SEIAA –

CHECK LIST FOR MINING/ QUARRYING PROJECTS

Name of the Project : “Ordinary Sand Quarry” of

Sri. Beerappa A Walikar

Sl. No DOCUMENTS √ / X 1 Form -1 √ 2 Pre-Feasibility Report [PFR] in the format prescribed by MoEF, GOI √ 3 Environmental management plan [EMP] √ 4 Approved Mining/ Quarry Plan √ 5 Topo sheet Duly marking the project site with 10 Kms Radius √ Original Village Maps duly marking project site. Adjacent village maps √ 6 of the project site is located at vicinity of the village boundary 7 Latest Google Map Duly marking the project site √ 8 Latest Site Photographs √ 9 Year wise production audit report from DMG if it is NA ongoing/expansion/modification project 10 Land Documents Notification OR Letter of Intent from Department of Mines and It’s a patta land a. Geology sand b. District Task Force committee Proceedings √ District Mineral Survey Report proposed as per Notification No. √ c S.O.141 dated 15th January 2016 Compliance of the earlier E.C in case of Renewal, Expansion, NA d. Modification e. Lease Deed in case of Renewal, Expansion, Modification NA f. Renewal Notification OR Deemed Extension Letter etc., NA g. RTC √ NOC from Forest Department - Compulsory 1st Stage Clearance in case NA h. of Forest Land i. NOC from Revenue Department in case of Government, Patta Land √ j. NOC from Forest Department in case of Government, Patta Land √ k. Regarding Applicability of ESA/ESZ NA l. Joint inspection report in case of Government Gomal Land √ Copy of order of conversion of the land for non Agricultural -mineral/ √ m. quarrying purpose in case of private/patta land n. Allotment letter/Gazette Notification in case River sand quarrying NA o. Other Specify X 11 Disputes if any and copy of documents/ orders there off X Comparative statement of the project profile between the existing and NA 12 the proposed with difference thereof in case of Expansion and Modification project Certified report of the status of compliance of the conditions stipulated NA 13 in the E.C from the regional office of MoEF& CC in case of proposal involving expansion and medication Cluster Certificate From Dept of Mines and Geology details regarding √ 14 Quarries within 500mts from the applied Quarry area. Horizon Ventures NABET Certificate No. NABET/EIA/1 922/IA0046 Address: No. 4, Anaga, 3rd 15 Accreditation certificate for Consultant floor, Devasandra, New BEL Road, Opposite MS Ramaiah Hospital, Bengaluru – 560094 Letter of Authorization issued by the company, Partnership/ proprietor NA 16 if the authorized signatory other than the proprietor himself for filing of application before SEIAA DD towards processing fee in accordance with G.O No. FEE 46 EPC √ 17 2013 dated 10.05.2013 amended from time to time 18 Any other document relevant to the project proposal ( Specify) NA

SEIAA –KARNATAKA

BRIEF NOTE FOR MINING/ QUARRYING PROJECTS

Sl. No PARTICULARS INFORMATION Sri. Beerappa A Walikar S/o Appanna, Name & Address of the Project 1 45, Tappasakatti, , Proponent Mamatageri, Karnataka-- 587155 “Ordinary Sand Quarry” over an extent of 11-36Acre at Sy. No. 137/2, 138/1 & 138/2 2 Name & Location of the Project Jalihal village, Taluk, , Karnataka Corner Latitude Longitude Pillar A N 15° 49' 52.6" E 75° 45' 59.2" B N 15° 49' 52.9" E 75° 45' 54.5" 3 Co-ordinates of the Project Site C N 15° 49' 46.3" E 75° 45' 53.5" D N 15° 49' 46.3" E 75° 45' 51.1" E N 15° 49' 42.9" E 75° 45' 53.1" F N 15° 49' 42.6" E 75° 45' 57.9" MAP DATUM – WGS -84

4 Type of Mineral Ordinary Sand Quarry New / Expansion / Modification New 5 / Renewal Patta Land Type of Land [ Forest, 6 Government Revenue, Gomal, Private/Patta, Other]

No Whether the project site fall 7 within ESZ/ESA

8 4.82 Ha Area in Ha Actual Depth of sand in the NA 9 lease area in case of River sand Depth of Sand proposed to be 3.00 m 10 removed Rate of replenishment in case of Not Applicable For Patta land river sand mining as specified 11 in the sustainable sand mining guideline 2016 Measurements of the existing Fresh Land quarry pits in case of 12 ongoing/expansion/modification of mining proposals other than river sand Annual Production Proposed 69,000 cumTons/annum 13 (Metric Tons/ CUM) / Annum Quantity of Topsoil/Over 39,012 Cu.m 14 burden in cubic meter Mineral rejects like Shingles and pebbles Mineral Waste Handled 15 will be dumped back in the worked out area (Metric Tons/ CUM)/ Annum as a part of reclamation 16 Project Cost (Rs. In Crores) 0.57crores 17 Environmental Sensitivity a. Nearest Forest Belur Reseved Forest – 2.55 kms(NW) b. Nearest Human Habitation Jalihal Village – 1.35 Km NW The nearest post and telegraph office, Educational Institutes, c. hospital, schools, police station is situated in Hospital Badami. d. Water Bodies Sasve River – 45 meters (S) e. Other Specify -- Applicability of General NA 18 Condition of the EIA Notification, 2006 19 Details of Land Use in Acres a. Area for Mining/ Quarrying 10-02 b. Waste Dumping Area -- c. Top Soil Storage Area -- d. Mineral Storage Area -- e. Infrastructure Area -- f. Road Area -- Green Belt Area/Buffer 1-34 g. Zone h. Unexplored area -- i. Others Specify -- Semi Mechanized Open quarrying 20 Method of Mining/ Quarrying excavation Rate of Replenishment in NA 21 case River sand project 22 Water Requirement Drinking water : Borewell from the village a. Source of water Dust Suppression: River Water Dust 1.05 KLD Suppression Total Requirement of b. Domestic 0.80 KLD Water in KLD Other 0.55 KLD Total 2.40 KLD • Drains will be constructed along the boundary of activity area • Check dams will be constructed to 23 Storm water management plan contain the surface run-off of the silt and sediments from the lease area during heavy rainy season

Remarks:-