Thrissur District
Total Page:16
File Type:pdf, Size:1020Kb
File No.PWD-H1/6/2020-PWD GOVERNMENT OF KERALA PUBLIC WORKS (H) DEPARTMENT NOTIFICATION G.O.(P)No.1/2020/PWD 07/04/2020 Thiruvananthapuram Considering the devastation faced by Kerala due to unprecedented flood of 2018, the Government had decided as per G O.(MS)No.22/2019/PWD dated 4/5/2019 to build the road sector reform agenda around the core road network which entails enhanced budgetary provisions, improved climate and disaster resilient standards and performance based maintenance contracting framework. The prioritization of the Core Road Network was to be broadly based on economic importance, connectivity to economic growth centres and strategically important corridors, traffic volume, share of commercial vehicle, public transport routes, disaster relief and climatic resilence functionalities.The Chief Engineer(Maintenance) has submitted list of roads to be declared as core road network after completing the prioritisation exercise 2) Accordingly, Government of Kerala, hereby notify the following roads for setting up the Core Road Network in the State. LIST OF CORE ROAD NETWORK Sl District State RITES Other MDRs- Addl Total Total No Highway 2001 Scorewise length MDRs No. of length Roads (in Km) roads (in Km) > 90 > 80 > 70 1 Thiruva 201.56 152.45 33.02 10.83 24.00 397.85 nantha puram 2 Kollam 164.19 158.38 23.00 322.57 3 Alappu 170.841 122.29 44.25 22.75 25.00 360.13 zha 4 Pathan 196.084 138.50 5.30 110.18 34.00 450.05 amthitt a File No.PWD-H1/6/2020-PWD 5 Kottay 406.531 122.27 7.46 67.30 34.00 603.56 am 6 Idukki 959.222 7.43 20.86 17.00 987.51 7 Ernakul 325.206 209.54 12.02 14.99 49.00 561.76 um 8 Thrissu 374.033 17.74 29.36 129.82 19.13 47.00 570.08 r 9 Palakka 245.987 191.12 13.08 23.00 450.18 d 10 Malapp 374.764 209.57 9.78 35.00 594.11 uram 11 Kozhik 359.435 167.09 33.50 61.15 33.00 621.17 kode 12 Wayan 128.955 172.03 21.96 19.00 322.95 ad 13 Kannur 244.665 227.21 0.51 13.95 22.00 486.33 14 Kasara 141.78 109.38 20.20 9.00 271.36 god Total 4293.253 2004.99 66.52 173.19 375.24 86.43 394.00 6999.61 length (Km) 3) The district wise details are appended herewith. 4) The Chief Engineer(Roads), Chief Engineer(Bridges) and Chief Engineer(Maintenance) should ensure that priority be given to works on these roads and enhanced climate and disaster risk resilience standards are maintained. The Chief Engineer(Admin) to take steps to create separate budget head for Core Road Network(CRN) in FY 2020-21. By order of Governor T K JOSE ADDITIONAL CHIEF SECRETARY 67 4360290/2020/OS-PWD PWD ROAD MAINTENANCE WING DRAFT LIST OF CORE ROAD NETWORK Priority I Priority II Priority III Total Total No Road Additional length (in State RITES 2001 Other MDRs of roads MDRs Km) Highways Roads >70 recommended Total 4293.25 2004.99 614.94 86.43 6999.61 394.00 length CHIEF ENGINEER 68 4360290/2020/OS-PWD PWD ROAD MAINTENANCE WING DRAFT LIST OF CORE ROAD NETWORK PRUNED DOWN AT HIGHER LEVEL Other MDRs-Scorewise Addtl RITES Total Sl State length (in Km) MDRs Total No. District 2001 length No Highways recomme of roads Roads (in Km) > 90 > 80 > 70 nded Thiruvananthapur 1 201.56 152.45 33.02 10.83 24.00 397.85 am 2 Kollam 164.19 158.38 23.00 322.57 3 Alappuzha 170.841 360.13 122.29 44.25 22.75 25.00 4 Pathanamthitta 196.084 450.05 138.50 5.30 110.18 34.00 5 Kottayam 406.531 603.56 122.27 7.46 67.30 34.00 6 Idukki 959.222 987.51 7.43 20.86 17.00 7 Ernakulum 325.206 209.54 12.02 14.99 49.00 561.76 8 Thrissur 374.033 17.74 29.36 129.82 19.13 47.00 570.08 9 Palakkad 245.987 191.12 13.08 23.00 450.18 10 Malappuram 374.764 209.57 9.78 35.00 594.11 11 Kozhikkode 359.435 167.09 33.50 61.15 33.00 621.17 12 Wayanad 128.955 172.03 21.96 19.00 322.95 13 Kannur 244.665 227.21 0.51 13.95 22.00 486.33 14 Kasaragod 141.78 109.38 20.20 9.00 271.36 Total length 4293.253 2004.99 66.52 173.19 375.24 86.43 394.00 6999.61 (Km) CHIEF ENGINEER 69 KASARAGOD DISTRICT 4360290/2020/OS-PWD Core Road Network Details of Link Criteria of selection of Road (As per Methodology) Starting Node Ending Node Density of Connecting Tribal or Under Tourits/Pilgrim SL. Length of Traffic Interstate Connectivity Remark Name of Road Corridors Developed Regions Centers/Ports&Harbours No Road s Total Constit Score uency Chainag Name Name Chainage Starting End e Grade Score Score Grade Score Category Grade Score Grade Score Present status DLP Node Node 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 STATE HIGHWAYS DLP of BM&BC Cherkala - Jalsoor road work expired long 1 (S.H. No. 55) Cherkala Jalsoor 39.138 SH ago. The road is 03.05.2015 km 0/00 to 39/138 made trafficable by patch works Road is trafficable at present. Km 0/000 to 15/000 DLP expired. Patch work ongoing in this reach DLP of Km 0/000 to these patch works 15/000 -2016, is 6 months. Km Km15/000 to 15/000 to 24/000 24/000- Hosdurg - Panathur is under DLP upto 29/10/2022, Km Panathu 2 road (S.H. No. 56)km Hosdurg 44.175 SH 29/10/2022. 24/000 to r 0/00 to 44/175 Km24/000 to 42/000- June 42/000 patch 2020 (for patch works were works) , 42/000 arranged this to 44/175- reach and DLP will March 2021. expire by June 2020. Km 42/000 to 44/175 is under DLP upto March 2021. 70 Kasaragod - Road handed over Kanhan 4360290/2020/OS-PWD 3 Kanhangad road (S.H. Kasaragod 29.500 SH to KSTP. Work gad No. 57) km 0/00 to completed. KIIFB work is Kalladka - Cherkala ongoing in this Adkasthal Cherkal 2024 ( 4 road km 23/227 to 28.967 SH road. The DLP is a a anticipated) 52/194 (SH 31) km 3 years after the completion 141.780 RITES LIST 2001 This road is maintained by 1 Uppala Kanyana road Kaikamba 0/00 Kanyana 15/550 15.55 Manjeshwar 2033 RICK. DLP upto 2033 (13 years) KIIFB work is ongoing in this Manimo 2024 ( 2 Thekkil Alatty road Poinachi 0/00 34/696 34.696 Udma road. The DLP is ola anticipated) 3 years after the completion KIIFB work is Nileshwar Raja road & Thrik ongoing in this Edathod 2024 ( 3 Nileshwar Edathodu Nileshwar 0/00 22/130 22.13 aripu road. The DLP is u anticipated) road r 3 years after the completion 0/000 to 6/500- Budget work ongoing, 6/500 to 16/500-DLP expired on Kanh 30/01/2018 , anga 6/500 to Odayanch Cherupu 16/500 to 22/000 4 Odayanchal Cherupuzha road 0/00 37/00 37.00 d&Tri 16/500- al zha Budget work karip 30/01/2018. ongoing, 22/000 to ur 32/000 KIIFB work ongoing, 32/000 to 37/000 Hill Highway work ongoing TOTAL 109.38 OTHER MDRs 71 4360290/2020/OS-PWD KIIFB work is Minor ongoing in this Badiadka-Yethadka- Kasar 2024 ( 20/200 20.200 30 5 25 pilgrim Z 5 Y 10 75 road. The DLP is Sulapadavu Road agod anticipated) centre 3 years after the completion Tribal( 1 Badiadka 0/00 Sulapadavu D b d E) 20.200 KANNUR DISTRICT 72 4360290/2020/OS-PWD Core Road Network Details of Link Criteria of selection of Road (As per Methodology) Starting Node Ending Node Density of Connecting Tribal or Tourits/Pilgrim Interstate Length of Traffic SL.N Corridors Under Centers/Ports&Harbours Connectivi Total Name of Road Road(K Constituency Remarks DLP Status o Starti Score Name Chainage Name Chainage M) Grad Grade Score ng End Node Score Grade Score Category Grade Score Score e Node 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 STATE HIGHWAYS SH-30 Thalassery- Handed over to 1 Coorg road km 55.128 SH Koottupuz KSTP 0//0 to 55/128 ha (State Thalassery Border) SH 36- Taliparamba -Iritty Ongoing work 2 46.470 SH road km 0/00 to under CRF 46/470 Taliparamba Iritty (NH17) bridge SH 38- Puthiyangadi - 100/300 to Kuttiyadi - 103/350 - Peringathur - work Panoor - completed on 3 33.537 SH Kuthuparamba- 30/11/2019 Chovva Byepass and DLP up road km 66/480 to Peringathur to 80/967 and 82/967 bridge Thazhe 28/11/2022 to 102/017 (District Chovva Border) (NH17) Good Hill Highway km 134/380 to 243/910 73 4360290/2020/OS-PWD (Kannur Division portion connecting Cherupuzha - Manjakkad - Alakode - Karuvanchal - Cherupuzha Ambaytho Cherupuzha - 4 Thavukunnu - (District 109.530 SH Ch. 64/620 Vallithode - Naduvil- Chemperi - du Border) to 71/690 - work in Payyavoor- Ulikkal - 25.12.2017 progress Vallithodu - Ch.