COMMERCIAL SPACE Developments Sky Gardens Manchester , St George s Gardens No1 Castlefield Transition Keeps Growing Contacts

Connectivity is everything and as the Manchester was voted the “Most UK’s third largest Airport, Manchester Liveable City in the UK” ( The Airport connects with over 200 cities. Economist Unit, 2019) It has over 60 trains travel from Manchester 100,000 students attending its four to London every day, plus strong Universities. It is home to over 2000 motorway connections with Liverpool, foreign owned companies making Birmingham, Leeds and the rest of the it the most invested city outside U.K ensure Manchester continues to London in the past decade. be a key connection in the North West.

Manchester Metro link is a tram / rail system that has seven lines and connects the City centre to Manchester Manchester was Airport, , Ashton-under- voted the Most Lyne, Bury, East , Eccles, Media City and . The trams Liveable City in have free superfast WI-FI and helps the UK in 2019 reduce traffic from the road network. Manchester even has its own free Metroshuttle connecting main train stations and the city centre.

Page 2 OVER 300,000 PEOPLE WORK IN THE CITY CENTRE Manchester Developments Sky Gardens , St George s Gardens No1 Castlefield Transition Contacts 2.8 MILLION Manchester’s population is 2.8 million and this is projected to rise by 17.6% from 2019 to 2030* 62.8 BILLION The 10 metropolitan boroughs of ** make up the largest city region economy outside London with a gross value added (GVA) of £62.8 billion 8.4 BILLION The visitor economy added an additional £8.4 billion to the Greater Manchester economy in 2017 with £904 million coming from Conference and Business Events in 2018 23,590 In 2017 there were 23,590 new businesses created in Greater Manchester

*source Manchester Council Page 4 **Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan Manchester Developments Sky Gardens Our , St George s Gardens No1 Castlefield Transition Developments Contacts

, DeTrafford s developments in Castlefield have over 1500 apartments, duplexes, triplexes and townhouses which will be completed over the next 1-4 years.

We are creating communities who No1 Castlefield which is just 4 minutes can enjoy their homes and the local from Cornbrook Tram Stop and amenities. adjacent to the will add a further 419 one, two, three The award winning Roof Gardens has bed apartments, townhouses and 71 apartments & town houses and this penthouses. will be followed by Sky Gardens, City Gardens and St George’s Gardens Transition which is just 10 minutes walk which will add an additional 413, from Castlefield will add an additional one, two and three bed apartments. 399 homes. Following this Gallery Gardens and Courtyard Gardens will complete the DeTrafford masterplan with residents having access to each development’s roof top garden space. Page 5 OUR COMMERCIAL SPACE IS KEY TO OUR COMMUNITIES Manchester Developments Sky Gardens Our , St George s Gardens No1 Castlefield Transition Belief Contacts

We focus on putting the community at the heart of our develop ments.

We create and build beautifully designed, sustainable communities who communicate and interact together.

Our commercial space is key to our communities. We want to partner with independent retailers that can offer our residents something different and bring back the ‘local feeling’ to our neighbourhoods.

Page 7 Roof Gardens

St George’s Gardens

City Gardens

Gallery Gardens

Sky Gardens

Gallery Gardens Page 9 Manchester Developments Sky Sky Gardens , St George s Gardens No1 Castlefield Gardens Transition Contacts

Sky Gardens is Phase 2 in our Castlefield masterplan. This 13 storey development will have 166 homes, comprising of 6 one bed and 7 two bed standard apartments, 48 one 166 HOMES bed and 88 two bed duplex apartments and 13 triplex apartments. There is a rooftop garden, residents lounge, basement parking and concierge services.

The scheme is adjacent to Road and Spinners 8 MIN WALK Way, an 8 minute walk to Cornbrook Metro Station and TO METRO 10 minute walk to Train Station and Metro Stop. 10 MIN WALK TO TRAIN Due for Manchester Planning Developments completion Sky Gardens , Approved Uses Q3 2020 St George s Gardens No1 Castlefield Transition A1 Contacts Shops & Retail

A2 Financial & Professional Services A3 Food & Drink A4 Drinking Establishments B1 Offices, Research & Development

Page 11 Manchester Developments Sky Gardens Sky Gardens , St George s Gardens No1 Castlefield Unit 1 Transition Contacts

Size OPENS ONTO OUTDOOR 4,219 SQ FT TERRACE 391 SQ M AREA

Description

⇾ Floor to ceiling glass fronted ground floor unit with access from Chester Road and Spinners Way giving dual aspect

⇾ Opens out on to outdoor terrace on Spinners Way side

⇾ The unit faces on to a public square

⇾ Option to split the unit into 2 or 3 smaller units each with access to both sides of the building Manchester Developments Sky Gardens Sky Gardens , St George s Gardens No1 Castlefield Unit 1 Transition Contacts

A B C

A212_P_44 A212_P_44 A212_P_44

EXIT FFL + 29.900

07

06 01 EB EB EB EB EB EB EB EB EB EB

05 02 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 04 03 SUBSTATION 04 FFL +30.000 05

06

07 EB EB EB EB EB EB EB EB EB EB 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L

REFUSE STORE: RECYCLING STORE: 15No. 1100LTR EUROBINS 8No. 1100LTR EUROBINS

1100L EB 1100L EB 1100L EB

PLANT ROOM 1

POST

DURAVIT VERO #070445 #220209 3 STARK DURAVIT

DIS. WC A B GROUND FLOOR LEVEL FFL + 31.080 RESIDENTIAL RECEPTION LOBBY CLOAKS BANK BANK

LANDLORD SERVICE RISER

DEVELOPMENT

SPACES SPACES PLANT ROOM 2 . . MANAGEMENT OFFICE PARKING PARKING

800kg

52No 52No 10 PERSON BICYCLE BICYCLE

800kg 10 PERSON RETAIL/COMMERCIAL RETAIL/COMMERCIAL

UNIT C1-A DRY SERVICE UNIT C1-B RISER

A B C

A212_P_44 A212_P_44 A212_P_44

IMPORTANT NOTES: CLIENT: DETRAFFORD ESTATES

PROJECT: SITE C, CHURCH GATE MASTERPLAN N

ADDRESS: CASTLEFIELD, MANCHESTER, M15 4LN OLLIER SMURTHWAITE ARCHITECTS DRAWING TITLE:BLOCK C1 PROPOSED GROUND FLOOR PLAN 106 Albert Mill, 10 Hall Road, Manchester, M15 4LY SCALE: 1:100@A1 DATE: JANUARY 2014 T 0161 883 0838 F 0161 883 0839 REVISION DATE DESCRIPTION DRAWING NO: A212_P_17H E [email protected] Manchester Developments Sky Gardens Sky Gardens , St George s Gardens No1 Castlefield Unit 2 Transition Contacts

Size FLOOR 3,024 SQ FT TO CEILING 281 SQ M GLASS

Description

⇾ Floor to ceiling glass fronted ground floor unit

⇾ Direct access from Chester Road Manchester Developments Sky Gardens Sky Gardens , St George s Gardens No1 Castlefield Unit 2 Transition Contacts

A B C

A212_P_44 A212_P_44 A212_P_44

EXIT FFL + 29.900

07

06 01 EB EB EB EB EB EB EB EB EB EB

05 02 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 04 03 SUBSTATION 04 FFL +30.000 05

06

07 EB EB EB EB EB EB EB EB EB EB 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L 1100L

REFUSE STORE: RECYCLING STORE: 15No. 1100LTR EUROBINS 8No. 1100LTR EUROBINS

1100L EB 1100L EB 1100L EB

PLANT ROOM 1

POST

DURAVIT VERO #070445 #220209 3 STARK DURAVIT

DIS. WC A B GROUND FLOOR LEVEL FFL + 31.080 RESIDENTIAL RECEPTION LOBBY CLOAKS BANK BANK

LANDLORD SERVICE RISER

DEVELOPMENT

SPACES SPACES PLANT ROOM 2 . . MANAGEMENT OFFICE PARKING PARKING

800kg

52No 52No 10 PERSON BICYCLE BICYCLE

800kg 10 PERSON RETAIL/COMMERCIAL RETAIL/COMMERCIAL

UNIT C1-A DRY SERVICE UNIT C1-B RISER

A B C

A212_P_44 A212_P_44 A212_P_44

IMPORTANT NOTES: CLIENT: DETRAFFORD ESTATES

PROJECT: SITE C, CHURCH GATE MASTERPLAN N

ADDRESS: CASTLEFIELD, MANCHESTER, M15 4LN OLLIER SMURTHWAITE ARCHITECTS DRAWING TITLE:BLOCK C1 PROPOSED GROUND FLOOR PLAN 106 Albert Mill, 10 Hulme Hall Road, Manchester, M15 4LY SCALE: 1:100@A1 DATE: JANUARY 2014 T 0161 883 0838 F 0161 883 0839 REVISION DATE DESCRIPTION DRAWING NO: A212_P_17H E [email protected]

, Manchester Developments St George s Sky Gardens , St George s Gardens No1 Castlefield Gardens Transition Contacts

, This unique location for St George s Gardens overlooks the Grade II listed church offering the 138 homes a magnificent setting. There are 46 one bed and 91 two 138 HOMES bed apartments, over 11 floors all with access to a , rooftop garden area. St George s Gardens is Phase 4 in our Castlefield masterplan.

The scheme is adjacent to Chester Road, an 8 minute 8 MIN WALK walk to Cornbrook tram stop and a 10 minute walk to TO METRO Deansgate Train Station and Metro Stop. 10 MIN WALK TO TRAIN Manchester Planning Developments Sky Gardens , Approved Uses St George s Gardens No1 Castlefield Transition A1 Contacts Shops & Retail

A2 Financial & Professional Services A3 Food & Drink A4 Drinking Establishments B1 Offices, Research & Development

Due for completion Q2 2020 , Manchester Developments St George s Gardens Sky Gardens , St George s Gardens No1 Castlefield Unit 1 Transition Contacts

Size 908 SQ FT 84 SQ M

Description

⇾ Glass fronted, ground floor unit with access from Chester Road and Spinners Way

⇾ Outdoor seating area overlooking St George’s Church

⇾ Opportunity to combine with access to the Roof Garden & Bar for private functions OUTDOOR ⇾ Proposed roof top chapel SEATING AREA Manchester Developments No1 Sky Gardens , St George s Gardens No1 Castlefield Castlefield Transition Contacts

This highly accessible development offers 419 homes including 139 one bed, 245 two bed and 35 three bed apartments including some roof top houses. Residents 419 HOMES will have access to a rooftop garden and concierge facilities.

No1 Castlefield is a 4 minute walk to the busy Cornbrook Metro stop giving easy access to the City 4 MIN WALK Centre or outwards to Media City, Sale, Altrincham and TO METRO . The scheme is also a 15 minute walk to Deansgate high street and is adjacent to and gives direct access to Bridgewater Canal. 15 MIN WALK TO TRAIN Due for Manchester Developments completion Sky Gardens , Q4 2023 St George s Gardens No1 Castlefield Transition Contacts

Planning Approved Uses

A1 Shops & Retail

A2 Financial & Professional Services A3 Food & Drink A4 Drinking Establishments B1 Offices, Research & Development D2 Assembly & Leisure Manchester Developments No1 Castlefield Sky Gardens , St George s Gardens No1 Castlefield Building A - Vantage Transition Contacts

UNIT 1 UNIT 2

Size Size 2,336 SQ FT 2,756 SQ FT 217 SQ M 256 SQ M

Description Description

⇾ Glass fronted ground ⇾ Glass fronted ground floor unit floor unit

⇾ Fronts on to Trentham ⇾ Opens out to building Street interior

⇾ Has direct links to the Bridgewater canal tow path Manchester Developments No1 Castlefield Sky Gardens , St George s Gardens No1 Castlefield Building B - Interchange Transition Contacts

UNIT 3 UNIT 4

Size Size 4,101 SQ FT 3,961 SQ FT 381 SQ M 368 SQ M

Description Description

⇾ Glass fronted ground ⇾ Glass fronted ground floor unit floor unit

⇾ Fronts on to Trentham ⇾ Fronts on to Trentham Street Street Manchester Developments No1 Castlefield Sky Gardens , St George s Gardens No1 Castlefield Building C - Nexus Transition Contacts

UNIT 5 UNIT 6 UNIT 7

Size Size Size 3,531 SQ FT 3,154 SQ FT 2,304 SQ FT 328 SQ M 293 SQ M 214 SQ M

Description Description Description

⇾ Glass fronted ground ⇾ Glass fronted ground ⇾ Glass fronted ground floor unit floor unit. floor unit.

⇾ Fronts on to Ellesmere ⇾ Fronts on to Ellesmere ⇾ Fronts on to Ellesmere Street Street Street

⇾ Prominent frontage facing Chester Road Page 25 Manchester Developments Transition Sky Gardens , St George s Gardens No1 Castlefield Transition Contacts

Transition is a development of three towers with 32, 26 and 18 floors offering a total of 399 homes. These include 132 one bed, 240 two bed and 14 three bed apartments. 399 HOMES In addition there are 13 townhouses creating a local neighbourhood look and feel at street level. Designed , by award winning Simpson Hough Architects. Transition s 3 buildings are part of the 21 individual buildings within 5 the Great Jackson Street Development Framework giving in MIN WALK TO METRO excess of 6000 homes. TRAIN

Transition is a 10 minute walk from Deansgate high street and a 5 minute walk to Deansgate Station and Metro Stop. 10 FROM HIGH STREET Transition

⇾ There is a high density of ] residential developments in the area making this an ideal location for commercial usage

⇾ The scheme offers 5 commercial units split between the three towers fronting Owen Street and Great Jackson Street

⇾ Unit 2 in Building 1 is located on the 4th floor and is ideal for a rooftop restaurant or bar

⇾ There is also planning for 50 one and two bed retirement suites with private amenity space

⇾ Finally, there is an opportunity to purchase private underground parking for commercial units Manchester Planning Developments Sky Gardens , Approved Uses St George s Gardens No1 Castlefield Transition A1 Contacts Shops & Retail

A2 Financial & Professional Services A3 Food & Drink A4 Drinking Establishments B1 Offices, Research & Development D1 Doctors & Dentists D2 Assembly & Leisure

Due for completion 2023

Manchester Developments Transition Sky Gardens , St George s Gardens No1 Castlefield Building 1 Transition Contacts

OVER 55 CLASS RETIREMENT C2 LIVING SUITES UNITS

Size 23,767 SQ FT 2,208 SQ M

Description

⇾ 50 retirement living units (C2 Residential)

⇾ Located between the Ground floor to Third floor

⇾ Opportunity to operate 50 one and two bed luxury suites with amenity space Manchester Developments Transition Sky Gardens , St George s Gardens No1 Castlefield Building 1 Transition Contacts

ACCESS UNIT 1 TO ROOF GARDEN Size 1,506 SQ FT 140 SQ M

Description

⇾ Suitable for fine dining restaurant / bar

⇾ Private access to roof garden with outdoor seating

⇾ Accessible by private lift Manchester Developments Transition Sky Gardens , St George s Gardens No1 Castlefield Building 2 Transition Contacts

UNIT 2 UNIT 3

Size Size 1,307 SQ FT 2,335 SQ FT 122 SQ M 217 SQ M

Description Description

⇾ Suitable for retail / café ⇾ Planning approved for Doctor / Dental surgery ⇾ Double height glass fronted ground floor unit ⇾ Glass fronted two storey unit ⇾ Option to install first floor mezzanine ⇾ Ground floor reception

⇾ Option for outdoor seating area Manchester Developments Transition Sky Gardens , St George s Gardens No1 Castlefield Building 3 Transition Contacts

UNIT 4 UNIT 5

Size Size 3,802 SQ FT 898 SQ FT 353 SQ M 84 SQ M

Description Description

⇾ Double height glass ⇾ Suitable for retail / café fronted ground floor unit ⇾ Double height glass ⇾ Option to install fronted ground floor unit mezzanine first floor ⇾ Option to install first floor ⇾ Small outdoor seating mezzanine area ⇾ Option for outdoor seating area

Manchester Developments Sky Gardens Get , St George s Gardens No1 Castlefield Transition in touch Contacts

For any enquiries and to request more information about our commercial space, please contact

JULIE HALL

E. [email protected] M. 07580 796435

www.detrafford.com

Page 35