Notification

Notice of Traffic Counting August 2020 | www.hs2.org.uk

High Speed Two (HS2) is the new high speed railway for Britain. We are Duration of works continually reviewing the works on our construction sites in line with Government and Public Health (PHE) advice on dealing with Installation will begin in COVID-19. You can sign up for regular updates in your local area at August 2020 and remain in www.hs2inbucksandox.co.uk place for traffic monitoring for Who is EKFB? 12 months Eiffage Kier Ferrovial BAM (EKFB) is one of the contractors carrying out civil Normal working hours: engineering works for the new HS2 line. EKFB will undertake all earthworks Monday to Friday and landscaping in this area as well as creating bridges, viaducts and green 8:00am – 6:00pm tunnels. Saturdays What are we doing? 8:00am – 1:00pm As part of HS2’s preparation works, automatic traffic counters will be Night-time working planed installed at six locations in your area. These counters will monitor the traffic for Missenden Bypass works movements on the hilltop lanes so that we can measure the impact of any between 7:30pm – 11:30pm. traffic once the main works begin. The counter will remain in place for 12 months. What to expect When will these works take place? Traffic management for a Installation of the counters will take place in August 2020. There are six short period of time in the six proposed locations for these counters and will take approximately 3 hours locations during installation. to install. Minor works on or adjacent 1. Rignall Road, Great Missenden to the highway. 2. Road, Great Missenden 3. A413 Missenden Bypass, Great Missenden, notes these works What we will do will take place between 7:30pm – 11:30pm to avoid rush hour periods Take care to respect your 4. Potter Row, Great Missenden community and the 5. Village Road, Ballinger environment. 6. Lane, Chartridge Respond promptly to any complaints and take The proposed location can be seen on the maps attached in this document. appropriate action. Inform you of any changes to the dates we have given. If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]

Call our HS2 Helpdesk team on 08081 434 434

Notice of Installation of Notification Automatic Traffic Counting

www.hs2.org.uk How will this affect me? Installation of these monitoring points will be completed within a day at each location, and we need to use temporary traffic management to support the works. The works involve a slot cut that is 65-80mm deep and 10mm wide, made using a motor drive saw, at each location before installing the loop feeder cable. Hot pour bitumen will then backfill the slot. The installed loops will terminate into a roadside cabinet, this will require installing plinths and ducts, then bolting the cabinet onto a concrete plinth to secure and install loops into the cabinet. Finally, once the works are completed the traffic management will be removed. The specified locations are detailed below;

Location 1 – Rignall Road, Great Missenden

Contact our HS2 Helpdesk team on 08081 434 434

Location 2 – Aylesbury Road, Great Missenden

Location 3 – A413 Missenden Bypass, Great Missenden

Contact our HS2 Helpdesk team on 08081 434 434

Location 4 – Potter Row, Great Missenden

Location 5 – Village Road, Ballinger

Contact our HS2 Helpdesk team on 08081 434 434

Location 6 – Chartridge Lane, Chartridge

Contact our HS2 Helpdesk team on 08081 434 434

What else is happening in your area? www.hs2.org.uk Contact our new HS2 Helpdesk team Our new Helpdesk team is based in our Head Office in Birmingham. This is so that we can provide you with the best service possible. Our team is here to listen and respond to your enquiry, complaint or feedback to help us be a good neighbour. You can contact our Helpdesk team all day, every day of the year on: Freephone: 08081 434 434 Minicom: 08081 456 472

Email: [email protected]

Keep up to date with your local community website To find out more about what’s happening in your area and receive regular email updates, you can sign up to our local community websites at: www.hs2inyourarea.co.uk. About our Community and Business Funds We are offering two funds that are available to local communities and businesses between the West Midlands and , to help with the disruption caused by our construction work. These are the Community and Environment Fund (CEF) and the Business and Local Economy Fund (BLEF). The CEF is designed to give communities the opportunity to share in the benefits of HS2. It is an allocated fund that communities are able to apply for, to help to support local projects that aim to improve their local area. The BLEF is designed to support local economies that may be disrupted by the construction of HS2. BLEF grants are for local business support organisations and local authorities to help maintain business activity in local communities.

For more information about each of these funds, including how to apply, please visit: https://www.groundwork.org.uk/hs2funds

Contact our HS2 Helpdesk team on 08081 434 434

Keeping you informed We are committed to keeping you informed about work on HS2. This includes ensuring you know what to expect and when to expect it, as well as how we can help. Residents’ Charter and Commissioner The Residents’ Charter is our promise to communicate Contact Us as clearly as we possibly can with people who live along or near the HS2 route. Contact our HS2 Helpdesk team all day, www.gov.uk/government/publications/hs2-residents- every day of the year on: charter We also have an independent Residents’ Freephone 08081 434 434 Commissioner whose job is to make sure we keep to Minicom 08081 456 472 the promises we make in the Charter and to keep it under constant review. Find reports at: Email [email protected] www.gov.uk/government/collections/hs2-ltd- residents-commissioner Write to: You can contact the Commissioner at: FREEPOST [email protected] HS2 Community Engagement

Construction Commissioner Website www.hs2.org.uk The Construction Commissioner’s role is to mediate and monitor the way in which HS2 Ltd manages and To keep up to date with what is responds to construction complaints. You can contact happening in your local area, visit: the Construction Commissioner by emailing: www.hs2inyourarea.co.uk [email protected]

Property and compensation You can find out all about HS2 and properties along Please contact us if you’d like a free copy of the line of route by visiting: this document in large print, Braille, audio www.gov.uk/government/collections/hs2-property or easy read. You can also contact us for Find out if you’re eligible for compensation at: help and information in a different www.gov.uk/claim-compensation-if-affected-by-hs2 language.

Holding us to account HS2 Ltd is committed to protecting personal If you are unhappy for any reason you can make a information. If you wish to know more about complaint by contacting our HS2 Helpdesk team. For how we use your personal information please more details on our complaints process, please visit see our Privacy Notice our website: https://www.gov.uk/government/publications/ www.hs2.org.uk/how-to-complain high-speed-two-ltd-privacy-notice

Reference number: 1MC06-CEK-SE-NTE-CS05-000001

High Speed Two (HS2) Limited, registered in England and Wales. Registered office: Two Snowhill, Snow Hill Queensway, Birmingham B4 6GA. Company registration number: 06791686. VAT registration number: 888 8512 56.