Mirzapur (UTTAR PRADESH)
Total Page:16
File Type:pdf, Size:1020Kb
PURVANCHAL VIDYUT VITARAN NIGAM LTD. SCHEME FOR HOUSEHOLD ELECTRIFICATION DISTRICT : Mirzapur (UTTAR PRADESH) DEEN DAYAL UPADHYAYA GRAM JYOTI YOJANA Table of Contents Sl.No. Format No. Name Page No. 1 A General Information 1 2 A(I) Brief Writeup 2 3 A(II) Minutes 2 4 A(III) Pert Chart 2 5 A(IV) Certificate 2 6 A(V) Basic Details of District 2 7 A(VI) Abstract : Scope of Work & Estimated Cost 4 8 A(VII) Financial Bankability 16 9 B Electrification of UE villages 18 10 B(I) Block-wise coverage of villages 19 11 B(II) Villagewise/Habitation wise coverage 20 12 B(III) Existing Habitation Wise Infrastructure 20 13 B(IV) Village Wise/Habitation Proposed Works 20 14 B(V) Existing REDB Infrastructure 20 15 B(VI) Block-Wise Substation 22 16 B(VII) Feederwise DTs 23 17 C Feeder Segregation 28 18 D Connecting unconnected RHHs 29 19 D(I) Block-wise coverage of villages 30 20 D(II) Villagewise/Habitation wise coverage 31 21 D(III) Existing Habitation Wise Infrastructure 40 22 D(IV) Village Wise/Habitation Proposed Works 51 23 D(V) Existing REDB Infrastructure 78 24 D(VI) Block-Wise Substation 80 25 D(VII) Eligibility for Augmentation of Existing 33/11 KV Substations 81 26 D(VIII) Feederwise DTs 96 27 E Metering 101 28 E(I) DTR Metering 102 29 E(II) Consumer Metering 144 30 E(III) Feeder Metering 148 31 F System Strengthening and Augmentation 149 32 F(I) Block-Wise Substation 150 33 F(II) New 33 (or 66) KV REDB Works Proposed 151 34 F(III) Proposed Augumentation of Existing Sub-station 152 35 F(IV) EHV Substation Feeding the District 154 36 F(V) Districtwise Details of Existing 66 KV or 33 KV Lines 158 37 F(VI) Districtwise Details of Existing 11 KV or 22 KV Lines 160 38 F(VII) Details of New 66 KV or 33 KV Lines 165 39 F(VIII) Details of New 11 KV or 22 KV Lines 166 40 G SAGY 169 41 G(I) Block-wise coverage of villages 170 42 G(II) Villagewise/Habitation wise coverage 171 43 G(III) Existing Habitation Wise Infrastructure 172 44 G(IV) Village Wise/Habitation Proposed Works 173 Section -A Basic Details of District State : UTTAR PRADESH District : Mirzapur Page 1 of 174 20/07/2016 (AS PER ORIGINAL DPR) A(V) Basic Details of District State : UTTAR PRADESH District : Mirzapur Name of Project Implementing Agency Purvanchal Vidyut Vitaran Nigam Ltd. Name of DISCOM Purvanchal Vidyut Vitaran Nigam Ltd. Name of State UTTAR PRADESH Name of District Mirzapur Total Population of district 2496970 Total Geographical Area(SqKm) 4405 Percentage of Hilly area 0 Total Block in the district 12 Total Urban Town in the district 4 Total Urban Population in the district 347567 Population Of Urban Area 347567 Total Census Revenue Villages in the district 1965 Total Habitations in the district 0 Total Rural Population in the district 2149403 House Holds Details :- Description 2001 Census 2011 Census CAGR Total HHs by Total HHs by 31.03.2015 as derived 31.03.2019 as derived Total House Holds in the district 332659 390819 2.33 459148 539422 Rural HH in the district 285556 335481 1.17 394135 463043 Urban HH in the district 47103 55338 1.16 65013 76379 Total Energised HH in the district 124271 145997 1.16 171522 201509 Urban HH electrified in the district 36569 42962 1.17 50473 59297 Rural HH electrified in the district 87702 103035 1.16 121049 142212 Balance Un-electrified Rural HH 197854 232446 0.01 273086 320831 Page 2 of 174 20/07/2016 (AS PER ORIGINAL DPR) A(V) Basic Details of District State : UTTAR PRADESH District : Mirzapur Balance Un-electrified Urban HH 10534 12376 -0.01 14540 17082 Balance Total un-electrified HH in the 0 0 0 0 0 district Status of Already Sanctioned 10th / 11th / 12th Plan Projects :- Plan Un-Electrified Villages Intensive Electrified Villages Total Habitation RHH Incl. BPL BPL Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement 10th 605 587 0 0 0 0 6530 6530 6530 6530 11th 0 0 0 0 0 0 0 0 0 0 12th 0 0 1589 0 3461 0 227023 0 74375 0 Page 3 of 174 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Mirzapur S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) C.Sansad Adarsh Gram Yozna BPL Hhs 1 Hallia Total BPL Hhs proposed to be electrified Nos. 51 0.03 1.53 Sub-Total (BPL Hhs) 51 1.53 New 11 KV Line DTR 2 Hallia 25 KVA (3 Ph) Nos. 11 2.64 29.04 Sub-Total (New 11 KV Line DTR) 11 29.04 New 11 KV Spur Line 3 Hallia 11 KV Weasel Conductor Kms. 1.51 6.19 9.3469 Sub-Total (New 11 KV Spur Line) 1.51 9.3469 New LT AB Cable 4 Hallia 2X25+1X16 Kms. 1.88 3.72 6.9936 3X50+1X35+1X16 Kms. 0.69 5.14 3.5466 Sub-Total (New LT AB Cable) 2.57 10.5402 Total (C.Sansad Adarsh Gram Yozna) 50.4571 D.Connecting / UnConnecting HHs BPL Hhs 1 Chhanvey Total BPL Hhs proposed to be electrified Nos. 27 0.03 0.81 2 Hallia Total BPL Hhs proposed to be electrified Nos. 10 0.03 0.3 3 Jamalpur Total BPL Hhs proposed to be electrified Nos. 27 0.03 0.81 4 Kon Total BPL Hhs proposed to be electrified Nos. 39 0.03 1.17 5 Lalganj Total BPL Hhs proposed to be electrified Nos. 12 0.03 0.36 6 Majhawa Total BPL Hhs proposed to be electrified Nos. 99 0.03 2.97 Page 4 of 174 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Mirzapur S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 7 Marihan Total BPL Hhs proposed to be electrified Nos. 35 0.03 1.05 8 Nagar (City) Total BPL Hhs proposed to be electrified Nos. 19 0.03 0.57 9 Narainpur Total BPL Hhs proposed to be electrified Nos. 51 0.03 1.53 10 Pahari Total BPL Hhs proposed to be electrified Nos. 8 0.03 0.24 11 Rajgarh Total BPL Hhs proposed to be electrified Nos. 229 0.03 6.87 12 Sikhar Total BPL Hhs proposed to be electrified Nos. 1 0.03 0.03 Sub-Total (BPL Hhs) 557 16.71 New 11 KV Line DTR 13 Chhanvey 25 KVA (3 Ph) Nos. 12 2.64 31.68 14 Hallia 25 KVA (3 Ph) Nos. 8 2.64 21.12 15 Jamalpur 25 KVA (3 Ph) Nos. 11 2.64 29.04 16 Kon 25 KVA (3 Ph) Nos. 10 2.64 26.4 17 Lalganj 25 KVA (3 Ph) Nos. 11 2.64 29.04 18 Majhawa 25 KVA (3 Ph) Nos. 41 2.64 108.24 19 Marihan 25 KVA (3 Ph) Nos. 18 2.64 47.52 20 Nagar (City) 25 KVA (3 Ph) Nos. 5 2.64 13.2 21 Narainpur 25 KVA (3 Ph) Nos. 33 2.64 87.12 22 Pahari 25 KVA (3 Ph) Nos. 8 2.64 21.12 23 Rajgarh 25 KVA (3 Ph) Nos. 98 2.64 258.72 24 Sikhar 25 KVA (3 Ph) Nos. 2 2.64 5.28 Sub-Total (New 11 KV Line DTR) 257 678.48 New 11 KV Spur Line 25 Chhanvey 11 KV Weasel Conductor Kms. 3 6.19 18.57 Page 5 of 174 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Mirzapur S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 26 Hallia 11 KV Weasel Conductor Kms. 1.88 6.19 11.6372 27 Jamalpur 11 KV Weasel Conductor Kms. 2.75 6.19 17.0225 28 Kon 11 KV Weasel Conductor Kms. 2.65 6.19 16.4035 29 Lalganj 11 KV Weasel Conductor Kms. 2.55 6.19 15.7845 30 Majhawa 11 KV Weasel Conductor Kms. 10.29 6.19 63.6951 31 Marihan 11 KV Weasel Conductor Kms. 4.44 6.19 27.4836 32 Nagar (City) 11 KV Weasel Conductor Kms. 1.31 6.19 8.1089 33 Narainpur 11 KV Weasel Conductor Kms. 8.05 6.19 49.8295 34 Pahari 11 KV Weasel Conductor Kms. 1.84 6.19 11.3896 35 Rajgarh 11 KV Weasel Conductor Kms. 24.64 6.19 152.5216 36 Sikhar 11 KV Weasel Conductor Kms. 0.47 6.19 2.9093 Sub-Total (New 11 KV Spur Line) 63.87 395.3553 New LT AB Cable 37 Chhanvey 2X25+1X16 Kms. 2.7 3.72 10.044 3X50+1X35+1X16 Kms. 1.16 5.14 5.9624 38 Hallia 2X25+1X16 Kms. 1.74 3.72 6.4728 3X50+1X35+1X16 Kms. 0.73 5.14 3.7522 39 Jamalpur 2X25+1X16 Kms. 2.48 3.72 9.2256 3X50+1X35+1X16 Kms. 1.07 5.14 5.4998 40 Kon 2X25+1X16 Kms. 2.35 3.72 8.742 3X50+1X35+1X16 Kms. 1.01 5.14 5.1914 41 Lalganj 2X25+1X16 Kms. 2.37 3.72 8.8164 3X50+1X35+1X16 Kms. 1 5.14 5.14 Page 6 of 174 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Mirzapur S.No.