Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Name of the members who were present in the meeting are as follows: ­

1. Shri Manoj Kumar Nandi Vice Chairman, SEAC 2. Prof. (Dr.) Siddhartha Dutta Member, SEAC 3. Prof. (Dr.) Jayashree Roy Member, SEAC 4. Prof. Subhash Chandra Santra Member, SEAC 5. Dr. Kalyan Rudra Member, SEAC 6. Shri Somnath Bhattacharyya Member, SEAC 7. Shri Arijit Banerjee Member, SEAC 8. Dr. S. P. Sinha Ray Member, SEAC 9. Shri Sandipan Mukherjee, I.F.S. Secretary, SEAC & Member Secretary, WBPCB

In the beginning of the 70th meeting of SEAC, which was held on 30.08.2012 at 11:00 hrs at the Conference Room, Paribesh Bhawan, Bidhan Nagar, the Secretary, SEAC welcome all the members. After introductory session, three cases were discussed under 'Miscellaneous' section. Eleven cases were placed for reconsideration. Seven applicants were requested to make their presentation before the committee. All the seven applicants appeared before the SEAC for technical presentation on their respective project proposal.

Session I

A. Mi scellaneous Section :­

1. Solid Waste Management for housing projects in non­municipal areas.

As decided in the joint meeting of SEIAA & SEAC, held on 25.07.2012 Prof. A. Majumder, Member SEIAA has prepared a model scheme / guidelines for solid waste management for housing projects in non­municipal areas. Scheme is placed for discussion and consideration in the 70th SEAC meeting held on 30.08.2012. SEAC members discussed the issue and recommended that a concept note in this regard is to be prepared.

2. Proposed Secured Landfill System (SLS) by the Commerce & Industries Department, Government of West Bengal at Mouza – Andulgari, adjacent to Calcutta Leather Complex, Bantala, .

Activity:

This is a proposal for development of Secured Landfill (SLF) System for Calcutta Leather Complex at Bantala. Dewatered sludge generated in the Leather Complex is proposed to be disposed off to this site.

Chronology of the event: Salient features of the proposed project are : i. Location of the Site – Mouza Andulgari, adjacent to Zone 8 in the southern side of CLC, Bantala, West Bengal. ii. Land Area – 20.74 ha / 51.30 acres. iii. Landfill structure – Length : 225m, Width : 200m, Side depth : 6m, Centre depth : 8.5m, Height above existing GL : 6.5m, Volume of excavated soil : 45000 cum

Page 1 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

iv. Water Requirement – shall be met from Calcutta Leather Complex. v. Wastewater – Leachate will be stored in sump and pumped to CETP of the Leather Complex, Domestic sewage will be treated in septic tanks and finally pumped to CETP of the Leather Complex. vi. Plantation – 2520 trees is proposed to be planted in plantation area of 36000 sqm. Landsacping water requirement 326 KLD. vii. Rainwater Harvesting – There is no waterbody within the premises, two water bodies of total volume 30000 cum is proposed to be constructed. viii. Solid Waste – Non­hazardous solid wastes (300 T) generated from construction activities will be reused in the site. ix. Power Requirement – 10 KVA, CLC. Solar Street lighting will be provided. After scrutiny of the application, the SEAC has requested the project proponent through letter dated 20.04.2009 to incorporate the following issues in the project report :­  Waste generation should be re­estimated on basis of actual operation for past six month’s period.  Specific area should be earmarked for the above mentioned activities and shown in a scaled layout map.  RCC retaining walls should be provided to ensure structural stability.  CETP leachate should not be sprinkled for wetting dust.  HDPE liner of thickness 1.5 mm with 1. tensile strength at yield >18 KN/m, 2. tensile strength at break >30 KN/m, 3. Tear Resistance >150N & 4. Puncture Resistance >250N should be used in place of plastic sheet.  Requirements of additional area for carrying out of storage and disposal should be explored.  Measures to be taken for the operation of the landfill during monsoons should be clearly described. The project proponent has not submitted any reply to the SEAC. However , they have requested to resolve the EC issue at an early date. The case was placed for discussion in the 70th SEAC meeting held on 30.08.2012. After scrutinizing the documents submitted by the unit, the committee recommended that 1. Detailed Project Report to be modified for the development of the Hazardous Waste landfill facility based on the CPCB guidelines (Criteria for Hazardous Waste Landfill). 2. Opinion of the Chief Technical Officer, Wetlands Management Authority (EKWMA) regarding the status of the site with respect to East Kolkata Wetland to be obtained. 3. Creation of rain water harvesting pond as proposed should be avoided. It has been decided that the case shall be further considered only after submission of the necessary documents.

Page 2 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

3. Proposed 5 / 7 Star Hotel by M/s. Fabworth Promoters Pvt. Ltd. at 4A, JBS Halden Avenue, Mouza – Bonchtola, Jl. No. – 4, E.M. Bye­Pass, PO & PS – , Kolkata – 700 105, West Bengal.

Activity:

This was a proposal for construction of 5 / 7 Star Hotel having 582 guest rooms (2B+G+20 storied building).

Chronology of the event:

The SEAC has recommended Environmental Clearance in the 23rd SEAC meeting held on 15.09.2008. The project proponent had obtained final Environmental Clearance from the SEIAA, West Bengal on 11.11.2008.

The project proponent has requested the SEIAA, West Bengal on 07.07.2012 for amendment of the Environmental Clearance as the project has been upgraded to gold rated green building. The salient features of the proposed project are as follows :

Configuration as per Revised Configuration submitted Environmental Clearance on 07.07.2012 approved by the SEIAA on 11.11.2008 Land Area : 22711.11 sqm. : 22711.11 sqm. Net Land Area : 22708.23 sqm. : 22708.23 sqm. Expected Hotel : 3784 persons + 300 staffs : 3149 persons + 200 staffs Population Total Water requirement : 838 KLD (Operation stage) : 700 KLD (Operation stage) Fresh Water requirement : 550 KLD (Municipal supply & : 375KLD (Municipal supply) Ground water) Domestic Water : 400 KLD : 255 KLD requirement Make­up Water : 150 KLD : 255 KLD (including HVAC + requirement DG) Domestic Wastewater : 320 KLD (to be treated in STP) : 360 KLD (to be treated in STP) generated Wastewater reused : 288 KLD (after treatment in STP) : 325 KLD (after treatment in STP) Solid waste disposal : 1.05 tonnes per day : 0.880 tonnes per day Total Built­up Area : 73723.45 sqm. : 88924.17 sqm. (including extra area for parking). (including extra area for parking). Ground Coverage : 9017.91 sqm. : 9635.63 sqm. (39.71% of land area) (42.43% of land area) Landscaped Green Area : 12320 sqm. : Exclusive Green Area – 4602 sqm. (20.26% of land area) Page 3 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Configuration as per Revised Configuration submitted Environmental Clearance on 07.07.2012 approved by the SEIAA on 11.11.2008 : Other Green Area – 3911.31 sqm. (17.23% of land area) Water Body : 1240 sqm. : 1102.55 sqm. Parking Area : 11625 sqm. : 26514.62 sqm. No. of Car Parking : 675 nos. : 778 nos. Spaces Boilers : 6 nos. each 600 kg/hr & 4 nos. : 2 nos. each 600000 kcal/hr each 300000 Kcal/hr. Total Power requirement : 6120 KW, WBSEB : 4204 KW, WBSEB Backup Power : 2 nos. DG Sets each 1250 KVA : 2 nos. DG Sets each 2000 KVA & & 3 nos. DG Sets each 1500 KVA 2 nos. DG Sets each 750 KVA

The case was placed for discussion in the 70th SEAC meeting held on 30.08.2012. After scrutinizing the documents submitted by the unit, the committee recommended amendment of Stipulated Condition for Environmental Clearance. The set of environmental conditions are annexed as Annexure 1A.

B. Reconsideration Proposals :­ Eleven reconsideration proposals were placed in the meeting.

Industry Sector :­

1. Proposed expansion of the existing Cement Grinding Unit and installation of CBM based Captive Power Plant by M/s. Birla Corporation Ltd., Unit : Durgapur Cement Works at Jl. No. – 62 & 63, Vill. – Sujara, Near DSP Slag Bank, Durgapur – 713 203, Dist. ­ Burdwan, West Bengal.

Activity:

This is a proposal for expansion of the existing Cement Grinding unit for increasing the manufacturing capacity of Portland Slag Cement from 0.6 to 1.3 Million TPA and installation of CBM based Captive Power Plant (2x6.93 MW i.e. 13.86 MW). The existing plant also produces Portland Pozzolana Cement (1.0 Million TPA). It is noted that clinker will not be manufactured at the site. The manufacturing process will involve grinding of Cement Clinker with Slag / Flyash and Gypsum.

The existing coal fired slag drier shall be removed and Roller Press unit shall be installed. The proposed Roller Press shall have dual function – drying and grinding of slag and shall be dual fuel operated – CBM and Coal. However, Coal shall be used only in case of non­availability of CBM.

Page 4 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Chronology of the event: The SEAC has recommended Environmental Clearance in the 60th SEAC meeting held on 24.11.2011. The project proponent had obtained final Environmental Clearance from the SEIAA, West Bengal on 18.01.2012 and NOC from the WBPCB on 13.04.2012. The project proponent has submitted request for amendment of Environmental Clearance vide Memo No. EN/124/T­II­1/053/2011 dated 18.01.2012 specifying (A) Specific Conditions in Page – 3 as “The stack emission should not exceed 30 mg/Nm3, as proposed”. However, the proponent proposed during the presentation that as per the declared designed outlet dust concentration level for Packer and Cement Silo were stated to be 50 mg/Nm3, as per the Pollution Control Equipment ordering schedule. The name of the Environmental Consultant is M/s. SGS Pvt. Ltd. The case was placed for reconsideration in the 70th SEAC meeting held on 30.08.2012. After scrutinizing the documents submitted by the unit, the committee recommended amendment of Environmental Clearance.

2. Proposed Hosiery Park by M/s. West Bengal Hosiery Park Infrastructure Ltd. at Jl. No. – 2, Mouza – Jagdishpur, PS – , Dist. –

Activity:

This is a proposal for development of a Hosiery Park. The proposed Park will have units involved with weaving, cutting, stitching, finishing and packing of knitwear items. Dyeing and Bleaching activities will not be undertaken. The expected population of the park when fully operational is 10200. The Park is expected to handle approximately 10000 equivalent passenger car units (EPCU) per day.

The Park is proposed to be an Industry Cluster having common infrastructure and support services for the candidate industries. The proposed park shall comprise of the – i. Processing Area – having individual plots for candidate industries as well as built­up Standard Design Factory (SDF, G+3 storied buildings) for smaller units. ii. Non­Processing Area – having Common Infrastructural Faculties including Internal Roads, Common Facilities Building (CFB), Training Centre, Water Supply System, Drainage and Sewerage System, Rain Water Harvesting System, Power Distribution System, Area and Street Lighting, Solid Waste Handling System, Open spaces, Services Area (including Fire Station, Reservoirs, Common STP, DG Sets, etc.). The Park will be managed by the Special Purpose Vehicle (SPV) formed on 17.10.2007 i.e. West Bengal Hosiery Park Infrastructure Ltd. (WBHPIL). All the fully serviced plots and built­up spaces will be leased out. The candidate units will have to abide by the Development Control & Operational Regulations of the Park.

Chronology of the event :

Salient features of the proposed project are –

Land Area : 96.4 acres (390121.16 sqm.)

Expected Population : 10200

Total Water requirement : 150 KLD (Construction stage, Ground water) Page 5 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Total Water requirement : 609 KLD (Operation stage)

Fresh Water requirement : 366 KLD (Operation stage, Ground water)

Wastewater generated : 487.2 KLD (to be treated in STP)

Wastewater recycled : 243 KLD (to be reused after treatment in STP)

Wastewater discharged : 243 KLD (to be discharged to a branch canal of the Howrah Drainage Canal after treatment in STP)

Solid waste disposal : 1.53 tonne per day

Total Built­up Area : Covered area – 25450 sqm. (SDF – 20000 sqm., CFB – 3900 sqm., Training Centre – 1400 sqm., Utility Buildings – 150 sqm.), STP – 309 sqm., Covered area in plots – 287220.91 sqm., Total area – 312979.91 sqm.

Ground Coverage : 50% of land area

Green Area : 78024.23 sqm. (20% of land area)

Paved Area : 46814.54 sqm. (12% of land area)

No. of Parking Spaces : Cars ­ 136 proposed

Truck Parking Area : 2450 sqm.

Power requirement : 5958 KVA, WBSEDCL

Backup Power : DG Sets (2 x 250 KVA)

After carefully considering the presentation in the 35th SEAC meeting held on 28.08.2009, the State Level Expert Appraisal Committee (SEAC) made the following recommendations. Subsequent response dated 27.10.2009 from the unit is given below :­

Recommendations / Directions of the Response of the Proponent 27.10.2009 Committee dated 10.09.2009 1. The project proponent should interact with 1. The proponent has submitted copy of the the local body to ensure a buffer zone in and letter from Jagdishpur GP mentioning that around the estate to avoid any future no residential complex is planned in the complications due to growth of new vicinity. residential area around the estate and the environmental conflicts between the estate and the neighborhood residents due to noise. 2. Concurrence letters should be submitted at 2. The proponent has submitted copy of – an earliest i. The acceptance letter from Howrah District, GW Authority, for ground water abstraction. ii. In­principle Consent from Jagdishpur GP for discharge of treated sewage and excess stormwater to Saheb khal,

Page 6 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Recommendations / Directions of the Response of the Proponent 27.10.2009 Committee dated 10.09.2009 a branch canal to Howrah Drainage canal. iii. In­principle Consent from Jagdishpur GP for disposal of solid waste. 3. Recharging is not permitted for industrial 3. The proponent has mentioned that rain activities in the state of West Bengal. water storage provision of 3720 m3 will be However, the project proponent should made, as proposed in the presentation. The maximize the provision for storage and proponent has also confirmed that reuse of harvested Rainwater to the extent recharging of GW will not be done. possible. 4. The packaging materials and plastic should 4. The proponent has mentioned that be collected separately. The plastic should segregation of solid waste will be done, be sent to designated plastic recycling unit packaging materials and plastic will be handled separately and sent to designated recycling units. 5. The solar lighting should be used as a part 5. The proponent has mentioned that the of peripheral lighting. Use of CFL is not solar lighting will be used for peripheral permitted lighting and CFL will not be used. 6. It is learnt during the presentation that one 6. The proponent has mentioned that Truck truck terminal is also being proposed within Terminal and Fire Station will be located the estate. The total area of the truck in Service Area 2, marked in the layout terminal should be provided. The oil and plan. The area for Truck terminal will be grease traps should be provided at storm 2224 sqm. and O&G trap will be provided water collection pits. at appropriate locations. 7. Adequate road should be provided within 7. The proponent has submitted road network the estate for movement of the vehicles and traffic movement layout. inside the estate.

The response of the project proponent was considered in the 38th SEAC meeting held on 27.11.2009 and the State Level Expert Appraisal Committee (SEAC) made the following recommendations. Subsequent response dated 30.12.2009 from the unit is given below :­ Recommendations / Directions of the Response of the Proponent dated 30.12.2009 Committee dated 07.12.2009 1. Specific concurrence letters from 1. The proponent has submitted copy of – concerned authorities for water supply, i. Permit for sinking new wells. discharge of treated sewage and solid ii. In­principle Consent from Jagdishpur GP waste disposal are still awaited. It should for discharge of treated sewage and be submitted at an earliest. excess stormwater to Saheb khal, a branch canal to Howrah Drainage canal. iii. In­principle Consent from Jagdishpur GP for disposal of solid waste. 2. Recharging is not permitted for industrial 2. The proponent has kept the same rain water activities in the state of West Bengal. storage provision of 3720 m3, as proposed in

Page 7 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Recommendations / Directions of the Response of the Proponent dated 30.12.2009 Committee dated 07.12.2009 However, the proponent should maximize the presentation. The proponent has again the provision for storage and reuse of confirmed that recharging of GW will not be harvested Rainwater to the extent possible. done. 3. Details of the Court cases, if any, pending 3. The proponent has mentioned that they have in any Court of Law against the project as no intimation from any Court of Law in India well as any directions passed by the Court about any litigation against the project and relating to the project directly or indirectly they have not received any direction from should be mentioned. any Court of Law relating to the project. 4. Details of the notices, if any, given to the 4. The proponent has mentioned that they have project under Section 5 of the Environment not received any notice from any Authority (Protection) Act, 1986 and Section 18 of under any Section of the Environment the Air (Prevention & Control of (Protection) Act, 1986 and under any Section Pollution) Act, 1981 should be mentioned. of the Air (Prevention & Control of Pollution) Act, 1981 for the project.

The reply dated 30.12.2009 was placed before the SEAC in the 40th meeting held on 22.01.2010. The committee recommended the following – 1. The project proponent should obtain the necessary permission from the Irrigation Department for discharge of treated sewage and excess stormwater which would finally reach Howrah Drainage Canal. 2. The project proponent should maximize the provision for storage and reuse of harvested rainwater to the extent possible. 3. The project proponent should earmark specific area for disposal of solid waste. The unit is also requested to specify the proposed location for disposal of solid waste from the project. This may be also done in consultation with Jagadishpur Gram Panchayat. 4. The project proponent should submit the status of land availability for the project. Project Proponent has submitted a letter dated 21.08.2012 requesting to grant notional clearance in principle subject to producing clearance from Irrigation Deptt., for purpose of conversion of land. However they have not submitted reply of the SEAC letter issued dated 15.02.2010. The case was placed for reconsideration in the 70th SEAC meeting held on 30.08.2012. After scrutinizing the documents submitted by the unit, the committee recommended that clarification as sought earlier vide Memo No. 84­2N­43/2009(E) dated 15.02.2010 to be submitted for further processing of the application.

It has been decided that the case shall be further considered only after submission of the necessary documents.

Page 8 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Construction Sector

3. Proposed Residential Complex by M/s. NFMA Manufacturers Pvt. Ltd. at 46, Diamond Harbour Road, KMC Ward No. 125, PS – , Kolkata – 700 063. Activity:

This was a proposal for construction of a Commercial Complex (1 block of 2B+G+6 storied building) comprising of 7 Anchor Stores, 150 Shops, Multiplex, Food Court and Restaurant. The proposal was considered in the 12th SEAC meeting held on 13.11.2007 and 14th meeting held on 10.01.2008. The Provisional Environmental Clearance was issued on 29.01.2008 to M/s. Avani Projects and Infrastructure Limited for the proposed Commercial Complex.

Subsequently, M/s. NFMA Manufacturers Pvt. Ltd. submitted vide letter dated 15.06.2009, a modified proposal for a Residential complex having 319 flats and 8 shops (5 blocks of B+G+10 storied buildings and 2 blocks of B+G+9 storied buildings). The proponent also submitted on 06.07.2009 the development agreement between M/s. NFMA Manufacturers Pvt. Ltd. and M/s. Avani Projects and Infrastructure Limited for the proposed project.

Chronology of the event :

The modified proposal was considered in the 33rd SEAC meeting held on 26.06.2009 and 34th SEAC meeting held on 31.07.2009. The Provisional Environmental Clearance for the modified proposal was issued on 19.08.2009 to M/s. NFMA Manufacturers Pvt. Ltd. on cancellation of the earlier Provisional Environmental Clearance issued on 29.01.2008.

The proponent was directed to pay pollution cost of Rs. 2.00 lacs vide letter dated 24.02.2011 of the Department of Environment, Government of West Bengal.

The proponent obtained EC from SEIAA on 29.03.2011.

The proponent has again submitted revised scheme on 07.04.2011. The revised proposal comprises of a Residential complex having 397 flats and 6 shops (5 blocks of B+G+12 storied buildings and 2 blocks of B+G+10 storied buildings).

The SEAC reviewed the letter submitted on 07.04.2011 in the 54th meeting held on 12.05.2011. The SEAC noted that the proponent has repeatedly modified the project proposal and each time asked for fresh Environmental Clearance. The latest revised scheme has been submitted on 07.04.2011 to SEAC, West Bengal. However, the number of car parking spaces was stipulated by SEIAA in the Environmental Clearance dated 29.03.2011 was 578 (as per plan sanctioned by KMC). The number of car parks has been drastically reduced to 386 although the number of flats and the Total Built­up area has increased, no clarification or breakup calculation has been provided for this project.

The proponent has mentioned in the letter dated 14.06.2011 that as per the circular of KMC earlier the project site was falling under C Zone which required 1.5 times car parking. However, the premise is not falling under C zone as per new law.

SEAC issued stipulated conditions for Environment Clearance on 56th meeting held on 15.07.2011.

Page 9 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

The project proponent has submitted sanctioned building plan of KMC along with comparative statement on 09.04.2012 to SEIAA which was subsequently forwarded to SEAC for consideration on 16.05.2012. The Project Proponent also submitted additional information on 02.08.2012.

As per SCEC dated 14.09.2011 As per sanctioned building plan by KMC Land Area : 15833 sqm. : 15833 sqm. Building Profile : 397 flats and 6 shops (5 blocks : 397 flats and 6 shops (5 blocks of of B+G+12 storied buildings and B+G+12 storied buildings and 2 2 blocks of B+G+10 storied blocks of B+G+10 storied buildings) buildings) Expected Population : 1985 (fixed), 150 (floating) : 1985 (fixed), 150 (floating) Total Water requirement : 300 KLD : 300 KLD Fresh Water requirement : 157 KLD (KMC supply) : 157 KLD (KMC supply) Wastewater generated : 240 KLD (to be treated in STP) : 240 KLD (to be treated in STP) Wastewater recycled : 143 KLD (to be reused after : 143 KLD (to be reused after treatment in STP) treatment in STP) Wastewater discharged : 97 KLD (to be discharged to : 97 KLD (to be discharged to KMC KMC sewer line after treatment sewer line after treatment in STP) in STP) Solid waste disposal : 1.023 tonnes/day : 1.023 tonnes/day (to be disposed off by KMC) (to be disposed off by KMC) Total Built­up Area : 56038.67 sqm. : 56038.67 sqm. Proposed Ground : 5764.56 sqm. : 5764.56 sqm. Coverage (36.41% of land area) (36.41% of land area) Landscaped Green Area : 4857.22 sqm. : 4857.22 sqm. (30.68% of land area) (30.68% of land area) Plantation Area : : 3185.53 sqm. (20.12% of land area) Water Body : 1392 sqm. (8.79% of land area) : 1392 sqm. (8.79% of land area) Paved Area : 3819.22 sqm. : 3819.20 sqm. (24.12% of land area) (24.12% of land area) Nos. of Parking spaces : 386 : 386 (covered – 312, Open – 74) proposed No of Trees : : 223– proposed, Solar Lights : : 15 nos. Total Power requirement : 2300 KVA, CESC : 2300 KVA, CESC Backup Power : DG sets (8 x 100 KVA) : DG sets (8 x 100 KVA)

The case was placed for reconsideration in the 70th SEAC meeting held on 30.08.2012. The SEAC considered the submission by the proponent and recommended Environmental Clearance.

Page 10 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

4. Proposed IT Park “ASTRA TOWERS” by M/s. IT Park Ltd. at Plot No. IIC/1, Action Area – II, New Town, Rajarhat, Kolkata, Dist – 24 Parganas (North), West Bengal.

Activity:

This is a proposal for construction of an IT Park alongwith allied facilities (2 blocks of B+G+7 storied buildings, 1 block of B+G+3 storied building having common basement). The project will comprise of IT and General Offices as well as Retail Spaces, Food Court and Hypermarket.

Chronology of the event :

The SEAC stipulated the conditions for Environmental Clearance for the proposed project in the 64th meeting held on 16.02.2012.

Now the unit has submitted the copy of the building plan for the proposed project sanctioned by the NKDA, on 19.07.2012. The modified features of the proposed project are as follows: ­

As per Provisional As per Sanctioned Plan Environmental Clearance submitted on 19.07.2012 dated 09.03.2012 Total Land Area : 16,189 sq.m : 16,189 sq.m

Expected Population : Employee – 3171, : Employee – 3171, Others – 2300 Others – 2300 Total Water requirement : 294 KLD (Operation stage) : 294 KLD (Operation stage) [Domestic – 205 KLD] [Domestic – 205 KLD] Fresh Water requirement : 137 KLD (WBHIDCO Supply) : 137 KLD (WBHIDCO Supply)

Utilization of RWH : 9 KLD : 9 KLD

Wastewater generated : 164 KLD (to be treated in STP) : 164 KLD (to be treated in STP)

Treated waste water from : 148 KLD : 148 KLD STP Wastewater recycled : 148 KLD (to be reused after : 148 KLD (to be reused after treatment in STP) treatment in STP) Wastewater discharged : NIL : NIL

Solid waste disposal : 1.6 TPD (disposed by ) : 1.6 TPD (disposed by )

Total Built­up Area : 54,417.05 sq. m. : 49654.29 sq. m. (including parking) (including parking) Ground Coverage : 6475.00 sq.m : 6455.97 sq.m (40% of land area) (39.88% of land area) Paved Area : 1905.345 sq.m : 1905.345 sq.m (11.76% of land area) (11.89%of land area) Exclusive Tree Plantation : 3237.80 sq.m : 3238.37 sq.m Area (20% of land area) (20% of land area) Page 11 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

As per Provisional As per Sanctioned Plan Environmental Clearance submitted on 19.07.2012 dated 09.03.2012 Soft Area : 4570.855 sq.m : 4570.855 sq.m (28.24% of land area) (28.24% of land area) Total internal Road area : 3423.19 sq.m : 3423.19 sq.m (21.14% of land area) (21.14% of land area) Min. No. of plantation : 230 Nos. : 230 Nos. proposed No. of Parking spaces : 651(Open – 31, Covered – : 651(Open – 31, Covered – 620) proposed 620 ) Min. No. of solar street : 18 nos. solar operated LED : 18 nos. solar operated LED lights lights proposed lights (Total street light: 73 nos.) (Total street light: 73 nos.) Total Power requirement : 3446 KW, NTESCL : 3446 KW, NTESCL

Backup Power : DG Sets (3x1500 KVA, 4x 500 : DG Sets (3x1500 KVA, 1x 500 KVA) KVA) RWH : 1136 kL / annum out of which : 1136 kL / annum out of which 360 kL storage rain water tank 360 kL storage rain water tank

The case was put up for reconsideration in the 70th SEAC meeting held on 30.08.2012. The SEAC considered the submission by the proponent and recommended Environmental Clearance.

5. Proposed Residential Complex "CLUB TOWN GARDEN” by M/s. Leisure Developers Pvt. Ltd. at 12, M.M. Feeder Road, Municipality Ward No. ­ 11, Jl. No. 1, Mouza – Ariadaha Kamarhati, PS – Belghoria, Kolkata ­ 700057, Dist. – 24 Parganas (N).

Activity:

This is a proposal for construction of Residential Complex having 411 flats (18 blocks of G+5 storied buildings and 1 block of G+4 storied building) alongwith Club (single storied).

Chronology of the event : SEAC stipulated the conditions for Environmental Clearance for the proposed project in the 59th meeting held on 20.09.2011. The proponent has submitted on 14.08.2012 the Site Plan approved by Kamarhati Municipality along with the comparative statement for the proposed project. The modified salient features are given below

As mentioned in Provisional As per sanctioned plan by Environmental Clearance Kamarhati Municipality submitted on 14.08.2012 Land Area : 6.165 acres (24949.83 sqm.) : 6.165 acres (24949.83 sqm.),

Page 12 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

As mentioned in Provisional As per sanctioned plan by Environmental Clearance Kamarhati Municipality submitted on 14.08.2012 Land Gifted to : : 67.46 sqm. Municipality Net Land Area : : 24882.373 sqm. Expected Population : 2688 (fixed – 2055, floating – 633) : 2688 (fixed – 2055, floating – 633) Total Water requirement : 437 KLD (Operation stage) : 437 KLD (Operation stage) Fresh Water : 343 KLD (Kamarhati Municipality : 343 KLD (Kamarhati Municipality requirement supply) supply) Wastewater generated : 276 KLD (to be treated in STP) : 276 KLD (to be treated in STP) Wastewater recycled : 94 KLD (to be reused after : 94 KLD (to be reused after treatment in STP) treatment in STP) Wastewater discharged : 182 KLD (to be discharged to : 182 KLD (to be discharged to municipal drain after treatment in municipal drain after treatment in STP) STP) Solid waste disposal : 1.1 tonne per day (to be disposed : 1.1 tonne per day (to be disposed off through local authority) off through Kamarhati Municipality) Total Built­up Area : 56660.69 sqm. (including car : 56687.265 sqm. (including car parking), 48819.33 sqm. (excluding parking), 45658.921 sqm. car parking) (excluding car parking) Ground Coverage : 10073.98 sqm. : 10112.76 sqm. (40.38% of land area) (40.64% of land area) Total Paved Area : 6172.76 sqm. : 6147.43 sqm. (24.74% of land area) (24.64% of land area) Landscaped Green Area : 8703.09 sqm. : 8638.493 sqm. (34.88% of land area) (34.72% of land area) No. of Parking spaces : 373 (Covered ­ 334, Open ­ 39) : 373 (Covered ­ 334, Open ­ 39) proposed Total Power : 2235 KW, CESC : 2235 KW, CESC requirement Backup Power : DG Sets (3 x 250 KVA) : DG Sets (3 x 250 KVA)

The case was placed for reconsideration in the 70th SEAC meeting held on 30.08.2012. The SEAC considered the submission by the proponent and recommended Environmental Clearance.

Page 13 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

6. Proposed “HEALTH CITY” by M/s. Bengal Faith Health Care Pvt. Ltd. at JL No. 41, Mouza – Goda, Dist – Burdwan, West Bengal.

Activity:

This is a proposal for development of Health City. The proposed project shall consist of 500 bedded Multi specialty Hospital, Educational institutions like Medical College (100 seats), Dental College, Paramedical institutions, Super specialty centres, Ancillary health care facilities, Pharma Park, IT based Telemedicine services etc. including residential accommodations and peripheral facilities.

Chronology of the event :

The State Level Expert Appraisal Committee (SEAC) has made the following recommendations during the presentation in the 32nd meeting held on 28.05.2009. Subsequent response from the unit, dated 22.10.2009, is furnished below :­ Recommendations / Directions of the Response of the Proponent Committee 1. To improve upon the proposed 1. The proponent has submitted the list of the infrastructural facilities and provide details proposed healthcare facilities and of the proposed healthcare facilities. infrastructural facilities. 2. To consider modular design of different 2. The proponent has mentioned that modular common facilities like ETP considering design of different common facilities like phased development. ETP will be taken up. 3. To submit the details of air­conditioning 3. The proponent has submitted the details of system and building management system air­conditioning system and building management system. 4. To submit the copy of agreement with BDA 4. The proponent has submitted the copy of agreement with BDA. 5. To submit the corrected water balance 5. The proponent has submitted the corrected diagram. water balance diagram. 6. To submit the area management plan, if any. 6. The proponent has submitted the proposed area management plan. 7. To submit the preparedness for management 7. The proponent has submitted the E­waste and disposal of e­waste. management plan.

The State Level Expert Appraisal Committee (SEAC) stipulated the conditions for Environmental Clearance in the 37th SEAC meeting held on 29.10.2009. The proponent has submitted letters on 16.06.2011 and 07.07.2011 which was placed before the SEAC in the 56th SEAC meeting held on 15.07.2011, mentioning that there is only one existing waterbody in dag no. 1120 and other plot nos. having doba or pukur in the land documents are outside the proposed project. The proponent has submitted sanctioned Master plan with comparative statement. However, detailed area statement is not provided in the Master plan and the proponent has not mentioned the present status of the proposed project.

Page 14 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

The State Level Expert Appraisal Committee (SEAC) has made the following recommendations in the 56th meeting held on 15.07.2011. Subsequent response from the unit, dated 02.09.2011, is furnished below :­

Recommendations / Directions of the Committee Response of the Proponent

1. The proponent has mentioned that construction 1. The proponent has mentioned that work is in progress. The SEAC has directed the construction of one hospital was initiated proponent that no construction work should be i.e. 'Trauma Care & Medical Research undertaken before obtaining Environmental Centre'. However, they have confirmed Clearance from the State Environment Impact that construction work has been stopped Assessment Authority, West Bengal followed by at present. the Consent­to­Establish from the West Bengal Pollution Control Board.

2. The proponent has mentioned that certain Dag 2. The proponent has mentioned that only nos which are classified as Dobas are not one dag no. 1120 (pukur) is falling included in the project area. However, the Dag within the project boundary and the same Nos. are mentioned in the land schedule. The will be retained. Other three dag nos. justification provided is not clear. Please note 990, 1138 and 1139 as earmarked in land that the proponent should obtain prior permission schedule are in their possession but has from concerned authorities (Fisheries been kept outside the project boundaries. Department, L & LR Department) for any Other dag nos. 1118 and 1122 mentioned alteration of the characteristics of the in land schedule as pukurpar and pukur, waterbodies. Authenticated documents and maps respectively has not been mentioned. showing existing waterbodies as per land records However, the proponent has mentioned and proposed alterations should be submitted. that they will maintained all waterbodies in their possession and will not change character without due permission from concerned authority. The proponent has also submitted mouza map with project boundary.

3. The proponent has submitted sanctioned Master 3. The proponent has mentioned that they Plan and comparative statement. However, have submitted revised master plan to detailed area statement and salient features of the BDA for sanctioning. However, the proposed development are not explicitly proponent has not submitted the same mentioned in the Master Plan. Moreover, it has alongwith corresponding comparative been revealed that the proponent has obtained statement. sanctioned Master Plan even before applying for Environmental Clearance to the SEIAA, West Bengal. Hence, revised sanctioned Master Plan should be submitted in a suitable scaled and gridded layout with necessary details.

Page 15 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

The State Level Expert Appraisal Committee (SEAC) reviewed the letter submitted on 02.09.2011 in the 59th meeting held on 20.09.2011. The SEAC noted the following ­

Recommendations / Directions of the Committee Response of the Proponent submitted on 31.10.2011 1. The proponent has mentioned that only one dag no. 1. The proponent has mentioned that dag 1120 (pukur) is falling within the project boundary nos. 1118 and 1122 are part of dag no. and the same will be retained. Other three dag nos. 1120. 990, 1138 and 1139 as earmarked in land schedule are in possession but has been kept outside the pro­ ject boundaries. However, other dag nos. 1118 and 1122 mentioned in land schedule as pukurpar and pukur, respectively has not been mentioned. 2. The proponent has also mentioned that the revised 2. The proponent has mentioned that the master plan has been submitted to BDA for sanc­ revised Master Plan is lying pending tioning. However, the same has not been submitted with BDA. alongwith corresponding comparative statement.

The case was placed before the SEAC in the 61st meeting held on 29.11.2011 and the committee recommended the following :­

Recommendations / Directions of the Response of the Proponent submitted on Committee 19.12.2011 13.07.2012, 19.07.2012 and 27.08.2012 1. Project Proponent has mentioned that Dag 1. Project Proponent has submitted a letter Nos. 1118 (pukurpar) and 1122 (pukurpar) from BDA informing that 1118,1120 & are part of Dag no. 1120 (pukur). The 1122 are situated within the earmarked area project proponent is requested to submit of the project. authenticated supporting documents in this regard. 2. Project Proponent has not yet submitted 2. Master Plan duly approved by CEO, revised Master Plan sanctioned by BDA Burdwan Development Authority has been submitted.

Salient Features of the project: SEAC stipulated the conditions for Environmental Clearance for the proposed project in the 37th meeting held on 29.10.2009. The proponent has submitted on 28.08.2012 the Sanctioned Master Plan by BDA along with the comparative statement for the proposed project. The modified salient features are given below :–

As per Stipulated Conditions As per Sanctioned Master Plan by issued on 25.11.2009 BDA

Land Area : 56.969 acres / 23.0547 ha. : 56.969 acres / 23.0547 ha. (230547.85 sqm.) (230547.85 sqm.)

Expected population : 10820 persons : 10820 persons

Page 16 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Total Water : 300 KLD (Construction stage) : 300 KLD (Construction stage) requirement

Total Water : 2105 KLD (Operation stage) : 2105 KLD (Operation stage) requirement

Fresh Water : 1231 KLD (Ground water & RWH) : 1231 KLD requirement (Ground water & RWH)

Wastewater generated : 936 KLD (to be treated in STP, : 936 KLD (to be treated in STP, partly reused and partly discharged partly reused and partly discharged in in the drain leading to Banka river). the drain leading to Banka river).

Wastewater reused : 874 KLD (to be reused after : 874 KLD (to be reused after treatment in STP) treatment in STP)

Wastewater discharged : 62 KLD (to be discharged after : 62 KLD (to be discharged after treatment in STP) treatment in STP)

Solid waste disposal : 5.2 TPD : 5.2 TPD (to be disposed off through BDA) (to be disposed off through BDA)

Biomedical waste : 1.2 TPD (to be disposed off : 1.2 TPD (to be disposed off through through Sembramky) Sembramky)

Total Built­up Area : 379000 sqm. : 372100 sqm.

Ground Coverage : 54600 sqm. (23.68% of land area) : 60000 sqm. (26.02% of land area)

Landscaped Green : 117556.4 sqm. : 112156.4 sqm. Area (50.99% of land area) (48.65% of land area)

Total Paved Area : 56069.06 sqm. : 56069.06 sqm. (24.32% of land area) (24.32% of land area)

Proposed waterbody : 2305.5 sqm. (1% of land area) : 2305.5 sqm. (1% of land area)

No. of Parking Spaces : Cars – 2081, Bus – 10. : Cars – 2081, Bus – 10. proposed

Total Power : 40 MVA, WBSEBCL : 40 MVA, WBSEBCL requirement

Backup Power : 5 nos. DG Sets each 1000 KVA & : 5 nos. DG Sets each 1000 KVA & 10 nos. DG Sets each 2000 KVA 10 nos. DG Sets each 2000 KVA

The name of the Environmental Consultant is M/s. Consulting Engineering Services (India) Pvt. Ltd. The case is placed for reconsideration. The SEAC considered the submission by the proponent and recommended Environmental Clearance with condition.

Page 17 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

7. Proposed Residential Complex by M/s. Pataka Industries Pvt. Ltd. at Premises No. 18, Convent Road, Borough No. VI, PS – , KMC Ward No. 55, Kolkata – 700 014, West Bengal .

Activity:

This is a proposal for 2 Blocks of B+ G+17 storied Residential Complex.

Chronology of the event :

Salient features of the proposed project are –

Land Area : 1.9404 acres (7852.843 sqm.)

Expected Population : 874 persons

Total Water requirement : 157 KLD (Operation stage)

Fresh Water requirement : 143 KLD (Operation stage, KMC supply)

Wastewater generated : 129 KLD

Wastewater treated : 124 KLD (to be treated in STP)

Wastewater discharged : 110 KLD (to be discharged to KMC sewer)

Waste water recycled : 10 KLD

Rain water harvesting : RWH potential ­1681 KL(surface storage­ 672.4 KL and recharge­ 1008.6 KL), Proposed surface storage – one tank of capacity 77 KL

Solid waste disposal : 630 kg/day

Total Built­up Area : 24043.75 sqm. including basement

Ground Coverage : 1422.221 sqm. (18.11% of land area)

Extended basement : 2743.33 sqm. (34.93% of land area) covered with landscape

Paved Area : 1839.093 sqm. (23.703% of land area)

Exclusive tree plantation : 1578.685sqm. (20.103% of land area) Area

No. of plantation proposed : 150 nos. detail list submitted. Existing – 51 nos.

No. of Solar Street lights : 28 nos. proposed

No. of Parking spaces : 148 Cars (Covered) proposed

Total Power requirement : 1452.96 KVA, CESC Page 18 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Backup Power : DG Sets (2x600 KVA)

CSR : 2 % of total project cost

After carefully considering the presentation in the 68th SEAC meeting held on 14.06.2012, the State Level Expert Appraisal Committee (SEAC) made the following recommendations and the subsequent response from the unit submitted on 07.08.2012 is given below :­

Recommendations / Directions of the Response of the Proponent submitted on Committee issued on 29.06.2012 07.08.2012 1 . Permission for tree cutting from concerned 1. The Project Proponent has submitted authority to be obtained for cutting/felling revised Master Plan retaining all the of trees and compensatory afforestation to existing trees. be undertaken as per norms. Accordingly, However, the overall area of the extended revised tree plantation scheme to be basement, paved area and green area will be submitted. remain same. 2 . Approval from the competent authority for 2. The Project Proponent has mentioned that additional ground coverage as proposed to as per revised proposal it will be only a be obtained and revised area statement to residential project instead of residential and be submitted. commercial project. There is no provision for commercial activities. Previously area allocated for commercial / retail earlier will be used as Banquet hall solely by the residents. The Project Proponent has submitted the copy of resolutions of Municipal Building Committee (MBC) regarding additional ground coverage. 3 . Capacity of rain water storage tank should 3. The Project Proponent has mentioned that be revised considering on peak rainfall of they are increasing storage capacity of the season as discussed during the harvested rain water from 75 KL to 100 KL presentation. and harvested rain water storage tank dimension is 6250 m X 4200 m X 3.8 = 100 cum or 100 KL. 4 . An undertaking to be submitted that 4. The Project Proponent has submitted the unrestricted access to rooftop will not be necessary undertaking. provided for the residents and the same should be documented in the sale agreement. 5 . Revised CSR programme with detailed 5. The Project Proponent has submitted the breakup of activities should be submitted. revised CSR programme is 2% of the total project cost. The total project cost is approx. Rs. 39 crores and thus the CSR is approx. Rs. 78 lacks allocated for 5 years.

Name of the Environmental Consultant is M/s. Voyants Solution Pvt. Ltd. The case was put up for reconsideration in the 70th SEAC meeting held on 30.08.2012. The SEAC considered the

Page 19 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

submission by the proponent and finalised Stipulated Conditions for Environmental Clearance. The set of environmental conditions are annexed as Annexure 1. 8. Proposed Residential housing Complex by M/s. Yours Projects Pvt. Ltd. at Dag No. 2352 & 2353, Khatian No.­12, J.L No.­13, Holding No. 8, Khudiram Bose Sarani, Kolkata – 700 080, Ward No. 21 under Municipality, Dist: North 24 Pgs.

Activity:

This is a proposal for construction of residential housing complex having 223 nos. of flats (3 Blocks of 2B+G+11 storied building.

Salient features of the project are :­

Land Area : Total Land Area: 9376.453 sq.m Net Land Area: 8392.453 sq.m

Expected Population : 1267 persons (during operation)

Total Water requirement : 205 KLD (domestic­171 KLD)

Fresh water requirement : 114 KLD. (municipality supply)

Wastewater generated : 137 KLD (to be treated in STP)

Wastewater treated : 123 KLD.

Wastewater recycled : 85 KLD

Wastewater discharged : 38 KLD to municipality drain

Rain water harvesting : surface storage­120 KL& recharge ­1166 KL/ annum . The Project Proponent will install 2nos. recharge well of capacity­12 KL/day

Solid waste disposal : 0.64 TPD

Total Built­up Area : 36414.328 sq.m (including parking)

Ground Coverage : 2840.00 sq.m (30.29% of land area)

Exclusive tree plantation area : 1900 sq.m (20.26% of land area)

Soft Area other than plantation : 1311.933 sq.m (13.99% of land area )

Total Paved area : 2290.42 sq.m (24.43 % of land area)

Height of the building : 34.80 m

Right of way : 15 m

No. of plantation proposed : 177 nos. (Existing trees­41 nos., Trees to be removed­17 nos., Retained ­24 nos.)

No. of Solar Street lights : 12 nos. proposed

Page 20 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

No. of Parking spaces proposed : 278 nos.(Open – 8 nos., Covered – 270 nos)

Total Power requirement : 1157 KW, CESC

Backup Power : DG Sets ( 2x320 KVA)

Chronology of the event :

After carefully considering the presentation in the 69th SEAC meeting held on 25.07.2012, the State Level Expert Appraisal Committee (SEAC), West Bengal, made the following recommendations and the subsequent response dated 14.08.2012 from the unit is given below :­ Recommendations / Directions of the Response of the Proponent dated 14.08.2012 Committee issued on 10.08.2012 1. Details of the Municipal Solid Waste The proponent has submitted the copy of letter management plan of the concerned issued by the Chairman, Dum Dum Municipality. Municipality mentioning that at present the Municipal Authority dumping garbage at 2. Source of treated surface water to be promode Nagar site under supplied by the concerned Municipality for Municipality and it is Tri­Municipal Project of the proposed project. South Dum Dum Municipality, Burranagar Municipality and Dum Dum Municipality. Supply of treated water is also Tri Municipal Project and the main surface water treatment plant is located under Burranagar Municipality the total programme is under JNNURM scheme.

Name of the Environmental Consultant is M/s. Centre for Sustainable Development. The case was placed for reconsideration in the 70th SEAC meeting held on 30.08.2012. The SEAC considered the submission by the proponent and finalised Stipulated Conditions for Environmental Clearance. The set of environmental conditions are annexed as Annexure 2.

9. Proposed Residential Complex by M/s. Ledo Financial Services Ltd. & 15 Others at JL No. 48, Mouza – Kumrakhali, Holding No. 266, PO & PS – Sonarpur, Municipality Ward No. 27 (previously 25), Kolkata – 700 103, Dist – 24 Parganas (South).

Activity:

This is a proposal for construction of a Residential Complex having 171 flats (2 blocks of B+G+17 storied buildings and 1 block of B+G+15 storied building) alongwith Commercial area comprising of shops, showroom, food court etc.

Chronology of the event :

Salient features of the proposed project are : ­

Land Area : 7824.21 sqm.

Expected Population : 860 (fixed), 386 (others)

Page 21 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Total Water requirement : 153 KLD (Operation stage)

Fresh Water requirement : 136 KLD (Rajpur Sonarpur Municipality supply)

Wastewater generated : 111 KLD (to be treated in STP)

Wastewater reclaimed : 100 KLD (after treatment in STP)

Wastewater recycled : 12 KLD (to be reused after treatment in STP)

Wastewater discharged : 88 KLD (to be discharged to municipal drain after treatment in STP)

Solid waste disposal : 0.55 tonnes per day (to be disposed off through local authority)

Total Built­up Area : 27994.86 sqm.

Ground Coverage : 2339.74 sqm. (29.90% of land area)

Internal Road (Paved) : 1128.25 sqm. (14.42% of land area)

Semi Paved Area (50% paved : 827.97 sqm. (10.58% of land area) portion)

Semi Paved Area (50% soft : 827.97 sqm. (10.58% of land area) portion)

Total Paved Area : 1956.22 sqm. (25% of land area)

Landscaped Green Area : 3528.42 sqm. (45.1% of land area)

Tree Plantation Area : 1800 sqm. (23.00% of land area)

Soft Area (other than Plantation) : 900.28 sqm. (11.52% of land area)

No. of plantation proposed : 120

No. of Parking spaces proposed : 200 (Covered ­ 84, Open ­ 116)

Total Power requirement : 600 KW, WBSEDCL

Backup Power : DG Sets (3x125 KVA)

During presentation in the 59th SEAC meeting held on 20.09.2011, the committee noted that :­ 1. The Municipal Solid Waste Authorisation of the Municipality has expired. 2. The unit has declared that no waterbody exist within the project site. 3. 25% of the external illumination shall be provided by using solar lighting. 4. There is an overlap between the water reservoir and car parking area.

Page 22 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

5. Land documents and Gridded Master Plan was not found although mentioned in Annexure to FORM – I and IA.

Further the committee recommended the following:­

Recommendations / Directions of the Response of the Proponent submitted on Committee issued on 30.09.2011 15.05.2012 1. Land documents and Gridded Master 1. The project proponent has submitted Gridded Plan was not found although mentioned Master Plan and land related documents. in Annexure to FORM – I and IA. 2. The project proponent should obtain 2. The project proponent has submitted the assurance from Municipality which will concurrence letter from Rajpur­Sonarpur ensure supply of arsenic­free water to the Municipality for water supply. proposed project. 3. The recharge in this arsenic prone zone 3. The proponent has mentioned that the RWH should be designed as per the MoEF potential in 1000 sqm. Roof Area is Manual for large construction projects considered to be 768000 litres and storage and provisions of State Ground Water facility to be created from 1000 sqm. Roof Act. Revised Rainwater Harvesting plan Area is 3 lacs litres (for 10 – 15 storied should be submitted. buildings and above). This is 18 storied building and rooftop area is 1500 sqm., thus available rooftop rainwater for storage is 1500 x 300000 / 1000 litres = 450000 litres/annum. 4. The overlapping of car parking area and 4. The project proponent has mentioned that out water reservoir top should be avoided. As of 200 car parking, 84 nos. is covered and rest agreed by the project proponent during 116 nos. is open. They also mentioned that as the meeting, the car parking area should per W.B. Municipal Building Rule 2007 be accommodated within the building. surface car parking can be accorded over the water reservoir, as it will be laid below the G.L. 5. The building footprint should be reduced 5. The project proponent submitted that: to fulfil the following criteria. The land use distribution for the proposed  limiting the paved area within 25% of complex is as follows: land area ; Building Footprint = 2339.74 sq.m (29.90% of  ensuring 20% tree plantation area ; land area), Internal Road (Paved) = 1128.25 and sq.m (14.42% of land area), Semi Paved Area  limiting the total impervious area of (50% Paved Portion) = 827.97 sq.m (10.58% the site within permissible Ground of land area), Semi Paved Area (50% Soft Coverage and Paved Area Portion) = 827.97 sq.m (10.58% of land area), stipulations Tree Plantation Area = 1800 sq.m (23.00% of land area), Soft Area (Other than plantation) = 900.28 sq.m (11.52% of land area) 6. Revised landscape layout with detailed 6. The project proponent has mentioned that 120 lists of plantation should be submitted as no. trees will be planted and also submitted discussed in the meeting. the plantation list and revised landscaped layout. 7. Land conversion certificate, if any, 7. The project proponent has obtained Land should be submitted. conversion Certificate and submitted copies of the same.

Page 23 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Recommendations / Directions of the Response of the Proponent submitted on Committee issued on 30.09.2011 15.05.2012 8. There should not be any overlapping 8. The project proponent has mentioned that the among the STP and car parking area. STP will be laid below the ground level. Thus it has been reviewed that surface car parking can easily be accommodated over the top of STP. The detail of STP has been submitted earlier. 9. Utilisation of fly ash building materials 9. The project proponent has mentioned that the should be submitted as per the MoEF utilisation of fly ash building materials for the latest Notification. proposed project will be according to the MoEF latest Notification. Fly Ash will be utilised in the form of Flyash Bricks, Paver Blocks and Flyash Blended Cement. 10. 25% external illumination by solar 10. The project proponent has submitted that out lighting should be substantiated with of 47 nos. street light, they will provide 12 adequate details on the lighting nos. of solar lighting. arrangement.

The case was put up for reconsideration in the 70th SEAC meeting held on 30.08.2012. The SEAC considered the submission by the proponent and finalised Stipulated Conditions for Environmental Clearance. The set of environmental conditions are annexed as Annexure 3.

10. Proposed Residential Complex by M/s. Merlin Projects Limited at Plot No. 94/6K & 94/7K, G T Road, JL No. 8, Mouza – Kotrang, , Kotrang Municipality, Dist – Hooghly, West Bengal.

Activity:

This is a proposal for construction of a Residential Complex comprising of 9 Blocks G+4 storied buildings having 245 nos. residential flats and 7 Blocks G+4 storied buildings having 166 nos. residential flats.

Chronology of the event :

The case was discussed by the committee in the 64th SEAC meeting held on 16.02.2012, 66th meeting held on 25.04.2012 and 67th meeting held on 21.05.2012. It was decided in the 67th SEAC meeting held on 21.05.2012 that land conversion certificate obtained from concerned authority should be submitted by the Project Proponent. The Project Proponent has submitted to SEAC on 21.06.2012 the copy of land conversion certificate obtained from the office of the ADM and DL&LRO, Hooghly.

Salient features of the proposed project are –

Land Area : 16513.79 sq.m.

Expected Population : 2713

Total Water requirement : 367 KLD (Operation Phase)

Fresh water requirement : 327 KLD (Municipal supply and ground water)

Page 24 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Wastewater generated : 259 KLD

Wastewater recycled : 40 KLD

Wastewater discharged : 219 KLD (To municipal drain after treatment in STP)

Rain water harvesting : Surface storage – 1371 cum, Sub surface recharge – 823 cum 2 nos. storage tanks 50 cum each to be provided. Remaining 2094 cum to recharge through 2 nos. recharge wells, strainer between 70 – 94 mtr. Zone.

Solid waste disposal : 1182 Kg per day

Total Built­up Area : 34369.49 sq.m.

Ground Coverage : 7017.14 sq.m. (42.49% of land area)

Exclusive tree plantation area : 3875.7 sq.m. (23.47% of land area)

Other green area : 307.33 sq.m. (1.86% of land area)

Total Paved area : 4114.34 sq.m. (24.91% of land area)

Semi paved area : 1066.35sq.m. (6.46% of land area)

Service area : 321.88 sq.m. (1.95% of land area)

Road area : 3343.71 sq.m. (20.25% of land area)

Swimming pool : 106.77 sq.m. (0.65% of land area)

No. of plantation proposed : 240.

Open parking area : 474.91 sq.m. (2.88% of land area)

No. of Solar Street lights proposed : 18 nos

No. of Parking spaces proposed : 240

Total Power requirement : 1200 KVA, CESC Ltd.

Backup Power : 2x320 KVA DG set

CSR proposed : Rs. 7 Lacs.

The State Level Expert Appraisal Committee (SEAC) made the following recommendations during the presentation in the 69th SEAC meeting held on 25.07.2012. Subsequent response dated 23.08.2012 from the unit is given below :­

Page 25 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Recommendations / Directions of the Committee dated 10.08.2012 Response of the Proponent dated 23.08.2012

1. The details of municipal solid 1. The proponent has submitted copy of the letter dated waste management plan of the 22.08.2012 from Uttarpara­Kotrung Municipality, which concerned local body including suggests that the Municipality has already developed door to door SWM collection facility with a collection the site for of disposal of such efficiency of more than 90%. They also use 12 nos. wastes should be submitted. Tractor, 5 nos. Power Tiller Trailor, 1 no. Auto Tripper, 1 no. Desilt Car, 1 no. Air Pressure Auto Cleaner, 79 nos. Rickshaw Van, 9 nos. Push Trolly, 2 nos. Hand Cart and the present land area for SWM disposal is 1.83 acres. In this regard they also mentioned that 51 acres of land at Dirghangi in Hooghly District was identified for a common facility project for SWM and , , Konnagar, Uttarpara­Kotrung, and Municipality. The project is under the progress. 2. The depth of recharge well for 2. Total recharging capacity from 1 no. 150 mm diameter rainwater harvesting to be tube well is 52.45 cum/day. Design of recharge structure checked. submitted. Depth of recharge well as shown between 90­100m.

The case was placed for reconsideration in the 70th SEAC meeting held on 30.08.2012. The SEAC considered the submission by the proponent and finalised Stipulated Conditions for Environmental Clearance. The set of environmental conditions are annexed as Annexure 4.

11. Proposed Residential & Commercial Complex by M/s. P.S. Villa Pvt. Ltd. & Others at Holding No. – 4S/08/Block­P & 4S/09/Block­P, Jl. No. – 5 & 6, Mouza – & Mondal Ganti, Rajarhat Gopalpur Municipality Ward No. – 26 & 27, PS – Baguihati, Dist. – 24 Parganas (North), West Bengal.

Activity:

This is a proposal for construction of a Residential and Commercial Complex. The Residential Complex (6 blocks of B+G+9 storied buildings) shall consist of 216 apartments. The Commercial block (1 block of B+G+7 storied building) shall consist of Retail Area, Hotels (with 184 double bedded rooms) and Restaurants.

Chronology of the event :

The State Level Expert Appraisal Committee, West Bengal stipulated the conditions for Environmental Clearance in the 45th SEAC meeting held on 03.08.2010.

The proponent has now applied for Environmental Clearance vide letter dated 11.11.2011 and 16.11.2011. The proponent has also submitted the copy of the building plans provisionally sanctioned by the Chairman, Rajarhat Gopalpur Municipality on 28.09.2011 upto ground floor. However, the area statement in the plan is not clearly legible. The proponent has also mentioned that piling work is being

Page 26 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

carried out at the site. The modified salient features of the proposed project as per the comparative statement submitted by the proponent, are as follows:­

Salient Features As per SCEC dated Post plan sanction by Rajarhat 18.08.2010 Gopalpur Municipality Land Area 13602.69 sqm. 13602.69 sqm. No. of Flat 216 216 No. of Building Block Residential – 6 Residential – 6 Commercial – 1 Commercial – 1 Height of Building Block Residential – B+G+9 storied Residential – B+G+9 storied Commercial – B+G+7 storied Commercial – B+G+7 storied Expected Population 1080 (fixed) 1080 (fixed) 1861 (floating) 1861 (floating) Total Water requirement 451 KLD (operation stage) 451 KLD (operation stage) Fresh Water requirement 289 KLD (Municipal Supply) 289 KLD (Municipal Supply) Domestic Water requirement 285 KLD 285 KLD Wastewater generated 207 KLD 207 KLD Wastewater treated 166 KLD 166 KLD Wastewater recycled 162 KLD 162 KLD Wastewater discharged 4 KLD 4 KLD Wastewater Treatment To be treated in Sewage To be treated in Sewage Treatment Plant Treatment Plant Solid waste disposal 1.2 tonne per day 1.2 tonne per day Total Built­up Area 49606.55 sqm. 50668.43 sqm. Ground Coverage 5650.04 sqm. 6102.50 sqm. (41.5% of land area) (44.86% of land area) Green Area 4552.44 sqm. 4099.98.44 sqm. (33.5% of land area) (30.14% of land area) Paved Area 3400.21 sqm. 3400.21 sqm. (25.0% of land area) (25.0% of land area) No. of Parking Spaces 292 (Covered – 241, Open ­ 51) 302 (Covered – 252, Open – 50) proposed Total Power requirement 1000 KW (WBSEDCL) 1000 KW (WBSEDCL) Back up Power 4 x 250 KVA D.G. Sets 4 x 250 KVA D.G. Sets

Furthers the SEAC has considered the reply submitted on 16.11.2011 in the 61st meeting held on 29.11.2011 and the committee has recommended the following :­

Page 27 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Recommendations / Directions of the Response of the Proponent dated 18.01.2012 Committee dated 19.12.2011 1. The ultimate source of water from which the 1. The unit has submitted a letter from the water will be supplied to the project. office of Rajarhat­Gopalpur Municipality informed that part supply from the Municipality may be availed and rest to be obtained by installing deep tubewell after getting permission from SWID. 2. The capacity of the storm water carrying 2. To be discharged to Municipality drain. drain and its route to final disposal point.

3. As per the submission the municipality is 3. The project proponent has submitted the supposed to collect and finally dispose the letter issued by the Chairman of Rajarhat­ solid waste, the municipality should possess Gopalpur Municipality for the collection a valid Municipal Solid Waste Authorisation and dispose of the solid waste. Certificate. 4. The area statement in the plan submitted is 4. The proponent has submitted the area not legible. The unit is requested to submit a statement ratified by Rajarhat­Gopalpur legible copy of the same. Municipality.

The letter of the project proponent submitted on 17.01.2012 was considered in the 63rd SEAC meeting held on 31.01.2012 and the SEAC has noted that infrastructure facilities to be provided for the proposed project need further introspection. Accordingly a letter was issued on 08.02.2012 and subsequent response dated 15.02.2011 from the unit is given below :­

Recommendations / Directions of the Committee Response of the Proponent dated dated 08.02.2012 15.02.2012 1. Permission form SWID for drawl of ground 1. The unit has submitted concurrence water. letter from the Rajarhat­Gopalpur Municipality regarding part supply of portable water. The proponent also applied to SWID for abstraction of groundwater. 2. As per the submission the concerned 2. To be collected by Rajarhat­Gopalpur municipality will collect and finally dispose the Municipality. solid waste. The municipality should possess a valid Municipal Solid Waste Authorization Certificate. Copy of the same is to be submitted. 3. Sanctioned building plan from the concerned 3. The project proponent has submitted municipality clearly suggests that the building sanctioned building plan. plan is provisionally sanctioned up to Ground floor. The project proponent is required to submit the sanctioned plan for the total project. 4. It has also been observed as per the submission 4. The proponent submitted that they will dated 11.11.2011, piling work has been started. comply with all statutory requirements The unit is therefore directed not to start any of SEAC and WBPCB. construction activity without obtaining Page 28 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Recommendations / Directions of the Committee Response of the Proponent dated dated 08.02.2012 15.02.2012 Environmental Clearance from SEIAA and NOC from the WBPCB.

The reply dated 15.02.2012 of the project proponent was considered in the 65th SEAC meeting held on 20.03.2012 and the committee has recommended that the matter shall be kept pending till the report from MSW committee of WBPCB is received. The Project Proponent has submitted letter on 19.07.2012 to SEAC mentioning that they have obtained permission from SWID for sinking of new tube well of capacity of 20m3/hr with maximum allowable running capacity is 6 hours/day and 15m3/hr with maximum allowable running capacity is 6 hr/day respectively and also an undertaking regarding in­house MSW Management facility and layout plan showing location of the facility. The case was considered in the 69th SEAC meeting held on 25.07.2012. The SEAC recommended the following and the subsequent response of the project proponent submitted on 24.08.2012 are : ­

Recommendations / Directions of Response of the Proponent dated 24.08.2012 the Committee dated 10.08.2012 1. Permission form SWID for drawl 1. The Project Proponent stated that PS Magnum is the of ground water not in favour of developer of the said property on behalf of P S Villa project proponent. Pvt. Ltd. and Others. The Project Proponent also submitted development agreement. 2. Details of the Municipal Solid 2. Regarding Municipal Solid Waste Management Waste Management system of the system of the Rajarhat­Gopalpur Municipality, Project municipality. Proponent submitted a letter from the municipality informing that door to door collection system has been provided by the municipality. The wastes so collected are taking to dumping ground at Dasodron, Power House for segregation of organic and nonorganic waste. After segregation the wastes are taken to permanent dumping ground at Dum Dum Gorui Mathcal under South Dum Dum Municipality which is also used by South Dum Dum Municipality, and New Municipality.

The case was placed for reconsideration in the 70th SEAC meeting held on 30.08.2012. The SEAC considered the submission by the proponent and recommended Environmental Clearance with condition.

Page 29 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Session II C. Technical Presentations: ­

Industry Sector :­

1. Proposed Iron Ore Beneficiation plant of M/s. Onkar Udyog Ltd. at Vill. – Guptamoni, Jl. No. – 638, Mouza – Jamsole, PS – Jhargram, Dist. – Paschim Medinipur, West Bengal. Activity: This is a proposal for installation of an Iron Ore Beneficiation plant (20 TPH) with capacity of 96000 TPA throughout and about 70000 TPA iron ore.

Chronology of the event :

Salient features of the proposed modernisation project are : i. Location of the Site – Vill. – Guptamoni, Jl. No. – 638, Mouza – Jamsole, PS – Jhargram, Dist. – Paschim Medinipur, West Bengal. ii. Land Area – 4 acres, 56 decimals. Green Area – 1.4 acres (36.60% of land area). Total no. of saplings is 1750. iii. Raw Materials – Iron ore fines (90000 TPA). iv. Emission Sources ­ Raw Material Handling Section, Transfer Points, Jaw Crusher (20 TPH), Roller Mill/ Ball Mill (20 TPH), HIM Separator, Belt Conveyor, Screen etc. v. Air Pollution Control System – Bag Filters with stack height of 30m from GL shall be provided for all emission sources. vi. Water Requirement – 246 m3 per day. Groundwater. vii. Wastewater – domestic effluent to be discharged through septic tank to soak pit. Zero effluent discharge. viii. Power Source – 500 KVA, WBSEB. ix. Back up Power – DG Set, 1x125 KVA x. CSR – Rs. 336000.00 xi. RWH Potential – 718.49 m3/year The name of the Environmental Consultant is M/s. Sun Consultancy and Services. The case was put up for reconsideration in the 70th SEAC meeting held on 30.08.2012. After carefully considering the proposal and presentation, the committee recommended that – 1. Contour map of the proposed project site should be submitted. 2. Item wise break up of Corporate Social Responsibility along with financial commitment as discussed during the presentation should be submitted. 3. Treated water quality report which is to be reused in the process should be furnished. It has been decided that the case shall be further considered only after submission of the necessary clarification.

Page 30 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Construction Sector :­

2. Proposed Residential Complex “SANKALPA I” by M/s. West Bengal Infrastructure Development Finance Corporation Ltd. at Prem. No. – 34, MAR (Plot No. – BB/1), Action Area I, New Town, Rajarhat, Kolkata, Dist. – 24 Parganas (North), West Bengal.

Activity:

This is a proposal for construction of a Residential Complex having 255 flats (2 blocks of B+G+15/19 storied buildings, 2 blocks of B+G+20/24 storied buildings and 1 block of B+G+12/14 storied building) alongwith Club (1 block of B+G+2 storied building) and Community block (single storied).

Chronology of the event :

The matter was placed for discussion in the 52nd SEAC meeting held on 04.03.2011. The SEAC re­ commended forwarding the case of violation of Environmental Clearance process to the State Envir­ onmental Impact Assessment Authority for necessary action.

Salient features of the proposed project are –

Land Area : 25457.40 sqm.

Expected Population : 1275 (fixed), 230 (floating)

Total Water requirement : 266 KLD (Operation stage)

Fresh Water requirement : 250 KLD (WBHIDCO supply)

Domestic Water requirement : 218 KLD

Wastewater generated : 158 KLD (to be discharged to WBHIDCO sewer line)

Solid waste disposal : 0.75 tonnes per day (to be disposed off through local authority)

Total Built­up Area : 61287.582 sqm. (including car parking allowance area), 50787.582 sqm. (excluding car parking allowance area)

Ground Coverage : 9629.98 sqm. (36.414% of land area)

Total Paved Area : 6174.35 sqm. (25% of land area)

Open Space Area : 16187.42 sqm. (25% of land area)

Soft Area (Other than plantation) : 5250.0 sqm. (20.62% of land area)

Surface car parking area (Paved : 1162.5 sqm. (4.57% of land area) Area)

Internal Road & Pavement : 5201.85 sqm. (20.43% of land area)

Landscaped Green Area : 9874.93 sqm. (63.586% of land area)

Page 31 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Total No. of plantation proposed : 350/255 ??

No. of Parking spaces proposed : 536 (Covered ­ 350, Open ­ 186)

Total Power requirement : 3885 KW, NTESCL

Backup Power : DG Sets (3x320 KVA)

RWH :

CSR : Rs. 21.12 lakhs (subject to necessary approval of WBHIDCO)

Construction started : Yes

The case was put up for consideration in the 70th SEAC meeting held on 30.08.2012. After carefully considering the proposal and presentation, the committee recommended that – 1. Item wise break up of Corporate Social Responsibility along with financial commitment as discussed during the presentation should be submitted. 2. Revised tree plantation list to be submitted. 3. Clearance from Airport Authority of India regarding height of the proposed project should be submitted. It has been decided that the case shall be further considered only after submission of the necessary cla­ rification.

3. Proposed Residential Complex “SANKALPA III” by M/s. West Bengal Infrastructure Development Finance Corporation Ltd. at Prem. No. – 23, MAR (Plot No. – CA/12 to CA/17), Action Area I, New Town, Rajarhat, Kolkata, Dist. – 24 Parganas (North), West Bengal.

Activity:

This is a proposal for construction of a Residential Complex having 274 flats (2 blocks of B+G+13/15 storied buildings, 1 block of B+G+11/13 storied building, 1 block of B+G+9/11 storied building and 1 block of B+G+15/17 storied building) alongwith Club (1 block of B+G+2 storied building).

Chronology of the event :

The matter was placed for discussion in the 52nd SEAC meeting held on 04.03.2011. The SEAC re­ commended forwarding the case of violation of Environmental Clearance process to the State Envir­ onmental Impact Assessment Authority for necessary action.

Salient features of the proposed project are –

Land Area : 15073 sqm.

Expected Population : 1370 (fixed), 240 (floating)

Total Water requirement : 263 KLD (Operation stage)

Page 32 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Fresh Water requirement : 254 KLD (WBHIDCO supply)

Domestic Water requirement : 233 KLD

Wastewater generated : 170 KLD (to be discharged to WBHIDCO sewer line)

Solid waste disposal : 0.80 tonnes per day (to be disposed off through local authority)

Total Built­up Area : 38765.87 sqm. (including car parking allowance area), 33725.87sqm. (excluding car parking allowance area)

Ground Coverage : 5817.91 sqm. (38.60% of land area)

Proposed Open Space : 9255.09 sqm. (61.40% of land area)

Total Paved Area : 2797.52 sqm. (18.56% of land area)

Landscaped Green Area : 3022.14 sqm. (20.05% of land area)

Soft Area (other than plantation) : 2466.68 sqm. (16.36% of land area)

Total No. of plantation proposed : 210

No. of Parking spaces proposed : 344 (Covered ­189, Open ­155)

Total Power requirement : 3288 KW, NTESCL

Backup Power : DG Sets (2x320 KVA)

RWH :

CSR : Rs. 21.12 lakhs (subject to necessary approval of WBHIDCO)

Construction started : Yes

The case was put up for consideration in the 70th SEAC meeting held on 30.08.2012. After carefully considering the proposal and presentation, the committee recommended that – 1. Item wise break up of Corporate Social Responsibility along with financial commitment as discussed during the presentation should be submitted. 2. Revised tree plantation list to be submitted. 3. Clearance from Airport Authority of India regarding height of the proposed project should be submitted.

It has been decided that the case shall be further considered only after submission of the necessary cla­ rification.

Page 33 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

4. Proposed Residential Complex “Rameswara Waterview” by M/s. Khetawat Towers Pvt. Ltd. at Dag No. – 2, 5, 6 & 10, Jl. No. 31, Mouza – Basina, Rajarhat Bishnupur II GP, PS – Rajarhat, Dist – 24 Parganas (North), West Bengal.

Activity:

This is a proposal for construction of a Residential Complex having 390 flats (15 blocks of G+5 storied buildings) and 1 club (G+2 storied).

Chronology of the event :

Salient features of the proposed project are –

Land Area : 4.49 acres (18171.03 sqm.)

Building Profile : 15 blocks of G+5 storied buildings and 1 club of G+2 storied building

Expected Population : 1950 persons (1560 – fixed & 370 – floating)

Total Water requirement : 311 KLD (Operation stage)

Fresh Water requirement : 159 KLD (local authority / groundwater supply) Permission from DLA 24 Parganas (N) submitted.

Wastewater generated : 196 KLD (to be treated in STP)

Wastewater recycled : 152 KLD (to be reused after treatment in STP)

Wastewater discharged : 44 KLD (through locality drain)

Solid waste disposal : 1100 kg per day (to be disposed off through local authority)

Total Built­up Area : 40909.09 sqm. (including parking)

Ground Coverage : 7011.17 sqm. (38.58% of land area)

Total Paved Area : 3446.88 sqm. (18.97% of land area)

Semi Paved Area : 1813.58 sqm. (9.98% of land area)

Tree Plantation Area : 3742.73 sqm. (20.60% of land area)

Other Green Area : 895.28 sqm. (4.93% of land area)

Service Area : 902.58 sqm. (4.97% of land area)

Open Parking Area : 358.81 sqm. (1.97% of land area)

Min. No. of plantation : 254 (mandatory), 415 (compensatory) and 5 (retained)

Page 34 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

No. of Parking spaces : 355 (covered – 320, open – 35) proposed

Min. No. of solar street lights : LED light – 27 nos. & Conventional light – 52 nos. proposed

Total Power requirement : 2700 KVA, WBSEDCL

Backup Power : DG Sets (3x500 KVA)

RWH : Recharging capacity is 39.52 cum through 5 nos. of 150 mm diameter tube well for recharging.

CSR : Rs. 10 lakhs.

Name of the Environmental Consultant is M/s. Envirotech East Pvt. Ltd. The case was put up for consideration in the 70th SEAC meeting held on 30.08.2012. During presentation in the 70th SEAC meeting, it has been noted that proposed project will be developed surrounding a large waterbody as shown in gridded conceptual plan. The SEAC has opined that the waterbody is to be kept in natural conditions without disturbing the ecological habitat and should not be lined and no embankments should be cemented. Existing waterbody should not be encroached / reshaped without prior permission of the competent authority. As discussed during the presentation, SEAC has recommended that project proposal should be redesigned considering sufficient open space along the periphery of the waterbody. It has been decided that the case shall be further considered only after submission of the redesigned proposal.

5. Proposed Residential Complex by M/s. Prudent Infrarealty Pvt. Ltd. & Others at JL No. 59, Mouza – Sripur, Bagharghol ‘A’, 272, Boral Main Road, PO – Bonhooghly, PS – Sonarpur, Rajpur­Sonarpur Municipality Ward No. 33, Dist – 24 Parganas (South), PIN – 711 103, West Bengal.

Activity:

This is a proposal for Residential Complex developed in two phases. Phase – I comprising of 11 nos. G+4 storied residential blocks and total no. of flats is 176. In Phase – II all the 10 nos. of G+& storied residential blocks and 1 no. of G+ 4 storied residential blocks and the total no. of flats will be will be 306.

Chronology of the event :

Salient features of the proposed project are –

Phase – I Phase – I & II

Land Area : 10889.149 sqm. : 10889.149 sqm.

Page 35 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Phase – I Phase – I & II

Expected Population : Total 1000 persons (Residents – : Total 1710 persons (Residents – 880, Floating – 100, Service – 1530, Floating – 160, Service – 20) 20)

No. of Flats : 176 nos. : 306 nos.

Total water requirement : : 271 KLD

Fresh water requirement : : 155 KLD (Rajpur­Sonarpur Municipality supply)

Domestic Water : : 233 KLD (Rajpur­Sonarpur Requirement Municipality supply)

Wastewater generated : : 186 KLD (to be treated in STP)

Wastewater treated : : 167 KLD (for toilet flushing, landscaping and road cleaning)

Wastewater recycled : : 110 KLD

Wastewater discharged : : 57 KLD (to Municipal drain)

Solid waste disposal : : 0.87 Tonnes per day (through Rajpur­Sonarpur Municipality)

Total Built­up Area : 19372.656 sqm. : 29845.306 sqm.

Ground Coverage : 3846.437 sqm. (35.352% of : 3901.391 sqm. (35.828% of land land area) area)

Internal Road & Pavement : 2177.80 sqm. : 2177.80 sqm. (19.99 % of land area) (19.99 % of land area)

Surface Car Parking Area : 450.00 sqm. : 525.00 sqm. (4.13% of land area) (4.82% of land area)

Green Area for plantation : 2177.829 sqm. : 2177.829 sqm. (20.00 % of land area) (20.00 % of land area)

Soft Area : 2107.109 sqm. : 2107.109 sqm. (19.362 % of land area) (19.362 % of land area)

Area for future development : 129.954 sqm. : (1.193 % of land area)

No. of plantation proposed : : 160 nos.

Page 36 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Phase – I Phase – I & II

No. of Parking spaces : : 187 (covered – 145, open – 42) proposed

Total Power requirement : : 1122 KW, WBSEDCL

Backup Power : : DG Sets (2X3200 KVA)

Width of abutting road : : 15.83m

Height of Building : 14.50 m 24.0m

Rainwater Harvesting : Surface Storage 100 KL Subsurface recharge 1414 KL/annum

Corporate Social : Not submitted Responsibility

Name of the Environmental Consultant is M/s. Centre for Sustainable Development. The case was put up for consideration in the 70th SEAC meeting held on 30.08.2012. After carefully considering the proposal and presentation, the committee finalised Stipulated Conditions for Environmental Clearance. The set of environmental conditions are annexed as Annexure 5.

6. Proposed Residential Complex by M/s. Jain Group Projects Pvt. Ltd. at Dag No. 178, 186, 187, JL No. 105 (new 83), Mouza – Daknikata, Champasari Gram Panchayat, PS – Matigara (presently Pradhannagar), PIN : 734001, Dist – Darjeeling, West Bengal. Activity: This is a proposal for construction of a Residential Complex having 380 flats (6 blocks of G+10 storied residential buildings) with common basement. Chronology of the event :

The matter was discussed in the 61st SEAC meeting held on 29.11.2011 and the committee has noted that the proponent has mentioned that the local panchayat shall provide infrastructural facilities. The committee requests the project proponent to obtain necessary permission from Task force on Total Sanitation Campaign (TSC) of Panchayat and Rural Development Department for infrastructural facilities. But the Task Force on Total Sanitation Campaign, Panchayat & Rural Development Department, Govt. of West Bengal has informed SEAC vide their letter dated 03.05.2012 that the subject matter is not within the purview of functioning of the office.

The project proponent has submitted additional information on 21.08.2012.

Salient features of the proposed project (PHASE I) are –

Land Area : 4.0 acres (16187.44 sqm.), PHASE I – 12795.39 sqm., PHASE II – 3391.91 sqm.

Page 37 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Expected Population : 2470 persons

Total Water requirement : 380 KLD (Operation stage)

Fresh Water requirement : 216 KLD (groundwater)

Wastewater generated : 242 KLD (to be treated in STP)

Wastewater recycled : 164 KLD (to be reused after treatment in STP)

Wastewater discharged : 78 KLD (to be discharged to drain of local authority after treatment in STP)

Solid waste disposal : 1.0 tonnes per day (to be disposed off through local authority)

Total Built­up Area : 56252.77 sqm. (including parking), 47332.54 sqm. (excluding parking),

Ground Coverage : 4658.22 sqm. (36.41% of PHASE I land area)

Service Area : 655.03 sqm. (5.12% of PHASE I land area)

Total Parking Area including : 8920.23 sqm. (not mentioned in Master Plan) common basement

Common Basement : 5012.35 sqm. (39.17% of PHASE I land area) (not mentioned in Master Plan)

Total Paved Area : 3172.96 sqm. (24.79% of PHASE I land area)

Exclusive Green Area : 3110.25 sqm. (24.31% of PHASE I land area)

Other Soft Area : 1198.8 sqm. (9.37% of PHASE I land area)

No. of Parking spaces : 325 nos. proposed for PHASE I

Total No. of plantation : 200 nos. (Existing trees – 11 nos.) proposed for PHASE I

Total Power requirement : 1500 KVA, WBSEDCL

Backup Power : DG Sets (1x450 KVA)

CSR : Rs. 20 lakhs.

The name of the Environmental Consultant is M/s. Centre for Sustainable Development. The case was put up for consideration in the 70th SEAC meeting held on 30.08.2012. After carefully considering the proposal and presentation, the committee recommended that – 1. Distance of the Mahananda Wildlife Sanctuary from the project area to be furnished alongwith necessary authenticated documents. 2. Corporate Social Responsibility proposal should be revised as discussed during the presentation mentioning name of the local primary schools for which infrastructure facilities will be developed. 3. Revised tree plantation list to be submitted.

Page 38 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

It has been decided that the case shall be further considered only after submission of the necessary clarification.

7. Proposed Residential Complex by M/s. Global Scape Infrastructure Pvt. Ltd. at Jl. No. 2, Mouza – Dabgram, Plot No. 240, 246­253, 2nd Mile Sevoke Road, Siliguri, PO – Sevoke Road, PS – Bhaktinagar, SMC Ward No. 41, PIN – 734001, Dist – Jalpaiguri, West Bengal.

Activity: This is a proposal for construction of a Residential Complex having 532 flats (4 blocks of G+11 storied buildings and 6 blocks of G+13 storied buildings). Chronology of the event :

Salient features of the proposed project are –

Land Area : 5.362 acres (21700 sqm.)

Building Profile : Blocks A, B, H & J (4 blocks of G+11 storied buildings) Blocks – C to G & I (6 blocks of G+13 storied buildings) and Basement. (Existing structure – Block A, B & Basement).

Expected Population : 2660 (fixed), 550 (others). Total ­ 3210

Total Water requirement : 469 KLD (Operation stage)

Fresh Water requirement : 395 KLD (SMC supply) – Concurrence letter submitted

Wastewater generated : 328 KLD (to be treated in STP)

Wastewater recycled : 74 KLD (to be reused after treatment in STP)

Wastewater discharged : 254 KLD (to be discharged to municipal drain after treatment in STP)

Solid waste disposal : 1.35 tonnes per day (to be disposed off through SMC)

Total Built­up Area : 76871.53 sqm. (including parking) Existing – 18147.36 sqm., Expansion – 58724.172 sqm.

Ground Coverage : 5580.197 sqm. (25.72% of land area) Phase I – 1305.890 sqm. (6.02% of land area) Expansion Phase – 4274.307 sqm. (19.70% of land area)

Temple Area : 12.71 sqm. (0.06% of land area)

Swimming Pool Area : 142.44 sqm. (0.66% of land area)

Total paved Area : 5422.25 sqm. (24.98 % of land area)

Page 39 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Service Area : 953.93 sqm. (4.40% of land area)

Open Parking Area : 2159.00 sqm. (12.62% of land area)

Total green area : 9588.47 sq.m (44.19%)

Exclusive Tree Plantation Area : 4357.43 sqm. (20.08% of land area)

Min. No. of plantation proposed : 310 nos.

No. of Parking spaces proposed : 533 (covered – 301, open – 232)

Min. No. of solar street lights : 23 nos. (solar operated LED light) proposed 48 nos. (conventional street light)

Total Power requirement : 2000 KVA, WBSEDCL

Backup Power : DG Sets (4x250 KVA)

RWH : surface storage­ 63.62 lakhlitre, recharge­95.42 lakh litre

CSR : Rs. 13 lakhs.

The case was put up for consideration in the 70th SEAC meeting held on 30.08.2012. After carefully considering the proposal and presentation, the committee recommended that – 1. Specific concurrence letter regarding supply of drinking water indicating source of water from Siliguri Municipal Corporation should be submitted. 2. Corporate Social Responsibility proposal should be revised as discussed during the presentation mentioning name of the local primary schools for which infrastructure facilities will be developed. 3. Revised tree plantation list to be submitted. It has been decided that the case shall be further considered only after submission of the necessary clarification.

Summaries of above decisions are also provided in Table­1.

Page 40 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

Table­1 : List of the projects which were placed before the SEAC in the seventieth meeting held on 30.08.2012 at 11:00 hrs. and the Summary Decisions thereof:

A Miscellaneous cases

Sl. Name of the unit & Project address Summary Decision No.

1. Solid waste Management for housing projects in non­ Concept note to be prepared municipal areas

2. Commerce & Industries Department, Government of Project should come up as per West Bengal CPCB Guidelines, Concurrence Proposed Secured Landfill System (SLS) at Mouza – from EKWA, RWH not permitted. Andulgari, adjacent to Calcutta Leather Complex, Bantala, Kolkata, West Bengal.

3. M/s. Fabworth Promoters Pvt. Ltd. Amendment of Stipulated Condition for Environmental Clearance Proposed 5 / 7 Star Hotel at 4A, JBS Halden Avenue, recommended Mouza – Bonchtola, Jl. No. – 4, E.M. Bye­Pass, PO & PS – Tiljala, Kolkata – 700 105, West Bengal.

B Cases placed for consideration of Environment Clearance

Sl. Name of the unit Summary Decision No.

1. M/s. Birla Corporation Ltd., Unit : Durgapur Cement Works Amendment of Proposed expansion of the existing Cement Grinding Unit and Environmental Clearance installation of CBM based Captive Power Plant at Jl. No. – 62 & recommended 63, Vill. – Sujara, Near DSP Slag Bank, Durgapur – 713 203, Dist. – Burdwan, West Bengal.

2. M/s. West Bengal Hosiery Park Infrastructure Ltd. Letter to be issued Proposed Hosiery Park at Jl. No. – 2, Mouza – Jagdishpur, PS – requesting submission of Liluah, Dist. – Howrah, West Bengal. documents as sought earlier

3. M/s. NFMA Manufacturers Pvt. Ltd. REC Proposed Residential Complex at 46, Diamond Harbour Road, KMC Ward No. 125, PS – Thakurpukur, Kolkata – 700 063.

4. M/s. Rajarhat IT Park Ltd. REC Proposed IT Park “ASTRA TOWERS” at Plot No. IIC/1, Action Area – II, New Town, Rajarhat, Kolkata, Dist – 24 Parganas Page 41 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

B Cases placed for consideration of Environment Clearance

Sl. Name of the unit Summary Decision No.

(North), West Bengal.

5. M/s. Leisure Developers Pvt. Ltd. REC Proposed Residential Complex "CLUB TOWN GARDEN” at 12, M.M. Feeder Road, Kamarhati Municipality Ward No. ­ 11, Jl. No. 1, Mouza – Ariadaha Kamarhati, PS – Belghoria, Kolkata ­ 700057, Dist. – 24 Parganas (N).

6. M/s. Bengal Faith Health Care Pvt. Ltd. REC with condition Proposed HEALTH CITY at JL No. 41, Mouza – Goda, Dist – Burdwan, West Bengal.

7. M/s. Pataka Industries Pvt. Ltd. SCEC Proposed Residential Complex at Premises No. 18, Convent Road, Borough No. VI, PS – Entally, KMC Ward No. 55, Kolkata – 700 014, West Bengal.

8. M/s. Yours Projects Pvt. Ltd. SCEC Proposed Residential housing Complex at Dag No. 2352 & 2353, Khatian No.­12, J.L No.­13, Holding No. 8, Khudiram Bose Sarani, Kolkata – 700 080, Ward No. 21 under Dum Dum Municipality, Dist: North 24 Pgs.

9. M/s. Ledo Financial Services Ltd. & 15 Others SCEC Proposed Residential Complex at JL No. 48, Mouza – Kumrakhali, Holding No. 266, PO & PS – Sonarpur, Rajpur Sonarpur Municipality Ward No. 27 (previously 25), Kolkata – 700 103, Dist – 24 Parganas (South).

10. M/s. Merlin Projects Limited SCEC Proposed Residential Complex at Plot No. 94/6K & 94/7K, G T Road, JL No. 8, Mouza – Kotrang, Konnagar, Uttarpara Kotrang Municipality, Dist – Hooghly, West Bengal.

11. M/s. P.S. Villa Pvt. Ltd. & Others REC with condition Proposed Residential & Commercial Complex at Holding No. – 4S/08/Block­P & 4S/09/Block­P, Jl. No. – 5 & 6, Mouza – Kaikhali & Mondal Ganti, Rajarhat Gopalpur Municipality Ward No. – 26 & 27, PS – Baguihati, Dist. – 24 Parganas (North), West Bengal.

Page 42 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

C Cases placed for presentation

Sl. Name of the unit & Project address Summary Decision No.

1. M/s. Onkar Udyog Ltd. AAS Proposed Beneficiation of Iron Ore Plant at Vill – Guptomoni, JL No. 638, Mouza – Jamshol, PS – Jhargram, Sub division – Kharagpur, Dist – Paschim Medinipur.

2. M/s. West Bengal Infrastructure Development Finance AAS Corporation Ltd. Proposed Residential Complex “SANKALPA­I” at Premises No. 34, MAR (Plot No. BB/1), Action Area­I, New Town, Rajarhat, Kolkata.

3. M/s. West Bengal Infrastructure Development Finance AAS Corporation Ltd. Proposed Residential Complex “SANKALPA­III” at Premises No. 23, MAR (Plot No. CA/12, CA/13, CA/14, CA/15, CA/16, CA/17), Action Area­I, New Town, Rajarhat, Kolkata.

4. M/s. Khetawat Towers Pvt. Ltd. Presentation not accepted. Revised submission as per Proposed Residential Complex “RAMESWARA recommendation of the WATERVIEW” at Dag No. – 2, 5, 6 & 10, Jl. No. 31, Mouza SEAC to be made – Basina, Rajarhat Bishnupur II GP, PS – Rajarhat, Dist – 24 Parganas (North), West Bengal.

5. M/s. Prudent Infrarealty Pvt. Ltd. & Others SCEC Proposed Residential Complex at JL No. 59, Mouza – Sripur, Bagharghol ‘A’, 272, Boral Main Road, PO – Bonhooghly, PS – Sonarpur, Rajpur­Sonarpur Municipality Ward No. 33, Dist – 24 Parganas (South), PIN – 711 103, West Bengal.

6. M/s. Jain Group Projects Pvt. Ltd. AAS Proposed Residential Complex at Dag No. 178, 186, 187, JL No. 105 (new 83), Mouza – Daknikata, Champasari Gram Panchayat, PS – Matigara (presently Pradhannagar), PIN : 734001, Dist – Darjeeling, West Bengal.

Page 43 of 44 Minutes of the seventieth meeting of the State Level Expert Appraisal Committee, West Bengal held on 30.08.2012 at 11:00 hrs. at the Conference Room, Paribesh Bhawan, Salt Lake. ______

C Cases placed for presentation

Sl. Name of the unit & Project address Summary Decision No.

7. M/s. Global Scape Infrastructure Pvt. Ltd. AAS Proposed Residential Complex at JL No. 2, Mouza – Dabgram, Plot No. 240, 246­253, 2nd Mile Sevoke Road, Siliguri, PO – Sevoke Road, PS – Bhaktinagar, SMC Ward No. 41, PIN – 734001, Dist – Jalpaiguri, West Bengal.

REC: Recommended Environmental Clearance, SCEC: Stipulated Conditions for Environmental Clearance, AAS: Asked for Additional Submission / Clarification The meeting ended with a note of thanks to the Chair.