COMPANYCORPORATE PROFILE PROFILE | SEPTEMBER | MAY 20162018 PROFILE COMPANY SUMMARY

1. At a glance: Technology-driven EPC contractor 2. KT at a glance 3. KT Order intake & Revenues

4. KT Projects

SEPTEMBER 2018 SEPTEMBER COMPANY PROFILE | PROFILE COMPANY AT A GLANCE: TECHNOLOGY DRIVEN EPC CONTRACTOR

OIL&GAS | | FERTILIZERS | POWER | SUSTAINABLE INFRASTRUCTURE INDUSTRY

TECNIMONT KT- Kinetics STAMICARBON NEOSIA Technology

Oil&Gas and Refining Infrastructure, Petrochemicals Refining, Fertilizers Civil Engineering, Fertilizers Hydrogen & Syngas Technology Renewable

Large-scale Production and Energies COMPANIES

OPERATING OPERATING contracting Sulphur Recovery GROUPOVERVIEW

More than 8,000 professionals 5,400 employees +3,000 professionals in Electrical & Instrumentation

ORGANIZATION 40 COUNTRIES / 50 OPERATING COMPANIES CORPORATE PROFILE | 3 IN THE WORLD

ROME SITTARD BRAUNSCHWEIG MUMBAI

ITALY AND REST OF EUROPE 2,381

INDIA AND REST OF ASIA 1,791

RUSSIA AND CASPIAN REGION 415 Headquarters

Main offices and engineering centres AMERICAS 49 Subsidiaries, branches and representative offices

MIDDLE EAST 681 GROUPOVERVIEW

NORTH AFRICA AND SUB-SAHARAN 126 The Group market position and our competitiveness depend AFRICA first of all on skilled and committed human resources.

TOTAL 5, 443* More than 5,500 employees worldwide, EMPLOYEES and additional 3,000 professionals in Electrical & Instrumentation,

*Average age: ~41 years CORPORATE PROFILE | Approx. 66% graduates make Maire Tecnimont a multicultural and multinational Group. 4 Data as of: 31.12.2017 SAFETY FIRST

TOTAL RECORDABLE INJURY RATE* LOST TIME INJURY FREQUENCY*

1.6 0.3 1.4 0.25 1.2 0.2 1 0.8 0.15 0.6 0.1 0.4 0.05 0.2 0 0 2012 2013 2014 2015 2016 2012 2013 2014 2015 2016

International Oil&Gas Producers Maire Tecnimont Group

* Safety Performance Indicators referring only to Construction Sites of Technology, Engineering & Construction Business Unit.

IOGP: LTIF & TRIR of contractors engaged in construction activities. GROUPOVERVIEW

ZERO INCIDENT TARGET Widespread safety culture is part of our core values Integrated HSE Management System constantly reinforced, diffused, checked and

CORPORATE PROFILE | upgraded with results considerably higher than international standards. 5 KEY MILESTONES Our Evolution

1899 GROUP 1937 1971 1972 Dutch State Mines – DSM Kinetic Technology Int. - KTI Incorporation of research centre for services More than 40 years of FIAT ENGINEERING work to coal mines experience in process engineering 2001 1947 1988 Acquisition of FIAT Avio’s Electric Incorporation of Mannesmann acquired KTI Design & Construction Business STAMICARBON 1999 Chemical and Fertilizer Technip acquired KTI 2004 licensing Acquisition of Listing on the Acquisition of KT Kinetics Repositioning Fiat Engineering Italian Stock Acquisition of Technology (formerly completed and (later MAIRE ENGINEERING) Exchange Stamicarbon Technip KTI) Record Backlog

2005 2007 2009 2010 2011 2013 2015

Incorporation of 100% Acquisition of the Indian subsidiary Tecnimont Pvt. Ltd. Reorganization Launch of the MAIRE TECNIMONT (formerly TICB) of New Business Italian HQs Strategy 1990s Tecnimont acquires 50% of the Indian company renamed as Tecnimont ICB Pvt Ltd (TICB) 2005 Maire Group acquires 1977 Tecnimont Creation of the first JV MAIRE MAIRE TECNIMONTGROUP OVERVIEW between ICB and Tecnimont 1973 1958 Incorporation of New Milan Offices TECNIMONT Incorporation of ICB Pvt Ltd as consulting 1963 firm in the plant sector in Mumbai Giulio Natta 1966 Nobel Prize for Incorporation of

chemistry MONTEDISON COMPANY COMPANY | PROFILE 1884 1888 MONTECATINI 6 Power Supply Mines and Chemicals KT TRACK RECORD

More than 45 +120 years’ experience as a Process Engineering Hydrogen and Sulphur A leading expertise to Contractor and in the Recovery Unit Projects development of new Implement technologies for Oil & completed in the oil refining projects Gas industry last 10 years

Development of Well recognized Well recognized Innovative technologies international player international player and creation of in licensing Hydrogen in licensing Sulphur

KT AT A GLANCE AT KTA Pilot Plants technology, with single train Recovery and Tail Gas capacity up to Treatment Technology with 188,000 Nm3/h single train up to 1,800 t/d

COMPANY COMPANY | PROFILE 7 KT BRAND HISTORY

Our Evolution

KTI KT – Kinetics A Company of TECHNIP KTI Technology Mannesman Group Management Buy-out Recently the 75% of the Company was KT was acquired Company has acquired by its by Mannesmann changed its name Management. Anlagenbau into KT – Kinetics The remaining 25% KT was established Technology to was owned by under the name of highlight company Technip Italy Selas Italia historical identity

1971 1974 1988 1999 2005 2010 2013

The first logo Technip Italy Maire Tecnimont was created acquired 100% acquired the 100% of KTI SpA changing the of Technip KTI SpA name in Technip KTI SpA changing its name in KTI Tecnimont KT SpA

TECHNIP KTI Tecnimont KT

KT AT A GLANCE AT KTA COMPANY COMPANY | PROFILE 8 KT BUSINESS AREAS

COMPETENCES TRACK RECORDS HIGHLIGHTS

Successful execution of Delayed Coker Refining processing units Capability to implement projects complex, Vacuum Distillate HDT, HDC Oil & Gas Development fields based, whenever required, on complex, Gas field central processing Gas Treatment and fractionation third-party licensed technologies facility, Oil&gas treatment plant, Gas OIL & GAS & OIL Fractionation

❑ Leading Licensor and EPC Contractor Well recognized player in licensing ❑ Tailor-made solutions sulphur recovery and tail gas Proprietary technologies for Gas ❑ Full plant life cycle support treatment technology with design Sweetening and Tail Gas ❑ Extensive expertise plant revamping capacity of single train up to 1800 t/d Treatment (RAR Technology)

AND GAS AND and retrofitting

SULPHUR SULPHUR

RECOVERY RECOVERY TREATMENT

❑ Leading Licensor and EPC Contractor Over 60 hydrogen and syngas projects ❑ Tailor-made solutions designed/built worldwide Leading Company in providing ❑ Full plant life cycle support Well recognized player in licensing hydrogen production units based ❑ Extensive expertise plant revamping hydrogen technology, with single on steam reforming technology SYNGAS and retrofitting

train capacity up to 188,000 Nm3/h

PRODUCTION HYDROGEN & & HYDROGEN

❑ Process, detailed mechanical design and supply all required materials ❑ More than 40 years experience Approved Supplier of major World ❑ Revamping and debottlenecking players such as Bechtel, KBR, services, after Sales services ❑ More than 1700 installations FIRED FIRED Aramco, Takreer, Sasol and others

HEATERS ❑

AND HEAT HEAT AND Full plant life cycle support

TRANSFER TRANSFER

EQUIPMENT KT AT A GLANCE AT KTA

Activities with international Industrial Partners, Universities and Research Application of more than 15 Patents ❑ Development of innovative institutions in 2011-2012 technologies Funding from Italian Ministry of Owner of Plant Testing Facilities ❑ Design and realization of pilot

ACTIVITIES plants

RESEARCH & Education and European Commission DEVELOPMENT DEVELOPMENT

COMPANY COMPANY | PROFILE 9 KT HSE PERFORMANCE: SAFETY FIRST

2,00

1,75

1,50

1,25

1,00

0,75

0,50

0,25

0,00 Year 2012 Year 2013 Year 2014 Year 2015 Year 2016 LTCR 0,263 0,762 0,000 0,000 0,142 TRIR 0,263 0,762 1,564 0,000 0,142

LOST TIME INJURY CASE RATE (LTCR) TOTAL RECORDABLE INJURY RATE (TRIR) KT AT A GLANCE AT KTA N. of cases with lost work days x 200.000 N. of recordable cases x 200.000

Exposure time of Employees hours Number of Employee labour hours worked

COMPANY COMPANY | PROFILE 10 KT TOWARDS THE SOCIAL RESPONSIBILITY

Sustainability is the cultural root of KT: it is a constitutive element of our mission that helps to draw our own identity. The ethical principles of KT, described in the Group Code of Ethics, are the references shared by all our employees. Our mission is not only to produce profit, but do it in a sustainable and useful way for the development of the community and future generations Equality Training No workplace discrimination Working together Honesty Our code of ethics to integrity and transparency I mprovement C onduct Looking ahead and moving forward Defend and protect legal and human rights Association Strength in unity

KT AT A GLANCE AT KTA Like prevention Love communication Safe and healthy work environment Dialogue You A team player COMPANY COMPANY | PROFILE 11 KT ORDER INTAKE & REVENUES

LAST TOP AWARDS Russian Federation: LUKOIL, SRU & HC Gas Fractionatoin Units HDT & HPU/ROG PSA EPC

| | ORDERKT & REVENUES INTAKE Egypt: PETROBEL, Sulphur Recovery Unit for Ramp-up to Plateau EP Belgium: TOTAL, Refinery Off Gas (ROG) EPC Cameroun: SONARA Refinery, Hydrocracker Complex EPC Poland: GRUPA LOTOS Gdansk Refinery, DCU+HVD EPC Saudi Arabia: PETRO RABIGH, Clean Fuels & SRU EPC

Egypt: PETROBEL, Sulphur Recovery Unit EP COMPANY COMPANY PROFILE 12 < 200 € mn 200 to 500 € mn OIL & GAS

COMPETENCES

❑ Refining processing units ❑ Oil & Gas Development fields ❑ Gas Treatment and Fractionation

TRACK RECORDS

❑ Successful execution of Delayed Coker complex, HDC complex, Vacuum

KT PROJECTSKT Distillation, HDT, Gas field central processing facility ❑ Oil & Gas Treatment plant

❑ Gas Fractionation plant COMPANY COMPANY | PROFILE 13 RECENT OIL & GAS PROJECTS

REFINERY OFF GAS (ROG) PROJECT ANTWERP (BELGIUM) CAPACITY: 1 Saturated Gas Train 39 t/h off gas; 1 Unsaturated Gas Train 30 t/h off Gas. CLIENT: Total Olefins Antwerp CONTRACT TYPE: EPC - LSTK PLANTS KSTOVO REFINERY: SRU & HC GAS FRACTIONATION UNITS HDT & HPU/ROG PSA KSTOVO (RUSSIAN FEDERATION) CAPACITY: GFU 425 ktons/y - SRU 80 ktons/y HPU 50 kNm3/h - ROG PSA 60 kNm3/h - DHT 1530 ktons/y CLIENT: LLC LUKOIL – Nizhegorodnefteorgsintez CONTRACT TYPE: EPC - LS

MILD HYDROCRACKING UNIT, BUSALLA (ITALY) CAPACITY: 1,400 t/d (vacuum gasoil) CLIENT: IPLOM CONTRACT TYPE: EPC - LS

OIL & GAS TREATMENT PLANT, LUBIATOW VACUUM UNIT REVAMPING, MILAZZO (ITALY) (POLAND) CAPACITY:11,000 t/d GAS CAPACITY: 30,000 Nm3/h CLIENT: RAM (Raffineria di Milazzo) OIL CAPACITY: 1,300 t/d CONTRACT TYPE: Services for EPC - LS CLIENT: Polish Oil & Gas Company (PGNiG)

CONTRACT TYPE: EPC - LSTK KT PROJECTSKT

SRU & ACID GAS REMOVAL UNITS, HABSHAN 5 (UAE) CAPACITY: 4 x 1,300 t/d CLIENT: GASCO

CONTRACT TYPE: EP CS - LS COMPANY COMPANY | PROFILE UNDER REALIZATION PROJECT COMPLETED PROJECT 14 RECENT OIL & GAS PROJECTS

REFINERY OFF GAS (ROG) PROJECT PLANTS KSTOVO REFINERY: SRU & HC GAS FRACTIONATION UNITS ANTWERP (BELGIUM) HDT & HPU/ROG PSA KSTOVO (RUSSIAN FEDERATION) CAPACITY: 1 Saturated Gas Train 39 t/h off gas; 1 CAPACITY: GFU 425 ktons/y - SRU 80 ktons/y HPU 50 kNm3/h - Unsaturated Gas Train 30 t/h off Gas. ROG PSA 60 kNm3/h - DHT 1530 ktons/y CLIENT: Total Olefins Antwerp CLIENT: LLC LUKOIL – Nizhegorodnefteorgsintez CONTRACT TYPE: EPC - LSTK CONTRACT TYPE: EPC - LS

MODERNIZATION BAKU OIL REFINERY - HAOR PROJECT (AZERBAIJAN) CAPACITY: SRU: 2x30 t/d; TGT: 40 t/d Client: SOCAR HAOR MILD HYDROCRACKING UNIT, BUSALLA (ITALY) Contract type: EPC (JV TCM/KT) CAPACITY: 1,400 t/d (vacuum gasoil) CLIENT: IPLOM CONTRACT TYPE: EPC - LS

VACUUM UNIT REVAMPING, MILAZZO (ITALY) SRU & ACID GAS REMOVAL UNITS, HABSHAN 5 (UAE) CAPACITY:11,000 t/d CAPACITY: 4 x 1,300 t/d CLIENT: RAM (Raffineria di Milazzo) CLIENT: GASCO

CONTRACT TYPE: Services for EPC - LS CONTRACT TYPE: EP CS - LS KT PROJECTSKT OIL & GAS TREATMENT PLANT, LUBIATOW (POLAND) GAS CAPACITY: 30,000 Nm3/h OIL CAPACITY: 1,300 t/d CLIENT: Polish Oil & Gas Company (PGNiG)

CONTRACT TYPE: EPC - LSTK COMPANY COMPANY | PROFILE UNDER REALIZATION PROJECT COMPLETED PROJECT 15 RECENT OIL & GAS PROJECTS

OIL AND GAS TREATMENT "TEMPA ROSSA“ CORLETO PERTICARA (ITALY) CAPACITY: 50Kb/d crude oil treatment CLIENT: Total E&P Italia SpA (Total Group) CONTRACT TYPE: EPSCC CONTRACTOR: Project Association between Tecnimont and KT

DELAYED COKING UNIT AND HYDROGEN PRODUCTION UNIT, GDANSK (POLAND) CAPACITY: DCU 350,000 t/y; HPU 24,000 Nm3/h CLIENT: LOTOS ASFALT SP. ZO.O CONTRACT TYPE: EPC - LSTK

PHASE 2 MODERNIZATION PROJECT SONARA REFINERY, COKER NAPHTA HYDROTREATING UNIT AND HYDROWAX HYDROCRACKER COMPLEX, LIMBE (CAMEROUN) VACUUM DISTILLATION UNIT, GDANSK (POLAND) CAPACITY: 18,000 BPD CAPACITY: CNHTU 18,000 T/D; HVDU 2,280 t/d CLIENT: SONARA ReFineRY CLIENT: GROUPA LOTOS S.A. CONTRACT TYPE: EPC - LSTK CONTRACT TYPE: EPC - LSTK CONTRACTOR: Consortium with KT CAMEROUN; USTAY)

GAS COMPRESSION STATION, AL-ARISH (EGYPT)

KT PROJECTSKT CAPACITY: 400,000 Nm3/h CLIENT: East Mediterranean Gas Company

CONTRACT TYPE: EPC - LS COMPANY COMPANY | PROFILE UNDER REALIZATION PROJECT COMPLETED PROJECT 16 SRU & HC GAS FRACTIONATOIN UNITS HDT & HPU/ROG PSA, KSTOVO

Two EPC contracts granted by LUKOIL for a refinery upgrading project in central Russia.

KT has been awarded two EPC (Engineering- Procurement) contracts by LUKOIL NizhegorodNefteorgSyntez, a subsidiary of JSC LUKOIL. The contracts are related to five refinery process units for the large residue upgrading project, part of the Deep Conversion Complex in Kstovo City, central Russia.

The Project will improve the complexity and technological content of the Kstovo Refinery, enabling the plant to produce

KT PROJECTSKT CLIENT: LLC LUKOIL – ROG PSA 60 kNm3/h | | higher value products and refine lower Nizhegorodnefteorgsintez DHT 1530 ktons/y quality crude oil, therefore meeting the COUNTRY: Kstovo (Russian YEAR OF AWARD: 2017 Federation) START-UP: 2021 growing market demand for cleaner fuels as CONTRACT TYPE: EPC- LS well as ensuring higher yields of valuable CAPACITY: GFU 425 ktons/y - SRU 80 ktons/y HPU 50 kNm3/h GENERAL PRESENTATION GENERAL products. 17 HEYDAR ALIYEV OIL REFINERY MODERNIZATION (1/2) AND RECONSTRUCTION PROJECT

On February 2018 Maire Tecnimont Group, through the Joint Venture between its subsidiaries Tecnimont and KT has been awarded an EPC Contract on lump sum turn key basis for an important part of the execution of the Modernization and Reconstruction works for the Heydar Aliyev Baku Oil Refinery, in Azerbaijan.

The scope of the project entails the installation of several new grass root process units, the relevant utilities and storage with the final aim to upgrade the refinery facilities to be capable of processing 7.5 MMTPA of crude CLIENT: State Oil Company YEAR OF AWARD: 2018 of the Azerbaijan Republic START-UP: 2021

oil, while meeting quantity and quality (SOCAR) KT PROJECTSKT | | requirements of products both to feed COUNTRY: Azerbaijan

Azerikimya revamped plant and CONTRACT TYPE: EPC - LS to produce Euro V quality automotive

transportation fuels. GENERAL PRESENTATION GENERAL 18 HEYDAR ALIYEV OIL REFINERY MODERNIZATION (1/2) AND RECONSTRUCTION PROJECT

Among the new process units in the scope:

• Naphtha Splitter

• Diesel Hydrotreater Unit

• Isomerization Unit

• Hydrogen Production Unit

• Two PSA Units

• C4 Hydrogenation Unit

• MTBE Unit • Sour Water Stripper Unit with Sulphur Recovery Unit

The project aims at allowing the

KT PROJECTSKT commencing of the production within 2021

| | GENERAL PRESENTATION GENERAL 19 DELAYED COKER UNIT AND HYDROGEN PRODUCTION UNIT, GDANSK (1/2)

The Client is Lotos Asfalt Sp Zo.o. subsidiary of Grupa Lotos SA. The project is related to a refinery unit upgrading in the Gdansk refinery, in the framework of the EFRA (Effective Refining) Project. The contract includes the implementation of a Delayed Coking Unit, a Coker Naphtha Hydrotreating Unit, a Hydrogen Production Unit together with ancillary units in the premises of the Gdansk refinery. The scope of the contract entails the implementation of the best available technology for produced coke downloading and dewatering. CLIENT: LOTOS ASFALT SP YEAR OF AWARD: 2015 COUNTRY: Poland START-UP: 2018 This technology is regarded as a CONTRACT TYPE: EP - LSTK ENGINEERING HOURS: 480,000

breakthrough approach to the Delayed TOTAL CONTRACTVALUE: 304 MM€ CONSTRUCTION HOURS: KT PROJECTSKT Coking environmental impact mitigation. 2,500,000 CAPACITY: 350,000 t/y coke

28,000 Nm3/h Hydrogen Unit COMPANY COMPANY | PROFILE 20 DELAYED COKER UNIT AND HYDROGEN PRODUCTION UNIT, GDANSK (2/2)

Grupa Lotos (GLSA) owns and operates the Gdansk Refinery, second largest refinery in Poland. In the frame of a modernization program (Program 10+) and the efforts to eliminate the production of road asphalt and increase the production of middle distillate GLSA has identified additional units to be incorporated into the refinery, in particular: ❑ Delayed Coking licensed by Lummus

❑ Naphtha Hydrotreater licensed by Axens

❑ LPG Washing, licensed by Merichem

❑ Hydrogen Generation Unit licensed by KT

KT PROJECTSKT COMPANY COMPANY | PROFILE 21 REFINERY OFF GAS PROJECT (ROG PROJECT), ANTWERP (1/4)

PROJECT OBJECTIVE

The refinery configuration scheme will be modified by the provision of Refinery Off Gas (ROG) Unit aimed to recover valuable compounds (Ethane, Propane, Ethylene and Propylene) from Refinery Off Gases currently routed to Fuel Gas network and the integration of these streams

within existing U91 NC3 Cracker.

KT PROJECTSKT COMPANY COMPANY | PROFILE 22 REFINERY OFF GAS PROJECT (ROG PROJECT), ANTWERP (2/4)

The ROG project is divided in two lots: ❑ LOT A: new ROG Unit (U94) consisting of saturated and unsaturated Refinery Off Gases recovery train, new cooling towers installation, dedicated substation and instrument building. ❑ LOT B: Modification of existing NC3 Crackers (U91) to process the stream from ROG Unit and interconnecting works foreseen within the project.

CAPACITY OF ROG UNIT: 1 Saturated Gas Train 39 t/h Off Gas; 1 Unsaturated Gas Train 30 t/h Off

Gas KT PROJECTSKT YEAR OF AWARD: 2014 START-UP: 2016 ENGINEERING HOURS: 380,000

CONSTRUCTION HOURS: 700,000 COMPANY COMPANY | PROFILE 23 REFINERY OFF GAS PROJECT (ROG PROJECT), ANTWERP (3/4)

KEY PROJECT FEATURES

LOT A ❑ Highly congested ROG construction area and very limited availability of laydown areas at site and at TCF ❑ Challenging /tight Project Schedule ❑ Modularization approach was a key strategy for the Project and full modularization strategy has been developed during the FEED phase and endorsed during EPC.

LOT B ❑ Extensive survey to identify tie-ins and study of confirm interconnecting piping

routing KT PROJECTSKT ❑ Execution of a high number of tie-ins ❑ Strict coordination with refinery for scheduling erection works inside the

operating NC3 and especially during T/A. COMPANY COMPANY | PROFILE 24 REFINERY OFF GAS PROJECT (ROG PROJECT), ANTWERP

(4/4)

KT PROJECTSKT COMPANY COMPANY | PROFILE 25 SONARA REFINERY EXPANSION PROJECT, LIMBE

New Units: ❑ One Hydrocracker Unit (License by Axens) ❑ Ancillary Units: HPU, SWS, ARU, SRU, Off Gas Recovery ❑ One Cogeneration Train 15 MW Power ❑ Storage Tank Farm

Interface with existing facilities: ❑ Upgrade of: Flare, Instrument Air, Cooling Water, Fire Fighting systems ❑ New Cogen Train to be installed in the area of an existing twin Package ❑ Addition of new equipment in existing VDU and Gasoline Stabilization Unit CLIENT: SONARA (Societè YEAR OF AWARD: 2013 Nationale de Raffinage) START-UP: 2017 COUNTRY: Cameroun KT PROJECTSKT ENGINEERING HOURS: The Expansion Project is aimed to increase the CONTRACT TYPE: EPC - LSTK 500,000 Refinery capacity from 2.1 to 3.5 MTA and TOTAL CONTRACT VALUE: CONSTRUCTION HOURS: increase the production of Gasoil. 450 M€ 4000,000

CAPACITY: 18,000 BPD COMPANY COMPANY | PROFILE 26 GAS COMPRESSION STATION, AL-ARISH

The Project consists of a Compression Station located at the Al-Arish Terminal in Egypt, a subsea pipeline from Al-Arish to Ashqelon, and the Ashqelon Receiving Terminal in Israel. The pipeline has an internal diameter of 26 in. with a total length of 89 km, of which 85.4 km is subsea. Natural gas is supplied to the Project from a connection to the 36 in. Trans-Sinai Gas pipeline. From Ashqelon, the natural gas enters the Israeli Natural Gas Transmission System. The Project is designed to ultimately supply up to 7.0 Billion Cubic Metres per Annum (“BCMA”) of Egyptian sales quality natural gas to Israel. The current transport capacity of the existing facilities is at least 3.5 BCMA. KT has been awarded an EPC-LSTK contract for both Compression Station and Receiving Station, and a CLIENT: East Mediterranean YEARD OF AWARD: 2005 Gas Company KT PROJECTSKT PMC contract for the overall project management, START-UP: 2008 including the subsea pipeline. COUNTRY: Egypt ENGINEERING HOURS: 73,000 CONTRACT TYPE: EPC - LSTK CONSTRUCTION HOURS: TOTAL CONTRACT VALUE: 43,000

€92 MN COMPANY COMPANY | PROFILE 27 OIL AND GAS TREATMENT, TEMPA ROSSA

The Scope of work includes the central process facilities of the oil center where 50,000 barrels per day (BOPD) of crude oil are treated and stabilized and the treatment of the associated gas and water, the LPG storage center, the surface facilities on the well pads, the connections of the flowlines and pipelines with Snam Rete Gas and with Taranto Refinery pipeline.

CLIENT: Total E&P Italia SpA YEAR OF AWARD: 2012

KT PROJECTSKT COUNTRY: Italy START-UP: 2015 CONTRACT TYPE: EPC ENGINEERING HOURS: 200,000 (KT portion) TOTAL CONTRACT VALUE: US$600 MN (KT Portion: CONSTRUCTION HOURS: 1,000,000 (KT portion) US$180 mn)

CAPACITY: 50,000 BOPD Crude Oil COMPANY COMPANY | PROFILE 28 OIL & GAS TREATMENT PLANT, LUBIATOW

Scope of Work was the development of the Pipelines for 14 Oil and associated Gas wells and the development of the Central Treatment Plant consisting of two identical lines.

CLIENT: PGNiG COUNTRY: Poland TOTAL CONTRACT VALUE: US$140 MN

CONTRACT TYPE: EPC CAPACITY: 1,300 t/d – Oil 12,590 Nm3/hr – Sales Gas

YEAR OF AWARD: 2008 START-UP: 2012

KT PROJECTSKT ENGINEERING HOURS: 160,000

CONSTRUCTION HOURS: 1,200,000 COMPANY COMPANY | PROFILE 29 MILD HYDROCRACKING UNIT, BUSALLA

The project includes the construction of a Mild Hydrocracker and a Hydrogen Unit, in addition to a major revamping of the refinery utilities and Infrastructure. The refinery has a crude capacity of about 2 millions metric tons per year.

CLIENT: IPLOM Refinery COUNTRY: Italy TOTAL CONTRACT VALUE: US$130 mn

CONTRACT TYPE: EPC CAPACITY: 10,000 BBLD

1,400 t/d vacuum gasoil KT PROJECTSKT YEAR OF AWARD: 2008 START-UP: 2011 ENGINEERING HOURS: 150,000

CONSTRUCTION HOURS: 1,000,000 COMPANY COMPANY | PROFILE 30 HABSHAN 5 PROCESS PLANT, ABU DHABI

Scope of work of the JV Tecnimont – JGC is the development of the entire process facilities at Habshan which consists of: CLIENT: GASCO COUNTRY: U.A.E. ❑ Two trains of feed gas compression for the new associated gas CONTRACT TYPE: EPC (JV TCM-JGC) feeds CONTRACT VALUE: US$4,700 MN ❑ One train of condensate stabilization (TCM Portion 50%)

❑ Four gas sweetening and dehydration trains KT Subcontract: US$170 MN KT PROJECTSKT CAPACITY: 2,000 SCFD ❑ Two rich gas NGL recovery trains (designed for high ethane recovery) YEAR OF AWARD: 2009 START-UP: 2013 ❑ Four sulphur recovery units with associated tail gas treatment

facilities (total recovery 99.9+%) ENGINEERING HOURS: 200,000 COMPANY COMPANY | PROFILE 31 SULPHUR AND GAS TREATMENT FACILITIES

COMPETENCES

❑ Leading Licensor and EPC Contractor ❑ Tailor-made solutions ❑ Full plant life cycle support ❑ Extensive expertise plant revamping and retrofitting

HIGHLIGHTS KT PROJECTSKT Proprietary technologies for Gas Sweetening and Tail Gas Treatment (RAR

Technology) COMPANY COMPANY | PROFILE 32 RECENT SULPHUR RECOVERY AND GAS TREATMENT PROJECTS (1/2) MOSCOW REFINERY SULPHUR RECOVERY UNIT (SRU) MOSCOW (RUSSIAN FEDERATION) SULPHUR RECOVERY UNIT – SOUR WATER STRIPPER – AMINE RECOVERY, SULPHUR RECOVERY UNIT (SRU) MILAZZO (ITALY) CAPACITY: SRU 2x290t/d – Amine Recovery 2x240t/h MOSCOW (RUSSIAN FEDERATION) CAPACITY: SRU 110 t/d – SWS 108 t/h - Amine Recovery 160 m3/h CLIENT: JSC Gazpromneft Moscow Refinery CAPACITY: SRU 2x230t/d – TGT 1x460t/d CLIENT: RAM (Raffineria di Milazzo) CONTRACT TYPE: BEDP - LS CLIENT: JSC Gazpromneft CONTRACT TYPE: EPC - LS CONTRACT TYPE: B - LS

BASIC ENGINEERING DESIGN FOR SRU & TGT, FAJA DUE DILIGENCE FEASIBILITY STUDY FOR NEW REFINERY DEL ORINOCO (VENEZUELA) MONGOLIA CAPACITY: SRU 4x700 t/d – TGT 2x1400 t/d CAPACITY 4600 t/d CLIENT: PetroMiranda CONTRACT TYPE: BEDP - LS CLIENT: MONGOL REFINERY CONTRACT TYPE: Consultancy services

BASIC ENGINEERING DESIGN FOR SRU & TGT, FAJA DEL ORINOCO (VENEZUELA) CAPACITY:SRU 3x540 t/d – TGT 2x1080 t/d CLIENT: Petrocarabobo SA CONTRACT TYPE: BEP - LS

SULPHUR RECOVERY UNIT FOR RAMP UP TO PLATEAU, ZOHR DEVELOPMENT PROJECT, PORT SAID – EGYPT CAPACITY: N.3 Claus trains, SRU 12 t/d (each); SULPHUR RECOVERY UNIT (SRU) – TAIL GAS N.2 TGT units with SO2 Scrubber, SRU 24 t/d TREATMENT (TGT), BAKU (AZERBAIJAN) (each) CAPACITY: SRU 2x30 t/d – TGT 1x40 t/d CLIENT: Belayim Petroleum Co. (PETROBEL) CLIENT: SOCAR CONTRACT TYPE: EP - LS CONTRACT TYPE: License + PDP - LS

SULPHUR RECOVERY UNIT, ZOHR DEVELOPMENT PROJECT, FEED FOR SO2 EMISSIONS REDUCTIONS PROJECT, PORT SAID – EGYPT MESAIEED (QATAR) CAPACITY: 4 x12t/d – TGT 2 x 24 t/d CLIENT: Q-CHEM CLIENT: Belayim Petroleum Co. (PETROBEL) CONTRACT TYPE: FEED - LS

KT PROJECTSKT CONTRACT TYPE: EP - LS

SULPHUR RECOVERY UNIT, MOSTOROD CLEAN FUEL & SULPHUR RECOVERY UNIT PROJECT (EGYPT) RABIGH (KINGDOM OF SAUDI ARABIA) CAPACITY: 320 t/d CAPACITY: NHT 17,000 b/d; SRU 290 t/d CLIENT: Egyptian Refining Company (ERC) CLIENT: Petro Rabigh (JV Saudi Aramco & Sumitomo Chemical)

CONTRACT TYPE: BEP, EP - LS CONTRACT TYPE: EPC - LS COMPANY COMPANY | PROFILE UNDER REALIZATION PROJECT COMPLETED PROJECT 33 SULPHUR RECOVERY UNITS – PHASE I & II - PORT SAID

KT has been awarded a new EP (Engineering & Procurement) contract by Belayim Petroleum Co. (PETROBEL) in the frame of the ZOHR DEVELOPMENT PROJECT, in Egypt.

The entire project consists in new Greenfields gas processing facilities at Zohr site in Port Said and will be developed in two different phases by Petrobel.

KT Scope of work consists of the supply of two modularized Sulphur recovery Units complete with Claus, TGT and AGE sections, and based on KT's Multipurpose TM proprietary technology. These two Units were delivered by KT as part of the Phase 1 Zohr Project, while two other Units relevant to Phase 2 will follow.

CLIENT: Belayim Petroleum Co. (PETROBEL) YEAR OF AWARD: 2017 KT PROJECTSKT | | COUNTRY: Egypt START-UP: 2021 CONTRACT TYPE:EP - LS ENGINEERING HOURS: 100,000 CAPACITY Phase I: N.4 Claus trains, SRU 12 t/d each No. 2 TGT with SO2 scrubber, SRU 24 t/d each

Phase II: No. 3 Claus trains, SRU 12 t/d each GENERAL PRESENTATION GENERAL No. 2 TGT with SO2 scrubber, SRU 24 t/d each 34 PETRO RABIGH, Clean Fuels & SRU, RABIGH

Rabigh Refining & Petrochemical Co. (Petro Rabigh) is a joint venture of Saudi Aramco and Sumitomo Chemical Co.

The Project aims to complete a Clean Fuels program at Petro Rabigh’s 400,000-barrels/day refinery and chemicals complex located in the port city of Rabigh, Kingdom of Saudi Arabia.

KT will provide engineering, procurement, and construction services for the project, which will include a 17,000-barrels/day naphtha hydrotreater, a 220 tons/day sulphur recovery unit, as well as related interconnecting works. The project completion is expected in the first-

KT PROJECTSKT quarter of 2019. CLIENT: Petro Rabigh (JV CAPACITY: NHT 17,000 b/d; | | Saudi Aramco & Sumitomo SRU 290 t/d Chemical) KT is eager to continue to support Petro Rabigh in YEAR OF AWARD: 2016 COUNTRY: KINGDOM OF SAUDI START-UP: 2019 the technological development of one of the most ARABIA strategic hydrocarbon processing complexes in the CONTRACT TYPE: EPC - LS

GENERAL PRESENTATION GENERAL Country. 35 SULPHUR RECOVERY UNIT, MILAZZO

The scope of work consists of the following: ❑ New SWS, ARU and SRU ❑ New internals for vacuum column ❑ New Slide cut for LC FINING ❑ New cooling system ❑ New vacuum system

CLIENT: Milazzo Refinery (RAM) SRU CAPACITY: 100 t/h (130t/h with YEAR OF AWARD: 2012

COUNTRY: Italy enriched air) START-UP: 2015 KT PROJECTSKT CONTRACT TYPE: EPC OGA CAPACITY: 150 t/h of rich amine ENGINEERING HOURS: 160,000 solution TOTAL CONTRACT VALUE: US$85 MN CONSTRUCTION HOURS: 1,800,000 SWS CAPACITY: 110 t/h of sour water VACUUM UNIT CAPACITY: 60,000 BPSD

LC FINING CAPACITY: 26,000 BPSD COMPANY COMPANY | PROFILE 36 SULPHUR RECOVERY UNIT, BURGAS

The new SRU-4 is composed by the following sections: ❑ Two identical sulphur recovery trains, with a capacity of 148 t/d of produced sulphur each

❑ A common Tail Gas Treatment (TGT) section including incinerator with a tail gas capacity corresponding to the total production of 296 t/d sulphur

❑ Sulphur solidification package (3x110 t/d Pastillating Units)

❑ Sulphur handling, storage (10,000 tons capacity) and loading. CLIENT: OOO Lukoil Neftochim START-UP: 2014 Burgas AD ENGINEERING HOURS: 85,000 COUNTRY: Bulgaria

KT PROJECTSKT CONSTRUCTION HOURS: CONTRACT TYPE: EPC - LSTK 500,000 TOTAL CONTRACT VALUE: €53 MN CAPACITY: 200,000 BBLD

YEAR OF AWARD: 2012 COMPANY COMPANY | PROFILE 37 RECENT SULPHUR RECOVERY AND GAS TREATMENT PROJECTS (2/2)

SULPHUR RECOVERY UNIT (SRU) – TAIL GAS SULPHUR RECOVERY UNIT & TAIL GAS TREATMENT, TREATMENT (TGT), BURGAS (BULGARIA) SRU/TGT CRITICAL EQUIPMENT SUPPLY, NYNASHAMN (SWEDEN) CAPACITY: SRU 2x148 t/d – TGT 296 t/d NOVOPOLOTSK (BIELARUS) CAPACITY: 48 t/d CLIENT: Lukoil Neftochim Burgas AD CAPACITY: 226 t/d CLIENT: Nynas Refinery AB CONTRACT TYPE: EPC - LS CLIENT: Naftan CONTRACT TYPE: EPC - LSTK CONTRACT TYPE: BP - LS

CLAUS MODULAR PACKAGE UNIT, KHABAROVSK SULPHUR PROJECT: SULPHUR RECOVERY PLANT, TAIL (RUSSIAN FEDERATION) GAS TREATMENT, AMINE, SOUR WATER STRIPPER, CAPACITY: 7.5 t/d GDANSK (POLAND) CLIENT: Khabarovsk Oil Refinery CAPACITY: SRU 2x75 t/d – TGT 150 t/d, Amine 8,400 CONTRACT TYPE: EP - LS t/d – SWS 1,560 t/d CLIENT: Grupa Lotos SA CONTRACT TYPE: EPC - LSTK

BASIC DESIGN & ENGINEERING PACKAGE FOR SRU, KARBALA (IRAQ) CAPACITY: 360 t/d CLIENT: SCOP (IRAQI STATE COMPANY FOR OIL PROJECTS) 63 KT/A SULPHUR RECOVERY UNIT BAOTA CONTRACT TYPE: BEPD - LS PETROCHEMICAL PROJECTS, XINJIANG (CHINA) CAPACITY: Claus: 1x180 t/d – TGT 1X180 t/d CLIENT: Jiangsu Sunpower Technology Co. Ltd CONTRACT TYPE: EP - LS

EXTENDED BASIC DESIGN PACKAGE, TECHNOLOGY PROVIDER AND SINGLE POINT OF RESPONSIBILITY FOR AGR, SULPHUR RECOVERY UNIT SINO-KUWAIT REFINERY SRU &TGT, SO2 SCRUBBER SYSTEM – JURASSIC EPF, PETROCHEMICAL INTEGRATED PROJECT, SRU – KUWAIT CITY (KUWAIT) ZHANJIANG (CHINA) CAPACITY: 1,100 t/d CLIENT: Kuwait Oil Company CAPACITY: 1,480 t/d CONTRACT TYPE: BEPD - LS CLIENT: China Petrochemical International Co. Ltd

CONTRACT TYPE: B - LS KT PROJECTSKT

SRU & ACID GAS REMOVAL UNITS HABSHAN 5 SULPHUR RECOVERY UNIT 260 KTA CAPACITY, ABU DHABI (UAE) TIANJIN (CHINA) CAPACITY: 4x1,300 t/d CAPACITY: Claus 820 t/d, TGT 875 t/d CLIENT: GASCO CLIENT: Petrochina Yunnan Petrochemical Co. Ltd

CONTRACT TYPE: EPCS - LS CONTRACT TYPE: B - LS COMPANY COMPANY | PROFILE UNDER REALIZATION PROJECT COMPLETED PROJECT 38 SULPHUR COMPLEX, GDANSK

Scope of the work is the performance of an EPC LSTK project, including Engineering, Design, Supply of Equipment and Materials, Construction and Pre-commissioning of the New Sulphur Complex (KAS) of GLSA Gdansk Refinery, that will be necessary after completion of the new unit for achieve. Capacity of 10.5 millions metric tons per year.

CLIENT: Grupa Lotos SA AMINE UNIT: 350 t/h capacity YEAR OF AWARD: 2007 COUNTRY: Poland SOUR WATER STRIPPER UNIT: 65 t/h START-UP: 2009

KT PROJECTSKT CONTRACT TYPE: EP - LSTK capacity ENGINEERING HOURS: 120,000 TOTAL CONTRACT VALUE: US$ 150 MN 2 SULPHUR RECOVERY UNITS: 75 t/d CONSTRUCTION HOURS: 1,000,000 capacities each TAIL GAS TREATMENT UNIT: 150 t/d

capacity COMPANY COMPANY | PROFILE 39 SULPHUR RECOVERY UNIT, NYNASHAMN

The scope of work consists of the following: ❑ New Sulphur Recovery Unit 24 t/d capacity ❑ New Tail Gas Treatment Unit 48 t/d capacity Interconnecting Facilities ❑ Sulphur Storage and Truck Loading

❑ DCS and Substation KT PROJECTSKT CLIENT: Nynas AB YEAR OF AWARD: 2010 COUNTRY: Sweden START-UP: 2012 CONTRACT TYPE: EPC - LSTK ENGINEERING HOURS: 130,000

TOTAL CONTRACT VALUE: €50 MN CONSTRUCTION HOURS: 600,000 COMPANY COMPANY | PROFILE 40 HYDROGEN & SYNGAS PRODUCTION

COMPETENCES

❑ Leading Licensor and EPC Contractor ❑ Tailor-made solutions ❑ Full plant life cycle support ❑ Extensive expertise plant revamping and retrofitting

KT PROJECTSKT HIGHLIGHTS Leading Company in providing hydrogen production units based on steam

reforming technology COMPANY COMPANY | PROFILE 41 RECENT HYDROGEN AND SYNGAS PROJECTS (1/2)

MODULARIZED HPU, HDT, DEWAXING OF DIESEL FUEL FEASIBILITY STUDY, FEED, OBE (Open Book Estimation) AND PROJECT, OMSK (RUSSIA) PSA (Pressure Swing Adsorption) SUPPLY FOR HYDROGEN CAPACITY: 15,500 Nm3/h PRODUCTION UNIT, BAIJI (IRAQ) CLIENT: JSC GAZPROMNEFT CAPACITY: 72,000 Nm3/h CONTRACT TYPE: EP - LS CLIENT: North Refineries Company (Iraqi State Company for Oil Projects) CONTRACT TYPE: FS + EP - LS

HYDROGEN GENERATION PLANT, NYNASHAMN (SWEDEN) CAPACITY: 15,000 Nm3/h CLIENT: Nynas Refinery AB CONTRACT TYPE: EPC - LSTK

HYDROGEN PRODUCTION UNIT, BUSALLA (ITALY) CAPACITY: 16,000 Nm3/h CLIENT: IPLOM CONTRACT TYPE: EPC - LS BASIC ENGINEERING DESIGN PACKAGE FOR HPU, NASSIRIYA (IRAQ) CAPACITY: 2 x 188,000 Nm3/h CLIENT: SCOP (Iraqi State Company For Oil Projects)

CONTRACT TYPE: BEDP - LS

KT PROJECTSKT COMPANY COMPANY | PROFILE UNDER REALIZATION PROJECT COMPLETED PROJECT 42 HYDROGEN PRODUCTION UNIT, OMSK

The Scope of Work of KT covers the following: ❑ Basic Engineering Design for the new Hydrogen Production Unit,

❑ Detailed Engineering Design

❑ Equipment and Materials Supply

❑ Fabrication of Modules

❑ Client’s Personnel Training

❑ Assistance during Construction, Precommissioning, Commissioning and Start Up of the Plant. The Hydrogen Production Unit will produce 12 t/y (15500 Nm3/h) of pure (99.9% vol.) Hydrogen.

CLIENT: JSC Gazpromneft CAPACITY: 15,500 Nm3/h of H2 KT PROJECTSKT COUNTRY: Russian Federation CONTRACT TYPE: EP TOTAL CONTRACT VALUE YEAR OF AWARD: 2015 Including Attachments: START-UP: 2018

Approx. 27,3 MM€ COMPANY COMPANY | PROFILE 43 HYDROGEN GENERATION PLANT, NYNASHAMN

The hydrogen production rate is 15,000 Nm3/h in terms of pure hydrogen with both naphtha and natural gas feedstock. ❑ Turn down ratio 30% (equivalent to 4,500 Nm3/h hydrogen production) ❑ The cycle length based on catalyst lifetime is minimum four years. Time between turndowns is four years. The unit is designed for four years uninterrupted operation. ❑ High availability and reliability of the unit is required. The availability is 99.0% or higher.

CLIENT: Nynas Refinery AB YEAR OF AWARD: 2008 KT PROJECTSKT COUNTRY: Sweden START-UP: 2010 TOTAL CONTRACT VALUE: €30 MN ENGINEERING HOURS: 60,000 CONTRACT TYPE: EPC - LSTK CONSTRUCTION HOURS: 200,000

CAPACITY: 15,000 Nm3/h as H2 COMPANY COMPANY | PROFILE 44 RECENT HYDROGEN AND SYNGAS PROJECTS (2/2)

MODULARIZED HYDROGEN PRODUCTION PLANT, PERM’ HYDROGEN GENERATION PLANT, RIJEKA (CROATIA) (RUSSIAN FEDERATION) CAPACITY: 81,000 Nm3/h CAPACITY: 40,000 Nm3/h CLIENT: INA Industrija Nafte CLIENT: Lukoil Permnefteorgsintez CONTRACT TYPE: EPC - LSTK CONTRACT TYPE: EP - LS

HYDROGEN PLANT, MAZIEIKIAI (LITHUANIA) CAPACITY: 60,000 Nm3/h CLIENT: Mazhieikiu Nafte AB CONTRACT TYPE: EPC - LS

NEW HYDROGEN PRODUCTION UNIT CADEREYTA STEAM REFORMER PACKAGE, AL JUBAIL (KINGDOM REFINERY, CADEREYTA, MONTERREY (MEXICO) OF SAUDI ARABIA) CAPACITY: 2x132,000 Nm3/h CAPACITY: 25,000 Nm3/h CLIENT: SATORP (JV Saudi Aramco & Total) CLIENT: Pemex Refinaciόn CONTRACT TYPE: EP - LS CONTRACT TYPE: EPC – LS

CONTRACTOR: JV KT, OHL Industrial SL, Tapia SA KT PROJECTSKT

HYDROGEN PRODUCTION UNIT, MOSTOROD (EGYPT) HPU, GDANSK (POLAND) CAPACITY: 100,000 Nm3/h CAPACITY: H2 - 28,000Nm3/h CLIENT: Egyptian Refining Company (ERC) CLIENT: LOTOS ASFALT SP. ZO.O CONTRACT TYPE: BEP, EP - LS

CONTRACT TYPE: EPC - LSTK COMPANY COMPANY | PROFILE UNDER REALIZATION PROJECT COMPLETED PROJECT 45 HYDROGEN PRODUCTION UNIT, RIJEKA

Scope of Work was the implementation, on EPC basis, of a 81,000 Nm3/h Hydrogen Production Unit.

The Plant configuration has been developed based on KT know-how in Hydrogen and Syngas production.

CLIENT: INA Industija Nafte DD YEAR OF AWARD: 2007

KT PROJECTSKT COUNTRY: Croatia START-UP: 2010 TOTAL CONTRACT VALUE: US$ 90 MN ENGINEERING HOURS: 100,000 CONTRACT TYPE: EPC CONSTRUCTION HOURS: 800,000 CAPACITY: 81,000 Nm3/h as H2

COMPANY COMPANY | PROFILE 46 HYDROGEN PRODUCTION UNIT, MOSTOROD

The scope of work consists of HPU and SRU units for a Refinery expansion. The units will be designed, fabricated and fully modularized in order to minimize construction site activities.

CLIENT: GS/ERC CAPACITY: YEAR OF AWARD: 2012 KT PROJECTSKT COUNTRY: Egypt ❑ 100,000 Nm3/h of H2 START-UP: 2014 CONTRACT TYPE: EP Modularized ❑ 3 Claus 162 T/day ENGINEERING HOURS: 160,000 TOTAL CONTRACT VALUE: US$150 MN 1 TGT 325 T/day

1 Sulphur solidification of 325 T/day COMPANY COMPANY | PROFILE 47 HYDROGEN PRODUCTION UNIT, PERM

The plant is designed to produce 40,000 Nm3/h of Hydrogen. The design philosophy adopted is oriented in: ❑ minimizing the raw materials and utilities consumptions in order to achieve the maximum Plant Efficiency for both operating cases with Hydrocarbon Gas and Natural Gas Feeds and, also, obtaining a valuable amount of steam export with no need for any steam level import ❑ optimizing the plant configuration against the variable feedstock scenarios providing the technical

solution for a modular execution CLIENT: OOO Lukoil CAPACITY: 40,000 Nm3/h KT PROJECTSKT strategy compatible with logistic Permnefteorgsintez YEAR OF AWARD: 2013 constraints. COUNTRY: Russia START-UP: 2014 TOTAL CONTRACT VALUE: €44,5 MN ENGINEERING HOURS: 64,000

CONTRACT TYPE: EP- LSTK COMPANY COMPANY | PROFILE 48 HYDROGEN PLANT, MAZIEIKIAI

Scope of Work was the implementation, on EPC basis, of a 60,000 Nm3/h Hydrogen Production Unit. Plant configuration has been developed to handle multiple feedstock (Refinery off Gas and Liquid Butane) together with dual fuel to burners. In a conventional process scheme with primary reformer, HTS and PSA, provision of multiservice compressor system for feed and product, advanced control system and air preheating above 500°C are the main features of this unit to be highlighted.

CLIENT: AB Mazekiu Nafta COUNTRY: Lithuania TOTAL CONTRACT VALUE: €60 MN CONTRACT TYPE: EPC- LSTK

CAPACITY: 60,000 Nm3/hr as H2 KT PROJECTSKT YEAR OF AWARD: 2006 START-UP: 2009 ENGINEERING HOURS: 100,000

CONSTRUCTION HOURS: 500,000 COMPANY COMPANY | PROFILE 49 FIRED HEATERS AND HEAT TRANSFER EQUIPMENT

COMPETENCES

❑ Process, detailed mechanical design and supply all required materials ❑ Revamping and debottlenecking services, after Sales services ❑ Full plant life cycle support

HIGHLIGHTS

Proprietary technology and know how Approved Supplier of major World Players: Bechtel (ThruPlus Coker KT PROJECTSKT Heaters), KBR (Ammonia Reformers), Aramco (Fired Heaters), Sasol (GTL

Heaters) and others COMPANY COMPANY | PROFILE 50 RECENT FIRED HEATERS AND HEAT TRANSFER EQUIPMENT PROJECTS

NEW TOPPING AND PREFLASH HEATERS, AMMONIA AND PROCESS OSBL PROJECT: KBR MAZIEIKIAI (LITHUANIA) H2 STEAM REFORMER PRIMARY REFORMER, IOWA (USA) HEATER DUTY: 150 Gkcal/h YANBU (KINGDOM OF SAUDI ARABIA) CAPACITY: 2200 MTPD CLIENT: Mazhieikiu Nafte AB CAPACITY: 60,000 Nm3/h CLIENT: Orascom Construction Industrie CONTRACT TYPE: EPC - LS CLIENT: LUBEREF CONTRACT TYPE: EP – LS CONTRACT TYPE: EP - LS

N.2 EDC CRACKING HEATERS FOR PYROLISIS, SHANDONG (CHINA) PROCESS GAS HEATER, ST. JAMES (LOUISIANA) CAPACITY: 2x59 t/h of EDC liquid HEATER DUTY: 247 MMkcal/h CLIENT: Shandong Yangmeihengtong Chemical & Co. CLIENT: Hyl Technologies S.A. DE C.V. Ltd CONTRACT TYPE: EP - LS CONTRACT TYPE: EP - LS

TOPPING REVAMPING FURNACES, LE HAVRE (FRANCE) N.2 KETENE CRACKING FURNACES, QINGDAO (CHINA) HEATER DUTY: 150 Gkcal/h HEATER DUTY: 4,58 MW CLIENT: TOTAL CLIENT: Qindao Double Peach Specialty Chemicals (Group) CONTRACT TYPE: EP + assistance - LS + Construction Co. Ltd assistance reimbursable CONTRACT TYPE: EP - LS

REACTOR FEED HEATER, NAFTA SPLIT REBOILER, EXTRACT HEATER – GDANSK (POLAND)

KT PROJECTSKT HEATERS DUTY: 11.8 MW; 16,2 MW; 14,25 MW CLIENT: Grupa Lotos SA CONTRACT TYPE: EPC - LS ASC PHASE – VI PROJECT (PACKAGE-1) EDC PYROLYSIS FURNACE FU-C401A/B, ANYER – BANTEN (INDONESIA) HEATER DUTY: 2x81 t/h N.4 FIRED HEATERS KETENE CRACKING FURNACES CLIENT: P.T. Asahimas Chemical (ASC), AGC Japan Group YANBU (KINGDOM OF SAUDI ARABIA) CONTRACT TYPE: EP - LS TOTAL DUTY: 30 MM kkcal/h CLIENT: LUBEREF

CONTRACT TYPE: EP - LS COMPANY COMPANY | PROFILE UNDER REALIZATION PROJECT COMPLETED PROJECT 51 TOPPING AND PREFLASH UNIT, MAZIEIKIAI

The scope of works of this project will include the design, procurement, fabrication, installation of the following items: ❑ New heaters built adjacent to the existing ones ❑ Civil works for pre-assembly areas, and equipment foundations (fan and Air pre-heater ground mounted) ❑ Piping Works ❑ Instrumentation Works including field and DCS/ESD system in MCR. ❑ Electrical Work including lighting, and power supply from/to local boxes/boards. ❑ Removal of existing Heaters and replacing with the new ones.

The construction strategy was based on replacing the old heaters with new ones, by using the existing foundations; existing heaters have been jacked up and extracted from foundations by skidding or equivalent system (i.e. rollers), and left beside the actual plot area, leaving sufficient spaces for insertion of new heaters; afterwards the new pre-assembled heaters have been moved with the same system and jacked KT PROJECTSKT down on foundations.

CLIENT: AB Mažeikių Nafta TOTAL CONTRACT VALUE: €25 MN ENGINEERING HOURS: 40,000 COUNTRY: Lithuania YEAR OF AWARD: 2005 CONSTRUCTION HOURS: 60,000

CONTRACT TYPE: LSTK/EPC START-UP: 2006 COMPANY COMPANY | PROFILE 52 RESEARCH & DEVELOPMENT ACTIVITIES

COMPETENCES

❑ Activities with international Industrial Partners, Universities and Research institutions ❑ Funding from Italian Ministry of Education and European Commission

HIGHLIGHTS KT PROJECTSKT Development of innovative technologies

Design and realization of pilot plants COMPANY COMPANY | PROFILE 53 RECENT RESEARCH & DEVELOPMENT PROJECTS

PROMECA - PROCESS INTENSIFICATION THROUGH THE DEVELOPMENT OF INNOVATIVE MEMBRANES AND CATALYSTS FISR PROJECT PILOT PLANT: MEMBRANE REFORMING REACTOR FOR HYDROGEN PRODUCTION, CHIETI (ITALY) EINDHOVEN - THE NETHERLANDS CAPACITY: 20 Nm3/h Capacity: HP 1 Nm3/h CONTRACT TYPE: R&D Funded by EU R&D Contract founded by EU Coordinator: University of Salerno

INNOVATIVE CATALYTIC TECHNOLOGIES & MATERIALS FOR NEXT DEMETO (De-polymerization by Microwaves Technology) GAS-TO-LIQUID (NEXT-GTL), CHIETI (ITALY) CHIETI - ITALY CAPACITY: 20 Nm3/h CAPACITY: 100 kg/h (Pilot Plant capacity) CONTRACT TYPE: R&D Funded by EU CONTRACT TYPE: Horizon 2020, R&D Funded by EC COORDINATOR : Processi Innovativi

SOLAR COMPACT MULTIFUEL-ENERGY TO HYDROGEN CONVERTER (CoMETHy), ROME (ITALY) CAPACITY: 2 Nm3/h CONTRACT TYPE: R&D Funded by EC CONTRACTOR: Processi Innovativi

MULTIPURPOSE APPLICATIONS BY THERMODINAMICS SOLAR PROJECTS, ALEXANDRIA (EGYPT) CAPACITY: 100,000 Nm3/h CAPACITY: 1 Mwel (electic energy) – 250 m3/d (desalinated water) CONTRACT TYPE: R&D Funded by EU KT PROJECTSKT DEVELOPMENT OF SYSTEMS FOR DISTRIBUTED HYDROGEN AND SYNGAS PRODUCTION BY MULTIFUEL CATALYTIC AUTOTHERMAL REFORMING (PON), SALERNO (ITALY) CAPACITY: 50 Nm3/h CONTRACT TYPE: EPC – LSTK R&D Funded by EC

CONTRACTOR: Processi Innovativi COMPANY COMPANY | PROFILE UNDER REALIZATION PROJECT COMPLETED PROJECT 54 THE 2.0 GROUP MOTTOS

55 Maire Tecnimont Group’s Headquarters

Via Gaetano De Castillia, 6A 20124 Milan P. +39 02 6313.1 F. +39 02 6313.9052 [email protected]

KT – Kinetics Technology

Viale Castello della Magliana, 27 00148 Rome P. +39 06 60216 1 [email protected]

www.kt-met.com Follow us on