARA ST
HANSON RD FIRST AVE COKER ST WOODVILLE GDNS
REGENCY ROAD REGENCY ROAD SOUTH ROAD SUPERWAY TRAFFIC CHANGES Major traffic change South Road
Construction Area ON RAMP CLOSED DRY CREEK
PORT RIVER EXPRESSWAY SALISBURY HWY
N
W E HINES RD S
NORTH TCE WING ST WING ST N
W E
NINTH TCE
WINGFIELD RD WINGFIELD
PHILLIS ST PHILLIS
SOUTH ROAD SOUTH
MILLERS RD MILLERS STAITE ST STAITE
HANSON RD HANSON S SOUTH TCE SOUTH TCE SOUTH TCE
CORMACK RD CORMACK RD CORMACK RD 328 c HAKKINEN RD SENNA RD
PLYMOUTH RD 40 Vest Logo Shirt Logo
T WINGFIELD oll People
DAVIS ST DAVIS Toll People No Right 1300 769 875
Turn ST DAVIS
WINGFIELD RD WINGFIELD
BOWYER RD BOWYER
ALBION ST ALBION CAPELLI RD CAPELLI
FRANCIS RD FRANCIS ROAD FRANCIS RD HANSON RD HANSON
SIXTH ST
LAFITTE RD LAFITTE JOHANSSON RD RD JOHANSSON FIFTH ST NORTH RD CHURCHILL
EXIT ROSBERGROSBERG RD RD FOURTH ST PLYMOUTH RD ENTRY MORGAN ST
THIRD ST DAVIS ST DAVIS SECOND ST STREIFF RD
FIRST ST ST DAVIS DUNSTAN RD DUNSTAN
HILL RDHILL WINGFIELD RD WINGFIELD
PRODUCTION RD
GRAHAM ST PENLEY AVE PENLEY
GRAND JUNCTIONGRAND JUNCTION RD RD GRAND JUNCTION RD
INDAMA ST JOHN ST 40 ANGLE
HENRY ST HENRY ONE WAY
FREDERICK ST RICHARD ST RICHARD OPALA ST OPALA PARK SOUTH ROAD DUDLEYDUDLEY ST ST WIRRIGA ST ANGLE RD WIRRIGA ST
ANGLE RD REGENCY
HANSON RD HANSON PARK CARDIGAN ST KATEENA ST KATEENAKATEENA ST ST
WILSON ST RD NAWEENA TRAFFORD ST TRAFFORD BIRRALEE RD
COWAN ST DR GALLIPOLI 40
TAMINGA ST Access to businesses TAMINGAand ST side streets must
use left lane DAYS RD DAYS To avoid delays at night,TRAFFORD ST motorists
RIDLEYare encouraged GROVE to seek alternativeRIDLEY GROVE ROAD SOUTH ARUMAARUMA ST STST routes including Hanson Road,FERRYDEN RD CHURCHILL REGENCY Churchill Road, Gallipoli Drive andPARK Cormack Road. PARK
CAMIRA ST NAWEENA RD NAWEENA
LIBERTY GROVE LIBERTY Alternative TIKALARA ST routes to bypass HANSON RD HANSON FIRST AVE COKER ST WOODVILLE the South Road Superway GDNS roadworks REGENCY ROAD REGENCY ROAD
* This map is indicative only and not to scale
Urban Superway, comprising John Holland Pty Ltd and Leed Engineering and Construction Pty Ltd, is the design and construction contractor delivering the $842 million Australian and South Australian government funded South Road Superway with the Department of Planning, Transport and Infrastructure.