December 2018

RioCan – 2525 – Lincoln Fields Shopping Centre Transportation Impact Assessment Report

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre

Transportation Impact Assessment Strategy Report

prepared for: RioCan Yonge Eglington Centre 2300 Yonge Street, Suite 500 Toronto, ON M4P 1E3

prepared by:

1223 Michael Street North Suite 100 , ON K1J 7T2

December 18, 2018

476888-01000

TABLE OF CONTENTS

1. TIA SCREENING FORM ...... 1 2. DESCRIPTION OF PROPOSED DEVELOPMENT ...... 1 2.1. PROPOSED DEVELOPMENT ...... 1 3. EXISTING CONDITIONS ...... 1 3.1. AREA ROAD NETWORK ...... 1 3.2. PEDESTRIAN/CYCLING NETWORK ...... 4 3.3. TRANSIT NETWORK ...... 4 3.4. EXISTING STUDY AREA INTERSECTION ...... 5 3.5. EXISTING INTERSECTION OPERATIONS ...... 7 3.6. EXISTING ROAD SAFETY CONDITIONS ...... 8 3.7. EXISTING AREA TRAFFIC MANAGEMENT MEASURES ...... 9 4. PLANNED CONDITIONS ...... 9 4.1. PLANNED STUDY AREA TRANSPORTATION NETWORK CHANGES ...... 9 4.2. OTHER AREA DEVELOPMENTS ...... 9 4.2.1. DYMON SELF STORAGE – 2583-2599 CARLING AVENUE ...... 9 4.2.2. URBAN STRUCTURE PROPERTIES LTD - 351 CROYDON AVENUE ...... 9 5. STUDY AREA ...... 9 5.1. TRANSIT ...... 9 5.2. NETWORK CONCEPT ...... 9 5.3. INTERSECTION DESIGN ...... 10 6. TIME PERIODS ...... 10 7. HORIZON YEARS ...... 10 8. EXEMPTIONS REVIEW...... 10 9. DEVELOPMENT-GENERATED TRAVEL DEMAND ...... 10 9.1. TRIP GENERATION ...... 10 9.1.1. COMMERCIAL/RETAIL TRIP GENERATION ...... 10 9.1.2. MODE SHARES ...... 11 9.2. TRIP DISTRIBUTION...... 12 9.3. TRIP ASSIGNMENT ...... 12 10. BACKGROUND NETWORK TRAVEL DEMANDS ...... 14 10.1. TRANSPORTATION NETWORK PLANS ...... 14 10.2. BACKGROUND GROWTH ...... 14 10.2.1. PROJECTED BACKGROUND 2020 OPERATIONS ...... 15 10.2.2. PROJECTED BACKGROUND 2025 OPERATIONS ...... 16 10.3. OTHER AREA DEVELOPMENTS ...... 17 11. DEVELOPMENT DESIGN ...... 17 11.1. CIRCULATION AND ACCESS ...... 17 12. PARKING ...... 17 12.1. PARKING SUPPLY ...... 17 13. BOUNDARY STREET DESIGN...... 17

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Forecasting Report i

14. ACCESS INTERSECTION DESIGN ...... 18 14.1. LOCATION AND DESIGN OF ACCESS ...... 18 14.2. INTERSECTION CONTROL ...... 18 14.3. INTERSECTION DESIGN ...... 18 14.3.1. PROJECTED TOTAL OPERATIONS ...... 18 14.3.2. MMLOS ANALYSIS ...... 18 15. SUMMARY OF IMPROVEMENTS INDICATED AND MODIFICATIONS OPTIONS ...... 19

LIST OF FIGURES

FIGURE 1: LOCAL CONTEXT ...... 2 FIGURE 2: SITE PLAN ...... 3 FIGURE 3: AREA TRANSIT NETWORK – ROUTES ...... 4 FIGURE 4: AREA TRANSIT NETWORK – STOP LOCATIONS ...... 5 FIGURE 5: EXISTING PEAK HOUR TRAFFIC VOLUMES ...... 8 FIGURE 6: FORECASTED PEAK HOUR VEHICLE TRIPS (EXCLUDING PASS-BY TRIPS) ...... 13 FIGURE 7: FORECASTED PEAK HOUR PASS-BY TRIPS ...... 13 FIGURE 8: TOTAL FORECASTED PEAK HOUR VEHICLE TRIPS ...... 14 FIGURE 9: PROJECTED BACKGROUND 2020 TRAFFIC VOLUMES ...... 15 FIGURE 10: PROJECTED BACKGROUND 2025 TRAFFIC VOLUMES ...... 16

LIST OF TABLES

TABLE 1: EXEMPTIONS REVIEW SUMMARY ...... 10 TABLE 2: 9TH EDITION ITE TRIP GENERATION RATES ...... 11 TABLE 3: 9TH EDITION ITE VEHICLE TRIP GENERATION ...... 11 TABLE 4: 9TH EDITION ITE PASS-BY RATES ...... 11 TABLE 5: TOTAL SITE PERSON TRIP GENERATION ...... 12 TABLE 6: PROJECTED BACKGROUND 2020 PERFORMANCE AT STUDY AREA INTERSECTIONS ...... 15 TABLE 7: PROJECTED BACKGROUND 2025 PERFORMANCE AT STUDY AREA INTERSECTIONS ...... 16 TABLE 8: MMLOS – BOUNDARY STREET SEGMENTS ...... 17 TABLE 9: MMLOS – BOUNDARY SIGNALIZED INTERSECTIONS ...... 18

LIST OF APPENDICES APPENDIX A – SCREENING FORM AND CORRESPONDENCE APPENDIX B – OC TRANSPO ROUTE INFORMATION APPENDIX C – TRAFFIC DATA APPENDIX D – COLLISION DATA APPENDIX E – 2020 AND 2025 SYNCHRO ANALYSIS

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report ii

TIA Plan Reports

On 14 June 2017, the Council of the City of Ottawa adopted new Transportation Impact Assessment (TIA) Guidelines. In adopting the guidelines, Council established a requirement for those preparing and delivering transportation impact assessments and reports to sign a letter of certification.

Individuals submitting TIA reports will be responsible for all aspects of development-related transportation assessment and reporting, and undertaking such work, in accordance and compliance with the City of Ottawa’s Official Plan, the Transportation Master Plan and the Transportation Impact Assessment (2017) Guidelines.

By submitting the attached TIA report (and any associated documents) and signing this document, the individual acknowledges that s/he meets the four criteria listed below.

CERTIFICATION

1. I have reviewed and have a sound understanding of the objectives, needs and requirements of the City of Ottawa’s Official Plan, Transportation Master Plan and the Transportation Impact Assessment (2017) Guidelines; 2. I have a sound knowledge of industry standard practice with respect to the preparation of transportation impact assessment reports, including multi modal level of service review; 3. I have substantial experience (more than 5 years) in undertaking and delivering transportation impact studies (analysis, reporting and geometric design) with strong background knowledge in transportation planning, engineering or traffic operations; and 4. I am either a licensed1 or registered2 professional in good standing, whose field of expertise [check ✓ appropriate field(s)] is either transportation engineering □ or transportation planning □.

1,2 License of registration body that oversees the profession is required to have a code of conduct and ethics guidelines that will ensure appropriate conduct and representation for transportation planning and/or transportation engineering works.

City Of Ottawa Ville d'Ottawa Infrastructure Services and Community Services d 'infrastructure et Viabilité des Sustainability collectivités Planning and Growth Management Urbanisme et Gestion de la croissance 110 Laurier Avenue West, 4th fl. 110, avenue Laurier Ouest Ottawa, ON K1P 1J1 Ottawa (Ontario) K1P 1J1 Tel. : 613-580-2424 Tél. : 613-580-2424 Fax: 613-560-6006 Télécopieur: 613-560-6006

Transportation Impact Assessment Guidelines

Dated at Ottawa this 18 day of December , 20 18 . (City)

Name: Ronald Jack (Please Print)

Professional Title: Senior Transportation Engineer

Signature of Individual certifier that s/he meets the above four criteria

Office Contact Information (Please Print) Address: 1223 Michael Street

City / Postal Code: Ottawa K1J 7T2

Telephone / Extension: 613 – 738 ‐ 4160

E‐Mail Address: [email protected]

Stamp

18-Dec-18

68 Revision Date: June, 2017

TIA Forecasting Report

1. TIA SCREENING FORM The Screening Form for the proposed development has been prepared and included as Appendix A. The screening exercise identified the need for a Transportation Impact Assessment (TIA) based on the Location trigger as it is within a 600m radius of the existing Lincoln Fields transitway (future LRT) station and both Richmond Road and Carling Avenue are design priority areas. The proposed Site Plan will see a demolition of the existing shopping centre and relocation of two tenants (Metro and Rexall) to new buildings. The overall reduction in shopping centre space is approximately 18,600 m2 (200,000 sq. ft.). The site will connect to the adjacent road network through the existing driveways on Richmond Road, Croydon Avenue, Assaly Road and Carling Avenue.

2. DESCRIPTION OF PROPOSED DEVELOPMENT

2.1. PROPOSED DEVELOPMENT

The proposed Site Plan for 2525 Carling Avenue facilitates the demolition of the existing shopping centre and accommodates existing tenant obligations. A City-led Community Design Plan and Secondary Plan exercise to develop an overall plan surrounding the future LRT station at Lincoln Fields is scheduled to begin late 2018/early 2019 to review the area as a whole and engage the community. The ultimate zoning and land use planned for the shopping centre will be determined through this process and future development phases will proceed once LRT is opened at Lincoln Fields station.

The current zoning is a mix of Arterial Mainstreet (AM in the centre and AM10 along the Richmond and Carling frontages), with the permitted uses accommodating a broad range of uses including retail, service commercial, offices, residential and institutional uses in mixed-use buildings or side by side in separate buildings in areas designated Arterial Mainstreet in the Official Plan. The existing site access/egress driveways are located on Carling (signalized full movement), Croydon (full movement), Richmond (right-in/right-out), and a secondary access (signalized full movement) is provided through private property (owner by others) adjacent to the east. A total of approximately 1,268 parking spots will be provided on the entire site, including 259 spaces dedicated to the new Metro and Rexall buildings. It is noted that the existing site includes 1,050 parking spaces so there is a net increase of 218 parking spaces associated with the demolition and new construction. The site’s local context is illustrated in Figure 1 and the Phase 1 Site Plan is illustrated in Figure 2. The estimated date of completion of the Phase 1 development is 2020.

The Zoning By-Law and Private Approach By-Law will be the City regulatory documents primarily used for analysis of this site.

3. EXISTING CONDITIONS

3.1. AREA ROAD NETWORK

The following City-owned roads are within the study area network:

Carling Avenue is an east-west arterial road, extending from March Road, through Nepean to Bronson Avenue. Within the proposed Study Area, Carling Avenue is a divided four to six lane urban roadway with a posted speed limit of 60km/h. Carling Avenue is also identified as a trucking route. The right-of-way protection for Carling is 44.5m.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Forecasting Report 1

Figure 1: Local Context

Richmond Road is an east-west arterial road, extending from Baseline Road, through Nepean to Island Park Drive. Within the proposed Study Area, Richmond Road is a two-lane urban roadway with a posted speed limit of 50km/h. Richmond Road is also identified as a trucking route. The right-of-way protection for Richmond is 37.5m.

Croydon Avenue is a two-lane local road, extending from Regina Street to Carling Avenue. The road has an assumed 50km/h unposted speed limit.

Assaly Road is a two-lane local road, extending north from Richmond Road to Regina Street. The road has an assumed 5- km/h unposted speed limit.

The NCC-owned Sir John A Macdonald Parkway is located east of the site.

Adjacent retail and commerical driveways are located on Richmond Road and Croydon Avenue, and residential driveways are located on the south side of Carling Avenue.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 2 Figure 2: Proposed Site Plan

3.2. PEDESTRIAN/CYCLING NETWORK

The pedestrian network is comprised of sidewalks on both sides of Richmond and Carling, and along the west side of Croydon. A multi-use pathway connection is provided along Sir John A Macdonald corridor. Richmond and Carling are designated cycling spine routes, and Richmond has bike lanes with a section of cycle track between Forest and Sir John A Macdonald on the south side of the roadway. Multi-use pathways along Sir John A Macdonald also provide cycling facilities to/from the east of the site.

3.3. TRANSIT NETWORK

Transit service within the vicinity of the site is currently provided by OC Transpo Routes #11, 16, 85, 97, and 153. These routes provide the following service:  Route #11 currently provides service along Richmond Road approximately every 10-30 minutes between Bayshore and Rideau. This route will discontinue service between Lincoln Fields and Bayshore stations as of September 2, 2018.  Route #16 provides service along Richmond Road and Carling Avenue, looping through the shopping centre approximately every 10-30 minutes between Britannia Park and the General Hospital Campus Ring Road.  Route #85 provides service along Carling Avenue every 15-30 minutes between Bayshore and Rideau.  Route #97 provides service along Carling Avenue every 15-30 minutes predominantly between Bayshore and the Airport.  Route #153 provides service between Lincoln Fields and the Mall, looping through the Lincoln Fields Shopping Centre between 8am and 5:20pm.

Figure 3 illustrates the routes within the vicinity of the Lincoln Fields Shopping Centre, and Figure 4 illustrates the stop locations in the surrounding area. The transit routes and timetables are provided in Appendix B.

Figure 3: Area Transit Network – Routes

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 4

Figure 4: Area Transit Network – Stop Locations

http://plan.octranspo.com/plan, accessed November 1, 2018

3.4. EXISTING STUDY AREA INTERSECTION

Carling / Access #1 Carling Avenue / Access #1 is a 4-legged signalized intersection. The northbound approach (Connaught) consists of a one-way, right-out approach. The southbound approach consists of a left-turn lane and an auxiliary right-turn lane. The east and westbound approaches have 3 through lanes, and auxiliary lanes are provided into the Lincoln Fields Shopping Centre (westbound left-turn lane and eastbound right-turn lane). It is noted that the Southbound left-turn lane is prohibited during the AM peak period, Monday to Friday between the hours of 7:00 to 9:00)

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 5

Croydon / Access #2 Croydon / Access #2 is a 3-legged intersection with yield- control on the minor approach. The southbound approach (Croydon) consists of a shared through-left lane, the northbound approach consists of a shared through-right lane and the westbound approach consists of a shared left-turn lane.

Richmond / Access #3 Richmond Road / Access #3 is a 3-legged intersection with stop-control on the minor approach. The northbound approach (Access#3) consists of a right-in/right-out access. The eastbound approach consists of a through lane and an auxiliary left-turn lane that extends back from Assaly Road. The westbound approach consists of a through lane. A bike lane is provided in the westbound direction and no stopping is permitted on the additional pavement width between the bike lane and sidewalk.

Richmond / Assaly Richmond Road / Assay Road is a 4-legged signalized intersection. The northbound approach (Assaly) is a private access consisting of a shared through/left-turn lane and an auxiliary left turn lane. The southbound approach consists of a shared single lane permitting all movements. The eastbound and westbound approaches consist of a shared through/right-turn lane and an auxiliary left-turn lane. The eastbound left-turn lane extends to 1365 Richmond Road, near Croydon Avenue, and serves as a left turn lane for adjacent driveways on the north side of Richmond Road. Additional shoulder width is provided in the westbound direction, on the far side of the bike lane.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 6

Carling / Croydon Carling / Croydon is a 3-legged signalized T-intersection. The southbound approach (Croydon) consists of an auxiliary left turn lane and a shared left/right turn lane. The eastbound approach consists of three through lanes and an auxiliary left-turn lane. The westbound approach consists of two through lanes and a shared through-left turn lane.

Richmond / Croydon Richmond / Croydon is a 4-legged signalized intersection. The southbound approach (Croydon) consists of a single full movement lane. Westbound and eastbound approaches consist of an auxiliary left-turn lane and a shared through/right-turn lane. The northbound approach consists of consists of an auxiliary left-turn lane and shared through/right-turn lane. The northbound approach also has a bike pocket and a no right on red restriction.

3.5. EXISTING INTERSECTION OPERATIONS

The existing peak hour traffic volumes (illustrated in Figure 5) were obtained from City of Ottawa turning movement counts, which were completed in 2016. The resulting peak hour and full traffic volume counts are included as Appendix C. The turning movement counts for the secondary accesses have been left blank as tenant changes (e.g. vacancy of Walmart) within the site are not accurately accounted for in the existing data.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 7

Figure 5: Existing Peak Hour Traffic Volumes

3.6. EXISTING ROAD SAFETY CONDITIONS

Collision history for study area roads has been requested from the City of Ottawa. The available data on Open Data Ottawa website has been summarized as follows.

Over the four-year period, the types of collisions cited by police include: rear end (35% or 35 collisions), turning movement (33% or 33 collisions), sideswipe (13% or 12 collisions), angled (10% or 10 collisions), single vehicle (other) (5% or 5 collisions), other (4% or 4 collisions), and single vehicle (unattended vehicle) (1% or 1 collision). Three pedestrian related collisions are also noted (Carling Avenue and Sir John A Macdonald, Carling Avenue and Croydon Avenue, and Richmond Road and Croydon Avenue) and a single cyclist collision is noted at Richmond Road and Croydon Avenue.

A standard unit of measure for assessing collisions at an intersection is based on the number collisions per million entering vehicles (MEV). At intersection and road segment within the study area, reported collisions per MEV is as follows:  0.06 collisions/MEV at the Carling Avenue and Sir John A Macdonald intersection  0.30 collisions/MEV at the Carling Avenue and Connaught Avenue intersection  0.09 collisions/MEV at the Carling Avenue and Tavistock Road intersection  0.69 collisions/MEV at the Carling Avenue and Croydon Avenue intersection  0.94 collisions/MEV at the Richmond Road and Croydon Avenue intersection

With respect to the subject site, there does not appear to be any prevailing safety issues at the study area intersections beyond the high congestion (e.g. rear ends and sideswipes/lane changes) The higher collisions/MEV value at the Richmond

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 8

Road and Croydon Avenue intersection is half rear end collisions (10 of the 20 collisions) and may be due to the skewed geometry of the intersection.

The open source collision data as provided as Appendix D.

3.7. EXISTING AREA TRAFFIC MANAGEMENT MEASURES

There are currently no existing area traffic management measures present within the study area.

4. PLANNED CONDITIONS

4.1. PLANNED STUDY AREA TRANSPORTATION NETWORK CHANGES

As outlined within the Ottawa Transportation Master Plan, Richmond Road is identified to be widened between conceptually Carling Avenue and Highway 417 but is not listed in the Affordable Network. The Stage 2 LRT extension is planned to be open at the Lincoln Fields Station by 2023. A future sidewalk connection is planned along Connaught Avenue, connecting south to multi-use pathway connection on Roman Avenue.

No future projects are identified as part of the Ward 7 Planned Construction Program.

4.2. OTHER AREA DEVELOPMENTS

4.2.1. DYMON SELF STORAGE – 2583-2599 CARLING AVENUE

A Site Plan Control and Zoning Bylaw Amendment application for the 2583 and 2599 Carling Avenue has been submitted for a proposed Dymon self-storage facility. The site is comprised of a 136,000 sq. ft storage facility and 10,000 sq. ft. of retail space. Site accesses will be located on Carling Avenue, Forest Street and Bond Street. Given the unique trip characteristics of Dymon storage sites, the overall traffic impacts are anticipated to be negligible.

4.2.2. URBAN STRUCTURE PROPERTIES LTD - 351 CROYDON AVENUE

A Site Plan Control application for the 351 Croydon Avenue property been submitted for a proposed three storey, eight-unit residential building. Due to the size of the development, no transportation study was completed and should have minimal impact on the area. The lot is currently vacant, and it has been used by food trucks.

5. STUDY AREA

5.1. TRANSIT

As discussed in Section 3.3, transit is served within the area with bus stops for Route #11, 16, 85, 97 and 153, with stops located within the site and on the boundary road network.

5.2. NETWORK CONCEPT

Screenline SL-24 is located along the Sir John A. Macdonald and Transitway corridor between the Ottawa River and Pinecrest Creek Pathway (north of Baseline Road). The removal of the shopping centre will represent an overall decrease in the screenline volumes.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 9

5.3. INTERSECTION DESIGN

No changes to the existing site access are proposed as part of the demolition of the existing building and construction of two smaller buildings for the existing Metro and Rexall tenants.

6. TIME PERIODS No operational analysis is required for the demolition of the existing shopping centre. The morning and afternoon roadway peaks would be the critical time periods.

7. HORIZON YEARS It is estimated that the demolition of the shopping centre and construction of two smaller buildings to accommodate the existing Metro and Rexall tenants will be completed by 2020. No operational analysis is required for the horizon year as existing conditions are based on higher site-generated traffic than the future conditions.

8. EXEMPTIONS REVIEW Based on the foregoing analysis and review of the existing conditions in Step 2, the Scoping Report, it is recommended that, if required, any future work within the context of this TIA excludes the following modules and elements summarized in Table 1. Table 1: Exemptions Review Summary Module Element Exemption Consideration 4.1 Development 4.1.3 New Not required for Site Plans. Design Street Networks 4.2.2 Spillover 4.2 Parking The overall site will not be under 15% of unconstrained demand. Parking Network Impact Component All Elements The location does not trigger the trip generation. (Modules 4.5 – 4.9)

9. DEVELOPMENT-GENERATED TRAVEL DEMAND

9.1. TRIP GENERATION

As the proposed development is reducing both the number of tenants and floor area compared to existing conditions, it is difficult to assess the approximate trip share each of the existing tenants contributes to the site. As such, the following sections will develop the trip generation as if the site is brand new, zero all the existing turning movements to/from the site and re-apply the new trip generation to the study area intersections. To re-iterate: the site will experience a reduction in overall trips to/from the site with the demolition of the existing shopping mall. The Metro (supermarket), Rexall (pharmacy), Wendy’s (fast food with drive-through), and Pizza Pizza (fast-food without drive-through) will remain on site after the demolition and removal of over 100,000 sq. ft. of shopping mall. The only new proposed land use will be 8,300 sq. ft. of single tenant office space.

9.1.1. COMMERCIAL/RETAIL TRIP GENERATION

The trip generation rates for the proposed development were obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual 9th Edition for the retail component. Table 2 summarizes the trip generation rates.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 10

Table 2: 9th Edition ITE Trip Generation Rates Trip Rates Land Use ITE Code AM Peak PM Peak Supermarket 850 n/a Ln(T) = 0.74 Ln(x) + 3.25 Pharmacy 880 n/a T = 9.48(x) Office 715 T = 1.67(x) + 21.93 T = 1.52(x) + 34.6 Fast-Food without Drive Through 933 n/a T = 26.15(x) Fast-Food with Drive Through 934 n/a T = 32.65(x) Notes: T = Average Trip Ends x =Gross Floor Area

ITE trip generation surveys only record vehicle trips and typically reflect highly suburban locations (with little to no access by travel modes other than private automobiles), adjustment factors appropriate to the more connected suburban study area context were applied to attain estimates of person trips for the proposed development. This approach is considered appropriate within the industry for more urban developments.

To convert ITE vehicle trip rates to person trips, an auto occupancy factor and a non-auto trip factor were applied to the ITE vehicle trip rates. Our review of available literature suggests that a combined factor of approximately 1.28 is considered reasonable to account for typical North American auto occupancy values of approximately 1.15 and combined transit and non-motorized modal shares of less than 10%. As such, the person trip generation for the proposed site is summarized in Table 3

Table 3: 9th Edition ITE Vehicle Trip Generation

Data AM Peak (veh/h) PM Peak (veh/h) Land Use Floor Area Source In Out Total In Out Total Supermarket ITE 850 28,200 sq.ft. - - - 194 203 397 Pharmacy ITE 880 8,000 sq.ft. - - - 55 54 109 Office ITE 715 8,300 sq.ft. 41 6 47 9 52 61 Fast-Food without Drive Through ITE 933 3,500 sq.ft. - - - 60 59 119 Fast-Food with Drive Through ITE 934 3,600 sq.ft. - - - 79 74 153

Pass-by percentages were also applied, consistent with the ITE Trip Generation Manual 9th Edition for each land use and is summarized in Table 4.

Table 4: 9th Edition ITE Pass-By Rates

Land Use Pass-By Rate

Supermarket 30% Pharmacy 30% Office - Fast-Food without Drive Through 50% Fast-Food with Drive Through 50%

9.1.2. MODE SHARES

Using the ITE Auto Trips projected in Table 3 and the modal share percentages from the 2011 NCR Household Origin – Destination Survey, the modal share for the proposed development are summarized in Table 5 with the associated pass- by volumes.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 11

Table 5: Total Site Person Trip Generation Mode AM Peak (persons/h) PM Peak (persons/h) Travel Mode Share In Out Total In Out Total Auto Driver 55% 23 4 27 250 280 530 Auto Passenger 15% 6 1 7 68 76 144 Transit 15% 6 1 7 68 76 144 Non-motorized 15% 6 0 6 67 76 143 Total People Trips 100% 41 6 47 450 508 961 Sub-Total Auto Trips 23 4 27 213 238 451 Pass-By Auto - - - -78 -78 -166 Total Auto Trips 23 4 27 135 160 373

As shown in Table 5, based on the ITE Trip Generation, the proposed development is projected to generate approximately 30 two-way vehicle trips during the weekday AM peak and 451 two-way vehicle trips (including 166 pass-by trips) during the weekday PM peak.

9.2. TRIP DISTRIBUTION

Traffic distribution was based on the 2011 NCR Household Origin – Destination Survey, existing volume splits at study area intersections and our knowledge of the surrounding area. The resultant distribution is as follows.  25% to/from the east via Carling Avenue  38% to/from the west via Carling Avenue  37% to/from the west via Richmond Road 100%

9.3. TRIP ASSIGNMENT

The resulting site-generated vehicle trips were assigned to the study area intersections using the above distribution. Figure 6 illustrates the forecasted future trips, Figure 7 illustrates the forecasted pass-by trips, and Figure 8 illustrates the total site-generated vehicle trips used in this analysis.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 12

Figure 6: Forecasted Peak Hour Vehicle Trips (Excluding Pass-by Trips)

Figure 7: Forecasted Peak Hour Pass-By Trips

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 13

Figure 8: Total Forecasted Peak Hour Vehicle Trips

10. BACKGROUND NETWORK TRAVEL DEMANDS

10.1. TRANSPORTATION NETWORK PLANS

The transportation network changes have been discussed within Section 4.1.

10.2. BACKGROUND GROWTH

The background traffic volumes along Carling Avenue and Richmond Road have been assumed to increase by 2% by 2025. As the demolition will be completed during the interim, a 1% increase has been assumed during the 2020 horizon.

As the demolition of the existing building structures is completed, traffic volumes at the site’s existing accesses will be affected to a much greater degree than at the adjacent intersections of Croydon/Carling and Croydon/Richmond. This is due to the anticipated reduction of vehicles entering and exiting the site; For this reason, the analysis moving forward will focus on only the mall’s accesses listed below:  Connaught/Access #1/Carling  Assaly/Richmond  Croydon / Access #2  Richmond / Access #3 Figure 9 and Figure 10 illustrate the future background traffic volumes for the 2020 and 2025 future background traffic volumes, respectively. These volumes include the reduction in the existing site-generated vehicle trips developed in Section 9.0.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 14

10.2.1. PROJECTED BACKGROUND 2020 OPERATIONS

The projected 2020 traffic volumes illustrated in Figure 9 were derived by superimposing the total forecasted peak hour vehicle trips (Figure 8) onto the 2020 background traffic growth. Since the planned demolition of the existing retail space is removing traffic, the total projected vehicle traffic entering and exiting the site is less than the existing vehicle traffic. Table 6 provides a summary of the projected 2020 operations at the study area intersections. The SYNCHRO model output of projected 2020 conditions is provided within Appendix E. Figure 9: Projected Background 2020 Traffic Volumes

Table 6: Projected Background 2020 Performance at Study Area Intersections

Weekday AM Peak (PM Peak) Intersection Critical Movement Intersection ‘as a whole’ max. v/c or LoS Movement Delay (s) LoS v/c avg. delay (s) Signalized Carling / Access #1 B(B) 0.62(0.65) EBT(WBT) 4.9(13.2) B(B) 0.61(0.63) Richmond / Assaly D(B) 0.83(0.67) EBT(WBT) 21.3(10.9) B(B) 0.69(0.61) Stop-Controlled / Yield Control Croydon / Access #2 A(B) 10.0(11.7) WBT(WBT) 0.1(2.7) A(A) - Richmond / Access #3 A(B) 0.0(11.6) NBT(NBT) 0.0(0.3) A(A) - Note: Analysis of signalized intersections assumes a PHF of 1.0 and a saturation flow rate of 1800 veh/h/lane.

As shown in Table 6, the study area intersections, ‘as a whole’, are projected to operate at an acceptable LoS ‘B’ or better during the peak hours with regard to City of Ottawa operating standards. The critical movements at study area intersections are projected to operate at a LoS ‘E’ or better during the peak hours.

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 15

10.2.2. PROJECTED BACKGROUND 2025 OPERATIONS

The projected 2025 traffic volumes illustrated in Figure 10 were derived by superimposing the total new site generated traffic (Figure 8) onto the 2025 background traffic. Since the planned demolition of the existing retail space is removing traffic, the total vehicle traffic entering and exiting the site is less than the existing vehicle traffic. The resulting total projected 2025 traffic volumes are illustrated in Figure 10. Table 7 provides a summary of the projected 2025 operations at the study area intersections. The SYNCHRO model output of projected 2025 conditions is provided within Appendix E. Figure 10: Projected Background 2025 Traffic Volumes

Table 7: Projected Background 2025 Performance at Study Area Intersections

Weekday AM Peak (PM Peak)

Intersection Critical Movement Intersection ‘as a whole’ max. v/c or LoS Movement Delay (s) LoS v/c avg. delay (s) Signalized Carling / Access #1 B(C) 0.69(0.72) EBT(WBT) 5.3(14.3) B(B) 0.68(0.70) Richmond / Assaly E(C) 0.92(0.74) EBT(WBT) 25.8(12.3) C(B) 0.78(0.68) Stop-Controlled / Yield Control Croydon / Access #2 A(B) 10.0(11.7) WBT(WBT) 0.1(2.7) A(A) - Richmond / Access #3 A(B) 0.0(12.2) NBT(NBT) 0.0(0.3) A(A) - Note: Analysis of signalized intersections assumes a PHF of 1.0 and a saturation flow rate of 1800 veh/h/lane.

As shown in Table 7, study area intersections are projected to operate similar to the total projected 2020 conditions with the study area intersections, ‘as a whole’, are projected to operate at an acceptable LoS ‘B’ or better during the peak hours

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 16

with regard to City of Ottawa operating standards. The critical movements at study area intersections are projected to operate at a LoS ‘E’ or better during the peak hours. No improvements are recommended for the 2025 horizon year.

10.3. OTHER AREA DEVELOPMENTS

The City of Ottawa’s Development Applications webtool has been used to determine if there are proposed developments within the area of influence of the proposed development. These developments have been discussed in greater detail in Section 4.2 and will have negligible impacts from these developments are anticipated on the study area intersections.

11. DEVELOPMENT DESIGN

11.1. CIRCULATION AND ACCESS

The existing driveway connections to adjacent roads will be used for the proposed development and currently support delivery vehicles and OC Transpo vehicles. No issues are noted with the proposed loading bays.

12. PARKING

12.1. PARKING SUPPLY

Vehicle Parking A total of approximately 1,268 parking spots will be provided on the entire site, including 259 spaces dedicated to the new Metro and Rexall buildings. It is noted that the existing site includes 1,050 parking spaces so there is a net increase of 218 parking spaces associated with the demolition and new construction.

Bicycle Parking A total of 108 bicycle parking spaces are proposed, this includes 8 exterior parking spaces and 100 interior parking spaces provided within the underground parking level. This amount of bicycle parking meets the City’s minimum requirement with respect to the City’s By-Law.

13. BOUNDARY STREET DESIGN The boundary streets for the development are Carling Avenue, Croydon Avenue, and Richmond Road. It is assumed that no complete street exercises have been completed for the area and will likely be included as part of the Secondary Plan exercise at Lincoln Fields LRT Station.

The multi-modal level of service analysis for the road segments along the boundary streets adjacent to the site is summarized in Table 8, with detail analysis provided in Appendix F. The existing MMLoS targets for the Arterial Main Streets and General Urban Local Street were used for this site and are shown in Table 8. Table 8: MMLOS – Boundary Street Segments

Level of Service Road Segment Pedestrian (PLoS) Bicycle (BLoS) Transit (TLoS) Truck (TkLoS) PLoS Target BLoS Target TLoS Target TLoS Target Carling Avenue F C F C D No Target A D Croydon Avenue B C B D D No Target B No Target Richmond Road (south side) C C A C D No Target C E Richmond Road (north side) C C D C D No Target C E

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 17

As shown in Table 8, the pedestrian and bicycle target level of service is not currently met on Carling Avenue. The travel speeds, assumed to be above the posted 60km/h, govern the pedestrian LoS, and the 3 travel lanes in each direction govern the bicycle LoS. Carling Avenue would need to be reduced to an operating speed of 30-50 km/h and narrowed to 2 lanes per direction to meet the MMLOS targets.

Along Richmond Road, the bicycle target level of service is not met on the north side of the roadway due to the adjacent parking lane. If the parking lane was removed and the bike lane placed at the curb side, the level of service would be met, but this would require the reconstruction of the north side of Richmond Road (by others).

As such, no improvements to the boundary streets are recommended as part of the proposed development.

14. ACCESS INTERSECTION DESIGN

14.1. LOCATION AND DESIGN OF ACCESS

The proposed development will use the existing Lincoln Fields Shopping Centre access points. No changes or modifications are proposed as part of this development.

14.2. INTERSECTION CONTROL

The proposed development will use the existing Lincoln Fields Shopping Centre access points. No changes or modifications are proposed as part of this development.

14.3. INTERSECTION DESIGN

14.3.1. PROJECTED TOTAL OPERATIONS

As the existing shopping centre will be demolished and some existing tenants relocated, the background conditions represent the future projected operations. Refer to Section 10.2 for the intersection operations.

14.3.2. MMLOS ANALYSIS

The MMLoS analysis for the study area signalized intersections is summarized in Table 9. The detailed MMLoS analysis is provided as Appendix F. Table 9: MMLoS – Boundary Signalized Intersections Level of Service Intersection Pedestrian (PLoS) Bicycle (BLoS) Transit (TLoS) Truck (TkLoS) PLoS Target BLoS Target TLoS Target TkLoS Target Carling / Access #1 F C F C B No Target D D Richmond / Assaly D C D C C No Target E D

The issues discussed in Section 13, the speeds and road width of Carling Avenue directly impact the pedestrian and the lack of dedicated facilities impacts the bicycle LoS for the Carling Avenue/Access #1 intersection.

Richmond Road and Assaly Road do not meet the pedestrian levels of service due to the crossing distance on Richmond Road and the bicycle target level of service is not met due to the mixed traffic approaches from the north and south, and the need to cross a lane to turn left from Richmond Road. Bike boxes would need to be implemented along Richmond Road

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 18

with dedicated facilities on Assaly Road and the private approach to the south to meet the level of service targets. The truck level of service is not achieved at this intersection due to the single receiving lanes on the approaches. As such, no improvements to the boundary study area intersections are recommended as part of the proposed development.

15. SUMMARY OF IMPROVEMENTS INDICATED AND MODIFICATIONS OPTIONS Based on the results summarized herein, the following conclusions are provided:

Proposed Site  The proposed Site Plan will see a demolition of the existing shopping centre and relocation of two tenants (Metro and Rexall) to new buildings. This represents an overall reduction in shopping centre floor space of approximately 18,600 m2 (200,000 sq. ft.);  The proposed development will connect to the adjacent road network via the existing driveway connections to Richmond Road, Croydon Avenue, Assaly Road and Carling Avenue.

Background Conditions  The demolition of the existing mall does not include any new tenants or land uses as part of the proposed Site Plan;  A desktop review identified a total background traffic growth of 2% by 2025 on Carling Avenue and Richmond Road;  Overall, the study area intersections, ‘as-a-whole’, are projected to operate acceptably during the peak hours for both the 2020 and 2025 horizons years;  No local improvements are recommended for the 2020 or 2025 total projected traffic conditions; and,  No new land uses are proposed at this time that would generate future traffic volumes.

Site Plan  The number of vehicle and bicycle parking spaces meet the City’s minimum By-Law requirement;  The existing Lincoln Fields Shopping Centre access driveways will provide adequate access to the site; and,  No issues have been noted with respect to site circulation or truck turning movements.

Boundary Streets  No improvements are recommended for Carling Avenue, Richmond Road or Assaly Road to address the MMLOS deficiencies.

Based on the foregoing, the proposed Site Plan is recommended from a transportation perspective.

Prepared by: Reviewed by:

18-Dec-18 18-Dec-18

Matthew Mantle, P.Eng. Ronald Jack, P.Eng. Transportation Engineer Senior Transportation Engineer

RioCan – 2525 Carling Avenue – Lincoln Fields Shopping Centre – Transportation Impact Assessment Strategy Report 19

Appendix A Screening Form and Correspondence

1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: +1 613.738.4160 l F: +1 613.739.7105 l www.parsons.com

City of Ottawa 2017 TIA Guidelines Date 21-Aug-18 TIA Screening Form Project RioCan - Lincoln Fields Project Number 908489-40021 Results of Screening Yes/No Development Satisfies the Trip Generation Trigger No Development Satisfies the Location Trigger Yes Development Satisfies the Safety Trigger No

Module 1.1 - Description of Proposed Development Municipal Address 2525 Carling Avenue, Ottawa CON 1 OF PT LOT 22 & 23 PLAN;348 PT LOT 45 TO 57 PLAN 311;PT Description of location LOT 48 RP 4R-489 PT PT 2;PTS 5 & 11 Land Use Existing Shopping Mall, Zoned AM and AM10 Development Size Removal approximately 100,000 sq. ft. 3 existing accesses (Carling, Croydon and Richmond) with secondary Number of Accesses and Locations access within private lands on Richmond Development Phasing Single phase Buildout Year 2019-2020 Sketch Plan / Site Plan See attached

Module 1.2 - Trip Generation Trigger Land Use Type Destination Retail Development Size -9290 sq. m Trip Generation Trigger Met? No

Module 1.3 - Location Triggers Development Proposes a new driveway to a boundary street that is designated as part of the City's Transit Priority, Rapid No Transit, or Spine Bicycle Networks (See Sheet 3) Development is in a Design Priority Area (DPA) or Transit- Yes oriented Development (TOD) zone. (See Sheet 3) Location Trigger Met? Yes

Module 1.4 - Safety Triggers Posted Speed Limit on any boundary road <80 km/h Horizontal / Vertical Curvature on a boundary street limits No sight lines at a proposed driveway A proposed driveway is within the area of influence of an adjacent traffic signal or roundabout (i.e. within 300 m of intersection in rural conditions, or within 150 m of No intersection in urban/ suburban conditions) or within auxiliary lanes of an intersection; A proposed driveway makes use of an existing median break No that serves an existing site There is a documented history of traffic operations or safety concerns on the boundary streets within 500 m of the No development The development includes a drive-thru facility No Safety Trigger Met? No Harte, Andrew

From: Jack, Ronald Sent: Friday, August 17, 2018 11:27 AM To: Baggs, Rosanna Cc: Harte, Andrew; Stuart Craig Subject: Re: Lincoln Fields Redevelopment TIA: Proposed Table of Contents

OK but it will be extremely brief.

Sent from my iPhone

On Aug 17, 2018, at 11:25 AM, Baggs, Rosanna wrote:

HI Ron,

Regardless if there is a reduction (and you can note this in the report) it is still required so that the City can have accurate information related to this applications and what the site will be contributing to the network.

Please complete the forecasting section.

Regards,

Rosanna Baggs, C.E.T. Project Manager, Infrastructure Approvals | GPRJ Approbation demandes infrastructure Development Review West Branch | Dir Services d'exam des dem d'amgt Tel |Tél. : 613‐580‐ 2424 ext. | poste 26388

***Absence alert*** Please note that I will be out of the office with no access to e-mail Friday August 31 to Friday September 7. I will be returning on Monday September 10, 2018

From: Jack, Ronald Sent: Friday, August 17, 2018 11:22 AM To: Baggs, Rosanna Cc: Harte, Andrew ; 'Stuart Craig' Subject: RE: Lincoln Fields Redevelopment TIA: Proposed Table of Contents

Hi Rosanna As there will be a reduction is site‐generated traffic, it is meaningless to do any traffic forecasting, as we would be removing not adding traffic volumes from the adjacent intersections. What I propose is we will identify the pedestrian and transit trips of the proposed smaller development, we will identify the background traffic growth and we will identify other area development, but as the existing traffic in the study area is greater before than after development, we won’t be doing and vehicle forecasting. As such, we will be doing only the meaningful/relevant components of Step 3 applicable to this project. Regards Ron

1 Ronald Jack, P.Eng. The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. ** 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 P: 613.738.4160 x5250 F: 613.739.7105 [email protected] http://www.parsons.com

From: Baggs, Rosanna Sent: Friday, August 17, 2018 11:03 AM To: Jack, Ronald Cc: Harte, Andrew ; 'Stuart Craig' Subject: RE: Lincoln Fields Redevelopment TIA: Proposed Table of Contents

Hi Ron,

All of Step 1‐3 will be required.

This Traffic Impact Assessment will be exempt from: ‐ the Design Review Components (Mods 4.1‐4.4) ‐ Mods 4.6 and 4.8 of the Network Impact Component. ‐ You will have to advise me whether you meet the exemption for Mods 4.5.

Please let me know if you have any questions or concerns.

Regards,

Rosanna Baggs, C.E.T. Project Manager, Infrastructure Approvals | GPRJ Approbation demandes infrastructure Development Review West Branch | Dir Services d'exam des dem d'amgt Tel |Tél. : 613‐580‐ 2424 ext. | poste 26388

***Absence alert*** Please note that I will be out of the office with no access to e-mail Friday August 31 to Friday September 7. I will be returning on Monday September 10, 2018

From: Jack, Ronald Sent: Friday, August 17, 2018 10:55 AM To: Baggs, Rosanna Cc: Harte, Andrew ; Stuart Craig Subject: Lincoln Fields Redevelopment TIA: Proposed Table of Contents

Hi Rosanna As you know, RioCan will be demolishing much of the current shopping centre and providing new buildings for their existing Metro and Rexall tenants. Other existing tenants in the current main building will not be accommodated resulting in significantly less floor area on site and a significantly lower site traffic generation compared to when the existing buildings were occupied.

2 With this as background, and related to the TIA report requirements, we note that the Trip Generation Trigger is not satisfied, the Location Trigger is satisfied and the Safety Trigger may not be triggered as no new site connections are proposed. Given this, attached is the Table of Contents that we believe is appropriate for the TIA Report for this project. The topics/items we propose to address are highlighted in green. The topics not highlighted will not be addressed. We believe the proposed table of contents will address all the relevant transportation‐related topics needed to make informed decisions on the proposed redevelopment that will have a lower site traffic generation than the historic on‐site development.

We are basing our work plan/fee to RioCan on the proposed (green) table of contents, and would therefore very much appreciate your comments and approval. Any questions, please call to discuss. Regards Ron

Ronald Jack, P.Eng. The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. ** 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 P: 613.738.4160 x5250 F: 613.739.7105 [email protected] http://www.parsons.com Mantle, Matthew

From: Mantle, Matthew Sent: Tuesday, December 18, 2018 3:15 PM To: Mantle, Matthew Subject: RE: Lincoln Fields - Site Plan Application Coordination

Responses in red below:

Traffic Engineering

1. There are No Right Turn on Red heading NB at Richmond Road/Croydon Avenue and NB Richmond Road / Assaly Road to help facilitate the bike boxes. Noted, NB right on red restricted in models. 2. Southbound Left Turn prohibition at Carling Avenue / Connaught Avenue between the hours 7‐9; M‐F. Noted. 3. These prohibitions to remain and should be documented. Report updated to reflect notes in section 3.4.

Transportation Engineering Services 1. If trip generation trigger is not met, Module 3.1 is exempted from the TIA. Noted. Section added previously at request by City as part of Step 2 Review. Section remains to show projected new traffic of the site due to the reduced Commercial and Office space provided.

From: Baggs, Rosanna Sent: Wednesday, December 12, 2018 11:47 AM To: Mantle, Matthew ; Nahas, Rani Cc: Baker, Mark ; Jack, Ronald Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

Hi Matthew,

Please see the comments from the circulation:

Traffic Engineering

1. There are No Right Turn on Red heading NB at Richmond Road/Croydon Avenue and NB Richmond Road / Assaly Road to help facilitate the bike boxes. 2. Southbound Left Turn prohibition at Carling Avenue / Connaught Avenue between the hours 7‐9; M‐F. 3. These prohibitions to remain and should be documented.

Transportation Engineering Services 1. If trip generation trigger is not met, Module 3.1 is exempted from the TIA.

If the above can be incorporated into the next submission, please proceed with Step 4. Otherwise, please discuss responses prior to proceeding.

1

Regards,

Rosanna Baggs, C.E.T. Project Manager, Infrastructure Approvals | GPRJ Approbation demandes infrastructure Development Review West Branch | Dir Services d'exam des dem d'amgt Tel |Tél. : 613‐580‐ 2424 ext. | poste 26388

From: Mantle, Matthew Sent: Monday, December 10, 2018 3:23 PM To: Nahas, Rani ; Baggs, Rosanna Cc: Baker, Mark ; Jack, Ronald Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

Hi Rosanna,

We are looking to prepare and submit step 4 in the coming days to meet with our client’s deadline, would I be able to get an update on the review of Step 3 for Lincoln fields?

Thank you,

Matt

Matthew Mantle, P.Eng. Transportation Engineer

1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 [email protected] - +1 613.691.1528 PARSONS - Envision More www.parsons.com | LinkedIn[linkedin.com] | Twitter [twitter.com]| Facebook [facebook.com]

From: Nahas, Rani Sent: Thursday, November 29, 2018 4:24 PM To: Baggs, Rosanna Cc: Baker, Mark ; Jack, Ronald ; 'Stephanie Morris' ; Mantle, Matthew Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

Hi Rosanna,

Please see attached Synchro files for Step 3.

Thanks, Rani

2 From: Baggs, Rosanna Sent: Thursday, November 29, 2018 4:21 PM To: Nahas, Rani Cc: Baker, Mark ; Jack, Ronald ; 'Stephanie Morris' ; Mantle, Matthew Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

Hi Rani,

Please forward the electronic synchro files to support the hard copies attached in Appendix E. I cannot circulate it until I get them.

Regards,

Rosanna Baggs, C.E.T. Project Manager, Infrastructure Approvals | GPRJ Approbation demandes infrastructure Development Review West Branch | Dir Services d'exam des dem d'amgt Tel |Tél. : 613‐580‐ 2424 ext. | poste 26388

From: Baggs, Rosanna Sent: Wednesday, November 28, 2018 3:23 PM To: 'Nahas, Rani' Cc: 'Baker, Mark' ; 'Jack, Ronald' ; 'Stephanie Morris' ; 'Mantle, Matthew' Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

Hi Rani,

Can you please provide me with an electronic copy of the Synchro files.

Traffic Signal Operations Unit (Traffic Engineering) have requested that electronic Synchro files be included with all Forecasting submissions. The Forecasting report will not be circulated for review without the document attached. This will be a requirement for all future submissions of Forecasting Reports.

Regards,

Rosanna Baggs, C.E.T. Project Manager, Infrastructure Approvals | GPRJ Approbation demandes infrastructure Development Review West Branch | Dir Services d'exam des dem d'amgt Tel |Tél. : 613‐580‐ 2424 ext. | poste 26388

From: Nahas, Rani Sent: Monday, November 26, 2018 11:56 AM To: Baggs, Rosanna Cc: Baker, Mark ; Jack, Ronald ; 'Stephanie Morris' ; Mantle, Matthew Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

Hi Rosanna,

3

Please see attached forecasting report. The highlighted comments below have been addressed for this submission.

Kind Regards, Rani

From: Baggs, Rosanna Sent: Thursday, November 22, 2018 3:27 PM To: Nahas, Rani Cc: Baker, Mark ; Jack, Ronald ; 'Stephanie Morris' ; Mantle, Matthew Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

Hi Rani,

As per the e‐mail attached to Andrew dated 28 Aug 2018, it notes that I made an error in the e‐mail to Ron dated 17 Aug 2018 that you attached.

Design Review Components (Mods 4.1‐4.4) are required.

Please revise and resubmit.

Regards,

Rosanna Baggs, C.E.T. Project Manager, Infrastructure Approvals | GPRJ Approbation demandes infrastructure Development Review West Branch | Dir Services d'exam des dem d'amgt Tel |Tél. : 613‐580‐ 2424 ext. | poste 26388

From: Nahas, Rani Sent: Thursday, November 22, 2018 2:21 PM To: Baggs, Rosanna Cc: Baker, Mark ; Jack, Ronald ; 'Stephanie Morris' ; Mantle, Matthew Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

Hi Rosanna,

I am updating the Forecasting Report based on the revisions below. However, as per the attached email, the Design Review Components (Mods 4.1‐4.4) and 4.6 and 4.8 of the Network Impact Component have been exempt.

Kind Regards, Rani

From: Baggs, Rosanna Sent: Wednesday, November 14, 2018 11:08 AM To: Mantle, Matthew Cc: Baker, Mark ; Jack, Ronald ; 'Stephanie Morris' Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

4

Hi Matthew,

The following comments were not addressed as per my previous comments:

Existing area traffic management measures – Please note in the report that there are no ATMs.

Design Review Component (mods 4.1‐4.4, except 4.1.3) are still required.

Please revise and resubmit.

Regards,

Rosanna Baggs, C.E.T. Project Manager, Infrastructure Approvals | GPRJ Approbation demandes infrastructure Development Review West Branch | Dir Services d'exam des dem d'amgt Tel |Tél. : 613‐580‐ 2424 ext. | poste 26388

From: Mantle, Matthew Sent: Friday, November 09, 2018 11:51 AM To: Baggs, Rosanna Cc: Baker, Mark ; Jack, Ronald ; Stephanie Morris Subject: RE: Lincoln Fields ‐ Site Plan Application Coordination

Hi Rosanna,

Please find the attached digital copy of the draft TIA for Lincoln Fields addressing comments from the strategy report.

Thanks,

Matt

Matthew Mantle, P.Eng. Transportation Engineer

1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 [email protected] - +1 613.691.1528 PARSONS - Envision More www.parsons.com | LinkedIn[linkedin.com] | Twitter [twitter.com]| Facebook [facebook.com]

NOTICE: This email message and all attachments transmitted with it may contain privileged and confidential information, and information that is protected by, and proprietary to, Parsons Corporation, and is intended solely for the use of the addressee for the specific purpose set forth in this communication. If the reader of this message is not the intended recipient, you are hereby notified that any reading, dissemination, distribution, copying, or other use of this message or its attachments is strictly prohibited, and you should delete this message and all copies and backups thereof. The recipient may not further distribute or use any of the information contained herein without the express written authorization of the sender. If you have received this

5 message in error, or if you have any questions regarding the use of the proprietary information contained therein, please contact the sender of this message immediately, and the sender will provide you with further instructions. '

This e‐mail originates from the City of Ottawa e‐mail system. Any distribution, use or copying of this e‐mail or the information it contains by other than the intended recipient(s) is unauthorized. Thank you.

Le présent courriel a été expédié par le système de courriels de la Ville d'Ottawa. Toute distribution, utilisation ou reproduction du courriel ou des renseignements qui s'y trouvent par une personne autre que son destinataire prévu est interdite. Je vous remercie de votre collaboration.

' '

This e‐mail originates from the City of Ottawa e‐mail system. Any distribution, use or copying of this e‐mail or the information it contains by other than the intended recipient(s) is unauthorized. Thank you.

Le présent courriel a été expédié par le système de courriels de la Ville d'Ottawa. Toute distribution, utilisation ou reproduction du courriel ou des renseignements qui s'y trouvent par une personne autre que son destinataire prévu est interdite. Je vous remercie de votre collaboration.

' '

This e‐mail originates from the City of Ottawa e‐mail system. Any distribution, use or copying of this e‐mail or the information it contains by other than the intended recipient(s) is unauthorized. Thank you.

Le présent courriel a été expédié par le système de courriels de la Ville d'Ottawa. Toute distribution, utilisation ou reproduction du courriel ou des renseignements qui s'y trouvent par une personne autre que son destinataire prévu est interdite. Je vous remercie de votre collaboration.

' '

This e‐mail originates from the City of Ottawa e‐mail system. Any distribution, use or copying of this e‐mail or the information it contains by other than the intended recipient(s) is unauthorized. Thank you.

Le présent courriel a été expédié par le système de courriels de la Ville d'Ottawa. Toute distribution, utilisation ou reproduction du courriel ou des renseignements qui s'y trouvent par une personne autre que son destinataire prévu est interdite. Je vous remercie de votre collaboration.

'

6 Mantle, Matthew

From: Baggs, Rosanna Sent: Tuesday, August 28, 2018 2:21 PM To: Harte, Andrew Cc: Jack, Ronald; Dickinson, Mary Subject: Lincoln Fields Shopping Centre - Transportation Impact Assessment (TIA) Step 1&2 - TPM Comments Attachments: RE: Lincoln Fields Redevelopment TIA: Proposed Table of Contents; 908489.40021.lincoln fields.tia scoping.08232018.pdf

Hi Andrew,

Please see my comments related to your submission of Step 1‐2 of the Traffic Impact Assessment dated 23 August 2018.

Please include the following: Module 2.1 ‐ Exisng and Planned Condions Element 2.1.1 ‐ Proposed Development Provide the following:  Estimated date of occupancy;  Planned phasing of development;  Number of parking spaces; and Element 2.1.2 ‐ Exisng Condions Provide the following:  Existing intersections, indicating type of control, lane configurations, turning restrictions, and any other relevant data (e.g., extraordinary lane widths, grades, etc.);  Carling/access 1 – note SB through lanes  Richmond/access 3 – The NB Right out is a yield sign.  Include the intersection of Richmond and Assaly.  I think the pictures of the intersections are missing  Existing area traffic management measures;  Existing peak hour travel demands by mode; and  Include intersection of Asslay on Figure 5  Five‐year collision history.  Provide a collision diagram

Element 2.2.2 ‐ Time Periods Operational analysis is still required. Element 2.2.3 ‐ Horizon Years Operational analysis is still required. Module 2.3 ‐ Exempons Review

1 NOTE: The City of Ottawa reserves the right to determine the scope of any TIA study based on its professional judgement despite these guidelines.

Since there will be a reducon in the traffic volume, it is considered that the trip gen trigger will not be sasfied. Therefore, the Network Impact Module (mods 4.5‐4.9) will not be required.

Mods 3.1‐3.3, 4.1.2, 4.2.1, 4.3 and 4.4 are sll required.

Sorry, I had it backwards when I responded to Ron. When a locaon does not trigger the trip gen it is exempt from the Network Impact Component (mods 4.5‐4.9) not as I had stated in the aached email.

If the above can be incorporated into the next submission please proceed with Step 3. Otherwise please discuss responses prior to proceeding.

Regards,

Rosanna Baggs, C.E.T. Project Manager, Infrastructure Approvals | GPRJ Approbation demandes infrastructure Development Review West Branch | Dir Services d'exam des dem d'amgt City of Ottawa | Ville d’Ottawa Tel |Tél. : 613‐580‐ 2424 ext. | poste 26388 web | Site Web : www.ottawa.ca[ottawa.ca]

***Absence alert*** Please note that I will be out of the office with no access to e-mail Friday August 31 to Friday September 7. I will be returning on Monday September 10, 2018

'

This e‐mail originates from the City of Ottawa e‐mail system. Any distribution, use or copying of this e‐mail or the information it contains by other than the intended recipient(s) is unauthorized. Thank you.

Le présent courriel a été expédié par le système de courriels de la Ville d'Ottawa. Toute distribution, utilisation ou reproduction du courriel ou des renseignements qui s'y trouvent par une personne autre que son destinataire prévu est interdite. Je vous remercie de votre collaboration.

'

2

Appendix B OC Transpo Route Information

0 p  ‘ r ‘ r ÿ g q  ™ ÿ ÿ { H C { C y H x x { C y | x C C v y y y C x H H | y C C H x y { | v C y ‰ s { t H v t C t H v t C H v H C t { v { C H C v t { s v t s H C s { s H v s ˆ u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u ÿ r r ‡ z s | x { C t H z | y t C z s H v y x { C s z | y { C z s H t v y x { H e e † b b c c d ‚ d ÿ o ƒ p ‚ i g e  h i € g e g f y xs xH xs zs yH CH xH Hs zs zs yH CH Hs HH yH yH Hs Hs {s CH yH HH xs ts ts CH yH vs xH HH CH zs ts Hs yH CH r j h C { v s t { C s v { H s v H C { { { v { C s v { C s v { v s C C v { s s f u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u i r c c z s H | x { C H z | y t C z s H t v y x { C s z | y { C | s H t t y x { g f f e f d h r ÿ k  m ie o   k d  ÿ tH ts {H zH zs {s xs tH zH {H |s xs xs zH zs |H tH tH zs |s ss zH tH tH |H {s Hs Hs tH {s {H |H zH ys Hs zH e  n s C { t v s t { H s t { H s t s H { { C t { H s t { C s t { v s H H v {  g u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u i $ r y t { z s H v | x { C H z | y t C z s H t v y x { C s z | y { C | s H t r  f

— ™  a ' 2 % D  4 d  P e $ 9 & g S k ÿ 9  ™ ys tH zH ss |H tH xs zs Cs zH tH |H {s Cs Cs zH tH vs {H zH zH xs ts xs tH zH {H |s ys ys tH zH zs |H {H xs 2  n C H v C C t v v t C H v t { H v t s H C C C t C H v t C H v t C t v H v e ÿ ! u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u 2 i f % | y t C z s H v y x { C s z | y { C z s H t v y x { H s z | x { C z H t E  r s Q  — 7 h $ P f  `

ÿ  j D # Q

4 " g Y 

e k D  ÿ ™ ys vs CH yH |s xH CH vs ys ss yH CH xH Hs ss ss yH CH {s HH yH yH vs Cs ts CH yH HH xs vs vs CH yH xs HH vs P  n ! X t C H v H C t v v t C H v t { H v t s H C C C t C H v t C H v t C v H v d ÿ u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u

i e E z | y t C z s H v y x { C s z | y { C z s H t v y x { H s z | x { C H t 

r h D  — S h  ÿ   ™ 7

  B  4

  i W  ÿ i  2   V g

h $  ss ss zs vH sH Hs sH vH ss ss ts sH vH sH vs {s ts sH vH xs vH sH sH ss vs |s vH sH vH ss |s zs vH sH vH ss S e g   v t H s v H C { v v { C s v { C s v { v s C C C { H s v { C s t { C v s ™ U

™  ÿ u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u d  e H z | y t C z s H v y x { C s z | y { C | s H t v y x { H s z | x { C t D ' e  d 7  % m h 7

 ÿ  k h I   9 ™ $  7 &  @a A   r ÿ ™ 4 ÿ  l Q  ! 9  e 7 9 ˜

% vH ss |s zs vH sH zs sH vH ts ss ts sH vH sH vs Cs ts sH vH ts vH sH sH ts vs |s vH sH vH ss ys zs vH sH ts

d T 4 e  v t C s v t v H C t t C H v t C H v t C t v H H H C s v t C H v { H t C  S  A u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u s  i ÿ B $ C s z | y { C | s H v y x { H s z | x C | z H t v y x C H { s z y x t { g  9 i 7 ÿ  ™

 B W s  9 r 7 # ÿ g

m R 4 " D 9  ÿ

4 i  Q R ÿ h  d D ! 4 P g e Q

D Q yH CH ys vs xs CH yH xs yH CH Hs ys Hs yH CH yH Cs zs Hs yH CH Hs Cs yH yH Hs Cs vs CH yH CH ys ts xs CH Hs  ÿ j h

s v { C s v { v s C t { C s v { C s v { C t v s s H C s v { C s v { C t 4 Q Q u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u B i 2 d P c 9 x { C s z | y { C | s H v y x { H s z | x { C | z H t v y x C H s z y t Y r  f 2 I  W ÿ

ÿ d f R  ÿ V H P  k

A H 7  ÿ ÿ  ie x D 7 ÿ  f

9 4 D P  f G Q 9 s  i 4 4 r Y  B f Y ss xH HH xH Hs ys ss xH HH |s HH xH Hs vs HH xH HH xs Hs vs HH xH {s xs HH HH xs zs xH HH xH Hs xs r ÿ 7 g h ÿs ÿs ÿs F D C s v { C s v { C { v s C s v { C s v { C s C { v v s t { C s v { ÿ B ÿ ÿ ÿ  h ™ P e P ÿ ÿ ÿ u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u E ™  ÿ ÿ ÿ f X r E y x { H s z | x { C | z H y x C H s z y x { C | z s { y v C H s |

ÿ D b ÿ b  e i s H s H c C 7 c 7 f  ÿ T 9 d f  B e P B ÿ c  2 7 p 7 g  – 4 2  ÿ i 8  9 – @A

e 8 4

ÿ vÿ vÿ vÿ h 7 d 4 c 9  D ÿ u u u  ÿ y Cs yH CH yH Cs ys Cs yH CH |s Cs y Cs ys CH yH CH CH ys Cs ys CH yH { ys CH ys Hs yH CH y Cs • h t t t 8 7 g 2  C H v t C H v t C H C t v H v t C H v t C H v H C t t v t C H v t  v v v — 7 ” d W u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u 7  f  C v C 6 9 e ™ | y x C H s z y x { C | z s y v C H s | y x { H | z s { x v C H z 4 ÿ  ÿ u u u “  e 5 ˜ s s s H H H s s s H H s s H s s H H H s s s H H s s H H s s H H s   v t t w   I ÿ 4 ) d r s s s ’ ÿ v  7 c  2 P —

 u

 u d 1 b t ( 2018.06 560560 417 RIDEAU

Croydon

Carling 613-560-1000 613-842-3600 613-563-4011 613-741-2478 Richmond Acres Holly Plant Recreation Centre Centre Récréatif Plant

Bank Bronson Preston ......

Bayswater Parkdale Holland

Woodroffe

Churchill

votre numéro d’arrêt à quatre chiffres

Somerset Bayshore

INFO 613-741-4390 octranspo.com

Wellington Elgin plus RIDEAU BAYSHORE

Slater e

Bayshore Woodrid g

Albert Scott ...... Centre Rideau BAYSHORE S.C/C.C. BAYSHORE

All day service

Assaly ...... Wellington Service toute la journée

Station Early morning trips service and some Sunday Service le dimanche tôt le matin et quelques trajets Timepoint / Heures de passage Effective June 24, 2018

En vigueur 24 juin 2018 1 Schedule / Horaire ...... Texto / Text Pasture Tunney’s

Future/Futur 11 LINCOLN FIELDS S.C/C.C. your four digit bus stop number / No early morning service and no Sunday service except midday / Aucun service tôt le matin et dimanche sauf durant la mi-journée 7 days a week / jours par semaine

Frequent plus BAYSHORE Security / Sécurité Lost and Found / Objets perdus Customer Relations Service à la clientèle        ! " # $%!&$%' $        ! " # $%!&$%' $ H‚ƒ„ H†ƒ‡ˆH†ƒCCH†ƒC„H†ƒ‚„H†ƒ†CH†ƒ††H†ƒ†‰H†ƒ„CH†ƒ„ 23455234562345723458234592346723469234@52347828422284A7 H†ƒHCH†ƒCHH†ƒ‚ H†ƒ†‡H†ƒ„‡H†ƒ„ H†ƒ„‰H„ƒ‡†H„ƒ‡ H„ƒHC 234682346B234@2234@6234@7234762347B2842A284A82845A28463 H†ƒC H†ƒ‚ˆH†ƒ„„H†ƒ„H„ƒ‡H„ƒH„H„ƒH H„ƒCCH„ƒC H„ƒ‚† 2347523476234772347B284222842B284A6284A328465284632847A H†ƒ†CH†ƒ„HH„ƒH‡H„ƒH‚H„ƒC‚H„ƒ‚‡H„ƒ‚CH„ƒ‚ H„ƒ†CH„ƒ†‰ 284282842B284A2284A@284A32845@2845928465284@B284752B42B H†ƒ„ H„ƒ‡ˆH„ƒC„H„ƒCH„ƒ‚H„ƒ†„H„ƒ† H„ƒ„CH„ƒ„ Hˆƒ‡† 284552845628457284592846A28469284@@284@82B4262B4282B456 H„ƒHC H„ƒCHH„ƒ‚‰H„ƒ†CH„ƒ„CH„ƒ„‰Hˆƒ‡HHˆƒ‡ˆHˆƒHHHˆƒC‡ 284682846B284@2284@@284@32847@284792B4252B4AB2B4552B46B H„ƒCˆH„ƒ‚„H„ƒ„‚H„ƒ„ˆHˆƒ‡ˆHˆƒH‚HˆƒH„HˆƒC‡HˆƒC„Hˆƒ‚† 2847A 284752847@2847B2B4222B42B2B4A62B4A32B4652B4632B475 H„ƒ†CH„ƒ„HHˆƒ‡‰HˆƒHCHˆƒCCHˆƒC‰Hˆƒ‚HHˆƒ‚ˆHˆƒ†HHˆƒ„‡ 2B4232B4282B4292B4A62B4A72B4562B45B2B46A2B4@82B47A29428 H„ƒ„ Hˆƒ‡ˆHˆƒC†HˆƒC Hˆƒ‚ Hˆƒ††Hˆƒ†ˆHˆƒ„HHˆƒ„ˆH ƒ‡„ 2B45A2B4552B45@2B45B2B4622B4692B4@62B4@329425294272945A HˆƒHC HˆƒCHHˆƒ‚‰Hˆƒ†CHˆƒ„CHˆƒ„‰H ƒ‡HH ƒ‡ˆH ƒHHH ƒC‡ 2B4632B4682B4692B4@62B4@72B47@2B47B2942A294A82945229463 HˆƒC Hˆƒ‚ˆHˆƒ„†Hˆƒ„ H ƒ‡ H ƒH†H ƒHˆH ƒCHH ƒCˆH ƒ‚„ 2B47A2B4752B47@2B47B2942229429294A6294A329465294672947A Hˆƒ†CHˆƒ„HH ƒ‡H ƒHHH ƒCHH ƒCH ƒ‚‡H ƒ‚„H ƒ‚‰H ƒ†ˆ 294232942829429294A6294A72945@2945B2946A294@829472A2423 Hˆƒ„ H ƒ‡ˆH ƒC‚H ƒCˆH ƒ‚ˆH ƒ†‚H ƒ†„H ƒ„‡H ƒ„†Hƒ‡H 2945A294552945@2945B2946229469294@6294@3A2425A2427A245A H ƒHCH ƒCHH ƒ‚H ƒ†HH ƒ„HH ƒ„Hƒ‡‡Hƒ‡„Hƒ‡‰HƒHˆ 29463 2946829469294@6294@72947@2947BA242AA24A8A2452A2463 H ƒC H ƒ‚ˆH ƒ„‚H ƒ„ˆHƒ‡ˆHƒH‚HƒH„HƒC‡HƒC†Hƒ‚H 2947A294752947@2947BA2422A2429A24A6A24A3A2465A2467A247A H ƒ†CH ƒ„HHƒ‡HƒHHHƒCHHƒCHƒ‚‡Hƒ‚„Hƒ‚‰Hƒ†ˆ A2423A2428A2429A24A6A24A7A2457A2459A2465A24@8A2472AA428 H ƒ„ Hƒ‡ˆHƒC‚HƒCˆHƒ‚„Hƒ†HHƒ†CHƒ†„Hƒ†Hƒ„‚ A245AA2455A245@A245BA2462A24@2A24@@A24@8AA425AA427AA455 HƒHCHƒCHHƒ‚Hƒ†HHƒ„‡Hƒ„ˆHƒ„ H‰ƒ‡‡H‰ƒ‡‚H‰ƒ‡ A2463A2468A2469A24@6A24@7A2477A2479AA425AA4A8AA452AA468 HƒC Hƒ‚ˆHƒ„‚Hƒ„ˆH‰ƒ‡„H‰ƒHHH‰ƒHCH‰ƒH„H‰ƒHH‰ƒC‚ A247AA2475A247@A247BAA422AA4A2AA4A@AA4A8AA465AA467AA475 Hƒ†CHƒ„HH‰ƒ‡H‰ƒHHH‰ƒC‡H‰ƒCˆH‰ƒC H‰ƒ‚‡H‰ƒ‚‚H‰ƒ‚ AA423AA428AA429AA4A6AA4A7AA457AA459AA465AA4@8AA472A5428 Hƒ„ H‰ƒ‡ˆH‰ƒC‚H‰ƒCˆH‰ƒ‚„H‰ƒ†HH‰ƒ†CH‰ƒ†„H‰ƒ†H‰ƒ„‚ AA45AAA455AA45@AA458AA459AA4@2AA4@7AA4@BA5426A542BA5456 H‰ƒH†H‰ƒC‚H‰ƒ†‡H‰ƒ†‚H‰ƒ„CH‰ƒ„H‰ƒ„‰C‡ƒ‡CC‡ƒ‡„C‡ƒH‡ AA463AA468AA469AA4@5AA4@@AA477A5422A5426A54ABA5456A546B H‰ƒ‚CH‰ƒ†HH‰ƒ„C‡ƒ‡HC‡ƒH‡C‡ƒHˆC‡ƒH C‡ƒC‡C‡ƒC‚C‡ƒC AA47AAA475AA47@AA478AA479A54A2A54A7A54ABA5466A546BA5476 H‰ƒ†‰H‰ƒ„C‡ƒHCC‡ƒH„C‡ƒC†C‡ƒ‚‡C‡ƒ‚HC‡ƒ‚†C‡ƒ‚ C‡ƒ†C A5423A5428A5429A54A5A54A@A5457A5462A5466A54@BA5476A642B C‡ƒ‡ C‡ƒHˆC‡ƒ‚‡C‡ƒ‚‚C‡ƒ†CC‡ƒ†C‡ƒ†‰C‡ƒ„CC‡ƒ„„CHƒ‡‡ A545AA5455A5457A545BA5462A54@2A54@7A54@BA6426A642BA645@ C‡ƒC‚C‡ƒ‚CC‡ƒ†ˆC‡ƒ†‰C‡ƒ„CHƒ‡†CHƒ‡„CHƒ‡CHƒHHCHƒHˆ A5463A5468A54@2A54@6A54@7A5477A6422A6426A64ABA6456A6469 C‡ƒ‚‰C‡ƒ†CHƒ‡CCHƒ‡„CHƒH†CHƒC‡CHƒCHCHƒC†CHƒC CHƒ‚C A547AA5475A5477A547BA6422A64A2A64A7A64ABA6466A646BA647@ C‡ƒ„‰CHƒ‡CHƒCCCHƒC„CHƒ‚†CHƒ†‡CHƒ†HCHƒ††CHƒ† CHƒ„C A6427A6423A6429A64A5A64A@A645@A6459A6465A64@8A6475A@42B CHƒH‰CHƒC CHƒ†‡CHƒ†‚CHƒ„CCHƒ„ CHƒ„CCƒ‡‡CCƒ‡‚CCƒ‡ A6452A645AA645@A6458A6459A6469A64@@A64@8A@425A@428A@456 CHƒ‚‰CHƒ† CCƒ‡‡CCƒ‡‚CCƒHCCCƒH CCƒHCCƒC‡CCƒC‚CCƒC A6463A6468A64@2A64@6A64@7A6477A@422A@426A@4ABA@456A@469 CCƒ‡HCCƒ‡‰CCƒCCCCƒC„CCƒ‚†CCƒ‚‰CCƒ†‡CCƒ†CCCƒ†„CCƒ„‡ A647AA6475A6477A647BA@422A@4A2A@4A7A@4ABA@466A@46BA@47@ CCƒ‚HCCƒ‚CCƒ„HCCƒ„†C‚ƒ‡‚C‚ƒ‡C‚ƒ‡‰C‚ƒH‡C‚ƒH‚C‚ƒH A@428A@42BA@4AAA@4A@A@4A3A@453A@46AA@467A@47AA@478A74A@ C‚ƒ‡HC‚ƒ‡C‚ƒCHC‚ƒC†C‚ƒ‚‚C‚ƒ‚C‚ƒ‚‰C‚ƒ†‡C‚ƒ†‚C‚ƒ† A@45AA@455A@457A@45BA@462A@4@2A@4@7A@4@9A7427A74AAA745B C‚ƒ‚HC‚ƒ‚C‚ƒ„HC‚ƒ„†‡‡ƒ‡‚‡‡ƒ‡‡‡ƒ‡‰‡‡ƒH‡‡‡ƒH‚‡‡ƒH A@463A@468A@4@2A@4@6A@4@7A@473A742AA7427A7456A745BA74@3 ‡‡ƒ‡H‡‡ƒ‡‡‡ƒCH‡‡ƒC†‡‡ƒ‚‚‡‡ƒ‚‡‡ƒ‚‰‡‡ƒ†‡‡‡ƒ†‚‡‡ƒ† A@47A A@475A@477A@47BA7422A74AAA74A3A7452A746BA74@6A342A ‡‡ƒ‚‚‡‡ƒ†‡‡‡ƒ„‚‡‡ƒ„ˆ‡Hƒ‡„‡HƒH‡‡HƒHH‡HƒHC‡HƒH„‡HƒH‰ A7423A7428A74A2A74A6A74A7A7453A746AA7467A7476A747BA34A3

12ÿ45ÿ67897@A7BÿCDEFÿB4G97ÿHHÿIPQQÿD4ÿQ4DR7Bÿ9BST7QÿA79I77DÿUSV2W4B7ÿSDEÿXPDY4QDÿ`P7QE2ÿ29S9P4D2a A745AA7455A7457A745BA7462A74@AA74@3A7472A342BA34A6A346A A7463A7468A74@2A74@6A74@7A7473A342AA3427A3456A345BA34@3 bcdefgchipÿrstuvhde A747AA7475A7477A747BA3422A34AAA34A3A3452A346BA34@6A842A wxyÿ€472ÿD49ÿ27BT7ÿXPDY4QDÿ7PRW92 A3423A3428A34A2A34A6A34A7A3458A3465A3463A347@A8422A84AB

dcbes‘ÿ’s–e——ci˜ghi rsifÿ™ rsifÿ™ uhdedueg uhdedueg vh——sibÿ™ g‘iietiu dcfvdhib —cifh—i rstuvhde A345AA3455A3457A345BA3462A34@5A34@8A347AA8429A84A7A8466 “dcbes‘ ™ÿdegfs—ee g‘eei —cu˜sd –ÿ™ÿrsif –ÿ™ –e——ci˜ghihsug‘deÿr ™ ece—bu js A3463 A3468A34@2A34@6A34@7A3478A8425A8423A845@A8462A84@B ug”• hdeughi —hffvsdgds——ÿ–eug A347AA3475A3477A347BA8422A84A5A84A8A845AA8469A84@7AB426 ‡†ƒ„Cwxy‡†ƒ„‚wxy‡†ƒ„†wxy‡†ƒ„ˆwxy‡†ƒ„wxy‡„ƒ‡†wxy‡„ƒ‡wxy‡„ƒHHwxy‡„ƒC‡ÿÿÿÿÿ‡„ƒ‚H A8423A8428A8429A84A5A84A@A8457A8462A846@A8475A8478AB4A6 ‡„ƒCCwxy‡„ƒC‚wxy‡„ƒC†wxy‡„ƒCˆwxy‡„ƒCwxy‡„ƒ‚†wxy‡„ƒ‚wxy‡„ƒ†Hwxy‡„ƒ„‡ÿÿÿÿÿ‡ˆƒ‡H A845AA8455A845@A8458A8459A84@2A84@7A84@9AB428AB4A5AB45B ‡„ƒ† wxy‡„ƒ†wxy‡„ƒ†‰wxy‡„ƒ„Hwxy‡„ƒ„‚wxy‡„ƒ„‰wxy‡ˆƒ‡‚wxy‡ˆƒ‡ˆwxy‡ˆƒHˆÿÿÿÿÿ‡ˆƒC A8463A8468A8469A84@5A84@@A847@A8479AB426AB45AAB45@AB469 ‡ˆƒ‡ ‡ˆƒ‡‡ˆƒH‡‡ˆƒHC‡ˆƒH†‡ˆƒC‡‡ˆƒC†‡ˆƒC ‡ˆƒ†C‡ˆƒ†„‡ ƒ‡‡ A847AA8475A847@A8478A8479AB429AB4A@AB4ABAB463AB469AB47@ ‡ˆƒCC‡ˆƒC‚‡ˆƒC„‡ˆƒC ‡ˆƒC‰‡ˆƒ‚„‡ˆƒ‚‰‡ˆƒ†C‡ˆƒ„ ‡ ƒ‡‡‡ ƒH„ ( )       ! " # $%!&$%' $0 ( )       ! " # $%!&$%' $01        ! " # $%!&$%' $ MAIN 123451234212314123161231712387123641236912378123771@314 BRITANNIA 123881238612387123821236412394123971239@1@3451@3141@387 16 1236512362123941239612397123771@3441@3491@3881@3871@394 7 days a week / 7 jours par semaine 123781237612377123721@3441@3141@3171@31@1@3651@3941@377 All Day Service 1@3451@3421@3141@3161@3171@3861@3851@3641@3991@39584341 Service toute la journée 1@388 1@3861@3871@3821@3641@3621@3981@3971@37@843488431A

1@3651@3621@3941@3961@3971@3761@37584344843198431584361 Centre HOSPITAL SANDY YOUVILLE Charlotte Range Centre HÔPITAL 1@3781@3761@3771@372843448434284318843178438@843688439A HILL 8434584342843148431684317843868438584364843998439581341 Wiggins Friel Mann CHEO / HEEO

843818438884389843858438@843658439184399843728134181317 Chapel L REHAB. e

e GENERAL

s Somerset E.

8439484391843968439A843928437A8134481346813158138481369 Rideau Wilbrod

Laurier E. King Edward LEES H 8134481341813468134A813428131A8138481386813658139481379 LAURIER uOTTAWA Walle r Université

8138481381813868138781385813698136281391813798137588342 Lees SAINT-PAUL University Smyth CENTRE Nicholas Alta Vista 8136@8139481398813998139A813768137588344883168831A88385 RIDEAU Riverside CENTRE MACKENZIE KING Main 8834588342883148831888319883848838988385883948839688377 Riverdale R. RIDEAU R. C. RIDEAU C. 883628836@88391883968839788371883778837286311863198638A Centre Elgin 8634586342863148631886319863848638986385863948639686377 Metcalfe MAIN

86365863628636@86391863968639@863768637A443424431144381 Albert Bank

Lyon Slater 44345443424434@44311443164431@443864438A443624439144371 Bronson 44365443624436@44391443964439@443764437A413424131141381 LEBRETON Booth 413144131141318413194131A413884138A4138@413914139941379 BAYVIEW Scott

TUNNEY'S Wellington PASTURE Holland Byron Kirkwood Richmond

Clare Churchill Dovercourt Broadview Sherbourne

S

a v i lle CARLINGWOOD R

o

w

Woodroffe

LINCOLN FIELDS

S.C./ C. C. Carling Assaly LINCOLN FIELDS BRITANNIA Poulin Croydon

Richmond

Britannia Howe

Bradford

Cassels

Salina

Don PARC BRITANNIA PARK Lakeside Gardens

Legend • Légende

Transitway Station / Station du Transitway Light Rail Connection / Correspondance au train léger Some trips / Quelques trajets Timepoint / Heures de passage 2016.09

Information / Renseignement...... 613-741-4390 Customer Relations Service à la clientèle ...... 613-842-3600 Lost and Found / Objets perdus ...... 613-563-4011 Schedule / Horaire...... 613-560-1000 ( )       ! " # $%!&$%' $00 Text / Texto ...... 560560 plus your four digit bus stop number / plus votre numéro d’arrêt à quatre chiffres

Effective / En vigueur Sept. 4 sept. 2016

613-741-4390 octranspo.com        ! " # $%&!'$&( $        ! " # $%&!'$&( $

ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿabcddDeFabcdfDeFabcgfDeFabcbhDeFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ PeV€ÿbdVÿfggfYebVÿpecVbefUÿqWÿYcfiieU‚ÿbfÿbdVÿqfbbfƒ„ agcgiÿÿÿÿÿagcbhagcbbabchaabchaabchfÿÿÿÿÿabcgaabcbiabcbdabcbgapchhÿÿÿÿÿÿÿÿÿÿ agcbfDYFÿÿÿÿÿabchbDYFabcahDYFabcapDYFabcapDYFabciiDYFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ abcabÿÿÿÿÿabcidabciqabcdgabcdgabcghÿÿÿÿÿapcapapcifapciqapcirapcdbÿÿÿÿÿÿÿÿÿÿ 4˜™deÿfg †‡ˆ‰ÿ‘ˆ’“ÿ”•–ÿ—— abcdhDYFÿÿÿÿÿabcdqDYFabcgdDYFabcgrDYFabcgrDYFabcbbDYFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 234567389@ÿBC39ÿDÿE8FG37CH abcgbÿÿÿÿÿabcbdabcbqapchgapchgapcahÿÿÿÿÿapcgpapcbfapcbqapcbrafchbÿÿÿÿÿÿÿÿÿÿ IPQÿSTUUVWXYÿ`aYbTcV apchiDYFÿÿÿÿÿapcahDYFapcabDYFapciaDYFapciaDYFapcifDYFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ IaQÿSdeYÿYbfgÿeYÿfTbÿfhÿTYVÿgiVaYVÿheUpÿWfTcÿqTYÿabÿrbfgÿst IuQÿvwxÿyfYgebai apcabÿÿÿÿÿapcidapciqapcdgapcdgapcghÿÿÿÿÿafcapafcifafciqafcirafcdbÿÿÿÿÿÿÿÿÿÿ apcdaDYFÿÿÿÿÿapcdrDYFapcggDYFapcbhDYFapcbhDYFapcbpDYFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ h437C993C6CFF5HFÿjH3968H9H3968H96C4H39nl8826C4H39nl88228p5468q47 4325Cq BC6i59v356ECG5HÿjH55FÿmCH55FÿmhqÿF7 BC39ÿj 439n apcgbÿÿÿÿÿapcbdapcbqafchgafchgafcahÿÿÿÿÿafcgpafcbfafcbqafcbraqchbÿÿÿÿÿÿÿÿÿÿ GC4i h4C2k842 k35H2F k35H2F oÿH8hHClF oÿF5C4F jÿh48C2p35l rC i39nÿfC BC99 GCqHÿq ECv5H 48C2ÿj H88G BCHH mh s4325Cq 78E afchhDYFÿÿÿÿÿafchqDYFafcadDYFafcarDYFafcarDYFafcibDYFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ l5F7 F7tu newexyz afcabÿÿÿÿÿafcidafciqafcdgafcdgafcghÿÿÿÿÿaqcabaqcipaqcifaqciqaqcdgÿÿÿÿÿÿÿÿÿÿ 6y{|™} afcdhDYF ÿÿÿÿÿafcdqDYFafcgdDYFafcgrDYFafcgrDYFafcbbDYFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ~€s~€‚sÿÿÿÿÿ~€„~€ ~€ ~w€~sÿÿÿÿÿ~w€ss~w€‚v~w€‚„~w€‚s~w€‚†ÿÿÿÿÿÿÿÿÿÿ afcgpÿÿÿÿÿafcbgafcbraqchbaqchbaqcahÿÿÿÿÿaqcgdaqcbgaqcbbaqcbparchiÿÿÿÿÿÿÿÿÿÿ ~w€~~w€vsÿÿÿÿÿ~w€„„~w€„ ~w€„ ~w€ssÿÿÿÿÿ~ €~‚~ €v„~ €vs~ €v‚~ €„~ÿÿÿÿÿÿÿÿÿÿ hgarcagarcabarcaparciiÿÿÿÿÿÿÿÿÿÿ ~w€vIPQ~w€„sIPQÿÿÿÿÿ~w€s„IPQ~w€s IPQ~w€s IPQ~w€‚sIPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ aqchrÿÿÿÿÿaqcafaqciiaqciqaqciqaqcddÿÿÿÿÿarc aqcdhÿÿÿÿÿaqcdqaqcgdaqcgraqcgraqcbgÿÿÿÿÿarcidarcdiarcddarcdgarcghÿÿÿÿÿÿÿÿÿÿ ~w€„~w€ssÿÿÿÿÿ~w€‚„~w€‚ ~w€‚ ~w€sÿÿÿÿÿ~ €„‚~ €s„~ €ss~ €s‚~ €‚~ÿÿÿÿÿÿÿÿÿÿ aqcbaÿÿÿÿÿaqcbrarchgarchrarchrarcagÿÿÿÿÿarcgiarcbaarcbiarcbdarcbrÿÿÿÿÿÿÿÿÿÿ ~w€sIPQ~w€‚sIPQÿÿÿÿÿ~w€„IPQ~w€IPQ~w€IPQ~ €~‚IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ arcadÿÿÿÿÿarciaarciparcdaarcdaarcdpÿÿÿÿÿihchgihcadihcagihcabihciaÿÿÿÿÿÿÿÿÿÿ ~w€‚~w€sÿÿÿÿÿ~ €~„~ €~ ~ €~ ~ €vsÿÿÿÿÿ~ €‚w~ €‚~ €~ €w~€~„ÿÿÿÿÿÿÿÿÿÿ arcdb ÿÿÿÿÿarcgdarcgqarcbdarcbdarcbqÿÿÿÿÿihcipihcdbihcdpihcdfihcgdÿÿÿÿÿÿÿÿÿÿ ~w€IPQ~ €~sIPQÿÿÿÿÿ~ €vsIPQ~ €v†IPQ~ €v†IPQ~ €„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿihcgpihcbbihcbpihcbfiachdÿÿÿÿÿÿÿÿÿÿ ~ €~~ €vsÿÿÿÿÿ~ €„„~ €„~ €„~ €s‚ÿÿÿÿÿ~€~ ~€v~€vw~€v ~€„sÿÿÿÿÿÿÿÿÿÿ arcbbÿÿÿÿÿihchdihchqihcadihcadihcaqÿÿÿÿ ihcabÿÿÿÿÿihcidihciqihcddihcddihcdqÿÿÿÿÿiachpiacabiacapiacafiacidÿÿÿÿÿÿÿÿÿÿ ~ €vIPQ~ €„sIPQÿÿÿÿÿ~ €ssIPQ~ €s†IPQ~ €s†IPQ~ €‚IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ihcdbÿÿÿÿÿihcgdihcgqihcbdihcbdihcbqÿÿÿÿÿiacipiacdbiacdpiacdfiacgdÿÿÿÿÿÿÿÿÿÿ ~ €„~ €ssÿÿÿÿÿ~ €‚s~ €‚†~ €‚†~ €ÿÿÿÿÿ~€„†~€s~€‚~~€‚v~€‚ ÿÿÿÿÿÿÿÿÿÿ ~ €sIPQ~ €‚sIPQÿÿÿÿÿ~ €sIPQ~ €†IPQ~ €†IPQ~€~IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ihcbbÿÿÿÿÿiachdiachqiacadiacadiacaqÿÿÿÿÿiacgpiacbbiacbpiacbfiichdÿÿÿÿÿÿÿÿÿÿ ~ €‚~ €sÿÿÿÿÿ~€~s~€~†~€~†~€vÿÿÿÿÿ~€‚†~€~†€~~~†€~v~†€~ ÿÿÿÿÿÿÿÿÿÿ iacabÿÿÿÿÿiacidiaciqiacddiacddiacdqÿÿÿÿÿiichpiicabiicapiicafiicidÿÿÿÿÿÿÿÿÿÿ ÿÿÿiicifiicdpiicdfiicdqiicggÿÿÿÿÿÿÿÿÿÿ ~ €IPQ~€~sIPQÿÿÿÿÿ~€vsIPQ~€v†IPQ~€v†IPQ~€„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ iacdfÿÿÿÿÿiacggiacgriacbgiacbgiacbrÿÿ iichfDYFÿÿÿÿÿiicagDYFiicarDYFiicigDYFiicigDYFiicirDYFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ~€~~€vsÿÿÿÿÿ~€„s~€„†~€„†~€sÿÿÿÿÿ~†€~†~†€v~†€„~~†€„v~†€„ ÿÿÿÿÿÿÿÿÿÿ iicdfÿÿÿÿÿiicggiicgriicbgiicbgiicbrÿÿÿÿÿidcifidcdpidcdfidcdqidcggÿÿÿÿÿÿÿÿÿÿ ~€vIPQ~€„sIPQÿÿÿÿÿ~€s„IPQ~€sIPQ~€sIPQ~€‚‚IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ~€s~~€sÿÿÿÿÿ~€‚‚~€~~€~~€wÿÿÿÿÿ~†€„†~†€s ~†€s~†€s†~†€‚ÿÿÿÿÿÿÿÿÿÿ ~€‚~IPQ~€‚IPQÿÿÿÿÿ~€‚IPQ~†€~~IPQ~†€~~IPQ~†€~wIPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 234567389@ÿB437C993C DEFÿHIPQRSTQRUSÿERHITVÿWISQXI ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ~†€‚IuQ~†€‚~†€„~†€sv~€~w DYFÿERHITVÿWISQXI ~€„~€ ÿÿÿÿÿ~†€~w~†€v„~†€v„~†€vÿÿÿÿÿ~†€‚†~†€ ~†€~†€†v~€~ÿÿÿÿÿÿÿÿÿÿ ~†€~„IPQÿÿÿÿÿ~†€vvIPQ~†€vwIPQ~†€„„IPQ~†€„„IPQ~†€„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 439s 439s C39ÿt †ÿ‡7 ‰55‡ÿC‰55‡ÿB6uCˆ5‰ C99ÿt C6’59“3528•5468†476C4‰39s‘8826C4‰39s‘882‰3968‰9‰3968‰9B437C993C4325C† 48C2ÿt48C2ÿtu54432s5ˆC†‰ÿ† t 6uCˆ5‰ ’39sÿ”C tÿ259B†4– —ÿ‰8B‰C‘‡ —ÿ‡5C4‡ ˜35‰2‡ ˜35‰2‡ ˆC4’ C ~†€v„ÿÿÿÿÿ~†€„v~†€„w~†€s„~†€s„~†€sÿÿÿÿÿv~€~†v~€v v~€vv~€v†v~€„ÿÿÿÿÿÿÿÿÿÿ 78u 78u ‘3ss39‡ ™C C‰‰ ‰88ˆ d4325C† ~†€„wIPQÿÿÿÿÿ~†€sIPQ~†€‚~IPQ~†€‚wIPQ~†€‚wIPQ~†€„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ svwvxy€svwvxy€ 5C‡7 ‡7ef 6y‚ƒ„6y‚ƒ„ ~†€‚vÿÿÿÿÿ~†€~~†€v~€~vv~€~vv~€~ ÿÿÿÿÿv~€sv~€‚wv~€‚ v~€‚v~€‚ÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhpcahhpcaphpcaphpcafhpcafhpcifhpcbphfchihfchihfchfÿÿÿÿÿhfcihÿÿÿÿÿ ~†€ IPQÿÿÿÿÿv~€~wIPQv~€vvIPQv~€v IPQv~€v IPQv~€„sIPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhpcgahpcgfhpcgfhpcgqhpcgqhpcbqhfcifhfcddhfcddhfcdqÿÿÿÿÿhfcbaÿÿÿÿÿ v~€v„ÿÿÿÿÿv~€„~v~€„v~€svv~€svv~€s ÿÿÿÿÿvv€~vv€vvv€v†vv€„~vv€„wÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhfchphfcaihfcaihfcadhfcadhfcighfcbphqchihqchihqchqÿÿÿÿÿhqciaÿÿÿÿÿ v~€„ IPQÿÿÿÿÿv~€sIPQv~€‚~IPQv~€‚wIPQv~€‚wIPQv~€„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhfciphfcdihfcdihfcddhfcddhfcgghqcaphqciihqciihqciqÿÿÿÿÿhqcgaÿÿÿÿÿ v~€‚„ÿÿÿÿÿv~€~v~€vv€~vvv€~vvv€~ ÿÿÿÿÿvv€svv€‚vv€‚†vv€~vv€wÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhfcgphfcbihfcbihfcbdhfcbdhqchghqcdfhqcgdhqcgdhqcgrÿÿÿÿÿhrchiÿÿÿÿÿ v~€ IPQÿÿÿÿÿvv€~IPQvv€v~IPQvv€vwIPQvv€vwIPQvv€„„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhqchqhqcaghqcaghqcabhqcabhqciphqcbrhrchbhrchbhrcaahrcabhrcdhÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿv„€~~IuQv„€~‚IuQv„€v‚IuQv„€v IuQv„€v v„€„vv„€„„v„€s ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhqciphqcdihqcdihqcddhqcddhqcgghrcafhrcidhrcidhrcirhrcddhrcgqÿÿÿÿÿ vv€v„ÿÿÿÿÿvv€„~vv€„vv€svvv€svvv€s ÿÿÿÿÿv„€~v„€vv„€v†v„€„~v„€„wÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhqcgphqcbihqcbihqcbdhqcbdhrchihrcdahrcdfhrcdfhrcgdhrcgfahchiÿÿÿÿÿ vv€„ IPQÿÿÿÿÿvv€sIPQvv€‚~IPQvv€‚wIPQvv€‚wIPQvv€„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhrchghrcahhrcahhrcaahrcaahrcihhrcgqhrcbghrcbgahchhahchgahcaqÿÿÿÿÿ vv€‚„ÿÿÿÿÿvv€~vv€v„€~vv„€~vv„€~ ÿÿÿÿÿv„€sv„€‚†v„€~v„€vv„€ ÿÿÿÿÿÿÿÿÿÿ hrciaDEF ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ hrciiDEFhrcidDEFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhrcgdDEF vv€ IPQÿÿÿÿÿv„€~IPQv„€v~IPQv„€vwIPQv„€vwIPQv„€„„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ DYF v„€v„ÿÿÿÿÿv„€„~v„€„v„€svv„€svv„€s ÿÿÿÿÿvs€~vs€v†vs€„~vs€„vvs€„ ÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhrcarhrcibhrcibhrciphrciphrcdbahchdahchrahchrahcabahcarahcddÿÿÿÿÿ v„€„ IPQ ÿÿÿÿÿv„€sIPQv„€‚~IPQv„€‚wIPQv„€‚wIPQv„€„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhrcdghrcghhrcghhrcgahrcgahrcbhahcaqahcigahcigahcdhahcdgahcgqÿÿÿÿÿ v„€‚„ÿÿÿÿÿv„€~v„€vs€~vvs€~vvs€~ ÿÿÿÿÿvs€svs€‚†vs€~vs€vvs€ ÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿhrcgrhrcbbhrcbbhrcbphrcbpahchbahcddahcdrahcdrahcgbahcgraachdÿÿÿÿÿ v„€ IPQÿÿÿÿÿvs€~IPQvs€v~IPQvs€vwIPQvs€vwIPQvs€„„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿahchgahcahahcahahcaaahcaaahcihahcgqahcbgahcbgaachhaachgaacaqÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿv‚€~~IuQv‚€~‚IuQv‚€v‚IuQv‚€v IuQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿaachaaachfaachfaacadaacafaacdaÿÿÿÿÿ vs€v„ÿÿÿÿÿvs€„~vs€„vs€svvs€svvs€s ÿÿÿÿÿv‚€~v‚€v†v‚€„~v‚€„vv‚€„ ÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿahcdgahcghahcghahcgaahcgaahcbhaacaqaacigaacigaacdhaacdgaacgqÿÿÿÿÿ vs€„ IPQÿÿÿÿÿvs€sIPQvs€‚~IPQvs€‚wIPQvs€‚wIPQvs€„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿaaciraacdbaacdbaacgaaacgbaacbrÿÿÿÿÿ vs€‚„ÿÿÿÿÿvs€~vs€v‚€~vv‚€~vv‚€~ ÿÿÿÿÿv‚€sv‚€‚†v‚€~v‚€vv‚€ ÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿaachgaacahaacahaacaaaacaaaacihaacgqaacbgaacbgaichhaichgaicaqÿÿÿÿÿ vs€ IPQÿÿÿÿÿv‚€~IPQv‚€v~IPQv‚€vwIPQv‚€vwIPQv‚€„„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ aacdrDEF ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ aacghDEFaacgaDEFÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿaichaDEF v‚€v„ÿÿÿÿÿv‚€„~v‚€„v‚€svv‚€svv‚€s ÿÿÿÿÿv€~v€v†v€„~v€„vv€„ ÿÿÿÿÿÿÿÿÿÿ DYF v‚€„ IPQÿÿÿÿÿv‚€sIPQv‚€‚~IPQv‚€‚wIPQv‚€‚wIPQv‚€„IPQÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿaichaaichfaichfaicadaicafaicdaÿÿÿÿÿ

) 0       ! " # $%&!'$&( $1 ) 0       ! " # $%&!'$&( $1        ! " # $%&!'$&( $ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3345633467334673346333463334873943@394963949639457394563946@ÿÿÿÿÿ LEES ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ394533945A3945A394653946@35475ÿÿÿÿÿ BAYSHORE ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3947639437394373943339433394973946@3948639486354773547835497ÿÿÿÿÿ 85 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ354733547A3547A354353543@35455ÿÿÿÿÿ 7 days a week / 7 jours par semaine ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3945639467394673946339463394873543@3549635496354573545835487ÿÿÿÿÿ All day service ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ354533545A3545A354653546@36475ÿÿÿÿÿ Service toute la journée ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3547635437354373543335433354973546@3548635486364773647836497ÿÿÿÿÿ 35477BCD35478BCD35436BCD35438BCD3543@BCD3543EBCD35497ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3545EBFD ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 35467BFD35463BFDÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ36473BFD BCD Mann Lees ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ364733647A3647A364353643@36455ÿÿÿÿÿ Laurier E. Chapel uOTTAWA ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3545635467354673546335463354873643@3649636496364573645836487ÿÿÿÿÿ King Edward LEES ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ364533645A3645A364653646@38476ÿÿÿÿÿ Greenfield LAURIER uOTTAWA Lees ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ36476364373643736433364333643E3646@3648636486384773847838493ÿÿÿÿÿ Waller Main ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ384733847A3847A384353843@38456ÿÿÿÿÿ Nicholas ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3645A3646536465364663646636486384953849E3849E38458384673848Gÿÿÿÿÿ MACKENZIE KING ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3845638467384673846G384833G47Eÿÿÿÿÿ Elgin LEES ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3847G38439384393843538435384963848A3G4753G4753G47E3G4363G453ÿÿÿÿÿ Metcalfe 38477BCD38478BCD38436BCD38438BCD3843@BCD3843EBCD38497ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ

Bank Albert ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3G4783G4333G4333G43A3G4993G467ÿÿÿÿÿ Lyon ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3849638457384573845338453384663G43A3G4953G4953G49E3G4563G489ÿÿÿÿÿ Bronson Slater ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3G4983G4533G4533G45A3G4693A477ÿÿÿÿÿ LEBRETON Booth ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ38466384873848738483384833G4783G45E3G4683G4683G4833G48G3A436ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3G4683G4833G4833G48A3A4793A497ÿÿÿÿÿ Lac DOW'S Lake Preston ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3G4763G4373G4373G4333G4333G4983G48E3A4783A4783A4333A43G3A456ÿÿÿÿÿ Albert CARLING ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4753A47E3A47E3A4383A4973A45@ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3G4963G4573G4573G4533G4533G4683A43E3A4983A4983A4533A45G3A486ÿÿÿÿÿ CIVIC H Parkdale ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4963A4573A4573A45G3A4673A48Aÿÿÿÿÿ Holland Fisher ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3G4683G4833G4833G4893G4893A4763A45A3A4653A4653A46E3A4863@439ÿÿÿÿÿ ROYAL H ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4633A46A3A46A3A4853A48G3@439ÿÿÿÿÿ WESTGATE s.c./c.c ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4783A4333A4333A4393A4393A4953A4853A48E3A48E3@4783@47E3@49Gÿÿÿÿÿ Maitland ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A48G3@4793@4793@47@3@4333@498ÿÿÿÿÿ

ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4963A4573A4573A4533A4533A4673@4373@43G3@43G3@4993@4983@463ÿÿÿÿÿ Carling CARLINGWOOD Woodroffe ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3@4393@43@3@43@3@4953@49G3@45Eÿÿÿÿÿ

ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4663A4873A4873A4833A4833A48E3@49@3@4563@4563@4673@4653@48Aÿÿÿÿÿ LINCOLN FIELDS ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3@4593@45@3@45@3@4653@46G3@48Eÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3@4763@4373@4373@4333@4333@43E3@46G3@4893@4893@48A3E4773E435ÿÿÿÿÿ Pinecrest 417 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3@4963@4573@4573@4533@4533@45E3E47G3E4393E4393E43A3E4973E455ÿÿÿÿÿ Richmond

Carling ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3@4663@4873@4873@4833@4833@48@3E4953E49E3E49E3E4563E45A3E46Eÿÿÿÿÿ BAYSHORE Bayshore ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3E4783E4333E4333E4393E4393E43E3E4653E46E3E46E3E4863E48A9747Eÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3E4983E4533E4533E4593E4593E45E974759747E9747E974369743A9749Eÿÿÿÿÿ W BAYSHORE

o s.c./c.c.

ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3E4683E4833E4833E4893E4893E48E974959749E9749E974569745A9746Eÿÿÿÿÿ o d ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ97478974339743397439974399743E974659746@9746@974859748G9347@ÿÿÿÿÿ r idge BAYSHORE ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ9749G9745997459974559745597467934769347E9347E934369343A9349Eÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ9748G9347993479934759347593437934569345E9345E934669346A9348Eÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ9349G9345993459934559345593467994769947E9947E994369943A9949Eÿÿÿÿÿ Transitway Station / Station du Transitway ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ934899348@9348@9348E9348E9947G994579945899458994679946599488ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ9948G95473954739547G9547E95493ÿÿÿÿÿ O-Train Connection/ Correspondance avec l’O-Train ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ994899948@9948@9948E9948E9547G954579545895458954679546595488ÿÿÿÿÿ Timepoint / Heures de passage 2016.09

Information / Renseignement...... 613-741-4390 Customer Relations Service à la clientèle ...... 613-842-3600 Lost and Found / Objets perdus ...... 613-563-4011 Schedule / Horaire...... 613-560-1000 ) 0       ! " # $%&!'$&( $11 Text / Texto ...... 560560 plus your four digit bus stop number / plus votre numéro d’arrêt à quatre chiffres

Effective / En vigueur Sept. 4 sept. 2016

613-741-4390 octranspo.com        ! " # $%&!'$&( $        ! " # $%&!'$&( $ GHIPHGHIGQGHIRSGHISTGHIHSGHIHUGHIQGGHIQVGQIPQGQIGS ÿÿÿÿÿ DEFGÿIPFÿQRRQSEIFÿTEUFVIEQWÿXYÿSVUQ``EWaÿIQÿIPFÿXQIIQbc GHIGVGHISPGHISUGHIQRGHIQUGQIPSGQIPXGQIGHGQIRPGQIRUÿÿÿÿÿ GHISHGHIHQGHIQSGQIPTGQIGSGQIGUGQIRGGQIRVGQISQGQIHSÿÿÿÿÿ GHIHVGQIPPGQIPUGQIRRGQIRUGQISSGQISUGQIHXGQIQSGXIPGÿÿÿÿÿ 4wxy€ÿ‚ defghÿpgqrÿstuÿvv GQIPQGQIGTGQIRQGQISVGQIHXGQIQGGQIQXGXIPHGXIGGGXIRPÿÿÿÿÿ 234567389@ÿB55C GQIRG GQISSGQIHGGQIQQGXIPRGXIPTGXIGRGXIRPGXIRVGXISVÿÿÿÿÿ GQISTGQIHVGQIQTGXIGGGXIGUGXIRSGXIRUGXISXGXIHQGXIQQÿÿÿÿÿ

ƒ„ C†845 B3968B9 6„4B39‘8826„4B39ÿ“”45C789ÿ“”45C789ÿ“ CB„754ÿ“ CB„754ÿ“ •„6–59—35 B55Cÿ‡24325„™ÿ‰„ GQIQRGXIPHGXIGRGXIRXGXISSGXISUGXIHSGXIQGGTIPPGTIGPÿÿÿÿÿ ‡ƒ ˆ35B2Cÿ‰ƒ ’ÿC5„4C †8BB„92 6„4B39 C8•54C57 5•”45CC ƒ„9– –39ÿ˜„ d4325„™ GXIPTGXIGVGXIRTGXIHGGXIHUGXIQSGXIQUGTIPXGTIGQGTIRQÿÿÿÿÿ ‘ C7ef GXIRR GXISHGXIHRGXIQXGTIPSGTIPUGTIGSGTIRGGTISPGTIHPÿÿÿÿÿ ghijk ghiklghikmghilnghihhghihmghiogghiopgoiglÿÿÿÿÿÿÿÿÿÿ GXISTGXIHVGXIQTGTIGGGTIGUGTIRSGTIRUGTISXGTIHSGTIQRÿÿÿÿÿ ghihk ghiolghiomgoigngoijhgoijmgoikggoikpgoillÿÿÿÿÿÿÿÿÿÿ GXIQRGTIPHGTIGRGTIRXGTISSGTISUGTIHSGTIQGGTIQUGUIPTÿÿÿÿÿ goijrgoikmgoiljgoihlgoihpgoiojgoiohgrigkgrigmÿÿÿÿÿÿÿÿÿÿ GTIPTGTIGVGTIRTGTIHGGTIHTGTIQRGTIQTGUIPHGUIGGGUIRPÿÿÿÿÿ goilhgoihogoihngrigjgrigrgrigngrijkgrikggrikoÿÿÿÿÿÿÿÿÿÿ GTIRRGTISHGTIHRGTIQXGUIPRGUIPTGUIGRGUIGVGUIRXGUISQÿÿÿÿÿ goihn grigggrighgrijrgrikjgrikhgrikmgrilogrihgÿÿÿÿÿÿÿÿÿÿ GTISTGTIHVGTIQTGUIGGGUIGTGUIRRGUIRTGUISHGUIHGGUIQPÿÿÿÿÿ grigh grijogrijngriljgrilrgrilngrihkgrioggriooÿÿÿÿÿÿÿÿÿÿ GTIQRGUIPHGUIGRGUIRXGUISRGUISTGUIHGGUIHUGUIQHGVIPSÿÿÿÿÿ grijngrilggrilhgrihrgriojgriohgriomgmigogmijggmijpÿÿÿÿÿ GUIPV GUIRGGUIRVGUIHSGUIHVGUIQHGUIQUGVIPQGVIGGGVIRPÿÿÿÿÿ grilhgrihogrihngmigjgmigrgmigngmijkgmikggmikogmillÿÿÿÿÿ GUIRVGUIHGGUIHUGVIPGGVIPQGVIPVGVIGSGVIRPGVIRQGVISHÿÿÿÿÿ grihngmigggmigogmijpgmikhgmikpgmiljgmilngmihogmiolÿÿÿÿÿ GUIHVGUIQVGVIPXGVIGUGVIRRGVIRXGVIRVGVISXGVIHGGVIHVÿÿÿÿÿ gmigh gmijogmikkgmilogmihjgmihrgmioggmiopgpighgpijlÿÿÿÿÿ GVIPVGVIGVGVIRXGVISUGVIHRGVIHXGVIHVGVIQXRPIPGRPIPVÿÿÿÿÿ gmijngmilggmilmgmioggmiorgpigjgpigogpijlgpijngpikpÿÿÿÿÿ GVIRV GVISVGVIHXGVIQURPIPRRPIPXRPIPVRPIGXRPIRGRPIRVÿÿÿÿÿ gmilhgmihmgmiohgpigmgpijhgpijngpiklgpilkgpilpgpihmÿÿÿÿÿ GVIHVGVIQVRPIPXRPIGURPIRRRPIRXRPIRVRPISXRPIHGRPIHVÿÿÿÿÿ gmihngpigkgpigngpikkgpilggpilogpilngpihpgpiohgniglÿÿÿÿÿ RPIGPRPIRPRPIRQRPISTRPIHGRPIHQRPIHURPIQQRGIPPRGIPUÿÿÿÿÿ gpighgpijmgpikhgpilmgpihogpioggpiohgniglgnigngnijpÿÿÿÿÿ RPISPRPISVRPIHHRPIQHRPIQURGIPRRGIPQRGIGRRGIGTRGIRQÿÿÿÿÿ gpikggpilhgpihjgpioognigkgnigrgnijggnijngnikognilhÿÿÿÿÿ RPIQPRPIQVRGIPHRGIGHRGIGURGIRRRGIRQRGISRRGISTRGIHQÿÿÿÿÿ gpilhgpihpgpioognigngnijrgnikggnikhgniljgnilmgnihrÿÿÿÿÿ RGIGPRGIGVRGIRHRGISHRGISURGIHRRGIHQRGIQRRGIQVRRIPTÿÿÿÿÿ gpihngnigjgnigpgnikkgnikpgnilkgnilognihkgnihpgniorÿÿÿÿÿ RGISPRGISVRGIHHRGIQHRGIQURRIPRRRIPQRRIGRRRIGVRRIRTÿÿÿÿÿ gnighgnijrgniklgnilmgnihlgnihmgnioggniomjgigljgijjÿÿÿÿÿ RGIQPRGIQVRRIPHRRIGHRRIGURRIRRRRIRQRRISRRRISVRRIHTÿÿÿÿÿ gnijngniljgnilpgniokgniopjgigkjgigojgijkjgijpjgikrÿÿÿÿÿ RRIGGRRIRPRRIRQRRISQRRISVRRIHSRRIHXRRIQSRSIPPÿÿÿÿÿÿÿÿÿÿ gnilhgnihrgnioljgigmjgijljgijmjgikgjgikmjgilljgihjÿÿÿÿÿ RRISXRRIHQRRIQPRSIPPRSIPHRSIPURSIGGRSIGURSIRQÿÿÿÿÿÿÿÿÿÿ gnihn jgiggjgigmjgikjjgikmjgiljjgilhjgihjjgihmjgiooÿÿÿÿÿ RSIPXRSIGQRSIRPRSISPRSISHRSISURSIHGRSIHURSIQQÿÿÿÿÿÿÿÿÿÿ jgighjgijojgikkjgilrjgihkjgihrjgihnjgiorjjigkjjijgÿÿÿÿÿ RSISXRSIHQRSIQPPPIPPPPIPHPPIPUPPIGGPPIGUPPIRQÿÿÿÿÿÿÿÿÿÿ jgijnjgilgjgilmjgiojjgiomjjigjjjighjjijjjjijmjjikoÿÿÿÿÿ PPIRPPPIRVPPISHPPIHHPPIHUPPIQRPPIQQPGIPRÿÿÿÿÿÿÿÿÿÿPGIPT jgilhjgihojgiokjjigrjjijkjjijrjjijnjjikrjjilkjjihgÿÿÿÿÿ jgihn jjiggjjigmjjikjjjikmjjiljjjilhjjihjjjihmjjiooÿÿÿÿÿ 234567389@ÿBCDEF845 jjighjjijojjikkjjilrjjihkjjihrjjihnjjiorjkigkjkijgÿÿÿÿÿ jjijnjjilgjjilmjjiojjjiomjkigjjkighjkijjjkijmjkikoÿÿÿÿÿ Y55Eÿ`6aC6b59c35 CYB547ÿf CYB547ÿf g45E789ÿf g45E789ÿf 6C4Y39dÿf6C4Y39dh882 Y3968Y9 BCDEF845 jjilhjjihojjiokjkigrjkijkjkijrjkijnjkikrjkilkjkihgÿÿÿÿÿ b39dÿeC b597 5ag45EE BCYECa 6C4Y39d F8YYC92 iÿE5C4E p35Y2EÿqC rC jjihn jkiggjkigmjkikjjkikmjkiljjkilhjkihjjkihmjkiooÿÿÿÿÿ PHISHPHIHHPHIHXPHIHVPHIQRPHIQHPHIQUPQIGPPQIGSPQIRQ jkighjkijojkikkjkilrjkihkjkihrjkihnjkiorjligkjlijgÿÿÿÿÿ PQIPHPQIGHPQIGXPQIGVPQIRRPQIRHPQIRUPQIHPPQIHSPQIQQ jkijnjkilgjkilmjkiojjkiomjligjjlighjlijjjlijmjlikoÿÿÿÿÿ PQISHPQIHHPQIHXPQIHVPQIQRPQIQHPQIQUPXIGPPXIGSPXIRU jkilhjkihhjkiojjlighjlijgjlijojlijpjlikojliljjlilnÿÿÿÿÿ PQIQV PXIPVPXIGRPXIGQPXIGUPXIRPPXIRHPXISTPXIHPPXIQQ jkihnjkionjligrjlijnjlikojlilgjlilljlihgjlihrjliohÿÿÿÿÿ PXIGVPXIRVPXISRPXISQPXISUPXIHPPXIHHPXIQTPTIPPPTIGQ jlighjlijhjlikjjlilhjlihgjlihojlihpjlioojhigjjhignÿÿÿÿÿ PXISTPXIHUPXIQGPXIQHPXIQTPXIQVPTIPHPTIGUPTIRSPTISU jlijnjliknjlilrjlihnjlioojhiggjhigljhijgjhijrjhikhÿÿÿÿÿ PXIQRPTIPSPTIPTPTIGPPTIGSPTIGQPTIRGPTISQPTIHPPTIQQ jlilhjlihhjliojjhighjhijgjhijojhijpjhikojhiljjhilnÿÿÿÿÿ PTIPTPTIGUPTIRRPTIRQPTIRVPTISGPTISTPTIQGPTIQXPUIGR jlihnjlionjhigrjhijnjhikojhilgjhilljhihgjhihrjhiohÿÿÿÿÿ PTIRRPTISSPTISUPTIHSPTIHTPTIHVPTIQQPUIPVPUIGQPUISG jhighjhijojhikljhilmjhihljhihpjhiojjhionjoigojoijl PTSHPTHQPTQPPTQQPTQVPUPGPUPTPURGPURTPUHS ) 0       ! " # $%&!'$&( $1 ) 0       ! " # $%&!'$&( $1        ! " # $%&!'$&( $        ! " # $%&!'$&( $ 34567345783458334588345893@53A3@5343@5BA3@5B43@576 23456234762348923487234862348@234A75949A594295945A 3457C345843@53B3@5343@5AA3@5A83@5BA3@5683@57A3@58C 23486234A65949959497594965949@594275945A594795948A 3@53A3@5AB3@5A43@5BB3@5BC3@5633@56C3@5833@58C395AA 5949B5942B59452594585945B594535947859486594A252496 3@5AC3@5B43@56B3@5643@57A3@5783@58A39538395AA395BC 5945@5947@594855948A5948@594A9594AA52496524225245A 3@56A3@57B3@5743@58B3@58C3@58@39537395A@395B739569 5948@594A@524955249A5249@524295242A52456524725248A 3@57C3@58C3953A395373953@395AA395A43956A395643958B 5249@ 5242@524555245A5245@524795247A52486524A25549A 39536 395A6395A@395BA395B8395B@395673957@39587A3539 5245B5247B52482524885248B52483524A7554985549@55455 395A@395B@395663956C395733957639579A3536A3539A35B7 5248B524AB55492554985549B5549355427554585545@55485 39566395763957@3958A395883958@A3537A35A@A35B7A3569 5549B5542B55452554585545B5545355477554885548@57495 3957@3958@A3536A353CA35A3A35A6A35A9A3566A3569A3587 55475554855548655483554A5554A8554A@57493574275745B A3536A35A6A35A@A35BAA35B8A35B@A3567A357@A3587AA539 554AB5749B57422574285742B5742357457574785747@574A5 A35A@A35B@A3566A356CA3573A3576A3579AA536AA539AA5B7 5745557475574765747357485574885748@574A3994979942B A3566A3576A357@A358AA3588A358@AA537AA5A9AA5B8AA57B 574A599495994969949399425994289942@99453994779948B A357@ A358@AA536AA53CAA5A3AA5A6AA5A9AA567AA573AA584 99457994779947B99489994879948A9948392499924989242@ AA536AA5A6AA5A@AA5BAAA5B8AA5B@AA567AA579AA588AB5AB AA5A@AA5B@AA566AA56CAA573AA576AA579AB537AB5A3AB5B4 AA566AA576AA57@AA58AAA588AA58@AB537AB5A9AB5B8AB57B AA57@AA58@AB536AB53CAB5A3AB5A6AB5A9AB567AB573AB584 AB536AB5A6AB5A@AB5BAAB5B8AB5B@AB567AB579AB588A65AB AB5A@AB5B@AB566AB56CAB573AB576AB579A6537A65A3A65B4 AB566AB576AB57@AB58BAB58CAB589A6538A65B3A65BCA6576 AB57@AB58@A6536A6534A65AAA65A7A65B3A6568A657AA658@ A6536A65A6A65A@A65BBA65BCA65B9A6568A6583A658CA75A6 A65A@A65B@A6566A6564A657AA6577A6583A7538A75AAA75B@ A6566A6576A657@A658BA658CA6589A7538A75B3A75BCA7576 A657@A658@A7536A7534A75AAA75A7A75BAA756@A7577A853B A7536A75A6A75A@A75BBA75BCA75B9A756CA7586A7589A85A4 A75A@A75B@A7566A7564A757AA7577A758AA853@A85A7A856B A7566A7576A757@A758BA758CA7589A853CA85B6A85B9A8574 A7579A7589A8537A853@A85ABA85A8A85B6A8569A8578AC536 A853BA85A6A85A@A85BBA85BCA85B9A8564A8586AC533AC5A@ A85ACA85B4A856BA856CA8573A8576A858AAC534AC5A7AC56B A856AA857BA857@A858BA858CA8589AC534AC5B6AC563AC57@ A857CA8584AC536AC534AC5AAAC5A8AC5B7AC573AC57CA4537 AC53A AC5ABAC5A@AC5B8AC563AC567AC57BAC58@A4537A45BB AC5ACAC5B4AC566AC56@AC57BAC578AC58BA4534A45ABA456B AC563AC57AAC574AC58BAC58CAC589A453CA45BAA45BCA457C AC57CAC584A4536A453@A45ABA45A8A45BBA4564A457BA@53B A453AA45ABA45A@A45B6A45B4A4563A4564A458BA4584A@5A4 A45ACA45B4A456BA456CA4573A457BA457@A@53BA@534A@5B4 A456AA457BA4574A458AA4588A4584A@536A@5A4A@5BBA@569 A457C A4584A@53BA@53CA@5A3A@5ABA@5A@A@56BA@564A@587 A@53AA@5ABA@5A4A@5BAA@5B8A@5B4A@566A@574A@58BA9539 A@5ACA@5BCA@563A@566A@564A@569A@578A@584A953BA95A9 A@56AA@57AA@578A@57@A@58BA@587A9533A95ABA95A4A9567 A@57CA@58CA9533A9536A9534A9539A95A8A95B4A956BA9574 A953CA95ACA95B3A95B6A95BCA95B@A9566A9578A9583B3538 ) 0       ! " # $%&!'$&( $12 ) 0       ! " # $%&!'$&( $11 &   B  u ÿ ÿ f w z w z 7 | ~ h ‰ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ C x  w z z } ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ 9 m ˆ C ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ y y y y y y 8 ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ d m ‡  w    w 8 ÿ 8 6 k † 7 d

j „ 7 ÿ 4 ‚ }ÿ {ÿ {ÿ ÿ €ÿ {ÿ xÿ €ÿ {ÿ zÿ wÿ ÿ xÿ ÿ }ÿ }ÿ ÿ {ÿ wÿ }ÿ |ÿ ~ÿ wÿ zÿ xÿ wÿ |ÿ ÿ ~ÿ {ÿ C ÿ ÿ ÿ ÿ ÿ ÿ   | }  w z z z } w | | } w x z w z x  x }  z | x z   } ÿ ÿ ÿ ÿ ÿ ÿ 8 8 ÿ ÿ ÿ ÿ ÿ ÿ € y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y ÿ ÿ ÿ ÿ ÿ ÿ C 7 y   z w  w € ~ ~ ~ { € { w {  | w  w ~ ~ € € z w { € {  4 j x 3 B j 7 2 h ÿÿ ÿ ÿÿ ÿw ÿw ÿ ÿw ÿ ÿw ÿw ÿw ÿw ÿw ÿw ÿw ÿ ÿw ÿÿ ÿ ÿw ÿ ÿw ÿÿ ÿ ÿw ÿw ÿÿ ÿw ÿw ÿw ÿ ÿw ÿw ÿw ÿÿ ÿ 9 9 ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ m ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ m B ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ d  d k 6 ÿ  C D m  Hÿ Hÿ Hÿ Hÿ Hÿ Hÿ  6 G G G G G G k  }ÿ |ÿ wÿ wÿ ~ÿ ÿ wÿ |ÿ ÿ wÿ ÿ xÿ €ÿ |ÿ xÿ zÿ |ÿ ~ÿ wÿ xÿ |ÿ €ÿ }ÿ xÿ ÿ |ÿ }ÿ {ÿ xÿ wÿ f F F F F F F ÿ  7  w w | w z } x z  | z  | | } x x | }  } w z } } x x w } € z ~ x ~ x j $ y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y m } z }  | z  { {   w  € ~ z ~ w € { €  { w  | ~  w ~ ~ € € € z w  i y y y y y y

8 5 w  w  w   j q ) '  j H H H H H H  5 G G G G G G ™ |w ww }w z xw € €w zw ~w w xw x w €w w {w x }w w w | w ~w € €w |w w xw € x $ F F F F F F ™ 9 w x w | x | } x w z z  z w z  z } x z } w  | x  |  }  (  { }  }  B 3 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y 2  } x } w | x 3 f d { { { w  ~  € ~ z ~ w € { €  { w  | ~  w ~ € € € z w  y y y y y y  4 ! d  w w  w  3 h ' h & % 9 $ H H H H H H  B G G G G G G

ww w |w x €w ~w ~w xw ~w ~w zw € w w xw w }w € €w w x {w w w zw xw ww ~w x € F F F F F F  p w | } | | z } } } x w w z x w z  x } } z  w  | x  w } w  } {  {  # y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y

6 2  x  w z x { { { w | z ~  w € ~ ~ € { €  w {  | ~  w ~ € € € z w  " y y y y y y 4    w w  w

m   k !

m  m

B t  ÿw ÿ ÿ ÿw ÿw ÿ ÿ ÿw ÿ ÿw ÿ ÿ ÿw ÿw ÿw ÿw ÿw ÿ ÿw ÿw ÿw ÿw ÿw ÿw ÿ ÿ ÿw ÿw ÿw ÿ ÿw ÿ ÿ ÿw ÿw ÿw B e ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ  5 B ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ 5  7 ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ  r 2

2 3 j  3  4  4

s      5 

3 Hÿ Hÿ Hÿ Hÿ Hÿ Hÿ $  B ˜ G G G G G G   ÿ ~ÿ ÿ wÿ zÿ |ÿ wÿ ~ÿ ~ÿ wÿ wÿ xÿ €ÿ ~ÿ xÿ wÿ ÿ xÿ }ÿ }ÿ zÿ ~ÿ wÿ wÿ zÿ €ÿ ÿ wÿ xÿ xÿ f

F F F F F F 9  ÿ | z w  | z z x z } |   | x } | x } w   x w | w z } w   } x { € } € 5 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y ™ ) } } w w | x  q €  w { € { w | ~  € ~ z € ~ € { {  { w  | ~  ~ ~ € z w y y y y y y 9 '  6 3 w  w  w w 

 q B   $ p  (  9  H H H H H H  8  G G G G G G  vw ! xw }w w w ww w | }w ww w ww }w xw €w xw ww w w xw xw }w | w ww ww w ww }w xw | F F F F F F  7 Q

'  z | x | w x } | z x  w w z } }  z } | w  } w z | | x w € x x € € x B S 5 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y

& }   | | z S o  w € €  { { { w w | ~  € ~ z € ~ € { {   w  | ~  ~ € x 4 % y y y y y y  Q h $ w  w ~ w w  u  5 ÿ

  V d # T j

n 5 H H H Hw H H S " ÿ 7 G G G G G G 4 i ~ ~w  ~w ~w z {w w }w ~ {w zw €w w ~w ~w zw ~w w z }w ~w ww €w ~ €w w {w {w w {w Q F F F F F F

5 S 4 m | w } x z } z w }  z x } w | w x    x } z | w  | x z z  z ~ ~ z z ~ ÿ y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y B 9  7 } w w | | x c ! 8 ~ € €  { { w { w z ~ | ~  { ~ € € w { {   w | ~ | ~ € x y y y y y y j 9

b C w  w ~ w w ` B  m p

p C 8 7 Q g 4 B  H H H Hw H H  t 9

l E X X G G G G G G  ÿ d ~w w ~w ~w {w w }w €w w ~w ~w zw ~w w }w ~w ww €w €w w {w {w ÿ F F F F F F e ÿw ÿ ÿ ÿw ÿw ÿ ÿ ÿw  j B | x  }  x | }  | z | } w w }  x | w z } W ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ 8

z ~ ~ z z ~ b ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ y y y y y y y y y y y y y y y y y y y y y y  2 u ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ  | |  z z } 6 e a D ÿ { € €  { {  | ~ | { € € € { {   z ~ | ~ y y y y y y d p g  ÿ 9 b

w w ~ ~ w w i 3 a 5 3  7 Q d ` h f  — ÿ S 4  e t 5 e d H H Hw Hw H H 8 V b 4  ÿ g G G G G G G a c  {w zw {w {w |w zw ww €w zw ~w {w }w {w zw ww {w €w w €w zw {w |w C ` 8 F F F F F F ÿ ÿÿ ÿÿ ÿÿ ÿÿ ÿÿ ÿÿ ÿÿ ÿÿ

b z | } w  w } z  w z x z  | |  | } z x  ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ e } { { } } {  h e 4 e ` k ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ y y y y y y y y ÿ y y y y y y y y y y y y y y 3 g ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ g w z z x x   l j U z { € € €  { {  | ~ | { € € {  { |  | ~ V ÿ y y y y y y a ÿ a  S B i w w w w ~ ~ w w `  ÿ r f f X B ÿ  @ X – e e Q h  R W  d d 9 i a

ÿ ÿ 2 • V i

V c c ÿ d 8 U H H Hw Q  g 3 ÿ b e b  ÿ B G G G ` ` ` f ” |w |w |w |w w ~w {w T F F F V 7  ÿ ÿÿ ÿw ÿw ÿw ÿw ÿÿ ÿw ÿ ÿw ÿÿ ÿ ÿw ÿÿ ÿw ÿw ÿ ÿw ÿw ÿ ÿw ÿÿ ÿÿ ÿw ÿw ÿÿ ÿ  4 U q U S w w z x x x w ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ “ e ÿ ÿ x x x ÿ T  ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ 5 y y y y y y y  R 6 S ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ a a z   a 2  € { € {  |  ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ` ÿ ` Q ` ™ y y y  ’ 5   B w w w w w w w P G G G ~ w ~   ˜ f ÿ ÿ 1 ÿ ÿ ÿ 4 ‘  w w  D H 7 V H H H 3  3 `

 Y G W s

 — F 4 2 F F G F 0

ort 2016.09

KEYS p Keys South ro

SOUTH é 'a 560560 l

e BELLS d Seyton .

m CORNERS

Airport Pkwy. e

Ottawa

o f

r d'Ottawa f

AIRPORT i P l

AÉROPORT Walkley c Seyton t

H Old Richmond s

613-741-4390 613-842-3600 613-563-4011 613-560-1000 International Airport e

Aéroport international

Heron Uplands

d

Hunt Club Hunt Robertson W n Baseline rtson

Billings Bridge a e l b 2

r o Mackenzie King Mackenzie

e R

d

l h

Pleasant Park

t a

H u r

EY Centre Centre EY

S e

Riverside . g Moodie Greenboro J Bank Late night trips via Rideau St. z Fit votre numéro d’arrêt à quatre chiffres la rue Rideau au lieu de la station Les trajets de fin soirée utilisent Les trajets instead of Mackenzie King station / instead of Mackenzie Smyth BAYSHORE BELLS CORNERS

AIRPORT/AÉROPORT Lycée Claudel Lycée Hurdman plus après 22h. Some trips

CARLETON after 10 pm.

QUEENSWAY-

417 Certains trajets Lees

Richmond 417 All day service 2

Lees

Pinecrest

Riverside

417 Nicholas Fields Woodridge

Lincoln

Service toute la journée

Bayview

Bay Lyon Kent Bank O'Connor Metcalfe Elgin Bronson

Carling

K. Edward K. Bayshore Holly Acres Holly

Mackenzie King 97

Westboro

Slater Vanier 613-741-4390 octranspo.com

Transitway & Station Transitway uOttawa

Park & Ride | Parc-o-bus & Ride | Parc-o-bus Park Albert C.C.

S.C.

Via King Edward après 22 h Via King Edward 7 days a week / jours par semaine

Laurier E. FIELDS Bayshore

Timepoint | Heures de passage

LINCOLN

(All time periods | En tout temps)

After 10 pm via King Edward Ave. Ave. After 10 pm via King Edward your four digit bus stop number / Laurier Effective / En vigueur Sept. 4 sept. 2016

C.C. BAYSHORE S.C. C.C. BAYSHORE BAYSHORE

Pasture

DOWNTOWN LeBreton

Tunney's CENTRE-VILLE

Dominion plus Information / Renseignement...... Customer Relations Service à la clientèle ...... Lost and Found / Objets perdus ...... Schedule / Horaire...... Text / Texto ......        ! " # $%&'!($') $        ! " # $%&'!($') $ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 45678456754968@ ÿÿÿÿÿ 4964A496B7496CC ÿÿÿÿÿ 496D4 ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ334353346733468ÿÿÿÿÿ3349@33459334A7ÿÿÿÿÿ334ABÿÿÿÿÿ 37459CDE33476CDE33435CDE33465CDE3346@CDE3349BCDEÿÿÿÿÿ3345FCDE334A3CDE334A@CDEÿÿÿÿÿÿÿÿÿÿ334A8 45645EFG456C7EFG456D@EFG4567AEFG4968CEFG49647EFGÿÿÿÿÿ496B5EFG496CBEFG496D8EFGÿÿÿÿÿÿÿÿÿÿ496D4 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ334683349A33455ÿÿÿÿÿ334A9334A@3647Aÿÿÿÿÿ36436ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ4968749644496BCÿÿÿÿÿ496CD496D8496D9ÿÿÿÿÿ49677ÿÿÿÿÿ ÿÿÿÿÿ3343BCDE33468CDE33498CDE33459CDE334A6CDEÿÿÿÿÿ36473CDE3647FCDE36439CDEÿÿÿÿÿÿÿÿÿÿ36435 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ4968AEFG49647EFG496B9EFGÿÿÿÿÿ496C@EFG496DDEFG49674EFGÿÿÿÿÿÿÿÿÿÿ4967B ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ33455334A7334A8ÿÿÿÿÿ3647@3643936467ÿÿÿÿÿ3646Bÿÿÿÿÿ ÿÿÿÿÿ45678EFG4968CEFG4964DEFG4964@EFG496C8EFGÿÿÿÿÿ496D4EFG496D9EFG49677EFGÿÿÿÿÿÿÿÿÿÿ49675 33439CDE33496CDE33455CDE334A5CDE334A@CDE3647BCDEÿÿÿÿÿ3643FCDE36463CDE3646@CDEÿÿÿÿÿÿÿÿÿÿ36468 ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿ496B8496B5496C@ÿÿÿÿÿ496DA496774@68Bÿÿÿÿÿ4@648ÿÿÿÿÿ ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿ334A83647A36435ÿÿÿÿÿ364693646@3649Aÿÿÿÿÿ36456ÿÿÿÿÿ 456D5EFG49687EFG4964@EFG496BAEFG496CCEFG496D7EFGÿÿÿÿÿ49675EFG4@68BEFG4@648EFGÿÿÿÿÿÿÿÿÿÿ4@644 ÿÿÿÿÿ3345BCDE334A8CDE36478CDE36439CDE36466CDEÿÿÿÿÿ36493CDE3649FCDE36459CDEÿÿÿÿÿÿÿÿÿÿ36455 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ496C7496D44967Cÿÿÿÿÿ4@68D4@68A4@645ÿÿÿÿÿ4@6BCÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ364353646736468ÿÿÿÿÿ3649@36459364A7ÿÿÿÿÿ364ABÿÿÿÿÿ ÿÿÿÿÿ496B8EFG496CBEFG496DCEFG496D9EFG4967AEFGÿÿÿÿÿ4@648EFG4@645EFG4@6BCEFGÿÿÿÿÿÿÿÿÿÿ4@6BD 33459CDE36476CDE36435CDE36465CDE3646@CDE3649BCDEÿÿÿÿÿ3645FCDE364A3CDE364A@CDEÿÿÿÿÿÿÿÿÿÿ364A8 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ49678496754@689ÿÿÿÿÿ4@64@4@6BC4@6C8ÿÿÿÿÿ4@6C9ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ364683649A36455ÿÿÿÿÿ364A9364A@3947Aÿÿÿÿÿ39436ÿÿÿÿÿ 49645EFG496C7EFG496D@EFG4967AEFG4@68CEFG4@647EFGÿÿÿÿÿ4@6B5EFG4@6CBEFG4@6CAEFGÿÿÿÿÿÿÿÿÿÿ4@6D8 ÿÿÿÿÿ3643BCDE36468CDE36498CDE36459CDE364A6CDEÿÿÿÿÿ39473CDE3947FCDE39439CDEÿÿÿÿÿÿÿÿÿÿ39435 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ4@6874@6444@6BBÿÿÿÿÿ4@6CB4@6C94@6DDÿÿÿÿÿ4@674ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ36455364A7364A8ÿÿÿÿÿ3947@3943939467ÿÿÿÿÿ3946Bÿÿÿÿÿ ÿÿÿÿÿ49678EFG4@68BEFG4@64CEFG4@649EFG4@6B@EFGÿÿÿÿÿ4@6CAEFG4@6DDEFG4@674EFGÿÿÿÿÿÿÿÿÿÿ4@67B 36439CDE36496CDE36455CDE364A5CDE364A@CDE3947BCDEÿÿÿÿÿ3943FCDE39463CDE3946@CDEÿÿÿÿÿÿÿÿÿÿ39468 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ4@6B84@6B54@6C5ÿÿÿÿÿ4@6D54@6744@67@ÿÿÿÿÿ4A687ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ364A83947A39435ÿÿÿÿÿ394693946@3949Aÿÿÿÿÿ39456ÿÿÿÿÿ 496D9EFG4@685EFG4@64@EFG4@6BAEFG4@6CCEFG4@6DDEFGÿÿÿÿÿ4@677EFG4A688EFG4A689EFGÿÿÿÿÿÿÿÿÿÿ4A68@ ÿÿÿÿÿ3645BCDE364A8CDE39478CDE39439CDE39466CDEÿÿÿÿÿ39493CDE3949FCDE39459CDEÿÿÿÿÿÿÿÿÿÿ39455 ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿ4@6CD4@6D84@678ÿÿÿÿÿ4A6884A6874A64Bÿÿÿÿÿ4A64Aÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ394353946739468ÿÿÿÿÿ3949@39459394A7ÿÿÿÿÿ394ABÿÿÿÿÿ ÿÿÿÿÿ4@6B4EFG4@6CCEFG4@6DDEFG4@6D@EFG4@67@EFGÿÿÿÿÿ4A68@EFG4A64CEFG4A6B8EFGÿÿÿÿÿÿÿÿÿÿ4A6B4 36459CDE39476CDE39435CDE39465CDE3946@CDE3949BCDEÿÿÿÿÿ3945FCDE394A3CDE394A@CDEÿÿÿÿÿÿÿÿÿÿ394A8 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ4@6DA4@6774A687ÿÿÿÿÿ4A6474A6B84A6B9ÿÿÿÿÿ4A6CDÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ394683949A39455ÿÿÿÿÿ394A9394A@3547Aÿÿÿÿÿ35436ÿÿÿÿÿ 4@649EFG4@6C5EFG4@6D@EFG4@67AEFG4A68CEFG4A64CEFGÿÿÿÿÿ4A6BCEFG4A6B@EFG4A6C7EFGÿÿÿÿÿÿÿÿÿÿ4A6C5 ÿÿÿÿÿ3943BCDE39468CDE39498CDE39459CDE394A6CDEÿÿÿÿÿ35473CDE3547FCDE35439CDEÿÿÿÿÿÿÿÿÿÿ35435 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ4A68D4A6484A6B8ÿÿÿÿÿ4A6C84A6C74A6DBÿÿÿÿÿ4A6DAÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ39455394A735477ÿÿÿÿÿ354783543535463ÿÿÿÿÿ3546@ÿÿÿÿÿ ÿÿÿÿÿ4@674EFG4A68CEFG4A64DEFG4A64@EFG4A6B@EFGÿÿÿÿÿ4A6C@EFG4A6DCEFG4A678EFGÿÿÿÿÿÿÿÿÿÿ4A674 39439CDE39496CDE39455CDE394A5CDE394A@CDE3547BCDEÿÿÿÿÿ3543FCDE35463CDE3546@CDEÿÿÿÿÿÿÿÿÿÿ35468 4@6CA4@67@4A68@4A64@4A6BB4A6C8ÿÿÿÿÿ4A6CA4A6DD4A674ÿÿÿÿÿ4A67@ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ394A83547A3543Aÿÿÿÿÿ35465354683549Fÿÿÿÿÿ35459ÿÿÿÿÿ ÿÿÿÿÿ4A64C4A6BC4A6CC4A6C94A6D7ÿÿÿÿÿ4A67D4A67AB8685ÿÿÿÿÿB864Cÿÿÿÿÿ ÿÿÿÿÿ3945BCDE394A8CDE35478CDE35439CDE35466CDEÿÿÿÿÿ35493CDE3549FCDE35459CDEÿÿÿÿÿÿÿÿÿÿ35455 4A68A 4A6B@4A6C@4A6D@4A67BB8688ÿÿÿÿÿB868AB864DB86B4ÿÿÿÿÿB86B@ÿÿÿÿÿ ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿ354353546735493ÿÿÿÿÿ354533545B354A5ÿÿÿÿÿ3A473ÿÿÿÿÿ ÿÿÿÿÿ4A6DC4A67CB868CB8689B8647ÿÿÿÿÿB86BDB86BAB86C5ÿÿÿÿÿB86DCÿÿÿÿÿ 39459CDE35476CDE35435CDE35465CDE3546@CDE3549BCDEÿÿÿÿÿ3545FCDE354A3CDE354A@CDEÿÿÿÿÿÿÿÿÿÿ354A8 4A6CA4A67@B868@B864@B86BBB86C8ÿÿÿÿÿB86CAB86DDB8678ÿÿÿÿÿB8679ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ354683549A3545Fÿÿÿÿÿ354AF3A4763A437ÿÿÿÿÿ3A43Bÿÿÿÿÿ ÿÿÿÿÿB864CB86BCB86CCB86C9B86D7ÿÿÿÿÿB867DB867AB4687ÿÿÿÿÿB464Bÿÿÿÿÿ ÿÿÿÿÿ3543BCDE35468CDE35498CDE35459CDE354A5CDEÿÿÿÿÿ3A475CDE3A478CDE3A43FCDEÿÿÿÿÿÿÿÿÿÿ3A43B B868AB86B@B86C@B86D@B867BB4688ÿÿÿÿÿB468AB464DB46B8ÿÿÿÿÿB46B9ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ35455354A73A473ÿÿÿÿÿ3A4333A43B3A46Aÿÿÿÿÿ3A496ÿÿÿÿÿ ÿÿÿÿÿB86DCB867CB468CB4689B4647ÿÿÿÿÿB46BDB46BAB46C7ÿÿÿÿÿB46DBÿÿÿÿÿ 35439CDE35496CDE35455CDE354A5CDE354A@CDE3A478CDEÿÿÿÿÿ3A438CDE3A465CDE3A493CDEÿÿÿÿÿÿÿÿÿÿ3A496 B86CAB867@B468@B464@B46BBB46C8ÿÿÿÿÿB46CAB46DDB4678ÿÿÿÿÿB4679ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4763A47@3A438ÿÿÿÿÿ3A4973A49F3A455ÿÿÿÿÿ3A4A6ÿÿÿÿÿ ÿÿÿÿÿB464CB46BCB46CCB46C9B46D7ÿÿÿÿÿB467DB467ABB687ÿÿÿÿÿBB64Bÿÿÿÿÿ ÿÿÿÿÿ3545BCDE3A477CDE3A433CDE3A43ACDE3A46FCDEÿÿÿÿÿ3A49FCDE3A456CDE3A4A7CDEÿÿÿÿÿÿÿÿÿÿ3A4A3 B468AB46B@B46C@B46D@B467BBB688ÿÿÿÿÿBB68ABB64DBB6B8ÿÿÿÿÿBB6B5ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4383A46A3A49Fÿÿÿÿÿ3A45B3A4A93F473ÿÿÿÿÿ3F478ÿÿÿÿÿ ÿÿÿÿÿB46DDEHGB467DEHGBB68DEHGBB68@EHGBB645EHGÿÿÿÿÿBB6B9BB6CBBB6C@ÿÿÿÿÿBB6DDÿÿÿÿÿ 35459CDE3A476CDE3A43ACDE3A46FCDE3A497CDE3A453CDEÿÿÿÿÿ3A4A3CDE3A4ABCDE3F47ACDEÿÿÿÿÿÿÿÿÿÿ3F47F B46D8EIGB467AEIGBB68AEIGBB64AEIGBB6BCEIGBB6C4EIGÿÿÿÿÿBB6DBEIGBB6D9EIGBB67CEIGBB677BC68Cÿÿÿÿÿ ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿ3A46@3A4953A45Fÿÿÿÿÿ3A4AB3F4793F433ÿÿÿÿÿ3F438ÿÿÿÿÿ ÿÿÿÿÿBB64DEIGBB6BDEIGBB6CDEIGBB6C@EIGBB6D5EIGÿÿÿÿÿBB679EIGBC68BEIGBC68@EIGBC648BC64@ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4963A49@3A4A7ÿÿÿÿÿ3F4733F47B3F43Aÿÿÿÿÿ3F469ÿÿÿÿÿ BB648EIGBB6BAEIGBB6CAEIGBB6DAEIGBB67CEIGBC684EIGÿÿÿÿÿBC64BEIGBC649EIGBC6BCEIGBC6B7BC6CCÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A49B3A4593A4AAÿÿÿÿÿ3F47F3F4363F467ÿÿÿÿÿ3F46@ÿÿÿÿÿ ÿÿÿÿÿBB6DDEIGBB67DEIGBC68DEIGBC68@EIGBC645EIGÿÿÿÿÿBC6B9EIGBC6CBEIGBC6C@EIGBC6D8BC6D@ÿÿÿÿÿ ÿÿÿÿÿ3A467CDE3A499CDE3A455CDE3A45@CDE3A4A8CDEÿÿÿÿÿ3F437CDE3F43FCDE3F465CDEÿÿÿÿÿÿÿÿÿÿ3F46A BB6D8EIGBB67AEIGBC68AEIGBC64AEIGBC6BCEIGBC6C4EIGÿÿÿÿÿBC6DBEIGBC6D9EIGBC67CEIGBC6778868Cÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A45B3A4A93F47Aÿÿÿÿÿ3F43F3F4663F497ÿÿÿÿÿ3F49@ÿÿÿÿÿ ÿÿÿÿÿBC64AEIGBC6BAEIGBC6CAEIGBC6DBEIGBC678EIGÿÿÿÿÿ88684EIG88685EIG8864BEIG8864D886BBÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3A4A63A4A@3F437ÿÿÿÿÿ3F4633F46B3F49Aÿÿÿÿÿ3F459ÿÿÿÿÿ BC645EIGBC6C7EIGBC6D7EIGBC677EIGBC67@EIG88685EIGÿÿÿÿÿ88649EIG886BBEIG886B@EIG886C8886C@ÿÿÿÿÿ 3A43FCDE3A49ACDE3A45@CDE3A4A8CDE3F479CDE3F435CDEÿÿÿÿÿ3F46ACDE3F493CDE3F498CDEÿÿÿÿÿÿÿÿÿÿ3F457 ÿÿÿÿÿ88688EHG88648EHG886B8EHG886BCEHG886C4EHGÿÿÿÿÿ886DB886D98867Cÿÿÿÿÿ8867Aÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3F47B3F4393F46Aÿÿÿÿÿ3F49F3F4563F4A7ÿÿÿÿÿ3F4A@ÿÿÿÿÿ ÿÿÿÿÿ886B9EHG886C9EHG886D9EHG88678EHG8867@EHGÿÿÿÿÿ8468A8464D846B8ÿÿÿÿÿ846B5ÿÿÿÿÿ ÿÿÿÿÿ3A4A7CDE3F479CDE3F435CDE3F43@CDE3F497CDEÿÿÿÿÿ3F453CDE3F45BCDE3F4AACDEÿÿÿÿÿÿÿÿÿÿ3F4AF ÿÿÿÿÿ88679EPG84689EPG84649EPG846B8EPGÿÿÿÿÿ846BAEPG846DC846D@8467Dÿÿÿÿÿ8B688ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3F4673F46F3F49@ÿÿÿÿÿ3F4583F4AA3B479ÿÿÿÿÿ3B433ÿÿÿÿÿ ÿÿÿÿÿ846B9EPG846C9EPG846D9EPG84678EPGÿÿÿÿÿ8467AEPG8B64C8B64@8B6BDÿÿÿÿÿ8B6C8ÿÿÿÿÿ 3A45FCDE3F47ACDE3F43@CDE3F468CDE3F499CDE3F45ACDEÿÿÿÿÿ3F4AFCDE3B476CDE3B437CDEÿÿÿÿÿÿÿÿÿÿ3B433 ÿÿÿÿÿ8467AEPG8B68AEPG8B64AEPG8B6BBEPGÿÿÿÿÿ8B6C4EPG8B6D78B6788B675ÿÿÿÿÿ8C68Bÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3F49A3F4533F4A9ÿÿÿÿÿ3B4753B4373B43@ÿÿÿÿÿ3B46Fÿÿÿÿÿ ÿÿÿÿÿ8B6BAEPG8B6CAEPG8B6DAEPG8B67BEPGÿÿÿÿÿ8C684EPG8C6478C6B88C6B5ÿÿÿÿÿ8C6CBÿÿÿÿÿ ÿÿÿÿÿ3F467CDE3F499CDE3F455CDE3F45@CDE3B477CDEÿÿÿÿÿ3B433CDE3B43BCDE3B46ACDEÿÿÿÿÿÿÿÿÿÿ3B46F ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ8C649EPGÿÿÿÿÿ8C6B5EPG8C6D88C6D78C674ÿÿÿÿÿ8C679ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ3F45FCDE3F4A6CDE3B475CDEÿÿÿÿÿ3B43ACDE3B463CDE3B468CDEÿÿÿÿÿÿÿÿÿÿ3B497 3F4A73F4AF3B47@3B4383B46A3B4993B453 0 1       ! " # $%&'!($') $& 0 1       ! " # $%&'!($') $2&        ! " # $%&'!($') $        ! " # $%&'!($') $

345467893454@7893454A7893454B7893453C78934564789345D6789ÿÿÿÿÿ345F4789345FG789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 34567849@AÿC6DDEÿ795@65E ÿÿÿÿÿ3453F3453C3453G345663456@345DBÿÿÿÿÿ345F@345CD33543335433353D335DD FGHÿPQRSÿTUÿVTWSXY`a FbHÿbcTÿdcQeÿPRfT`R 3453B7893456F7893456C7893456G789345D6789345D@789345FB789ÿÿÿÿÿ345C@7893354D789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ FgHÿPQRSÿTUÿhiQQaWpSÿqTSUi`a FWHÿbcTÿdcQeÿPRfT`RÿrÿscRaTi ÿÿÿÿÿ3456@7H93456A7H93456B7H9345DC7H9345F47H9345C67H9ÿÿÿÿÿ335447H93354G7H93353F7H93353F7H93356G7H9ÿÿÿÿÿ 345D6789345D@789345DA789345DB789345FC789345C478933546789ÿÿÿÿÿ335347893353G789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ t45u958 vw@8 E9w8v‚566@C959C4DD4@‚Evw53ƒt@ƒt7€6@„465436twD6C5689@8w@@6ED4@79D@D4@79D@CtEv956‘48„‚65tD3 ÿÿÿÿÿ345F6345FD345FF345C4345CC3354@ÿÿÿÿÿ3353C33563335D4335D4335F636546 E89u 7DwC €6Eÿyt yt C543‚6 C €4@‚ÿyt t ‰t utE8w56 ‘46D3E ‘46D3E ’t “ÿt3‡ÿ‰” D99uÿx yt †5436tw 7 ‰t ’t 345F@789345C6789345CD789345CF789335447893354C7893353@789ÿÿÿÿÿ3356C789335D3789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ E89u E8‡ˆ ÿÿÿÿÿ345C@7H9345CA7H9345CB7H93354C7H9335347H9335667H9ÿÿÿÿÿ335D47H9335DG7H9335FC7H9335FC7H9335C@7H9ÿÿÿÿÿ yt 335467893354@7893354A7893354B7893353C78933564789335D6789ÿÿÿÿÿ335F4789335FG789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ •–—•˜FgH•–—™dFgH•–—™–FgH•–—™eFgH•–—f•FgH•–—feFgH•–—d˜FgHÿÿÿÿÿ•–—–eFgH•–—e•FgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ335363353D3353F335643356C335D@ÿÿÿÿÿ335FC335C3365443654436536365D6 •–—dhFgH•–—–fFgH•–—–dFgH•–—––FgH•–—–iFgH•–—e–FgH•e—•hFgHÿÿÿÿÿ•e—™–FgH•e—™iFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3353@789335667893356D7893356F789335D4789335DC789335F@789ÿÿÿÿÿ335CC78936543789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ •e—•h•e—™f•e—™d•e—™–•e—™i•e—f–•e—dhÿÿÿÿÿ•e—––•e—–i•e—eh•e—eh•h—•e•h—f– ÿÿÿÿÿ3356@7H93356A7H93356B7H9335DC7H9335F47H9335C67H9ÿÿÿÿÿ365447H93654G7H93653C7H93653C7H93656A7H9ÿÿÿÿÿ •e—dh•e—–f•e—–d•e—––•e—–i•e—e–•h—•hÿÿÿÿÿ•h—™–•h—™i•h—fh•h—fh•h—de•h—e– 335D6789335D@789335DA789335DB789335FC789335C478936546789ÿÿÿÿÿ365347893653G789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ •e—e–FGH•h—••FGH•h—•™FGH•h—•fFGH•h—•˜FGH•h—™fFGH•h—f–FGHÿÿÿÿÿ•h—dfFGH•h—d˜FGH•h—––FGH•h—––FGH•h—edFGHÿÿÿÿÿ ÿÿÿÿÿ335F6335FD335FF335C4335CC3654@ÿÿÿÿÿ3653C36563365D4365D4365FD3D54D •h—™••h—™h•h—™˜•h—™j•h—fd•h—fj•h—–•ÿÿÿÿÿ•h—–j•h—ed•˜—•••˜—•••˜—•i•˜—fj 335F@789335C6789335CD789335CF789365447893654C7893653@789ÿÿÿÿÿ3656C789365D3789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ •h—feFgH•h—d™FgH•h—dfFgH•h—ddFgH•h—djFgH•h—–dFgH•h—eeFgHÿÿÿÿÿ•˜—•dFgH•˜—•jFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ335C@7H9335CA7H9335CB7H93654C7H9365347H9365667H9ÿÿÿÿÿ365D47H9365DG7H9365FC7H9365FC7H9365CA7H9ÿÿÿÿÿ ÿÿÿÿÿ•h—dj•h—di•h—–••h—–e•h—e••˜—•dÿÿÿÿÿ•˜—™™•˜—™˜•˜—f–•˜—f–•˜—dd•˜—ef 365467893654@7893654A7893654B7893653C78936564789365D6789ÿÿÿÿÿ365F4789365FG789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ •h—–•FgH•h—–hFgH•h—–˜FgH•h—–jFgH•h—edFgH•h—ejFgH•˜—™™FgHÿÿÿÿÿ•˜—f•FgH•˜—fhFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ365363653D3653F365643656C365D@ÿÿÿÿÿ365FC365C33D5443D5443D53D3D5DD ÿÿÿÿÿ•h—edFGH•h—e–FGH•h—eeFGH•˜—•™FGH•˜—•hFGH•˜—™iFGHÿÿÿÿÿ•˜—fjFGH•˜—d–FGH•˜—–™FGH•˜—–™FGH•˜—e•FGHÿÿÿÿÿ 3653@789365667893656D7893656F789365D4789365DC789365F@789ÿÿÿÿÿ365CC7893D543789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ •h—eeFgH•˜—•™FgH•˜—•fFgH•˜—•dFgH•˜—•iFgH•˜—™–FgH•˜—f˜FgHÿÿÿÿÿ•˜—dhFgH•˜—–fFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ3656@7H93656A7H93656B7H9365DC7H9365F47H9365C67H9ÿÿÿÿÿ3D5447H93D54G7H93D53C7H93D53C7H93D56A7H9ÿÿÿÿÿ ÿÿÿÿÿ•˜—•j•˜—•i•˜—™••˜—™h•˜—f™•˜—d–ÿÿÿÿÿ•˜—–d•˜—–i•˜—eh•˜—eh•j—•e•j—f– 365D6789365D@789365DA789365DB789365FC789365C47893D546789ÿÿÿÿÿ3D5347893D53G789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ •˜—™•FgH•˜—™hFgH•˜—™˜FgH•˜—™jFgH•˜—f–FgH•˜—fiFgH•˜—–fFgHÿÿÿÿÿ•˜—e™FgH•˜—e˜FgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ365F6365FD365FF365C4365CC3D54@ÿÿÿÿÿ3D53C3D5633D5D43D5D43D5FD3F54D ÿÿÿÿÿ•˜—f•FgH•˜—f™FgH•˜—ffFgH•˜—fjFgH•˜—ddFgH•˜—–hFgHÿÿÿÿÿ•˜—eeFgH•j—•™FgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 365F@789365C6789365CD789365CF7893D5447893D54C7893D53@789ÿÿÿÿÿ3D56C7893D5D3789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ•˜—fdFGH•˜—f–FGH•˜—feFGH•˜—d™FGH•˜—dhFGH•˜—–iFGHÿÿÿÿÿ•˜—ejFGH•j—•–FGH•j—™™FGH•j—™™FGH•j—f•FGHÿÿÿÿÿ ÿÿÿÿÿ365C@7H9365CA7H9365CB7H93D54C7H93D5347H93D5667H9ÿÿÿÿÿ3D5D47H93D5DG7H93D5FC7H93D5FC7H93D5CA7H9ÿÿÿÿÿ ÿÿÿÿÿ•˜—f˜FgH•˜—fjFgH•˜—fiFgH•˜—deFgH•˜—–•FgH•˜—edFgHÿÿÿÿÿ•j—•fFgH•j—•jFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3D5467893D54@7893D54A7893D54B7893D53C7893D5647893D5D6789ÿÿÿÿÿ3D5F47893D5FG789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ •˜—feFgH•˜—d™FgH•˜—dfFgH•˜—ddFgH•˜—diFgH•˜—––FgH•˜—e˜FgHÿÿÿÿÿ•j—•hFgH•j—™fFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ3D5363D53D3D53F3D5643D56C3D5D@ÿÿÿÿÿ3D5FC3D5C33F5443F5443F53D3F5DD ÿÿÿÿÿ•˜—di•˜—–••˜—–™•˜—–˜•˜—ef•j—•eÿÿÿÿÿ•j—™–•j—f••j—f˜•j—f˜•j—dh•j—ee 3D53B7893D56F7893D56C7893D56G7893D5D67893D5D@7893D5FB789ÿÿÿÿÿ3D5C@7893F54D789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ•˜—––FgH•˜—–eFgH•˜—–hFgH•˜—efFgH•˜—e˜FgH•j—™•FgHÿÿÿÿÿ•j—™iFgH•j—feFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ3D56@7H93D56A7H93D56B7H93D5DC7H93D5F47H93D5C67H9ÿÿÿÿÿ3F5447H93F54G7H93F53C7H93F53C7H93F56A7H9ÿÿÿÿÿ •˜—–fFgH•˜—–jFgH•˜—–iFgH•˜—e•FgH•˜—ehFgH•j—•™FgH•j—™–FgHÿÿÿÿÿ•j—fdFgH•j—fiFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3D5D67893D5D@7893D5DA7893D5DB7893D5FC7893D5C37893F54D789ÿÿÿÿÿ3F5337893F53@789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ•˜—eeFGH•˜—ehFGH•˜—e˜FGH•j—•dFGH•j—•jFGH•j—f™FGHÿÿÿÿÿ•j—d•FGH•j—dhFGH•j—––FGH•j—––FGH•j—e–FGHÿÿÿÿÿ ÿÿÿÿÿ3D5F63D5FD3D5FF3D5C43D5CG3F54Aÿÿÿÿÿ3F53G3F5663F5D33F5D33F5FF3C54F ÿÿÿÿÿ•j—••FgH•j—•™FgH•j—•fFgH•j—•jFgH•j—™dFgH•j—fhFgHÿÿÿÿÿ•j—deFgH•j—–™FgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3D5F@7893D5C67893D5CD7893D5CF7893F5447893F54G7893F53A789ÿÿÿÿÿ3F56G7893F5D6789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ •˜—e˜FgH•j—•dFgH•j—•–FgH•j—•eFgH•j—™™FgH•j—™hFgH•j—fiFgHÿÿÿÿÿ•j—djFgH•j—––FgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ3D5C@7H93D5CA7H93D5CB7H93F54C7H93F5337H93F56D7H9ÿÿÿÿÿ3F5D37H93F5D@7H93F5FG7H93F5FG7H93F5CB7H9ÿÿÿÿÿ ÿÿÿÿÿ•j—™f•j—™d•j—™–•j—f••j—fe•j—djÿÿÿÿÿ•j—–˜•j—ed•i—•™•i—•™•i—™™•i—d™ 3F5467893F54@7893F54A7893F54B7893F53C7893F5637893F5DD789ÿÿÿÿÿ3F5F37893F5F@789ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ•j—™eFgH•j—™hFgH•j—™˜FgH•j—fdFgH•j—fjFgH•j—–™FgHÿÿÿÿÿ•j—e•FgH•j—ehFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ3F5363F53D3F53F3F5643F56G3F5DAÿÿÿÿÿ3F5FG3F5C63C5433C5433C53F3C5DF •j—™fFgH•j—™jFgH•j—™iFgH•j—f•FgH•j—fhFgH•j—d™FgH•j—––FgHÿÿÿÿÿ•j—edFgH•j—eiFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3F53@7H93F5667H93F56D7H93F56F7H93F5D47H93F5DG7H93F5FA7H9ÿÿÿÿÿ3F5CG7H93C5467H93C5337H93C5337H93C56F7H9ÿÿÿÿÿ ÿÿÿÿÿ•j—ffFgH•j—fdFgH•j—f–FgH•j—d•FgH•j—deFgH•j—–jFgHÿÿÿÿÿ•j—e˜FgH•i—•dFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ3F56@7H93F56A7H93F56B7H93F5DC7H93F5F37H93F5CD7H9ÿÿÿÿÿ3C5437H93C54@7H93C53G7H93C53G7H93C56B7H9ÿÿÿÿÿ ÿÿÿÿÿ•j—feFGH•j—fhFGH•j—f˜FGH•j—ddFGH•j—djFGH•j—e™FGHÿÿÿÿÿ•i—••FGH•i—•hFGH•i—™–FGH•i—™–FGH•i—f–FGHÿÿÿÿÿ 3F5D37H93F5DG7H93F5D@7H93F5DA7H93F5FF7H93F5C47H93C5467H9ÿÿÿÿÿ3C5347H93C53G7H93C56C7H93C56C7H93C5DA7H9ÿÿÿÿÿ •j—f˜FgH•j—ddFgH•j—d–FgH•j—deFgH•j—–™FgH•j—–hFgH•j—eiFgHÿÿÿÿÿ•i—•jFgH•i—™–FgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ3F5FF3F5FC3F5FG3F5C63F5CA3C534ÿÿÿÿÿ3C5643C56G3C5DC3C5DC3C5FA3G54A ÿÿÿÿÿ•j—–••j—–™•j—–f•j—–j•j—ed•i—•hÿÿÿÿÿ•i—™–•i—f••i—fj•i—fj•i—dj•i—ej 3F5C47H93F5CC7H93F5CG7H93F5C@7H93C54D7H93C54B7H93C5637H9ÿÿÿÿÿ3C5D37H93C5D@7H93C5FG7H93C5FG7H93C5CB7H9ÿÿÿÿÿ •j—–fFgH•j—–jFgH•j—–iFgH•j—e•FgH•j—ehFgH•i—•™FgH•i—™–FgHÿÿÿÿÿ•i—ffFgH•i—fjFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ3C54D7H93C54F7H93C54C7H93C5337H93C53@7H93C5D47H9ÿÿÿÿÿ3C5F47H93C5FG7H93C5CC7H93C5CC7H93G54A7H9ÿÿÿÿÿ ÿÿÿÿÿ•j—eeFGH•j—ehFGH•j—e˜FGH•i—•dFGH•i—•jFGH•i—f™FGHÿÿÿÿÿ•i—fiFGH•i—deFGH•i—–dFGH•i—–dFGH•i—edFGHÿÿÿÿÿ ÿÿÿÿÿ3C53D3C53F3C53C3C5633C56@3C5F4ÿÿÿÿÿ3C5C43C5CG3G54C3G54C3G53A3G5DA •j—e˜FgH•i—•dFgH•i—•–FgH•i—•eFgH•i—™™FgH•i—™hFgH•i—fiFgHÿÿÿÿÿ•i—d˜FgH•i—–dFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3C53G7H93C5667H93C56D7H93C56F7H93C5D47H93C5DG7H93C5FB7H9ÿÿÿÿÿ3C5CB7H93G54C7H93G53F7H93G53F7H93G56@7H9ÿÿÿÿÿ ÿÿÿÿÿ•i—™••i—™™•i—™f•i—™j•i—fd•i—deÿÿÿÿÿ•i—–d•i—–i•i—e˜•i—e˜™•—•i™•—fi ÿÿÿÿÿ3C56B7H93C5D47H93C5D37H93C5D@7H93C5FD7H93C5CG7H9ÿÿÿÿÿ3G54G7H93G5367H93G5637H93G5637H93G5DF7H9ÿÿÿÿÿ •i—™dFgH•i—™jFgH•i—™iFgH•i—f•FgH•i—fhFgH•i—d™FgH•i—–dFgHÿÿÿÿÿ•i—e™FgH•i—e˜FgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3C5D67H93C5DA7H93C5DB7H93C5F47H93C5FG7H93C5C67H93G54C7H9ÿÿÿÿÿ3G53C7H93G5637H93G5D47H93G5D47H93G5FD7H9ÿÿÿÿÿ ÿÿÿÿÿ•i—feFGH•i—fhFGH•i—f˜FGH•i—ddFGH•i—djFGH•i—e•FGHÿÿÿÿÿ•i—ejFGH™•—•–FGH™•—™fFGH™•—™fFGH™•—f–FGHÿÿÿÿÿ ÿÿÿÿÿ3C5FF3C5FC3C5FG3C5C63C5CA3G533ÿÿÿÿÿ3G5633G56@3G5DG3G5DG3G5FB3@54B •i—fjFgH•i—ddFgH•i—d–FgH•i—deFgH•i—–™FgH•i—–hFgH•i—ejFgHÿÿÿÿÿ™•—•hFgH™•—™fFgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3C5FG7H93C5C67H93C5CD7H93C5CF7H93G5447H93G54G7H93G53B7H9ÿÿÿÿÿ3G56B7H93G5DC7H93G5FF7H93G5FF7H93G5C@7H9ÿÿÿÿÿ ÿÿÿÿÿ•i—–••i—–™•i—–f•i—–j•i—ed™•—•eÿÿÿÿÿ™•—™d™•—™i™•—f˜™•—f˜™•—di™•—ei ÿÿÿÿÿ3C5CB7H93G5447H93G5437H93G54@7H93G53D7H93G56G7H9ÿÿÿÿÿ3G5DG7H93G5F67H93G5C37H93G5C37H93@54F7H9ÿÿÿÿÿ •i—–dFgH•i—–jFgH•i—–iFgH•i—e•FgH•i—ehFgH™•—•™FgH™•—™dFgHÿÿÿÿÿ™•—f™FgH™•—f˜FgHÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 3G5437H93G54@7H93G54A7H93G54B7H93G53C7H93G5637H93G5DF7H9ÿÿÿÿÿ3G5FF7H93G5C47H93G5CB7H93G5CB7H93@5367H9ÿÿÿÿÿ ÿÿÿÿÿ•i—eeFGH•i—ehFGH•i—e˜FGH™•—•dFGH™•—•jFGH™•—f•FGHÿÿÿÿÿ™•—fjFGH™•—d–FGH™•—–fFGH™•—–fFGH™•—e–FGHÿÿÿÿÿ

0 1       ! " # $%&'!($') $2& 0 1       ! " # $%&'!($') $2&        ! " # $%&'!($') $        ! " # $%&'!($') $ ÿÿÿÿÿ456474564845645456994569@45674ÿÿÿÿÿ456894568@4A6BA4A6BA4A69B4A67B 45645CDE45699CDE4569FCDE45697CDE456FBCDE456F5CDE4567GCDEÿÿÿÿÿ4A6BBCDE4A6B5CDE4A648CDE4A648CDE4A69@CDEÿÿÿÿÿ 223456782@32A6782@3246782@32B6786982@3@26782@3@4678 ÿÿÿÿÿ2@3D56782@3EF6782@3AA6782@34@6782@34@6782D322678ÿÿÿÿÿ 698 698 698 698 698 ÿÿÿÿÿ4569GCDE456FBCDE456F4CDE456FACDE4567FCDE45685CDEÿÿÿÿÿ4A6BACDE4A64FCDE4A699CDE4A699CDE4A6F8CDEÿÿÿÿÿ 2@3D56782@3EA6782@3E4678 2@3A26782@3AA678 456F4CDE456FACDE456F@CDE456FGCDE45678CDE45684CDE4A6B7CDEÿÿÿÿÿ4A648CDE4A694CDE4A6FBCDE4A6FBCDE4A67FCDEÿÿÿÿÿ 2@3EB678698 ÿÿÿÿÿ2@34F6782D32G6782D3@E6782D3D26782D3D26782D3D5678ÿÿÿÿÿ 698 698 698 698 698 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ45675456894568@4A644ÿÿÿÿÿ4A6994A69@4A6FA4A6FA4A68B4@64B 2D32E6782D32F6782D325678 2D3@A6782D3@F678 2D3@2678698 ÿÿÿÿÿ2D3ED6782D3A@6782D3AG6782D34A6782D34A6782E32E678ÿÿÿÿÿ 45675CDE45689CDE4568FCDE45687CDE4A6BBCDE4A6B5CDE4A64GCDEÿÿÿÿÿ4A6FBCDE4A6F5CDE4A678CDE4A678CDE4A68@CDEÿÿÿÿÿ 698 698 698 698 698 ÿÿÿÿÿ4568GCDE4A6BBCDE4A6B4CDE4A6BACDE4A64FCDE4A695CDEÿÿÿÿÿ4A6FACDE4A67FCDE4A689CDE4A689CDE4@6B8CDEÿÿÿÿÿ 2D3EG6782D3AD6782D3AE678 2D3AF6782D34D678 2D3AA678698 ÿÿÿÿÿ2E32B6782E3@46782E3D@6782E3DF6782E3DF6782E3EG678ÿÿÿÿÿ 698 698 698 698 698 4A6B4CDE4A6BACDE4A6B@CDE4A6BGCDE4A648CDE4A694CDE4A6F7CDEÿÿÿÿÿ4A678CDE4A684CDE4@6BBCDE4@6BBCDE4@64FCDEÿÿÿÿÿ 2E32G6H82E3@D6H82E3@E6H8 2E3@F6H82E3DD6H8 ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ4A6454A6994A69@4A674ÿÿÿÿÿ4A6844A68A4@6B54@6B54@64G4@6FG 2E3@A6H8698 ÿÿÿÿÿ2E3EB6H82E3A46H82E34@6H8ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ 698 698 698 698 698 4A645CDE4A699CDE4A69FCDE4A697CDE4A6FBCDE4A6F5CDE4A67GCDEÿÿÿÿÿ4A68GCDE4@6B8CDE4@647CDE4@647CDE4@69ACDEÿÿÿÿÿ 2E3EG6H82E3AD6H82E3AE6H8 2E3AF6H82E34D6H8 2E3AA6H8698 ÿÿÿÿÿ2A32B6H82A3@46H82A3D@6H8ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿ4A69GCDE4A6FBCDE4A6F4CDE4A6FACDE4A67FCDE4A688CDEÿÿÿÿÿ4@6B7CDE4@64BCDE4@64GCDE4@64GCDE4@6F9CDEÿÿÿÿÿ 698 698 698 698 698 4A6F4CDE4A6FACDE4A6F@CDE4A6FGCDE4A678CDE4A684CDE4@6B7CDEÿÿÿÿÿ4@647CDE4@69BCDE4@69GCDE4@69GCDE4@679CDEÿÿÿÿÿ ÿÿÿÿÿ4A6774A6784A6754A6894A68@4@64Bÿÿÿÿÿ4@64G4@6984@6F74@6F74@67A4G6BA 4A675CDE4A689CDE4A68FCDE4A687CDE4@6BBCDE4@6B5CDE4@64@CDEÿÿÿÿÿ4@69ACDE4@6FFCDE4@679CDE4@679CDE4@688CDEÿÿÿÿÿ ÿÿÿÿÿ4A68GCDE4@6BBCDE4@6B4CDE4@6BACDE4@64FCDE4@698CDEÿÿÿÿÿ4@6F7CDE4@67BCDE4@67GCDE4@67GCDE4G6B9CDEÿÿÿÿÿ 4@6B4CDE4@6B5CDE4@6BACDE4@6B@CDE4@649CDE4@64@CDE4@6FBCDEÿÿÿÿÿ4@6FGCDE4@678CDE4@687CDE4@687CDE4G6BACDEÿÿÿÿÿ ÿÿÿÿÿ4@6474@6484@6454@69B4@6954@6F@ÿÿÿÿÿ4@67A4@68F4G6B94G6B94G6474G6F7 4@645CDE4@694CDE4@699CDE4@69FCDE4@69ACDE4@6FFCDE4@678CDEÿÿÿÿÿ4@687CDE4G6BBCDE4G6BGCDE4G6BGCDE4G694CDEÿÿÿÿÿ ÿÿÿÿÿ4@69@CDE4@69GCDE4@6FBCDE4@6F7CDE4@67BCDE4@689CDEÿÿÿÿÿ4G6BBCDE4G6B5CDE4G648CDE4G648CDE4G69ACDEÿÿÿÿÿ 4@6F4CDE4@6F5CDE4@6FACDE4@6F@CDE4@679CDE4@67@CDE4G6BBCDEÿÿÿÿÿ4G6B@CDE4G647CDE4G69FCDE4G69FCDE4G6F8CDEÿÿÿÿÿ ÿÿÿÿÿ4@67F4@6774@6784@67G4@6884G6BAÿÿÿÿÿ4G6484G6944G6FB4G6FB4G6799B6B9 4@675CDE4@684CDE4@689CDE4@68FCDE4@68ACDE4G6BFCDE4G648CDEÿÿÿÿÿ4G69FCDE4G69GCDE4G6F@CDE4G6F@CDE4G68BCDEÿÿÿÿÿ ÿÿÿÿÿ4@68@CDE4@68GCDE4G6BBCDE4G6B7CDE4G64BCDE4G699CDEÿÿÿÿÿ4G6FBCDE4G6F5CDE4G678CDE4G678CDE4G68ACDEÿÿÿÿÿ 4G6BFCDE4G6B@CDE4G6BGCDE4G64BCDE4G647CDE4G69BCDE4G6F4CDEÿÿÿÿÿ4G6FGCDE4G678CDE4G687CDE4G687CDE9B6B5CDEÿÿÿÿÿ 4G64A4G6994G69F4G6974G69@4G6F74G678ÿÿÿÿÿ4G68F4G68G9B6B@9B6B@9B64G9B6FG 4G6F9CDE4G6FACDE4G6F@CDE4G6FGCDE4G67FCDE4G67@CDE4G68GCDEÿÿÿÿÿ9B6BACDE9B64FCDE9B699CDE9B699CDE9B6FFCDEÿÿÿÿÿ 4G6754G6844G6894G68F4G68A9B6B99B64Fÿÿÿÿÿ9B6949B69A9B6F59B6F59B67A946BA 9B6B4CDE9B6B5CDE9B6BACDE9B6B@CDE9B649CDE9B64ACDE9B69@CDEÿÿÿÿÿ9B6F5CDE9B679CDE9B684CDE9B684CDE946B9CDEÿÿÿÿÿ 9B6459B6949B6999B69F9B69A9B6F99B67Fÿÿÿÿÿ9B6849B68A946B5946B59464A946FA 9B6F4CDE9B6F5CDE9B6FACDE9B6F@CDE9B679CDE9B67ACDE9B68@CDEÿÿÿÿÿ946B5CDE94649CDE94694CDE94694CDE946F9CDEÿÿÿÿÿ 9B6759B6849B6899B68F9B68A946B99464Fÿÿÿÿÿ946949469A946F5946F59467A996BA 946B4CDE946B5CDE946BACDE946B@CDE94649CDE9464ACDE9469@CDEÿÿÿÿÿ946F5CDE94679CDE94684CDE94684CDE996B9CDEÿÿÿÿÿ 9464594694946999469F9469A946F99467Fÿÿÿÿÿ946849468A996B5996B59964A996FA 946F4CDE946F5CDE946FACDE946F@CDE94679CDE9467ACDE9468@CDEÿÿÿÿÿ996B5CDE99649CDE99694CDE99694CDE996F9CDEÿÿÿÿÿ 94675CHE94684CHE94689CHE9468FCHE9468ACHE996B9CHE99647ÿÿÿÿÿ996999969@996F5996F5996789F6B7 996B4CDE996B5CDE996BACDE 99649CDE9964ACDE 996B@CDECHE 9969GCDEÿÿÿÿÿ996FACDE9967FCDE99684CDE99684CDE9F6BBCDEÿÿÿÿÿ CHE CHE CHE CHE CHE 99645CHE99694CHE99699CHE9969FCHE9969ACHE996F9CHE99677ÿÿÿÿÿ996899968@9F6B59F6B59F6489F6F7 996F4CDE996F5CDE996FACDE 99679CDE9967ACDE 996F@CDECHE 9968GCDEÿÿÿÿÿ9F6BACDE9F64FCDE9F69BCDE9F69BCDE9F69GCDE ÿÿÿÿÿ CHE CHE CHE CHE CHE 9967ACHE99689CHE9968FCHE99687CHE9968@CHE9F6BFCHE9F648ÿÿÿÿÿ9F69F9F69G9F6F59F6F59F678BB6B7 9F6B9CDE9F6BACDE9F6B@CDE 9F64FCDE9F64@CDE 9F6BGCDECHE 9F6FBCDEÿÿÿÿÿ9F6F@CDE9F677CDE9F684CDE9F684CDEBB6BBCDE ÿÿÿÿÿ CHE CHE CHE CHE CHE 9F64ACDE9F699CDE9F69FCDE 9F69@CDE9F6FFCDE 9F697CDECHE 9F678CDEÿÿÿÿÿ9F68FCDE9F68GCDEBB6B5CDEBB6B5CDEBB648CDE ÿÿÿÿÿ CHE CHE CHE CHE CHE 9F6F9CDE9F6FACDE9F6F@CDE 9F67FCDE9F67@CDE 9F6FGCDECHE BB6BBCDEÿÿÿÿÿBB6B@CDEBB647CDEBB694CDEBB694CDEBB6FBCDEÿÿÿÿÿ CHE CHE CHE CHE CHE BB6B9CDEBB6BACDEBB6B@CDE BB64FCDEBB64@CDE BB6BGCDECHE BB6FBCDEÿÿÿÿÿBB6F@CDEBB677CDEBB684CDEBB684CDEB46BBCDEÿÿÿÿÿ CHE CHE CHE CHE CHE BB69@CDEBB6FFCDEBB6F7CDE BB6FGCDEBB677CDE BB6F8CDECHE BB685CDEÿÿÿÿÿB46B7CDEB464BCDEB464ACDEB464ACDEB4695CDEÿÿÿÿÿ CHE CHE CHE CHE CHE 0 1       ! " # $%&'!($') $2& 0 1       ! " # $%&'!($') $&&        ! " # $%&'!($') $ CARLINGWOOD HIPQÿSTPÿUVVUWISPÿXIYP`SIUaÿbcÿW`YUddIaeÿSUÿSTPÿbUSSUfg 153 LINCOLN FIELDS

7 days a week / 7 jours par semaine 4‚ƒ„ÿ †‡ hipqrÿtquvÿwxyÿ€€ Selected time periods only Périodes sélectionnées seulement 234567389@ÿ6B4C39DE882

C3968C9ÿF35C2Gÿ‡BC3968C9ÿF35C2GÿˆBCCÿ5BG76B4C39DE882ÿ‰ÿG5B4G ‘’‘’“‘’”•

CARLINGWOOD ”’”’“”’”‘ ””’–””’””””’—˜ ””’˜‘”—’—”—’”• ”“’‘”“’”—”“’—• ”™’”™’™”™’— CARLINGWOOD S.C/C.C. ”•’”•’™”•’— ”–’™•”–’™d”‘’“

Saville RowWoodroffe ”d’”d’˜”d’”– Richmond

Fairlawn 234567389@ÿC3968C9ÿF35C2G

A New Orchardm

b l 6B4C39DE882ÿ‰ÿC8eCBEG C3968C9ÿF35C2GÿˆBCCÿE5G7C3968C9ÿF35C2Gÿ‡B e s

i

d e ‘’™–‘’˜dd’˜

Carling ”’™–”’˜d””’˜ McEwen LINCOLN ””’“d””’˜””’˜• FIELDS ”—’™d”“’”“’•

Richmond TRANSITWAY ”“’™””“’˜—”“’˜‘

Assaly ”™’™–”™’˜d”˜’• ”•’—™”•’“•”•’™” LINCOLN FIELDS S.C./C.C. ”‘’“•”‘’™•”‘’˜—

Carling Croydon ”d’—”d’“”d’“•

LINCOLN FIELDS

Legend • Légende

Transitway & Station

Timepoint / Heures de passage

2013.04

Information / Renseignement...... 613-741-4390 Customer Relations Service à la clientèle ...... 613-842-3600 Lost and Found / Objets perdus ...... 613-563-4011 Schedule / Horaire...... 613-560-1000 Text / Texto ...... 560560 0 1       ! " # $%&'!($') $ plus your four digit bus stop number / plus votre numéro d’arrêt à quatre chiffres

Effective / En vigueur Dec. 23 déc. 2012

613-741-4390 octranspo.com

Appendix C Traffic Count Data

7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :2  7XUQLQJ0RYHPHQW&RXQW0LQXWH6XPPDU\5HSRUW 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU &$5/,1*$9(#&211$8*+7$9( 7XUQLQJ0RYHPHQW&RXQW&\FOLVW9ROXPH5HSRUW 6XUYH\'DWH 7XHVGD\-XO\ 7RWDO2EVHUYHG87XUQV  1RUWKERXQG  6RXWKERXQG  (DVWERXQG  :HVWERXQG  &$5/,1*$9(#&211$8*+7$9( &211$8*+7$9( &$5/,1*$9( &RXQW'DWH 7XHVGD\-XO\ 6WDUW7LPH  1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG 1 6 675 ( : 675 *UDQG &211$8*+7$9( &$5/,1*$9( 7LPH3HULRG /7 67 57 727 /7 67 57 727 727 /7 67 57 727 /7 67 57 727 727 7RWDO 7LPH3HULRG 1RUWKERXQG 6RXWKERXQG 6WUHHW7RWDO (DVWERXQG :HVWERXQG 6WUHHW7RWDO *UDQG7RWDO                                                                                                                                                                                                                                                 7RWDO        

                     &RPPHQW                     

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

727$/                 1RWH87XUQVDUHLQFOXGHGLQ7RWDOV &RPPHQW 1RWH7KHVHYROXPHVFRQVLVWVRIELF\FOHVRQO\ QRPRSHGVRUPRWRUF\FOHV DQG$5(127LQFOXGHGLQWKH7XUQLQJ0RYHPHQW&RXQW6XPPDU\ $XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :2  7XUQLQJ0RYHPHQW&RXQW)XOO6WXG\'LDJUDP 7XUQLQJ0RYHPHQW&RXQW+HDY\9HKLFOH5HSRUW &$5/,1*$9(#&211$8*+7$9( &$5/,1*$9(#&211$8*+7$9(

6XUYH\'DWH 7XHVGD\-XO\ :2  6XUYH\'DWH 7XHVGD\-XO\ 'HYLFH 0LRYLVLRQ &211$8*+7$9( &$5/,1*$9(

1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG 1 6 675 ( : 675 *UDQG 7LPH3HULRG 67 57 /7 67 57 /7 67 57 /7 67 57 /7 727 727 727 727 727 727 7RWDO &211$8*+7$9(                      N                      W E                          S                      7RWDO                          +HDY\                      9HKLFOHV                           &DUV                           

&$5/,1*$9( 6XE7RWDO                       87XUQV +HDY\9HKLFOHV              7RWDO                       +HDY\9HKLFOHVLQFOXGH%XVHV6LQJOH8QLW7UXFNVDQG$UWLFXODWHG7UXFNV)XUWKHUWKH\$5(LQFOXGHGLQWKH7XUQLQJ0RYHPHQW&RXQW6XPPDU\   

       

         

    &DUV      +HDY\    9HKLFOHV     7RWDO

 





&RPPHQWV

$XJ 3DJHRI

$XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU  7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU  7XUQLQJ0RYHPHQW&RXQW)XOO6WXG\6XPPDU\5HSRUW 7XUQLQJ0RYHPHQW&RXQW3HGHVWULDQ9ROXPH5HSRUW &$5/,1*$9(#&211$8*+7$9(

&$5/,1*$9(#&211$8*+7$9( 6XUYH\'DWH 7XHVGD\-XO\ 7RWDO2EVHUYHG87XUQV $$'7)DFWRU &RXQW'DWH 7XHVGD\-XO\ 6WDUW7LPH  1RUWKERXQG 6RXWKERXQG  (DVWERXQG :HVWERXQG  1%$SSURDFK 6%$SSURDFK (%$SSURDFK :%$SSURDFK 7LPH3HULRG 7RWDO 7RWDO *UDQG7RWDO (RU:&URVVLQJ (RU:&URVVLQJ 1RU6&URVVLQJ 1RU6&URVVLQJ )XOO6WXG\          &211$8*+7$9( &$5/,1*$9(          1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG          NB SB STR EB :% STR Grand Period LT ST RT LT ST RT LT ST RT LT ST RT          TOT TOT TOT TOT 727 TOT Total          07:00 08:00 0 0 48 48 1 0 16 17 65 39 2056 0 2095 0 770 69 839 2934 2999                   08:00 09:00 0 0 43 43 3 0 33 36 79 43 1919 0 1962 0 895 100 995 2957 3036          09:00 10:00 0 0 32 32 50 0 34 84 116 66 928 0 994 0 776 111 887 1881 1997                   11:30 12:30 0 0 38 38 95 1 93 189 227 71 858 0 929 0 872 148 1020 1949 2176          12:30 13:30 0 0 27 27 115 0 57 172 199 65 773 0 838 0 850 133 983 1821 2020                   15:00 16:00 0 1 30 31 87 0 81 168 199 35 1197 1 1233 0 1825 163 1988 3221 3420          16:00 17:00 0 0 28 28 99 3 76 178 206 40 1201 0 1241 0 1977 125 2102 3343 3549                   17:00 18:00 0 1 34 35 84 0 61 145 180 37 1084 0 1121 0 1864 143 2007 3128 3308                   Sub Total 0 2 280 282 534 4 451 989 1271 396 10016 1 10413 0 9829 992 10821 21234 22505          U Turns00 0 71 8 8          Total 0 2 280 282 534 4 451 989 1271 396 10016 1 10420 0 9829 992 10822 21242 22513                   EQ 12Hr 0 3 389 392 742 6 627 1375 1767 550 13922 1 14484 0 13662 1379 15043 29527 31294          1RWH7KHVHYDOXHVDUHFDOFXODWHGE\PXOWLSO\LQJWKHWRWDOVE\WKHDSSURSULDWHH[SDQVLRQIDFWRU                    AVG 12Hr 0 3 350 353 668 5 564 1237 1590 495 12530 1 13035 0 12296 1241 13538 26573 28163          1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH(TXLYDOHQWKUWRWDOVE\WKH$$'7IDFWRU                    AVG 24Hr 0 3 459 462 875 7 739 1621 2083 649 16414 2 17076 0 16108 1626 17735 34811 36894          1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH$YHUDJH'DLO\KUWRWDOVE\WRH[SDQVLRQIDFWRU                    &RPPHQWV          1RWH87XUQVSURYLGHGIRUDSSURDFKWRWDOV5HIHUWR 87XUQ 5HSRUWIRUVSHFLILFEUHDNGRZQ                                                                         7RWDO         &RPPHQW

$XJ 3DJHRI

$XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP &$5/,1*$9(#&211$8*+7$9( &$5/,1*$9(#&211$8*+7$9(

6XUYH\'DWH 7XHVGD\-XO\ :21R  6XUYH\'DWH 7XHVGD\-XO\ :21R  6WDUW7LPH  'HYLFH 0LRYLVLRQ 6WDUW7LPH  'HYLFH 0LRYLVLRQ

&211$8*+7$9( &211$8*+7$9( N N W E W E

  S   S             +HDY\ +HDY\ 9HKLFOHV      9HKLFOHV        &DUV      &DUV     

&$5/,1*$9( &$5/,1*$9(      

                    $03HULRG    )XOO6WXG\       3HDN+RXU     3HDN+RXU                                   

   &DUV    &DUV      +HDY\      +HDY\    9HKLFOHV    9HKLFOHV         7RWDO 7RWDO    

 

 

&RPPHQWV &RPPHQWV

$XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP &$5/,1*$9(#&211$8*+7$9( &$5/,1*$9(#&211$8*+7$9(

6XUYH\'DWH 7XHVGD\-XO\ :21R  6XUYH\'DWH 7XHVGD\-XO\ :21R  6WDUW7LPH  'HYLFH 0LRYLVLRQ 6WDUW7LPH  'HYLFH 0LRYLVLRQ

&211$8*+7$9( &211$8*+7$9( N N W E W E

  S   S             +HDY\ +HDY\ 9HKLFOHV      9HKLFOHV        &DUV      &DUV     

&$5/,1*$9( &$5/,1*$9(      

                    0'3HULRG    303HULRG       3HDN+RXU     3HDN+RXU                                  

   &DUV    &DUV      +HDY\    9HKLFOHV      +HDY\        9HKLFOHV 7RWDO     7RWDO        

&RPPHQWV &RPPHQWV

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

                           

                                                                                                                                                                                            

                           

                                                                                                                                                                                            

                           

                                                                                                                                                                                            

                           

                                                                                                                                            727$/                        1RWH87XUQVDUHLQFOXGHGLQ7RWDOV &RPPHQW 7RWDO      $XJ 3DJHRI

$XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU 7XUQLQJ0RYHPHQW&RXQW&\FOLVW9ROXPH5HSRUW 7XUQLQJ0RYHPHQW&RXQW)XOO6WXG\'LDJUDP  &$5/,1*$9(#&52<'21$9( &$5/,1*$9(#&52<'21$9( 6WDUW7LPH  &RXQW'DWH 7KXUVGD\$XJXVW 6XUYH\'DWH 7KXUVGD\$XJXVW :2  &52<'21$9( &$5/,1*$9( 'HYLFH 0LRYLVLRQ

7LPH3HULRG 1RUWKERXQG 6RXWKERXQG 6WUHHW7RWDO (DVWERXQG :HVWERXQG 6WUHHW7RWDO *UDQG7RWDO                            &52<'21$9( N                   W E                      S              7RWDO 7RWDO         +HDY\ 9HKLFOHV      &RPPHQW &DUV      

&$5/,1*$9(   

            

       

         

   &DUV      +HDY\    9HKLFOHV     7RWDO

 





&RPPHQWV

1RWH7KHVHYROXPHVFRQVLVWVRIELF\FOHVRQO\ QRPRSHGVRUPRWRUF\FOHV DQG$5(127LQFOXGHGLQWKH7XUQLQJ0RYHPHQW&RXQW6XPPDU\ $XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :2 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU   7XUQLQJ0RYHPHQW&RXQW+HDY\9HKLFOH5HSRUW 7XUQLQJ0RYHPHQW&RXQW3HGHVWULDQ9ROXPH5HSRUW &$5/,1*$9(#&52<'21$9( &$5/,1*$9(#&52<'21$9( &RXQW'DWH 7KXUVGD\$XJXVW 6WDUW7LPH  6XUYH\'DWH 7KXUVGD\$XJXVW 1%$SSURDFK 6%$SSURDFK (%$SSURDFK :%$SSURDFK 7LPH3HULRG 7RWDO 7RWDO *UDQG7RWDO &52<'21$9( &$5/,1*$9( (RU:&URVVLQJ (RU:&URVVLQJ 1RU6&URVVLQJ 1RU6&URVVLQJ          1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG          1 6 675 ( : 675 *UDQG 7LPH3HULRG 67 57 /7 67 57 /7 67 57 /7 67 57       /7 727 727 727 727 727 727 7RWDO                                                                                                                                                                                                                                                                                                 6XE7RWDO                             87XUQV +HDY\9HKLFOHV                         7RWDO                             +HDY\9HKLFOHVLQFOXGH%XVHV6LQJOH8QLW7UXFNVDQG$UWLFXODWHG7UXFNV)XUWKHUWKH\$5(LQFOXGHGLQWKH7XUQLQJ0RYHPHQW&RXQW6XPPDU\                                                                                                                                                                                     7RWDO         &RPPHQW

$XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU  7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7XUQLQJ0RYHPHQW&RXQW)XOO6WXG\6XPPDU\5HSRUW &$5/,1*$9(#&52<'21$9( 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP &$5/,1*$9(#&52<'21$9( 6XUYH\'DWH 7KXUVGD\$XJXVW 7RWDO2EVHUYHG87XUQV $$'7)DFWRU 1RUWKERXQG 6RXWKERXQG  (DVWERXQG :HVWERXQG  6XUYH\'DWH 7KXUVGD\$XJXVW :21R  )XOO6WXG\ 6WDUW7LPH  'HYLFH 0LRYLVLRQ &52<'21$9( &$5/,1*$9( 1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG NB SB STR EB :% STR Grand &52<'21$9( Period LT ST RT LT ST RT LT ST RT LT ST RT TOT TOT TOT TOT 727 TOT Total N 07:00 08:00 0 0 0 0 109 0 15 124 124 69 1911 0 1980 0 675 50 725 2705 2829 W E 08:00 09:00 0 0 0 0 156 0 25 181 181 93 2035 0 2128 0 842 88 930 3058 3239   S   09:00 10:00 0 0 0 0 155 0 48 203 203 65 1063 0 1128 0 751 93 844 1972 2175     11:30 12:30 0 0 0 0 141 0 66 207 207 82 765 0 847 0 800 111 911 1758 1965 +HDY\ 9HKLFOHV      12:30 13:30 0 0 0 0 153 0 69 222 222 71 985 0 1056 0 849 114 963 2019 2241  &DUV      15:00 16:00 0 0 0 0 136 0 75 211 211 69 1056 0 1125 0 1716 124 1840 2965 3176 &$5/,1*$9( 16:00 17:00 0 0 0 0 145 0 78 223 223 73 1101 0 1174 0 1893 116 2009 3183 3406    17:00 18:00 0 0 0 0 153 0 78 231 231 66 1155 0 1221 0 1788 128 1916 3137 3368   Sub Total 0 0 0 0 1148 0 454 1602 1602 588 10071 0 10659 0 9314 824 10138 20797 22399      U Turns00 0 243 27 27    $03HULRG    Total 0 0 0 0 1148 0 454 1602 1602 588 10071 0 10683 0 9314 824 10141 20824 22426    3HDN+RXU  EQ 12Hr 0 0 0 0 1596 0 631 2227 2227 817 13999 0 14849 0 12946 1145 14096 28945 31172       1RWH7KHVHYDOXHVDUHFDOFXODWHGE\PXOWLSO\LQJWKHWRWDOVE\WKHDSSURSULDWHH[SDQVLRQIDFWRU       AVG 12Hr 0 0 0 0 1436 0 568 2004 2004 736 12599 0 13364 0 11652 1031 12686 26050 28054  1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH(TXLYDOHQWKUWRWDOVE\WKH$$'7IDFWRU       AVG 24Hr 0 0 0 0 1881 0 744 2625 2625 964 16504 0 17507 0 15264 1350 16619 34126 36751 1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH$YHUDJH'DLO\KUWRWDOVE\WRH[SDQVLRQIDFWRU 

&RPPHQWV    &DUV 1RWH87XUQVSURYLGHGIRUDSSURDFKWRWDOV5HIHUWR 87XUQ 5HSRUWIRUVSHFLILFEUHDNGRZQ      +HDY\    9HKLFOHV     7RWDO  





&RPPHQWV

$XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP &$5/,1*$9(#&52<'21$9( &$5/,1*$9(#&52<'21$9(

6XUYH\'DWH 7KXUVGD\$XJXVW :21R  6XUYH\'DWH 7KXUVGD\$XJXVW :21R  6WDUW7LPH  'HYLFH 0LRYLVLRQ 6WDUW7LPH  'HYLFH 0LRYLVLRQ

&52<'21$9( &52<'21$9( N N W E W E

  S   S             +HDY\ +HDY\ 9HKLFOHV      9HKLFOHV        &DUV      &DUV     

&$5/,1*$9( &$5/,1*$9(      

                    )XOO6WXG\    0'3HULRG       3HDN+RXU     3HDN+RXU                                  

   &DUV    &DUV      +HDY\      +HDY\    9HKLFOHV    9HKLFOHV         7RWDO 7RWDO        

&RPPHQWV &RPPHQWV

$XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU  7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7XUQLQJ0RYHPHQW&RXQW0LQ87XUQ7RWDO5HSRUW &$5/,1*$9(#&52<'21$9( 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP 6XUYH\'DWH 7KXUVGD\$XJXVW &$5/,1*$9(#&52<'21$9( 1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG 7LPH3HULRG 7RWDO 87XUQ7RWDO 87XUQ7RWDO 87XUQ7RWDO 87XUQ7RWDO 6XUYH\'DWH 7KXUVGD\$XJXVW :21R         6WDUW7LPH  'HYLFH 0LRYLVLRQ              

&52<'21$9(        N        W E          S              +HDY\        9HKLFOHV               &DUV           

&$5/,1*$9(                                          303HULRG              3HDN+RXU                                                                &DUV             +HDY\    9HKLFOHV            7RWDO                                        &RPPHQWV                             7RWDO      $XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :2  7XUQLQJ0RYHPHQW&RXQW0LQXWH6XPPDU\5HSRUW 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU &52<'21$9(#5,&+021'5' 7XUQLQJ0RYHPHQW&RXQW&\FOLVW9ROXPH5HSRUW 6XUYH\'DWH 7KXUVGD\$XJXVW 7RWDO2EVHUYHG87XUQV  1RUWKERXQG  6RXWKERXQG  (DVWERXQG  :HVWERXQG  &52<'21$9(#5,&+021'5' &52<'21$9( 5,&+021'5' &RXQW'DWH 7KXUVGD\$XJXVW 6WDUW7LPH  1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG 1 6 675 ( : 675 *UDQG &52<'21$9( 5,&+021'5' 7LPH3HULRG /7 67 57 727 /7 67 57 727 727 /7 67 57 727 /7 67 57 727 727 7RWDO 7LPH3HULRG 1RUWKERXQG 6RXWKERXQG 6WUHHW7RWDO (DVWERXQG :HVWERXQG 6WUHHW7RWDO *UDQG7RWDO                                                                                                                                                                                                                                                 7RWDO        

                     &RPPHQW                     

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

                    

727$/                    1RWH87XUQVDUHLQFOXGHGLQ7RWDOV &RPPHQW 1RWH7KHVHYROXPHVFRQVLVWVRIELF\FOHVRQO\ QRPRSHGVRUPRWRUF\FOHV DQG$5(127LQFOXGHGLQWKH7XUQLQJ0RYHPHQW&RXQW6XPPDU\ $XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :2  7XUQLQJ0RYHPHQW&RXQW)XOO6WXG\'LDJUDP 7XUQLQJ0RYHPHQW&RXQW+HDY\9HKLFOH5HSRUW &52<'21$9(#5,&+021'5' &52<'21$9(#5,&+021'5'

6XUYH\'DWH 7KXUVGD\$XJXVW :2  6XUYH\'DWH 7KXUVGD\$XJXVW 'HYLFH 0LRYLVLRQ &52<'21$9( 5,&+021'5'

1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG 1 6 675 ( : 675 *UDQG 7LPH3HULRG 67 57 /7 67 57 /7 67 57 /7 67 57 /7 727 727 727 727 727 727 7RWDO &52<'21$9(                      N                      W E                          S                      7RWDO                          +HDY\                      9HKLFOHV                           &DUV                             

5,&+021'5' 6XE7RWDO                       87XUQV +HDY\9HKLFOHV              7RWDO                       +HDY\9HKLFOHVLQFOXGH%XVHV6LQJOH8QLW7UXFNVDQG$UWLFXODWHG7UXFNV)XUWKHUWKH\$5(LQFOXGHGLQWKH7XUQLQJ0RYHPHQW&RXQW6XPPDU\   

       

         

    &DUV      +HDY\    9HKLFOHV     7RWDO

 





&RPPHQWV

$XJ 3DJHRI

$XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU  7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU  7XUQLQJ0RYHPHQW&RXQW)XOO6WXG\6XPPDU\5HSRUW 7XUQLQJ0RYHPHQW&RXQW3HGHVWULDQ9ROXPH5HSRUW &52<'21$9(#5,&+021'5'

&52<'21$9(#5,&+021'5' 6XUYH\'DWH 7KXUVGD\$XJXVW 7RWDO2EVHUYHG87XUQV $$'7)DFWRU &RXQW'DWH 7KXUVGD\$XJXVW 6WDUW7LPH  1RUWKERXQG 6RXWKERXQG  (DVWERXQG :HVWERXQG  1%$SSURDFK 6%$SSURDFK (%$SSURDFK :%$SSURDFK 7LPH3HULRG 7RWDO 7RWDO *UDQG7RWDO (RU:&URVVLQJ (RU:&URVVLQJ 1RU6&URVVLQJ 1RU6&URVVLQJ 303HULRG          &52<'21$9( 5,&+021'5'          1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG          NB SB STR EB :% STR Grand Period LT ST RT LT ST RT LT ST RT LT ST RT          TOT TOT TOT TOT 727 TOT Total          15:00 16:00 93 63 43 199 17 54 30 101 300 20 373 75 468 42 644 24 710 1178 1478                   16:00 17:00 114 72 36 222 16 60 23 99 321 22 419 84 525 47 711 14 772 1297 1618          17:00 18:00 106 95 46 247 12 54 28 94 341 24 407 67 498 43 667 13 723 1221 1562                   Sub Total 313 230 125 668 45 168 81 294 962 66 1199 226 1491 132 2022 51 2205 3696 4658          U Turns00 0 00 0 0                   Total 313 230 125 668 45 168 81 294 962 66 1199 226 1491 132 2022 51 2205 3696 4658          EQ 12Hr 435 320 174 929 63 234 113 409 1338 92 1667 314 2072 183 2811 71 3065 5137 6475          1RWH7KHVHYDOXHVDUHFDOFXODWHGE\PXOWLSO\LQJWKHWRWDOVE\WKHDSSURSULDWHH[SDQVLRQIDFWRU                    AVG 12Hr 392 288 156 836 56 210 101 368 1204 83 1500 283 1865 165 2530 64 2758 4623 5827          1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH(TXLYDOHQWKUWRWDOVE\WKH$$'7IDFWRU                    AVG 24Hr 513 377 205 1095 74 275 133 482 1577 108 1965 370 2443 216 3314 84 3614 6057 7634          1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH$YHUDJH'DLO\KUWRWDOVE\WRH[SDQVLRQIDFWRU                    6XUYH\'DWH 7KXUVGD\$XJXVW 7RWDO2EVHUYHG87XUQV $$'7)DFWRU          1RUWKERXQG 6RXWKERXQG           (DVWERXQG :HVWERXQG                    )XOO6WXG\          &52<'21$9( 5,&+021'5'          1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG          NB SB STR EB :% STR Grand Period LT ST RT LT ST RT LT ST RT LT ST RT          TOT TOT TOT TOT 727 TOT Total                   07:00 08:00 25 21 59 105 11 50 18 79 184 19 440 51 510 14 236 7 257 767 951          08:00 09:00 35 23 68 126 28 69 38 135 261 19 502 54 575 19 345 16 380 955 1216                   09:00 10:00 46 34 48 128 21 61 20 102 230 16 363 65 444 36 353 14 403 847 1077          11:30 12:30 72 48 46 166 12 56 15 83 249 12 396 73 481 56 439 13 508 989 1238                   12:30 13:30 95 53 63 211 19 33 30 82 293 20 435 79 534 39 456 11 506 1040 1333          15:00 16:00 93 63 43 199 17 54 30 101 300 20 373 75 468 42 644 24 710 1178 1478 7RWDO         16:00 17:00 114 72 36 222 16 60 23 99 321 22 419 84 525 47 711 14 772 1297 1618 &RPPHQW 17:00 18:00 106 95 46 247 12 54 28 94 341 24 407 67 498 43 667 13 723 1221 1562

Sub Total 586 409 409 1404 136 437 202 775 2179 152 3335 548 4035 296 3851 112 4259 8294 10473 U Turns00 0 00 0 0 $XJ 3DJHRI Total 586 409 409 1404 136 437 202 775 2179 152 3335 548 4035 296 3851 112 4259 8294 10473

EQ 12Hr 815 569 569 1952 189 607 281 1077 3029 211 4636 762 5609 411 5353 156 5920 11529 14558 1RWH7KHVHYDOXHVDUHFDOFXODWHGE\PXOWLSO\LQJWKHWRWDOVE\WKHDSSURSULDWHH[SDQVLRQIDFWRU 

$XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU   7XUQLQJ0RYHPHQW&RXQW)XOO6WXG\6XPPDU\5HSRUW 7XUQLQJ0RYHPHQW&RXQW)XOO6WXG\6XPPDU\5HSRUW &52<'21$9(#5,&+021'5' &52<'21$9(#5,&+021'5'

AVG 12Hr 733 512 512 1756 170 547 253 970 2726 190 4172 686 5048 370 4818 140 5328 10376 13102 AVG 24Hr 174 128 287 588 98 295 125 518 1106 88 2139 279 2506 113 1531 61 1704 4210 5316 1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH(TXLYDOHQWKUWRWDOVE\WKH$$'7IDFWRU  1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH$YHUDJH'DLO\KUWRWDOVE\WRH[SDQVLRQIDFWRU 

AVG 24Hr 960 670 670 2301 223 716 331 1270 3571 249 5465 898 6613 485 6311 184 6980 13593 17164 &RPPHQWV 1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH$YHUDJH'DLO\KUWRWDOVE\WRH[SDQVLRQIDFWRU  1RWH87XUQVSURYLGHGIRUDSSURDFKWRWDOV5HIHUWR 87XUQ 5HSRUWIRUVSHFLILFEUHDNGRZQ 6XUYH\'DWH 7KXUVGD\$XJXVW 7RWDO2EVHUYHG87XUQV $$'7)DFWRU 1RUWKERXQG 6RXWKERXQG  (DVWERXQG :HVWERXQG  0'3HULRG &52<'21$9( 5,&+021'5' 1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG NB SB STR EB :% STR Grand Period LT ST RT LT ST RT LT ST RT LT ST RT TOT TOT TOT TOT 727 TOT Total 11:30 12:30 72 48 46 166 12 56 15 83 249 12 396 73 481 56 439 13 508 989 1238

12:30 13:30 95 53 63 211 19 33 30 82 293 20 435 79 534 39 456 11 506 1040 1333

Sub Total 167 101 109 377 31 89 45 165 542 32 831 152 1015 95 895 24 1014 2029 2571 U Turns00 0 00 0 0 Total 167 101 109 377 31 89 45 165 542 32 831 152 1015 95 895 24 1014 2029 2571

EQ 12Hr 232 140 152 524 43 124 63 229 753 44 1155 211 1411 132 1244 33 1409 2820 3573 1RWH7KHVHYDOXHVDUHFDOFXODWHGE\PXOWLSO\LQJWKHWRWDOVE\WKHDSSURSULDWHH[SDQVLRQIDFWRU 

AVG 12Hr 209 126 136 472 39 111 56 206 678 40 1040 190 1270 119 1120 30 1269 2539 3217 1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH(TXLYDOHQWKUWRWDOVE\WKH$$'7IDFWRU 

AVG 24Hr 274 166 179 618 51 146 74 270 888 52 1362 249 1663 156 1467 39 1662 3325 4213 1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH$YHUDJH'DLO\KUWRWDOVE\WRH[SDQVLRQIDFWRU 

6XUYH\'DWH 7KXUVGD\$XJXVW 7RWDO2EVHUYHG87XUQV $$'7)DFWRU 1RUWKERXQG 6RXWKERXQG  (DVWERXQG :HVWERXQG  $03HULRG &52<'21$9( 5,&+021'5' 1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG NB SB STR EB :% STR Grand Period LT ST RT LT ST RT LT ST RT LT ST RT TOT TOT TOT TOT 727 TOT Total 07:00 08:00 25 21 59 105 11 50 18 79 184 19 440 51 510 14 236 7 257 767 951

08:00 09:00 35 23 68 126 28 69 38 135 261 19 502 54 575 19 345 16 380 955 1216

09:00 10:00 46 34 48 128 21 61 20 102 230 16 363 65 444 36 353 14 403 847 1077

Sub Total 106 78 175 359 60 180 76 316 675 54 1305 170 1529 69 934 37 1040 2569 3244 U Turns00 0 00 0 0 Total 106 78 175 359 60 180 76 316 675 54 1305 170 1529 69 934 37 1040 2569 3244

EQ 12Hr 147 108 243 499 83 250 106 439 938 75 1814 236 2125 96 1298 51 1446 3571 4509 1RWH7KHVHYDOXHVDUHFDOFXODWHGE\PXOWLSO\LQJWKHWRWDOVE\WKHDSSURSULDWHH[SDQVLRQIDFWRU 

AVG 12Hr 133 98 219 449 75 225 95 395 844 68 1633 213 1913 86 1168 46 1301 3214 4058 1RWH7KHVHYROXPHVDUHFDOFXODWHGE\PXOWLSO\LQJWKH(TXLYDOHQWKUWRWDOVE\WKH$$'7IDFWRU 

$XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP &52<'21$9(#5,&+021'5' &52<'21$9(#5,&+021'5'

6XUYH\'DWH 7KXUVGD\$XJXVW :21R  6XUYH\'DWH 7KXUVGD\$XJXVW :21R  6WDUW7LPH  'HYLFH 0LRYLVLRQ 6WDUW7LPH  'HYLFH 0LRYLVLRQ

&52<'21$9( N &52<'21$9( N W E W E

  S   S             +HDY\ +HDY\ 9HKLFOHV      9HKLFOHV        &DUV      &DUV     

5,&+021'5' 5,&+021'5'      

                    $03HULRG    )XOO6WXG\       3HDN+RXU     3HDN+RXU                                 

    &DUV     &DUV      +HDY\      +HDY\    9HKLFOHV    9HKLFOHV         7RWDO 7RWDO    

 

 

&RPPHQWV &RPPHQWV

$XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP 7XUQLQJ0RYHPHQW&RXQW3HDN+RXU'LDJUDP &52<'21$9(#5,&+021'5' &52<'21$9(#5,&+021'5'

6XUYH\'DWH 7KXUVGD\$XJXVW :21R  6XUYH\'DWH 7KXUVGD\$XJXVW :21R  6WDUW7LPH  'HYLFH 0LRYLVLRQ 6WDUW7LPH  'HYLFH 0LRYLVLRQ

&52<'21$9( N &52<'21$9( N W E W E

  S   S             +HDY\ +HDY\ 9HKLFOHV      9HKLFOHV        &DUV      &DUV     

5,&+021'5' 5,&+021'5'      

                    0'3HULRG    303HULRG       3HDN+RXU     3HDN+RXU                                 

    &DUV     &DUV      +HDY\      +HDY\    9HKLFOHV    9HKLFOHV         7RWDO 7RWDO    

 

 

&RPPHQWV &RPPHQWV

$XJ 3DJHRI $XJ 3DJHRI 7UDQVSRUWDWLRQ6HUYLFHV7UDIILF6HUYLFHV :RUN2UGHU  7XUQLQJ0RYHPHQW&RXQW0LQ87XUQ7RWDO5HSRUW &52<'21$9(#5,&+021'5' 6XUYH\'DWH 7KXUVGD\$XJXVW

1RUWKERXQG 6RXWKERXQG (DVWERXQG :HVWERXQG 7LPH3HULRG 7RWDO 87XUQ7RWDO 87XUQ7RWDO 87XUQ7RWDO 87XUQ7RWDO                                                                                                                                                                                                                                 7RWDO     

$XJ 3DJHRI

Appendix D Collision Data and Analysis

Total Area Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 3023131003148483% Non-fatal injury 5100002001717% Non reportable 0000000000% Total 353313100514101100% #1 or 35% #2 or 33% #3 or 13% #4 or 10% #8 or 0% #5 or 5% #7 or 1% #6 or 4%

CARLING AVE/CONNAUGHT AVE Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 16 36,900 1460 0.30

Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 463000001381% Non-fatal injury 03000000319% Non reportable 0000000000% Total 4930000016100% 25% 56% 19% 0% 0% 0% 0% 0%

CARLING AVE/CROYDON AVE Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 37 36,800 1460 0.69

Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 7115402023184% Non-fatal injury 23000100616% Non reportable 0000000000% Total 91454030237100% 24% 38% 14% 11% 0% 8% 0% 5%

CARLING AVE/OTTAWA RIVER PKWY Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 3 36,900 1460 0.06

Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 300000003100% Non-fatal injury 0000000000% Non reportable 0000000000% Total 300000003100% 100% 0% 0% 0% 0% 0% 0% 0%

CARLING AVE/TAVISTOCK RD Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 5 36,900 1460 0.09

Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 210200005100% Non-fatal injury 0000000000% Non reportable 0000000000% Total 210200005100% 40% 20% 0% 40% 0% 0% 0% 0%

CARLING AVE, CONNAUGHT AVE to OTTAWA RIVER PKWY Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 5 34,800 1460 0.10

Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 10300000480% Non-fatal injury 10000000120% Non reportable 0000000000% Total 203000005100% 40% 0% 60% 0% 0% 0% 0% 0%

CARLING AVE, CROYDON AVE to TAVISTOCK RD Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 4 34,800 1460 0.08 Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 021000014100% Non-fatal injury 0000000000% Non reportable 0000000000% Total 021000014100% 0% 50% 25% 0% 0% 0% 0% 25%

CARLING AVE, TAVISTOCK RD to CONNAUGHT AVE Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 2 34,800 1460 0.04

Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 00100000150% Non-fatal injury 10000000150% Non reportable 0000000000% Total 101000002100% 50% 0% 50% 0% 0% 0% 0% 0%

CROYDON AVE/RICHMOND RD Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 20 14,600 1460 0.94

Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 920301011680% Non-fatal injury 12000100420% Non reportable 0000000000% Total 10403020120100% 50% 20% 0% 15% 0% 10% 0% 5%

CROYDON AVE, RICHMOND RD to CARLING AVE Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 3 3,100 1460 0.66

Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 010100103100% Non-fatal injury 0000000000% Non reportable 0000000000% Total 010100103100% 0% 33% 0% 33% 0% 0% 33% 0%

RICHMOND RD, CROYDON AVE to ASSALY RD Total # 24 Hr AADT Years Days Collisions/MEV Collisions Veh Volume 2014-2017 6 11,500 1460 0.36

Single vehicle Classification of Turning Single Vehicle Rear End Sideswipe Angle Approaching (Unattended Other Total Accident Movement (other) vehicle) P.D. only 40000000467% Non-fatal injury 02000000233% Non reportable 0000000000% Total 420000006100% 67% 33% 0% 0% 0% 0% 0% 0%

Appendix E 2020 and 2025 Synchro Analysis

Projected Background 2020 AM 1: Connaught/Access #1 & Carling 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 38 2225 0 0 861 6 0 0 48 0 0 1 Future Volume (vph) 38 2225 0 0 861 6 0 0 48 0 0 1 Adj. Flow (vph) 42 2472 0 0 957 7 0 0 53 0 0 1 Lane Group Flow (vph) 42 2472 0 0 957 7 0 0 53 0 0 1 Turn Type Perm NA NA Perm Perm Perm Perm Protected Phases 2 6 Permitted Phases 2 6 8 4 4 Detector Phase 2 2 6 6 8 4 4 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 23.6 23.6 25.8 25.8 40.1 40.1 40.1 Total Split (s) 89.0 89.0 89.0 89.0 41.0 41.0 41.0 Total Split (%) 68.5% 68.5% 68.5% 68.5% 31.5% 31.5% 31.5% Yellow Time (s) 3.7 3.7 3.7 3.7 3.0 3.0 3.0 All-Red Time (s) 1.9 1.9 1.9 1.9 4.1 4.1 4.1 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.6 5.6 5.6 5.6 7.1 7.1 7.1 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max None None None Act Effct Green (s) 107.2 107.2 107.2 107.2 14.6 14.6 Actuated g/C Ratio 0.82 0.82 0.82 0.82 0.11 0.11 v/c Ratio 0.10 0.62 0.24 0.01 0.28 0.00 Control Delay 3.7 4.6 4.2 0.0 35.1 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.7 4.6 4.2 0.0 35.1 0.0 LOS AA AA D A Approach Delay 4.6 4.2 35.1 Approach LOS A A D Queue Length 50th (m) 1.2 37.4 15.4 0.0 7.6 0.0 Queue Length 95th (m) m3.1 140.1 43.8 0.0 16.7 0.0 Internal Link Dist (m) 51.5 125.1 209.4 82.4 Turn Bay Length (m) Base Capacity (vph) 410 4018 4018 1092 412 492 Starvation Cap Reductn 0 14 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.10 0.62 0.24 0.01 0.13 0.00 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 36 (28%), Referenced to phase 2:EBTL and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.62 Intersection Signal Delay: 4.9 Intersection LOS: A Intersection Capacity Utilization 66.1% ICU Level of Service C Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 1 Projected Background 2020 AM 1: Connaught/Access #1 & Carling 12/18/2018 m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1: Connaught/Access #1 & Carling

Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 2 Projected Background 2020 AM 2: Croydon & Access #2 12/18/2018

Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 1 1 181 3 3 137 Future Volume (Veh/h) 1 1 181 3 3 137 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 1 1 201 3 3 152 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 180 80 pX, platoon unblocked vC, conflicting volume 360 202 204 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 360 202 204 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 637 838 1368 Direction, Lane # WB 1 NB 1 SB 1 Volume Total 2 204 155 Volume Left 1 0 3 Volume Right 1 3 0 cSH 724 1700 1368 Volume to Capacity 0.00 0.12 0.00 Queue Length 95th (m) 0.1 0.0 0.1 Control Delay (s) 10.0 0.0 0.2 Lane LOS A A Approach Delay (s) 10.0 0.0 0.2 Approach LOS A Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 20.2% ICU Level of Service A Analysis Period (min) 15

Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 4 Projected Background 2020 AM 3: Access #3 & Richmond 12/18/2018

Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 616 6 0 377 0 0 Future Volume (Veh/h) 616 6 0 377 0 0 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 684 7 0 419 0 0 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 183 136 pX, platoon unblocked 0.79 0.87 0.79 vC, conflicting volume 684 1106 688 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 468 655 472 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 865 373 468 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 691 419 0 Volume Left 0 0 0 Volume Right 7 0 0 cSH 1700 1700 1700 Volume to Capacity 0.41 0.25 0.00 Queue Length 95th (m) 0.0 0.0 0.0 Control Delay (s) 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 37.9% ICU Level of Service A Analysis Period (min) 15

Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 6 Projected Background 2020 AM 4: Carling & Croydon 12/18/2018

Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 96 2061 850 88 156 25 Future Volume (vph) 96 2061 850 88 156 25 Adj. Flow (vph) 107 2290 944 98 173 28 Lane Group Flow (vph) 107 2290 1042 0 201 0 Turn Type Prot NA NA Perm Protected Phases 5 2 6 Permitted Phases 4 Detector Phase 5 2 6 4 Switch Phase Minimum Initial (s) 5.0 10.0 10.0 10.0 Minimum Split (s) 10.4 15.4 30.4 32.7 Total Split (s) 14.0 97.0 83.0 33.0 Total Split (%) 10.8% 74.6% 63.8% 25.4% Yellow Time (s) 3.7 3.7 3.7 3.3 All-Red Time (s) 1.7 1.7 1.7 3.4 Lost Time Adjust (s) -1.4 -1.4 -1.4 -2.7 Total Lost Time (s) 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Recall Mode None C-Max C-Max None Act Effct Green (s) 12.4 102.0 85.7 20.0 Actuated g/C Ratio 0.10 0.78 0.66 0.15 v/c Ratio 0.66 0.60 0.33 0.40 Control Delay 77.1 7.3 6.6 47.2 Queue Delay 0.0 0.0 0.1 0.0 Total Delay 77.1 7.4 6.8 47.2 LOS E A A D Approach Delay 10.5 6.8 47.2 Approach LOS B A D Queue Length 50th (m) 26.0 58.9 37.8 23.5 Queue Length 95th (m) #58.5 115.6 4.9 31.7 Internal Link Dist (m) 356.3 23.1 156.3 Turn Bay Length (m) 65.0 28.0 Base Capacity (vph) 161 3823 3155 729 Starvation Cap Reductn 0 0 951 0 Spillback Cap Reductn 0 82 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.66 0.61 0.47 0.28 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 45 (35%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.66 Intersection Signal Delay: 11.4 Intersection LOS: B Intersection Capacity Utilization 63.3% ICU Level of Service B Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 7 Projected Background 2020 AM 4: Carling & Croydon 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 4: Carling & Croydon

Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 8 Projected Background 2020 AM 5: Croydon & Richmond 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 20 520 63 15 346 15 34 26 73 25 65 34 Future Volume (vph) 20 520 63 15 346 15 34 26 73 25 65 34 Adj. Flow (vph) 22 578 70 17 384 17 38 29 81 28 72 38 Lane Group Flow (vph) 22 648 0 17 401 0 38 110 0 0 138 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 2684 Permitted Phases 2684 Detector Phase 2 2 6 6 8 8 4 4 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 26.4 26.4 26.4 26.4 31.1 31.1 31.1 31.1 Total Split (s) 39.0 39.0 39.0 39.0 31.0 31.0 31.0 31.0 Total Split (%) 55.7% 55.7% 55.7% 55.7% 44.3% 44.3% 44.3% 44.3% Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 All-Red Time (s) 3.1 3.1 3.1 3.1 2.8 2.8 2.8 2.8 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.4 6.4 6.4 6.4 6.1 6.1 6.1 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max None None None None Act Effct Green (s) 46.0 46.0 46.0 46.0 16.0 16.0 16.0 Actuated g/C Ratio 0.66 0.66 0.66 0.66 0.23 0.23 0.23 v/c Ratio 0.04 0.56 0.04 0.35 0.14 0.32 0.37 Control Delay 9.4 13.8 6.6 8.1 19.2 22.7 18.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.4 13.8 6.6 8.1 19.2 22.7 18.5 LOS AB AA BC B Approach Delay 13.6 8.1 21.8 18.5 Approach LOS B A C B Queue Length 50th (m) 0.8 35.9 0.1 1.7 4.4 13.5 13.2 Queue Length 95th (m) 5.0 #123.0 m2.5 75.5 9.0 20.3 21.2 Internal Link Dist (m) 381.9 159.1 55.9 132.6 Turn Bay Length (m) 55.0 45.0 40.0 Base Capacity (vph) 588 1150 392 1162 435 532 562 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.04 0.56 0.04 0.35 0.09 0.21 0.25 Intersection Summary Cycle Length: 70 Actuated Cycle Length: 70 Offset: 40 (57%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay: 13.3 Intersection LOS: B Intersection Capacity Utilization 62.0% ICU Level of Service B Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 9 Projected Background 2020 AM 5: Croydon & Richmond 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 5: Croydon & Richmond

Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 10 Projected Background 2020 AM 6: Assaly & Richmond 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 7 564 15 25 347 18 25 6 33 67 2 25 Future Volume (vph) 7 564 15 25 347 18 25 6 33 67 2 25 Adj. Flow (vph) 8 627 17 28 386 20 28 7 37 74 2 28 Lane Group Flow (vph) 8 644 0 28 406 0 0 35 37 0 104 0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 2684 Permitted Phases 2 6 8 8 4 Detector Phase 2 2 6 6 88844 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 30.3 30.3 30.3 30.3 33.3 33.3 33.3 33.3 33.3 Total Split (s) 37.0 37.0 37.0 37.0 33.0 33.0 33.0 33.0 33.0 Total Split (%) 52.9% 52.9% 52.9% 52.9% 47.1% 47.1% 47.1% 47.1% 47.1% Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 All-Red Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max Max Max Max Max Max Act Effct Green (s) 30.7 30.7 30.7 30.7 26.7 26.7 26.7 Actuated g/C Ratio 0.44 0.44 0.44 0.44 0.38 0.38 0.38 v/c Ratio 0.02 0.83 0.17 0.52 0.07 0.06 0.20 Control Delay 7.3 27.2 15.4 17.1 14.3 3.6 12.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 7.3 27.2 15.4 17.1 14.3 3.6 12.1 LOS AC BB BA B Approach Delay 26.9 17.0 8.8 12.1 Approach LOS C B A B Queue Length 50th (m) 0.7 86.1 2.1 36.5 2.8 0.0 6.4 Queue Length 95th (m) m0.6 #135.5 7.3 60.1 8.0 3.8 15.8 Internal Link Dist (m) 111.6 60.1 44.8 81.9 Turn Bay Length (m) 215.0 45.0 18.0 Base Capacity (vph) 339 779 161 778 538 591 528 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.02 0.83 0.17 0.52 0.07 0.06 0.20 Intersection Summary Cycle Length: 70 Actuated Cycle Length: 70 Offset: 1 (1%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 21.3 Intersection LOS: C Intersection Capacity Utilization 93.1% ICU Level of Service F Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 11 Projected Background 2020 AM 6: Assaly & Richmond 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 6: Assaly & Richmond

Lincoln Fields Mall 12/18/2018 Projected Background 2020 AM Synchro 10 Report Page 12 Projected Background 2020 PM 1: Connaught/Access #1 & Carling 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 62 1238 0 0 1996 49 0 0 32 55 0 55 Future Volume (vph) 62 1238 0 0 1996 49 0 0 32 55 0 55 Adj. Flow (vph) 69 1376 0 0 2218 54 0 0 36 61 0 61 Lane Group Flow (vph) 69 1376 0 0 2218 54 0 0 36 61 0 61 Turn Type Prot NA NA Perm Perm Perm Perm Protected Phases 5 2 6 Permitted Phases 6 8 4 4 Detector Phase 5 2 6 6 8 4 4 Switch Phase Minimum Initial (s) 5.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 11.0 23.6 25.1 25.1 40.1 40.1 40.1 Total Split (s) 14.0 89.0 75.0 75.0 41.0 41.0 41.0 Total Split (%) 10.8% 68.5% 57.7% 57.7% 31.5% 31.5% 31.5% Yellow Time (s) 3.7 3.7 3.7 3.7 3.0 3.0 3.0 All-Red Time (s) 2.3 1.9 1.9 1.9 4.1 4.1 4.1 Lost Time Adjust (s) -2.0 -1.6 -1.6 -1.6 -3.1 -3.1 -3.1 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None C-Max C-Max C-Max None None None Act Effct Green (s) 10.7 103.9 91.6 91.6 22.3 22.3 22.3 Actuated g/C Ratio 0.08 0.80 0.70 0.70 0.17 0.17 0.17 v/c Ratio 0.49 0.35 0.65 0.06 0.11 0.21 0.20 Control Delay 82.1 3.9 16.5 1.1 1.5 44.2 7.5 Queue Delay 0.0 0.1 0.0 0.0 0.0 0.0 0.0 Total Delay 82.1 4.0 16.5 1.1 1.5 44.2 7.5 LOS F A B A A D A Approach Delay 7.7 16.1 1.5 25.8 Approach LOS A B A C Queue Length 50th (m) 18.0 16.1 100.2 0.0 0.0 14.8 0.0 Queue Length 95th (m) 31.8 29.8 188.1 2.4 1.3 23.2 8.4 Internal Link Dist (m) 51.5 125.1 209.4 82.4 Turn Bay Length (m) Base Capacity (vph) 144 3893 3433 940 477 473 467 Starvation Cap Reductn 0 1021 0 0 0 0 0 Spillback Cap Reductn 0 0 117 0 0 0 1 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.48 0.48 0.67 0.06 0.08 0.13 0.13 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 19 (15%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.65 Intersection Signal Delay: 13.2 Intersection LOS: B Intersection Capacity Utilization 65.0% ICU Level of Service C Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 1 Projected Background 2020 PM 1: Connaught/Access #1 & Carling 12/18/2018 Splits and Phases: 1: Connaught/Access #1 & Carling

Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 2 Projected Background 2020 PM 2: Croydon & Access #2 12/18/2018

Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 47 47 176 33 32 176 Future Volume (Veh/h) 47 47 176 33 32 176 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 52 52 196 37 36 196 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 180 80 pX, platoon unblocked vC, conflicting volume 482 214 233 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 482 214 233 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 90 94 97 cM capacity (veh/h) 528 825 1335 Direction, Lane # WB 1 NB 1 SB 1 Volume Total 104 233 232 Volume Left 52 0 36 Volume Right 52 37 0 cSH 644 1700 1335 Volume to Capacity 0.16 0.14 0.03 Queue Length 95th (m) 4.4 0.0 0.6 Control Delay (s) 11.7 0.0 1.4 Lane LOS B A Approach Delay (s) 11.7 0.0 1.4 Approach LOS B Intersection Summary Average Delay 2.7 Intersection Capacity Utilization 39.3% ICU Level of Service A Analysis Period (min) 15

Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 4 Projected Background 2020 PM 3: Access #3 & Richmond 12/18/2018

Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 454 49 0 822 0 32 Future Volume (Veh/h) 454 49 0 822 0 32 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 504 54 0 913 0 36 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 183 136 pX, platoon unblocked 0.86 0.77 0.86 vC, conflicting volume 504 1444 531 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 340 1017 372 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 94 cM capacity (veh/h) 1047 204 579 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 558 913 36 Volume Left 0 0 0 Volume Right 54 0 36 cSH 1700 1700 579 Volume to Capacity 0.33 0.54 0.06 Queue Length 95th (m) 0.0 0.0 1.5 Control Delay (s) 0.0 0.0 11.6 Lane LOS B Approach Delay (s) 0.0 0.0 11.6 Approach LOS B Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 49.0% ICU Level of Service A Analysis Period (min) 15

Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 6 Projected Background 2020 PM 4: Carling & Croydon 12/18/2018

Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 81 1144 1955 128 147 97 Future Volume (vph) 81 1144 1955 128 147 97 Adj. Flow (vph) 90 1271 2172 142 163 108 Lane Group Flow (vph) 90 1271 2314 0 271 0 Turn Type Prot NA NA Prot Protected Phases 5 2 6 4 Permitted Phases Detector Phase 5 2 6 4 Switch Phase Minimum Initial (s) 5.0 10.0 10.0 10.0 Minimum Split (s) 10.4 15.4 30.4 32.7 Total Split (s) 14.0 97.0 83.0 33.0 Total Split (%) 10.8% 74.6% 63.8% 25.4% Yellow Time (s) 3.7 3.7 3.7 3.3 All-Red Time (s) 1.7 1.7 1.7 3.4 Lost Time Adjust (s) -1.4 -1.4 -1.4 -2.7 Total Lost Time (s) 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Recall Mode None C-Max C-Max None Act Effct Green (s) 11.2 102.3 87.1 19.7 Actuated g/C Ratio 0.09 0.79 0.67 0.15 v/c Ratio 0.62 0.33 0.72 0.48 Control Delay 75.9 4.9 4.0 31.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 75.9 4.9 4.0 31.5 LOS E A A C Approach Delay 9.6 4.0 31.5 Approach LOS A A C Queue Length 50th (m) 22.1 22.7 3.9 20.4 Queue Length 95th (m) #46.8 47.6 6.8 30.4 Internal Link Dist (m) 356.3 23.1 156.3 Turn Bay Length (m) 65.0 28.0 Base Capacity (vph) 147 3833 3216 776 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.61 0.33 0.72 0.35 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 18 (14%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay: 7.8 Intersection LOS: A Intersection Capacity Utilization 73.2% ICU Level of Service D Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 7 Projected Background 2020 PM 4: Carling & Croydon 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 4: Carling & Croydon

Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 8 Projected Background 2020 PM 5: Croydon & Richmond 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 23 439 115 54 751 16 134 89 33 13 56 18 Future Volume (vph) 23 439 115 54 751 16 134 89 33 13 56 18 Adj. Flow (vph) 26 488 128 60 834 18 149 99 37 14 62 20 Lane Group Flow (vph) 26 616 0 60 852 0 149 136 0 0 96 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 2684 Permitted Phases 2684 Detector Phase 2 2 6 6 8 8 4 4 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 27.1 27.1 27.1 27.1 31.8 31.8 31.8 31.8 Total Split (s) 54.0 54.0 54.0 54.0 31.0 31.0 31.0 31.0 Total Split (%) 63.5% 63.5% 63.5% 63.5% 36.5% 36.5% 36.5% 36.5% Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 All-Red Time (s) 3.1 3.1 3.1 3.1 2.8 2.8 2.8 2.8 Lost Time Adjust (s) -2.4 -2.4 -2.4 -2.4 -2.1 -2.1 -2.1 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max None None None None Act Effct Green (s) 57.3 57.3 57.3 57.3 19.7 19.7 19.7 Actuated g/C Ratio 0.67 0.67 0.67 0.67 0.23 0.23 0.23 v/c Ratio 0.10 0.53 0.14 0.71 0.54 0.35 0.25 Control Delay 8.1 10.2 6.9 10.8 34.6 28.1 21.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 8.1 10.2 6.9 10.8 34.6 28.1 21.6 LOS AB AB CC C Approach Delay 10.1 10.5 31.5 21.6 Approach LOS B B C C Queue Length 50th (m) 1.2 38.0 2.2 31.6 22.1 19.2 10.9 Queue Length 95th (m) 5.5 87.4 m5.4 #63.1 35.1 30.0 20.2 Internal Link Dist (m) 381.9 159.1 55.9 132.6 Turn Bay Length (m) 55.0 45.0 40.0 Base Capacity (vph) 265 1156 418 1197 377 526 521 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.10 0.53 0.14 0.71 0.40 0.26 0.18 Intersection Summary Cycle Length: 85 Actuated Cycle Length: 85 Offset: 71 (84%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 14.0 Intersection LOS: B Intersection Capacity Utilization 74.0% ICU Level of Service D Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 9 Projected Background 2020 PM 5: Croydon & Richmond 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 5: Croydon & Richmond

Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 10 Projected Background 2020 PM 6: Assaly & Richmond 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 16 446 24 54 766 48 21 13 45 39 2 30 Future Volume (vph) 16 446 24 54 766 48 21 13 45 39 2 30 Adj. Flow (vph) 18 496 27 60 851 53 23 14 50 43 2 33 Lane Group Flow (vph) 18 523 0 60 904 0 0 37 50 0 78 0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 2684 Permitted Phases 2 6 8 8 4 Detector Phase 2 2 6 6 88844 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 30.3 30.3 30.3 30.3 33.3 33.3 33.3 33.3 33.3 Total Split (s) 52.0 52.0 52.0 52.0 33.0 33.0 33.0 33.0 33.0 Total Split (%) 61.2% 61.2% 61.2% 61.2% 38.8% 38.8% 38.8% 38.8% 38.8% Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 All-Red Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max None None None None None Act Effct Green (s) 65.4 65.4 65.4 65.4 15.6 15.6 15.6 Actuated g/C Ratio 0.77 0.77 0.77 0.77 0.18 0.18 0.18 v/c Ratio 0.06 0.38 0.10 0.67 0.14 0.16 0.29 Control Delay 8.5 7.7 5.9 11.7 27.6 8.5 20.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 8.5 7.7 5.9 11.7 27.6 8.5 20.1 LOS AA AB CA C Approach Delay 7.7 11.4 16.6 20.1 Approach LOS A B B C Queue Length 50th (m) 0.5 19.8 2.0 55.8 5.4 0.0 6.6 Queue Length 95th (m) m3.4 71.9 10.1 #207.1 10.4 7.0 14.3 Internal Link Dist (m) 111.6 60.1 44.8 81.9 Turn Bay Length (m) 215.0 45.0 18.0 Base Capacity (vph) 325 1360 590 1358 499 523 477 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.06 0.38 0.10 0.67 0.07 0.10 0.16 Intersection Summary Cycle Length: 85 Actuated Cycle Length: 85 Offset: 64 (75%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.67 Intersection Signal Delay: 10.9 Intersection LOS: B Intersection Capacity Utilization 69.0% ICU Level of Service C Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 11 Projected Background 2020 PM 6: Assaly & Richmond 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 6: Assaly & Richmond

Lincoln Fields Mall 12/18/2018 Projected Background 2020 PM Synchro 10 Report Page 12 Projected Background 2025 AM 1: Connaught/Access #1 & Carling 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 38 2480 0 0 959 6 0 0 48 0 0 1 Future Volume (vph) 38 2480 0 0 959 6 0 0 48 0 0 1 Adj. Flow (vph) 42 2756 0 0 1066 7 0 0 53 0 0 1 Lane Group Flow (vph) 42 2756 0 0 1066 7 0 0 53 0 0 1 Turn Type Perm NA NA Perm Perm Perm Perm Protected Phases 2 6 Permitted Phases 2 6 8 4 4 Detector Phase 2 2 6 6 8 4 4 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 23.6 23.6 25.8 25.8 40.1 40.1 40.1 Total Split (s) 89.0 89.0 89.0 89.0 41.0 41.0 41.0 Total Split (%) 68.5% 68.5% 68.5% 68.5% 31.5% 31.5% 31.5% Yellow Time (s) 3.7 3.7 3.7 3.7 3.0 3.0 3.0 All-Red Time (s) 1.9 1.9 1.9 1.9 4.1 4.1 4.1 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.6 5.6 5.6 5.6 7.1 7.1 7.1 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max None None None Act Effct Green (s) 107.2 107.2 107.2 107.2 14.6 14.6 Actuated g/C Ratio 0.82 0.82 0.82 0.82 0.11 0.11 v/c Ratio 0.12 0.69 0.27 0.01 0.28 0.00 Control Delay 3.7 5.2 4.3 0.0 35.1 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.7 5.2 4.3 0.0 35.1 0.0 LOS AA AA D A Approach Delay 5.1 4.3 35.1 Approach LOS A A D Queue Length 50th (m) 1.2 40.4 17.6 0.0 7.6 0.0 Queue Length 95th (m) m2.7 191.6 49.5 0.0 16.7 0.0 Internal Link Dist (m) 51.5 125.1 209.4 82.4 Turn Bay Length (m) Base Capacity (vph) 365 4018 4018 1092 412 470 Starvation Cap Reductn 0 1 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.12 0.69 0.27 0.01 0.13 0.00 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 36 (28%), Referenced to phase 2:EBTL and 6:WBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.69 Intersection Signal Delay: 5.3 Intersection LOS: A Intersection Capacity Utilization 71.3% ICU Level of Service C Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 1 Projected Background 2025 AM 1: Connaught/Access #1 & Carling 12/18/2018 m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1: Connaught/Access #1 & Carling

Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 2 Projected Background 2025 AM 2: Croydon & Access #2 12/18/2018

Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 1 1 181 3 3 137 Future Volume (Veh/h) 1 1 181 3 3 137 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 1 1 201 3 3 152 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 180 80 pX, platoon unblocked vC, conflicting volume 360 202 204 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 360 202 204 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 637 838 1368 Direction, Lane # WB 1 NB 1 SB 1 Volume Total 2 204 155 Volume Left 1 0 3 Volume Right 1 3 0 cSH 724 1700 1368 Volume to Capacity 0.00 0.12 0.00 Queue Length 95th (m) 0.1 0.0 0.1 Control Delay (s) 10.0 0.0 0.2 Lane LOS A A Approach Delay (s) 10.0 0.0 0.2 Approach LOS A Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 20.2% ICU Level of Service A Analysis Period (min) 15

Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 4 Projected Background 2025 AM 3: Access #3 & Richmond 12/18/2018

Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 687 6 0 420 0 0 Future Volume (Veh/h) 687 6 0 420 0 0 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 763 7 0 467 0 0 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 183 136 pX, platoon unblocked 0.77 0.86 0.77 vC, conflicting volume 763 1234 766 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 539 717 544 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 789 339 414 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 770 467 0 Volume Left 0 0 0 Volume Right 7 0 0 cSH 1700 1700 1700 Volume to Capacity 0.45 0.27 0.00 Queue Length 95th (m) 0.0 0.0 0.0 Control Delay (s) 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 41.9% ICU Level of Service A Analysis Period (min) 15

Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 6 Projected Background 2025 AM 4: Carling & Croydon 12/18/2018

Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 96 2298 948 88 156 25 Future Volume (vph) 96 2298 948 88 156 25 Adj. Flow (vph) 107 2553 1053 98 173 28 Lane Group Flow (vph) 107 2553 1151 0 201 0 Turn Type Prot NA NA Perm Protected Phases 5 2 6 Permitted Phases 4 Detector Phase 5 2 6 4 Switch Phase Minimum Initial (s) 5.0 10.0 10.0 10.0 Minimum Split (s) 10.4 15.4 30.4 32.7 Total Split (s) 14.0 97.0 83.0 33.0 Total Split (%) 10.8% 74.6% 63.8% 25.4% Yellow Time (s) 3.7 3.7 3.7 3.3 All-Red Time (s) 1.7 1.7 1.7 3.4 Lost Time Adjust (s) -1.4 -1.4 -1.4 -2.7 Total Lost Time (s) 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Recall Mode None C-Max C-Max None Act Effct Green (s) 12.4 102.0 85.7 20.0 Actuated g/C Ratio 0.10 0.78 0.66 0.15 v/c Ratio 0.66 0.67 0.36 0.40 Control Delay 77.1 8.4 6.9 47.2 Queue Delay 0.0 0.0 0.1 0.0 Total Delay 77.1 8.4 7.0 47.2 LOS E A A D Approach Delay 11.2 7.0 47.2 Approach LOS B A D Queue Length 50th (m) 26.0 73.1 43.1 23.5 Queue Length 95th (m) #58.5 143.0 5.2 31.7 Internal Link Dist (m) 356.3 23.1 156.3 Turn Bay Length (m) 65.0 28.0 Base Capacity (vph) 161 3823 3159 729 Starvation Cap Reductn 0 0 829 0 Spillback Cap Reductn 0 91 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.66 0.68 0.49 0.28 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 45 (35%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.67 Intersection Signal Delay: 11.8 Intersection LOS: B Intersection Capacity Utilization 68.1% ICU Level of Service C Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 7 Projected Background 2025 AM 4: Carling & Croydon 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 4: Carling & Croydon

Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 8 Projected Background 2025 AM 5: Croydon & Richmond 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 20 580 63 15 386 15 34 26 73 25 65 34 Future Volume (vph) 20 580 63 15 386 15 34 26 73 25 65 34 Adj. Flow (vph) 22 644 70 17 429 17 38 29 81 28 72 38 Lane Group Flow (vph) 22 714 0 17 446 0 38 110 0 0 138 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 2684 Permitted Phases 2684 Detector Phase 2 2 6 6 8 8 4 4 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 26.4 26.4 26.4 26.4 31.1 31.1 31.1 31.1 Total Split (s) 39.0 39.0 39.0 39.0 31.0 31.0 31.0 31.0 Total Split (%) 55.7% 55.7% 55.7% 55.7% 44.3% 44.3% 44.3% 44.3% Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 All-Red Time (s) 3.1 3.1 3.1 3.1 2.8 2.8 2.8 2.8 Lost Time Adjust (s) -2.4 -2.4 -2.4 -2.4 -2.1 -2.1 -2.1 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max None None None None Act Effct Green (s) 47.9 47.9 47.9 47.9 18.1 18.1 18.1 Actuated g/C Ratio 0.68 0.68 0.68 0.68 0.26 0.26 0.26 v/c Ratio 0.04 0.59 0.05 0.37 0.13 0.28 0.33 Control Delay 8.2 13.2 6.2 8.1 17.8 20.5 16.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 8.2 13.2 6.2 8.1 17.8 20.5 16.1 LOS AB AA BC B Approach Delay 13.0 8.1 19.8 16.1 Approach LOS BABB Queue Length 50th (m) 0.7 36.2 0.1 1.5 4.3 12.9 12.4 Queue Length 95th (m) 4.6 #135.1 m2.1 83.8 8.6 19.2 19.7 Internal Link Dist (m) 381.9 159.1 55.9 132.6 Turn Bay Length (m) 55.0 45.0 40.0 Base Capacity (vph) 553 1200 354 1212 428 577 615 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.04 0.59 0.05 0.37 0.09 0.19 0.22 Intersection Summary Cycle Length: 70 Actuated Cycle Length: 70 Offset: 40 (57%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay: 12.4 Intersection LOS: B Intersection Capacity Utilization 61.5% ICU Level of Service B Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 9 Projected Background 2025 AM 5: Croydon & Richmond 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 5: Croydon & Richmond

Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 10 Projected Background 2025 AM 6: Assaly & Richmond 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 7 628 15 25 387 18 25 6 33 67 2 25 Future Volume (vph) 7 628 15 25 387 18 25 6 33 67 2 25 Adj. Flow (vph) 8 698 17 28 430 20 28 7 37 74 2 28 Lane Group Flow (vph) 8 715 0 28 450 0 0 35 37 0 104 0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 2684 Permitted Phases 2 6 8 8 4 Detector Phase 2 2 6 6 88844 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 30.3 30.3 30.3 30.3 33.3 33.3 33.3 33.3 33.3 Total Split (s) 37.0 37.0 37.0 37.0 33.0 33.0 33.0 33.0 33.0 Total Split (%) 52.9% 52.9% 52.9% 52.9% 47.1% 47.1% 47.1% 47.1% 47.1% Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 All-Red Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max Max Max Max Max Max Act Effct Green (s) 30.7 30.7 30.7 30.7 26.7 26.7 26.7 Actuated g/C Ratio 0.44 0.44 0.44 0.44 0.38 0.38 0.38 v/c Ratio 0.03 0.92 0.25 0.58 0.07 0.06 0.20 Control Delay 6.7 34.7 19.8 18.3 14.3 3.6 12.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 6.7 34.7 19.8 18.3 14.3 3.6 12.1 LOS AC BB BA B Approach Delay 34.4 18.4 8.8 12.1 Approach LOS C B A B Queue Length 50th (m) 0.7 95.7 2.2 42.0 2.8 0.0 6.4 Queue Length 95th (m) m0.5 #157.4 8.4 68.2 8.0 3.8 15.8 Internal Link Dist (m) 111.6 60.1 44.8 81.9 Turn Bay Length (m) 215.0 45.0 18.0 Base Capacity (vph) 303 780 110 778 538 591 528 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.03 0.92 0.25 0.58 0.07 0.06 0.20 Intersection Summary Cycle Length: 70 Actuated Cycle Length: 70 Offset: 1 (1%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 25.8 Intersection LOS: C Intersection Capacity Utilization 96.6% ICU Level of Service F Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 11 Projected Background 2025 AM 6: Assaly & Richmond 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 6: Assaly & Richmond

Lincoln Fields Mall 12/18/2018 Projected Background 2025 AM Synchro 10 Report Page 12 Projected Background 2025 PM 1: Connaught/Access #1 & Carling 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 62 1379 0 0 2227 49 0 0 32 55 0 55 Future Volume (vph) 62 1379 0 0 2227 49 0 0 32 55 0 55 Adj. Flow (vph) 69 1532 0 0 2474 54 0 0 36 61 0 61 Lane Group Flow (vph) 69 1532 0 0 2474 54 0 0 36 61 0 61 Turn Type Prot NA NA Perm Perm Perm Perm Protected Phases 5 2 6 Permitted Phases 6 8 4 4 Detector Phase 5 2 6 6 8 4 4 Switch Phase Minimum Initial (s) 5.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 11.0 23.6 25.1 25.1 40.1 40.1 40.1 Total Split (s) 14.0 89.0 75.0 75.0 41.0 41.0 41.0 Total Split (%) 10.8% 68.5% 57.7% 57.7% 31.5% 31.5% 31.5% Yellow Time (s) 3.7 3.7 3.7 3.7 3.0 3.0 3.0 All-Red Time (s) 2.3 1.9 1.9 1.9 4.1 4.1 4.1 Lost Time Adjust (s) -2.0 -1.6 -1.6 -1.6 -3.1 -3.1 -3.1 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None C-Max C-Max C-Max None None None Act Effct Green (s) 10.7 103.9 91.6 91.6 22.3 22.3 22.3 Actuated g/C Ratio 0.08 0.80 0.70 0.70 0.17 0.17 0.17 v/c Ratio 0.49 0.39 0.72 0.06 0.11 0.21 0.20 Control Delay 82.9 4.0 18.5 1.1 1.5 44.2 7.5 Queue Delay 0.0 0.1 0.1 0.0 0.0 0.0 0.0 Total Delay 82.9 4.1 18.6 1.1 1.5 44.2 7.5 LOS F A B A A D A Approach Delay 7.5 18.2 1.5 25.8 Approach LOS A B A C Queue Length 50th (m) 18.0 18.8 123.6 0.0 0.0 14.8 0.0 Queue Length 95th (m) 32.0 31.6 231.4 2.4 1.3 23.2 8.4 Internal Link Dist (m) 51.5 125.1 209.4 82.4 Turn Bay Length (m) Base Capacity (vph) 144 3893 3433 940 477 473 467 Starvation Cap Reductn 0 795 0 0 0 0 0 Spillback Cap Reductn 0 0 117 0 0 0 1 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.48 0.49 0.75 0.06 0.08 0.13 0.13 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 19 (15%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay: 14.3 Intersection LOS: B Intersection Capacity Utilization 69.7% ICU Level of Service C Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2025 PM Synchro 10 Report Page 1 Projected Background 2025 PM 1: Connaught/Access #1 & Carling 12/18/2018 Splits and Phases: 1: Connaught/Access #1 & Carling

Lincoln Fields Mall 12/18/2018 Projected Background 2025 PM Synchro 10 Report Page 2 Projected Background 2025 PM 2: Croydon & Access #2 12/18/2018

Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 47 47 176 33 32 176 Future Volume (Veh/h) 47 47 176 33 32 176 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 52 52 196 37 36 196 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 180 80 pX, platoon unblocked vC, conflicting volume 482 214 233 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 482 214 233 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 90 94 97 cM capacity (veh/h) 528 825 1335 Direction, Lane # WB 1 NB 1 SB 1 Volume Total 104 233 232 Volume Left 52 0 36 Volume Right 52 37 0 cSH 644 1700 1335 Volume to Capacity 0.16 0.14 0.03 Queue Length 95th (m) 4.4 0.0 0.6 Control Delay (s) 11.7 0.0 1.4 Lane LOS B A Approach Delay (s) 11.7 0.0 1.4 Approach LOS B Intersection Summary Average Delay 2.7 Intersection Capacity Utilization 39.3% ICU Level of Service A Analysis Period (min) 15

Lincoln Fields Mall 12/18/2018 Projected Background 2025 PM Synchro 10 Report Page 4 Projected Background 2025 PM 3: Access #3 & Richmond 12/18/2018

Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 508 49 0 917 0 32 Future Volume (Veh/h) 508 49 0 917 0 32 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 564 54 0 1019 0 36 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 183 136 pX, platoon unblocked 0.82 0.69 0.82 vC, conflicting volume 564 1610 591 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 365 1087 398 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 93 cM capacity (veh/h) 984 164 537 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 618 1019 36 Volume Left 0 0 0 Volume Right 54 0 36 cSH 1700 1700 537 Volume to Capacity 0.36 0.60 0.07 Queue Length 95th (m) 0.0 0.0 1.6 Control Delay (s) 0.0 0.0 12.2 Lane LOS B Approach Delay (s) 0.0 0.0 12.2 Approach LOS B Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 54.3% ICU Level of Service A Analysis Period (min) 15

Lincoln Fields Mall 12/18/2018 Projected Background 2025 PM Synchro 10 Report Page 6 Projected Background 2025 PM 4: Carling & Croydon 12/18/2018

Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 81 1272 2180 128 147 97 Future Volume (vph) 81 1272 2180 128 147 97 Adj. Flow (vph) 90 1413 2422 142 163 108 Lane Group Flow (vph) 90 1413 2564 0 271 0 Turn Type Prot NA NA Prot Protected Phases 5 2 6 4 Permitted Phases Detector Phase 5 2 6 4 Switch Phase Minimum Initial (s) 5.0 10.0 10.0 10.0 Minimum Split (s) 10.4 15.4 30.4 32.7 Total Split (s) 14.0 97.0 83.0 33.0 Total Split (%) 10.8% 74.6% 63.8% 25.4% Yellow Time (s) 3.7 3.7 3.7 3.3 All-Red Time (s) 1.7 1.7 1.7 3.4 Lost Time Adjust (s) -1.4 -1.4 -1.4 -2.7 Total Lost Time (s) 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Recall Mode None C-Max C-Max None Act Effct Green (s) 11.2 102.3 87.1 19.7 Actuated g/C Ratio 0.09 0.79 0.67 0.15 v/c Ratio 0.62 0.37 0.80 0.48 Control Delay 75.9 5.1 6.0 31.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 75.9 5.1 6.0 31.5 LOS E A A C Approach Delay 9.4 6.0 31.5 Approach LOS A A C Queue Length 50th (m) 22.1 26.4 3.8 20.4 Queue Length 95th (m) #46.8 54.7 7.7 30.4 Internal Link Dist (m) 356.3 23.1 156.3 Turn Bay Length (m) 65.0 28.0 Base Capacity (vph) 147 3833 3221 776 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 14 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.61 0.37 0.80 0.35 Intersection Summary Cycle Length: 130 Actuated Cycle Length: 130 Offset: 18 (14%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 8.8 Intersection LOS: A Intersection Capacity Utilization 77.7% ICU Level of Service D Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2025 PM Synchro 10 Report Page 7 Projected Background 2025 PM 4: Carling & Croydon 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 4: Carling & Croydon

Lincoln Fields Mall 12/18/2018 Projected Background 2025 PM Synchro 10 Report Page 8 Projected Background 2025 PM 5: Croydon & Richmond 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 23 488 115 54 838 16 134 89 33 13 56 18 Future Volume (vph) 23 488 115 54 838 16 134 89 33 13 56 18 Adj. Flow (vph) 26 542 128 60 931 18 149 99 37 14 62 20 Lane Group Flow (vph) 26 670 0 60 949 0 149 136 0 0 96 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 2684 Permitted Phases 2684 Detector Phase 2 2 6 6 8 8 4 4 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 27.1 27.1 27.1 27.1 31.8 31.8 31.8 31.8 Total Split (s) 54.0 54.0 54.0 54.0 31.0 31.0 31.0 31.0 Total Split (%) 63.5% 63.5% 63.5% 63.5% 36.5% 36.5% 36.5% 36.5% Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 All-Red Time (s) 3.1 3.1 3.1 3.1 2.8 2.8 2.8 2.8 Lost Time Adjust (s) -2.4 -2.4 -2.4 -2.4 -2.1 -2.1 -2.1 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max None None None None Act Effct Green (s) 57.3 57.3 57.3 57.3 19.7 19.7 19.7 Actuated g/C Ratio 0.67 0.67 0.67 0.67 0.23 0.23 0.23 v/c Ratio 0.13 0.58 0.16 0.79 0.54 0.35 0.25 Control Delay 9.1 11.1 7.0 13.3 34.6 28.1 21.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.1 11.1 7.0 13.3 34.6 28.1 21.6 LOS AB AB CC C Approach Delay 11.0 12.9 31.5 21.6 Approach LOS B B C C Queue Length 50th (m) 1.2 43.8 2.2 34.8 22.1 19.2 10.9 Queue Length 95th (m) 5.9 100.7 m4.9 #209.8 35.1 30.0 20.2 Internal Link Dist (m) 381.9 159.1 55.9 132.6 Turn Bay Length (m) 55.0 45.0 40.0 Base Capacity (vph) 202 1158 381 1197 377 526 521 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.13 0.58 0.16 0.79 0.40 0.26 0.18 Intersection Summary Cycle Length: 85 Actuated Cycle Length: 85 Offset: 71 (84%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 15.2 Intersection LOS: B Intersection Capacity Utilization 74.2% ICU Level of Service D Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2025 PM Synchro 10 Report Page 9 Projected Background 2025 PM 5: Croydon & Richmond 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 5: Croydon & Richmond

Lincoln Fields Mall 12/18/2018 Projected Background 2025 PM Synchro 10 Report Page 10 Projected Background 2025 PM 6: Assaly & Richmond 12/18/2018

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 16 496 24 54 854 48 21 13 45 39 2 30 Future Volume (vph) 16 496 24 54 854 48 21 13 45 39 2 30 Adj. Flow (vph) 18 551 27 60 949 53 23 14 50 43 2 33 Lane Group Flow (vph) 18 578 0 60 1002 0 0 37 50 0 78 0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 2684 Permitted Phases 2 6 8 8 4 Detector Phase 2 2 6 6 88844 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 30.3 30.3 30.3 30.3 33.3 33.3 33.3 33.3 33.3 Total Split (s) 52.0 52.0 52.0 52.0 33.0 33.0 33.0 33.0 33.0 Total Split (%) 61.2% 61.2% 61.2% 61.2% 38.8% 38.8% 38.8% 38.8% 38.8% Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 All-Red Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead-Lag Optimize? Recall Mode C-Max C-Max C-Max C-Max None None None None None Act Effct Green (s) 65.4 65.4 65.4 65.4 15.6 15.6 15.6 Actuated g/C Ratio 0.77 0.77 0.77 0.77 0.18 0.18 0.18 v/c Ratio 0.07 0.42 0.11 0.74 0.14 0.16 0.29 Control Delay 9.3 8.5 6.0 13.9 27.6 8.5 20.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.3 8.5 6.0 13.9 27.6 8.5 20.1 LOS AA AB CA C Approach Delay 8.5 13.4 16.6 20.1 Approach LOS A B B C Queue Length 50th (m) 0.6 23.0 2.0 69.7 5.4 0.0 6.6 Queue Length 95th (m) m3.4 82.5 10.3 #243.4 10.4 7.0 14.3 Internal Link Dist (m) 111.6 60.1 44.8 81.9 Turn Bay Length (m) 215.0 45.0 18.0 Base Capacity (vph) 262 1361 548 1360 499 523 477 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.07 0.42 0.11 0.74 0.07 0.10 0.16 Intersection Summary Cycle Length: 85 Actuated Cycle Length: 85 Offset: 64 (75%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 12.3 Intersection LOS: B Intersection Capacity Utilization 72.2% ICU Level of Service C Analysis Period (min) 15 Lincoln Fields Mall 12/18/2018 Projected Background 2025 PM Synchro 10 Report Page 11 Projected Background 2025 PM 6: Assaly & Richmond 12/18/2018 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 6: Assaly & Richmond