PELLA INSTALLATION INSTRUCTIONS FIN, NAIL FIN WITH J-CHANNEL AND ENDURACLAD EXTERIOR TRIM WITH NAIL FIN

THE FOLLOWING INSTALLATION METHODS ARE INCLUDED IN THIS BOOKLET:

New Construction Installation After Building Wrap for Nail Fin Windows

New Construction Installation Before Building Wrap for Nail Fin Windows

ER I R RR E A I B RR T A N B A T ST N SI ER TA E I IS ER R RR S I A E RR B R T BA N T TA N R IS TA IE S IS RR RE S E BA R T N R A IE ST R SI R E BA New Construction Installation with Water Resistant Sheathing R T N A ST SI for Nail Fin Windows RE

R R IE IE R RR R A BA B T T N N ER TA TA I S S RR SI H SI A E T R E B R I E R T W RI NTH R N R A I E O A T W I I B IS RR T T S N A LA N EIO B U A RT T S T H LA N IN IS T R U A H S I E S T T R E W RI N IS I E R N R I S W RI O A E N R I B R O A T T I B LA N AT T H U A L N IT R S T U A W E N IS S T RI I S IN IS N R RE S IO A RE T B New Construction Installation with Nail Fin over 1-1/2" – 2" Continuous Exterior LA T H U N IT R S TA IE IN S WR SI N R E IOBA Insulation Using Rough Opening Support Brackets. (Patent Pending) R T T LA N U A S ST INSI RE H H T R IT R I IE IE W R W R N R N R O A IO A TI B T B H A T A T IT R Flashing Tape L Flashing N L N E U A U A W I S ST S ST N R IN I IN Iblock Concrete R S ES IO A RE R T B LA T U N S TA N S I SI RE

Frame head groove head New Construction Installation in Masonry Construction for Nail Fin Windows Checkrail

Frame sill groove sill Flashing Tape Flashing

Frame block Concrete Weep valves Weep groove jamb Installation clip Installation

Full Frame Replacement after Brickmould/trim Removal Corner Flashing Tape or Siding cut-back for Nail Fin Windows Corner Flashing Tape Top Flashing Tape Side Flashing Tape Side Flashing Tape These instructions were developed and tested for use with wall systems designed to manage water. These instructions are not to be used with any other construction methods or frame types. block Concrete Installation instructions for use with other construction methods or frame types may be obtained from Pella Corporation, your local Pella® retailer or www.installpella.com. Building designs, construction methods, building materials, and site conditions unique to your project may require an installation method different from these instructions and/or additional care. Determining the appropriate installation method is the responsibility of you, your architect, or construction professional.

BY PURCHASING, INSTALLING OR USING PELLA PRODUCTS (INCLUDES PELLA GOODS AND PELLA SERVICES), YOU AGREED TO THE TERMS OF THE LIMITED WARRANTY AND YOU AND PELLA FURTHER AGREE TO ARBITRATE DISPUTES ARISING OUT OF OR RELATING TO PELLA PRODUCTS, AND YOU WAIVE ANY RIGHT TO PARTICIPATE IN A CLASS ACTION LIMITED RELATED TO PELLA PRODUCTS unless you notify Pella of your decision to opt out of the Arbitration Agreement no later than ninety (90) calendar days from the date you purchased or otherwise took ownership of Your Pella Goods. Opting out of the Arbitration Agreement will not affect the coverage provided by any applicable limited warranty pertaining to Your Pella Products. For opt out information and additional details please read the Limited Warranty and Arbitration Agreement for your Pella Products at www.Pella.com/arbitration.

NF-1 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet IMPORTANT SAFETY AND PRODUCT INFORMATION − WINDOW

CAUTION: Many windows in older homes are painted with lead-based paint. Removal of old windows may disturb this paint. Proper precautions must be taken to minimize exposure to dust and debris. Consult state or local authorities and/or go to www.epa.gov/lead for more information.

WARNING: To ensure safety and security and help prevent property damage, including possible damage to your window or , close and ! lock! windows and any time they are not being used for venting on a nice day, and particularly during high winds or rain.

Important Notice Because all construction must anticipate some water infiltration, it is important that the wall system be designed and constructed to properly manage moisture. Pella Corporation is not responsible for claims or damages caused by anticipated and unanticipated water infiltration; deficiencies in building design, construction and maintenance; failure to install Pella products in accordance with Pella’s installation instructions; or the use of Pella products in wall systems which do not allow for proper management of moisture within the wall systems. The determination of the suitability of all building components, including the use of Pella products, as well as the design and installation of flashing and sealing systems are the responsibility of the Buyer or User, the architect, contractor, installer, or other construction professional and are not the responsibility of Pella. Pella products should not be used in barrier wall systems which do not allow for proper management of moisture within the wall systems, such as barrier Exterior Insulation and Finish Systems (EIFS) (also known as synthetic stucco) or other non-water managed systems. Except in the states of California, New Mexico, Arizona, Nevada, Utah and Colorado, Pella makes no warranty of any kind on and assumes no responsibility for Pella windows and doors installed in barrier wall systems. In the states listed above, the installation of Pella Products in barrier wall or similar systems must be in accordance with Pella’s installation instructions. Product modifications that are not approved by Pella Corporation will void the warranty. Care and Maintenance Care and maintenance information is available by contacting your local Pella retailer. This information is also available at www.pella.com. Cleaning Instructions GLASS: Remove any protective film and labels and clean the glass, using a soft, clean, grit-free cloth and mild soap or detergent. Be sure to remove all liquid by wiping dry or use a clean squeegee. FACTORY FINISHED PRODUCT: Pella product that has been prefinished with stain or paint from the factory requires no additional finishing. Clean the surface with mild soap and water. PELLA® ALUMINUM CLAD OR IMPERVIA FRAMES: The interior and exterior frame and sash are protected with a tough factory finish. Clean this surface with mild soap and water. Stubborn stains and deposits may be removed with mineral spirits. DO NOT use abrasives. DO NOT scrape or use tools that might damage the surface. ENCOMPASS BY PELLA®/THERMASTAR BY PELLA®, PELLA® 150 SERIES, PELLA® 350 SERIES AND PELLA® 250 SERIES WINDOWS FRAMES: The vinyl frame may be cleaned using the same method as the glass. For stubborn dirt, a “non-abrasive" cleaner such as Bon-Ami® or Soft Scrub® may be used. Do not use solvents such as mineral spirits, toluene, xylene, naphtha or muriatic acid as they can dull the finish, soften the vinyl and/or cause failure of the insulated unit seal. Keep door tracks clear of dirt and debris. Keep weep holes open and clear of obstructions. DO NOT use abrasives. DO NOT scrape or use tools that might damage the surface. Notice: DO NOT use inappropriate solvents or brickwash or cleaning chemicals. If you do, permanent damage can result and the product failure, loss or damage would not be covered by the Limited Warranty. Interior Finish ( Windows) Paint or finish immediately after installation. If products cannot be finished immediately, cover with clear plastic to protect from dirt, damage and moisture. Remove any construction residue before finishing. Sand all wood surfaces lightly with 180 grit or finer sandpaper. DO NOT use steel wool. BE CAREFUL NOT TO SCRATCH THE GLASS. Remove sanding dust. Pella products must be finished per the below instructions; failure to follow these instructions voids the Limited Warranty. Note: To maintain proper product performance do not paint, finish or remove the weatherstripping, mohair dust pads, gaskets or vinyl parts. Air and water leakage will result if these parts are removed. After finishing, allow venting windows and doors to dry completely before closing them. If paint, stain or finish gets on the weatherstripping, wipe it off immediately with a damp cloth. Window Cleaning and Prep Instructions for Unfinished or Primed windows: Dry wipe dust from windows gently. Examine window for possible smudges or fingerprints made from normal handling or construction. To remove smudges, lightly wipe surface with warm water. Scuff sand with light grade sand paper or abrasive pad (220 grit or higher). Rinse surface with warm water. Let window surfaces dry completely before applying finish. Finish the windows as soon as possible after installation. • On casement and awnings, it is optional to paint, stain or finish the vertical and horizontal sash edges. • On single-hungs and double-hungs, do not paint, stain or finish the vertical sash edges, any finish on the vertical sash edges may cause the sash to stick; it is optional to paint, stain or finish the horizontal sash edges. Pella Corporation is not responsible for interior paint and stain finish imperfections for any product that is not factory-applied by Pella Corporation. For additional information on finishing see the Pella Owner’s Manual or go towww.pella.com. The use of unapproved finishes, solvents or cleaning chemicals may cause adverse reactions with door materials. Pella will not be responsible for problems caused by the use of unapproved materials. If in doubt, contact your local retailer or representative. Exterior Finish of Existing Frame (Pocket Replacement) It is the responsibility of the homeowner, contractor or installer to ensure any exposed unfinished wood is covered or finished. Possible methods include, however are not limited to, covering with aluminum coil stock or painting.

For Casement Hardware Installation go to: www.installpella.com/trimaccessory/hardware

NF-2 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet FULL FRAME REMOVAL WHEN PREPARING TO INSTALL A NEW NAIL FIN WINDOW

This method of Full Frame Removal involves removing the sash and entire frame of the existing window from the wall. The resulting opening is the original rough opening. The existing window nailing fins are usually nailed to the studs in frame construction with siding, brick veneer or other exterior material applied over the fin on the outside. The interior may have a drywall return from the wall to the window frame. CAUTION: Many windows in older homes are painted with lead-based paint. Removal of old windows may disturb this paint. Proper precautions must be taken to minimize exposure to dust and debris. Consult state or local authorities and/or go to www.epa.gov/lead for more information. B TOOLS REQUIRED: • Utility knife • Phillips and Standard • Pry bar • Circular saw • Hammer • Putty knife screwdrivers

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

EXISTING WOOD BRICKMOULD FRAME WINDOW A. Score paint or varnish between the interior trim and the wall with a sharp utility knife. NOTE: This will minimize the damage to the interior wall and trim. B D B. Remove the interior trim. Using a pry bar and block of wood, remove the interior trim from all four sides of the window including the stool at the bottom of the window. If the interior trim is being reused, pull the nails out through the back side of the board with nipper pliers. C. Cut the exterior sealant line between the exterior brickmould or trim and the exterior siding or wall cladding. D. Remove the exterior brickmould or flat trim using a pry bar and block of wood. Caution: Some windows may come out of the opening as the exterior trim is removed.

EXISTING NAIL FIN WINDOW REMOVAL D E. Remove the window frame using a pry bar if necessary. Sash Removal: B A. Remove the vent sash and screen from the old window. C B. Remove the fixed sash. In some cases, there are screws holding in the fixed Remove sash. Remove the screws and take out the fixed sash. division bar NOTE: There may be a need to break the caulking free from around the fixed sash before it can be removed. C. Remove the division bar by unscrewing the fasteners holding it to the frame. If the screws are not accessible, then use a hacksaw to cut the division bar off at Existing metal frame the head and sill flush with the old window frame.

WINDOW WITH EXTERIOR TRIM D E D. Remove the existing exterior trim (if applicable). Use a block of wood to protect the exterior wall material. Use a pry bar to remove the existing exterior trim. E. Remove the nails or screws attaching the window nailing fin to the wall. F. Remove the window from the opening.

WINDOW WITH NO EXTERIOR TRIM G. Use a reciprocating saw to cut through sealant line and the nailing fin. G H OR H. Remove siding or cut back the siding a minimum of 3" or far enough to expose the nailing fin. Remove the fasteners attaching the window to the wall. NOTE: When cutting back the siding, set the saw blade depth 1/8" less than the thickness of the siding. Break the cut ends of the siding off after sawing. DO NOT cut through the existing building wrap. I. Remove the window from the wall.

Consult with local providers and authorities to recycle or properly dispose of old window components.

NF-3 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet PREPARING FOR NAIL FIN WINDOW INSTALLATION

YOU WILL NEED TO SUPPLY: TOOLS REQUIRED: • Moisture resistant shims/spacers • Tape measure • Scissors or utility knife • Fasteners (see nail fin anchor instructions and tables at the end of this booklet) • Level • Small flat blade screwdriver • Closed cell foam backer rod/sealant backer • Square • Sealant Gun • Pella® SmartFlash™ foil backed butyl window and door flashing tape • Hammer or equivalent • Screw Gun with • Stapler a Phillips Driver bit • Low expansion, low pressure polyurethane insulating window and door foam sealant. DO NOT use high pressure or latex foams. • Drill with 1/8", 5/32", 3/16" and 3/8" drill bits • Pella Window and Door Installation Sealant or equivalent high quality, SEALANT multi-purpose sealant • 1/8" Allen wrench Other construction materials may be required. Read and understand the instructions and inspect the wall conditions before you begin. INSTALLATION WILL REQUIRE (2) OR MORE PERSONS FOR SAFETY REASONS.

Store windows in upright position, out of direct . ROUGH OPENING VERIFICATION Interior Interior A. Confirm the opening is plumb and level. NOTE: It is critical the bottom is level and it does not slope to the interior. 1AA 1BB B. Remove dirt, oil or debris from the opening and surrounding wall surfaces. C. Confirm the window will fit the opening. Measure all four sides of the opening to make sure it is 1/2" to 3/4" larger than the window in both width and height. On larger openings measure the width and height in several places to ensure the header or studs are not bowed. NOTE: 1-1/2" or more of solid wood blocking is typically required around the perimeter of the opening. Fix any problems with the rough opening before proceeding. D. For continuous exterior insulation panels up to 1" thick, utilize standard installation methods. For insulating panels 1.5" to 2" thick, Rough Opening Support Brackets or solid wood blocking is required. Pull screen near PREPARE THE WINDOW FOR INSTALLATION shipping clip

Shipping DISCARD

A. Remove plastic wrap and cardboard packaging from window. DO NOT cut checkrail bands (if present) or PUSH Clip DISCARD remove plastic or foam shipping spacers located between the window sash and frame. DO NOT open the PUSH window until it is securely fastened. B. Inspect the product for any damage such as cracks, dents or scratches. DO NOT install damaged windows. C. Remove screens and hardware (if necessary). Label them and set them aside in a protected area. Windows with Half Screens: From the exterior, pull one side of the screen near the shipping clips until the clips disengage from the frame. Rotate the shipping clips toward the exterior of the screen until they snap free E from the screen. 2CD Half screens of some vinyl windows can be removed from the interior. D. Fold out installation fin to 90° (units with fold up fin only). Be careful not to remove or tear the fin corners.

NOTE: If the fin is not at 90°, the window will not line up correctly on the interior. Fixed Extruded Fin E. Units with painted head drip cap fin and no pre-punched holes:Pre-drill holes through the fin (refer to the anchor page for spacing) #6 x 5/8” corrosion resistant screws Curved top units with flexible fins:Prepare the window frame for attachment by pilot drilling through the frame 6“ from end or securing installation clips (refer to the anchor page).

Units with EnduraClad Exterior trim and narrow fins with NO pre-punched holes: Install clips or pre-drill holes for Lip frame screws. See the anchor instruction pages at the end of this booklet. E2D Additional preparation may be required for performance upgrade, impact-resistant products or to comply with local building code requirements. F. Read the entire instruction before proceeding.

These instructions were developed and tested for use with wall systems designed to manage water. These instructions are not to be used with any other construction methods or window frame types. Installation instructions for use with other construction methods or frame types may be obtained from Pella Corporation, your local Pella® retailer or www.installpella.com. Building designs, construction methods, building materials, and site conditions unique to your project may require an installation method different from these instructions and/or additional care. Determining the appropriate installation method is the responsibility of you, your architect, or construction professional.

BY PURCHASING, INSTALLING OR USING PELLA PRODUCTS (INCLUDES PELLA GOODS AND PELLA SERVICES), YOU AGREED TO THE TERMS OF THE LIMITED WARRANTY AND YOU AND PELLA FURTHER AGREE TO ARBITRATE DISPUTES ARISING OUT OF OR RELATING TO PELLA PRODUCTS, AND YOU WAIVE ANY RIGHT TO PARTICIPATE IN A CLASS ACTION LIMITED RELATED TO PELLA PRODUCTS unless you notify Pella of your decision to opt out of the Arbitration Agreement no later than ninety (90) calendar days from the date you purchased or otherwise took ownership of Your Pella Goods. Opting out of the Arbitration Agreement will not affect the coverage provided by any applicable limited warranty pertaining to Your Pella Products. For opt out information and additional details please read the Limited Warranty and Arbitration Agreement for your Pella Products at www.Pella.com/arbitration.

NF-4 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet NEW CONSTRUCTION INSTALLATION WITH NAIL FIN AFTER BUILDING WRAP R E R I R IE R E R R R I R IE A R A R B R R E A B B E A IV E IV B T T E IS IV S IV S R T I R T E IE IS S E S R S R E I I R E E R R S R R RR I R E IE R A E R R E I R R R A R I B R A E E B R R E R Fin I I E R A R IV IAE B R R E B A T R B WindowE Top CornerR Fin R IV I E S RE IV A A T R B I AV T B Window Top B IS R IV E S R I S Corner E S R AER T E IE TBNailing FinI E E E I S IV R ES S R V I BR I T R I E E I IV R E S R ER S R ISV R I TNailing Fin T R R E E I I R A TE R S IS R IVA R I R S E SR R I S R A T B R R E I B I S E S R R R E SR R A E E I B I E A EE E B R R R E S V R A B R IV RT I R E I IE B E A T R E R IV R T E S A R IV E A T S R IV B I W A T B S I R IV T E S IER T A E I S A T S E B IS S E S I IV R ER S W ER IV E R B I S T R E I T R E S E IS AIV R R S R E R S R ER BT R I E IV R E E I S A S R T RT R I R EI E E A ES E R R VS R ER B R I II T R IE E I E R W RS R R R A TR I R V R RE IE A IE A B S R R I R W I R T A R A R R B E S A S E R R E V E A B I B I B A A I R B E S E R E R IV T E E B E B T S R IV IV R IV E I E S I E IV R T A T R I S T R T R S S IV R IV S E A E T IS E I B I T R T E R I IS S R S E S S E A S R W RS E T E E E I I B I R R RE A I R IV R S R E S E E A R R T E R E I T R R R W R IS R A IV R R A E B E A S R B T R I E T R E IE E IS A W R IV A E B R R S R B R T I E R IV E IE E A S W R T SillR Flashing Tape #1 I R IV A S R IV B S T I R E E A IS B S A T Sill Flashing Tape #1 R B S Window Bottom E E Sill Flashing Tape #2 IS IV E R B S T E IV E E S IV R Window Bottom T Sill Flashing Tape #2 I T IS IV R S S S Water Resistive BarrierT E I E IS R S R S Water Resistive Barrier E Sheathing E R R Sheathing Framing

SETTING AND FASTENING R IE R R THE WINDOW PREPARE THE OPENING R IE A R 1 R 2 B E A IV B Refer to the nail fin installation preparationT section at the beginningE of A. Insert the window into the opening on the sill spacers. Center the IS IV S R T E IE IS this booklet. R R S R window between jambs. R E IE A R R R R R IE B IE R E R A R R IV RR IE B IE WaterA ResistiveT Barrier A RWater ResistiveE Barrier 2E B IS B R IV RR 2B A. Cut the building wrap. E S E A T A 1stE cut V B IS B IV R I E S 1st cut E Corner 6”T T 6” E V Refer to the diagram for IS IS IV R I Flashing Corner S R S TR T E IE E ISE IS Flashing R R S I R S R Tape other window shapes on R E R E E E R R R R I R I Tape A E A R CornerR B A 3rd cut R R R 6” E T B A6” E Corner the next page. E A 2ndFlashingA IV B T B 2E T WA IV E cutE Flashing 2B S T Tape I IS IV WA IV S R S RT T Tape E 1C E E EIS S R 1A I SI R I Top R R R ER 1AE S E R R 1CI E FlashingI Top 2B A R A R R R E R R B I B A A Flashing2B E R E R Tape IV R IV B IE3rd cut B Tape T A 2ndT E R Side E IS B IS IVR R IV S E S cut TE A FlashingT Side E E IS I B IS R R IV R S R S E B. Drive two fasteners, one near each end of the top nailing fin. (See nail fin T E R E TapeE I Flashing IS R A IV R R S R B T R Tape anchor instructions at the end of this booklet) E IE E ISideS A R R S R B R IV E FlashingIE E Side A T R R IS IV B S TapeR T Flashing C. Plumb and square the window using shims at the E E A S Interior View B I Interior IV R E SExterior Tape T Exterior E locations shown. Adjust shims 1” IS IV R S T E IS R S to plumb and square the B. Fold the building wrap in E R 2C at the jambs and staple it in window. Keep shims 1/2" 2C place. Fold the top flap up short of window frame depth. Mid and temporarily fasten with NOTE: DO NOT shim above 1B 1B flashing tape. 1D 1D the window. Additional shims are required at screw

locations for large units and 1” combinations. See the nail fin For windows over 53” tall. anchor instructions at the end Interior of this booklet. 2C 1" D. Check the window placement by C. Cut 2 pieces of flashing tape12" longer than 2D measuring from the interior surface opening width. 1E 1 1D mm INCHES 2 0 3 0 2 of the window frame or jamb 4 0 5 0 3 D. Apply sill flashing tape #1at the sill extending 1" to 6" 6 0 7 0 extension to the interior surface the exterior and 6" up each jamb. 1/2" of the wall for consistency. If the 1/2" E. Cut 1" wide tabs at each corner by tearing the foil dimensions are not equal, confirm the 1/2" each way from corner. 1E1F fins are folded fully to 90º (if applicable). F. Apply sill flashing tape #2 overlapping tape #1 by E. Drive two fasteners, one near each end of the sill 1" minimum. 1" nailing fin. NOTE: Press all tape down firmly. F. Check window operation. 1F G. Install and level sill shims. Place 1" wide x 1/4" to 1G Vent awning and casement: See lock lever and crank handle instructions 3/8" thick shims 1/2" from each side. Keep shims at the end of this instruction. Lift the lock lever and turn the crank handle back 1/2" from interior face of window. Place to open the window. Remove the shipping spacers. Open and close the additional shims under each mullion and sliding window to test for proper operation. window interlocker. Double Hung: Cut the checkrail bands (if applicable) and remove For vinyl windows, add shims so maximum spacing shipping spacers. Open, close and tilt the sashes to test for proper is 18". 1G2A operation. Check for equal sash to frame reveal from top to bottom. H. Attach shims to prevent movement after they NOTE: Adjust shims to correct any issues with plumb, square, operation are level. or reveal. NOTE: Improper placement of shims may result in G. Close and lock the window. bowing the bottom of the window. H. Finish driving fasteners into the nailing fin. Refer to the nail fin anchor instructions at the end of this booklet. NF-5 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet Fin Fin WindowWindow Top Top CornerCorner NailingNailing Fin Fin

Sill FlashingSill Flashing Tape Tape #1 #1 Sill FlashingSill Flashing Tape Tape #2 #2 WindowWindow Bottom Bottom WaterWater Resistive Resistive Barrier Barrier SheathingSheathing FramingFraming

NEW CONSTRUCTION INSTALLATION WITH NAIL FIN AFTER BUILDING WRAP (CONTINUED)

CornerCorner FlashingFlashing TapeTape CornerCorner FlashingFlashing TapeTape Top Top FlashingFlashing TapeTape Side Side FlashingFlashing TapeTape Side Side FlashingFlashing TapeTape

3 INTEGRATING WITH THE BUILDING WRAP NOTE: Apply flashing tape 1/2" C. Apply top flashing tape. onto frame cladding with fold-up or slide-in fins. Pre-fold flashing tape Flashing Rectangular Units: Cut one piece of at 1/2" to assist with application. Tape flashing tape to extend 1" past both side For siding less than 1/2" thick, flashing tapes. 3C3B adjust the placement of the tape to allow the exterior sealant to cover the tape edge. 3C3B

1" Curved Top Units: Using several short Curved and angle top units without pre-applied fin corners: pieces, start taping from the sides of the A. Cut four 1-1/2" long pieces of window working towards the peak. Cut flashing tape. 3A3A each piece short enough so each piece overlaps Apply one to each end of sill the previous piece. Tighter curved frames will finto extend it 1-1/2" past each st require shorter pieces of tape. jamb. 1 Apply one to the bottom end of each jamb fin beginning 1-1/2" 3C from the end of the fin and 3A3A 2E lapping over the first piece of flashing tape. 2nd

2E NOTE: DO NOT tape over bottom nailing fin. D. Fold down top flap of weather resistive barrier. B. Apply straight side flashing tape.Cut two pieces E. Apply flashing tape to top diagonal cuts. Cut pieces of flashing tape at of flashing tape 4" taller than straight sides. Apply least 1" longer than each diagonal cut. Lap tape 1" past end of cut onto tape over the fin and onto weather resistive barrier. weather barrier. Overlap multiple pieces of tape by 1" when necessary. Extend tape 2" above and below straight sides. 3B3B NOTE: PRESS ALL FLASHING TAPE DOWN FIRMLY.

Angle top Units: On the short side, do not allow 3E Exterior View 3E4C the side tape to extend higher than what the top tape will cover. 3E 3E4D Building Wrap Cutting Patterns for Window Shapes

3E4D

Half Circle Full Circle Quarter Circle Oval Circle Head F. Install interior sealant. Refer to the interior sealant instructions at the end of this booklet. G. Install head flashing, properly incorporating it with the siding and building wrap according to applicable code requirements.

Right Triangle H. Install exterior sealant. (After wall cladding is installed) Refer to the Octagon exterior sealant instructions at the end of this booklet. Arch Head Dog House Trapezoid Rectangle

NF-6 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet NEW CONSTRUCTION INSTALLATION WITH NAIL FIN BEFORE BUILDING WRAP

With or without sheathing

r Wideape 9” g P hin Flas Sill Flashing Tape #1 Sill Flashing Tape #2 Framing

SETTING AND FASTENING 1 PREPARE THE OPENING 2 THE WINDOW

Refer to the nail fin installation preparation section at the beginning of er A. Insert the window into the opening on the sill spacers. Center the Pap ing ash this booklet. g Fl window between jambs. shin Fla A. Apply flashing paper at the bottom. Cut one piece of 9" minimumide 9” w B. Drive two fasteners, one near each end of the top nailing fin. width flashing paper 18" longer than the width of the opening. Staple it (See nail fin anchor instructions at the end of this booklet). flush with the top of the sill plate. Top B. Apply flashing paper to the sides. Cut 2 pieces of 9" minimumFlashing width Tape flashing paper 18" longer than the longest straightSide side of the opening. Flashing Center the flashing paper with the opening heightTape and staple one piece flush with the inside edge on both sides. 2A2D Side Flashing Tape 2B2D

1D1B 1B1D C. Plumb and square the window using shims at the locations shown. Adjust 1C shims to plumb and square the Interior Interior View 1A 1” window. Keep shims 1/2" short of window frame depth. 2C 2C NOTE: DO NOT shim above the window. Additional shims are Mid required at screw locations for large units and combinations. See

the nail fin anchor instructions at 1” For windows over 53” tall. C. Cut 2 pieces of flashing tape 12" longer than 1" the end of this booklet. opening width. 1D1E D. Check the window placement by measuring from Interior e 6" D. Apply sill flashing Wididepe tape #1 at the sill extending 1" the interior surface of the window frame or jamb 9”” Wg Ta hin to the exteriorFlas and 6" up each jamb. extension to the interior surface of the wall for 2C 1/2" E. Cut 1" wide tabs at each corner by tearing the 1/2" consistency. If the dimensions are not equal, confirm the foil 1/2" each way from corner. 1E 1F fins are folded fully to 90º (if 2D F. Apply sill flashing tape #2 overlapping tape #1 mm 1 INCHES applicable). 2 0 3 0 2 4 0 5 0 3 by 1" minimum. 1" 6 0 7 0 E. Drive two fasteners, one near NOTE: Press all tape down firmly. each end of the sill nailing fin. 1F1G G. Install and level sill shims. Place 1" wide x 1/4" F. Check window operation. to 3/8" thick shims 1/2" from each side. Place Vent awning and casement: See lock lever and crank additional shims under each mullion and sliding handle instructions at the end of this instruction. Lift the lock lever and window interlocker. turn the crank handle to open the window. Remove the shipping spacers. For vinyl windows, add shims so maximum Open and close the window to test for proper operation. spacing is 18". Double Hung: Cut the checkrail bands (if applicable) and remove H. Attach shims to prevent movement after they 1G2A shipping spacers. Open, close and tilt the sashes to test for proper are level. operation. Check for equal sash to frame reveal from top to bottom. NOTE: Improper placement of shims may result in bowing the bottom of the window. NOTE: Adjust shims to correct any issues with plumb, square, operation or reveal. G. Close and lock the window. H. Finish driving fasteners into the nailing fin. Refer to the nail fin anchor instructions at the end of this booklet. NF-7 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet r Wideape 9” g P hin Flas Sill Flashing Tape #1 Sill Flashing Tape #2 Framing

er Pap ing ash g Fl shin Fla ide 9” w

Top Flashing Tape Side Flashing Tape r Wideape 9” g P hin Flas Side Flashing Sill Flashing Tape #1 Tape Sill Flashing Tape #2 NEWFraming CONSTRUCTION INSTALLATION WITH NAIL FIN BEFORE BUILDING WRAP (CONTINUED)

er Pap ing ash g Fl shin Fla ide 9” w

Top Flashing Tape Side Flashing Tape

e ididepe Side 9” W Ta 9”ing Flashing lash Tape F

3 INTEGRATING WITH THE FLASHING PAPER C. Apply top flashing tape. NOTE: Apply flashing tape 1/2" onto Rectangular Units: Cut one piece of flashing frame cladding with fold-up or slide-in Flashing tape to extend 1" past both side flashing fins. Pre-fold flashing tape at 1/2" to 3B3B Tape tapes. assist with application. For siding less Curved Top Units: Using several short than 1/2" thick, adjust the placement of pieces, start taping from the sides of the the tape to allow the exterior sealant to cover the tape edge. window working towards the peak. Cut each piece short enough so each piece overlaps 3C3B e Wididepe 9”” Wg Ta hin the previous piece. Tighter curved frames Flas will require shorter pieces of tape. 1” NOTE: Press all flashing tape down firmly. Curved and angle top units without pre-applied fin corners:

A. Cut four 1-1/2" long pieces of flashing tape. 3C3B

Apply one to each end of sill fin to extend it 1-1/2" past each jamb.

Apply one to the bottom end of NOTE: DO NOT tape over bottom nailing fin. 3A each jamb fin beginning 1-1/2" D. Apply top flashing paper. from the end of the fin and Rectangular windows: Cut one piece of 9" lapping over the first piece of st 1 minimum width flashing paper 21" longer than flashing tape. the window width. Center it above the window and flush with the top. Staple it to the header. Shaped windows: Cut one piece of flashing paper long enough to overlap nd 2 the side flashing paper by 2" on each side. 3C3D Cut the bottom of the paper to match the shape of the window (curved only). Center B. Apply straight side flashing tape. Cut two pieces of flashing tape 4" taller it above the window and flush with the than straight sides. Apply tape over the fin and onto the flashing paper. top. Staple it to the header. Ensure the top Extend tape 2" above and below straight sides. of the side flashing paper is completely Angle top Units: On the short side, do not allow the side tape to extend covered by the top flashing paper on each higher than what the top tape will cover. side. Apply multiple pieces of top flashing paper if necessary, overlapping them 6" in watershed fashion. NOTE: When apply building paper to the 3D3C wall, ensure the sill flashing paper overlaps the building paper to create a watershed effect. E. Install interior sealant. Refer to the interior 3B3A sealant instructions at the end of this booklet. 3A3B F. Install head flashing, properly incorporating it with the siding and building wrap according to applicable code requirements. G. Install exterior sealant. (After wall cladding is installed) Refer to the exterior sealant instructions at the end of this booklet.

NF-8 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet R IE RR BA T N A R ST E I RI ES R R BA T N ER A I ST R RR I IE A ES R B R R T BA N T TA R N R S IE A E SI R T I E R IS RR R A S A B E B T R T N N R A R A E ST E T I I I IS RR S R S A RE R E B BA R T T R N N IE A A R ST ST R I I A ES S B R RE T N ER TA I S RR Sill Flashing Tape #1 I A ES B R T Sill Flashing Tape #2 N A NEW CONSTRUCTION INSTALLATION WITH NAIL SFINT Water OVER Resistant WATER Sheathing RESISTANT SHEATHING SI RE Framing ER RI R R R IE E A R I B R RR T A A N B B A R T T ST IE N N SI R Fin TA R A R E R Window Top S IE ST E R A Corner SI R I RI Fin B E R ES R Window Top T Corner R A R A Corner R N Nailing Fin B B E TA T T RI S R Flashing R N R N Nailing Fin R SI IE IE TA E A A E R Tape R S R I ST R B R R R SI IE R I IE T A Corner A E R R S R N B B R R A E R A T T A B R A T R N R Flashing B T B IS IE A E N T N T S R T RI TA R N R A R N E R IS R Tape S IE A E ST E ER R A S A SI R T I I I TA I B E B E R IS R S R IS R T R Top R A S R RE R S R N T B E A A E A A N R Flashing T R B B R B T R TA IE N T T T IS IE S R N R N N R S R SI R Tape TA R TA IE A R A E E R E A S IE S R ST E T I R A R B Side SI R I R I I IS RR B T E R ES A ES R S A T R N Flashing R A R B R R E B N E A B T BA R T A I T T R N T R IS Tape N E A T R N IS R S A I T N IE TA S A E Side T R IS TA R S E B R IS R S S R SI R T R S A E SI A E N E Flashing E B R E B R TA RI R T R R T R S R Sill Flashing Tape #1 Tape N E N E SI A TA RI A I E B S R Sill Flashing Tape #1 ST R R T Sill Flashing Tape #2 SI A I R N Window Bottom E B S BA A R T Sill Flashing Tape #2 RE T N T Window Bottom IS Water Resistant Sheathing A N S T TA E IS Water Resistant Sheathing IS R ES S Framing R RE Framing R IE RR ER A I B RR T A SETTING AND FASTENINGN B A R T ST IE N SI R Fin A R E R Window Top ER PREPAREST THEE OPENING THE WINDOWR A Corner I I RI Fin B R 1 ES R 2 R T Corner R Window Top IE N A R BA Corner R R A Nailing Fin B T R IE T R Flashing T Refer to the nail finN installation preparation A. Insert the windowA intoR the openingIS E on the sill spacers. Center the window N R A Nailing Fin 2" B R S I TA R IE T T A E RR Tape S IE R IS ER N B R I R section atR the beginningS I of this booklet. between jambs.A T BA Corner ES R A E R T NER R A B R R IS A I T B T A 1C1E S T R ER N R Flashing T N B E IS R I TA IE N A. InspectA the jointsT of the water resistant R S A R S R Tape R A T R N R E B R SI R IE T IS IE A IE 6" R T A E A 2B2E R IS ER S R ST R R N B R B Top R S I sheathing.E R JointsI mustR be sealed according to 2B E TA T T A E R R A S A RI S N R N R B R R B RE B R I A IE R A E FlashingT A the sheathingT manufacturer’sT instructions. Pella A ES ST R E T I N B N N B R I R I IS RR Tape A T A A ER 1/2" ES A R S A T R N R T R T I 1/2" T B R E Side IS IE A E CorporationIS IE assumesS noR responsibility for the N R T A R B S R T RI S R SI R A R B T E R IS R E R E A T E N T R R N Flashing R A S A R A R B IS I TA N IE IE A B E B design,B quality or durabilityT of the sheathing S R S A R R ST T R T R N E R I T R R I Tape T N E A R A ES IS A A S N N R A I T 1D1F B R S B B E2E Side TA R TA IE systemT orR its joints.IS Taped joints intersecting T E T T R2B IS IE S R IS R S N R N N R R S R SI R S BA E A R A A E IE Flashing E R E A withE the bottomR or sides of the opening ST E T T RI R Sill Flashing Tape #1 R A R B R T R I I IS IS R R Tape B T N E ES R S S A A T R N TA RI B.R Drive Rtwo fasteners,E E B one B N E A mustS haveR tape installed before beginning 1" A R R T T Sill Flashing Tape #2 A I T I A B N Window Bottom T R IS ES B nearT eachR end of theN A top IS R S R N IE TA T S A E installation.T Window Bottom A R S IS Water Resistant Sheathing E B R N ST R I S R T R TA nailingI A fin. (SeeES theE nail fin N E S ES B R R TA RI B. Cut S2I pieces of flashing tape 12" longer than R T S R E 1E1G anchorN instructionsER Framing at the end of this booklet.) SI A R TA I E B S RR R T opening width. I A N ES B A C. RPlumbT and square the T N Interior Interior View IS C. Apply sill flashing tape #1 at the sill extending A ES windowST using shims at the 1” R 2" to the exterior and 6" up each jamb. SI locationsRE shown. Adjust D. Cut 1" wide tabs at each corner by tearing the R 2C 2C shims to plumb and squareIE RR foil 1/2" each way fromER corner. the window. Keep shimsA 1/2" I B RR T A N E. Apply sill flashing B tape #2 overlapping tape #1 short of window frameA depth.R Mid T ST IE N SI R by 1" minimum.A R E R ST E NOTE: DO NOTR shimA above I RI B ES R T R A the window.R AdditionalN B E TA T RI S R F. Cut 2 piecesR ofN flashing tape. Make one shims areR requiredSI at screwIE IE TA A E RR R IS ER B R A For windows over 53” tall. equalR to theS height Iof each side of the locationsT for large units B and A E RR N T 1” B R A TA R N R opening.T B combinations.IS IE SeeA the anchorIE N T S R ST R TA R N R E R I R Interior S IE A E scheduleR A at the endS of Athis G. SApplyI Rone pieceT on eachI jamb starting 1" B RE B E R IS RR T T R A ES A booklet.N N R B R B 1" TA R TA IE fromT the exterior ofT the framing, over the IS IE S R 2C N N R 1G1G S R SI R TA R TA IE E R E A edgeS ofIE the sheathingS R and onto the surface D. CheckR theA windowR placement B SI R I R B T E R ES A T R N R of theA sheathing.R B N IE A 2D B T by measuringA R from theST interior T R N ST R SI E A I A 1 INCHES N I T S E mm A R surfaceE of Bthe windowR frame or 2 0 3 0 2 IMPORTANT:T UseIS a roller to firmly press all T 4 0 3 S R S R R 5 0 6 0 I A E N E 7 0 ES B R TA I RflashingT tape down until the texture of the jamb extensionS RR to the interior N ER SI A TA I E B sheathingS RR can be seen through the tape. surfaceR of Tthe wall for consistency. I A N ES B A R T If the dimensionsT are not equal, N IS A ES ST confirmR the fins are folded fully to 90º SI H. InstallRE and level sill shims. Place 1" wide x 1/4" (if applicable). to 3/8" thick shims 1/2" from each side. Keep E. Drive two fasteners one near each end of the sill nailing fin. shims back 1/2" from interior face of window. Place additional shims under each mullion and F. Check window operation. sliding window interlocker. Vent awning and casement: See lock lever and crank handle instructions For vinyl windows, add shims so maximum at the end of this instruction. Lift the lock lever and turn the crank handle spacing is 18". to open the window. Remove the shipping spacers. Open and close the 1H I. Attach shims to prevent movement after they window to test for proper operation. are level. Double Hung: Cut the checkrail bands (if applicable) and remove NOTE: Improper placement of shims may shipping spacers. Open, close and tilt the sashes to test for proper result in bowing the bottom of the window. operation. Check for equal sash to frame reveal from top to bottom. NOTE: Adjust shims to correct any issues with plumb. G. Close and lock the window. H. Finish driving fasteners into the nailing fin. Refer to the nail fin anchor instructions at the end of this booklet. NF-9 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet R IE R RR IE R BA R T BA N T TA R N IS IE A S R RR ST E IE I R R BA ES R T R A N R B A IE T T R R R N IS E E R A S RI I A ST E R R RR B I R IE A T ES R B BA N R R T T TA R A N R N S IE B A E A SI R T T I T E R R N IS R RR IS R IE A A S E S R B T E RI A E R T IS R R B R A N S A T B E B N R T TA R R T TA IE N S IE S R A SI R N I R R T E R R TA ES IE A IS R IE A S R R B S R B SI R T E R T RE A N R A N IER B A B A R T ST T ST R R N I N I IE A TA ES TA ES R B IS R IS R R T R S S BA N E E E T TA I R R S R RR Sill Flashing Tape #1 N I IE TA S R BA S RE R SillSill Flashing Flashing Tape Tape #1 #2 I A T ES B N R T TA Sill Flashing Tape #2 N IS Water Resistant Sheathing TA ES IS R Water Resistant Sheathing S Framing RE ER Framing RI R R R IE IE A R RR B ER R T I A BA N R B T TA R R T N S IE BA N A SI R Fin T TA R T E ER R Window Top N IS IE IS R I A Fin Corner A S R Fin S RR B T E ER R Window Top E T Window Top Corner IS R I A Fin Corner RR BA N Nailing Fin Corner S R B IE T TA Flashing E R T Window Top R N S R Corner RR BA N Nailing Fin Corner R R A SI IE Nailing Fin IE T TA IE A T E R R FlashingTape R N S R R B IS R E R R R A SI IE Nailing Fin R T S I A Corner IE A T E R A N E RR B Tape R B IS R ER R B A R T R T S I A T T R BA N R CornerFlashing A N E R B N IS IE A IE B A R R T A S R T ST R Tape T T R A N R T E ER R N I R R Flashing N IS IE B A IE IS R I A TA ES IE A A S R T ST R ES RR B IS R R B TapeTop T E ER R N I R R R A T S R T IS R I A TA S IE A B N E A N R S R B S E R B A R R B A E Top Flashing E R T I R R T T ST E T T I R A N ES A N N I I N IS R RR Tape B A R B A ER TA S R R A S IE Flashing T T R T T I S E E R T E R BA Side N IS IE N IS R I R I A IS R R Tape A S R A S ER R S R B S T T E R R T E I A E R T RE BA N Side Flashing IS R IE A IS R R B R A N IER A S R B S R T B A R T ST E R T RE A N T T R R N I FlashingTape R A N ER B A N IS IE A A S B I T T A S R B ST E Side T TA R R N IS T E R I R Tape N S E R A S IS R A T R S A SI I A T E S B N E E Side Flashing T E R B IS R E T TA RI R IS R R T R S R N S R R Sill Flashing Tape #1 Tape S BA N E E A SI IE A Flashing E T TA I R T E R B Sill Flashing Tape #1 R S R RR IS R R T Sill Flashing Tape #2 Tape N I IE A S A N Window Bottom TA ES R B E B A IS R R T R T T Sill Flashing Tape #2 Window Bottom S A N Window Bottom N IS Water Resistant Sheathing E B A TA S R T T Window Bottom S RE Water Resistant Sheathing N IS SI TA S E Framing S RE R SI Framing RE NEW CONSTRUCTION INSTALLATION WITH NAIL FIN OVER WATER RESISTANT

SHEATHING (CONTINUED) R IE R RR ER IE A I R B R RR R T IE A BA N R B T TA R R T N S IE A N SI R B A R TA E R R T ST E IS R IE A N I RI S R B TA ES R R E R T IS R IE A RR A N S R B E B A E R T I T ST R R A N R RR N I IE R B A IE TA ES R IE T T R R BA S R R R R N IS E R SI IE A ER R A S I A T E R B I A T E R RR B N R R T R B IS R IE A T TA R A N R R T S R B N IS IE B A E A N E R T A S R T T I B A R A T E R R N IS R RR T T ER B N R IS R IE A A S IE N IS I T TA IE S R B T E R BA A S R R N S R E R T IS R R ST E E R SI ER R R A N S A T I R I A TA E I A B E B N R S R B S R R B T TA R R T TA IE E R T SI R T N S IE S R R A N E A N R A SI R N I R R B A R B A E T E R R TA ES IE A T T ER T T I IS R IE A S R R B N IS I N IS R R S R B SI R T A S R R A S E R E R T E A N ST E E R T E I A R A ERR B A I R I A IS R RR B B N I T T S R B S T T TA R R N IS E R T RE BA N N S E R A S R A N IER A A SI I A T E B A R T ST T E R B IS R T ST R R N I IS R R T R S N I IE A TA ES S BA N E E TA ES R B IS R E T TA RI R IS R R T R S R N IS R R S BA N E E A S IE A E T TA I R T E R B R S R RR IS R R T N I IE A S A N TA ES R B E B A IS R R T R T T S A N N IS E B A TA S R T T S RE N IS SI TA S E S RE R SI RE

3 SEALING TO THE SHEATHING NOTE: Apply flashing tape 1/2" C. Apply top flashing tape. onto frame cladding with fold-up or slide-in fins. Pre-fold flashing tape Flashing Rectangular Units: Cut one piece of at 1/2" to assist with application. Tape flashing tape to extend 1" past both side For siding less than 1/2" thick, flashing tapes. 3C3B adjust the placement of the tape to allow the exterior sealant to cover the tape edge. 3C3B Curved Top Units: Using several short pieces, start taping from the sides of the 1" window working towards the peak. Cut Curved and angle top units without pre-applied fin corners: each piece short enough so each piece overlaps the previous piece. Tighter A. Cut four 1-1/2" long pieces of 3A3A curved frames will require shorter pieces of tape. flashing tape. Apply one to each end of sill 3C3B 1st finto extend it 1-1/2" past each jamb. Apply one to the bottom end of each jamb fin beginning 1-1/2" 3A3A from the end of the fin and 2nd lapping over the first piece of NOTE: DO NOT tape over bottom nailing fin. flashing tape. D. Apply a second layer of sheathing manufacturer’s joint sealant tape. Cut one piece so it will extend 1" past the first layer of flashing tape on each side. Overlap the first layer of tape by 1" to create a water shed effect. B. Apply straight side flashing tape.Cut two pieces E. Apply sheathing manufacturer’s joint sealant tape to any joints of flashing tape 4" taller than straight sides. Apply intersecting with the top of the opening, overlapping the head sealant tape over the fin and onto weather resistive barrier. tape in accordance with the manufacturer’s instructions. Extend tape 2" above and below straight sides. 3B Angle top Units: On the short side, do not allow 3B the side tape to extend higher than what the top tape will cover. 3D 3E

IMPORTANT: Use a roller to firmly press all flashing tape down until the texture of the sheathing can be seen through the tape. F. Install interior sealant. Refer to the interior sealant instructions at the end of this booklet. G. Install head flashing, properly incorporating it with the siding and sheathing according to applicable code requirements. H. Install exterior sealant. (After wall cladding is installed) Refer to the exterior sealant instructions at the end of this booklet. NF-10 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet Surface-applied support blocking Wall Flashing option: Weather barrier over or under insulation (shown under). Exterior Perimeter Sealant

Interior Perimeter Sealant

TH I ER W I TH R N RR I E O A W I I B RR T T N A LA N IO B U A T T S T H LA N IN IS T R U A H S I E S T T R E W RI N IS I E R N R I S W RI Support Bracket O A E N R I B R O A T T I B LA N AT T H U A L N IT R Sheet WeatherS T Barrier U A W E N IS S T RI I S IN IS N R RE S IO A RE T B LA T H Rough opening U N IT R S TA IE support blocking IN S WR SI N R E IOBA option: R T T Self-Adhered Membrane Flashing LA N U A Weather barrier over S ST INSI or under insulation RE (shown under). H H T R IT R I IE IE W R W R Incidental Moisture Drainage PathN R N R O A IO A I B T B HSill Flashing Tape #1 AT T A T T L N L N I ER U A U A Sill W IFlashing Tape #2 S ST S ST N R NEW CONSTRUCTION INSTALLATION WITH NAILIN I FININ I OVERR 1-1/2"–2" THICK CONTINUOUS S WaterES ResistantIO A Insulation RE R T B LA T Sheathing U N S TA EXTERIOR INSULATION USING ROUGH OPENING SUPPORTN S BRACKETS (PATENT PENDING) Framing I SI RE Contact Pella Corporation or your local Pella retailer for additional information regarding this installation accessory. TH I ER H W I H T R R IT ER I E N R I W I H R IO A W R N R IT E T B N R R W I A T O A IO BA R L N TI B T N R U A A T Package # 05CB A T IO A S ST H L N L N T B IN I T R U A H SU A A T S I IE S T IT R ST H L N E W R N IS IE IN I IT R U A H Fin R N R I S W R Support Bracket ES IE S ST IT R Window Top A E N R 2" Pella Insulation R W R IN I IE Corner IO B R O A N R S W R T T I B O A RE N R LA N T T H support Bracket Interior PerimeterI B Seal O A Nailing Fin U A LA N IT T T I B S T U ER LA N AT T H N IS S TA W I U A L N IT R I S N IS N R S T U A W E E I S O R N IS S T RI R E I A I S IN IS N R R T B # 51GH E S O A LA T H Shim to Plumb, Level,R & Square E TI B U N IT R R A T S TA IE L N H IN S WR U A IT R SI N R S T W IE E O A IN IS R Pella Insulation R TI B Incidental Moisture Exit Point S N R A T E IOBA support bracket L N R T T SU TA LA N S U A option: INSI S T E Pella Support Bracket IN IS Weather barrier over R ES R insulation. H H T R IT R # 51GG I IE IE H H W R W R IT R IT ER N R N R IE W I O A O A W R R I B TI B Sill Flashing Tape #1 N R N R T T A T TH O A IO A LA N L N I R I B T B H U A U A W IE AT T A T T S T S T Sill R Flashing Tape #2 L N L N I ER N IS IN IS N R 1 1/2" Pella Insulation U A U A W I I S WaterS ResistantIO A Insulation S ST S ST N R E E T B IN I IN I R Window Bottom R R A T support Bracket S ES IO A Sheathing L N RE R T B SU A LA T ST U N Framing IN I S TA ES N S R I SI RE SETTING AND FASTENING H H IT R IT R IE H E W R T R W RI TH R N PREPARER I IE THE OPENING NTHER WINDOWI E O A W R O A W I 1I B R 2I B RR T N T N A T O A A T O A L N TI B L N TI B SU A A T U A A T ST H L N A. S SInsertT H the windowL N into the opening on the sill spacers. Center the IN I IT R U A H Fin IN I IT R U A H ReferES toI Ethe nailS ST finIT installationR Window Toppreparation section at ES IE S ST IT R R W R IN I IE Corner R W R IN I IE N R ES W R windowN R betweenS W R jambs. the beginningO A R of thisN R booklet. O A RE N R TI B O A Nailing Fin I B O A A T TI B AT T TI B L N A T TH L N A T TH 2B2E U TA L N I R 1C U TA L N I R A.S InspectS the jointsU A of W theIE water resistant exterior insulation. 1C S S U A W IE IN I S ST R IN I S ST R ES IN I N R ES IN I N R R The insulationES mustIO A be fastened and sealed according R S IO A R T B RE T B to the insulationLA manufacturer’sT H instructions. Pella LA T H U N IT R 2B U N T R S A IE S A I E Corporation assumesN T W noR responsibility for the design, N T WRI I IS N R I IS N R ES O A ES O A quality or durabilityR I ofB the exterior insulation system or its R I B AT T T T joints. L N 1B1B LA N SU TA SU TA 2B2E IN IS IN IS Taped joints intersectingES with the bottom or sides of ES the opening mustR have tape installed before beginning R H H H H window installation.T R IT R T R IT R I IE IE I IE IE W R W R W R W R N R N R N R N R B. Insert theO A RoughIO A Opening Support Brackets by pressing O A IO A TI B T B H I B T B H A T A T T AT T A T T the supportL N LbracketN IintoER the edge of the insulation panel. B. DriveL N two Lfasteners,N I ER one near each end of the top nailing fin. (Longer U TA SU TA W I U TA U TA W I InsureS S that theS bracketN RR is tight against the wall system’s S S S S N R IN I IN SI O Window Bottom IN I IN I R ES E I BA fastenersS E Srequired,IO A see the nail fin anchor instructions at the end H of this R R T RE R T B R T I sheathing or roughLA T opening framing. Support brackets LA T H E I U N booklet.) U N T R R W S TA S TA Interior I IE Interior ViewR N N S N S W R A O are requiredI Iat each shim location: I I N R B I ES 1D1D S 1” A T T A R RE IO B N L C. Plumb and square the T T A U • • Sill: 1/2" from each bottom corner. LA N H T S U A H T R S I N I 2" window using shims at the S T IT R I IE S • • Jambs: Refer to Step 2C. 2C N IS IE 2C W R E H I S W R N R R T R E N R A PlaceI additionalE support brackets at each mullion or locations shown. Adjust R O A IO B W I H I B T T R IT ER 1F T T A N interlocker.N R I 1F LA L IO A W R shims to plumb and square N HSU TA T B N R 6" SU TA IT R S R ReferA T to the anchorO A schedule at the end of the booklet for N S INE SI E L N TI B MidI SI W I E I U A A T the window. Keep shims E RRR R S allST additionalH LshimN and support bracket locations that are R ONA R IN I T R U A H TI B A S I IE S T IT R 1/2" A B H E required W R forN IlargerS windowsE and combinations. 1/2" 1/2" short of window frame L T T IT R R N R I S W RI U N H N IE A E N R S TA IT R A WR IO B R A N S IE ST N R ForT T vinyl windows,IO B add support brackets so maximum depth. I I WR I O A A N T T H ES N R S I B L A T 1G R A RE T T UspacingTA is 18"L alongN I theR sill. 1G IOB LAN S S SU TA W IE T T U IN SI S R NOTE: DO NOT shim above A S TA E NOTE: No supportIN I N bracketsR are required above L ForN windows overN 53”S tall. R ES IO A 1” SU TA I SI R T B the window. Additional N IS E the window. LA T H 1" I S R U N IT R E H W S TA IE R IT R H R IN S WR shims are required at screw IE InteriorT R IONA C. Fasten the supportSI bracketN R to the rough opening framing. W R I E T B E O A N R WRI A T R TI B locations for large units and combinations. See the O A N R L N • • For wood Aframing,T use either two roofing nails or TI B O A U A L N 1H1H A T I B S T U A LH N AT T IN IS two #6 or #8S SscrewsT with minimum 1-1/2" embedment. anchor schedule at the end of this booklet. UR T AI L N S IN I S SE I T W U A 2CE ES IN I R S T R Stagger theR fasteners. ES R N N IS R A O I I S D. Check the window placement B RET • • For light gaugeH steel framing, use one #10 or two #8 T A L THR T R N U I E I E A T S self-drillingW I /W tappingI screws. by measuring from the interior S N R RR 2D I I N R NA S E • • IO BAFor concreteIO B or masonry, use one 3/16" masonry R T T T T H surface of the window frame A A T 1 INCHES L N L N I R mm UscrewA withU A 1-1/4"W I Eminimum embedment. H 2 0 3 0 2 S T S T R T R 4 0 5 0 3 S S N R or jambI extension to the 6 0 7 0 IN I IN SI O W IE H D. CutES 6" piecesE of flashingI BA tape and apply tape over each H R IT R R R T T 1" R T I R IE LA H E I W interiorIONA surface W ofR the wall for support bracket,U N covering each bracket completely. IT R R 1K1K T B N R S TA IE R N A T O A N IS W R A O I L N I B E. Cut 2 pieces IofS flashing tape 12" longer than the opening N R B T Uconsistency.A A TIfT the dimensions E O A T A S ST H L N R TI B N L IN I IT R U A H width. A T A U ES IE S ST IT R L N H T S S R are WnotR equal,IN I confirmIE the fins are U A H IT R I N I N R ES W R S ST 2"IT R IE S E O A R N R F. Apply sill flashing tape #1 at the sill extending 2" to the IN I IE W R 1J R foldedI B fully to O90ºA (if applicable). S W R N R T T TI B RE N R O A LA N A T H exterior and 6" up each jamb. O A TI B U A L N IT R TI B A T S T U A W E A T L N E.N ISDrive two fastenersS T RI one near each end of the sill nailing fin. L N H U A I S IN IS N R G. Cut 1" wide tabs at each corner by tearing the foil 1/2" U A T S T E S O A S T I NR IS R R E TI B each way from corner. IN IS W IIE S IE R A T S R E R F. Check windowL N operation.H E R R R U A IT R R IONA A S T W IE H. Apply sill flashing tape #2 overlapping tape #1 by 1" T B B H IN IS R LA T T IT R Vent awningS and casement:N R See lock lever and crank handle instructions U N H N IE E IOBA minimum. S TA IT R TA WR R T T IN S IE S N R LA N SI WR SI O A at the end of thisU A instruction. Lift the lock lever and turn the crank handle I. Cut 4 pieces of flashing tape equal to the height of the E N R E TI B S T R O A R A T N IS TI B L N to open the window.I S Remove the shipping spacers. Open and close the opening. A T SUTA RE L N N S SU TA I SI J. Apply one piece on each jamb extending 2" onto the N IS E window to test for proper operation. I S R H TH R E H W IT ER I E surface of the insulating panel. R IT R H R W I W RI IE T R 1LONA R R W R I E TI B Double RHung:NA Cut the checkrail bands (if applicable) and remove N R W I A IONBA IO B K. Apply a second piece on each jamb overlapping the first O A R L T T T T H I B N R U N A T A IT R T T IOBA S TA shippingL N spacers.L N Open,E close and tilt the sashes to test for proper piece by 1". Press tape down firmly. LH A N T N S U TA SU TA W I UR T AI A T I I S S S N RR S E T L N ES IN I IN SI N ISI W U A R operation.ES E CheckIO A for equal sash to frame reveal from top to bottom. L. Install and level sill shims. Place 1" wide x 1/4" to 3/8" I S R N S ST R R T B E R IN I LA T R A O I ES U N thick shims onto each rough opening support bracket B RT NOTE: AdjustS T Ashims to correct any issues with plumb, T A L N S N U I SI on the sill. Keep shims back 1/2" from interior face of the A T S E S N R window. I S I G. Close and lock the window. E R M. Use flashing tape to attach shims to prevent movement after they are level. TH H. Finish driving fasteners into the nailing fin. Do not over-drive fasteners. NOTE:I E RImproper placement of shims may result in bowing the bottom of W I TH R RR I E Refer to the nail fin anchor instructions at the end of this booklet. theON window.A W I I B RR T T N A LA N IO B U A T T S T H LA N Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet NF-11IN IS T R U A H S I E S T T R E W RI N IS I E R N R I S W RI O A E N R I B R O A T T I B LA N AT T H U A L N IT R S T U A W E N IS S T RI I S IN IS N R RE S IO A RE T B LA T H U N IT R S TA IE IN S WR SI N R E IOBA R T T LA N U A S ST INSI RE H THR T R I E I IE W RI W R R N R ONA IO A I B T B H AT T A T T L N L N I ER U A U A W I S ST S ST N R IN I IN I R S ES IO A RE R T B LA T U N S TA N S I SI RE TH I ER W I TH R N RR I E O A W I I B RR T T N A LA N IO B U A T T S T H LA N IN IS T R U A H S I E S T T R E W RI N IS I E R N R I S W RI Support Bracket O A E N R I B R O A T T I B LA N AT T H U A L N IT R S T U A W E N IS S T RI I S IN IS N R RE S IO A RE T B LA T H U N IT R S TA IE IN S WR SI N R E IOBA R T T LA N U A S ST INSI RE H H T R IT R I IE IE W R W R N R N R O A IO A I B T B HSill Flashing Tape #1 AT T A T T L N L N I ER U A U A Sill W IFlashing Tape #2 S ST S ST N R IN I IN I R S WaterES ResistantIO A Insulation RE R T B LA T Sheathing U N S TA N S Framing I SI RE

TH I ER W I TH R N RR I E O A W I I B RR T T N A LA N IO B U A T T S T H LA N IN IS T R U A H Fin S I E S T T R E W RI N IS I E Window Top R N R I S W RI Corner O A E N R I B R O A T T I B Nailing Fin LA N AT T H U A L N IT R S T U A W E N IS S T RI I S IN IS N R RE S IO A RE T B LA T H U N IT R S TA IE IN S WR SI N R E IOBA R T T LA N U A S ST INSI RE H H T R IT R I IE IE W R W R N R N R O A IO A H TI B T B H IT R A T A T T R IE H L N L N I E W R T R U TA SU TA W I N R I IE S S S N RR O A W R INSI IN SI O A Window Bottom TI B N R E E I B A T O A R R AT T L N I B L N U A T T U A S T H LA N S T IN IS T R U A H N S S I E S T T R I SI E W RI N IS I E E R N R I S W RI Support Bracket R O A E N R I B R O A T T I B LA N AT T H U A L N IT R S ST U A W IE H IN I S ST R IT R ES IN I N R W IE H R S IO A R IT R RE T B N R IE A T H IO A W R L N T R T B N R SU A I E A T O A N T WRI L N TI B I IS N R U A A T S A S ST H L N E IOB IN I IT R U A H R T T ES IE S ST IT R LA N R W R IN I IE U N R S W R S TA O A RE N R N IS I B O A I S AT T TI B E L N A T TH R U TA L N I R S S SU TA W IE IN SI N S N R H H E I SI R IT R IT ER R E IO A IE W I R T B W R R LA T H N R N R U N IT R O A IO A S A IE TI B T B HSill Flashing Tape #1 N ST WR A T A T T R I I N R L N L N I E S O A U A U A Sill W IFlashing Tape #2 RE I B S ST S ST N R T T IN I IN I R LA N S WaterES ResistantIO A Insulation U A RE R T B S T LA T N IS Sheathing U N I S S TA E Framing IN IS R ES R H H T R IT R I IE IE W R W R N R N R O A IO A TI B T B H A T A T IT R TH L N L N E I R U TA SU TA W I W IE H S S S N RR R IT R INSI IN SI O A N R IE E E I B H T IO A W R R R AT T R I T B N R L N H E I W A T O A U A IT R R L N TI B S T IE R N U A A T N IS W R A O I S ST H L N I S N R B T IN I IT R U A H Fin E O A T A ES IE S ST IT R Window Top R TI B N L R W R IN I IE Corner A T A U N R ES W R L N H T S S O A R N R U A H IT R I N I I B O A Nailing Fin S ST IT R IE S E T T I B IN I IE W R R LA N AT T H S W R N R U A L N IT R RE N R O A S T U A W E O A I B N IS S T RI TI B T T I S IN IS N R A T LA N E S O A L N U A R E TI B U A THS T R A T S T I NR IS R L N H IN IS W IIE S IE U A IT R S R E R S T W IE E R R R IN IS R R IONA A S N R T B B H E IOBA LA T T IT R R T T U N H N IE A S TA IT R A WR L N N S IE ST N R SU TA I I WR I O A N S ES N R S I B I SI R A RE T T E IOB LAN R T T U A LA N S T U A IN IS H H S T S T R IT R IN IS E I E IE S R W W RI W R E H R N R R IT R H R NA A IE T R ONA IO B IO B W R I E TI B T T T T H N R W I A A A IT R O A R L T L N L N E I B N R U N U TA SNEWU TA CONSTRUCTION W I INSTALLATION WITH NAIL FIN OVER 1-1/2"–2" THICK CONTINUOUS EXTERIOR INSULATIONT T IO A S T A S S S N RR LH A N T B N S IN I IN SI O Window Bottom R T A A T I I ES E I BA SUE TI L N ES R R USINGT ROUGH OPENING SUPPORT BRACKETS (PATENT PENDING) (CONTINUED) N ISI W U A R LA T I S R N S ST U N E R IN I S TA R A O I S N S B RET I SI T A L E N U R A T S S N I S I E R H IT R H IE H IT R W R T R IE H N R I IE W R T R O A W R R I IE TI B N R ONA W R A T A TI B N R L N IO B A T A U A T T L N IO B S T H LA N U A T T IN IS T R U A H S T H LA N S I E S T T R IN IS T R U A H E W RI N IS I E S I E S T T R R R I S W I E W I N IS I E N E R R RR I S W I IO BA R N R N E R T IO A IO BA R N R A T T B H T IO A L N A T T A T T B H U TA L N I R L N A T T S S SU TA W IE U TA L N I R IN SI S N R S S SU TA W IE E IN I R IN SI S R R ES IO A E IN I N R R T B R ES IO A LA T H R T B U N IT R LA T H S A IE U N IT R N ST WR S A IE I I N R N ST WR S O A I I N R RE I B S O A T T RE I B LA N T T U A LA N S T U A IN IS S T S IN IS RE S RE H H T R T R H H I E I IE T R T R W RI W R I E I IE R N R W RI W R NA A R N R IO B IO B A A T T T T H IONB IO B A A N IT R T T T T H L N L E A A N IT R U TA SU TA WRI L N L E S S S N R U TA SU TA WRI INSI IN SI O A S S S N R E E I B H INSI IN SI O A R R T T R T I E E I B LA H E I W R R T U N IT R R LA T S TA IE R N U N N S W R A O S TA I I N R B I N S S A T T A I I RE IO B N L S T T A U RE LA N H T S U A H T R S I N I S T T R I E S N S I E W RI E I SI W I N R R E N RR A R A IO B IO B T T T T A N SEALING TO THE INSULATION LA L A U N HSU T 3 S TA ITNR IS R N IS W IE S E I S RI E I E R R RR R IONA A C. Apply top flashing tape. NOTE: Apply flashing tape 1/2" T B B H LA T T IT R U N H N IE onto frame cladding with fold-up or S TA IT R A WR N S IE ST N R I I WR I O A ES N R S I B Rectangular Units: Cut one piece of slide-in fins. Pre-fold flashing tape R A RE T T Flashing IOB LAN T T U A at 1/2" to assist with application. Tape LA N S T flashing tape to extend 1" past both side U A IN IS S ST ES For siding less than 1/2" thick, INSI R flashing tapes. 3C3B E H W R IT R H R IE T R ONA adjust the placement of the tape to W R I E TI B N R WRI A T O A N R L N allow the exterior sealant to cover I B A U A AT T IOB S T LH N T T IN IS UR T AI LAN S the tape edge. S E I T U A E IN IS R W S T R 3C3B ES R N N IS R A O I I S B RET T A L Curved Top Units: Using several short N U A T S S I N I S E pieces, start taping from the sides of the 1" R window working towards the peak. Cut TH I ER W I TH R each piece short enough so each piece RR I E ONA W I I B RR T T N A overlaps the previous piece. Tighter LA N IO B CurvedU A and angleT T top units without pre-applied fin corners: S T H LA N curved frames will require shorter pieces of tape. IN IS T R U A H S I E S T T R E W RI N IS I E R N R I S W RI O A E N R I B R O A T T I B 3A 3C3B LA N AT T H 3A A. U CutA four 1-1/2"L N longIT R pieces of S T U A W E N IS S T RI I S IN IS N R RE flashing tape.S IO A RE T B LA T H st U N IT R 1 Apply one toS TeachA endIE of sill IN S WR SI N R finto extendE it 1-1/2"IOBA past each R T T LA N U A jamb. S ST INSI Apply one toR Ethe bottom end 3A3A H NOTE: DO NOT tape over bottom nailing fin. THR T R of each IjambE finI IE beginning W RI W R R N R 2nd 1-1/2"ON fromA ItheO A end of the fin D. Apply a second layer of insulation manufacturer’s joint sealant tape. Cut I B T B H AT T A T T L N L N I ER andU AlappingU A over W theI first piece one piece so it will extend 1" past the first layer of flashing tape on each S ST S ST N R IN I IN I R S ES IO A ofRE flashingR tape.T B side. Overlap the first layer of tape by 1" to create a water shed effect. LA T U N S TA IN IS E. Apply insulation manufacturer’s joint sealant tape to any joints ES R intersecting with the top of the opening, overlapping the head sealant tape in accordance with the manufacturer’s instructions. B. Apply straight side flashing tape.Cut two pieces of flashing tape 4" taller than straight sides. Apply tape over the fin and onto weather resistive barrier. Extend tape 2" above and below straight sides. 3B 3D 3E Angle top Units: On the short side, do not allow 3B the side tape to extend higher than what the top tape will cover.

IMPORTANT: Use a roller to firmly press all flashing tape. F. Install interior sealant. Refer to the interior sealant instructions at the end of this booklet. G. Install head flashing, properly incorporating it with the siding and sheathing according to applicable code requirements. H. Install exterior sealant. (After wall cladding is installed) Refer to the exterior sealant instructions at the end of this booklet.

NF-12 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet NEW CONSTRUCTION INSTALLATION INTO MASONRY CONSTRUCTION FOR THE INSTALLATION OF NEW NAIL FIN WINDOWS INTO MASONRY OPENINGS WITH WOOD BUCKS

Window Top Fin Corner Nailing Fin

Concrete block Concrete block Window Bottom

SETTING AND FASTENING PREPARE THE OPENING rior THE WINDOW 1 Inte 2 Refer to the nail fin installation preparation section A. Insert the window into the opening on the sill at the beginning of this booklet. spacers. Center the window between jambs. A. Apply water resistant coating. Extend the B. Drive two fasteners, one near each end of the top coating into the opening on all four sides and nailing fin. See the anchor schedule at the end of this booklet for fastener onto the wall surface at least 9". The water rior 2B resistant coating may be a self-adhered sheet te requirements. In 1A membrane (SASM) or a liquid applied flashing. 1A C. Plumb and square the window Ensure continuity between the water resistant using shims at the locations shown. coating in the opening and the rest of the wall Adjust shims to plumb and square surface. SASM’s must be overlapped in a water the window. Keep shims 1/2" short of shed fashion. Apply all water resistant coatings window frame depth. according to the manufacturer’s directions. NOTE: DO NOT shim above the window. Additional NOTE: Allow liquid flashing to dry according to shims are required at screw locations for the manufacturer’s recommendations. large units and combinations. See Interior Interior View 1B 1” B. Apply 2 beads of sealant to the masonry opening 1B the nail fin anchor where the wood buck will be attached. instructions at the 2C NOTE: Ensure the sealant is compatible with the end of this booklet. 2C water resistant coating. r D. Check the window erio Int placement by Mid C. Pre-drill and fasten the treated wood buck to measuring from the the masonry opening using code-approved rior interior surface of Inte fasteners and spacing. the window frame or

D. Apply water resistant coating (optional) jamb extension to the 1” over the wood buck and onto the masonry interior surface of the For windowsInterior over View 53” tall. wall for consistency. opening. If using liquid 1C applied flashing, allow If the dimensions are not it to dry according to equal, confirm the fins 2D InteriorInterior View

1D 1 INCHES are folded fully to 90º (if mm the manufacturer’s 2 0 3 0 2 4 0 5 0 3 recommendations before applicable). 6 0 7 0 2C proceeding. E. Drive two fasteners one near each end of the sill nailing fin. F. Check window operation. E. Install and level sill shims. Place 1" wide x 1/4" Vent awning and casement: See lock lever to 3/8" thick shims 1/2" from each side. Keep 1E and crank handle instructions at the end of shims back 1/2" from interior face of window. this instruction. Lift the lock lever and turn the Place additional shims under each mullion and crank handle to open the window. Remove the sliding window interlocker. shipping spacers. Open and close the window to test for proper operation. For vinyl windows, add shims so maximum spacing is 18". Double Hung: Cut the checkrail bands (if applicable) and remove shipping spacers. Open, close and tilt the sashes to test for proper F. Attach shims to prevent movement after they operation. Check for equal sash to frame reveal from top to bottom. are level. NOTE: Adjust shims to correct any issues with plumb, square, operation NOTE: Improper placement of shims may result or reveal. in bowing the bottom of the window. G. Close and lock the window. H. Finish driving fasteners into the nailing fin. Refer to the nail fin anchor instructions at the end of this booklet. NF-13 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet Flashing Tape Flashing Tape Concrete block Concrete block

Frame Frame head groove head groove

Checkrail Checkrail

Frame Frame sill groove sill groove Flashing Tape Flashing Tape Concrete block Frame Weep valves Concrete block Frame NEW CONSTRUCTION INSTALLATIONjamb groove INTO MASONRY CONSTRUCTION (CONTINUED) jamb groove Weep valves FOR THE INSTALLATION OF NEW NAIL FIN WINDOWS INTOInstallation MASONRY clip OPENINGS WITH WOOD BUCKS Installation clip

Corner Flashing Tape Corner Flashing Tape Top Flashing Tape Top or liquid applied flashing Flashing Tape Side Flashing Tape Side or liquid applied flashing Flashing Tape Side Flashing Tape Side or liquid applied flashing Flashing Tape

Concrete block Concrete block

3 SEALING THE TOP AND SIDE NAILING FINS NOTE: Apply flashing tape or liquid D. Apply top flashing tape. applied flashing 1/2" onto frame Rectangular Units: Cut one piece of cladding with fold-up or slide-in fins. Flashing flashing tape to extend 1" past both side Pre-fold flashing tape at 1/2" to assist Tape flashing tapes. with application. For siding less than 3D3B 1/2" thick, adjust the placement of the tape to allow the exterior sealant to cover the tape edge. 3D3B Curved and angle top units without pre- applied fin corners: 1"

3A A. Cut four 1-1/2" long pieces of flashing tape. Apply one to each end of sill 1st Curved Top Units: Using several short pieces, start fin to extend it 1-1/2" past each taping from the sides of the window working towards jamb. the peak. Cut each piece short enough so each piece overlaps the previous piece. Tighter curved frames B. Apply one to the bottom end of will require shorter pieces of tape. each jamb fin beginning 1-1/2" 3B3A from the end of the fin and lapping over the first piece of 2nd Exterior Exterior flashing tape. If liquid applied flashing was used to prepare the opening, apply it

over the nail fin at jambs and head at this time according to the manufacturer’s instructions. Leave the sill nailing fin uncovered. Skip to step 3E. NOTE: Insert shims under the sill nailing fin to ensure the nail fin does not If the opening was prepared using SASM, seal to the liquid applied flashing. follow steps C-D. C. Apply straight side flashing tape. Cut NOTE: DO NOT tape over bottom nailing fin. two pieces of flashing tape 4" taller than NOTE: Press all flashing tape down firmly. straight sides. Apply tape over the fin and Apply SASM or liquid applied water management system in water- onto liquid applied flashing or SASM. shed fashion with head flashing and in accordance with manufacturer's Extend tape 2" above and below straight recommendations. sides. 3C4A E. Install interior sealant. Refer to the interior sealant instructions at the end Angle top Units: On the short side, do not of this booklet. allow the side tape to extend higher than F. Install head flashing, properly incorporating it with the siding and water what the top tape will cover. management system according to applicable code requirements. G. Install exterior sealant. (After wall cladding is installed) Refer to the exterior sealant instructions at the end of this booklet. NOTE: Frame curved portions of rough opening to support window and wind loads (if applicable).

NF-14 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet Nailing fin

FULL FlashingFRAME tape #1 REPLACEMENT WITH NAIL FIN INSTALLATIONFlashing tape OF #2 NEW NAIL FIN WINDOWS AFTER THE REMOVAL OF EXISTING WINDOWS AND THE SURROUNDING TRIMCheckrail OR SIDING

Nailing fin

Flashing tape #1 Flashing tape #1 Flashing tape #2 Flashing tape #2 Checkrail SETTING AND FASTENING 1 PREPARE THE OPENING 2 THE WINDOW Refer to the existing frame removal instruction A. Insert the window into the opening on the sill and nail fin installation preparation sections at the spacers. Center the window between jambs. beginning of this booklet. 1B 1" 6" 1C B. Drive two fasteners, one near each end of the top A. Repair the wall surface around the opening (if nailing fin. See the nail fin anchor instructions

necessary) by installing new blocking flush with the 1/2" at the end of this booklet for fastener 1/2" surface of the existing sheathing and/or repairing requirements. 2B3B the existing building wrap with flashing tape. 1D1C C. Plumb and square the window B. Cut 2 pieces of flashing tape 12" longer than using shims at the locations shown.

opening width. 1" Adjust shims to plumb and square C. Apply sill flashing tape #1extending far enough the window. Keep shims 1/2" short of onto the wall surface to overlap the building wrap window frame depth. 1" or onto the top edge of the siding and 6" up 1E1D NOTE: DO NOT shim above the window. Additional shims are required at screw locationsFlashing tape #1 each jamb. Interior Interior View 1B Flashing tape #2 1” D. Cut 1" wide tabs at each corner by tearing the1" foil 6" for large units and 1” combinations. See 1/2" each way from corner. the nail fin anchor 1/2" E. Apply sill flashing tape #2overlapping tape #1 1/2"by instructions at the end 1" minimum. of this booklet. 1C 1E Mid Mid If existing building wrap is folded into the opening D. Check the window at the jambs, skip to step 1H. placement by 1" F. Cut 2 pieces of flashing tape. Make one equal to measuring from the 1G3A the height of each side of the opening. interior surface of 1” 1” G. Apply one piece on each jamb starting 1" from 1D the window frame or For windows over 53” tall. the exterior of the framing, over the edge of the jamb extension to the sheathing and onto the surface of the sheathing. interior surface of the wall for Interior NOTE: Press all flashing tape down firmly. consistency. If the dimensions are not equal, H. Install and level sill shims. Place 1" wide 2C confirm the fins are folded 2D x 1/4" to 3/8" thick shims 1/2" from each fully to 90º (if applicable). mm 1 INCHES 1H1E 2 0 3 0 2 side. Keep shims back from interior 4 0 5 0 3 E. Drive two fasteners one near 6 0 7 0 face of window. Place additional shims each end of the sill nailing under each mullion and sliding window fin. interlocker. 3A F. Check window operation. For vinyl windows, add shims so Vent awning and casement: See lock lever maximum spacing is 18". and crank handle instructions at the end of this I. Attach shims to prevent movement instruction. Lift the lock lever and turn the crank after they are level. handle to open the window. Remove the shipping spacers. Open and NOTE: Improper placement of shims may result close the window to test for proper operation. in bowing the bottom of the window. Double Hung: Cut the checkrail bands (if applicable) and remove J. Apply a continuous, 3/8" tall bead of sealant shipping spacers. Open, close and tilt the sashes to test for proper 1J3A 1/2" from the edge of the opening at the sides operation. Check for equal sash to frame reveal from top to bottom. and top only. Do NOT apply sealant at the sill. NOTE: Adjust shims to correct any issues with plumb, square, operation This step may be omitted if there will be at least or reveal. 3" of wall surface between the edge of the 3A window frame and the siding after installation. G. Close and lock the window. H. Finish driving fasteners into the nailing fin. Refer to the nail fin anchor instructions at the end of this booklet.

NF-15 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet Nailing fin

FULL FRAME REPLACEMENT WITH NAIL FIN (CONTINUED) INSTALLATION OF NEW NAIL FIN WINDOWS AFTER THE REMOVAL OF EXISTING WINDOWS AND THE Flashing tape #1 Flashing tape #2 SURROUNDING TRIM OR SIDING Checkrail

Flashing tape #1 Flashing tape #2

3 SEALING THE TOP AND SIDE NAILING FINS NOTE: Apply flashing tape 1/2" onto C. Apply top flashing tape. frame cladding with fold-up or slide-in Rectangular Units: Cut one piece of fins. Pre-fold flashing tape at 1/2" to Flashing flashing tape to extend 1" past both 3C assist with application. For siding less Tape side flashing tapes. 3B than 1/2" thick, adjust the placement of the tape to allow the exterior Curved Top Units: Using several short 1" sealant to cover the tape edge. pieces, start taping from the sides of the window working towards the peak. Cut each piece short enough so each piece overlaps the previous piece. Tighter curved frames will require shorter pieces of tape. Curved and angle top units without pre-applied fin corners: A. Cut four 1-1/2" long pieces of flashing tape. Apply one to each end of sill fin to extend it 1-1/2" past each jamb. Apply one to the bottom end of each jamb fin beginning 1-1/2" from the end of the fin and lapping over the first piece of flashing tape. If there is less than 3" between the window frame and the siding, skip to step 3C.

3A

1st

NOTE: DO NOT tape over bottom nailing fin. NOTE: Press all flashing tape down firmly.

D. Install head flashing if none exists, properly incorporating it with the siding and building wrap according to applicable code requirements. 2nd E. Install blocking for frame expander support or solid trim at this time, if applicable. F. Install interior sealant. Refer to the interior sealant instructions at the end of this booklet. G. Install exterior sealant. Refer to the exterior sealant instructions at the end of this booklet. H. Install frame expander and receptor (if applicable). See separate instructions. B. Apply straight side flashing tape. Cut two pieces of flashing tape 4" taller than straight 3H 3B3B 3H4N 4M sides. Apply tape over the fin and onto weather resistive barrier. Extend tape 2" above and below straight sides. 3G3E

Angle top units: On the short side, do not allow the side tape to extend higher than what the top tape will cover.

NF-16 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet NAIL FIN WINDOW ANCHOR INSTRUCTIONS

Note: Standard performance only. Additional anchoring may be required for performance upgrade, impact-resistant products or to comply with local building code requirements.

PLACE FASTENERS AT THE LOCATIONS INDICATED. 3/8" drill for clearance hole 250 SERIES 5/32" drill Anchor clusters, see table. EVERY E S E EVERY E S E E

E Attachment clip HEAD 7/8" 1/2” 5/32" EVERY S EVERY 3/8” HP Nail Fin Frame S with Frame Filler EXTERIOR 1/2” 1/2" E E J A M Grooves Accessory Single-, Double-Hung Sliding Window XO / OX Sill accessory groove B SelfAdhesive Plastic Spacer

EVERY EVERY Attachment clip E S E E S E

E E Clip Installation for Mullions DOUBLE-HUNG WINDOW SILL SW Vent Track SW Pocket Filler Drill (2) 5/32" holes and install (2) #10 x 1-1/2" screws per clip. EVERY S EVERY S

E Plug Sliding Window XOX E Self-adhesive spacer Pocket Cover Removal Casement HP Frame Filler ENCOMPASS BY PELLA®/THERMASTAR BY PELLA® / PELLA® 150 SERIES / PELLA® 250 SERIES AND PELLA® 350 SERIES WINDOWS

PG Max Frame Max Frame Edge Max. Anchor Type Product Rating Width Height Spacing Intermediate Anchor Cluster (inches) (inches) (E) Spacing(s) Wood * Additional nails at 3" and 6" on both sides of < 50 Any Any Every Other Pre-Punched 2" 11 Ga. Roofing Nail the transition mullion at head and sill. Encompass, ** High Performance DH: (3) #10 x 2" jamb ThermaStar and Pella® frame screws, 4" apart at checkrails. Use (4) 150 Series Windows 50 Any Any Every Pre-Punched Hole #8 x 2" Screw with Washer #10 x 2" screws at head mullion ends and 4 clips at sill mullion ends 3" and 6" from mullion. Windows/CM Every Other Pre-Punched < 50 Any Any 1.5" 11 Ga. Roofing Nail /AW Hole High Performance DH: (3) #8 x 2" jamb frame screws, 4" apart at checkrails. SH/SW/FX 50 Any Any Every Pre-Punched Hole 1.5" 11 Ga. Roofing Nail DH 50 Any Any Every Pre-Punched Hole #10 x 2" Screw with Washer ** 3 jamb frame screws, 4" apart at Checkrails. CM/AW 50 Any Any Every Pre-Punched Hole #10 x 2" Screw with Washer None

250 SERIES Every Other Pre-Punched (6) #8 x 2" screws at head mullion ends Combinations < 35 Any Any #8 x 2" Screw with Washer Hole spaced 2" apart OR (4) #10 x 2" screws in Combinations > 35 Any Any Every Pre-Punched Hole #8 x 2" Screw with Washer each end anchor. 30 40" 63" 6" 8" 1.5" 11 Ga. Roofing Nail None 40 40" 63" 6" 8" 1.5" 11 Ga. Roofing Nail 5 nails, 2" apart at Checkrails SH and DH 5 nails, 2" apart at Checkrails +40/-60 Any Any 6" 8" 1.5" 11 Ga. Roofing Nail and Mullion Ends 30 76" 48" 6" 8" 1.5" 11 Ga. Roofing Nail None 2-Panel 40 76" 62" 6" 8" 1.5" 11 Ga. Roofing Nail 5 nails, 2 inches apart Meeting Stiles Sliding Windows +40/-60 76" 72" 6" 8" #10 x 2" Screw with Washer 3 Screws, 2" apart at Meeting Stiles 30 123" 48" 6" 8" 1.5" 11 Ga. Roofing Nail None 3-Panel 350 SERIES 40 123" 62" 6" 8" 1.5" 11 Ga. Roofing Nail 5 nails, 2" apart at Meeting Stiles Sliding Windows All Other Any Any 6" 8" #10 x 2" Screw with Washer 5 Screws, 2" apart at Meeting Stiles 40 Any Any 6" 8" 1.5" 11 Ga. Roofing Nail None CM/AW/FX 60 Any Any 4" 4" 1.5" 11 Ga. Roofing Nail None FX All Any Any 4" 4" 1.5" 11 Ga. Roofing Nail 5 nails, 2" apart at Mullion Ends Composites IMPORTANT: For installations over continuous exterior insulation, the anchor length must be increased by the thickness of the insulating panels * For light gauge steel framing, use #10 self-drilling modified Refer to the supplemental instruction included with the unit for securing mullion head screws. end anchors (if applicable). ** High Performance Frame Fillers are required at each jamb anchor location. When screws are used in the Nail-Fin, a 1" fender washer is required at each screw NOTE: Do not over-drive fasteners, but allow for movement of anchor location. building materials. NF-17 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet NAIL FIN WINDOW ANCHOR INSTRUCTIONS (CONTINUED)

Note: Standard performance only. Additional anchoring may be required for performance upgrade, impact-resistant products or to comply with local building code requirements. PELLA® IMPERVIA, ARCHITECT SERIES® (850) AND PELLA® LIFESTYLE SERIES NAIL FIN ANCHOR SPACING INSTRUCTIONS Units with Pella EnduraClad exterior trim with narrow fins and no pre-punched holes must be anchored with frame screws or installation clips. The fins are for flashing purposes only. Max Max Anchor Type PG Edge Max. Frame Frame Product Rating Spacing Intermediate Frame Anchors Width Height (E) Spacing (S) Wood * (inches) (inches)

Impervia Windows All Any Any 3" 7" 2" 11 Ga. Roofing Nail None

>50 sq. ft. requires screw through frame or clip anchors in addition to nail fin fasteners. Refer to block frame Impervia Direct Set All Any Any Every pre-punched hole 2" 11 Ga Roofing Nail anchor instructions for further details. (See Illustration below.) 40-50 sq. ft. see note below.

All 73" 73" Every Pre-Punched 2" 11 Ga. Roofing Nail None Architect Series & Lifestyle Series #10 x 3-1/2" Screws at 1/3 Clad Wood CM, AW or FX Windows All >73" >73" Every Pre-Punched Hole 2" 11 Ga. Roofing Nail points along head and jambs Architect Series & Lifestyle Series All Any Any Every Pre-Punched Hole 2" 11 Ga. Roofing Nail None SH or DH Windows

1-1/2" 11 Ga. Roofing Refer to the next page for units larger Monumental DH All <54 <96 Every Pre-Punched Hole Nail than 54 x 96

Clad wood Direct Set

Must be anchored with frame screws Clad Wood Curved Windows with (2) #6 x 1-1/2" screw All Any Any Every Pre-Punched Hole or installation clips. Refer to next page per clip Flexible Fin for anchoring instructions. Clad Wood Curved Windows with All Any Any 6" 12" 2" 11 Ga. Roofing Nail None Rigid Fin

IMPORTANT: For installations over continuous exterior insulation, the anchor length must be increased by the thickness of the insulating panels. * = For light gauge steel framing, use #10 Impervia Direct Set 40-50 Sq. Ft. use #10 x 3" screws Refer to the supplemental instruction included with the self-drilling modified truss head screws. required on longest edge spaced 6" from each end unit for securing mullion end anchors (if applicable). and on center. For integral mullion units, screws Clad wood direct set windows achieve PG50 up to NOTE: Do not over-drive fasteners in vinyl fins, but required 6" from the center of the mull on each side. 60" x 60" with standard anchoring. Larger sizes achieve allow for movement of building materials. PG40. Refer to advanced performance/impact-resistant instructions for other options. EXAMPLE ANCHOR TYPES

Roofing Nail K-Lath/Modified Truss Head Screw

>73" 1/3 1/3 1/3 #10 x 3-1/2" corrosion resistant wood screw 1/3 1/3

>73" 1/3 1/3 Fixed Extruded Fin Drill 1/8" diameter pilot 1/3 1/3 hole through the clearance Drill 1/8" diameter Holes for hole in the frame windows with curved rigid fins Screws not required at the sill.

Add installation clips or frame anchor screws for vent and fixed clad-wood casements over 73".

#6 x 5/8” corrosion resistant screws 6“ from end 16" 16" max Install screws max 16" at groove Lip max 16" max Clip 3/8" Masonry only drill 3/8” pilot hole through interior wall. Direct Set**** 5/32" Install Clips or frame screws for windows with non-structural curved flex fins. ****Use putty knife; insert where indicated and slide cover to interior. NF-18 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet UNITS WITH WIDE PELLA® ENDURACLAD® EXTERIOR TRIM WITH NARROW FINS AND NO PRE-PUNCHED HOLES ANCHOR INSTRUCTIONS AND MONUMENTAL HUNG > 54" X 96"

Note: Standard performance only. Additional anchoring may be required for performance upgrade, impact-resistant products or to comply with local building code requirements.

M2 M2 Units with narrow fins and NO pre-punched holes must be anchored using frame screws or installation clips. EVERY E S S E These fins are for flashing purposes only. M1 M1

Units installed over continuous exterior insulation must be anchored using installation clips E E EVERY E PLACE FRAME SCREWS OR CLIPS AT THE LOCATIONS INDICATED S

E EVERY S M2 M2 EVERY M2 M2 S E S S S E EVERY M1 M1 M1 M1 M2 M2 E S E M1 E M1 M1 M1 E M2 M2

EVERY EVERY EVERY S EVERY S S S

E E E E

ARCHITECT SERIES® (850) AND PELLA® LIFESTYLE SERIES WINDOW ANCHOR SPACING INSTRUCTIONS

Max. First Second Edge Fastener Intermediate Mullion Mullion Product Spacing Special Notes Spacing Anchor Anchor (E) Wood ** (S) (M1) (M2)

Casement / #8 x 3" 6" 16" 3"* 6" Awning Finish Screw Exterior trim with narrow fin

For windows with integrated Rolscreen® retractable screen, drive Double- or #8 x 3" jamb screws at each factory pre-punched hole in the jamb liner. 6" 16" 3"* 6" Single- Hung Finish Screw Add fasteners as necessary, driving the head past flush of the jamb liner. Avoid Rolscreen components in the head and sill.

#8 x 3" 6" 16" 3"* 6" Fixed Frame Finish Screw

Remove sashes and jamb liners. Drive 1 screw though each #6 x 1-1/2" screw jamb liner support clip (top, bottom, checkrail and center of Monumental DH #8 x 3" each sash). Drive 2 additional screws through the frame (or 6" (head) 16" (head) 3" * 6" * #6 x 5/8” corrosion > 54" x 96" Screw secure clips) 3" above and below the checkrail on each jamb. resistant screws Drive additional screws through the frame (or secure clips) 6“ from end centered between each jamb liner support clip. Lip * M1 anchor required if design pressure exceeds 20 psf. ** For light gauge steel framing, use #10 self-drilling/self-tapping screws; For concrete or masonry, use 3/16" masonry screws with 1-1/4" minimum embedment. 1/8" Pilot Hole Locations

Casement/Awning Lifestyle Series Double-Hung Architect Series Double-Hung Monumental-Hung Head Monumental Hung jamb liner support clip

Units with

Jamb Integrated Rolscreen

Pry Here Pry off Monumental Double-Hung jamb liner

Do not install fasteners Not applicable for units with Sill anchors not required. through operator cutout. Integrated Rolscreen Sill

Clad Frame Head/Jamb/Sill

NF-19 Revised 11/30/2020 © 2020 Pella Corporation Nail-Fin_Booklet INTERIOR AND EXTERIOR SEALANT

Interior Sealant Instructions A CAUTION: Use low pressure polyurethane window and door insulating foams. Follow the Interior directions on the can. Do not use high pressure or latex foams. A. Insert the nozzle or straw between the rough opening and window frame from the interior. Use a pliers (if necessary) to compress the end of a straw tube to allow it to fit in tight openings. B. Place a 1" deep bead of foam approximately 1" from the interior of the frame to allow for expansion. DO NOT fill the entire depth of the rough opening cavity. NOTE: Apply foam between the frame and rough opening, NOT between jamb extensions and the rough opening. C. To ensure a continuous interior seal, apply sealant over the interior surface of any shims or clips interrupting the foam seal. Backer rod (as necessary) and sealant can be used in place of the low expansion foam to create the interior seal. However, foam has greater insulating properties. Fiberglass batt or similar insulation is not recommended as it can absorb water and does not act as an air seal. NOTE: Use a low odor, paintable sealant such as Pella Window and Door Installation Sealant. Re-check window operation and remove shipping spacers after foam installation. Excess foam may be removed with a serrated knife after it cures.

Exterior Sealant Instructions CAUTION: Use a high quality, multi-purpose exterior sealant such as Pella Window and Door Installation Sealant. Follow the directions on the cartridge. When applying siding, brick veneer , flashing, or other exterior finish materials, leave adequate space between the window frame and the material for sealant application. A

A. Insert backer rod 3/8" deep in the space around the window. Backer rod adds shape and controls the B depth of the sealant line. B. Apply a continuous bead of sealant to the entire perimeter of the window. Do not block weep holes or weep hoods with sealant. C. Shape, tool and clean excess sealant. When finished, the sealant should be the shape of an hourglass.

NOTE: The siding details below apply to windows without a J-mould as part of the frame. The J-mould frame is only intended for vinyl or metal sidings where the siding is extended behind the J-mould portion of the frame. The J-mould should be removed and replaced with backer rod and sealant with all other siding or trim types.

BRICK VENEER SIDING SIDING WITH TRIM

Backer Rod and Sealant typical Sealant typical Sealant typical 3/8" Clearance 1/8" Clearance 3/8" Clearance Accessory Groove Accessory Groove Accessory Groove Insulating Perimeter Sealant Insulating Foam Insulating Perimeter Sealant must extend to room Foam Foam must extend to room side of Accessory side of Accessory Groove. Groove.

3/8" 1/8" 3/8"

3/8" Min. 3/8" Min.

CONTINUOUS INSULATION CONTINUOUS INSULATION WITH WITH SIDING AND TRIM Sealant typical SIDING AND TRIM AND PELLA ENDURACLAD EXTERIOR TRIM 3/8" Clearance Sealant typical Enduraclad Exterior Trim 3/8" Clearance Accessory Groove Insulating Insulating Perimeter Sealant NF-20 FoamRevised 11/30/2020 © 2020 Pella CorporationFoam must extend to room Nail-Fin_Booklet side of Accessory Groove.