Mandlai, Tehsil-Raipur Rani, District-Panchkula (Haryana)
Total Page:16
File Type:pdf, Size:1020Kb
1 STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY HARYANA Bay No. 55-58, Prayatan Bhawan, Sector-2, PANCHKULA. Telz 0172-2565232 E-mail Id: [email protected] No. sEIAA( I 26)MV2o2ot 6 (3 Dated: J\ nztzozo To M/s Shree Balaji Mines & Minerals, Regd. Oflice: 1072, NHBC, Sector- 11, Panipat, Haryana-132103 Subject: Environment Clearance for Mining Project of River Bed Minerals (Boulder, Gravel And Sand (Minor Minerals) With Production Capacity of 559543.808 MTPA (ROM), Area-13.20 HA, at Different Blocks of Mandlai I, Block IPKL, B-21, Khasra No. 83 Min., Near Village-Mandlai, Tehsil-Raipur Rani, District-Panchkula (Haryana). This letter is in reference to your application dated Nil addressed to M.S. SEIAA, Haryana received on 30.12.2019 and subsequent letter dated 17 .11 .2020 & 26.1 1 .2020 seeking prior Environmental Clearance of the above project under the EIA Notification, 2006. The proposal has been appraised as per prescribed procedure in the light of provisions under the EIA Notification, 2006 on the basis of the mandatory documents enclosed with the application viz., Form-l, Pre-feasibility report, copy of approved Mining Plan, EIA/EMP on the basis of approved TOR and the additional clarifications fumished in response to the observations of the State Expe( Appraisal Committee (SEAC) constituted by MoEF & CC, Gol vide their Notifioation dated 30.01.2019, in its meeting held on 16.01.2020 & 26.11.2020. The project has also been appraised in compliance of Orders dated 04.09.2018 passed by Hon'ble National Green Tribunal in O.A. No. 173 of 2018 wherein it is stated that"One of the conditions of every lease of mine or minerals would be that there will he indeD endent envlronmental audit at least one in a vear bv renuted third nartv entitv and renort of such audit be placed in public domain. In the course of suclt environmental audit "a tltree mlrnbct committee of local inhabitants will also be associated. Composition af three members committee rrreferablv Ex-servicemen, Former Tcacher, Former Civil Servant, The Commitlee will bq nominated bv the District Masistrate". l2l The SEAC has examined the application for Mining Project of River Bed Minerals (Boulder, Gravel And Sand (Minor Minerals) With Production Capaciry of 559543.808 MTPA (ROM), Area-13.20 HA, at Diff'erent Blocks of Mandlai 1, Block /PKL, B-21, Khasra No. 83 Min., Near Village-Mandlai, Tehsil-Raipur Rani, Disrict-Parr:hkula (Haryana). The detail of the d project t is as under: 1 Category/Item no. (in schedule): B1 2. Area of the project 13.20 ha 3. Date of Lol granted by Mines & DMG/H Y/Cont./Mandlai- I /Block/PKL Geology Department, Haryana B-21 12019 I | 096 dated I 3.03.20 I 9 4. Date of approval of Mining plan DMG/HY/Cont./Mandlai- I /Block/PKL granted by Mines & Geology B-21 12019 I 6309 dated 26. 1 1.201 9. Department, Haryana 5 Location of Prolect Different Blocks of Mandlai 1, Block /PKL, B-21, Khasra No. 83 MIN., Near Village- Mandlai, Tehsil-Raipur Rani, District- Panchkula (lJaryana) 2 6 Proiect Details Khasra No 83 MIN 7 Project Cost 1.50 Cr. 8. Water Requirement 9.52 KLD 9 Source of water Tanker Water Supply 10. Environment Management Plan Capital Cost- 8.92 Lac Budget Recurring Cost- 2.46 Lac 11. Production s59543.808 MTPA (ROM) 12 Comer Coordinates of the lease area Pilla Latitude (N) Longitude rs (E) A 30"3 3', 77"6'. 19.985"N 41.9012"E B 30'3 3' 7706' 27.703"N 44.0428"8 C 30'33'30.735 77"6', 6"N 41.3046.8 D 30"33',32.627 7706' 6'N 42.6256"8 E 30"33',36.66 7706', 85"N 39.9051"E F 30.33', 77.6' 40.304.N 42.7018"8 G 30"3 3' 77'6', s0.4968',N 42.7976.E H 30'34' 77"6' 9.8s86"N 37.835"E I 30'34', 77"6' 9.3577',N 33.2322 8 J 30"34', 77"6'. 0.5934',N 38.3086'E K 30"33' 77"6' 50.4276"N 39.1211"E L 30.33' 7706', 39.2583"N 35.6584"8 M 30'33', 77"6'. 39.2072',N 38.8058"E N 3 0.33' 77"6' 35.2699"N 37.7024',8 o 30'33' 77"6', 34.729"N 33.4215'E P 30"33' 7706', 30.7844',N 35.5442"8 o 30'3 3' 77"6' 27.9379"N 40.6643"8 R 30'33' 77"6', 22.0039"N 39.1179"E 13. Green belt/ plantation Green belt Area-4.356 ha (outside the lease area) Plantation-272i Nos. (in three year) 14. lncremental Load in respect of: i) PMz.s t6.44 (p{m3) ii) PM 16 21.8 (pglmr) iiD soz 1.12 (uglmr) iv) NOz 12.36(*9lm3) 3 Table:2 EnyLqrment Management Expenditure Sr. Description of Capital Cost Recurring Cost Budgetary Calculation No. Item (Rs) (Rs)/ Year Air Pollution 1 Control - Water Water Sprinkling 50,000/- Sprinkling Water Pollution (Maintenance of toilet facility 2 20.000i- Control Provided at mine site) 1 Air quality monitoring 1,20,000 location (6x5000x2)= (Weather 60,000 Monitoring 2 Water sampling Station) analysis Environmental (5x 3000 x 2): 3 Monitoring and 30,000 t,26,000/- Management J Soil Sampling analysis (6x3000x 1) = 18,000 4 Noise Sampling (6x1500x2)= 18,000 Water and maintenance cost 2,72,500Pls.1- for 200 days Green Belt (100 Rs/plant) 4 s0,000/- Development 100 Rs./plant 100 X 27 25= 2,72,500 Rs./- Awareness campaign to be Environmental 5. carried out on various 1,00,000 Awareness environmental issues, practical training Health check-up Camp, 5,00,000 Sanitation facility, 6. Social Welfare Infrastructure Development in nearby school, Education l_ facility such as Books, /\ Uniforms \l Total 8,92,500 2,46,000 Table3: List of Machinerv S. Machine No's Capacity NO. I JCB/Excavator/ 6 0.9 mj Scrapper 2 Dumper 12 16 Tons 3 Water Tanker I 4000 Liters 4 Light Vehicles 5 Maintenance Van I As per requirement 4 TABLE 4: Year wise Production details of Mineral and waste Year RoM(inMT) lt' year 559543.808 2nd year 559543.808 Jrrd year 559543.808 4ft year 5s9s43.808 5th year 559543.808 The SEIAA in its 126'h meeting held on 11.12.2020 decided to agree with the recommendations ofSEAC to accord Environment Clearance for One Year under Category 81, 1(a) to this project by imposing the following conditions: A: $lgg![c Cqndj!!qq:- 1. The PP shall comply with sand and mining Enforcement & Monitoring Guidelines for Sand Mining,2020. 2. The PP shall construct the pucca link roads connected to the main road at the mining site before the starl of mining. 3. The PP shall construct the Haul roads of width I 0 meters. 4. The PP shall submit the approved Wildlife Conservation Plan by Chief Wildlife Warden /Competent Authority before the start of the mining. 5. The PP shall provide only one exit and one entry to the Mining Project area and all the mining shall be dispatched through E-billing. 6. The PP shail maintain an un-mined block of 50 meters width after every block of 1000 meters over which mining is undertaken or at such distance as may be directed by the Director or any officer authorized by him. ., 7. The PP shall restrict mining within the central 3/4'' width of the river/rivulet. 8. The PP shall not permit any mining in a river bed up to a distance of five times of span of a bridge on upstream and ten times the span of such bridge on downstream side , subject to a minimum of 25Ometers on t}re upstream side and 500 meters on the downstream side. 9. The PP shall not exceed depth of mining in the river bed more than 3 meters from the un-mined bed level at any point in time with proper bench formation. 10. The PP shall not permit any mining in an area up to width of 500 meters from the active edges of embankments in case of River Yamuna, 250 meters in case of Tangri, Markanda and Ghaggar and 100 meters on either side of all other rivers/rivulets. 11. The PP shall develop 4.356 hectares for Green Area development outside the lease area of the project. 12. Separate wet and dry bins must be provided in each unit and at ground level for fhcilitating segregation of waste. Solid Waste shall be segregated into wet garbage and inert materials. Wet Garbage shall be composted in Organic waste convertor. Adequate area shall be provided for solid waste management within the premises which will include area for segregation, composting. The Inert waste from the project will be sent to dumping site. 13. The PP shall maintain the garland drains in the project area and catchment area for preserving overburden and dump mining. 14. The PP shatl take all measures that while mining, heary machineries shall not be used for excavation/digging which may adversely impact the aquatic biota. 15. Traffic management plan as submitted shall be implemented in letter and spirit. Apart, a detailed traffic management and traffic decongestion plan shall be drawn up to ensure that the current level of service ofthe roads within a 05 kms radius of the project is marinated and improved upon after the implementation of the project.