Company Profile 24 D-1, NESPAK Colony Phase-I, -53700 Phone: +92 423 5181331-3, E- mail: [email protected] Web http://www.berkeley.com

CONTENTS

INTRODUCTION

OUR DOMAIN

ORGANIZATION

TURNOVER

SPECTRUM OF SERVICES

COMPLETED PROJECTS

CLIENTS

TOPOGRAPHIC SURVEY EQUIPMENT

DRILLING EQUIPMENT

LABORATORY TESTING EQUIPMENT

KEY PERSONNEL

FIELD STAFF

REGISTRATION

QUALITY & SAFETY POLICY

Berkeley Associates (Pvt.) Ltd.

Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers

INTRODUCTION

Berkeley Associates (Pvt.) Ltd. is an engineering firm providing highly professional services in various disciplines of Civil Engineering. We provide project management, design, supervision, planning and drafting services in the fields of Construction, Geotechnical, Groundwater and Structural Engineering for various infrastructure and development Projects including Buildings, Highways, Motorways, Hydropower, Dams, Power Transmission Lines, and Airfields. Main areas of our Engineering Services include Topographic and Bathymetric Surveys, Project Management, Value Engineering, Geotechnical Investigations and Design, Foundation Engineering, Site Evaluation, Site Improvement, Pavement Design and Evaluation, Material Engineering, Construction Supervision of Earthworks and Foundations and Ground Water Studies. The project planning services are provided for all project stages including inception, feasibility, design, construction, and operation. Computer aided drafting facilities are provided for all kinds of engineering drawings.

Berkeley Associates (Pvt) Ltd

Our Domain

OUR DOMAIN

For Civil Engineering Projects we provide services in the following engineering disciplines;

1. Project/ Construction Management

2. Hydropower Engineering

3. Value Engineering

4. Geotechnical Engineering

5. Pile Foundation and Construction of Fills

6. Groundwater Engineering

7. Structural Engineering

8. Transmission Line / Grid Station & Power Plants

9. Highways & Bridges

10. Detailed Engineering & Drafting

11. Dewatering Design / Supervision

12. Topographic and Bathymetric Surveys

BERKELEY ASSOCIATES (PVT) LTD

ORGANIZATION CHART

CHIEF EXECUTIVE OFFICER Jahangir Akhtar

BOARD OF DIRECTORS Jahangir Akhtar Khalid Ayyub Muhammad Abbas

Accounts and Record Office Administration Keeping Aslam Hayat Asif Chughtai

Geotechnical Hydropower & Dams Project Management & Environmental & Public Contract Management Groundwater Engineering Survey Section Structural Engineering Engineering Engineering Business Development Health Engineering Syed Hamid Hassan Ahmed Nawaz Raja Naeem Ijaz Shafi Khalid Ayyub Janghir Akhtar Sheikh Ilyas Ahmad Syed Azhar Maqsood

Civil Design Environmental Senior Structural Senior Geotechnical Planning Engineers Geophysicists Surveyors Engineers Engineers Engineers Engineer

Junior Structural Public Health Junior Engineers/ E&M Design Schedulers Site Staff Helpers Engineers Geologists Engineers Engineers

CAD Operators Draftsman Environmentalists

Geotechnical Engg. Laboratory Technicians

Site Staff i/c Drillers & Helpers Organization Chart

Spectrum of Services

SPECTRUM OF SERVIC ES

For Civil Engineering Projects we provide services in the following engineering fields

Geotechnical Engineering

The Geotechnical Engineering services include planning and execution of field investigations, preparation of geotechnical investigation reports, evaluation of geotechnical design parameters, analyses and design of foundations, slopes, embankments. Evaluation of existing foundations, and earth retaining structures are also carried out.

Soil Investigations

Carrying out field investigations including drilling of boreholes, sampling, field tests, installation of piezometers, monitoring of ground water table, etc., using our in- house facilities. Planning of comprehensive Geotechnical investigation program tailored to specific needs of the Project with particular aim of obtaining safety and economy in the design of foundations and earth structures. Planning includes establishing drilling requirements, extent of drilling, method of drilling, method of soil sampling etc. Prepare cost estimates and specifications for the geotechnical investigations. Supervision and monitoring the progress of field investigations ensuring that investigations are being carried out in accordance with the internationally recognized standard practice. Carrying out initial analyses of the field data and modifying (if required) the field investigation program. Inspection of soil samples and preparation of most efficient laboratory testing Program. Carryout the laboratory testing under technical supervision. Carryout geophysical surveys.

Analyses & Design of Foundations & Embankments

Evaluation of physical and engineering characteristics of soils/ rocks on the basis of field and laboratory test results. Determination of foundation design parameters. Design of shallow and deep foundations i.e. spread foundations, rafts, piles etc. Preparation of geotechnical investigation reports. Design of earthen embankments for roads and water retaining structures. Spectrum of Services

Slope stability analyses Design of cut slopes and slope stabilization systems. Design of excavation support systems. Design of dikes and coffer dams. Design of under-ground water cut-off systems. Seepage analyses of water retaining structures. Liquefaction analyses. Evaluation of dynamic design parameters for design of foundations. Evaluation and remediation of problematic soil conditions. Design of site improvement systems. Design, performance and analyses of pile load tests.

Piling and Construction of Fills

Design and construction supervision of cast in-situ piles. Design and construction of contiguous pile system. Preparation of technical specifications for earthworks. Quality control of large earthworks. Assessment of engineering characteristics of earthworks. Supervision of construction of foundations, earthwork and soil improvement works. Pile load tests and evaluation.

Groundwater Engineering

In order to assess the groundwater potential for various projects, we plan and execute field investigations, computer modelling, assessment of aquifer parameters, prediction of availability of groundwater, ground water quality analyses. Design of tube wells and influence of exiting water facilities on pumping of new wells is also carried out. Groundwater Engineering services include;

Design of dewatering systems. Design and installation of piezometers. Performance of electrical resistivity surveys for initial assessment of ground water quality. Groundwater monitoring. Groundwater quality assessment. Planning and execution of pump out tests. Interpretation of pump out test data and evaluation of aquifer parameters. Installation and development of tube wells.

Spectrum of Services

Topographic and Bathymetric Surveys

Topographic surveys are carried out for all types of projects for developing the surface contours, area assessments, project planning and layout studies. Underwater surveys (Bathymetric Survey) are carried out to develop underwater bed profiles required for placement of intake and outfall structures. The services include;

Performance of Topographic Surveys of land for infrastructures projects. Preparation of topographic maps at desired contour intervals. Establishment of Benchmarks. Performance of underwater (Bathymetric) survey of canals and offshore sites.

Structural Engineering

Feasibility stage structural designs are carried out for development of cost estimates. Detailed analyses and design of structures are carried out using computer aided tools for all type of projects. Construction drawings are prepared for material take-offs and implementation. Design review services are also provided. Other service include;

Planning stage design of various structures. Analyses of structural elements of all types of projects. Detailed design of structures. Preparation of tender drawings and construction drawings. Preparation of bar bending schedules. Preparation of as-built drawings. Review of Civil works Design prepared by EPC contractors. Optimization of design and Value Engineering. Design for strengthening and rehabilitation of structures

Project Management & Construction Supervision

Project Management services are provided for optimizing the available resource. Resident construction supervision services are provided for ensuring quality construction and adherence to agreed time line. The services include;

Preparation and monitoring of project implementation schedules. Preparation and implementation of quality control/ quality assurance plans. Providing resident supervision and monitoring progress of works. Maintaining construction and QA/QC records. Preparation of as built drawing. Verify construction quantities and progress payment invoices.

Spectrum of Services

Contract management, issuance of variation orders. Preparation of detailed Bill of Quantities (BOQ) for construction projects.

Completed Projects

COMPLETED PROJECTS

Completed Projects

FEASIBILITY STUDIES DESIGN & PROJECT MANAGEMENT SERVICES

150 MW Patrint Hydropower Project, AJK

22 MW Jabban Hydropower Project, KPK

90 MW Batakundi Hydropower Project, KPK

180 MW Naran Hydropower Project, KPK

300 MW Balakot Hydropower Project, KPK

100 MW Solar Power Project, Bahawalpur

Cooling Tower for AES Lal Pir Power Project, Muzaffargarh

120 MW Shushghai Zhendoli Hydropower Project, Chitral

100 MW Kotli Hydropower Project, AJK

100 MW Shogo Sin Hydropower Project, Chitral

762 MW AES Power Project, Muzaffarabad

232 MW Karkey Rental Power Project,

120 MW Rajdhani Hydropower Project, AJK

Engro Rice Plant Extensions, Bhikki

Engro Food Plant Floor Rehabilitation

New Ammonia / Urea Plants Project of Engro Dharki

Machai Hydropower Project, AJK

Fire Water Tanks in UAE

Khari Hydropower Project, AJK

CONTRACT MANAGEMENT, CONSTRUCTION

SUPERVISION & QUALITY CONTROL SERVICES

Sind Engro Coal Mining Project, Thar

Foundation Piling for Mabarak Center, Lahore

Hub Water Treatment Plant, Hub, Karachi

Effluent Treatment Plant for Tanneries, Kasur

Additional Cooling Towers for AES Power Project , Mahmood Kot, Muzaffargarh

Water Supply & Sewerage System and Sewage Treatment Plant for New Mir Pur City

Completed Projects

Project, AJK

Water Supply & Sewerage System for Defense Housing Scheme, New

Ammonia/ Urea Plants Project at Engro Chemicals , Daharki Commercial

Complex at G-4, Clifton Road Karachi

Commercial Complex at F-99, Clifton Road Karachi

Dewatering Design / Supervision Projects

DEWATERING DESIGN / SUPERVISION PROJECTS

Dewatering Design / Supervision Projects

Dewatering Design / Supervision Projects

Estimation of drainage requirements and design of dewatering system for Lusai Underground Railway Construction Project, Qatar Estimation of drainable surplus using available data on aquifer parameters.

Doha Conventional Centre and Tower Project, Doha, Qatar Aquifer testing and data analysis, estimation of dewatering requirements, design of dewatering system and dewatering wells for construction below water table.

Site B-201 Nawabshah, , Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.

Site B-109, Sargodha, Punjab, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.

Study causes of rise of water table and proposed remedial measures - Industrial and ResidentialAreas in Dammam, Saudi Arabia.

Chashma Hydropower Project Member of panel of experts for dewatering. Analysis of aquifer test data, estimation of dewatering requirements to lower water table about 15 m to facilitate construction of power plant.

CHASNUPP - Evaluation of pumping requirements and design of dewatering system to facilitate construction of intake structure.

Supervision of 26 numbers dewatering tubewells installation at CHASNUPP Assuring installation in accordance with the design specifications

Geotechnical Investigations

GEOTECHNICAL INVESTIGATIONS Geotechnical Investigations

Housing Schemes

Army Officers Housing Scheme ASKARI-II, Gujranwala Cant. Army Officers Housing Scheme ASKARI-III, Sargodha Cant. Army Officers Housing Scheme ASKARI-VII, . Prime Minister Housing Scheme Peshawar. Prime Minister Housing Scheme Faisalabad. Prime Minister Housing Scheme Gujranwala. Commercial Plaza at Army Welfare Housing Society Morgah Rawalpindi. Park View Housing Society, Lahore Cant. Punjab Housing Scheme Satiana Road Faisalabad. Eden Canal Villas, Lahore. High rising building at DHA Morgah-II Islamabad. Sport Complex DHA Morgah-II Islamabad. Sukh Chayn Gardens Housing Society Multan road Lahore. WAPDA Finance Housing Scheme Road Lahore. WAPDA Finance Subsistence Farm Homes Lahore. Mosque at Defense Housing Islamabad.

High-Rise Buildings

Construction of Multistory building located at main Boulevard, Gulberg-Lahore Crescent Bay Project, Karachi Mabarak Center, A Mixed Use Project, Lahore Crescent Bay Project, Karachi Faletti's Hotel Development Project, Lahore Kalu Khan Girls High School Building at Swabi District Headquarter Complex at Swabi Regency Plaza at Mini Market Gulberg Lahore Aslam Arcade Mcleod Road Lahore Pakistan Air Force Complex at Abbott Road Lahore Police Club Complex at Race Course Road Lahore Mosque at Rinala Kurd Rahber Center at Jail Road Lahore Tax Free Plaza on Lawrance Road Lahore Extension Unit for Pakistan Air Force Complex at Abbott Road Lahore Shopping Complex at Main Market Gulberg Lahore Extension Units for Tax Free Plaza on Lawrance Road Lahore Pakistan Bait-ul-Maal Complex on Dev Smaj Road Lahore Leeds Center Main Boulevard Gulberg Lahore Ibrahim Mosque at Ferozepur Road Lahore Berkeley Associates (Pvt.) Ltd. Geotechnical Investigations

Big City Plaza Building at Liberty Chowk Lahore Multi storey building at Narang Mandi Multi-storey building at Bhatta Chowk Lahore Benevolent Fund Building at Peshawar Residential Villas Saudi Embassy Islamabad NHA Building at Thokar Niaz Baig, Lahore MCB Building, Jail Road Lahore Aitchison College, Lahore McDonald's Allama Iqbal Town , Lahore Jamia Mosque, Kala Shah Kaku, Lahore Descon ES Building, Lahore Zohra Heights, Gulberg Lahore Garrison Academy for Girls, Lahore Cantt. Garrison Degree College, Lahore Cantt. McDonalds, Faisalabad Fauji Foudation Medical College, Rawalpindi Honda Building Ferozpur Road, Lahore IT Building, Raiwind Road, Lahore A.D. Palace Rahim Yar Khan Aitchison College, Junior Wing, Lahore Babul Islam, Sargodha Bank Alhabib, Gulberg Lahore PSO Retail Stations at Lahore, D.G. Khan and Sargodha Law Chambers at Fan Road Lahore Neighbourhood G-11/4 Islamabad Detatched Houses at I-8 Islamabad New Auriga Shopping Plaza, Gulberg Lahore International Islamic Center, Lahore PIA Facilities at New Terminal Lahore Airport Aligarh college, Gulberg Lahore Aitchison College Staff Housing Lahore River Side Hotel Jhelum FFC Tower The Mall Rawalpindi PC Hotel Muzzaffarabad PIA Engineering Transportation Site PIA Cargo Complex Site Shaheen Airport Services SAPS Cargo Complex site Sheikh Zayyed Complex at Ferozpur road Lahore Expo Center Johar Town Lahore Geotechnical Investigations

Kohat University of Science and Technology Kohat Schlumberger offices and workshop at Sukkur Plaza at Liberty Market Bahria Town Lahore PSO Zoom Logo Sign Tower Pattoki Bypass Plaza at Abbott Road Lahore Plaza at 37-P, Gulberg Lahore Plaza at Davis Road Lahore Plaza at Mcleod Road Lahore Commercial plaza at Bedian Road Lahore Eden Palace Villas Mediacom Faisalaba Comsat Complex Islamabad PACE complex Gujrat Decent Plaza Gujranwala Government College Lahore Al-Nafah Tower Gujranwala Commercial Plaza Faisalabad Historical Structural at Shalimar Garden Lahore Enplan Plaza Lahore IT Park Ferozepur Lahore Suzuki Motors Showroom Sargodha Mian Tyre Office at Jail Road Lahore Sterling Plaza at M M Alam Road Lahore

Hospitals

North East Hospital Complex, Peshawar Ammar Medical Complex at Jail Road, near bypass, Lahore Rahmat-ul-Alameen Trust Hospital Pak Patten Muhammad Kidney Institute at Shaikh Zayed Hospital Lahore Alkhidmat Hospital, Sialkot Hospital at Ferozpur road Lahore Federal Hospital Rawalpindi Saudi-German Hospital at Bahria Town, Lahore-Pakistan Geotechnical Investigations

Industrial Buildings

Cherished Pharmaceutical Industry at Raiwind MSB Industries on Ferozepur Road Lahore Cholistan Sugar Mill Liaquatpur ICI go down near Kala Shah Kaku Rawat Switchyard FJFC Complex Bin Qasim Karachi Merino Textile Mill on Faisalabad Shahkot Road Shahkot International Juice Factory Azad Jammu & Kashmir Sapphire Textile at Bhai Pharu Pharmagen Beximco on Ferozpur Road Lahore CCL extension unit at Industrial Area Lahore ProDiesal Services on Firozpur Road Lahore Genesis Pharmaceutical Complex on Sheikhupura Faisalabad Road Tower Crane Foundation at Fauji Cement, Jhang Bhatar Ammar Textiles on Defence Road near Multan Road Lahore Gas Treatment Plant at Liberty Power Project Ghotki Sind CCL Godowns at Industrial Area Kot Lahkpat Lahore Maria Balal Garment Factory and its Extension Units at Raiwind Road Lahore Zuchini Industries Raiwind Road Lahore Expansion of Caustic Soda Plant at Sitara Chemicals Limited on Faisalabad Sheikhupura Road Carpet Processing Unit at Defence - Raiwind Road Lahore for Abbas Corporation (Pvt) Ltd Expansion Unit for Dynamic Sportswear (Pvt) Ltd Canal Road Lahore New Processing Unit for Vision Technologies (Pvt) Ltd Sialkot Burhan Flour Mill at Gujrat Bypass Kohat Cement Factory at Kohat Coca Cola Plant, Gugranawala Millac Foods, Manga Raiwind Road, Lahore Merit Pharmaceutical, 34 km Ferozpur Road Lahore Pepsi Cola International, Hattar Pakistan Gloves Manufacturers & Export, Building, Sialkot Shangai Chemicals, Sheikhupura Road Nishat Dying and Finishing, Lahore Ramey Textile Mills, Lahore Forest Sweaters Pvt Limited SKB Milk Plant, Raiwind Road, Lahore Sitara Chemicals, Faisalabad Rizwan Textile, Lahore Geotechnical Investigations

SKB Factory at Raiwind Road, Lahore Tandlianwala Suger Mill CSK Distilleries Palia Kohat Cement Plant Kohat ICI extension for polyester plant Sheikhupura Infra-structural for DHA Phase-VI Lahore Packages Pulp and Paper Factory Kasur Shed for Pepsi Cola Hattar Export Processing Zone Gujranwala Waste water treatment plant Rawalpindi Madina Cold Storage Sillanwali Road Faisalabad Food Processing Plant at Export Promotion Zone Gujranwala Pepsi cola Manga Road Lahore Rest House Building at Packages Kasur Hitech Feeds Rawalpindi, Sheikhupura, Sharakpur and Fatehjang Snack Green Field Factory at Sunder Industrial Estate for Pepsi. Faisal Asad Textile Mill Muzaffargarh Sitara Agriculture Research Centre Gutwala Faisalabad Sitara Hydrogen peroxide Plant Faisalabad Sitara Chemicals Faisalabad

Roads and Bridges

Underpasses at Committee Chowk and Rawalpindi General Hospital Chowk on Road Rawalpindi Sub-soil Investigation for Internal Roads for Rupafab at Raiwind Sub-soil Investigation for Internal Roads for District Headquarter at Swabi Sub-soil Investigation for Lahore Bypass (sub-contract) Sub-soil Investigation for Rawalpindi Ring Road Project Rawalpindi Road Side Soil Investigation & Borrow Material Exploration/Testing For ADB Assisted Rural Access Roads Project Phase - I in District Mandi Bahauddin, Jhelum, Khushab, Kasur and Okara. Road Side Soil Investigation & Borrow Material Exploration & Existing Road Condition Survey for Dualization of Sheikhupura Faisalabad Road Soil Investigation for Seven Nos. Of Bridges For Sheikhupura Faisalabad Dual Carriage Way Flyover bridge at Sherpao bridge Lahore Flyover bridge at Katchary Chowk Multan Underpass bridge at Jail Road Lahore Geotechnical Investigations

Additional Carriage Way (N-5) Section: TMP-Bahawalpur. Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition Survey for Khwaza Khela Besham Road Malakand Division. Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition Survey for Three Roads in Malakand Division. Bridge Over Sutlej River Soil Investigation and Testing at Ferozpur Road Lahore Chamman Road 200 km Roads in Wanna 200 km Roads in MRDP Sibbi Much Road Internal and Main Boulevard for Bahria Town Lahore M3 Confirmatory Investigations Lahore Ring Road Project Package VIII, IX, XI, VII and VIII Chukiatian Barawal Road

Hydropower Projects

Feasibility study for 1.2 Mw Marchai Hydropower Project. Feasibility Study for 1.5 MW Khari II Hydropower Project. Feasibility Study for 120 MW Shushghai Zhendoli Hydropower Project. EPC Bid Preparation for 100 MW Kotli Hydropower Project. Feasibility Study for 100 MW Shogo Sin Hydropower Project. Detail Civil Design for 22 MW Jabban Hydropower Project. EPC Bid Preparation for 120 Mw Rajdhani Hydropower Project. Periodic Inspection of 1450 Mw Ghazi Brotha Hydropower Project. Feasibility Study for 300 MW Naran Hydropower Project. Feasibility Study for 98 MW Batakundi Hydropower Project. Feasibility Study for 180 MW Balakot Hydropower Project. Bid Preparation for Small Hydropower Project on Canal in Punjab. Engineering Services for Lucky Hydropower Project, Marala Engineering Services for LBDC Hydropower Project, Chichawatni. Engineering Services for JBC Hydropower Project. Engineering Services for 130 MW Sehra Hydropower Project. Keyal Khuwar Hydropower Project, KPK Azad Patten Hydropower Project Geotechnical Investigation of Mahl HPP (Quarry sites), AJK

.

Geotechnical Investigations

Coal Exploration Projects

Geotechnical Investigation of Coal Field Block-I at Islamkot Thar, Sindh Soil Investigation K-2 Project, Sindh Punjab Coal Mine Project Kallar Kahaar, Punjab

Cement Quarry Exploration Projects

Geotechnical Investigation at D.G Khan Cement (Kallar Kahaar). Geotech Investigation at Maple leaf cement Iskandrabad in Mianwali Geotechnical Investigation at Gharibwal Cement

Mass Transit Projects

Lahore Rapid Mass Transit Project, Lahore Orange Line Metro Train Project, Lahore

Geotechnical Investigations

Thermal Power Plants

1180 MW RLNG Bhikki Power Project 230 MW LNG Based Engro Power Project Port Qasim 350 MW Coal Based Power Project of Siddique Sons, Port Qasim 2 x 330 MW Coal Fired Power Project in Thar, Engro Energy. 100 MW Charbon Coal Power Project. 2 x 60 MW Coal Fired Power Project, Fatima Energy. 50 MW Coal Power Project near Johar Abad, Orient Power. 11 MW Biomass Based Project in Faisalabad. 1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan 425 MW Combined Cycle Nandipur Power Plant 152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot 225 MW Shahpur Power Plant, Sargodha 135 MW Bhiki Power Project 225 MW Combined Cycle Balloki Power Plant 225 MW Combined Cycle Saif Power Plant, Sahiwal AES Power Plant; Design of Cooling Towers and Construction Supervision Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura Faisalabad Road Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura Faisalabad Road Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura Faisalabad Road

Power Plant and Fertilizer Plants

1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan 425 MW Combined Cycle Nandipur Power Plant 152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot 225 MW Shahpur Power Plant, Sargodha 225 MW Combined Cycle Balloki Power Plant 225 MW Combined Cycle Saif Power Plant, Sahiwal Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works AES Power Plant; Design of Cooling Towers and Construction Supervision Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura Faisalabad Road (Main contract with M/s Mirza Associates (pvt) Ltd Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu

Geotechnical Investigations

(Main contract with M/s Habib Rafiq (pvt) Ltd) Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura Faisalabad Road (Main contract with M/s Progressive Consultants (pvt) Ltd PAK and M/s Black & Veatch USA) Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura Faisalabad Road (Main contract with M/s Olympia Group) 135 MW Bhiki Power Project (Main contract M/s Pakistan Power Resources LLC)

Oil Refinery & Fertilizer Plants

Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works Preliminary Geotechnical Investigation for New Processing Units at Attock Refinery Morgah Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan) Detail design Geotechnical Investigation for New Processing Units at Attock Refinery Morgah Rawalpindi (sub-contract with M/s Mitsui Japan) Geotechnical Investigation for New tank area sites at Attock Refinery Morgah Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan) Preliminary Geotechnical Investigation for Pak Arab Refinery (PARCO) Mahmood Kot (sub-contract with M/s Habib Rafiq (pvt) Ltd). Geotechnical Investigation for Flare Stack Structure at Attock Refinery Rawalpindi (sub- contract with M/s Descon Engineering (pvt) Ltd)

Oil & Gas Sector

Detail design Geotechnical Investigation for Central Processing Plant for REHMAT-1 Gas Field at Sardar Garh near Gotki (Main contract with M/s Presson International of Canada) Detail design Geotechnical Investigation for Central Processing P l a n t f o r M O L G a s P l a n t at GURGURI (Main contract with M/s Presson International of Canada) Soil Survey Along 6” Dia. Oil Pipeline From Turkwal to ARL Via Pindori (for K.F. Corporation (Pvt.) Ltd

Cement Industry

New Grey 6700 TPD Cement Plant for M/s Kohat Cement Company Ltd at Kohat New Grey 7600 TPD Cement Plant for M/s Fauji Cement Company Ltd at Fatehjang

Geotechnical Investigations

Tele Communication Towers

28 Nos. of 30 m to 60 m High GF Towers in Lahore for Nortel Networks 18 Nos. of 30 m to 60 m High GF Towers in Sialkot for Nortel Networks 18 Nos. of 30 m to 60 m High GF Towers in Gujrat for Nortel Networks 18 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Nortel Networks 18 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Nortel Networks 14 No. of 30 m to 60 m High GF Towers in Sheikhupura for Nortel Networks 18 Nos. of 30 m to 60 m High GF Towers in Multan for Nortel Networks 3 Nos. of 30 m to 60 m High GF Towers in Attock for Nortel Networks 8 Nos. of 30 m to 60 m High GF Towers in Islamabad and Rawalpindi 45 Nos. of 30 m to 60 m High GF Towers in Lahore for Ericsson Pakistan 8 Nos. of 30 m to 60 m High GF Towers in wazirabad for Ericsson Pakistan 7 Nos. of 30 m to 60 m High GF Towers in Gujrat for Ericsson Pakistan 9 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Ericsson Pakistan 21 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Ericsson Pakistan 14 No. of 30 m to 60 m High GF Towers in sialkot for Ericsson Pakistan 12 Nos. of 30 m to 60 m High GF Towers in Multan for Ericsson Pakistan 8 Nos. of 30 m to 60 m High GF Towers in sargodha for Ericsson Pakistan 5 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Ericsson Pakistan 8 Nos. of 30 m to 60 m High GF Towers in phalia for Ericsson Pakistan 5 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Ericsson Pakistan 3 Nos. of 30 m to 60 m High GF Towers in Okara for Ericsson Pakistan 8 Nos. of 30 m to 60 m High GF Towers in Gujrat for Alandick Pakistan 4 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Alandick Pakistan 8 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Alandick Pakistan 11 No. of 30 m to 60 m High GF Towers in sialkot for Alandick Pakistan 17 Nos. of 30 m to 60 m High GF Towers in Multan for Alandick Pakistan 18 Nos. of 30 m to 60 m High GF Towers in sargodha for Alandick Pakistan 15 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Alandick Pakistan 5 Nos. of 30 m to 60 m High GF Towers in phalia for Alandick Pakistan 8 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Alandick Pakistan

Geotechnical Investigations

Power Transmission Lines

Tarbela-Ghatti 500 kv in-out arrangement for M/s ICC (Pvt) Ltd Rawat Islamabad 220 kv transmission line towers for M/s ICC (Pvt) Ltd Shahibagh - Peshawar 220 kv transmission line towers for M/s ICC (Pvt) Ltd Barotha Nowshera Shahibagh 220 kv transmission line towers for M/s ICC (Pvt) Ltd Rahim Yar Khan - Jamshoro 500 Kv Transmission Line, 3rd Circuit Zahir Pir - Guddu 500 Kv Transmission Line Jamshoro - Dadu 500 Kv Transmission Line (partial) 132/11.5 kV GIS Station at Lahore Airport 500 kV Grid station at Sahiwal for Siemens Ghatti-Muzzaffargarh 500 kv Transmission Line Project 220 kv AIS Substation Dadu and Moro Substation Ghazi Barotha 550/220kv Substation Peshawar Shahi Bagh Transmission Line Mansehra Allai Khwar 220kv Dubar Khwar-Khan Khwar-Allai Khwar Twin Bundle 132 kv Transmission Line 220kv Grid Station Gujrat 500 kv Rawat-Ghakhar-Lahore Transmission Line 500 kv Rawat-Mandi Bahauddin Transmission Line Guddu-Sibbi Substation

Miscellaneous

Thal Canal Project PSO Petrol Pump Sewerage Treatment Plant Rahim Yar Khan Mazar at Chalay Sharif Gujrat Weather Radar Station Islamabad Swimming Pool at Aitchison College Lahore Beacon House Complex Raiwing Road Lahore Bridge at Abdullahpur Faisalabad Office building for DESCON Ferozepur Road Lahore Sethi Motor Showroom Ferozpur Road Lahore Beacon House School Walton Road Lahore Magic park Motorway State Bank of Pakistan Suzuki Motors Sargodha Road Lahore Schlumberger S.A. offices and workshop at Sukkur

Piling Projects

PILING PROJECTS

Piling Projects

Piling Projects

Construction and Load Testing of 14 test piles for Orange Line Metro Train Project, Lahore

Construction of 40 pile foundations for Barotha Nowshera Industrial Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

Construction of 32 pile foundations for Peshawer Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

Construction of 28 pile foundations for Rewat Islamabad D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

Construction of 1500 nos of 760 mm each of 40 m deep diameter piles for New Grey Cement Plant for Kohat Cement (Pvt) Ltd at Kohat.

Construction of pile foundation for Highway Bridge near Muridkay. (Diameter of pile = 760 mm, Nos. of piles = 36, Using reverse rotary method)

Construction of pile foundation for Highway Bridge over B.S. Link Canal near Chunian. (Diameter of pile = 760 mm, Nos. of piles = 26, Using percussion method)

Construction of pile foundation for railway overhead bridge Ghari Shahu. (Diameter of pile = 840 mm, Nos. of piles = 126, Using reverse rotary method)

Construction of pile foundation for nullah at kharian Cantt. (Diameter of pile = 610 mm, Nos. of piles = 6, Using reverse rotary method)

Construction of pile foundations for 25 m high Mobilink Tower at Chung. (Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)

Construction of pile foundations for 25 m high Mobilink Tower at Muridkay.(Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)

Construction of 1220 mm dia piles for towers for 220 KV Transmission Lines (76 nos. of towers)

Construction of 1000 mm diameter piles for bridge at Bahria Town Rawalpindi

Well Drilling Projects

WELL DRILLING PROJECTS

Berkeley Associates (Pvt.) Ltd.

Well Drilling Projects

Design and Construction of Four (4) tubewells having 3.2 cusec discharge capacity at 425 MW CCPP Nandipur for M/s DEC China Design and Construction of six (6) tubewells having 3 cusec discharge capacity at PARCO Mid-Country Refinery Project Mahmood Kot for M/s Marubeni Corporation (MC / JJC) Japan. Construction of one (1) tubewell at Rehmat Oil and Gas Processing Plant for Presson / Petronas Canada. Construction of one (1) tubewell for Wapda at Gujrat Construction of one (1) tubewell at Liberty Power Project Ghotki Sind. Construction of one (1) tube well having 2 cusec discharge capacity at Sunny View Housing Scheme Lahore for M/s Habib Rafiq (pvt) Ltd. Construction of seven (7) tube wells having 3 cusec discharge capacity for construction of Lahore Islamabad Motorway on Section - I. Construction of five (5) tube wells for water supply in Islamabad. Construction of two (2) tube wells for water supply at Bhimber and Mirpur. Construction of two (2) tube wells for L.D.A. in under construction Gujarpura Scheme as sub-contract. Construction of seven (7) tube wells for WASA Faisalabad as sub-contract. Construction of three (3) tube wells for agriculture purpose in Kasur. Construction of one no. of tubewell at Labour Colony Gujrat for M/s Ghulam Habib Construction. Construction of one no. of tubewell at Gujrat for WAPDA Colony. Construction of one tubewell at Rehmat Gas Treatment Plant Gothki.

Berkeley Associates (Pvt.) Ltd.

Completed Projects

Topographic Surveys

Berkeley Associates (Pvt.) Ltd.

Completed Projects

75 KTPA LIGHT ASH EXPANSION (PHASE‐I) ICI Khewera 425 MW Combined Cycle Nandipur Power Plant 1180 MW CCPP at Bhikki 1223 MW CCPP at Balloki Calci Packages Limited 100 MW Fatima Energy Cogen Power Project New Ammonia / Urea Plants Project of Engro Dharki PARCO Mid‐Country Refinery Project Mahmood Kot Pepsi Cola International, Multan 660 Lucky Hydropower Project Gulf Rental Power 230 MW LNG Based Engro Power Project Port Qasim Green Power CNEC Rehabilitation of Building Defects of Malala Yousaf Zai Daanish School (Boys and Girls) Jand District Attock 100 MW Solar Power Project 300 MW Coal Based Power Project of Siddique Sons, Port Qasim 1 x 46 MW Coal Based Captive Power Plant of Nishat Chunian Ltd, Pakistan 90 MW Batakundi Hydropower Project, KPK 180 MW Naran Hydropower Project, KPK 300 MW Balakot Hydropower Project, KPK 120 MW Shushghai Zhendoli Hydropower Project, Chitral 200 Bed North East Hospital Complex, Peshawar Moro & Dadu 500Kv substations 22 MW Jabban Hydropower Project, KPK Residential Villas Saudi Embassy Islamabad JBC Hydropower Project, Sukheke

Berkeley Associates (Pvt.) Ltd.

Project Sheets

PROJECT SHEETS

Project Sheets

Project: 1180 MW CCPP at Bhikki

Location: Bhikki, District Shekhupura, Pakistan

Client: Quaid-e-Azam Thermal Power (Pvt.) Ltd., Govt. of Punjab

Scope of Services:

 Geotechnical Investigations for Power Plant and Access Road comprising 3,500 m drilling of investigation boreholes, down‐hole seismic survey, electrical resistivity survey, and laboratory testing

 Topographic Survey and Bathymetric Survey of canal

 Groundwater Studies comprising site survey, groundwater modeling, design of pumping wells

 Construction of test piles, pile load testing, evaluation of pile load tests

 Construction of 1300 cast in‐situ concrete piles

Start date: October 2015

End date: Dec. 2015

Project Sheets

Project: 1223 MW CCPP Balloki Pakistan Location: Balloki, District Kasur, Pakistan Client: National Power Parks Management Co. (Pvt.) Ltd., Government of Pakistan

Scope of Services:

 Geotechnical Investigations for Power Plant and Access Road comprising 3,400 m drilling of investigation boreholes, down-hole seismic survey, electrical resistivity survey, and laboratory testing

 Groundwater Studies comprising site survey, groundwater modeling, design of pumping wells

 Construction of test piles

 Performance of lateral free and fixed head pile load test

 Carrying out pile load test in compression and tension

 Slope stability analyses for intake and outlet structures

 Core drilling in working piles

Start date: November 2015

End date: January 2017

Berkeley Associates (Pvt) Ltd Project Sheets

Project: 2 x 330 MW Engro Thar Coal Project Location: Block 2, Thar, Sind, Pakistan Client: Engro Power Thar Limited

Scope of Services:

 Supervision and Review of Topograpic Survey and Geotechnical Investigations for Power Plant carried out by the EPC Contractor.

 Civil Design Review of the Power Plant Structures and all Civil related components including pavements, drainage system, sewerage, water supply and water treatment.

 Review of Groundwater Studies

 Quality Control through resident supervision

 Design of Evaporation Pond

Start date: October 2015

End date: On going

Berkeley Associates (Pvt) Ltd

Project Sheets

Project: 350 MW Coal Fired Power Plant

Location: Port Qasim

Client: Siddique Sons Energy

Scope of Services:

 Geotechnical Investigations

 Topographic Survey & Bathymetric Survey

 Groundwater Studies

 Resistivity Survey

Start date: Jan, 2015

End date: Mar, 2015

Project Sheets

Project: Groundwater PEPSICO Greenfield Project in Multan Industrial Estate, Multan Location: Multan Industrial Estate, Multan, Pakistan Client: PEPSICO, Pakistan

Scope of Services

 Desk Studies and Collection of available hydrogeological data  Field reconnaissance survey  Electrical Resistivity Survey for groundwater quality and quantity assessment  Drilling and Installation of test well and piezometers  Performance of aquifer test  Collection of water samples and their chemical analysis  Mathematical Modelling  Analysis of aquifer test data and determination of aquifer parameters  Submission of detailed report

Start Date: May, 2015 End Date: June, 2015

Berkeley Associates (Pvt) Ltd Project Sheets

Project: Groundwater Studies for 1x300 MW Local Coal Power Plant at Lilah Pind-Dadan Khan, Salt Range, Pakistan Location: Pind-Dadan Khan, Punjab, Pakistan

Client: China Machinery Engineering Corporation

Scope of Services

 Desk Studies and Collection of available hydrogeological data  Field reconnaissance survey  Electrical Resistivity Survey for groundwater quality and quantity assessment  Drilling and Installation of test well and piezometers  Performance of aquifer test  Collection of water samples and their chemical analysis  Mathematical Modelling  Analysis of aquifer test data and determination of aquifer parameters  Submission of detailed report

Start Date: December, 2014 End Date: January, 2015

Berkeley Associates (Pvt) Ltd Project Sheets

Project: Groundwater Studies for 1x40 MW Coal based Captive Power Plant for Nishat Chunian Limited, Bhai Pheru Location: Bhai Pheru, district Kasur, Punjab, Pakistan

Client: Quaid-e-Azam Thermal Power Pvt. Ltd.

Scope of Services

 Desk Studies and Collection of available hydrogeological data  Field reconnaissance survey  Electrical Resistivity Survey for groundwater quality and quantity assessment  Drilling and Installation of test well and piezometers  Performance of aquifer test  Collection of water samples and their chemical analysis  Mathematical Modelling  Analysis of aquifer test data and determination of aquifer parameters  Submission of detailed report

Start Date: October, 2014 End Date: November, 2014

Berkeley Associates (Pvt) Ltd

Project Sheets

Project: Orange Line Metro Train, Project

Location: Lahore, Pakistan

Client: Punjab Metro bus Authority

Scope of Services:

 Geotechnical Investigations along the alignment of the Orange Line

 Execution of 14 Test Piles and Pile Load Tests up to 12000 tons, interpretation of pile load tests, and design recommendations for working piles

Start date: July 2015

End date: September 2015

Project Sheets

Project: 150 MW Patrind Hydropower Project

Location: Muzaffarabad, AJK

Client: Daewoo Engineering & Construction

Scope of Services:

 Preparation of Construction Drawings for Power House, Weir, Excavation, Retaining System.  Detailed Design and preparation of Construction Drawings for Access Roads

Project Sheets

Project: Feasibility Study of 12 MW Biomass Based IPP Project

Location: Faisalabad, Punjab

Client: Masood Textile Mills

Scope of Services:

Sitting Studies Topographic survey Geotechnical investigations Initial Environmental Examination Grid interconnection studies

Completion Time: 9 Months

Completion Date: March 2013

Project Sheets

Project: Feasibility Study for 180 MW Naran Hydropower Project

Location: Naran,

Client: Sarhad Hydel Development Organization (SHYDO)

Scope of Services: Preparation of Geotechnical investigations program and tender documents Top supervision of Geotechnical investigations Preparation of laboratory testing program Geotechnical analysis and design for feasibility study Preparation of geotechnical investigations report Feasibility level design of all hydraulic structures Preparation of drawings for feasibility level design Financial and economic analyses of the project Seismological studies and geological mapping Environmental studies

Completion Time: 18 Months

Completion Date: December, 2013

Project Sheets

Project: Feasibility Study for 300 MW Balakot Hydropower Project

Location: Balakot, Khyber Pakhtunkhwa

Client: Sarhad Hydel Development Organization (SHYDO)

Scope of Services: Preparation of Geotechnical investigations program and tender documents Top supervision of Geotechnical investigations Preparation of laboratory testing program Geotechnical analysis and design for feasibility study Preparation of geotechnical investigations report Feasibility level design of all hydraulic structures Preparation of drawings for feasibility level design Financial and economic analyses of the project Seismological studies and geological mapping Environmental studies

Completion Time: 18 Months

Completion Date: December, 2013

Project Sheets

Project: Feasibility Study for 98 MW Batakundi Hydropower Project

Location: Batakundi, Khyber Pakhtunkhwa

Client: Sarhad Hydel Development Organization (SHYDO)

Scope of Services: Preparation of Geotechnical investigations program and tender documents Top supervision of Geotechnical investigations Preparation of laboratory testing program Geotechnical analysis and design for feasibility study Preparation of geotechnical investigations report Feasibility level design of all hydraulic structures Preparation of drawings for feasibility level design Financial and economic analyses of the project Seismological studies and geological mapping Environmental studies

Completion Time: 18 Months

Completion Date: December, 2013

Project Sheets

Project: Shogo – Sin Hydropower Project

Location: Chitral

Client: Private Power Infrastructure Board (PPIB)

Scope of Services: Preparation of Geotechnical investigations program Preparation of Tender documents for Geotechnical investigations Top supervision of Geotechnical investigations Preparation of Laboratory testing program Geotechnical analysis and design for feasibility study Preparation of geotechnical investigations report Feasibility level design of all structures Preparation of drawings for feasibility level design

Completion Time: 15 Months

Completion Date: April, 2010

Project Sheets

Project: Shushghai - Zhendoli Hydropower Project

Location: Chitral

Client: Private Power Infrastructure Board (PPIB)

Scope of Services: Preparation of Geotechnical investigations program Preparation of Tender documents for Geotechnical investigations Top supervision of Geotechnical investigations Preparation of Laboratory testing program Geotechnical analysis and design for feasibility study Preparation of geotechnical investigations report Feasibility level design of all structures Preparation of drawings for feasibility level design

Completion Time: 15 Months

Completion Date: April, 2010

Project Sheets

Project: 548 MW Kaigah Hydropower Project

Location: Kandian River

Client: Kaigah Power Pvt Ltd

Scope of Services: Preparation of Geotechnical investigations program Preparation of Tender documents for Geotechnical investigations Top supervision of Geotechnical investigations Preparation of Laboratory testing program Geotechnical analysis and design for feasibility study Preparation of geotechnical investigations report Feasibility level design of all structures Preparation of drawings for feasibility level design

Completion Time: 15 Months

Completion Date: February, 2011

Project Sheets

Project: 22 MW Jabban Hydroelectric Power Station Rehabilitation Project

Location: Jabban – District Malakand

Client: WAPDA

EPC Contractor: HRL – CCPG JV

Scope of Services: Preparation of Geotechnical investigations program Carrying out geotechnical investigation at site Preparation of geotechnical investigations report Geotechnical analysis and design for various components of Project (i.e. power house, substation, and penstock) Structural design of powerhouse, penstocks and 132 kV substation Rehabilitation design for Forebay structure Preparation of civil work construction drawings

Project Sheets

Project: JBC Hydropower Project, Sukheke

Location: Sukheke, (50km from Lahore)

Client: JBC Powr Ltd.

Consultants: Pakistan Consulting Services

Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling Total exploratory drilling – 130m Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests Factual and Interpretative Reports

Completion Time: Eight (04) weeks

No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and accessories

Completion Date: August 30th 2008

Project Sheets

Project: LBDC Hydropower Project, Chichawatni

Location: Chichawatni, (180km from Lahore)

Client: LBOD Power Ltd.

Consultants: Pakistan Consulting Services

Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling Total exploratory drilling – 130m Field permeability tests in boreholes Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests Factual and Interpretative Reports

Completion Time: Eight (04) weeks

No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and accessories

Completion Date: September 10th 2008

Project Sheets

Project: Lucky Hydropower Project

Location: Sialkot

Client: Olympus Energy (Pvt.) Ltd.

Consultants: Barqab

Scope of Services: Drilling of 5 boreholes ranging in depth from 20m to 30m along with SPT and undisturbed soil sampling Total exploratory drilling – 155m Field permeability tests in boreholes Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests Factual and Interpretative Reports

Completion Time: Eight (04) weeks

No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and accessories

Completion Date: August 30th 2008

Project Sheets

Project: 100 MW Fatima Energy Cogen Power Project

Location: Sanawan - Pakistan

Client: Fatima Energy Limited (FEL)

Scope of Services:

Sitting Studies Topographic survey Groundwater studies Material studies Coal Transportation studies Geotechnical investigations Initial Environmental Examination Preliminary design of civil structures

Completion Time: 10 Months

Completion Date: May 2011

Project Sheets COOLING TOWERS FOR AES THERMAL POWER PLANT

Scope of Work:

o Preparation of detailed design of all civil and mechanical works, and preparation of technical specifications, drawings, and Bill of Quantities o Preparation of tender documents o Prequalification of Contractors and Invitation of Bids o Evaluation of Bids o Award of construction contract o Construction Supervision for all site works o Quality Control and Quality Assurance audits o Verification of contractors running bills o Preparation of completion reports o Preparation of progress reports o Preparation of as-built drawings

Project Sheets

Project: Fatima Energy Cogen Power Project Location: Sanawan, Pakistan Client: Fatima Energy Limited

Scope of Services:

 Geotechnical Investigation (Drilling of 5 boreholes ranging from 15m to 30 m depth along with SPT and undisturbed soil sampling, 4 testpits, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)  Electrical Resistivity Survey  Geologic al Hazard Assessment

Completion Date: May 2011 (4 Weeks)

Project Sheets

Project: 234 MW Combined Cycle Power Plant

Location: Muridke, Lahore

Client: Albario Engineering (Pvt) Ltd. Project Consultants: Skoda Export

Scope of Services:  Geotechnical Investigation (Drilling of 3 boreholes each down to 15m depth along with SPT and undisturbed soil sampling, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)  Pile Integrity Test (Total Tested Piles = 23 Piles)

Completion Time: April 2008 (02 Weeks)

Project Sheets

Project: Feasibility Studies for 11 MW Biomass Based Power Plant

Location: Jhang, Punjab

Client: Lumen Energia (Private) Limited

Scope of Services: Sitting Studies Topographic survey Geotechnical investigations Initial Environmental Examination Grid interconnection studies

Completion Time: 9 Months

Completion Date: July 2011

Project Sheets

Project: Feasibility Study of 100 MW Charbon Coal Power Project

Location: Chakwal, Punjab

Client: Habib Rafiq (Pvt.) Limited

Scope of Services:

Sitting Studies Topographic survey Groundwater studies Material studies Coal Transportation studies Geotechnical investigations Initial Environmental Examination Preliminary design of civil structures

Completion Time: 12 Months

Completion Date: June 2013

Project Sheets

Project: 100 MW Solar Power Project

Location: Quaid-e-Azam Solar Park, Bahawalpur, Pakistan

Client: TBEA, China

Scope of Services:

 Review of Geotechnical Data

 Review Design of foundations for the Solar Panels and Buildings

 Evaluation of the load test results of the screw piles used for p a n e l s

Start date: June 2014

End date: Nov. 2014

Project Sheets

Project: 50 MW Coal Fired Khushab Power Plant

Location: Khushab - Pakistan

Client: Shahpur Energy (Pvt.) Limited

Scope of Services:

Sitting Studies Topographic survey Groundwater studies Material studies Coal Transportation studies Geotechnical investigations Initial Environmental Examination Preliminary design of civil structures

Completion Time: 12 Months

Completion Date: April 2011

Project Sheets

Project: Lahore Rapid Mass Transit System Project

Location: Lahore

Client: Metro Associates, Lahore

Consultants: Systra Group, France

Scope of Services: Drilling of 78 boreholes ranging in depth from 28m to 50m along with SPT and undisturbed soil sampling along the 27km long alignment Total exploratory drilling – 2,622m Field permeability tests in boreholes Installation of fourteen piezometer Thirty shallow test pits along with field density tests Five Plate Load tests Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests Factual and Interpretative Reports

Completion Time: Eight (08) weeks

No. of Drill Rigs: Six straight rotary drilling rigs along with necessary crew and accessories; and seven crews of hand auger cum light percussion

Project Sheets

Project: 425 MW CCPP Nandipur, Pakistan

Location: Nandipur (160 km from Lahore)

Client: Dongfang Electric Corporation Limited (DEC), China

EPC Contractor: DEC, China

Scope of Survey: Topographic Survey on Land and under water for Canal Preparation of Survey Maps and Report

Scope of Services: Drilling of 137 boreholes ranging in depth from 15m to 50m along with SPT and undisturbed soil sampling Total exploratory drilling = 4,200 m Down hole shear wave velocity tests in six boreholes 50 m deep Cone Penetration Tests (CPT) at 23 locations Field permeability test Six Plate load tests Electrical resistivity tests at 83 locations Laboratory testing including PSD, consolidation, direct shear, unconfined compression Factual and Interpretative Reports on the basis of Chinese Code

- Construction of a 120 m deep well, and five piezometers Performance of pump out test, analyses of data and design of pumping wells.

- Tubewell

- Ground water studies

- Surface water studies

Project Sheets

Project: 225 MW CCPP Saif Power Project Sahiwal

Location: Sahiwal (150 km from Lahore)

Client: Saif Power Limited, Islamabad

EPC Contractor: CMEC, China

Scope of Services: Drilling of 112 boreholes ranging in depth from 30m to 40m along with SPT and undisturbed soil sampling Total exploratory drilling – 2,800m Down hole shear wave velocity tests in three boreholes 80m deep Six Plate load tests Electrical resistivity tests at 20 locations Laboratory testing including PSD, consolidation, direct shear, unconfined compression Factual and Interpretative Reports

Completion Time: Ten (10) weeks

No. of Drill Rigs: Nine straight rotary drilling rigs along with necessary crew and accessories

Project Sheets

Project: 152 Combined Cycle Diesel Engine Power Plant, Pasrur

Location: Eastern Power Company (EPCO), Islamabad

Client: Eastern Power Company (EPCO), Islamabad

EPC Contractor: Gama Power, Turkey

Scope of Services: Drilling of 20 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling Total exploratory drilling – 920m Five shallow test pits along with field density test Installation of piezimeters Aquifer Pump out test Electrical resistivity tests at 12 locations Laboratory testing including PSD, consolidation, direct shear, unconfined compression Factual and Interpretative Reports

Completion Time: Eight (08) weeks

No. of Drill Rigs: Three straight rotary drilling rigs along with necessary crew and accessories

Project Sheets

Project: New Urea / Amonia Plants Project, Engro Dharki

Location: Dharki, Dist. Ghotki, Sindh

Client: Engro Chemicals Pakistan Ltd

EPC Contractor: Snamprogatti, Italy

Descon, Pakistan

Scope of Services:

- Geotechnical Investigation and foundation design - Design coordination with EPC contractor - Supervision of piling constructions - Design of dewatering system - Design of parameters for PMS buildings - Design review of ammonia storage tanks - Quality control and quality assurance of all civil works through resident team of engineers - Trouble shooting and assistance in design and construction bottle necks

Completion Time: Three (03) Years

Project Sheets

Project: Design of Cofferdam for Construction of Intake Structure

Location: Guddu, Sindh

Client: Habib Rafiq (Pvt.) Ltd.

Scope of Services:

- Development of design of cofferdam including stability analysis, seepage analysis - Preparation of construction drawings - Preparation of detailed method statement - Analysis to find out impact of construction of cofferdam on the following canal and development of remedial measures

Project Sheets

Project: PARCO Refinery

Location: Mahmood Kot, Near Multan

Client: Marubeni Corporation of Japan

Consultants: NA

Scope of Services: Design, Construction, and Commissioning of 6 deep wells of 2 cusec (ft3/sec) capacity each. The scope included drilling of wells, procurement of all materials and machinery required for the works.

Completion Time: Eight (08) weeks

No. of Drill Rigs: Two (reverse rotary type) Project Sheets

Project: Flattie’s Hotel Development Project

Location: Lahore

Client: Gulf Commercial Bank, Abu Dhabi

Consultants: Meinhardt, Singapore

Scope of Services: Drilling of 25 boreholes ranging in depth from 65m to 80m along with SPT and undisturbed soil sampling Total exploratory drilling – 1925m 12 CPT probes to 30m depth each Field permeability tests in boreholes Installation of piezometers Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests Factual and Interpretative Reports

Completion Time: Eight (08) weeks

No. of Drill Rigs: Nine straight rotary drilling rigs along with necessary crew and accessories

Project Sheets

Project: Mobilink Office Building at Quaid-e-Azam Industrial Estate

Location: Lahore, Punjab

Client: Progressive Consultants (Pvt.) Ltd.

Scope of Services:

Comparison of different layout of shoring systems Finalizing the layout of shoring system Evaluation of lateral loading at different support levels Design of different structural components of shoring system Design of in-situ tangent concrete piles Preparation of detailed construction drawings Preparation of Tender Documents for the construction of shoring system

Project Sheets

Project: Safety Assessment of Existing Shoring System and Design of Rehabilitation/ Strengthening Measures at Mubarak Center, Ferozepur Road, Lahore

Location: Lahore, Punjab

Client: M/s Taavun (Pvt.) Ltd.

Scope of Services:

Stage – I Assessment of existing retaining system and establish the need for remedial/ strengthening measures, which included;

a) Condition survey/ physical inspection of entire shoring system

b) In-situ Testing; Anchor lift-off tests; Integrity of concrete piles and bracing beams using Schmidt hammer and PUNDIT

c) Evaluation of existing shoring system by incorporating results of in-situ testing

Stage – II Suggesting the most appropriate and economical strengthening measures to ensure safety of the shoring system and adjacent buildings

Project Sheets

Project: Pindi Bhattian Faisalabad Motorway (M-3) Location: Pindi Bhattian-Faisalabad

Client: National HighwayAuthorities (NHA)

Scope of Work:

Drilling of 40 boreholes ranging in depth from 05m to 10m along with SPT and undisturbed soil sampling along the 60km long alignment

Forty (40) test pits along with field density tests

Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests

Factualand Interpretative Reports

Preparationofcomprehensiveevaluationrep

Project Sheets

Project: Bridge on Sutlej River, Bahawalpur. Location: Bahawalpur

Client: SKB Pvt. Ltd.

Scope of Work: Drilling of 2 boreholes to maximum depth of 50.0m along with SPT and undisturbedsoilsampling Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests

Preparation ofgeotechnical

investigation report Design of bridge

foundations

Start Date: July 01, 2003

End Date: July 20, 2003

Project Sheets

Project: Naran Jalkhan Road Location: Naran to Jakkhad

Consultants: Republic Engineering Corporation (REC), Lahore

Scope of Work: Eighty (80) test pits along with field density tests along the 60km long alignment

Laboratory testing including PSD, Liquid Limit, Plastic Limit, consolidation, direct shear, CBR tests

Preparation of geotechnical investigation reports for the road and all the structures along the road including bridges, culverts, and cross drainage structures

Design of pavement

Design of foundations for all the structures along the road

Date of Work Started: July 5, 2000

Project Sheets

Project: Lai Nullah Road Project, Rawalpindi Package-1) Location: Rawalpindi Client: National Engineering Services Pakistan (Pvt.) Limited

Scope of Work: Drilling of 20 boreholes ranging in depth from 20m to 40m along with SPT and undisturbed soil sampling.

Thirty Two shallow test pits along with field density tests

Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests

Preparation of factual reports for geotechnical investigations

Start Date: March 21, 2007

End Date: April 21, 2007

Completion Time: Eight (04) weeks

Project Sheets

Project: Lukpass Tunnel Quetta Location: Quetta,Baluchistan

Client: Associated Consulting Engineers (ACE) Pvt. Ltd.

Scope of Work: Drilling of 2 boreholes to maximum depth of 120m along with SPT and undisturbedsoilsampling

Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests

Preparationofgeotechnical

investigation reports Initial design of

tunnels support system

Design of slope stabilization near portals

Start Date: February 15, 2006

End Date: March 30, 2006

Project Sheets

Project: Improvement/Renovation of Existing Multan Road from Thokar Niaz Baig to Chauburji, Lahore Location: Lahore Client: National Engineering Services Pakistan (Pvt.) Limited

Scope of Work: Drilling of 4 boreholes to maximum depth of 06m along with SPT and undisturbedsoilsampling

Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests

Fourteen (14) test pits along with field density tests

Start Date: October 01, 2009

End Date: November 01, 2009

Project Sheets

EFFLUENT TREATMENT PLANT FOR TANNERIES, KASUR

Scope of Work:

Detailed design of Treatment Ponds, Screen House, Equalization Tanks, Settling tanks, Pump House, Embankments, Sludge Disposal Lagoons

Construction supervision for all site works

Quality Control and Quality Assurance audits

Project Sheets

HUBB WATER TREATMENT PLANT

Scope of Work: Detailed design of civil works of entire treatment plant including building, roads, and tanks

Construction Supervision for all site works

Quality Control and Quality Assurance audits

Preparation of progress report

Project Sheets

Project: Design, Construction and commissioning of six (6) tubewells having 1.0 cusec discharge capacity

Location: PARCO Mid-Country Refinery Project Mahmood Kot, Pakistan

Client: M/s Marubeni Corporation (MC) JGC Japan

Scope of Work: Design of wells, procurement of well material and pump / motor units, construction of wells, development and testing of wells

Completion Time: Two Months

Completion Date: November 1997

Clients

CLIENTS

Clients

Contractors

Harbin Electric International, China Dong Fong Electric Corporation, China CMEC, China CHINT, China TBEA, China Deawoo Corporation, Koria Karkey International, Turkey Sinogy, China Vestas, Australia M/s Mitsui Engineering & Shipbuilding Co Ltd Japan M/s Marubeni Corporation (JGC) Japan M/s Petrosin Pakistan Ltd M/s Presson Pakistan Ltd M/s Habib Rafiq (Pvt) Ltd M/s General Construction Company (Pvt) Ltd M/s Al-Wasay Construction Company (Pvt) Ltd M/s Walee Builders (Pvt) Ltd M/s Nowshera Engineering Services NENSER (Pvt) Ltd M/s Hisar Corporation (Pvt) Ltd M/s Ghulam Habib Construction (Pvt) Ltd M/s Nazir & Company (Pvt) Ltd

Private Agencies

Engro Pakistan Pepsicola, Pakistan Siddique Sons Energy, (Pvt.) Ltd. Tetra Pack, Pakistan Packages Pakistan Nishat Group Shareef Group M/s Align Technologies (pvt) Ltd USA M/s Fauji Fertilizer Rawalpindi M/s Pakistan Services Limited PSL Karachi M/s Regency Developer Group (Pvt) Ltd M/s Rupali Group (Pvt) Ltd M/s Crescent Services (Pvt) Ltd M/s Attock Refinery Ltd M/s Four Brothers (Pvt) Ltd M/s Global Marketing (Pvt) Ltd M/s Zafar Sons (Pvt) Ltd M/s Rahmat-ul-Alameen Trust M/s Cherished Pharmaceuticals (Pvt) Ltd M/s MSB Industries (Pvt) Ltd M/s Cholistan Sugar Mills (Pvt) Ltd M/s ICI Group Ltd M/s Merino Textile (Pvt) Ltd M/s International Juices (Pvt) Ltd M/s Sapphire Textile Group (Pvt) Ltd M/s Pharmagen Beximco (Pvt) Ltd M/s ProDiesal Services (Pvt) Ltd M/s Genesis Pharmaceuticals (Pvt) Ltd M/s Olympia Power Ltd M/s Hoechst Ravi Chemical Ltd M/s Sitara Chemicals Limited M/s Zuchini Industries Limited M/s Kohat Cement Limited

Clients

Government Agencies

National Highway Authority Building Division Swabi Pakistan Air Force Police Club Pakistan Bait-ul-Maal Rawalpindi Metropolitan Corporation Pakistan Television Corporation (Headquarter) Islamabad Assistant Director Housing Gujranwala Cantt General Headquarter AG's Branch Rawalpindi National Engineering Services Pakistan (NESPAK) Lahore Development Authority Engineering Consultancy Services Punjab (ECSP) Public Health Engineering Department, Punjab

Berkeley Associates (Pvt.) Ltd.

Topographic Survey Equipment

TOPOGRAPHIC SURVEY EQUIPMENT

Berkeley Associates (Pvt.) Ltd.

Completed Projects

RTK DGPS (Dual Frequency)

2 NO, SET Trimble R10 GNSS System,440 Channel Dual Frequency GPS and WAAS/EGNOS receiver system with L2C capability and integrated UHF radio modem 4 NO, SET Trimble R8 GNSS System, 440 Channel Dual Frequency GPS and WAAS/EGNOS receiver system with L2C capability and integrated UHF radio modem 2 NO, SET Trimble 5700 DGPS Receiver Advanced Dual Frequency GPS and WAAS/EGNOS receiver system with L2C capability and integrated UHF radio modem. 2 N0'S Sokkia Stratus L1 12 channel single frequency Receivers. 3 NO’S Magellan Triton series 400 3 NO’S Garmin Hand Held GPS E Series. TOTAL STATION 5 No’s (I) Sokkia CX‐105 (10,000 point) Built in Memory with Reflector less) 2 No’s (II) Sokkia 530 RK, (10,000 point) Built in Memory with Reflector less 1 No’s (III) Nikon NPl‐632, 2” accuracy (Built in Memory with SD card) 2 No’s (IV) Nikon Nivo 5‐M (Built in Memory) ECHO SOUNDERS 2 No’s GPSMAP 527xs ‐ Garmin LEVELS 10 No’s (I) Digital Level, Sokkia, NIKON, PENTAX (Level accuracy 0.10 mm) (ii) Wild B2

* Above all items are available with their accessories.

Berkeley Associates (Pvt.) Ltd.

Drilling Equipment

DRILLING EQUIPMENT

Berkeley Associates (Pvt.) Ltd.

Drilling Equipment

DESCRIPTION QTY MAKE

Rotary Boring Rig for Soil Investigations 12 No. Pakistan

Wash Boring Rig for Soil Investigation 2 No. Pakistan

CPT Rig (Manual) 1 No. Pakistan

Percussion Rig for Soil Investigation 4 No. Pakistan

Percussion Rig for Piling 15 No. Pakistan

Reverse Rotary for Tube well & Piling 6 No. Pakistan

Auger Bucket Dry Drilling Rigs for Piling 3 No. Pakistan

Auger boring for Soil Investigation 8 No. Pakistan

Tremie, Funnel, Bucket and Pipes 5 No. Pakistan

Core Extraction Machine 1 No. Pakistan

Hydraulic Jack 2 No. Pakistan

Casing 100mm Diameter Sufficient Pakistan

Shelby Tubes Sufficient Pakistan

Speedy Moisture Tester 2 No. USA

Pitcher Sampler 5 No. Pakistan

Denison Sampler 5 No. Pakistan

SPT Rods (AW) 800 m USA

SPT Apparatus 3 No. USA

Sand Cone Apparatus 3 No. Pakistan

Drive Cylinder 10 No. Pakistan

Berkeley Associates (Pvt.) Ltd.

Laboratory Testing Equipment

LABORATORY TESTING EQUIPMENT

Laboratory Testing Equipment

DESCRIPTION QTY MAKE

Electric Oven 2 Nos. Germany

Triple Beam Balance 2 Nos. USA

Digital Balance 4 Nos. USA

Analytical Balance 1 Nos. China China

Field Balance 2 Nos. Imported Mesh

US Standard Sieve US 4 Sets Pakistan

Standard Sieve (Coarse) 2 Sets China

Liquid Limit Device 3 Sets Imported Ring

Unconfined Compression Machine 2 Nos. Imported Ring

Direct Shear Machine 1 Nos. Pakistan

Consolidation Machine 4 Nos. Pakistan

Standard Proctor Apparatus 2 Nos. Pakistan

Modified Proctor Apparatus 2 Nos. Pakistan

CBR Molds 12 Nos. Pakistan

CBR Machine Sample 1 Nos. Pakistan

Extruder AASHTO 1 Nos. Pakistan

Compaction Test Cylinder 2 Sets China

1000 ml 12 Nos. China

Cylinder 500 ml 2 Nos. China

Beaker 250 ml 12 Nos. China

Pycnometers 50 ml 6 Nos.

Moisture Can Sufficient

Allied Accessories Sufficient

Key Personnel

KEY PERSONNEL

Berkeley Associates (Pvt.) Ltd.

Key Personnel

NAME AND DESIGNATION QUALIFICATION EXPERIENCE

Jahangir Akhtar B.Sc. Civil 48 years experience in Chief Executive Officer Engineering Geotechnical and Geoenvironmental Engineering, design of dams and overall engineering management of large projects

Khalid Ayyub M.Sc. in 24 years in Director/ Geotechnical Geotechnical Head Geotechnical Engineering Engineering, field work, Engineering Laboratory work, Analyses and design.

Ahmad Nawaz M.Sc. Geology 46 years experience in Groundwater Expert ground water Hydrology

Sheikh Ilyas Ahmed B.Sc. Civil 48 years experience of Chief Structural Engineer Engineering Structural Design of Head Project Manager Building, hydropower Project.

Ijaz Shafi B.Sc. Civil 40 years experience Head Structural Engineering

Saqib Mir B.Sc. Civil Engineering 15 years experience Principal Structural Engineer

Umar Maqsood B.E Civil Engineering 2.5 years experience Senior Structural Engineer

Hafiz Muhammad Hassan B.Sc. Civil Engineering 1 year experience Ajmal Junior Structural Engineer

Berkeley Associates (Pvt) Ltd Key Personnel

NAME AND DESIGNATION QUALIFICATION EXPERIENCE

Farooq Naveed M. Sc. Civil 8 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer

Imran Farooq M.Sc. Civil 5 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer

Abdullah Masood B.Sc. Civil 1 years experience Junior Engineer Engineering

Mannan Ali B.Sc. Geological 2 years experience Geological Engineer Engineering

Hafiz Abdur Razzaque M.Sc. Geology 5 years experience Senior Geologist

Asad Ali BS Applied Geology 2.5 years experience Geologist

Maheen Malik M.Sc. Environmental 2.5 years experience Public Health and Engineering Environmental Engineer

Raja Naeem Diploma in Civil 35 Year Experience in Chief Surveyor Technology Surveying, BOQs, Bar Bending Schedule and rate analyses

Berkeley Associates (Pvt) Ltd

Field Staff

FIELD STAFF

Berkeley Associates (Pvt.) Ltd.

Field Staff

NAME AND DESIGNATION QUALIFICATION EXPERIENCE

Abdur Razzaque M. Sc. Applied 5 years experience Site Geologist Geology

Asif Ali M. Phil Applied 2 years experience Site Supervisor Geology

Muhammad Ali Chughtai B. Sc. Geology 30 years experience Site Supervisor

Usman Majeed B. Sc. Geology 1 year experience Site Supervisor Engineering

Muhammad Ishaq F. Sc. 5 years in field and Site Supervisor Laboratory Testing

Muhammad Tariq Matric 15 years in piling and Site Supervisor well drilling works

Muhammad Naeem Matric 15 years in piling and Site Supervisor well drilling works

Muhammad Saeed F.A 30 years in laboratory Laboratory Technician testing at UET Lahore

Ajmal Hahat B. A 25 years experience in Laboratory Technician material testing lab.

Sikandar Hayat F.A 5 years experience in Laboratory Assistant laboratory testing

Abdul Hameed Middle 15 years experience in Driller drilling

Abdur Razzaque Middle 13 year experience in Driller drilling

Muhammad Imtiaz Middle 13 year experience in Driller drilling

Berkeley Associates (Pvt.) Ltd.

Curriculum Vitae of Key Personnel

CURRICULUM VITAE OF KEY PERSONNEL

Curriculum Vitae of Key Personnel

Khalid Ayyub Partner / Geotechnical Specialist

DATE OF BIRTH December 22, 1967. NATIONALITY Pakistani. EDUCATION B.Sc. Civil Engineering.

M.Sc. Soil Mechanics & Foundation Engineering.

OTHER TRAINING Advance computer course in C language from University of Engineering & Technology Lahore.

Special training course on the design and construction of horizontal drainage system organized by IWASRI and sponsored by UNDP/DTCD in collaboration with ILRI Netherland.

Advance course in Hydrology from University of Punjab Lahore.

Special course in saline water movement in response to pumping from Center of Excellence University

of Engineering & Technology

Lahore.

LANGUAGES English Urdu

MEMBERSHIP OF PROFESSIONAL SOCIETIES Pakistan Engineering Council, Islambad. Pakistan Engineering Congress, Lahore. Institution of Engineers, Pakistan. Pakistan National Society For Soil Mechanics And Foundation Engineering.

PROFESSIONAL RECORD

(a) From April 1999 Up to date

Partner Berkeley Associates.

Curriculum Vitae of Key Personnel

(b) From May 1994 March 1999

Chief Executive Kenrock Geotechnical Services

(c) From December 1993 April 1994

GEOTECHNICAL ENGINEER M/S ACE (PVT) LTD ON DESIGN OF EARTH DAMS FOR IRAN, INDONESIA & MALAYSIA.

(d) From October 1993 December 1993

GEOTECHNICAL ENGINEER M/S ACE (PVT) LTD ON DESIGN OF CHASMA HYDRO POWER PROJECT.

(e) From September 1991 October 1993

GEOTECHNICAL ENGINEER M/S ACE (PVT) LTD ON GHAZI - BAROTHA HYDRO POWER PROJECT.

(f) From May 1990 September 1991

GEOTECHNICAL ENGINEER M/S ACE (PVT) LTD ON TARBELA - LAHORE 500 KV TRANSMISSION LINE PROJECT.

(g) From January 1990 May 1990

STRUCTURAL ENGINEER M/S SHEIKH RAIZ AHMAD & ON DESIGN OF BRIDGES. ASSOCIATES.

Curriculum Vitae of Key Personnel JAHANGIR AKHTAR : Partner/ Project Management Specialist

Nationality : Pakistani

Date & Place of Birth : November 05, 1947 Lahore Pakistan

Profession : Civil Engineer

Position in Firm : Chief Executive Officer

Registration Number with : CIV-00873 Pakistan Engineering Council

Affiliation with : Member Pakistan Engineering Council Professional Institutions Member Institution of Engineers Pakistan Member Pakistan Geotechnical Engineering Society Member International Society for Soil Mechanics & Geotechnical Engineering

Key Qualifications

Practicing Professional Engineer since 1968.

Presently working as Chief Executive Officer in Berkeley Associates (Pvt.) Ltd., Responsible for technical coordination, business development, budget monitoring, overseeing the coordination of mega projects. Responsible for technical management, corporate technical monitoring and control, and value addition to the technical outputs of existing projects and review of proposals, bids and TORs for new mega projects.

Worked as Chief Operating Officer and Senior General Manager/Head Geotechnical and Geoenvironmental Division in Engineering Consultancy Services Punjab (Pvt. Limited, Lahore (ECSP from February, 2012 to April, 2016.

Worked as Chief Executive in Jahangir Akhtar and Associates (J&A) from 2009 to January 2012. In this capacity, handled geotechnical problems of Al-Ilam Bridge along Ring Road and two bridge projects along Batinah Coastal Road Sultanate of Oman for M/s Turkpak International. Besides worked as project manager for hydropower, management consultancy and off shore engineering works in Pakistan.

Worked with NESPAK from 1973 to 2009 as Geotechnical Engineer in various positions starting from Senior Engineer to Vice President (Technical Coordination and Vice President / Head of Geotechnical and Geoenvironmental Engineering Division Worked on a wide range of Projects as designer, head of design teams, review expert and coordinator including large dams and water supply projects, hydropower projects, small and medium dams, Highways, Motorways, Airports and bridge projects, Industrial and Energy Projects and Buildings.

During the career with NESPAK, worked on the following major engineering projects, as a Geotechnical Engineer in different capacities ranging from team leader to a team member.

Dams, Water Supply and Drainage Projects

Ghazi-Barotha Hydropower Project, Raising of , Basha Diamer Dam, , 12 small dams in FATA, 3 small dams in NWFP, Project, Berkeley Associates (Pvt.) Ltd. Curriculum Vitae of Key Personnel

Islamabad; Anchor Sihala Dam; 706 Army Base Workshop Water Supply Project; Gadani Water Supply Project Lasbela; Goronyo Dam, Nigeria; Euphrates East Drain Project Iraq; Eastern Province Water Transmission Project,K.S.A; Remodelling of Kinjhar-Gujjo Canal; Quetta Water Supply Project; Qusayba Drainage Project, K.S.A; Fordwah-Sadqia Surface Drainage Project; South Jazira Tunnel Project, Iraq; Hofuf Water Transmission System, K.S.A; Buraidah Feeder Line Project, K.S.A; Sabya Water Network Project (Phase-I), K.S.A. Participated in inspection of , Simly Dam and Khanpur Dam as a member of Panel of Experts. Energy and Power Projects

Chashma Nuclear Power Plant; 500 KV Transmission Network Towers Pakistan; Kot Addu Gas Turbine PowerStation Pakistan; Efficiency ImprovementofWAPDAThermal Power Plants;450 MW Combined Cycle Thermal Power Plant Guddu; Tarbela and Mangla Hydropower Extension projects Pakistan; KCP Workshop Jauharabad.

Bridges and Highway Projects

Third IBRD financed highway projects in Pakistan; Pategi-Eggan Road Project Nigeria; Bridges in Northern Areas; Sohar Roads-Sultanate of Oman; Khasab Coastal Road, Oman; Additional Carriageway Mianchannu-Sahiwal Highway; various portions of Indus Highway Pakistan; Djouju-Porga Road Benin; Overhead Bridge at Quetta; Chitral Booni Road; upgrading of Old Bridges on Kohat Thal Road; Farm to Market Roads in NWFP and Punjab; Rahim Yar Khan - Tarinda M. Pannah Highway; Strengthening and extension of N-70 Highway; Balochistan Development Authority (BDA) Roads, Islamabad-Muzaffarabad Dual Carriageway, N-70 Road Project.

Motorway Projects

Pakistan Motorway Lahore-lslamabad Section (M-2 Section) and Pakistan Motorway Sheikhupura-Multan-D.G. Khan Section(Old M-3 Section), Pakistan MotorwayPindi Bhattian- Faisalabad Section (current M-3 Section).

Buildings

UBL Multistoreyed Buildings at Karachi, Lahore and Islamabad; Armed Forces Medical City Rawalpindi; Overseas Pakistanis Foundation Head Office Islamabad, Aiwan-e-lqbal Complex Lahore; Air and Naval Headquarters Islamabad; Pakistan Engineering Council Head Office Islamabad; Gomal University D.I. Khan; EFU Head Office Lahore; SLIC Head Office Islamabad; State Bank Building Sialkot; Army Welfare trust Plaza Rawalpindi; PISIC House Lahore; MCB Head Office Building Karachi; OGDC Energy House Islamabad; Prime Minister's House and Secretariat Islamabad; Airport Terminal Buildings at Karachi; Lahore and Islamabad, Pakistan Housing Project spread all over Pakistan; Kidney Centers in Pakistan.

Industrial Facilities

Pak-Saudi Fertilizer Complex; Iron Ore and Coal Berths Port Qasim; Sea Water Intake and Disposal System Karachi Steel Mills; Galadari Cement Works Karachi; Mustehkam Cement Factory Hattar; Maple Leaf Cement Factory Iskandarabad; Storage Facilities for 40,000 tons of rice in Punjab Pakistan, Bhit Gas Field Development Project.

Berkeley Associates (Pvt.) Ltd. Curriculum Vitae of Key Personnel Education

Name of Institution Year Degree/Diploma

University of Engineering & 1968 B.Sc. Civil Engineering Technology, Lahore-Pakistan

Other Courses

University of Engineering & 1977 Certificate in Computer Technology, Lahore-Pakistan Programming

L'AllianceFrancaiseLahore 1990 Three Units Course in French Language

EXPERIENCE

I Name of Employing Agency Berkeley Associates (Pvt.) Ltd. Title of Position Executive Director Location of Assignment Lahore-Pakistan Period of Assignment May, 2016 to date

Activities

Working as Director in Berkeley Associates (Pvt.) Ltd., Responsible for technical coordination, business development, budget monitoring, overseeing the coordination of mega projects. Responsible for technical management, corporate technical monitoring and control, and value addition to the technical outputs of existing projects and review of proposals, bids and TORs for new mega projects.

II Name of Employing Agency Engineering Consultancy Services Punjab (Pvt.) Title of Position Chief Operating Officer Location of Assignment Lahore-Pakistan Period of Assignment February, 2012 to April, 2016.

Activities

Worked as Chief Operating Officer and Senior General Manager/Head Geotechnical and Geoenvironmental Division in Engineering Consultancy Services Punjab (Pvt.) Limited, Lahore (ECSP) from February, 2012 to April, 2016.

III Name of Employing Agency Jahangir Akhtar and Associates (J&A) Title of Position Chief Operating Officer Location of Assignment Lahore-Pakistan Period of Assignment September, 2009 to January, 2012.

Activities

In this capacity, handled geotechnical problems of Al-Ilam Bridge along Ring Road and two bridge projects along Batinah Coastal Road Sultanate of Oman for M/s Turkpak International. Besides worked as project manager for hydropower, management consultancy and off shore engineering works in Pakistan.

IV Name of Employing Agency National Engineering Services Pakistan (Pvt.) Ltd Berkeley Associates (Pvt.) Ltd.

Curriculum Vitae of Key Personnel

(NESPAK) Title of Position Vice President Technical Coordination Convenor Board of Management NESPAK Member Board of Management - Mangla Raising Project Member Board of Management - Dasu Hydropower Project Location of Assignment Lahore-Pakistan Period of Assignment September 2006 to August 2009

Activities

As Vice President Technical Coordination, heading the Technical Coordination Division. Responsible for technical coordination, budget monitoring, business development, overseeing and coordination for mega projects. Responsible for technical management, corporate level technical monitoring and control, and value addition to the technical outputs. Incharge of overall coordination of ERRA Projects.

V Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited (NESPAK) Title of Position Vice President Technical Coordination Division & Convenor BOM Location of Assignment Lahore -Pakistan Period of Assignment September 2006 to November 2007

Activities

As Vice President Technical Coordination, heading the Technical Coordination Division. Responsible for technical coordination, budget monitoring, business development, overseeing and coordination for mega projects. Responsible for technical management, corporate level technical monitoring and control, and value addition to the technical outputs. Inchargeofoverallcoordinationof ERRAProjects.

VI Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited (NESPAK) Title of Position Vice President /Head Geotechnical & Geoenvironmental Engineering Division Convenor BOM Location of Assignment Lahore -Pakistan Period of Assignment February 2000 to August 2006

Activities

As Vice President/Head Geotechnical and Geoenvironmental Engineering Division, guided the geotechnical team during the Concept Design Phase and reviewed the reports for preparation of the requirements of Geotechnical Studies for Al Shamiya Redevelopment Project, MakkahAl-Mukarrammah, KSA. Theprojectincludesdesignof tunnels, roadnetwork, undergroundspines, bridges/ flyovers, utilityworksetc.

As Vice President/Head Geotechnical and Geoenvironmental Engineering Division, responsible for planning/management of geotechnical studies, geotechnical design of dams and structures and review & quality assurance of geotechnical documents and proposals. Also responsible for administrative and financial management of Geotechnical & Geoenvironmental Engineering Division.

Working as Project Coordinator, review expert and Member of BOM for the following

Berkeley Associates (Pvt.) Ltd.

Curriculum Vitae of Key Personnel

large Dams and Hydropower Projects:

 Ghazi Barotha Hydropower/Dam Project  Basha Diamer Dam Project  Mirani Dam Project  Mangla Dam Raising Project

Providing technical coordination for the design and construction supervision of the following small to medium dams:

 Kot Ragha Dam  Maidani Dam  Mir Kalam Dam  Marsi Khel Dam  Kharosha dam  Dargai Pal Dam  Dande Dam Technical coordination is also being provided for the feasibility study of the following dams:  Zamir Gul Dam  Rajoyia Dam  Marobi Dam

VII Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited Deputed to Pakistan Hydro Consultants (Joint Venture of 5 National and International Consulting firms). Title of Position General Manager/Chief Geotechnical Location of Assignment Lahore -Pakistan Period of Assignment January 1994 to March 2000

Activities

As Chief Geotechnical for the Ghazi-Barotha Hydropower/Dam Project (a multi-billion dollars project consisting of a barrage, a 52 km long 1,600 cusecs capacity lined power channel and a 1,450 MW power house), responsible for the following activities:

 Complete review of geotechnical design aspects of the project; including barrage and headpond embankments (up to 60 m high), seepage control measures for the barrage (including plastic concrete cutoff, treatment of openworks, relief wells, drainage blanket, filter etc.), elaborate underdrainage system for the lined channel, deep excavations (up to 40 m for power channel and 70 m for power house), instrumentation system etc.  Preparation of construction drawings.  Review of contractor's method statement, and other submissions.  Construction material valuation and concrete mix design.  Attending to geotechnical site related problems and coordination with other specialists.  Design of project roads  Planning and setting up of material testing laboratories.

IV Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited Deputed to BCEOM -NESPAK Joint Venture for the design ofM-3 Motorway Project Title of Position Chief Engineer/Senior Advisor (Geotechnical) Location of Assignment Lahore -Pakistan

Berkeley Associates (Pvt.) Ltd.

Curriculum Vitae of Key Personnel

PeriodofAssignment March 1992 to Jan 1994

Activities

Worked as Senior Advisor (Geotechnical) for the Pakistan Motorway Sheikhupura- Multan - D.G. Khan Section (Old M-3 Section); a multi-billion rupee project. Project consisted of a 6 lane, 450 km long motorway. Responsibilities included:

 Planning and implementation of geotechnical investigations.  Design of geotechnical aspects of roadways and enroute structures including two major river bridges, a number of flyovers and interchanges.  Construction material studies using satellite imageries.  Preparation of design report and tender documents.  Assistance to the Project Manager in successful execution of the project  Expert review of reports and study documents

V Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited. (Deputed to Joint Venture for the detailed design of M-2 Motorway Project) Title of Position Chief Engineer/Chief Geotechnical Location of Assignment Lahore -Pakistan Period of Assignment May 1991 to March 1992

Activities

Worked as Chief Geotechnical for the joint venture. Responsible for the detailed design ofPakistanMotorwayM-2(Lahore-lslamabadSection).Responsibilities included:

 Planning and implementation of geotechnical investigations.  Recommendations for the geotechnical design aspects of the road embankment/pavement, river bridges, flyovers and interchanges.  Construction material studies  Documentation and preparation of design report and tender documents.  Expert review of design reports and tender documents

VI Name of Employing Agency National Engineering Services Pakistan (Pvt) Limited Title of Position Chief Engineer/Principal Engineer/Deputy Chief Geotechnical Engineer

Location of Assignment Lahore -Pakistan Period of Assignment 1981 to 1991 and 1994 to 1995

Activities

As Chief Engineer (from July 1987 to May 1991 and January 1994 to April 1995), responsible for management of geotechnical engineering and foundation aspects and review of design reports of the following projects which also involved close interaction with theclients:

 Water supply projects including Balochistan Water Supply Project; Water Supply System for Sakardu; Islamabad Water Supply Extension Project; bridges, culverts and aqueducts of Fordwah Sadqia Surface Drainage Project in Punjab; Eastern Province Water Supply Project, K.S.A. and Qusayba Drainage Project, K.S.A.  Multistoried buildings namely Muslim Commercial Bank Head Office Berkeley Associates (Pvt.) Ltd.

Curriculum Vitae of Key Personnel

Building Karachi, United Bank Head Office Buildings Karachi and Lahore; Commercial Complex Hayatabad Peshawar; Pakistan Engineering Council Buildings Islamabad; Air and Naval Headquarter Building Islamabad; AWT Plaza Rawalpindi; State Bank Building Sialkot; PISIC House Lahore; OGDC Energy House Islamabad; Prime Minister's House and Secretariat Building, Islamabad.  Highways and bridges namely upgrading of all bridges on Kohat - Thal road and Chitral - Booni road NWFP, Sibi - Talli Road, Balochistan; Bridges in Northern Areas, Farm to Market Roads Swat NWFP.  New proposed International Airports at Karachi, Lahore and Islamabad.  Responsible for the geotechnical aspects including soil classification, rock mass rating, calculation of rock loads and geotechnical design of the following:  Feasibility studies for increasing discharge of Benton Tunnel NWFP Pakistan. South Jazira Tunnel Project, Iraq.

As Deputy Chief (July 1981-June 1987), responsible for management and review of foundation and geotechnical aspects of the following engineering projects.

 Geotechnical engineering investigations for Karachi Steel Mills.  Design of dykes, drains and other structures of Euphrates East Drain Project, Iraq.  Subsurface investigations of 40,000 tons of Rice Storage Facilities in Punjab.  Foundation design of towers for 500 KV Transmission Network.  Pavement design for Pategi-Eggan Road Project Nigeria, Sohar Roads Sultanate of Oman and DjoujuPorga Road, Benin.

Also managed geotechnical engineering works and reviewed the reports for:

 Highways bridges in NWFP on Kohat-Bannu Road  Galadari Cement Works at Karachi.  Chashma Nuclear Power Plant  Eastern Taxiway Islamabad, New Islamabad International Airport.  UBL Head Office Building Islamabad, Medical City Rawalpindi.  Quetta Water Supply Project  Second Tarbela-Faisalabad 500 KV Transmission Line Project.

As Geotechnical Engineer (August 1973 to June 1981), responsible for:

 Design of water supply dam of 706 Army Base.  Geotechnical investigations for Sea Water Intake and Disposal System of Karachi Steel Mills; Pak Saudi Fertilizer Factory; Mustehkam Cement Plant; Maple Leaf Cement Factory; Pipri Thermal Power Station of Karachi Electric Supply Corporation (KESC).  Foundation related works for various features of Port Qasim Project, Karachi.  Galadari Cement Works -Foundation analysis and design.  Geotechnical investigations for 500 KV Transmission Line Project (Jamshoro- Multan and Tarbela-Faisalabad).  Geotechnical investigations for Left Bank Irrigation Tunnel of .

VII Name of Employing Agency Water and Power Development Authority (WAPDA) Title of Position Assistant Design Engineer Location of Assignment Lahore-Pakistan Period of Assignment 1971 to 1973

Activities  Structural design of WAPDA Buildings, Tarbela Hospital and design review Berkeley Associates (Pvt.) Ltd.

Curriculum Vitae of Key Personnel

of a sewage treatment plant at Tarbela.  Assistance in the design of Simly Dam Project, Islamabad.

VIII Name of Employing Agency Associated Consulting Engineers Limited (ACE) Title of Position Site Engineer Location of Assignment Khanpur -Pakistan Period of Assignment 1968 to 1971

Activities

Construction supervision of Khanpur Dam Project including grouting at abutments, tunnelandspillway.

PUBLICATIONS

 "Influence of boring and construction methods on the performance of bored cast in-situ  R.C. piles of a bridge" published in Piletalk Int'l Seminar in Kuala Lumpur in March, 1989.  “Prediction and performance of bored cost in-situ R.C. Piles in load tests in Pakistan” published in XIIth ICSMFE in Rio de Janiero in August, 1989.  "Time efficient and cost effective decisions during pile construction for a building project" First Asian Young Geotechnical Engineers Conference Bangkok Thailand in 1991.  "SPT for evaluation of unit skin friction and tip resistance of piles in Punjab sands" published in Int'l Conf. on Soil Improvement and Pile Foundations in China in 1991.  “Roadwork Related Properties of Punjab Area Soils” published in proceedings of the 10th Asian Regional Conference on Soil Mechanics and Foundation Engineering Beijing in 1996.  “Evaluation of seepage under the Ghazi Barrage-A case study” published in XIVth International Conference on Soil Mechanics and Foundation Engineering in Hamburg,  Germany in 1997.  “Cracking of Structures on Swelling Soils A Case Study” published in the proceedings of Symposium 2000 of C&W Department., Govt. of Punjab, held in Lahore in November 2000.

Language capability

English and Urdu - Excellent in speaking, reading and writing

French - Fair in speaking, reading and writing

Berkeley Associates (Pvt.) Ltd.

Curriculum Vitae of Key Personnel

1. Proposed Position: Structural Engineer

2. Name of Firm: Berkeley Associates

3. Name of Staff: Sheikh Ilyas Ahmad

4. Profession: Civil Engineer

5. Date of Birth: 16th March, 1947

6. Years with the Firm: 1.0 years

7. Nationality: Pakistani

8. Membership in Professional Societies: Member Institution of Engineers Pakistan Member Pakistan Engineering Congress Member Pakistan Engineering Council

9. Key Qualifications:

Practicing Professional Engineer since 1968

As Deputy Chief Executive Nespak Foundation, controlled & managed the Administrative & Financial operations of the Foundation (August 2007 to March 2010).

As Vice President/ Head Structural Engineering Division(2003 to 2007)supervised the Planning & Design and Project Management activities of various projects comprising Bridges, Hydropower, Nuclear Power, Oil & Gas transmission, Buildings, Cement Plants, Hydraulic Structure.

As Team Leader (Civil Designs) on deputation to Pakistan Hydro Consultants from 1995 to 2003, responsible for the preparation of detailed designs and construction drawings of 1,450 MW Ghazi-Barotha Hydropower Project consisting of the following major components:

- Ghazi Barrage across river Indus - 1,600 cumecs capacity, 52 km long power channel including nearly 80 cross drainage structures/ bridges. - Power complex comprising powerhouse, spillway, tail regulator, low level outlets, switchyard, sill structures, headponds.

As Chief Engineer Structures Division (1987 - 1995) responsible for the planning, design, Tender documents and Construction drawings of Tarbela Hydro power Third Extension, Mangla Hydroelectric 2nd Extension, Tarbela Tunnel 4 Hoist Bridge Remedial Measures, Kundal Shahi Hydel Scheme Muzaffarabad, Water Supply Schemes of Al-Majmaah-Shaqrah Saudi Arabia & Kachhi, , Quetta (Balochistan), Auxiliary Buildings of Multan-2 Thermal Power Station, Mirani Dam and Projects Balochistan.

As Principal Engineer Structures Division (1985 - 87) worked on the design review of pumping station structures of North Jazira Irrigation Project Iraq; Zubair Irrigation Project Iraq, design, contract documents, construction drawings of Chattar Bagh Suspension Bridge Islamabad,

Curriculum Vitae of Key Personnel

Kahlian-Sahlian Suspension Bridge, UGC Centres at Lahore & Karachi, Tourist Resort at Sahiwal, 50m high Steel Chimney of Guddu Thermal Power Station.

As Principal Engineer with Kalabagh Consultants on deputation from NESPAK from 1981-85, worked on planning, design and preparation of tender documents of major structures (i.e. Powerhouse, Power Intakes, Power Tunnels and Low Level Outlet Works) of Project, Pakistan.

As Principal Engineer (1981-1982) and Senior Engineer (1974-1981) in Structures Division of NESPAK, responsible for planning and detailed structural design of civil works of 700 MW Tarbela Hydropower First Extension Project; structural design of eight bridges on Al-Khabura- Dariz Highway Oman and three superhighway bridges of Zubair Irrigation Project-Iraq, planning & design of 20 storey 233 ft. high HBFC House, Islamabad, two industrial complexes in Peshawar and tower foundations for 500 KV Transmission Line (Pakistan) and design review of 50,000 ton capacity Grain Silos Project Chichawatni, (Pakistan).

As Assistant Executive Engineer/Design Engineer with Irrigation Department/ Pakistan Water and Power Development Authority (1968-1974), worked on the design and construction supervision of Marala Drainage Syphon, District road bridge over Upper Gogera Branch Canal, design of concrete lining of irrigation tunnels of Khanpur Dam Project and planning and design of irrigation systems of and Chashma Right Bank Canal.

10. Education

Name of Institution Year Degree/Diploma

University of Engineering & 1968 B.Sc. Civil Engineering - Degree Technology, Lahore-Pakistan University of Engineering & 1977 Computer Programming in FORTRAN Technology, Lahore-Pakistan IV Language (Certificate)

11. Employment Record:

I Name of Employing Agency Berkeley Associates

Title of Position Advisor Structures

Location of Assignment Lahore – Pakistan

Period of Assignment October 2011 to date

Activities

Supervising the structural design of the following projects:

i) 22MW Jabban Hydroelectric Power Station ii) Machai Hydropower Project at RD 47+000

II Name of Employing Agency Noor Durrani & Associates

Title of Position Structural Engineer

Curriculum Vitae of Key Personnel

Location of Assignment Lahore – Pakistan

Period of Assignment May 2010 to October 2011

Activities

Planning, design and preparation of Tender Documents & EPC Bids for the following projects:

i) 17.0MW capacity Ranolia Hydropower Project ii) 2.6MW capacity Machai Hydropower Project iii) 7.6MW capacity Marala Hydropower Project iv) 4.0MW capacity Deg Outfall Hydropower Project v) 5.4MW capacity Chianwali Hydropower Project vi) 4.2MW capacity Okara Hydropower Project vii) 2.8MW capacity Pakpattan Hydropower Project

III Name of Employing Agency Nespak Foundation

Title of Position Deputy Chief Executive

Location of Assignment Lahore – Pakistan

Period of Assignment August 2007 to March 2010

Activities

Supervised and managed the administrative and financial operations of Nespak Foundation

IV Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited

Title of Position Vice President (Str. Eng. Division)

Location of Assignment Lahore – Pakistan

Period of Assignment August 2003 to March 2007

Activities

As Head of Structural Engineering Division, supervised the activities of the Division including Planning & design, Project management, Business promotion etc on various Projects. Major projects included the following:

- KCP - Workshops (PAEC Project) - White Oil Pipeline Crossing over river Indus at Ghazi Ghat - Suigas Pipeline crossing over river Chenab at Shershah - Suigas Pipeline crossing over river Indus at Khairabad - Design of Road Bridge over river chenab at Shershah - Design of 9 bridges on Mansehra-Naran-Jhalkhad Road - 500 TPD White Cement Plant at Maple Leaf Factory - Acetic Acid Recovery Plant (PAEC Project) - Nuclear Safety Related Buildings

Curriculum Vitae of Key Personnel

- Up-gradation/ Renovation of Govt. College University Lahore - Government College University at Faisalabad - Servants Housing Scheme at Mohlanwal, Lahore - Peshawar Flyover Project - Rustik-Miskin Road bridges, Oman - Lahore Ring Road Project - Structures on Sewerage projects of Nizwa, Sur, Khasab, Buraimi and Misfat, Oman - Project - 12 Small Dams Project, NWFP - Rehabilitation of Torkham - Jalalabad road Project, Afghanistan - National Bank of Pakistan, Islamabad - KAPCO High School, Kot Addu - Rehabilitation of bridges on N-70 - Saudi German Hospital Complex Project

V. Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited

Title of Position Team Leader (Civil Designs) Pakistan Hydro Consultants

Location of Assignment Lahore – Pakistan

Period of Assignment March 1995 to June 2003

Activities

Supervision / coordination of all civil design activities of US $ 2.5 billion Ghazi- Barotha Hydropower Project which included analysis & design, review of tender stage designs, production of construction drawings in the Hydraulics, Geotechnical and Structural Sections. The following major activities were carried out:

- Review/checking of the tender stage designs - Review and updating of Tender design Criteria for forming basis of detailed designs - Detailed designs of component features of the project

Important structures include:

- Barrage (Standard Bays, Head Regulator, Under-sluices, Left & Right Guide Embankments, Separation Dyke) - 1,600 cumecs power channel containing nearly 50 cross drainage structures and as many bridges including National Highway Bridge and Lahore-Peshawar Main Railway Bridge - Power complex (1,450 MW Powerhouse having 5 unit bays, two erection bay and one unloading bay, siphon spillway, tail regulator, intake structure, sill structures, low level outlets, switchyard, tailrace channel and head pond and fore bay embankments)

- Checking/Quality Assurance of nearly 2,200 construction drawings pertaining to barrage, power channel and power complex - Review/ Quality Assurance & finalization design of reports of Barrage, Power Channel, Power Complex and Project Instrumentation - Review/comments on Contractor's detailed construction schedule

Curriculum Vitae of Key Personnel

- Review/approval of Contractor's submissions on Contractor's colonies at Hattian, Tarbela & Barotha, Contractor's alternative designs for Super-passages and bridges, Contractor’s design of Railway bridge based on alternate Chinese profiles - Review/approval of Contractor's River Diversion Scheme, Work Programme, Aggregate production plant, concrete Batching Plant, Powerhouse Excavation & dewatering schemes etc.

VI. Name of Employing Agency: National Engineering Services Pakistan (Pvt.) Limited

Title of Position: Chief Engineer

Location of Assignment: Lahore – Pakistan

Period of Assignment: July 1987 to March 1995

Activities:

Planning, design and preparation of construction drawings for the following projects:

- Civil Works of U.S. $ 760 million 1700 MW Tarbela Hydro power Third Extension Project, (4 x 432 MW) - Civil Works of U.S. $ 80 million 200 MW Mangla Hydroelectric 2nd Extension (2 x 100 MW) - Tarbela Dam Spillway Stoplogs (Main & Auxiliary Spillways) - Remedial Measures of Tarbela Tunnel-4 Hoist Bridge - Kundal Shahi Hydel Scheme (2MW) Muzaffarabad - Water Supply Schemes of Al-Majmaah-Shaqrah, Saudi Arabia - Quetta, Kachhi and Ziarat Water Supply Schemes, Balochistan - Auxiliary Buildings of Multan-2 Thermal Power Station - Inlet, outlet & spillway structures and tunnel of Mirani Dam Project, Balochistan Intake, tunnel and outlet structures of Hingol Dam Project, Balochistan

VII. Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited

Title of Position Principal Engineer

Location of Assignment Lahore – Pakistan

Period of Assignment January 1986 to June 1987

Activities:

- Design review of Pumping Station Structures of North Jazira Irrigation Project, Iraq. - Detailed Design, Tender Documents and construction drawings of:  Chitral Airport Terminal Building  University Grants Commission Buildings at Lahore & Karachi  Tourist Resorts at Multan, Khanewal, Sahiwal, Rahim Yar Khan and Panjnad  Chattar Bagh Pedestrian Suspension Bridge  Kahlian-Sahilian Suspension Bridge  50 meter high Steel Chimney of Guddu Thermal Power Station  Preliminary design and Tender Documents of Civil works of Zubair Irrigation Scheme,Iraq

Curriculum Vitae of Key Personnel

VIII. Name of Employing Agency: National Engineering Services Pakistan (Pvt.) Limited

Title of Position: Principal Engineer (Kalabagh Consultants)

Location of Assignment: Lahore – Pakistan

Period of Assignment: March 1982 to December 1985

Activities:

Planning, design and preparation of tenders of major structures including Powerhouse, Power Intakes, Low Level Outlet Works of U.S. $ 3400 million Kalabagh Dam Project, Pakistan.

IX. Name of Employing Agency: National Engineering Services Pakistan (Pvt.) Limited

Title of Position: Senior Engineer

Location of Assignment: Lahore – Pakistan

Period of Assignment: September 1974 to December 1981

Activities:

- Design review of U.S. $ 4 million Grain Silos Project, Pakistan (50,000 ton capacity)

- Design of Super Highway Bridges for Zubair Irrigation Project, Iraq - Planning design and preparation of construction drawings of:

 Civil Works of U.S. $ 50 million, 700 MW Tarbela Hydropower Extension Project (4 x 175 MW)  Highway Bridges of U.S. $ 15 million Al-Khabura-Dariz Road Project, Oman  Civil Works of U.S. $ 8 million Industrial Complex, including cold storages, for Sarhad Development Authority Peshawar (Pakistan)  20 Storey 233 ft. high building of “House Building Finance Corporation”, Islamabad, Pakistan  Tower foundations for U.S.$ 183 million 500 KV (Guddu-Jamshoro) Transmission Line

- Preparation of Prefeasibility Report on 480 Km long, U.S. $ 50 million Inland Water Route connecting Port Mohammad Bin Qasim with Sukkur, Pakistan

X. Name of Employing Agency Water & Power Development Authority (WAPDA)/ Irrigation Department Punjab

Title of Position Assistant Executive Engineer/Design Engineer

Curriculum Vitae of Key Personnel

Location of Assignment Lahore – Pakistan

Period of Assignment July 1968 to September 1974

Activities

Design and construction supervision of irrigation and drainage systems, bridges, cross drainage works, design of concrete lining for irrigation tunnels of Khanpur Dam Project and irrigation system design of Hub Dam & Chashma Right Bank Canals.

12. Languages:

English and Urdu - Excellent in speaking, reading and writing

Persian - Fair in speaking, reading and writing

AHMAD NAWAZ

CURRICULUM VITAE

Name of Person : AHMAD NAWAZ

Nationality : Pakistani

Date & Place of Birth : January 28, 1942 Jhang, Pakistan

Marital Status : Married

Profession : Hydro-geology Expert

Areas of Expertise : Groundwater Resources Evaluation, Development and Management, including Groundwater Numerical Modelling, Vertical Drainage and Construction Dewatering.

Affiliation with : Member of Punjab Geological Society Professional Institutions

Residential Address : 23-Badar Block, Allama Iqbal Town, Lahore

Cell No. : 0321-4676943

Email : [email protected] [email protected]

KEY QUALIFICATIONS

Practising as a professional Hydro-geologist / Groundwater Specialist since 1971.

Possess vast experience in exploration, exploitation and management of groundwater resources in arid and semi-arid regions. Prepared feasibility reports, operation manuals, contract documents etc. for groundwater development and management projects.

As a groundwater specialist planned and executed investigations for exploring potentially viable aquifers consisting unconsolidated (sand, gravels etc.) and consolidated sediments (sandstone, limestone, etc.). Investigations comprised monitoring of groundwater sources, geophysical surveys, geological mapping, test drilling, sampling (water and lithology) and aquifer testing.

Interpreted and analyzed hydrogeological data and demarcated potentially viable areas for groundwater development. Designed and conducted aquifer tests, monitored response of groundwater levels, analyzed the test data and evaluated safe yields of various types of aquifers. Design and construction of tubewells (including well fields) for projects involving water supply, drainage of agricultural lands and construction dewatering.

Conducted tubewell performance studies and rehabilitation of deteriorated tubewells.

Developed and calibrated groundwater numerical models (flow and solute transport) to study future behavior of aquifer under various groundwater development scenarios. Selection of the most environment friendly management strategies for groundwater use on sustainable basis.

1

AHMAD NAWAZ

Experience in using computer software such as Microsoft Word, Microsoft Excel, Lotus 1.2.3, Surfer, Processing MODFLOW for Windows (PMWin), Groundwater Vistas, GMS 8.1, Learned GIS for preparing maps and data processing.

I have worked in various types of terrains consisting of unconsolidated and consolidated sediments in Pakistan, Iraq, Oman, Qatar Saudi Arabia, and Iran. The major projects completed are listed in the following sections.

EDUCATION

Name of Institution Year Degree

University of Punjab Lahore, Pakistan 1970 M.Sc. Geology (Specialization in Petroleum and Structural Geology)

University of Punjab Lahore, Pakistan 1969 B.Sc. (Hons) Geology,

EXPERIENCE

Position Held and Description of Duties

I- From: 2009 To: Date Employer: Berkeley Associates (Pvt) Limited

Position Held and Description of Duties Groundwater Specialist/Hydrogeologist

Responsible for planning, investigation, evaluation of groundwater resource. Groundwater development and management groundwater resources, including groundwater numerical modelling. Synthesis of various studies and preparation of planning and feasibility reports, PC-Is, tender documents, Operation Manuals. The major projects completed are listed below:

- 1X40MW Nishat Chunian Power Plant Project - Groundwater resources evaluation to fulfil water requirements of the plant; - 152MW Power Plant, Pasrur, Sialkot - Groundwater investigations including drilling and development of test tubewell and piezometers, conductance of aquifer test, analysis of aquifer test data to find out aquifer parameters, estimation of safe yield of aquifer; and - Supervision of installation of water supply tubewells

II- From: 2002 To: 2009

Independent Consultant Hydrogeologist / Groundwater Specialist

As an Independent Consultant Hydrogeologist / Groundwater Specialist provided consultancy services in groundwater resources evaluation, development and management by preparing and calibrating groundwater numerical models both flow and solute transport on project to project basis to various industries and consultants such as National Engineering Services of Pakistan (NESPAK), Berkeley Associates, Halcro Group of Pakistan, National Development Consultants (NDC), Engineering Consultancy Services of Punjab (ECSP) etc. The major projects and the consultancy services provided include:

- Coal Fired Power Plant near Sahiwal – Groundwater resources evaluation to fulfil make up water requirements during period of canal closure. 2

AHMAD NAWAZ

- Groundwater Studies for Quaid-i-Azam Solar Park, Bahawalpur – Delineated useable groundwater aquifer(s) in and around the project area. - Groundwater Studies for Nishat Crystal Project Expo Centre, Lahore – Study of aquifer underlain by the project area through test drilling, conducting aquifer test (pump out test) and analyses of the data collected on response of groundwater potential heads. - Estimation drainage requirements and design of dewatering system for Lusail Underground Railway Construction Project, Qattar – Estimation of drainable surplus using available data on aquifer parameters. - Lower Bari Doab Canal Improvement Project (LBDCIP) Component 3 (Groundwater Monitoring, Modelling and Management) – Synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models. - Supervision of 26 numbers dewatering tubewells installation at CHASNUPP – Assuring installation in accordance with the design specifications. - Water Sourcing Study for Safe Water Supply Schemes in Dadu Concessional Area of BHP Petroleum (Pakistan) Pty Ltd. – Reconnaissance of the project area, supervision of electricity resistivity survey, test drilling, delineation of useable groundwater aquifer(s) and development strategy. - Alborz Integrated Land and Water Management Project, Iran – Synthesis and processing of available data on aquifer parameters and various recharge and discharge sources, developed and calibrated groundwater numerical models, studied various scenarios, with and without Alborz Dam, for efficient development and management of groundwater resources. - Doha Conventional Centre and Tower Project, Doha, Qattar – Aquifer testing and data analysis, estimation of dewatering requirements, design of dewatering system and dewatering wells for construction below water table. - Shamiya Redevelopment Project, Saudi Arabia – Prepared technical proposal to study the impact of new infrastructure on Abe Zam Zam. - Dayqah Storage Dam, Oman – Study the tightness of reservoir banks. - Recharge dam Wadi Kalboh, Oman – Study the impact of dam on groundwater resources. - AES Lalpir Thermal Power Plant, Kotaddu - Groundwater Resources Evaluation and Development, including design and construction of water supply tubewells. - Water Supply Schemes in – Delineation of potential groundwater zones for development. - Textile Mills, Power Plants, Dyeing and Finishing Units - Design and installation of water supply tubewells to pump useable quality groundwater from aquifer underlain and overlain by saline groundwater aquifer(s). - Site B-109, Sargodha, Punjab, Pakistan Site B-201 Nawabshah, Sindh, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation of the buildings.

III- From: 1975 To: 2002 Employer: National Engineering Services Pakistan (Pvt) Limited

Position Held and Description of Duties

1989 - 2002 Principal Geologist

As Principal Hydrogeologist, responsible for planning, investigation, evaluation, groundwater computer modelling, synthesis of various studies and preparation of planning and feasibility reports, PC-Is, tender documents, Operation Manuals. The major projects completed are listed below:

- Recharge Dam Wadi Sinaw, Oman – Evaluation of its impact on groundwater resources located downstream of the dam.

3

AHMAD NAWAZ

- Punjab Private Sector Groundwater Development Project - Synthesis and processing data on various recharge and discharge sources, development and calibration of groundwater numerical models and study of various development scenarios for developing and managing water resources efficiently. - Tubewell Design and Technical Specifications for 6R-Hakra Sub-Project of Command Water Management Project, Pakistan – Design of well field and tubewells. - Evaluation of Groundwater Resources and Study of Aquifer under Lahore – Collection, synthesis and processing of pumping data for preparing groundwater numerical models. - Water Supply Scheme for Private Housing Schemes in Zone-2 and extended areas of Islamabad – Evaluation of groundwater resources to assess availability of groundwater and recommendations to CDA. - Groundwater studies for developing water supply scheme for Bahria Town Sihala, Islamabad – Reconnaissance survey, monitoring of existing groundwater resources and recommendations to Bahria Town. - Second SCARP Transition North Rohri Pilot Project - Synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models and study of various development scenarios for developing and managing water resources efficiently. - Industrial and Residential Areas in Dammam, Saudi Arabia – Study causes of rise of water table and proposed remedial measures. - Second SCARP Transition Project, Punjab - Synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models and study of various development scenarios for developing and managing water resources efficiently. - Chashma Hydropower Project – Estimation of dewatering requirements for construction of power plant. - CHASNUPP - Evaluation of pumping requirements and design of dewatering system to facilitate construction of intake structure. - Groundwater Study CHASNUPP – Study of existing conditions of groundwater, synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models and study of various development scenarios to determine flow paths of radioactive materials in case of any mishap. - Strategic Provincial Investment Plan and Project Preparation for Rural Water Supply, Sanitation and Health Project, Baluchistan – Study of available data on groundwater potential areas in various basins and recommendations for developing water supply scheme including design of tubewells. - Groundwater Study for Fordwah Eastern Sadiqia Drainage Project - Evaluation of project performance, including development of Groundwater Numerical Model, Bahawalnagar. - Entire Command of Lasbela Canal, Baluchistan – Groundwater study for evaluation of drainage requirements. - Sehwan Barrage Complex, Sindh - Groundwater studies to assess drain-ability of agricultural soils. - Feasibility Study for Groundwater Development in Kurram Agency – Study of existing conditions of groundwater and availability of additional potential for further development.

1979 - 1989 Senior Geologist

As Senior Hydrogeologist planned, investigated, designed and performed construction supervision of groundwater development projects for irrigation, drainage and water supply. Participated in the preparation of technical reports i.e. inception, feasibility, design, tender documents, operation manuals. Major Projects completed include:

4

AHMAD NAWAZ

- Quetta Water Supply Project, Baluchistan, Pakistan – Siting and designing of tubewells. - Tubewells for Dhurnal Water Injection (to recover oil) Project, Pakistan - Construction supervision of tubewells. - Shahkot Drainage Sub-Project, CWMP, Pakistan - Design of drainage tubewells. - Warsak Lift Canal Sub-Project of CWMP, Pakistan - Survey and investigations to locate the reaches, for lining, where excessive seepage was taking place. - Groundwater Development for Augmentation of Water Supply to Rawalpindi Cantonment, Pakistan – Groundwater study to delineate potential areas for groundwater development. - Multan Thermal Power Station, Punjab, Pakistan - Groundwater study, comprising test drilling and conductance of aquifer test (pump out test), analysis of the data and evaluation of groundwater potential to meet the additional requirements as a result of expansion of the power plant. - Sinking of Tubewells in Federally Administered Area (FATA), NWFP, Pakistan – Study of existing groundwater conditions, delineation of groundwater potential areas for further development. - Ghotki Fresh Groundwater Irrigation Project, Sindh, Pakistan – Study of existing groundwater conditions and drainage requirements to lower water table in the waterlogged area located along the Ghotki Feeder. - Vertical Drainage Projects Karbala and Habbaniya, Iraq – Groundwater study to drain the area of run way. - Master Planing for Development of Irrigation Resources, Karak District, NWFP Pakistan – Groundwater study to assess feasibility of the project. - Barani Area Master Planning, Pakistan - Groundwater studies.

1975 – 1979 Hydrogeologist

As Hydrogeologist conducted explorations through tubewell inventory, test drilling, construction supervision of tubewells and piezometers, conducting aquifer tests etc. for the following projects:

- Salinity Control and Reclamation Project Fordwah and Eastern Sadiqia, Pakistan – Supervision of test drilling, monitoring of existing groundwater sources and collection of water samples. - Salinity Control and Reclamation Project Dera Ghazi Khan, Pakistan – Supervision of test drilling. - Baghalchur, Dera Ghazi Khan, Pakistan – Study of surface and groundwater resources, geological mapping to understand geometry of various sandstone aquifer(s), test well drilling and conductance of aquifer test, analysis of the data and development of water resources.

The projects covered more than 1.00 million hectares and involved construction of 3273 tubewells of capacity ranging from 28 to 112 litres/second. Total estimated cost of these projects was U.S. $ 400 million.

IV- From: 1971 To: 1975 Employer: Associated Consulting Engineering Limited (ACE)

Position Held and Description of Duties

5

AHMAD NAWAZ

1971 - 1975 Engineering Geologist

Conducted geotechnical investigations comprising test drilling, pressure tests for determining permeability of consolidated rocks, material investigation, detailed geological mapping, correlation and identification of various formations. The projects completed were:

- Kalabagh Dam Project Punjab, Pakistan – Geotechnical investigations. - American Fertilizer Factory, Iskandarabad, Pakistan - Geotechnical investigations. - Extension of Cement Factory, Iskandarabad, Pakistan - Geotechnical investigations.

LANGUAGE CAPABILITY

English: Excellent in speaking, reading and writing Urdu: Excellent in speaking, reading and writing Arabic: Excellent in reading

6

Curriculum Vitae

1. Name : Farooq Naveed Sheikh

2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.

3. Designation : Principal Geotechnical Engineer

4. Date of Birth : July 11, 1986

5. Year with the Firm : 4 years

6. Nationality : Pakistani

7. PEC Registration No. : Civil/27892

8. Key Qualifications

As a geotechnical engineer, have worked on the field investigations and subsequent geotechnical design of numerous projects. Major activities included defining scope of work for geotechnical investigations, furnishing technical and financial proposals, supervision of field & laboratory testing, carrying out slope stability analysis, foundation design, ground improvement design through installation of stone columns, settlement analyses, evaluation of rock mass parameters for tunnel design, seepage analysis, stability analyses of rock slopes, design of ground anchors & retaining system and development of computer aided programs.

9. Academic Qualification :

Name of Institution Year Degree/Diploma

University of Engineering 2012 M.Sc. in Civil Engineering and Technology (Lahore)

University of Engineering 2008 B.Sc. Civil Engineering and Technology (Lahore)

10. Employment Record

July 2015 to date - Principal Geotechnical Engineer Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore  1223 MW CCPP Balloki Pakistan  1180 MW CCPP Bhikki  350 MW Coal Fired Power Plant at Port Qasim, Karachi  IPF Plant at Manga Mandi

 Rehabilitation of Building Defects of Malala Yousaf Zai Daanish School (Boys and Girls) Jand District Attock  Treet Project at FIEDMC, Faisalabad  Corporate Office Building at Jail Road Lahore

Jan. 2014 to July 2014 Project Design Engineer Keller-Turki Co. Ltd. Dammam, Kingdom of Saudi Arabia

 Shuqaiq Steam Power Project, Shuqaiq – Kingdom of Saudi Arabia  Yanbu Aramco Sinopec Refining Project, Yanbu – Kingdom of Saudi Arabia  Sabic PCQ-02 Project, Jubail – Kingdom of Saudi Arabia  Saudi Aramco Third Party Cogeneration Project, Ras Tanura - Kingdom of Saudi Arabia  Common Utilities and Tank Farm Area, Rabigh – Kingdom of Saudi Arabia  Residential Building for Al-Mouwasat Hospital Accommodation, Qatif – Kingdom of Saudi Arabia

Aug. 2012 to Jan. 2014 Geotechnical Engineer Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

 Construction of New Khanki Barrage – Design Verification and Construction Supervision of Geotechnical Aspects of the Project  Feasibility Study of 180 MW Naran Hydropower Project, Khyber Pakhtunkhwa - Pakistan  Feasibility Study of 300 MW Balakot Hydropower Project, Khyber Pakhtunkhwa - Pakistan  Pre-Feasibility Study of 96 MW Batakundi Hydropower Project, Kyhber Pakhtunkhwa - Pakistan  Feasibility Study of 12 MW Biomass Based IPP, Faisalabad - Pakistan  Safety Assessment of Existing Shoring System and Design of Rehabilitation/ Strengthening Measures at Mubarak Center, Ferozepur Road, Lahore – Pakistan  Design of Retaining System without Ground Anchors for Mobilink Office Building at QIE, Lahore - Pakistan  Slope stability analysis of Parking Plazas at Jhika Gali, Bansara Gali, General Bus Stand and Lower Topa, Murree – Pakistan

Aug. 2011 to July 2012 Junior Engineer (Civil) P&I Organization - Water and Power Development Authority (WAPDA) Sunny View, Lahore

 Scope of work for geotechnical investigations of different dam projects like; - Chiniot Dam Project - Bhimber Dam Project - Khapalu Dam Multipurpose Project - Sanghar Dam Project - Munda Dam Project

 Planning Commission Proforma-II for feasibility studies of dam projects.

Jan. 2011 to Aug. 2011 Lecturer, Civil Engineering Department The University of Lahore

 As a lecturer, assisted in establishment of Soil Mechanics Laboratory along with regular lecture deliverance on Soil Mechanics

Oct. 2008 to Jan. 2011 Staff Engineer Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

 As a staff engineer, assisted in;

- Review of Request for Proposal (RFP) for mega projects - Furnishing technical and financial proposals for geotechnical investigations - Finalizing scope of work for field activities - Preparing laboratory testing advices - Interpreting field results and laboratory test results for geotechnical design - of sub-structure - Coordinating between different organs of JV for successful completion of - civil design - Preparation of EPC/ Turnkey proposals (both technical & financial) for hydropower projects

 Major projects include;

- Feasibility Study of Shogo-Sin Hydropower Project, Chitral - Pakistan - Feasibility Study of Shushghai-Zhendoli Hydropower Project, Chitral - Pakistan - 22 MW Jabban Hydroelectric Power Station – Rehabilitation Project, Malakand - Pakistan - 425 MW Combined Cycle Power Plant, Nandipur - Pakistan - Tetra Pak Project 2 Pakistan, Lahore - Pakistan - New Ammonia Urea Plant, Daharki - Pakistan - Girls and Boys Hostels at Sharif Medical City, Lahore - Pakistan - Geotechnical Investigations along LBDC - Pakistan - Preparation of EPC/ Turnkey Proposals for Canal Hydropower Projects at Pakpattan and Okara - Pakistan

11. Languages :

Read Write Speak  Urdu: Excellent Excellent Excellent  English: Excellent Excellent Excellent

Curriculum Vitae

1. Name Sheikh Ilyas Ahmed 2. Name of the Firm Berkeley Associates (Pvt) Ltd 3. Designation Hydraulic Structures Expert 4. Date of Birth 16 March, 1956 5. Years with Firm 06 Years 6. Nationality Pakistani 7. PEC Registration No. CIVIL/257 8. Key Qualifications Overall 48 years including 26 years’ experience of working on various aspects of Structural Engineering for large hydropower Projects and Infrastructure Projects as;  Worked as Chief Structure Design Civil for the Feasibility Studies of 188 MW Naran, 300 MW Balakot, 96 MW Batakundi and 218 MW Dhaddar Hydropower Projects.  Worked as Advisor Structures at Berkeley Associates and designed/produced construction drawings for 22 MW Jabban Hydropower Station.  Worked as Advisor Structures at Noor Durrani Associats and preparated EPC Bidding Documents for seven (7) Nos. Hydropower Projects in KPK & Punjab provinces (2.6 MW to 17 MW)  Worked as Deputy Executive NESPAK Foundation, controlled & managed the Administrative & Financial operations of the Foundation (August 2007 to March 2010).  As Vice President/Head Structural Engineering Division (2003 to 2007) supervised the Planning & Design and Project Management activities of various projects comprising Bridges, Hydropower, Nuclear Power, Oil & Gas transmission, Buildings, Cement Plants, Hydraulic Structures.  As Team Leader (Civil Designs) on deputation to Pakistan Hydro Consultants from 1995 to 2003, responsible for the preparation of detailed designs and construction drawings of 1,450 MW Ghazi‐Barotha Hydropower Project consisting of the major components like Ghazi barrage across river Indus, 1,600 cumecs capacity, 52 km long power channel including nearly 80 cross drainage structures/ bridges, power complex comprising powerhouse, spillway, tail regulator, low level outlets, switchyard, sill structures, head ponds.  As Chief Engineer Structures Division (1987 ‐ 1995) responsible for the planning, design, Tender documents and Construction drawings of Tarbela Hydro Power Third Extension, Mangla Hydroelectric 2nd Extension, Tarbela Tunnel 4 Hoist Bridge Remedial Measures, Kundal Shahi Hydel Scheme Muzaffarabad, Water Supply Schemes of Al‐Majmaah‐Shaqrah Saudi Arabia & Kachhi, Ziarat, Quetta (Balochistan), Auxiliary Buildings of Multan‐2 Thermal Power Station, Mirani Dam and Hingol Dam Projects Balochistan.  As Principal Engineer Structures Division (1985 ‐ 87) worked on the design review of pumping station structures of North Jazira Irrigation Project Iraq; Zubair Irrigation Project Iraq, design, contract documents, construction drawings of Chattar Bagh Suspension Bridge Islamabad, Kahlian‐Sahlian Suspension Bridge,

Page 1 of 5

UGC Centres at Lahore & Karachi, Tourist Resort at Sahiwal, 50m high Steel Chimney of Guddu Thermal Power Station.  As Principal Engineer Structures with Kalabagh Consultants on deputation from NESPAK from 1981‐85, worked on planning, design and preparation of tender documents of major structures (i.e. Powerhouse, Power Intakes, Power Tunnels and Low Level Outlet Works) of Kalabagh Dam Project, Pakistan.  As Principal Engineer Structures (1981‐1982) and Senior Engineer (1974‐1981) in Structures Division of NESPAK, responsible for planning and detailed structural design of civil works of 700 MW Tarbela Hydropower First Extension Project; structural design of eight bridges on Al‐Khabura‐Dariz Highway Oman and three superhighway bridges of Zubair Irrigation Project‐Iraq, planning & design of 20 story 233 ft. high HBFC House, Islamabad, two industrial complexes in Peshawar and tower foundations for 500 KV Transmission Line (Pakistan) and design review of 50,000 ton capacity Grain Silos Project Chichawatni, (Pakistan).  As Assistant Executive Engineer/Design Engineer with Irrigation Department/ Pakistan Water and Power Development Authority (1968‐1974), worked on the design and construction supervision of Marala Drainage Syphon, District road bridge over Upper Gogera Branch Canal, design of concrete lining of irrigation tunnels of Khanpur Dam Project and planning and design of irrigation systems of Hub Dam and Chashma Right Bank Canal.

9. Academic Qualification

Name of Institution Year Degree/Diploma University of Engineering & Technology, 1968 B.Sc. Civil Engineering Lahore‐Pakistan

10. Employment Record Name of Employing Agency Berkeley Associates (Pvt) Ltd Title of Position Hydraulic Structures Expert Location of Assignment Lahore‐Pakistan Period of Assignment January 2015 to date Activities  Structural Design of building for Temporary Facilities, Infrastructural design i.e. Water Supply/Sewerage, Drainage, roads for 1223 MW Balloki Thermal Power Station & production of construction drawings.  Review of Contractor’s Submissions on Civil Design Package on 2x330 MW Thar Coal Fired Power Plant.

Name of Employing Agency Mirza Associate Engineering Services & Berkeley Associates (Pvt) Ltd JV Title of Position Chief Structures Design (Civil) Location of Assignment Lahore‐Pakistan

Page 2 of 5

Period of Assignment Dec 2013 to Dec 2014 Activities Worked as Chief Hydraulic Structures Design (Civil) for the Feasibility Studies of 188MW Naran HPP and 102 MW Batakundi HPPs.

Name of Employing Agency Mirza Associate Engineering Services & Berkeley Associates (Pvt) Ltd JV Title of Position Chief Structures Design (Civil) Location of Assignment Lahore‐Pakistan Period of Assignment July 2012 to Dec 2013 Activities Worked as Chief Structures Design (Civil) for the Feasibility Studies of 300 MW Balakot Hydropower Project.

Name of Employing Agency Berkeley Associates Title of Position Chief Structures Design (Civil) Location of Assignment Pakistan Period of Assignment September 2011 to July 2012 Activities Supervised the Structural design of 22 MW Jabban Hydroelectric Power Station and Machai Hydropower Project at RD 47+000.

Name of Employing Agency Noor Durrani & Assoicates Title of Position Structural Engineer Location of Assignment Lahore‐Pakistan Period of Assignment May 2010 to September 2011 Activities Planning, design and preparation of Tender documents & EPC Bids for the following projects.  17.0 MW capacity Ranolia Hydropower Projects  2.6 MW capacity Machai Hydropower Projects  7.6 MW capacity Marala Hydropower Projects  4.0 MW capacity Deg Outfall Hydropower Projects  5.4 MW capacity Chianwali Hydropower Projects  4.2 MW capacity Okara Hydropower Projects  2.8 MW capacity Pakpattan Hydropower Projects

Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited Title of Position Vice President (Str. Eng. Division)

Page 3 of 5

Location of Assignment Lahore – Pakistan Period of Assignment August 2003 to March 2007 Activities As Head of Structural Engineering Division, supervised the activities of the Division including Planning & design, Project management, Business promotion etc. on various Projects.

Name of Employing Agency Pakistan Hydro Consultants on deputation from NESPAK Title of Position Team Leader (Civil Designs) Location of Assignment Lahore – Pakistan Period of Assignment March 1995 to June 2003 Activities Supervision / coordination of all civil design activities of US $ 2.5 billion Ghazi‐ Barotha Hydropower Project which included review of tender stage designs, updating of Tender Designing Criteria, analysis and production of construction drawings in the Hydraulics, Geotechnical and Structural Sections for Ghazi Barrage, 1600 cumecs power channel bridges, cross drainage structures, and power complex structures.

Name of Employing Agency National Engineering Services Pakistan (Pvt) Ltd Title of Position Chief Engineer Location of Assignment Lahore – Pakistan Period of Assignment July 1987 to March 1995 Activities Planning, design and preparation of construction drawings of various projects.

Name of Employing Agency National Engineering Services Pakistan (Pvt) Ltd Title of Position Principal Engineer Location of Assignment Lahore – Pakistan Period of Assignment January 1986 to June 1987 Activities  Design review of Pumping Station Structures of North Jazira Irrigation Project, Iraq.  Detailed Design, Tender Documents and construction drawings of buildings, suspension bridges at Chattar Bagh & Kahlian‐Sahlian.

Name of Employing Agency National Engineering Services Pakistan (Pvt) Ltd Title of Position Principal Engineer (Kalabagh Consultants) Location of Assignment Lahore – Pakistan Period of Assignment March 1982 to December 1985

Page 4 of 5

Activities Planning, design and preparation of tenders of major structures including Powerhouse, Power Intakes, Low Level Outlet Works of U.S. $ 3400 million Kalabagh Dam Project, Pakistan.

Name of Employing Agency National Engineering Services Pakistan (Pvt) Ltd Title of Position Senior Engineer Location of Assignment Lahore – Pakistan Period of Assignment September 1974 to December 1981 Activities  Design review of U.S. $ 4 million Grain Silos Project, Pakistan (50,000‐ton capacity)  Design of Super Highway Bridges for Zubair Irrigation Project, Iraq  Planning design and preparation of construction drawings of Tarbela Hydropower Extension Project.  Industrial Projects of Corn Complex & Leather Tannery, 20 Story 233 ft. high Building of HBFC House.

Name of Employing Agency WAPDA, Irrigation Department Punjab Title of Position Assistant Executive Engineer/Design Engineer Location of Assignment Lahore – Pakistan Period of Assignment July 1968 to September 1974 Activities Design and construction supervision of irrigation and drainage systems, bridges, cross drainage works, design of concrete lining for irrigation tunnels of Khanpur Dam Project and irrigation system design of Hub Dam & Chashma Right Bank Canals 11. Language Skills Speaking Reading Writing English Excellent Excellent Excellent Urdu Excellent Excellent Excellent

Page 5 of 5

Curriculum Vitae

1. Name : Imran Farooq

2. Name of Firm : Berkeley Associates (Pvt.) Ltd

3. Designation : Senior Geotechnical Engineer

4. Year with Firm : 3 Years

5. Date of Birth : December 02, 1988

6. Nationality : Pakistani

7. PEC Registration No. : CIVIL/30294

8. Key Qualifications

As a geotechnical engineer, have worked on the field investigations and subsequent geotechnical design of numerous projects. Major activities included defining scope of work for geotechnical investigations, furnishing technical and financial proposals, supervision of field & laboratory testing, carrying out slope stability analysis, foundation design, ground improvement design through installation of stone columns, settlement analyses, evaluation of rock mass parameters for tunnel design, seepage analysis, stability analyses of rock slopes, design of ground anchors & retaining system and development of computer aided programs.

9. Academic Qualification:

Name of Institution Year Degree/Diploma

University of Engineering and to date M.Sc. in Civil Engineering Technology (U.E.T) Lahore Specialization in Geotechnical Engineering

University of Engineering and 2010 B.Sc. in Civil Engineering Technology (U.E.T) Lahore . Government College University 2006 Higher Secondary School (GCU) (Pre-Engineering)

10. Employment Record

August, 2014 to Date Senior Engineer Berkeley Associates (Pvt.) Ltd.

Activities

Preparation of scope of work for geotechnical investigations and geophysical surveys Supervision of geotechnical investigations work

Preparation of laboratory testing schedules Design of foundation Geotechnical analyses (slope stability and seepage analyses) for hydropower projects Report writing

Feb 2012 to Aug 2014 Project Manager Client: US Air Force (USAF) Consultant: US Army Corps of Engineers (USACE) Project: Construction of four Pre-Engineered facilities with concrete foundations in the US Air Force base at Manas Transit Center, Kyrgyzstan

Roles and Responsibilities

 Handle all engineering and design related issues of project both from technical and functional  standpoint  Create, update and maintain the project submittal log and all other project specific quality control reports  Prepare/update daily progress report and project status using QCS/RMS  Review/audit and approve for submittal shop drawings and submittals for conformance with project  specifications by direct review and by leveraging the knowledge and experience of others in the project team when necessary  Conduct and document weekly QC meetings with the site superintendent and USACE personnel and provide written minutes as described in project specific contract documents  Have weekly meeting with the QA Engineers (as directed by USACE) to answer any question as to procedures and the future work items  Conduct preparatory, initial and follow-up meetings to establish an understanding of the standards of care desired for each definable feature of work. Working with the Construction Manager and Superintendents develop checklists to be used  Maintain the project "As-Built" drawings on a daily basis  Notify BOD and if necessary stop the work to resolve matters that affect safety, quality and/or inhibit the logical progress of work  Prepare variation orders and RFP’s as per contract requirement  Review and monitor the submission of proper documentation for technical proposal, materials and design approvals  Monitor field-tests and expedites contractor’s required report submittals  Prepare and compliance with the project schedule and quality procedures  Act as liaison between contractor and USACE

August, 2011 to Feb 2012 Project Engineer- Central

Roles and Responsibilities

 New development projects including Knock Down Rebuild, adoption & New to Industry  Project planning as per the international standards  Ensuring HSE standards on all projects  Planning/ proposing the projects in accordance with the local legislations & other allied government departments  Handling entire maintenance activities of the retail stations in the designated area  Hiring of appropriate resources  Defining the visit frequency for all on-going projects

Aug 2010 to Jul 2011 Structure Design Engineer

Roles and Responsibilities

 To provide efficient and effective solutions for the construction requirements of clients in the form of structural design  Designing of a hospital comprising of 410 beds in Bahawalpur; which included design of Flat slab, beam slab, combined footing, isolated footing, columns, beams, retaining walls, underground water tank and overhead water tank  Completion of design of commercial plazas using ETABS  Designing of residential houses  Designing of underground water tanks  Designing of retaining walls (cantilever & propped)

Professional Pakistan Geotechnical Engineering Society (PGES- M- 123) Affiliations USACE/NAVFAC Certified Engineer for Construction Quality Management CQM (MED021378407)

Professional Development and Trainings

 June 1, 3, 8, 10 & 13, 2014 achieved the mandatory professional development units for “Risk Management Professional (PMI-RMP) course”  May1, 4, 11 & 18, 2014 successfully completed the pre-requisite p r o f e s s i o n a l development units for “Project Management Professional (PMP) course”  June 10-11, 2013 Network Analysis and Schedule (NAS) for USACE contracts training by Wilhelmina Pierce, P.E  November 13-14, 2012 Construction quality management for contractors- #784 training course by US Army Corps of Engineers (USACE) and Naval Facility Engineering Command (NAVFAC)  March 14-15, 2013 13th National Conference on Geotechnical Engineering held by PGES

11. Language:

Read Write Speak

 English: Excellent Excellent Excellent  Urdu: Excellent Excellent Excellent

Curriculum Vitae

1. Name : Ijaz Shafi

2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.

3. Designation : Chief Structural Engineer

4. Date of Birth : June 19, 1953

5. Year with the Firm : 2 Years

6. Nationality : Pakistani

7. Reg No. With PEC : CIV-2878

8. Profession : Civil Engineer

9. Key Qualifications

Practicing professional engineering since 1976.

As a professional engineer I have been involved in the analysis and designing of Arch-cum-Gravity Mana Dam, Baluchistan using finite element technique .Was involved in the designing of under-sluices, skimming platform, Intake Structures, Culverts, Aqueducts and small hydel schemes. Worked on different structures of Rehabilitation Project. Carried out remedial measures for Wadi Dayqah Dam Project Sultanate of Oman. Also reviewed analysis and design for critical sections with different material properties of Tunnel No. 3 for Tarbela Hydropower Station Project using 2-dimensional model including rock interaction, Inspection of Mangla Powerhouse generating units and Switch yards for up- gradation of the Mangla Power Station.

As Vice President, NESPAK (July, 2011 to June, 2013) carried out the planning, analysis and design of Office buildings, Parking facilities and Pedestrian Under passes. Also worked on review projects including Apartment Buildings and Pedestrian Overhead Bridges . Design of Pedestrian bridges for Lahore Ring Road Project was also carried out.

As General Manager, NESPAK (2006 to 2011) carried out the planning, analysis and design of Office buildings and Multi-storeyed Commercial Plazas. The major projects are 25-storey Commercial plaza with five basements, Nuclear Plant and Safety related Nuclear Structures and 120m high stack. Also worked on the Remedial measures/ rehabilitation of Supreme Court of Pakistan Registary Office Building Lahore and vetting of bridges for improvement/up-gradation of Karakorum highway Raikot-Khunjerab section.

As Chief Engineer, NESPAK (1999 to 2006) carried out the planning, analysis and design of Industrial buildings, underpass structures and extension of bridges. One of the major projects is the Karachi-Hyderabad Motorway. This involves condition survey, evaluation and rehabilitation/modification of bridges and other structures. Also worked on the Remedial measures/ rehabilitation of industrial and office buildings.

As Principal Engineer, NESPAK (1991 to 1999) carried out analysis and design of Barrage under sluices,500 KV Transmission line tower, PP-9 Thermal Power Plant Riyadh, Prestressed concrete sleepers, Multi-storeyed buildings, Precast prestressed concrete bridges, Design review of box girder cantilever bridges, Rehabilitation works of the powerhouse structure and preparation of Technical specifications of different projects.

As Senior Engineer, NESPAK (1981 to 1991) carried out the planning, analysis and design of Bridges, Culverts, Hydraulic structures, Office buildings, Hospital complexes, Industrial buildings, Tunnels, Arch-cum-gravity dam, Intake structures, Spillways, Elevated tanks, Small hydel scheme and Retrofitting of the buildings. Also prepared the Technical Specifications of different projects.

From 1977 to 1981 as a Junior Engineer, NESPAK , carried out the structural analysis and design of several bridges and reinforced concrete frame buildings.

As Design Engineer (1976 to 1977) with National Design and the Industrial Services Corporation carried out steel structures detailing and fabrication for Karachi Steel Mills project.

10. Academic Qualification

Name of Institution Year Degree/Diploma

Canadian Society for Civil 1984 Workshop on "Bridge and Highway /Institution of Engineering" Engineers, Pakistan

International Institute of 1983 Post-Graduate Diploma in Seismology and Earthquake Earthquake Engineering Engineering, Tsukuba, Japan

University of Engineering& 1976 B.Sc. Civil Engineering - Degree Technology, Lahore-Pakistan

University of Engineering & 1978 Courseon FORTRAN Programming Technology, Lahore-Pakistan & Computer Applications

11. Experience :

April 01, 2014 to date - Structural Design Expert Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

- Reviews/ log study the data information on powerhouse concrete outline and Excavation drawings. Preparatory work for preparation of construction drawings in hand.

July. 1999 to June. 2013 - V.P. / General Manager/ Chief Engineer National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.

As a Vice President/ General Manager / Chief Engineer supervised and worked on the following Projects;  Analysis and design of Underground and Overhead Water Tanks to be constructed at Qurtaba City Islamabad was carried out. Bill of quantities along with tender and construction drawings were also prepared and issued for construction at site.

 Analysis and design of Pedestrian Underpasses to be constructed at Kalma Chowk, Ichra, and Canal-Wahdat Road Lahore was carried out along with the preparation of construction drawings.

 Vetting of design of Pedestrian Bridges for Package 16 and 17 was carried out. As per Clients recommendations super-structure of the bridges was replaced with Steel Trusses. Design of the same was carried out. Tender/Construction drawings including fabrication drawings were also prepared along with detailed bill of quantities and cost estimates.

 Design review of Pedestrian Steel Bridge at Aamir Road, Lahore was carried out. Necessary amendments in the design and drawings were made to suite the site conditions.

 Design review of Country Club Apartments designed by Mushtaq and Bilal Associates of Karachi was carried out. Feasibility of two additional floors constructed by the Client was also reviewed. Based upon the design vetting structural stability certificate was issued.

 3-dimensional structural analysis/design of a 25 storeyed I.T.TOWER having 5 basements also including design of excavation support system for the basements.

 Rehabilitation/Conservations of Supreme Court of Pakistan Registry Office Building at Lahore.

 Rehabilitation/Remedial measure design of kiln foundation of Askari Cement Plant, WAH.

 3-D analysis and design of 7 storey “Institute Building” and 6 Storey “Hostel and VIP Suites” buildings of Pakistan Planning and Management Institute(PPMI) Islamabad. ▪ 5  Design of Academic Blocks, Student Hostels, Administration Block, Library Block, Student Services Center, Apartments/Residences for staff and Residence for Vice Chancellor for University of Education Lahore.

 Analysis and design of multi-storeyed building of NESPAK House Peshawar.

 Analysis and design of Sewage Pumping Station, Sewage Lift Stations, Clarifier, Oxidation Ditch, Waste Wash Water pump House, Grit Channels, Screening Chamber, Flow Distribution Chamber, Treated Effluent Storage Tank, Recycle and Waste Sludge Pump house, Administration Building, Sludge Drying Beds, Generator and Guard Rooms for Rehabilitation and up-gradation of Sewage Treatment Plant at Khasab-Sultanate of Oman.

 Analysis and design of Sewage Pump Station for Sewage Network and Sewage treatment plant at SUR-Sultanate of Oman.

 Analysis and design of various blocks for University of Agriculture Faisalabad Faculty of Veterinary Science and Animal Husbandary at Paras-Faisalabad.

 Analysis and design of Mazar of Hazrat Peeray Shah Ghazi, Mazar of Mian Muhammad Buksh Sahib, Prayer Hall, Langer Khana and Sarai for Mazar at Khari Sharif.

 Analysis and design of 6-Storeyed building for National Bank of Pakistan Mall Road Branch Lahore.

 Participated in the development of the Building Code of Pakistan-Seismic Provisions 2007.

 Detailed Condition Survey for Hotel Inter-Continental Kabul, Afghanistan.

 Analysis and design of 8-Storeyed Academic Block Building, 4-Storeyed Apartment Buildings for Offices, Gymnasium, Over Head Water Tank(100,000 gallons), Boys/Girls Hostel for Services Institute of Medical Sciences (SIMS),Lahore.

 Remodeling of Auditorium and Main Operation Theaters for Services Hospital Lahore.

 Analysis and design of Structural Steel Canopy of Toll Plaza at Okara By Pass.

 3-D Analysis, design and detailed Engineering drawings of 8-Storeyed Structural Steel Cement Mill Building 1 and Cement Mill Building 2 for Mapple Leaf Cement Factory, 6700TPD Grey Cement Plant at Iskandarabad, District Mianwali.

 3-dimensional time history dynamic and static analysis of KCP - Workshop Building including soil structure interaction. Technical Specifications and preparation of detailed construction drawings along with bar bending schedules for KCP- workshop projects-Khushab.

 3-D Analysis and design of 120 m high Stack and connected tunnel for safety Related Nuclear Structure of KCP-workshops Khushab.

 Analysis and design of extension of existing Stack from 80 m to 120 m for KCP-II Project Khushab.

 Structural assessment of Assembly Plant roof structure damaged by fire for Millat Tractors Limited Sheikhupura.

 Design of overhead/underground Water Tank (200,000 gallons) for Safety Related Nuclear Structure of KCP-workshops Khushab.

 Design Review of Addition of two Floors over old wing of Pearl Continental Hotel, Lahore.

 Remedial measure design for basement roof slab of Mazar-e-Qauid-e-Azam Karachi.

 Design review of Main Pump House, Surge Vessels Drainage Shafts/Vent Shafts, Valve Chamber and Terminal facilities of Hofuf Water Transmission System, Kingdom of Saudi Arabia.

 Remedial measure design of 50-Bed Hospital at Said Mitha Bazar, Lahore.

 Structural evaluation of 7-Storeyed existing structure of Associated House, Lahore.

 Rehabilitation measure for Babu-Sabu Pumping Station at Mian Mir Drain, Lahore.

 Remedial measures design for Pre-Heater Tower of Fauji Cement Plant.

 Design review and remedial measures of High Court Bench complex at Sibi, Baluchistan.

 Planning, analysis, design and drawings for extension of existing bridges of Karachi - Hyderabad Motorway (M-9) also carried out condition survey of all the existing bridges and cross drainage works. Designed the rehabilitation, and up gradation of structures for 4-lane expressway to 6-lane motorway.

 Analysis, design, drawings and technical specifications of Hattar Chemical’s Plant.

 Design review of Control Building of Secondary Transmission Line and Grid Station Project.

 Design review of 25 MW KAMC Power Plant Extension - Tabuk, KSA.

 Analysis and design of machine hall and Annex-Building of 14 MW power plant at Fatehjang.

 Analysis, design and drawings of underpass at New Campus Canal Crossing Lahore.

 Design of Overhead Water tanks of 300m3 and 600m3 for water supply Schemes to Shinas and Liwa Towns Muscat, Sultanate of Oman.

▪ Also worked as Project Manager for some of the Projects.

1991 to 1999 - Principal Engineer (Structures) National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan. As Principal Engineer supervised and worked on the following projects:

 Worked on the remedial measures of the Kiln Foundations, Grey and White Cement slurry silos of Mapple Leaf Cement Factory.

 Worked on different structures of Warsak Dam Rehabilitation Project. The work consists of Powerhouse roof repairs, Alignment of powerhouse crane rails, Powerhouse structural system, and Substructure anchorage, Repairs to Draft tube, Spillways and Intake structures.

 Planning, analysis, design and review of design of Turbine and workshop building foundations and various equipment foundations of Riyadh Power Plant (PP-9) Saudi Arabia.

 Preparation of shop drawings for Directorate of Antiquities and Multi-media center building of King Abdul-Aziz Historical Center, Riyadh Saudi Arabia.

 Analysis, design and preparation of Punjab Workers Welfare Board's School Buildings at Gujranwala.

 Vetting of design and drawings of cast in situ prestressed concrete box girder cantilever bridges over river Jhelum at Kohala and Karote.

 Vetting of design of precast prestressed concrete bridge at GarhiHabibUllah.

 Design of precast prestressed concrete bridges over link canals, distributaries and drains of Pakistan Motorway Project (Sheikhupura - Multan - D.G. Khan Section).

 Worked on the design, drawings and technical specifications of the Korle Lagoon Ecological Restoration Project Accra-Ghana

 Review analysis and design of 500 KV Guddu-Multan Transmission line suspension type tower.

 Analysis and design of Undersluices of barrage structure of Ghazi-Barotha hydel power project.

 Vetting and design review of Pre-stressed concrete sleepers for 1 in 16 turnouts for Pakistan Railways.

1981 to 1991 - Senior Engineer National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.

Responsible for planning, analysis and structural design of the following projects:

 3-dimensional time history dynamic and static analysis of the buildings and design of remedial measures of Bolan Medical Complex Project, Quetta, Pakistan using computer programs SAP IV & SAP V developed by University of California Berkeley, U.S.A. The cost of the project was U.S. $ 29.3 million.

 Analysis, design and preparation of construction drawings of precast, prestressed girder, highway and freeway bridges and aqueduct structures of Euphrates East Drain Project, Iraq, costing U.S. $ 600 million.

 3-dimensional analysis of Arch-cum-Gravity Mana Dam using finite element technique. The Dam, located in Baluchistan, Pakistan, is more than 100 ft. high and is worth U.S. $ 2.34 million.

 Analysis of the Turbo-Generator Building (using computer program SAP IV) of Kundian Nuclear Complex Project (KNC-3), Pakistan, costing U.S. $ 600 million.

 Review analysis and design for critical sections with different material properties of Tunnel No. 3 for Tarbela Hydropower Station Project. 2-dimensional model including rock interaction was run on computer using package program SAP V.

 3-dimensional analysis and design of main pumping station supply pipe line Bi- furcation for transient pressure caused by water hammer of North Jazira Project, Iraq.

 Remedial measure design of Nurse's and Doctor's Hostel for Bolan Medical Complex.

 Analysis, design, technical specification and preparation of construction drawings of R.C.C. bridges, aqueduct structures, water course crossings, fall structures and siphon of Fordwah Sadiqia Drainage project.

 Analysis, design & preparation of detailed construction drawings for multi-storey office building of Punjab Board of Technical Education. The structure consisted of multi-storeyed frames and waffle/flat slabs system.

 Tender drawings and design of 12 storeyed building of State Life Insurance Corporation at Faisalabad.

 Analysis, design and preparation of detailed construction drawings of NESPAK House – Lahore. The structure consists of multi-storeyed frames with waffle slab for upper storeys and beam slab arrangement for basement roof.  Layout, analysis, design and preparation of tender and detailed construction drawings of precast prestressed concrete bridges for distributaries, drains and link canals of Pakistan Motorway Project (Sheikhupura - Multan - D.G. Khan Section).

 Tender drawings and design of spillway and intake structure of Gandially Dam project.

 Structural analysis and design of various facilities for Development of Parks and Play Ground at Quetta project.

 Analysis, design and preparation of detailed construction drawings for various branches of Bank of Punjab project.

 Analysis, design and drawings of various buildings such as Nurse's Hostel, Doctor's Hostel, Mosque, cafeteria and Residential Quarters of 50 Bed Hospital Complex, Project at Hub.

 Technical specification and tender/detail design of Intake Tower, Clarifier, Filters, Spillway Structure, Residential buildings & Mosque of AkraKaur Dam Project.

 Analysis, design and preparation of drawings for Assembly Plant Building and Auxiliary structures of Millat Tractor's Extension works project.

 "Updating of Seismic Code" for Quetta based on micro zoning of Quetta and practices in design.

1977 to 1981 - Junior Engineer National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.

 Participated in the analysis and design of the Main Plant Building & auxiliary buildings of Kundian Nuclear Complex (KNC-2), Pakistan costing U.S. $ 40 million.

 Design & supervision of preparation of construction drawings for R.C. and prestressed girder bridges of N.W.F.P., Pakistan. The cost of the project was U.S. $ 2.70 million.

 Review of the design of Provincial Assembly Building at Quetta, Pakistan.

 Analysis & design of prestressed concrete girder bridges of Al-Khabura Draiz Road, Project, Oman costing U.S. $15 million.

 Analysis & design of various R.C.C. framed residential & office buildings of Al- watba Township Project, Abu-Dhabi costing U.S $300 million.

12. Languages :

Read Write Speak  Urdu: Excellent Excellent Excellent  English: Excellent Excellent Excellent

Curriculum Vitae

1. Name : Umar Maqsood

2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.

3. Designation : Senior Engineer Structures

4. Date of Birth : January 01, 1992

5. Year with the Firm : 1.5 years

6. Nationality : Pakistani

7. PEC Registration / : Civil - 40791 Membership No.

8. Key Qualifications :

Practicing Professional engineer since 2008.

 Defining Scope of Work  Furnishing Technical and Financial Proposals  Supervision of Field & Laboratory Testing  Development of Computer Aided Designs and Drafts  Planning and interpretation of Geotechnical Investigations

9. Academic Qualification :

Name of Institution Year Degree/Diploma

NICE-SCEE-NUST- 2014 BE Civil Engineering Islamabad

Punjab College of 2010 F.Sc. Pre Engineering Sciences (Lahore)

Education Centre High 2008 Matric (Science) School

10. Employment Record :

May 2015 to date - Structural Engineer Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore  1223 MW CCPP Balloki Pakistan  Patrind Hydropower Project

Sep. 2014 to May 2015 Lab Engineer Structures Lab at NUST NUST Institute of Civil Engineering (NICE) at NUST Islamabad  Shuqaiq Steam Power Project, Shuqaiq – Kingdom of Saudi Arabia

Software Competency

 MS Office Suite (Word, PowerPoint, Excel)  AutoCAD  SAFE  Primavera P6  Micro Survey CAD  Arc GIS  MATLAB  SAP-2000pro  ETABS

11. Languages :

Read Write Speak  Urdu: Excellent Excellent Excellent  English: Excellent Excellent Excellent

Curriculum Vitae

1. Name : Maheen Malik

2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.

3. Proposed Designation : Public Health and Environmental Engineer

4. Date of Birth : November 28, 1989

5. Years with the Firm : Recently Joined

6. Nationality : Pakistani

7. PEC Registration No. : ENVIRO/200

8. Key Qualifications :

 As an Environmental Engineer I have worked on various National and International projects for assessing their environmental Impact Assessment. Major scope of work includes preparing technical as well as financial proposals for environmental assignments, formulating environmental management and mitigation plans, devising approach and methodologies for social impact assessment, supervising laboratory testing of various water and waste water samples.  Successful application of numerical analysis for the study of sedimentation in the Kurram Tangi Reservoir.  Poster Publication of “Evaluation of Surface Water Quality Indicators with Socio-Economic Dynamics in the Egyptian Nile” in the European Geoscience Union Conference in 2016 in Vienna, Austria.  Completion of various national and international trainings organized by the World Bank, British Council, National University of Sciences and Technology and USAID.

9. Academic Qualification

Name of Institution Year Degree/Diploma

Technical University of Munich, 2016 Masters in Environmental Germany Engineering National University of Sciences and 2012 Bachelors in Environmental Technology (NUST) H-12, Islamabad, Engineering Pakistan University of Massachusetts, 2011 Scholarship for the Study of Donahue Institute, Amherst, United Comparative Public Policy States of America Kinnaird College for Women Lahore, 2008 Intermediate (High School) Pakistan Beaconhouse School System, Lahore, 2006 O’Levels Pakistan

10. Employment Record

February, 2017 to date - Public Health & Environmental Engineer Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

 Preparation of Brochure for the inclusion of various environmental services.  Formulation of Financial and Technical Proposal for Environmental and Social Impact Assessment studies.  Development of the Environmental and Public Health Department.

July, 2012 to Feb. 2014 Junior Environmental Engineer National Engineering Services Pakistan (Pvt.) Limited (NESPAK) 1-C Block -N, Model Town Extension, 54700 Lahore (Pakistan)

 Preparation of Environmental & Social Assessment Reports.  Preparation of Financial and Technical Proposal for Environmental Impact Assessment studies.  Interpretation of Field and Laboratory Results for air, water and noise samples.  Coordination between NESPAK and other firms (JV) for successful completion of the Project.  Major Projects included Project, Alborz Hydropower Project and Iran Pakistan Pipeline Project.

11. Languages :

Read Write Speak  Urdu: Excellent Excellent Excellent  English: Excellent Excellent Excellent  German: Basic Basic Basic

Iftikhar Ahmad (IGC NEBOSH Certified, OSHA 30Hrs Construction Safety , BSc Chemical Engineer)

Birth Date: 11‐02‐1985 Email Address: [email protected] Nationality: Pakistani Cell: +923007953185

Astute professional with valuable experience managing Health, Safety & Environmental aspects. Apt in major Safety Program, Work Permit system, Safety at Excavations, Scaffoldings, First Aid, Height work & PPE. Skilled in all aspects of chemical engineering including process computer simulation, development, equipment sizing and specification. Also have hands‐on experience in making sure that standards of quality are met while production costs are kept as low as possible.

Areas of Expertise  Safety, Health & Environment Drive a culture of “Safety and Health” by ensuring all appropriate actions are taken to implement HS&E procedures/checklist/SSOW/inspection forms and monitoring HS&E performance within area of responsibility for different construction projects.  Review and creation of Job Hazard Analysis (JHA) and Work Method Statements.  Ensuring training to the staff in adherence to HS&E standards and procedures.

 Service Delivery  Delivering HS&E training so that all staff is aware of their HS&E obligations.  Acting as an internal coach and advisor to Business Unit, project and subcontractor employees. Ensuring accurate and up to date documentation and information relating to HS&E issues and training is collected, reported, disseminated and stored in project files. Monitoring Client Health, Safety and Environment requirements.  Standards / Compliance Keeping abreast of HS&E legislation, best practices and leveraging to facilitate HS&E practices on the project. Development of HS&E standards and processes to ensure the Project(s) is in compliance with regulatory and governance requirements. Monitoring and conducting regular compliance checks and audits within the project sites: reporting breaches, issuing non compliance reports, recommending remedial actions and follow‐up to ensure timely closeout.

Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185

PROFESSIONAL CONTOUR

Berkeley Associates (Pvt.) Ltd ( 27 JULY 2015 To Date) Client :Unilever Pakistan Ltd . Project: Installation of Iconic Super Structure at Surf Excel Plant Sheikhupura Lahore Pakistan Currently I am working as a HSE Engineer in Berkeley Associates (Pvt.) Ltd for the erection of Iconic super structure at Surf Excel Plant Unilever Pakistan Ltd. I am responsible to monitor all work related activities including structure fabrication, sand blastring and painting of structure, scaffolding erection and inspection, work at height, crane operation, hot work (Welding , cutting , grinding). My responsibilities also include PTW issuance, compliance of PTW as per Unilever Standards’ development of SSOW, deliver TBTs and conduct site safety inspections with client .

HS&E Team Leader Matrix Engg Ltd ( April 2015 to July 2015) Client: Procter and Gamble Ltd Karachi Pakistan Project: CI8(Expansion and modification of Arial Plant) Third Party: TUV Currently I Have worked as a HS&E team leader in Matrix Engg Ltd for the modification of existing Arial Plant at P&G Port Qasim Karachi Pakistan for 4 months.

Core responsibilities include Development & monitoring of HSE Managment System  Development of company technical safety (i.e., process safety, asset integrity) documentation.  Participating in HSE studies/reviews i.e., QRAs, EIAs, , HAZID, HAZOP, Project HSSE Reviews Ensure monitoring and audit of HSE performance standards & their management Develops & maintains the HSE performance reporting system & mechanisms for reporting on HSE performance . Maintains & further refines the process for HSE performance review to enhance & support implementation of HSE Management System Review and input to the development and maintenance of COMAH reports and HSE Impact Assessments (HSEIA) for Major Hazard sites. Ensuring process safety principles and best practices are implemented early in the design phase and carried through to facility completion and operation.

Construction Projects Senior HSE Engineer,Albahr Alarabi Marine & Engineering Services Hamriyah Free Zone Sharjah ,UAE ,August 2014 to April 2015 .

I have worked in Albahr Alarabi Marine and Engineering Services as a HSE Engineer for about 9 months as projects monitored by me as a HSE Engineer completed . Projects being supervised regarding HSE As HSE Engineer monitored and controlled all activities involved in Construction of emergency block of Khalipha Hospital at Ajman UAE with complete safety compliance as per UAE laws.

Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185

Construction of 12 Nos. storage tanks foundations, office building construction (G+4), dike wall, boundary wall, industrial flooring and inter lock work in Green Spring Energy LLC. Hamriyah Free Zone, Sharjah. Office Building construction , 8Nos. storatge tanks foundation , dike wall, boundary wall and interlock work at Sharjah National Lube Oils CompanY Ltd LLC. (Sharlu) Sharjah HFZ. Monitoring of construction work of pump room , office block (G+5) 12 Nos . tanks foundations, dike wall ,boundary wall , industrial flooring , interlock work, weigh bridge construction and fabrication of 12 new storage tanks ( Dia:Height 19.5 : 22 m) at NT Petroleum Ltd Sharjah HFZ. During excvavation work for under ground pipelines of NT Petroleum along road side monitoring the all work related activities such as heavy lifting , deep excavation barrication and risk assesments and road safety. Risk assessment of a project of fabrication of 6 storage tanks and office block construction (G +4) boundary wall, dike wall and interlock work at Gulf Petroleum Sharjah, HFZ.  Construction of 14 Nos storage tks at ARZOO Energy International Hamriyah Free Zone Sharjah UAE.

Responsible to monitor all the activities such as crane lifting operation, work at height, Monitoring of scaffolding erection and scaffolding inspection , site safety inspections , safety surveys, housekeeping, risk assessments, fire safety and trainings about fire fighting to workforce as all the projects are in oil and gas sector

Senior HSE Process Engineer, Century Paper and Board Mills Limited, Pakistan, January 4, 2010 to July 2014.

Key responsibilities include:  New system installations, process optimizations, process safety & trainings were the key responsibilities . During working at Stock Preparation Plant, I was dealing with plant operation, optimization and trouble shootings about the bottlenecks. I was responsible for the smooth plant operation using Distributed Control System. Attending all process safety reviews as necessary and making sure that all agreed recommendations were adhered to. Estimating production cost reports for senior managers.  Involved in researching ways to develop new and improved chemical manufacturing processes. Participating in incident investigations.  Preparing plant layout, equipment list, capital cost estimate and operating cost estimate. Developing process chemistry.  Also responsible for safe operations and inspection of air compressors and Boilers. Trained workers for evacuation drill during emergencies.  Undertaking regular inspections of site, plant and machinery. Monitor the effectiveness of existing safety standards. Accident investigation and reporting to higher managements. Preparation of weekly, monthly safety reports.  Inspection and positioning of portable fire extinguishers. Minimization of hazardous wastes, its effective management to protect environment. Health and hygiene of all employees such as washing / drinking and toilet facilities.  out risk assessments for chlorine gas handling at Sodium Hypo Chlorite production Plant.

Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185

 Development of emergency procedures to deal with the leakages of Chlorine gas.

TECHNICAL TRAININGS AND MANAGERIAL SKILLS

A training program on Management systems (ISO 9001:208, ISO 14001:2004, OHSAS 18001:2007) – Auditing Techniques at CPBM by ACS Registrars in April 2012. A training program on QHSE Introduction & Internal Auditing at Century Paper & Board Mills in January 2011 . A workshop on Basic Managerial Skills for First Line Managers at CPBM in May 2010.

EDUCATION

. B.Sc [Chemical Engineering], [University of Punjab], [2005‐2009]

. NEBOSH International General Certificate in Occupational Safety & Health (SHIELD UK) – 2014.

. OSHA 30 Hrs Construction Safety ‐2015.

PERSONAL DOSSIER

Permanent Address : Bunga Kharak Singh Tehsil & District – Okara Pakistan . Languages : English, Urdu, Punjabi, Saraiki Marital Status : Un‐married Passport No. : BT1161991

Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185

Registration

Registration

Berkeley Associates

Registration

Berkeley Associates

Details https://e.fbr.gov.pk/Registration/searchDetail.aspx?rand=0.893128141...

Taxpayer Online Verification

Date : 22-03-2017

Time : 14:35:45

NTN/FTN 4446209-3 Category COMPANY

Name BERKELEY ASSOCIATES (PRIVATE) LIMITED CNIC/PP/REG/INC No. 0094613

House/Flat/Plot No. --- Street/Lane ---

Block/Sector/Road --- City ---

Principal Business Activity SALARY INCOME

Business Nature Registered For INCOME TAX w.e.f 03-Sep-2015

Income Tax office CORPORATE RTO LAHORE

Print Back

1 of 1 3/22/2017 2:36 PM

Quality and Safety Policy

Quality and Safety Policy