JFRjustice facilities09 review

The American Institute of Architects Academy of Architecture for Justice Washington, D.C.

AIA Copyright 2009 by The American Institute of Architects All rights reserved Printed in the United States of America The project information in this book has been provided by the architecture firms represented in the book. The American Institute of Architects (AIA) has no reason to believe the information is not accurate, but the AIA does not warrant, and assumes no liability for, the accuracy or completeness of the information. It is the responsibility of users to verify the information with the appropriate architecture firm or other source. ISBN 1-57165-026-1

The American Institute of Architects 1735 New York Avenue, N.W. Washington, DC 20006

2009 Academy of Architecture for Justice Advisory Group Laurence Hartman, AIA, chair Charles Drulis, AIA, past chair Enrique Macia, AIA Herbert Roth, FAIA

AIA Staff Terri Stewart, managing director, Member Groups and Communities Douglas Paul, director, Member Groups and Communities Elizabeth Henry, manager, Honors and Awards Katherine Gupman, manager, Knowledge Communities Allison Fax, associate, Knowledge Communities iii ContentS 72 62 48 50 64 66 68 52 54 56 58

......

...... Law Enforcement Facilities . Office, Bryan, Texas Brazos County Sheriff’s Index of Architects Court Facilities Pittsburgh, California. East Contra Costa County Courthouse, San Jose, California. County of Santa Clara Laboratory, Fairfax County Courthouse Expansion, Fairfax, Virginia. Fairfax County Courthouse Arizona. U.S. Courthouse, Tucson, James A. Walsh Los Angeles. Metro Bomb Squad Facility, Spanish Fork Fourth District Court and City Police, Spanish Fork, Utah Leon Karelitz Judicial Center, Raton, New Mexico. Leon Karelitz Judicial Center, . New York County Family Court Building Renovation, New York Warren E. Burger Federal Building and United States Courthouse Renovation, St. Paul, Minnesota. 2 6 iv 10 14 18 22 26 30 36 38 40 42 44 vii ......

......

......

Correctional and Facilities Virginia Chesapeake, BRAC Joint Regional Correctional Facility, Metropolitan Courthouse Renovation, Nashville. Courthouse, Miami. Miami-Dade Children’s Virginia. Prince William/Manassas Regional ADC Expansion, Manassas, . St. Cloud Police Headquarters, St. Cloud, Minnesota Linden, New Jersey. Union County Juvenile Detention Center, Deer Ridge Correctional Institution, Madras, Oregon Denver. Denver Detention Center, Facilities, Development and Assessment Rhode Island Youth Cranston, Rhode Island. Raleigh, North Carolina. County Detention Center, Wake Calgary Courts Centre, Calgary, Canada. Calgary Courts Centre, Calgary, Citations Jury Members Jury Comments Canadian Plaza at the Peace Bridge, Fort Erie, Ontario, Canada. Canadian Plaza at the Peace Bridge, Fort Erie, Ontario, McConnell Public Safety & Transportation Operations Center, Fairfax, Virginia. contentS Jury members

Nick Seierup, FAIA Chief James M. Bradley Perkins + Will White Plains Police Department Los Angeles White Plains, New York

Jury Chair James Bradley has been a member­ Nick Seierup, FAIA, joined Perkins of the White Plains Police Depart­ + Will in 2000 after working with ment for 35 years and has held Steven Ehrlich and Eric Owen Moss. the rank of chief of police since For the past nine years, he has been 1990. His main responsibility is the principal and director of design operations and administration of the for the global firm’s downtown Los police department. From 1985 to Angeles office. Mr. Seierup was educated at Harvard’s Graduate 1989, Chief Bradley acted as the department project manager for School of Design, the Southern California Institute of Architecture planning and construction of the Public Safety Building. Over the (SCI-ARC, BArch, 1979), and Orange Coast College (AArts,1972). years, he has assisted police departments, both local and those He is involved in every aspect of the office’s strategic and tactical referred by the International Association of Chiefs of Police, with decision making. He oversees design conceptualization and his understanding of the collaborative effort necessary for large planning for the Los Angeles office’s corporate/commercial/civic, municipal projects to succeed. Chief Bradley holds a bachelor health care, science and technology, and education markets. of arts degree from the University of Bridgeport and a master’s Overseeing the international practice in Los Angeles, he travels degree in public administration from New York University. extensively throughout the world, and brings a multicultural per­ spective to his work.

Mr. Seierup’s design work has been recognized with more than 75 professional awards at the national, state, and local levels. Select honors include Southern California Institute of Architecture Distinguished Alumnus (2004), AIA California Council Emerging Talent Award (1999), and elevation to the American Institute of

Architects College of Fellows (2006 – Design) for a body of work committed to community, context, and culture. jfr o8 iv

Jeanne Chen, AIA Richard L. Stalder Moore Ruble Yudell Secretary of the Louisiana Department Santa Monica, CA of Public Safety and Corrections (ret.) Zachary, LA Jeanne Chen believes civic build­ ings can positively impact people’s Richard L. Stalder was appointed lives and was pleased that many secretary of the Louisiana Department of this year’s submissions cele­ of Public Safety and Corrections in brate the public realm and its active January 1992 by former Governor participation in its surroundings. A Edwin W. Edwards. He continued to principal at Moore Ruble Yudell, Ms. serve as secretary of the department Chen has collaborated on a broad spectrum of academic, civic, under the administration of former Governor M. J. “Mike” Foster and master planning projects across the country. She enjoys the Jr. (1996–2004) and former Governor Kathleen Babineaux Blanco challenges of working with multiple constituents who often see the (2004–2008). Mr. Stalder began his career with the department in project from their own unique perspective. 1971 as a correctional officer; he has served as superintendent and warden of major juvenile and adult facilities and other headquarters Recent projects include a new student commons at Dartmouth management roles. He possesses bachelor’s and master’s degrees College; an expansion of the Sloan School of Management from Louisiana State University. at the Massachusetts Institute of Technology; and the Robert E. Coyle United States Courthouse in Fresno, California, which has Mr. Stalder is an active member of many professional organizations won numerous awards, including the GSA Design Excellence and served as president of the Association of State Correctional Honor Award for Architecture, AIA Academy of Architec­ture Administrators (ASCA) from 2004 to 2006. He also served as for Justice Citation, and the Chicago Athenaeum American president of the American Correctional Association (ACA) from Architecture Award. 1998 to 2000.

Dean Roberts, AIA McLaren, Wilson, Lawrie Architects

Wheaton, IL v

Dean Roberts has been practicing Ju r y membe rs architecture since 1980. He undertook his first of many justice architecture projects 25 years ago. He became intrigued with the idea of creating a civic architecture expressive of the unique features of public safety buildings in 1991. Mr. Roberts endeavors to design by leveraging an in-depth understanding of police operations to create buildings that enable public safety professionals to become more effective and efficient. He has achieved recognition from police clients and architectural colleagues for his uniquely collaborative approach and passion for good design. Many of the projects he has led have received awards for planning and design excellence. jfro9o8 vi Jur community inwhichsheresides. many offices in various groups, both system in and the in court the held has and groups planning and boards, committees, many on served has Tinnell Ms. Courts. the of Office Administrative the for working and presidingjudge, the to assistant judicial a as working peace, the of pro-temporejustice a as court—serving the of areas all in and positions various in system court the in years 30 almost for worked has She Management. Court for Association National y members continued ber of the board of directors for the for directors of board the of ber completing a second term as a mem­­ currently is She commissioner. the jury and registrar Mohave probate the County as serves also She Arizona. Superior in County Mohave the of Court of clerk the as third term her serving is Tinnell Virlynn Kingman, AZ Clerk ofSuperiorCourt,MohaveCounty Virlynn Tinnell products. corrections and detention for standards F-33 ASTM of updating and development to contributed has and Specifier Construction Certified a is Williams Mr. practice. Architecture Justice AECOM n tcncl edrhp o the to leadership technical and management project provides He country. the across projects courts and detention, juvenile corrections, detention/ adult specific on years 20 with experience, of years 30 has He Design. AECOM of office Phoenix the in principal a is Williams Gregg Phoenix, AZ AECOM Design Gregg Williams viivii Jujury comments “ The process was different this year from years past, as projects were submitted digitally and reviewed by each of the jurors prior to their arrival at the to discuss AIA the submissions headquarters as a group. in This allowed Washington, for a more D.C., in-depth discussion in the time the jury by jury whole was the to presented were category each in project every together. Slides of the representative expert jurors of that discipline. Over the course of the morning, a short list was developed; in the afternoon, that short list was analyzed and debated in greater depth. Voting the following morning then culled down finalists award for selection. Several decisions projects had and nearly unanimous support the before debate spirited and rigorous triggered others jury; the of jury arrived at consensus. diligently worked who year, this members jury the to thanks Special and thoughtfully to understand, critique, debate, and ultimately agree on the projects on the following pages. The jury consisted of three pairs of experts, composed of an architect and a leading each client/practitioner, pair focusing on one of the primary entry categories (courts, correctional/detention, and law enforcement). As is typical for the this a juryprogram, wide range of represented types of practices, diverse The geographic locations, and gender. jury members are (representing courts) Jeanne Chen, AIA, from clerk Tinell, Virlynn and Calif., Monica, Santa in Yudell Ruble Moore of the Superior Court of Mohave County in Arizona; (representing correctional and detention projects) Gregg S. Williams, AIA, from AECOM Design, in Phoenix, Ariz., and Richard secretary Stalder, of the Louisiana Department of Public (retired); and Safety (representing law enforcement) Dean and Roberts, AIA, Corrections from McLaren Wilson & Lawrie, Wheaton, Ill., and James Bradley, chief of police from White Plains, Thank N.Y. you for sharing your a world the making for passion your and thoughtfulness, your time, of justice. the architecture better place for all who benefit from NCARB LEED AP, Nick Seierup, FAIA, 2009 Justice Facilities Review Jury Chair

Justice Facility Review, the om the Chair The View fr of their role in the communities and society they serve.

s y comment

The expression of justice in architecture—the image and identity of these buildings—has long been the core of communities their and society role they serve. in The issues the in planning and organizing these institutions are quite complex, and the security needs balancing of their residents and staff has always been a well goes submitted work the of best the see, will you As challenge. efficient functional, a of prerequisite a was felt jury the what beyond openness, light, of architecture inspiring an to solution, operational and transparency. Several submissions directly respond to history the of their contexts through expressions that are tied to their unique sites and programs. Although this year’s submissions did not offer a breakthrough new paradigm, the jury identified several many in primarydriver a become has Sustainability trends. definite LEED base than further much going many typologies, project the of certification. Beyond courthouses, whose budgets even that see to refreshing was it integration, demanded long have and clients correctional facilities are now being designed to incorporate day their for agendas quality-of-life and conservation, resource lighting, jury users. In an era of economic challenge, the saw an increasing number of renovations and adaptive reuse projects, which, while being sustainable approaches to existing building directly address the tectonics stock, of found conditions and also contextual was jury The communities. their into facilities integrating responses also happy to see this program expanding beyond our borders: This year the jury reviewed 52 submissions: 8 correctional, Welcome Welcome to the 2009 edition of the annual publication from the Academy American of Institute Architecture for of Justice, Architects architectural recognizing design the for best courts, in law juvenile detention, enforcement, and other facilities correctional, focused on the expression and delivery justice in society. of fact, In sites. international in located were submissions of number a two of the projects singled out for awards were from our neighbor to the north, Canada. 19 courts, 6 detention, 3 juvenile, 9 law enforcement, 2 multiuse, and 5 others that did not fall neatly into a particular category. Jur

the image and identity of these buildings—has long been the core the expression of justice in architecture—

Citations jfro9 2 Calgar rain harvesting,are alsointegratedintothedesign. and daylight including features, environmental Numerous access. and circulation clarify to floors court on repeated and lobby main given the building’s size. Digital monitors are cleverly utilized at the information sharing and wayfinding for visitors are especially critical, an entry pavilion. This is the largest courthouse building in Canada; to down steps and sky the The meets gracefully tower the building. of massing the into penetrate to light sun morning western allowing while the of impact the The minimizes construction. orientation under building’s currently Park Courthouse new a and appeals of court historic adjacent an to relationships establishes and access to natural light and views. The planning of the building two branches and provides those inside with a sense of orientation public atrium creates a dynamic, light-filled space that connects the same 26-story identity.A own their the maintain each they in that but building housed be court) (the federal the system and court court the provincial of branches separate two that required program The courthouse. the for openness and transparency of symbol a becomes that solution design defining a into site urban tight a on challenge programmatic unusual an turns project This Jury’s Calgary, Canada Alberta, S tatement tatement y Cour ts Centre 3 citations tatement S rchitect’s A The Calgary Courts Centre is a competition-winning design-build scheme that features two glass and concrete towers of 24 and 20 joined by stories a 26-story public atrium on a site. tight downtown The building expresses the two branches of the court system it contains: the Provincial Court of Alberta and the federal Court of Queen’s Bench. With 73 courtrooms, underlies it transparency and is openness the for largest desire A courthouse Canada. in facility security of level high a achieves complex The approach. design the views ensuring and light natural in letting manner, unobtrusive an in to the The surrounding project city. was also driven by a lean and efficient mandate given its This process. included a design that procurement allows for future inital design-build-finance-operate flexibility with the transformation of public registry floors into future electronic sophisticated most the of one as well as floors courtroom building The world. the in systems courtrooms wired and docketing of a LEED Silver submission. process in the review is presently jfro9 4 Completed 2008 Status ofproject $280 million Total costofconstruction 1.1 millionGSFnew Area ofbuilding 1.62 acres Site area New Type ofconstruction Court Type offacility Data Edmonton, Canada Government ofAlberta Owner 5 citations

Credits Architect Interior Design Kasian Architecture & Planning Ltd. Calgary with In joint venture/association Engineers NORR Limited Architects and Toronto Structural engineer Stantec Calgary Mechanical engineer Hemisphere Engineering Inc. Calgary Electrical engineer Stebnicki and Associates Ltd. Calgary Design consultant Carlos Ott Toronto Courthouse consultant AECOM Design Coral Gables, FL Builder Cana Construction Ltd. Calgary Photographer Robert Lemermeyer Photography Inc. Calgary jfro9 6 at thePeaceBridge Canadian Plaza inspiration, yieldingarich,mature workofarchitecture. of layers many of embracing comprehensive a exemplifies plaza the project, photographed and executed, drawn, meticulously beautifully and A extensions. natural as incorporated are canoes the building as both a shelter and a threshold. The river and native of understanding invites design The time. and place of specifics found on the site during construction, connecting the design to the artifacts aboriginal native of museum historical a add to expanded project the how is note particular Of environment. nighttime the in presence glowing strong, a establishes exterior lit beautifully a those entering the country. Natural daylight floods the interiors, and spaces, bothexteriorandinterior, forthebuilding’s occupantsand of series inviting and warm a provides also project the object, an as Striking bank. River Niagara adjacent the of flow the to related crossing and movement human of centuries reflects structures of local traditional material vernacular of wood and stone, the campus into a new country with a powerful iconic image. Deeply rooted in a crossing of act the celebrates which facility,border-crossing this Few projects generated as much unilateral respect from the jury as Jury’s Statement Erie,Ontario,Canada Fort 7 citations ow into the country, while f cant expression of Canadian sovereignty. It sovereignty. Canadianofexpression cant f tatement S cient, and welcoming f rchitect’s forming a landmark at this important transition from country to another. one A The new Canadian Plaza at the Peace Bridge transcends the complex, functional, security inspection and processing traffc- requirements of a national border crossing to signi a provide river-crossing and settlementhuman the ofcontinuation a is activities that have existed on the site for The grand, 10,000 sweeping wood roof and years. the curvilinear forms of the customs and immigration building accommodate and the movement canopies of travelers and provide an easy, ef jfro9 8 9 citations Credits Architect NORR Limited Toronto Structural engineer NORR Limited/Blackwell Bowick Engineers Toronto Mechanical/electrical engineer NORR Limited Toronto Landscape architect Envision Toronto Signage consultant Entro Communication Toronto Museum consultant Herd Design Terry Toronto Builder Bird Construction (General Contractor) Toronto Photographer Steven Evans Toronto —border crossing Owner The Buffalo and Fort Erie Public Bridge Authority Fort Erie, Ontario, Canada Data of facility Type Other­ of construction Type New Site area 19.5 acres Area of building 62,000 GSF new cost of construction Total $55.7 million Status of project Completed 2007 jfro9 10 and Transpor McConnell PubliSafety flexibility andoptimizedfunctionality. provides function center communication the with monitoring traffic of integration The areas. active intensely often these of pressure the relieve Communication to serves the Center Operations of Emergency and Center volume generous and space planned thoughtfully The spaces. interior key at at and entrance light visitor natural the and transparency of elements the humanized including been by has structure bunker-like a been have easily could What protection. weather extreme and security achieve to and identity its establish to site the uses innovatively project This Jury’s Statement VAFairfax, tation Operations Center 11 citations Architect’s Statement communications and operations emergency the of architecture The center (EOCC) not only protects advanced and supports technology, its users it with and also energetic symbolizes spirit their formally building’s massing, through use cooperative of the transparency, and the articulation active feeling of of the building’s the entry. The facility provides natural light and of glare-free the introduction through environment a tranquil working exterior views from deep inside the structure. Special acoustical attenuation in the Communications noise to facilitate Center multiple and simultaneous voice communication. dampens ambient Security and system resilience are key factors in Scenarios involving extraordinary natural circumstances. disasters preparing for such as hurricanes and earthquakes have been both considered the robustness in of the building structure and skin as well as the provision of redundant mechanical and and components. electrical As a systems critical resource, the EOCC is designed with a degree of explosive blast resistance. The architecture building’s also the of identity and autonomy individual the accommodates multiple county and state departments, which must focus on their unique responsibilities while seamlessly integrating as a team. single Although not certified, the design responds to the criteria guidelines. LEED its in Council Building Green U.S. the by outlined Intergovernmental cooperation and shared responsibility for the safety of the community have been the guiding principles in the planning and design of this facility. jfro9 12 Completed 2008 Status ofproject $58,514,190 Total costofconstruction 146,783 GSFnew Area ofbuilding 18 acres Site area New Type ofconstruction Law enforcement Type offacility Data Fairfax, VA Fairfax CountyGovernment Owner 13 citations Credits Architect HOK DC Washington, Structural engineer Restl Designers Inc. Gaithersburg, MD Mechanical/electrical engineer James Posey Associates Inc. Baltimore, MD Programming consultant RossDrulisCusenbery Sonoma, CA Information technology consultant RCC Consultants Inc. FL Tampa, Security consultant SAKO & Associates Fairfax, VA Builder Manhattan Construction Company Arlington, VA Photographer Lee B. Ewing DC Washington, jfro9o8 14 Renovation Metropolitan Cour dated tocurrent standards andallowforfuture flexibility. areas.Security, safety,life accessibility, up­­areall technology and office administrative as reclaimedare building the within areas jail the building to a civil court to allow its adaptation and reuse. Former reprogrammedwillingly they and criteria, security meet to building existing the of limitations the recognized courts the on, Early lot. parking structure on what was once a parking nondescript surface A new urban green space is located over a multilevel underground area. downtown the of life the to contributes it how and perceived is courthouse historic the way the transforms river,project the this and capitol state the of views with district business commercial downtown the near Located icons. Nashville’scivic of one primary and surroundings its engages establishes a dramatic that new setting for a building that is considered plaza public new major a creates it way the also but building, courthouse contemporary a into modernization thorough its and courthouse 1937 historic a of restoration careful its only not is project this distinguishes What Jury’s Nashville, TN S tatement tatement thouse 15 citations

a new entry plaza. The new deck provides direct secure access the enhances greatly and level basement the at courthouse the into civic presence of the building. Additional floor space was created on both the seventh floor and seventh mezzanine formerbuilding by reclaiming jail areas. levels of the Architect’s Statement The primary challenge in renovating the ca. Courthouse 1937 Metropolitan was designing a programmatic and security solution needs as well that as modern life-safety met code requirements while the maintaining and courts’ harmonizing with building’s impressive the historic fabric. The goal was to keep all the functional, be will that facility a create and place in elements historic secure, and adaptable for users and the the of public end each at added were cores elevator and stair New years. for another 50 building to verticalsecure resolve access and deficiencies egress in the existing building. The building was made ADA accessible, which required, among many revisions, reconfiguring the historic millwork in the courtrooms. Modern courtroom security technology and systems were introduced without overall detracting historic context. from A the multilevel underground parking deck, zoned to supply both general public parking and separate secure judiciary and court staff parking, was added and covered with jfro9 16 Nashville Bob Schatz Photographer Nashville Hardaway ConstructionCorp. Builder Columbia, SC Justice PlanningAssociates Programming consultant Nashville, TN Tuck HintonArchitects Plaza andparkingdeckdesign Albany, NY Mesick, Cohen,Wilson,Baker consultant Preservation Nashville Barge, Waggoner, Sumner, andCannonInc. Structural/mechanical/electrical engineer Fairfax, VA PSA-Dewberry In jointventure/associationwith Nashville Barge, Waggoner, Sumner, andCannonInc. Architect Credits Completed 2007 Status ofproject $35,708,118 Total costofconstruction 232,615 GSFrenovated Area ofbuilding 6.35 acres Site area Renovation Type ofconstruction Court Type offacility Data Nashville and DavisdonCounty Nashville of Government Metropolitan Owner 10M LONGITU DINAL SECTION

17 citations Miami, FL Miami-Dade Children’s Courthouse

Jury’s Statement

The design team states that “judicial for children should be different than judicial for adults,” and this project succeeds in creating a welcoming environment that addresses the special needs of a judicial environment for children. The design has an innovative programming approach that includes all the different support agencies within the building to provide more convenient access for families who use the facility. The courthouse is located in downtown Miami on a brownfield site that was selected because of its adjacency to other court facilities and to mass transit, allowing easier pedestrian access. The building frames a shaded public plaza that is visually connected to the lobby and the upper court floors. The project also demonstrates a strong commitment to public art, with installations integrated in the public plaza and throughout the building, and supports the multicultural values of Dade County. A lower lobby element has a green roof visible from the court floors. The building is on target for LEED Silver certification without any additional cost and incorporates numerous sustainable design initiatives, including a high-performance building skin. jfr o8 18 Architect’s Statement

The courthouse is to be a “signature building” within the framework of downtown Miami, conceived as a facility especially designed as a judicial environment for children. From early programming decisions to the choice of building materials, the process has been one that reflects the importance of value-driven justice and care. The design solution gives considerable attention to sustaining the multicultural values surrounding children in the justice system in Dade County and to carrying that attention through all aspects of design, including the aim of achieving a Silver LEED-certified courthouse. Sustaining the environment extends to sustaining basic values regarding the care of children who find themselves participants in the justice system, either as dependents or delinquents. The design of an environment that is nonthreatening, but judicial for children should be different than one for adults. Sustaining family values through the complexity of proceedings in juvenile court is more than “lip service” and, if properly considered, impacts the size, type, and configuration of spaces as well as scale and choice of materials. 19 c itation s jfro9 20 Estimated dateofcompletion2012 Construction documentsphase Status ofproject $134 million Total costofconstruction 371,500 GSFnew Area ofbuilding 3.38 acres Site area New Type ofconstruction Court, juvenile Type offacility Data Miami Miami-Dade County Owner 21 citations Credits Architect HOK Miami In joint venture/association with Perez & Perez Architects Planners Inc. Miami Structural engineer Bliss & Nyitray Inc. Miami Mechanical engineer SDM Consulting Engineers Inc. Miami Electrical engineer TLC Engineering for Architecture Inc. Tampa Civil engineer EAC Consulting Inc. Miami Landscape archictecture Curtis + Rogers Design Studio Inc. Miami Cost estimating consultant Faithful + Gould Maitland, FL Photographer Lifang (renderer) Shanghai, China jfro9 22 Adult DetentionCenterExp Prince WilliamCounty/ManassasRegional to thecommunity’s selfimage. contribute positively and architecture, good display can centers detention how of example an is it profession, the For construction. principles, the project is representative of excellence in design and planning jail modern other and visitation video of use and center detention functional and out laid well a with Coupled courthouse. era 1970’s adjacent and facility detention modern existing image the of and identity conflicting the solved which detailing; brick rich visually of example fine a is renovation and addition jail The Jury’s Statement Manassas, VA

ansion Architect’s Statement

Community identity, adjacency to the existing judicial complex, as well as a progressive management approach are among the most important influences that informed the design of this detention center. The historic community that hosts this regional facility was concerned with the potentially disquieting nature of an expansion of the county detention center. Although it has operated for many years without incident, the neighbors have grown displeased with the modern vernacular of the existing detention facility as well as the adjacent 1970s-era modern courthouse and its recent expansion. The community insisted that the project be built away from their historic city center. The county determined that it could not efficiently operate two separate facilities, nor could it afford to abandon the existing facility with its secure connection to the courthouse. As the architects, we were asked to propose a solution to help heal this divisive situation. We understood the problem as being more rooted in conflicting identity and image than operational compatibility. We began with a comprehensive master plan that recognized the historic assets of the city. We focused on two adjacent, turn-of- the century, historic buildings. The fortuitous spatial relationship between the Bennett School and Old Courthouse gave inspiration for a new “Judicial Green” that is planned to replace surface parking and low-scale buildings with a public park to give foreground to the two historic buildings. The exterior design of the detention center expansion reflects the historic context and city character. Through the addition of a proposed connecting colonnade and new court entry pavilion, the existing courthouse will serve well as a background building. The new public face for the detention center not only expresses respect for its unique community but also reflects the progressive philosophy through which it manages its inmates, visitors, and staff. 23 c itation s jfro9 24 Completed 2008 Status ofproject $53,042,364 Total costofconstruction 1,800 GSFrenovated 148,461 GSFnew Area ofbuilding 6.27 acres Site area Addition Type ofconstruction Detention Type offacility Data Woodbridge, VA Prince WilliamCountyGovernment Owner 25 citations Credits Architect HOK DC Washington, engineer Structural/mechanical/electrical Hankins and Anderson Richmond, VA Security consultant Services Latta Technical Plano, TX Food service/laundry consultant Inc. McFarland Kistler&Assoc. Pittsburgh Detention equipment consultant ECSI Haymarket, VA Builder Builders, Inc. Tompking DC Washington, Photographer Lee. B. Ewing DC Washington, jfro9 26 St. CloudPoliceHeadquar to thefuture. justice for vision look optimistic and dynamic a providesproject this representedin the but realities, to construction change will accommodate architecture the of tectonics the fruition, toward concept schematic from moves project this as that acknowledged jury The concerns. program with deal creatively that features all are traffic patrol expedient and systems, ventilation displacement harvesting, Daylight architecture. the of lines crisp the reinforcing custom brickwork) is handled with a clean and minimalist authority, soffits, below.(wood materials traditional common, the of Detailing spaces interior the to daylight natural abundant bring roof the on monitors light expressive elevations; street-side public the of one publicly a articulates lining rooms of series a with plaza, corner the off plan entry accessible workable and developed solidly A typology.building the of essence the at security and openness for demands conflicting the balances exuberantly brick. effect local overall The customized of veneer a with clad solid, others and latticework; diffusing some with defined some masses: transparent; and delicate of types three of composition striking visually a community the in enforcement de­ law is of image new powerful A Jury’s Statement St. Cloud,MN iee hr b te rain f n ra paa akd with backed plaza urban an of creation the by here livered

ters 27 citations

tions Architect’s Statement The brief for the St. design Cloud of a Police significant work Headquartersopera­ of state-of-the-art and public outlined environment architecture working incorporating contemporary the a to meet staff and community expectations. The multistory building incorporates a fully functioning police headquarters combining administration, investigations, patrol, training, community meeting space, evidence and forensics labs, and underground parking for 250 vehicles. The department was interested in fostering a sense of openness and transparency toward the The staff. its for environment working rich a providing to committed public. It was also design embraces the challenges of the constricted site, stacking the program vertically and placing the parking underground. The subterranean parking allows the confluence plaza urban of significant a commercial in resulting patterns, and pedestrian residential that marks the threshold of the two districts. The continuous linear clerestory links the internal spaces with light and also serves as 24-hour lantern in the community. a reassuring of police presence jfro9 28 Square feetperstaff:300 total of330) personnel, nonsworn 230 officers, sworn (100 330 Staff population Estimated dateofcompletion2009 Under construction Status ofproject $25 million Total costofconstruction 200,000 GSFnew Area ofbuilding 2.2 acres Site area New Type ofconstruction Law enforcement Type offacility D St. Cloud,MN City ofSt.Cloud Owner ATA 29 citations CREDITS Architect BKV Group Minneapolis In association with GLTArchitects St. Cloud, MN engineer Structural/mechanical/electrical BKV Group Minneapolis consultant Technology Elert & Associates MN Stillwater, Landscape architecture BKV Group Minneapolis Civil engineering Bonestroo St. Cloud, MN Interior design BKU Group Minneapolis Builder RA Morton (CM) St. Cloud, MN Renderings BKV Group Minneapolis jfro9 30 Detention Center Union CountyJuvenile a positiveimageofsafeenvironment totheresidents. have been animated with a glow warm at night, thereby presenting light natural in bring to created volumes The facility. secure a to appropriate light for natural and envelope transparency include the to pushes strategies It rehabilitation. and learning, for living, environment exemplary an as complex building the defines theme design consistent This spaces. interior the in light natural of quantities generous including effort, design rigorous a of result the portray photographs The courtyard. interior an enclose and drive the planning of program spaces to create a secure perimeter good between collaboration of considerations Operational expression.architectural and planning example fine a is project This Jury’s Statement Linden, NJ

31 citations Architect’s Statement The mayor of Linden, N.J., welcomed the placement of this new, 72,000-SF juvenile detention center in his but city, cautioned us at the city council hearing, “I don’t want to see any fence around this “thin” a designing by injunction mayor’s the embraced We building.” building—only one room deep—that wraps a completely one-acre around outdoor courtyard. We eliminated the inhumane security fencing by onerous using the building and perimeter as the light allows design Our practice. good by required enclosure secure into classrooms and housing units from both the exterior and the enclosed of acre an surround corridors Ten-foot-wide side. corridor recreation space where ample daylight and excellent sightlines typify the surrounding interior. Raked roofs above of use creative the long; year all lighting day allow dayrooms to south, the to open and allows enclosure glass to daylight secure brick provides enter to adjacent yards small recreation units; the housing 8-and 16-bed each dayroom allow daylight to penetrate to the floor. Recreation can take place in the dayroom, the gym, or the courtyard. “This is just what these kids need,” remarked one detention “There officer. is nothing like this in the state of New observed Jersey,” a noted corrections expert. Its architectural expression principles creates design a classical with modern aligned closely discipline of aesthetic space a comfortable providing and delight), commodity, (firmness, their challenges. youth to overcome for troubled jfro9 32 Completed 2008 Status ofproject $27 million Total costofconstruction 72,000 GSF Area ofbuilding 4.81 acres Site area New Type ofconstruction Juvenile detention Type offacility D Elizabeth, NJ Union CountyImprovementAuthority Owner ATA Image below isfine. 33 citations CREDITS Architect RicciGreene Associates New York Structural engineer Schoor Depalma Manalapan, NJ Mechanical/electrical engineer The PMK Group Cranford, NJ Landscape consultant LLC Landscape Architecture W-Architecture New York Security consultant PSE Engineering LLC Landsdale, PA Builder Chanree Construction Co. Ortley Beach, N.J. Photographer Mikiko Kikuyama New York

Correctional and detention facilities Chesapeake, VA BRAC Joint Regional Correctional Facility

Architect’s Statement

The 210,000-GSF facility consists of 400 single-inmate cells in five accessed through the vehicular sally port and consolidates the 80-bed housing units. Four housing units are typical, using direct major service elements of the facility (kitchen, laundry, warehouse, supervision principles, and the last is a special unit split between industry vocations, and power plant). The power plant screens this 40 female direct supervision and 40 special segregation indirect service courtyard from the public/staff entry. The recreation element supervision cell units. The facility is organized around a rectangular, anchors one end of the activity quadrangle, with the major outdoor landscaped activity quadrangle with the five two-level housing recreation yards adjacent on the outboard side. The other end units on one side and the programs and services on the other. The of the quadrangle is defined by intake, medical, and counseling tight 25-acre site optimizes but separates staff, , public, services. The facility is bound by a double security fence and and service access requirements. The two-level administration can be expanded by two additional 80-bed housing units. The component outside the security perimeter has a staff entrance dayrooms and cells are also sized for limited double bunking for and a public entrance but leads to a single access through the maximum flexibility. The facility is targeting a LEED Silver rating security perimeter at the main control station, which observes and utilizes green room, gray water, geothermal, and daylighting the lobby, visitation, major circulation, and quadrangle areas. A technology. This design/bridging documents package is the basis secondary organizing element is the service courtyard, which is for design-build proposals currently under consideration. jfr o8 36 37 correctional and detention facilities Security/detention consultant PSA-Dewberry Peoria, Ill. Kitchen consultant & Associates Vorndran IN Ft. Wayne, credits Architect PSA-Dewberry Inc. Peoria, IL Structural/mechanical/electrical engineer PSA-Dewberry Inc. Peoria, IL Civil engineer Dewberry Glen Allen, VA Status of project Construction documents phase Estimated date of completion 2010 Data of facility Type Correctional of construction Type New Site area 25 acres Area of building 210,000 GSF new cost of construction Total $70 million MIDLANT, Naval Facilities Engineering Command MIDLANT, DC Washington, Owner jfro9 38 center for the state system. Facing an aging statewide prison treatmentspecialized the as function programming,will prison this health mental Specifically and abuse substance inmates. accommodate to special-needs designed of population growing its In addition, this state facility embodies the state’s efforts to address DOC’s programmatic the values of and objectives heart for the inmate at rehabilitation. lies that mind-set a encourage and engender will that community functional and physical a is create to complex designed prison (DOC) Corrections of Department state This communities. therapeutic new and circulationplan, campus “mall” modular boiler arrays, roofs, compressed site and plan with joined cells buildings, each a steel cooling, at evaporative indirect yards unit, exercise housing private exposures, window large with features, resulting in surprising design solutions: housing dayrooms sustainable and features correctional between synergies design found prison 1,900-bed this standards, Silver LEED to Designed A Deer RidgeCorrectionalInstitution Madras, OR rchitect’s rchitect’s S tatement tatement amount oftimeinmatescanexercise outdoors. individual housing unit exercise yards are designed to increase the of series A work. and education, treatment, to dining and laundry different facilities to access numerous services and programs, through from circulate Inmates society. in life to inmates accustom environment to city-street a of feeling The the footprint. creates mall-type mall community community a around flow and situated form are to space recreational and work, service, programming and dayrooms; space; units; housing which in format prison condensed- a reflects design society.The in though as life live to and horizon, the view to outside, get to ability and opportunity the are here first and foremost to be corrected, they are presented with This facility has immense correctional value because while inmates care. geriatric to dedicated unit housing a incorporate to 14 state’s the of first the be will project ambitious this population, 39 correctional and detention facilities Credits Architect DLR Group Seattle Structural/mechanical/electrical engineer DLR Group Seattle Civil engineering David Evans & Associates Inc. Bend, OR Security R & N Systems Design LLC Germantown, TN Sustainability consultant SOLARC Architecture & Engineerig Eugene, OR Builder Hoffman Construction Portland, OR Kirby Nagelhout Construction Bend, OR Photographer Nick Garibbo Photo Design Portland, OR Owner of Corrections Oregon Department Salem, OR Data of facility Type Correctional of construction Type New Site area 51 acres Area of building 600,000 GSF new cost of construction Total $190 million Status of project Completed 2008 jfro9 40 Sebring, Florida The main façade steps down to an open colonnade, establishing colonnade, open an to down steps façade main The appearance. exterior modern solid, a creating while interior the to between the detainees and the public. bring These daylight courts privacy yards enhancing street, the recreationfrom away facing outdoor courts, inner are The buildings. neighboring the with concert in limestone, Indiana textured are materials exterior The contemporary new courthouse across the new justice center plaza. to the original Civic Center buildings while transitioning to the more relates top and middle, base, of organization classical abstracted The buildings. Center streetCivic existing the by established walls preserves massing reinforcethe Facades Rockies. the to steps capitol The the from views foreboding. being without purpose of District to the north. The Business exterior design is mindful Central of its seriousness the and south the to neighborhood mixed-use emerging the between link a form plaza center justice and center detention new Denver’s Center, Civic Downtown the in Located A Denver etentionCente Denver, CO rchitect’s rchitect’s S tatement tatement suite, laundry, foodservices,andstaff services. medical Denver,a of courtrooms, county arraignment and two city the for booking central houses center detention The plan. concise to minimize travel distances functions within the building. The result is a support simple, respective near located population. are pretrial units Housing short-term, a of characteristics and needs specific the meet to designed each units, single-celled security high- to dorms eight-bed to dormitories open from types, housing of dignity and detainees. The detention center hosts humanity a range of direct-supervision the maintains that environment—one “normative” a provide to commitment Denver’s reflects solution requirements, safety, security, and clarity of circulation. The design operational by driven is layout building to The courthouse. deference new in the plaza judicial the to backdrop simple a is form resulting The space. public outdoor the along scale pedestrian a 41 correctional and detention facilities Credits Architect OZ Architecture Denver Associate architect Hartman-Cox Architects DC Washington, Associate architect Ricci Greene Associates New York Structural engineer Martin/Martin Inc. Lakewood, CO Mechanical engineer M E Engineers Wheat Ridge, CO Electrical engineer Sorcar Engineering Arvada, CO Security and telecommunication consultant Plus Inc. Technology Aurora, CO Programmer Robertson Justice ServicesVoorhis Denver Landscape architect studioINSITE Denver Builder Hensel Phelps Construction Co. (CM/GC) CO Greeley, Owner City and County of Denver and Denver Sherriff’s Department Denver Data of facility Type Detention, court, multiuse of construction Type New Site area 3.16 acres Area of building 438,400 GSF new cost of construction Total $157,450,000 Status of project Construction phase Estimated date of completion 2010 jfro9 42 Rhode IslandYouthDevelopmentandAssessFa cilities nld fu 2-e huig nt, nldn a ihscrt unit high-security a including units, housing 24-bed four include DCYF.the for accommodations facility treatmenthousing a The as a serves and is boys adjudicated for center state-of-the-art Facility 96,000-SF Development Youth 96-bed The needs. functional public and juvenile, staff, accommodate to secure zones nonsecure and and population needs and special the sight for separation for sound opportunities provides configuration facility The needs. special and detention, intake, include accommodations housing The resources. its and community local the engage fully that juveniles for facility services comprehensive on focused is The operation proceedings. court awaiting boys for center the-art state-of- 33,000-SF a is (DCYF), Families and Youth Children, of Department the for facility detention a Facility, Assessment Youth 52-bed The youth. troubled and housing for physical environment operational optimal the provides population diverse and site complex project’s the to approach organizational innovative Our A Cranston, RI rchitect’s rchitect’s S tatement tatement is designed to cue appropriate behavior within a normalized normalized a within behavior environment. appropriate cue to designed is and strategy direct-supervision the into secure yard and recreation space outdoor day sunny open, large, a incorporates pod housing vocational Each recreation. outdoor and gym a and provides and space educational contains facility Each field. soccer full-scale a visitation, as well as room, suites, dental dining and medical, administration, gym, full-size and units adjacent housing space the to educational contains facility The building. to the access and parking private and public, as service, well segregated as building each for expansion provide to organized is site The configuration. site and building unique a within located facility boarding-school-type a of consists campus The functions. related public and program, juvenile staff, accommodate to zones nonsecure and secure to addition in population, needs special for 43 correctional and detention facilities

Credits Architect RicciGreene New York Structural engineer Oden Engineers Inc. Providence, RI Mechanical/electrical engineer TMP Consulting Boston Civil engineering Pare Corporation Lincoln, RI Surveyor Hangen Brustlin Inc. Vanasse Providence, RI Builder Gilbane Co. Cranston, RI Photographer Mikiko Kikuyama New York Owner Rhode Island Department of Corrections Data of facility Type Juvenile of construction Type New Site area 8 acres Area of building 129,000 GSF new cost of construction Total $52 million Status of project Completed 2008 Youth Facilities Youth Cranston, RI jfro9 44 W Sebring, Florida Raleigh, NC administration space and forensic labs. The facility will provide 672 inmate magistrates, house also transfer.will and facility storage, multiuse property The identification, include will program intake laundry,service, food open and booking new warehouse.The and services, academic infirmary, and clinic medical BureauIdentification, of City/County intake, open and booking include services consolidated those of Some facilities. separate three in located facility detention 414,599-SF werepreviously that activities and services detention consolidates new The for control. services and of efficiency consolidation and Enforcement, Customs and Immigration of integration shortages, space growth, population continued county’s the address to facility 1B Phase existing the to addition an be will facility 2 Phase new year.The per residents new 30,000 than more of rate a at grow to continues WakeCounty A rchitect’s rchitect’s ake CountyDetentionCenter S tatement tatement through periodsofnaturaldisasters. and day-to-day operational and sustainable, durable, functional, creatingon emphasis with maintainable, physically is that facility a continued Design employees. new for training streamlining while morale, efficiency,retention,and staff enhancing on concentrated also team design The system. justice criminal the of mission the general public, justice personnel, and the incarcerated, advancing the for environment secure and safe a with documents design the responsible, and forward thinking. This was communicated through that will be well received by the citizens of facility the county as justice innovative, criminal safe and efficient an creating on focused with, or slightly ahead of, demand for bed spaces. The design team remaineven to strive will county the time, same the At dormitories. 56-bed in beds 448 and cells, wet single 224 beds, inmate new 45 correctional and detention facilities Civil engineer/landscape consultant Kimley-Horn and Associates Raleigh, NC Food service and laundry design consultant Foodesign Associates Inc. Charlotte, NC Builder SKANSKA USA Durham, NC Photographer Little Diversified Architectural Consulting Durham, NC Credits Architect Little Diversified Architectural Consulting Durham, NC In joint venture/association with HDR Architecture Inc. Dallas/Chicago Structural engineer Fleming and Associates Fayetteville, NC Mechanical/electrical engineer HDR Architecture Inc. Dallas Fire protection N. L. Pettit & Associates Raleigh, NC Programming Carter Goble Lee Columbia, SC Data of facility Type Detention, multiuse of construction Type Addition, renovation Site area 19.77 acres Area of building 414,599 GSF new 5,922 GSF renovated cost of construction Total $146,060,913 Status of project Construction documents phase Estimated date of completion 2012 Owner County of Wake

court facilities Pittsburg, CA East Contra Costa County Courthouse

Architect’s Statement

This project is more than a highly advanced, full-service regional jury assembly and entry lobby portion of the project is carefully courthouse. Located at Pittsburg’s Civic Center, it is also intended planned and designed to be isolated, via roll-down security grilles, to serve as the catalyst for renewal of a modest suburban city. It is and used after hours by various community organizations. Secure situated at the gateway to the central business district, serving those judges’ parking is separate from both public parking and secure arriving via automobile from the adjacent highway interchange or staff parking. All principles of advanced courthouse planning and as pedestrians from the rapid transit center. The city is following up design are incorporated. The client’s design goal was to provide a with expansion and renewal of the landscaped, tree-lined boulevard contemporary, yet enduring, civic edifice that is easily recognizable that borders the east end of this courthouse. The building is oriented as the courthouse. The courthouse “square,” which connects the toward this thoroughfare. Currently under construction, this three- entry with public areas, is landscaped with native plants and level facility is the pilot project for implementation of California’s new trees, decomposed granite, and gradual steps and ramps up to Trial Court Facilities Standards. This courthouse provides traffic, the elevated building entry. The primary building materials are family, criminal trial, and arraignment courtrooms. The design limestone (most public-facing walls), precast concrete, and glass. provides seven courtrooms, with the provision for expansion to Most interior finishes, such as terrazzo floors, are made from ten. All courtrooms employ advanced technologies and receive recyclable materials. The building employs a green roof and is abundant natural light from windows and/or light monitors. The anticipated to receive LEED Silver certification. jfr o9 48 Owner Judicial Council of California, Administrative Office of the Courts San Francisco

Data Type of facility Court

Type of construction New

Site area 4.3 acres

Area of building 71,600 GSF new

Total cost of construction $41.7 million

Status of project Estimated date of completion 2010

Credits Architect HOK San Francisco

Structural engineer Middlebrook + Louie San Francisco

Mechanical/electrical engineer HOK San Francisco

Civil engineer BKF Engineers Walnut Creek, CA 49 Audio visual/security consultant

Smith, Fause McDonald Inc. c ou r San Francisco t f

Builder a c ilitie s SUNDT Construction Co. Sacramento

Remderings HOK San Francisco jfro9 50 Fairf Fairfax, VA it establishes a vehicular entry sequence that unifies the entire civic of a dignified new approach; the landscaped oval plaza leading to historic courthouses. The stately courthouse portal is the state’sculmination the in employed frequently elements reflect pavilion, entry architectural vocabulary, such as the covered arcades flanking the and materials of needs palette The system. security court regional growing and a of programmatic the architectural meeting rich while a heritage upon draws courthouse new county’s The Architect’s Statement ax CountyCour thouse Exp ansion and culture. community the of point focal a and image civic harmonious a into structures courts existing disparate the integrate and organize to manner sensitive contextually a in configured are areas program The corridors. public surrounding to relief visual providing and by a new inner quadrangle, a dignified, secure public space enlivened enclose to used are elements program courthouse The complex.

51 court facilities Credits Architect HDR Architecture Inc. Alexandria, VA In association with Architects Inc. Kallmann McKinnell & Wood Boston Structural/mechanical/electrical engineer HDR Architecture Inc. Alexandria, VA Programming consultant Dan L. Wiley & Associates Inc. FL Jupiter, Cost estimating & value engineering Morris Wade Alexandria, VA Balancing and commissioning consultant Brinjac Engineering D.C. Washington, Builder Dick Corporation (General Contractor) Philadelphia, PA Photographer Alan Karchmer Architectural Photographer DC Washington, Owner Fairfax County Fairfax, VA Data of facility Type Court of construction Type Addition, renovation Site area 8.39 acres Area of building 328,000 GSF new 268,000 GSF renovated cost of construction Total $94 million Status of project Completed 2008 jfro9 52 James A.W Tucson, AZ eat aifcin Etro ipoeet icue replacement included improvements Exterior satisfaction. tenant and improvements aesthetic and functional in resulting time, real in mock-ups 3-D computer-generated involved design and chamber Courtroom schedules. court accommodate to tenants with closely coordinating occupancy, maintaining while budget under Trustee.U.S. and the time and deliveredon projectwas The Court U.S. Bankruptcy U.S. the by Walshuse new for rehabilitated was Courthouse the security, for requirements stringent and needs U.S. Courthouse in 2000, and responding to ever-increasing DeConcini Tucson’sspace of construction Following government. and politics, local architecture, American to contributions historical its Tucsonfor of city the to significant is Courthouse U.S. Walsh The Architect’s Statement alsh UnitedStates Cour thouse are sensitivelyintegratedwithrespect forhistoriccharacter. and lobby, enhancements and main Improvements areas. the workplace modernized in station security of Court, area Bankruptcy cashier/intake the the of redesign/build-out room, hearing original character, its new judges’ chambers, to state-of-the-art videoconference courtroom historic primary the returning included avoiding while rehabilitation Interior streetscape. improving and barriers accessibility intrusive and safety of goals GSA’s uphold Neoclassic identity. building’s Major improvements to the perimeter security and landscaping restoring successfully also windows, of all nonhistoric windows with new energy-efficient, blast-resistant 53 court facilities credits Architect Reed Leskosky Westlake Phoenix Mechanical/electrical engineer Reed Leskosky Westlake Phoenix Ornamental painting and stenciling consultant EverGreene Painting Studios Inc. New York Photographer Bill Timmerman (interior) Mark Boisclair (exterior) Phoenix Owner ServicesU.S. General Administration San Francisco Data of facility Type Court of construction Type Renovation Site area 0.66 acres Area of building 77,540 GSF renovated cost of construction Total $9.8 million Status of project Completed 2008 jfro9 54 Leon karelitzJudicialCente Sebring, Florida Raton, NM n sprt pit o acs fr h jdca, ncsoy and in-custody, judicial, the for access of points separate and efficient providingfor while capabilities surveillance perimeter and training room. The site design incorporates security, access control, a and storage, evidence offices, administrative cells, holding port, sally a contains records and Sheriffsoffice, room.Department The clerk’s chambers, judges’ room, deliberation jury rooms, hearing two courtroom, large a include spaces court Key importance. and (low volume), thus physically acknowledging enforcement each law agency’s and function volume) (high court between distinguishes architecture The alterations. minor requiring strategies expansion this planned growth and operational evolution, incorporating logical functional flexibility, the current phase is designed to accommodate Office Attorney’sTo II. Phase for of allow part be will courtroom large second District a and a for addition future A Headquarters. to courthouse county new a house the 8th Judicial District and Court for the Colfax County Sheriffs called program I Phase The A rchitect’s rchitect’s S tatement tatement

aspects ofthebuildingdesign. including the use of controlled natural daylighting, are fundamental natural environment. surrounding These and the other sustainable of design strategies, utilization appropriate facility’s and with the compatibility and techniques, and materials construction the of quality and durability the efficiency, energy through measured is This architecture. of work enduring and lasting a be is to designed and strategies design sustainable incorporates facility. building the The and users the protect to measures protection force user the among antiterrorist/ utilizes efficiency,and functional promotes agencies, communication and encourages distractions, interaction minimizes appropriate spaces the of layout The requirements. interface public for provide layered and security; integrate of levels requirements; circulation internal public and in-custody, judicial, the separate effectively and space of waste without achieved are circulation of levels three The users. public 55 court facilities

Credits Architect Rohde May Keller McNamara Architecture PC Albuquerque Structural engineer JJK Group Inc. Albuquerque Mechanical engineer Beaudin Ganze Consulting Engineers Inc. Lakewood, CO Electrical engineer Hughes Design Inc. Albuquerque Civil engineer Larry Read & Asoociates Albuquerque Landscape architect Richard Borkovetz Landscape Architecture Albuquerque Renderings Rohde May Keller McNamara Architecture PC Albuquerque Owner Colfax County Raton, NM Data of facility Type Court, law enforcement of construction Type New Site area 2 acres Area of building 16,542 GSF new cost of construction Total $4,534,857 Status of project Under construction Estimated date of completion 2010 Staff population 11 sworn officers, 2 nonsworn personnel, total of 13 jfro9 56 New YorkCountyFamily Cour New York taey o rivnig hs ulig o a ae-yae basis, area-by-area inventive an on and building, this iterative reinventing for its strategy for remarkable is herein project presented The program. court family the of requirements updated primary the building’sfor functional longer no were the conducted, being was business where floors, courtroom upper the and the in cold dangerous; instances some use, in summer,and the in current hot and winter for small too was lobby entrance the 1990s. The exterior wall was in disrepair and required replacement; late the by deficiencies serious of number a developed had that Manhattan downtown in structure civic granite-clad Building black a Court was Family County York New the 1969, in Designed Architect’s Statement t BuildingRenovation and additionaladministrativespaces. elevator lobbies, spaces, attorney conference rooms, judges’ waiting robing rooms, public associated with courtrooms court family new 15 and floor; first the on newsstand and suite, officer’s court center, children’s lobby, entrance new a envelope; exterior new entire an included work the of program specific The aspirations. client’s its of aspects all fulfills that structure new enjoyable and strategy.contemporary,a is outcome The logical, practical, bright, tear-down-and-rebuild wasteful the than rather buildings, their of reuse creative and responsible the considering are who owners for map road a provides result end The years. 10 of period a over 57 court facilities

credits Architect Mitchell | Giurgola Architects LLP New York Structural engineer Ysrael A. Seinuk PC New York Mechanical/electrical, fire protection, and telecommunications engineer Cosentini Associates LLP New York Curtain wall consultant R. A. Heintges & Associates New York Site/civil/geotechnical consutant Langan Engineering and Environmental Services PC Elmwood Park, NJ Lighting design Cline Betrridge Bernstein Lighting Design New York Signage consultant Calori & Vanden-Eynden New York Cost estimating and Company Wolf Kathonah, New York Photographer Jeff Goldberg/Esto Mamaroneck, NY Owner City Office of the Criminal New York Justice Coordinator New York Data of facility Type Court of construction Type Renovation Site area 0.845 acres Area of building 79,000 GSF renovated 500,000 GSF total cost of construction Total $58.5 million Status of project Under construction Estimated date of completion 2009 jfro9 58 and UnitedStates Cour W St. Paul, MN mne ta rset te xsig ulig yt s itnt and distinct is yet building, existing the respects that manner a in work new design spaces; new of design the in precedent spaces for significant existing building’s the to look decorum; and ceremony of sense a create that building the throughout spaces and circulation of hierarchy clear a establish measures; security requisite incorporating quietly while Paul, St. of city the in building the for presence civic a establish courthouse; U.S. a as stature its with commensurate building the for dignity of sense a establish principles: following the by guided was design The program. new security, existing and new construction, and existing functions with courthouse. The design creates a balance between accessibility and both formerly a and courthouse a federal office building into a U.S. and U.S. Courthouse was driven by the charge to transform what was The modernization design of the Warren E. Burger Federal Building Architect’s Statement arren E.BurgeFedealuilding thouse Renovation strategies toachieveaLEEDSilverrating. sustainable of incorporation included modernization the program, physical the to addition In evidence. and witness the of viewing simultaneous for allows and jury the opposite witness the places added. All courtrooms implemented a new Well plan were concept, courtrooms which district new five Additionally, condition. original to restored were which of 4 renovated, were courtrooms existing 12 of total A areas. holding marshals’ and assembly, jury offices, lobby,the including entirebuilding, the court chambers, corridors, Charles Ginnever. New interior work included renovation of virtually and barriers security by Protagoras, sculpture, existing the of of resiting and conservation integration the including plaza, entry west the of redesign included work exterior New looking. forward 59 court facilities

Credits Architect TENG & Associates Inc. Chicago Structural engineer TENG & Associates Inc. Chicago Mechanical/electrical engineer Michaud Cooley Erickson Minneapolis Programming consultant Ray D. Greco, FAIA Minneapolis Acoustical engineer Kvernstoen, Ronnholm & Associates Minneapolis Builder Ryan Companies US Inc. (construction management) Minneapolis Photographer Photo Inc. Don Wong Minneapolis Owner ServicesU.S. General Administration DC Washington, Data of facility Type Court of construction Type Renovation Site area 1.91 acres Area of building 648 GSF new 451,491 GSF renovated cost of construction Total $71,941,097 Status of project Under construction Estimated date of completion 2009

law enforcement facilities Bryan, TX Brazos County Sheriff’s OfFIce

Architect’s Statement

The Brazos County Sheriff’s Office is a two-story, 28,000-SF facility resulting wedge shape provides a large, inviting staff entry, a bright designed to serve the law enforcement community of the 21st and airy break room, and focused controlled entry to the secure century. An abundance of natural light combined with rich color staff areas from the public lobby. The two-story, fully glazed staff and warm wood accents create a pleasant interior environment for entry enhances the officers’ image of themselves as professionals the staff and visitors. The building is organized into three major by creating the atmosphere of a building built for professional zones, with patrol/records and investigations/support on the first services. The facility provides offices for administration, officers, floor and administration on the second floor. These three zones are and investigators, as well as open office space. A large briefing connected by an open two-story volume that functions as staff entry, room; multiple conference rooms; copy and work rooms; and large break room, and the vertical circulation core. A balcony reception storage rooms for files, equipment, and supplies enable the staff area on the second floor allows for visual contact between the two to work efficiently and effectively. Large staff restrooms and locker floors and the individuals working in each area. This connection rooms, a well-equipped fitness room, crime lab, evidence storage reinforces the message of unity and teamwork within the Sheriff’s with high-density storage units, and a vehicle-search garage round Department. This area acts as a pivot point, bending the mass out the program. The building and site have been designed to allow of the building in response to a large stand of mature trees. The future expansion of offices as well as multipurpose training rooms. jfr o9 62 Owner Brazos County Bryan, TX

Data Type of facility Law enforcement

Type of construction New

Site area 9.98 acres

Area of building 28,407 GSF new

Total cost of construction $7,125,662

Status of project Completed 2007

Staff population 50 sworn officers, 10 nonsworn personnel, total of 60 Square feet per staff: 473.45

Credits Architect Wiginton Hooker Jeffry Architects Plano, TX

Structural engineer Jaster-Quintanilla Dallas LLP Dallas

Mechanical/electrical engineer MD Engineering LLP Dallas 63 Civil engineer

Garret Engineering L aw en f o rc ement Bryan, TX

Landscape architect Newman+Jackson+Bieberstein Dallas

Builder a c ilitie s Hunt Construction (construction manager-at-risk) Dallas

Photographer Doug Reeves Highland Village, TX San Jose, CA County of Santa Clara Crime Laboratory

Architect’s Statement

The County of Santa Clara’s new state-of-the-art crime laboratory address possible contamination concerns of evidence and staff is the country’s most advanced forensic facility. The new facility and provide a safe working environment for the criminalists. The provides the county the ability to meet the ever-evolving needs of ability to provide staff with highly specialized laboratory spaces the sophisticated feld of forensic science. This building contains maintains the integrity of the experiments without compromise. This various state-of-the-art features such as a wireless evidence in turn provides the county with the most sophisticated forensic tracking, mitochondrial DNA lab, low copy DNA lab, dedicated laboratories in the world. Beyond the world of forensic science the air pressurization vestibules at each lab suite, dedicated lab new facility was also designed to meet or exceed crime laboratory instrumentation rooms and a sophisticated building management accreditation requirements issued by the American Society of system. As crime laboratory technologies and equipment change, Crime Laboratory Directors. The crime laboratory was designed the new building will be able to accommodate those changes to be a sustainable and energy effcient structure. The new crime without major modifcations. This will serve the District Attorney’s laboratory project was the frst county project to address LEED offce and residents of the county for many years to come. Within the energy saving goals and is on track to become one of the frst structure the demand to maintain a high level of evidence security, LEED-Gold forensics laboratories in the country. jfr o9 64 65 Law enforcement facilities

Credits Architect HDR Architecture Inc. Sacramento Structural engineer The Crosby Group CA Redwood City, Mechanical/electrical engineer Affiliated Engineers Inc. Creek, CA Walnut Forensic planning consultant McLaren Wilson & Lawrie Inc. Roanoake, VA Civil engineering Sandis CA Mountain View, Construction manager Construction Company Turner San Jose, CA Builder S. J. Amoroso Construction Co. (general contractor) Redwood Shores, CA Photographer Mark Ballogg Photography Chicago Owner Clara County of Santa San Jose, CA Data of facility Type Law enforcement of construction Type New Site area 1.5 acres Area of building 90,072 GSF new cost of construction Total $54 million Status of project Completed 2008 Staff population 82 nonsworn personnel Square feet per staff: 1098 Los Angeles Metro Bomb Squad Facility

Architect’s Statement

After 9/11, there was a surge of terrorist threats and almost daily the ground floor, the main office area is situated adjacent to the bomb scares throughout the city of Los Angeles. In response, the evidence processing rooms and laboratories, drive-through Metro Bomb Squad/Hazardous Materials Facility was built to provide apparatus bay, research and development shop and warehouse, the Los Angeles Police Department with state-of-the-art emergency and disruptor test pit area. The second floor houses briefing, response, explosives-handling training, and technical operations to training, and break rooms; sleeping quarters; and lockers. A secure protect the general public. This design recognizes that bomb squad outdoor area above the ground floor is protected and shaded by the officers, who are subjected to extreme levels of stress associated extended perimeter wall. Closed to the general public, the building with high risk of bodily injury and death, deserve a place of pride was designed to call very little attention to itself and to blend with and comfort in which to work and train. The result is a state-of-the- the adjacent concrete artist lofts. Exterior finishes take their cues art facility that is also an important piece of civic architecture that from the industrial context: painted metal and stucco, corrugated provides the citizens with a strong symbol of protection in the post- siding, and vandal-protected glazing. Two colors of plaster, similar 9/11 era of Homeland Security terrorism alerts. in hue to the officers’ bomb suits, create a restrained pattern on the front elevation. Expressive metal louvers and staggered window As a template for future facilities, the flexible design accommodates patterns that allude to shrapnel add character to this elevation, future space requirements, new technology developments and while providing users with natural light and visual protection. training techniques, and staff increases to the year 2030. On jfr o8 66 Owner City of Los Angeles, Department of Public Works, Bureau of Engineering

Data Type of facility Law enforcement

Type of construction New

Site area 1.3 acres

Area of building 23,000 GSF new

Total cost of construction $12,732,550

Status of project Completed 2008

Staff population 30 sworn officers, 2 nonsworn personnel, total of 32 Credits Architect WWCOT Santa Monica, CA

Structural engineer Brandow & Johnston Los Angeles

Mechanical engineer Tsuchiyama Kaino Sun & Carter Irvine, CA

Electrical engineer 67 RE Wall & Associates

Tustin, CA L aw en f o rc ement

Civil engineer Wagner Engineering and Survey Northridge, CA

LEED commissioning

CTG Energetics Inc. a c ilitie s Irvine, CA

Security consultant TRC-EASI Irvine, CA

Builder Bernards Bros. Construction (general contractor) San Fernando, CA

Photographer Daly Architectural Photography Chino Hills, CA jfro9 68 Sp Spanish Fork, UT mat poie cuat elh n sft, n esr long- ensure and safety, environmental and health its occupant provide reduce impact, to strategies sustainable numerous incorporates building The sandstone. and brick of combination a using tradition, masonry local the reflect materials building’s The facilities. both serves that plaza entry large a of edges the creates also and center civic future the of corner southwest the provides configuration L-shaped The activities. police and courts the both serves that area holding and receiving prisoner located centrally a to tethered each wings, two has building center. The arts visual a and performing include a center,and senior library, a city a also hall, city new will that center civic regional planned master of a building first the is and site seven-acre a on sits building SF state 59,000- The a building. safety public municipal combines a with facility Center court Justice Fork Spanish new the Utah, central in community changing rapidly yet historic, an in Located A rchitect’s rchitect’s anish ForkFou S tatement tatement th DistrcCou t andCityPolice lobby andavailableforcommunityfunctions. main the from accessible are which areas, training/conferencing includes spaces to support areathe department’s law enforcement activities and This technology. and requirements changing for flexible be yet department, police the for area functional secure, a provide to The designed was and space. story single a gallery is wing safety upper pubic the from daylight both natural borrow and downtown. views courtrooms historic the the clerestories, to intervening building Through the orient and WasatchMountains the of views extraordinary site’s the curtain capture by that side walls one on enclosed are that galleries waiting and circulation public stacked of consists wing court the of edge north The lighting. artificial by controlled and augmented high-efficiency regularly occupied spaces are lit during the day by natural daylight all virtually wing, court two-story the In citizens. the for value term 69 Law enforcement facilities

Credits Architect EDA Architects Salt Lake City Structural engineer ABS Consulting Engineer Salt Lake City Mechanical engineer Boerum and Fank Associate Van Salt Lake City Electrical engineer Spectrum Engineer Salt Lake City Civil engineering/landscape consultant Dominion Engineering Salt Lake City Builder Layton Construction Companies (CM/GC) UT Sandy City, Photographer Paul Richer Salt Lake City Owner Fork, Utah City of Spanish Data of facility Type Court, law enforcement of construction Type New Site area 6.73 acres Area of building 58,999 GSF new cost of construction Total $16,610,154 Status of project Completed 2008 Staff population 65 sworn officers, 10 nonsworn personnel, total of 75 Square feet per staff: 363

index of architects

NEW IMAGE jfro9 72 index WWCOT. Architects. Wiginton HookerJeffry Westlake ReedLeskosky. TENG &AssociatesInc. Rohde MayKellerMcNamaraArchitecturePC. Ricci GreeneAssociates. OZ Architecture. NORR LimitedArchitectsandEngineers. Little DiversifiedArchitecturalConsulting. Inc.. PSA-Dewberry Perez &ArchitectsPlannersInc.. Mitchell |GiurgolaArchitectsLLP. Kasian ArchitectureInteriorDesign&PlanningLtd.. Kallmann McKinnell&Wood ArchitectsInc.. HOK. Hartman-Cox Architects. HDR ArchitectureInc.. GLTArchitects. EDA Architects. DLR Group. BKV Group. Barge, Waggoner, Sumner, andCannonInc...... of ...... architects ...... 13, 21,25,49 41, 51,65 33, 41,43 16, 37 5, 9 59 45 21 57 67 63 53 55 41 51 41 29 69 39 29 16 5