ASSOCIATED CONSTRUCTORS SUPPLEMENTAL ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated June 6, 2011 LYCOMING COUNTY – SR 414(35M) #92834 PROPOSAL:$21.36 PLANS:$5.50 12X18:$6.75 24X36:$97.50 X-SEC:$4.40 12X18:$5.40 24X36:$78.00 EXSTRUCT:$2.42 12X18:$2.97 24X36:$42.90 For the construction os a retaining wall, superpave asphalt mixture design base and wearing courses, guide rail upgrades, drainage, and other miscellaneous construction all as indicated on the approved drawings included in the bid package for STATE ROUTE 414, SECTION 35M in BROWN TOWNSHIP, LYCOMING COUNTY, from approximately 2.1 miles east of the intersection with SR 4009 at Segment 0470 Offset 1818 to approximately 1.7 miles south west of the Lycoming/Tioga County line at Segment 0470 Offset 2991. MBE 0%, WBE 0%, Anticipated Notice to Proceed 7-14-11, Required Completion 11-11-11. ______LYCOMING COUNTY – (53E) #89030 PROPOSAL:$22.56 PLANS:$6.82 12X18:$8.7 24X36:$120.90 Williamsport Healthy Communities -- Pathways to Health Project. Walnut Street between High St and Little League Blvd, City of Williamsport, Lycoming County. DBE 1%, Anticipated Notice to Proceed 8-8-11, Required Completion 6-25-12. ______LUZERNE COUNTY – SR 3007(370) #9210 PROPOSAL:$17.76 PLANS:$9.24 12X18:$11.34 24X36:$163.80 X-SEC:$2.20 12X18:$2.70 24X36:$39.00 For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LUZERNE COUNTY, DORRANCE TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 3007, SECTION 370. The project being situated as follows: From a point approximately 3.11 miles WEST/ NORTHWEST of the intersection with SR 0081 (Dorrance exit) at Segment 0080/0247 (Station 202+00) to a point approximately 3.23 miles WEST/ NORTHWEST of the intersection with SR 0081(Dorrance exit) at Segment 0080/0897 (Station 208+50) along SR 3007. The project involves the replacement of a steel girder bridge with a composite p/s bulb-tee beam bridge over Big Wapwallopen Creek. Maintenance and protection of traffic during project construction shall consist of a detour. Other work includes bituminous pavement, pavement markings, post mounted signs, guide rail and seeding and soil supplements and mulching, all contained within an overall project length of 0.104 mile (550 linear feet) as indicated on the approved drawings included in the bid package. DBE 3%, Anticipated Notice to Proceed 8-29-11,Required Completion 7-17-12. ______ERIE COUNTY – SR 430(244) #92506 PROPOSAL:$24.84 PLANS:$6.82 12X18:$8.37 24X36:$120.90 For the construction of certain section of STATE ROUTE in HARBORCREEK AND GREENFIELD TOWNSHIPS, ERIE COUNTY, Commonwealth of Pennsylvania, SR. 0430 SECTION 244, this project is as follows: From the intersection with State Route 290 at Segment 80 Offset 0 to the intersection with State Route 89 at Segment 230 Offset 0. For the milling and resurfacing of the existing roadway with warm mix superpave asphalt. Also for the construction of an 84" concrete cross pipe, and the complete removal and reconstruction of 500 linear feet of pavement, and miscellaneous guiderail and pavement markings as indicated on the approved drawings. MBE 3%, WBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 9-30-11. ______

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated June 3, 2011 HUNTINGDON COUNTY – SR 3006(MC2) #92529 PROPOSAL:$16.44 PLANS:$1.65 12X18:$1.89 24X36:$27.30 The description and location of the project is as follows: This project is for the resurfacing of approximately 2.479 miles of bituminous roadway and miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 3006, SECTION MC2, in HUNTINGDON COUNTY at the approximate locations: SR 3006 From Segment 0010, Offset 0000 to Segment 0060, Offset 2926. MBE 2%, WBE 4%, Anticipated Notice to Proceed 8-8-11, Required Completion 10-24-11. ______

1 CAMBRIA COUNTY – SR 1035(EHS) #92187 PROPOSAL:$16.32 PLANS:$4.18 12X18:$5.13 24X36:$74.10 X-SEC:$1.32 12X18:$1.62 24X36:$23.40 The description and location of the project is as follows: This project consists of curb and sidewalk replacement along East High Street and Rowena Drive from 1/2 block east of Caroline Street to the Ghost Town Trail and Tanner Street and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 1036, SECTION EHS, in CAMBRIA COUNTY, EBENSBURG BOROUGH at the following locations: STATION 50+25.00 TO STATION 71+00.00 SEGMENT 0040, OFFSET 0412 TO SEGMENT 0050, OFFSET 1885. DBE 2%, Anticipated Notice to Proceed 8-8-11, Required Completion 10-3-11. ______MERCER COUNTY – (STU) #92534 PROPOSAL:$18.8 PLANS:$1.98 12X18:$2.43 24X36:$35.10 For the construction or improvement of a certain section of roadway in MERCER COUNTY, BOROUGH OF SHARPSVILLE, Commonwealth of Pennsylvania, said roadway known as 4th Street. This project is situated as follows: From the intersection with Milliken St at Station 8+47.46 to the intersection with Hazen Road (SR 3016) at Station 37+73.46. For the milling resurfacing of the existing roadway and the construction of curb and sidewalks, all within a project length of 2,897 feet (0.549 mile) as indicated on the approved drawings. DBE 5%, Anticipated Notice to Proceed 8-15-11, Required Completion 10-14-11. ______MCKEAN COUNTY – SR 6(L10) #91486 PROPOSAL:$20.40 PLANS:$12.10 12X18:$14.85 24X36:$214.50 EXSTRUCT:$1.10 12X18:$1.35 24X36:$19.50 The description and location of the project is as follows: For the bridge repairs to various STATE HIGHWAYS, in LIBERTY, KEATING, and FOSTER TOWNSHIPS, PORT ALLEGANY, MCKEAN COUNTY, Commonwealth of Pennsylvania, SR 0006-L10. The 6 bridges are located on various STATE HIGHWAYS; SR 0006, SR 0046, and SR 0346 throughout the county, and involve a total construction length of approximately 706 feet (0.134 miles). Construction includes milling of bituminous pavement; concrete bridge deck repairs; beam spall repairs; hydrodemolition; latex modified wearing surface; bituminous wearing course installation as either a superpave asphalt mixture design or a warm mix asphalt; guide rail installation; pavement markings; temporary traffic signals; and miscellaneous construction as indicated on the approved construction drawings. DBE 1%, Anticipated Notice to Proceed 8-8-11, Required Completion 10-4-12. ______LEBANON COUNTY – SR 3023(004) #20310 PROPOSAL:$20.28 PLANS:$16.50 12X18:$20.25 24X36:$292.50 X-SEC:$1.76 12X18:$2.16 24X36:$31.20 This project consists of the replacement of the SR 3023 bridge structures over the , including minor approach work, guide rail updates, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 3023, SECTION 004, in LEBANON COUNTY, NORTH CORNWALL TOWNSHIP, from Segment 0030 Offset 0000 to Segment 0040 Offset 0031, for an overall project length of 55.01 linear feet (0.010 mile). DBE 6%, Anticipated Notice to Proceed 8-8-11, Required Completion 10-17-12. ______LEHIGH COUNTY – SR 78(AWP) #92278 PROPOSAL:$14.52 The description and location of the project is as follows: This project includes the repair and/or installation of all weather pavement markers (AWPMs) on various state routes in various municipalities within Berks, Carbon, Lehigh, Monroe, Northampton and Schuylkill Counties. DBE 0%, Anticipated Notice to Proceed 8-8-11, Required Completion 7-27-12. ______CHESTER COUNTY – GR. 6-11-GRC #92784 PROPOSAL:$18.36 For the repair and/or replacement of guide rail, median barrier, structure mounted signs and/or their hardware, and Right-Of-Way fence on various State Routes in Chester County. MBE 0%, WBE 0%, Anticipated Notice to Proceed 8-8-11, Required Completion 8-7-14. ______

2 FRANKLIN COUNTY – SR 11(068) #82454 PROPOSAL:$19.08 PLANS:$5.50 12X18:$6.75 24X36:$97.50 The project consists of resurfacing the existing roadway and shoulders, guide rail updates, minor drainage work, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0011, SECTION 068, in FRANKLIN COUNTY, CHAMBERSBURG BOROUGH and GREENE & SOUTH HAMPTON TOWNSHIPS, from South Penn Hall Drive at Segment 0370 Offset 2564 to Dear End Lane at Segment 0490 Offset 0154, a length of 29,439.00 linear feet (5.57 miles). Also included is STATE ROUTE 0997, SECTION 028, IN FRANKLIN COUNTY, GREENE and LETTERKENNY TOWNSHIPS, from the intersection of SR 0011 and SR 0997 at Segment 0480 Offset 0000 to Orrstown Road at Segment 0580 Offset 2063, a length of 27,332.00 linear feet (5.18 miles). Overall project length is 56,771.00 linear feet (10.75 miles). DBE 6%, Anticipated Notice to Proceed 8-8-11, Required Completion 8-3-12. ______ARMSTRONG COUNTY – SR 2008(FBM) #93074 PROPOSAL:$13.08 PLANS:$2.28 The description and location of the project is as follows: For the bituminous resurfacing of SR 2008 and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2008, SECTION FBM, in Armstrong COUNTY Cowanshannock and Kittanning TOWNSHIPS from approximately the SR 2008/Kirkwood Hill Road intersection at segment 100 offset 0000 to approximately the SRE 2008/SR 2005 intersection at segment 150 offset 3193. MBE 1%, WBE 2%, Anticipated Notice to Proceed 8-8-11, Required Completion 9-30-11. ______

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated May 31, 2011 PHILADELPHIA COUNTY – SR 2014(LA1) #57893 PROPOSAL:$52.68 PLANS:$13.32 12X18:$15.12 24X36:$218.40 The description and location of the project is as follows: includes traffic signal replacement at 21 intersections, installation of bumpouts at 17 intersections; replacement of street lights; installation of new signal interconnect; and the construction of ADA curb ramps and other miscellaneous construction, all as indicated on the drawings approved May 11, 2001 for STATE ROUTE 2014, SECTION LA1 in PHILADELPHIA COUNTY from approximately PA 611 (Broad Street) at segment 0040 offset 0806 to approximately Richmond Street at segment 0100 offset 2079 a distance approximately 14,235 feet (2.7 miles). DBE 8%, Anticipated Notice to Proceed 8-26-11, Required Completion 4-30-13. ______VENANGO COUNTY – SR 417(02M) #89182 PROPOSAL:$19.56 PLANS:$14.08 12X18:$17.28 24X36:$249.60 For the construction or improvement of a certain section of STATE HIGHWAY in VENANGO COUNTY, SUGARCREEK BOROUGH, Commonwealth of Pennsylvania, STATE ROUTE 0417, SECTION 02M. This project is situated as follows: From the intersection with SR. 0322 and SR.4006 at Segment 0010 Offset 0059 (Station 1+00.00) then north to approximately 45 feet north of the intersection with Keely Rd. (T-523) at Segment 0100 Offset 0045 (Station 215+40.00). For the bituminous milling and overlay of existing roadway 30' to 46' feet in width with Warm Asphalt (WMA) Designs; also for widening, cold in place recycled bituminous base course, ADA curb ramps, paved shoulders, drainage, guide rail, signs, and pavement markings updates all within a project length of 21,305.00 feet (4.035 miles) as indicated on the approved drawings. DBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 6-22-12. ______CLEARFIELD COUNTY – SR 53(L09) #91485 PROPOSAL:$29.28 PLANS:$15.84 12X18:$19.44 24X36:$280.80 EXSTRUCT:$2.64 12X18:$3.24 24X36:$46.80 The description and location of the project is as follows: For the bridge repairs to certain sections of STATE HIGHWAYS, VARIOUS TOWNSHIPS, CLEARFIELD COUNTY, Commonwealth of Pennsylvania, SR 0153-L09. The 5 bridges are located on various STATE HIGHWAYS throughout the county, and involve a total construction length of approximately 2496 feet (0.472 miles). Construction includes fabricated structural steel repairs; painting of structural steel; concrete bridge deck repairs; hydrodemolition; latex modified wearing surface; intrusion grout bag installation, bituminous base, and wearing course installation as either a superpave asphalt mixture design or a warm mix asphalt; guide rail installation; pavement markings; temporary traffic signals; and miscellaneous construction as indicated on the approved construction drawings. MBE 0%, WBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 10- 17-12. 3 ______PHILADELPHIA COUNTY – GR. ERP(ECG) #90180 PROPOSAL:$46.08 PLANS:$26.18 12X18:$32.13 24X36:$464.10 The description and location of the project is as follows: TIGER Funded project consisting of multi-use trail approximately 1.5 miles in length. The trail traverses north along the west side of 58th street until turning west onto Chester Avenue for a short distance. The trail will then turn north onto 59th Street for several blocks until it intersects with Cobbs Creek Parkway and the existing trail at Cobbs Creek park. City Bid Number: 3724 59TH Street: STA 100+50.32 to STA 116+53.97 Chester Ave: STA 90+50.00 to STA 96+00.00 58th Street: STA 50+27.50 to STA 83+39.50 SR 3021: STA 37+01.39 to STA 40+52.03 SR 3025: STA 11+94.19 to STA 19+33.62. DBE 10%, Anticipated Notice to Proceed 8-25-11, Required Completion 10-19-12. ______WARREN COUNTY – SR 27(B05) #2540 PROPOSAL:$18.72 PLANS:$13.20 12X18:$16.20 24X36:$234.00 X-SEC:$1.98 12X18:$2.43 24X36:$35.10 For the construction of a certain section of STATE HIGHWAY in WARREN COUNTY, PITTSFIELD TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0027 SECTION B05. This project being situated as follows: From approximately 0.2 miles north of the intersection with SR 3008 (Mickle Hill Rd) at Sta 791+00.00 to approximately 0.8 miles south of the intersection with SR 3014 (Kane Rd) at Sta 796+00.00. For construction of a single span prestressed concrete spread box beam bridge with a total span of 56.6 feet; construction of new approach roadways using Superpave Asphalt Mixture Designs; guiderail, delineation, pavement markings, signing and a temporary traffic signals all within a project length of 377.97 feet (0.072 mile) as indicated on the approved drawings. MBE 2%, WBE 4%, Anticiapted Notice to Proceed 8-8-11, Required Completion 9-13-12. ______LACKAWANNA COUNTY – SR 6006(201) #62958 PROPOSAL:$19.68 PLANS:$21.34 12X18:$26.19 24X36:$378.30 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LACKAWANNA COUNTY, CITY OF SCRANTON, Commonwealth of Pennsylvania, STATE ROUTE 6006, SECTION 201. The project being situated as follows: From a point approximately 0.24 mile SOUTHWEST from the intersection with SR 0081 at Segment 0224/0020 (Station 206+50) to the intersection with SR 0081 at Segment 0250/0011 (Station 218+50) along SR 6006 also SR 8033. Limits of Signing: From a point approximately 0.96 mile SOUTHWEST from the intersection with SR 0081 at Segment 0272/0015 to a point approximately 0.35 mile NORTHWEST from the intersection with SR 0081 at Segment 0311/1374 along SR 0011. The project consists of the addition of a concrete barrier to prevent traffic from weaving into adjacent lanes and removal of an on ramp. Other work includes paving with bituminous concrete, manholes, drainage, guiderail work, curb and sidewalk, pavement markings, removal of signs, and traffic signal repairs, all contained within an overall project length of 0.198 miles as indicated on the approved drawings included in the bid package. DBE 5%, Anticipated Notice to Proceed 8-8-11, Required Completion 12-19-11. ______

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated May 26, 2011 INDIANA COUNTY – SR 403(490) #89652 PROPOSAL:$15.48 PLANS:$4.20 The description and location of the project is as follows: Highway restoration to include bituminous patching, resurfacing, and drainage and guiderail upgrade work and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 403, SECTION 490, in Indiana COUNTY East Wheatfield TOWNSHIP from approximately the Indiana County/Cambria County line at segment 0010 offset 0000 to approximately the SR 403/Ramp G/Ramp H (SR 22) intersection at segment 0100 offset 1941. DBE 2%, Anticipated Notice to Proceed 8-8-11, Required Completion 10-7-11. ______

4 POTTER COUNTY – SR 120(ST6) #91493 PROPOSAL:$17.52 PLANS:$4.62 12X18:$5.67 24X36:$81.90 The description and location of the project is as follows: For the improvements of certain sections of STATE HIGHWAYS in POTTER and CAMERON COUNTIES, VARIOUS TOWNSHIPS and BOROUGHS, Commonwealth of Pennsylvania, Group 2-11-ST6 For the improvements to 11 State Routes having a combined construction length of approximately 515,450 feet (97.6 miles), involving various combinations of milling, scratch and resurfacing, using various Superpave Asphalt Mixture Designs for binder and wearing courses, bituminous seal coat, Full Depth Reclamation, pavement markings, and miscellaneous construction as indicated on the approved construction drawings. MBE 0%, WBE -0%, Anticipated Notice to Proceed 8-8-11, Required Completion 11-10-11. ______

POTTER COUNTY – SR 6(L11) #91487 PROPOSAL:$26.40 PLANS;$15.18 12X18:$18.63 24X36:$269.10 EXSTRUCT:$5.28 12X18:$6.48 24X36:$93.60 The description and location of the project is as follows: For the bridge repairs to certain sections of STATE HIGHWAYS, VARIOUS TOWNSHIPS and BOROUGH, POTTER COUNTY, Commonwealth of Pennsylvania, GROUP 2-11-L11. The 6 bridges are located on various STATE HIGHWAYS throughout the county, and involve a total construction length of approximately 1527 feet (0.289 miles). Construction includes painting of structural steel; milling of bituminous pavement; concrete bridge deck repairs; hydrodemolition; latex modified wearing surface; bituminous wearing course installation as either a superpave asphalt mixture design or a warm mix asphalt; guide rail installation; pavement markings; temporary traffic signals; and miscellaneous construction as indicated on the approved construction drawings. DBE 2%, Anticipated Notice to Proceed 8-8-11, Required Completion 8-22-12. ______BERKS COUNTY – SR 1022(POC) #85242 PROPOSAL:$14.04 PLANS:$1.56 The description and location of the project is as follows: Surface improvements includes milling, paving, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE HIGHWAYS in BERKS COUNTY, in DISTRICT, HEREFORD, RICHMOND, and ROCKLAND Townships, Commonwealth of Pennsylvania, STATE ROUTE 1022. This project is situated as follows: STATE ROUTE 1022 - From Segment 0010 Offset 0000 to Segment 0270 Offset 2605 and short distances on connecting side roads. Also includes pavement marking within a length of 13.74 miles as indicated on the approved drawings included in the bid package for GROUP 5-09-POC1G. MBE 1%, WBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 10- 14-11. ______

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated May 25, 2011 LYCOMING COUNTY – SR 0(LEV) #76456 PROPOSAL:$33.72 PLANS:$6.60 12X18:$8.10 24X36:$117.00 X-SEC:$15.62 12X18:$19.17 24X36:$276.90 The description and location of the project is as follows: Construction of trail for Riverwalk Extension. DBE 1%, Anticipated Notice to Proceed 8-8-11, Required Completion 10-28-11. ______ALLEGHENY COUNTY – SR 0(LOC) #27045 PROPOSAL:$25.68 PLANS:$6.60.12X18:$8.10 24X36:$117.00 X-SEC:$0.88 12X18:$1.08 24X36:$15.60 The description and location of the project is as follows: For concrete pavement of three lanes, street lighting, drainage, pavement markings, curb ramps, landscaping, and other miscellaneous construction, all within a length of 490 linear feet (0.093 miles) as indicated on the approved drawings included in the bid package for CHUCK NOLL WAY, in ALLEGHENY COUNTY, CITY OF PITTSBURGH, Commonwealth of Pennsylvania. The project is situated as follows: From North Shore Drive (Station 99+64.77) to West General Robinson Drive (Station 104+54.95). DBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 11-18-11. ______

5 ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated May 23, 2011 LEHIGH COUNTY – SR 2030(01B) #11417 PROPOSAL:$18.24 PLANS:$4.18 12X18:$5.13 24X36:$74.10 For the removal of the closed structure carrying State Route 2030 over the Saucon Creek water course in LEHIGH COUNTY, UPPER SAUCON TOWNSHIP, Commonwealth of Pennsylvania; STATE ROUTE 2030, SECTION 01B – This project being situated as follows – from approximately the intersection of SR 2030 (Station Avenue) and SR 309 (Main Street) at Segment 0010 Offset 0012 to approximately the intersection of SR 2030 (Station Avenue) and T-442 (New Street) at Segment 0010 Offset 0677. This is a design/build project to be constructed under detour, involving the removal of the existing bridge, design and construction of roadway work including the construction of a cul-de-sac at the terminus of SR 2030, lowering the existing grade of SR 2030, removal of a concrete wall, construction of a stone monument for the historic plaque, landscaping, drainage improvements, design and construction of traffic control including detouring of traffic, design and construction of erosion and sediment pollution control, acquisition of right of way and utility clearance, all within an overall project length of 628.00 linear feet (0.119 mile) as indicated on the approved drawings included in the bid package. MBE 1%, WBE 1%, Anticipated Notice to Proceed 8-22-11, Required Completion 6-30-13. ______BERKS COUNTY – GR. 5-10-MBR #89240 PROPOSAL:$2.36 The description and location of the project is as follows: For the repair and/or replacement of accident damaged concrete median barrier, single face concrete barrier, single slope concrete median barrier, and end transitions; also for the repair and/or replacement of existing sound barrier wall panels and posts as directed; on various STATE ROUTES in various MUNICIPALITIES in BERKS, CARBON, LEHIGH, MONROE, NORTHAMPTON, and SCHUYLKILL COUNTIES, Commonwealth of Pennsylvania. MBE 0%, WBE 0%, Anticipated Notice to Proceed 9-1- 11, Required Completion 6-30-13. ______

BERKS COUNTY – SR 10(MRS) #92563 PROPOSAL:$15.72 The description and location of the project is as follows: This project is the installation of milled center line rumble strips and other construction, all as specified in the bid package for VARIOUS MUNICIPALITIES in BERKS, CARBON, LEHIGH, MONROE, NORTHAMPTON, and SCHUYLKILL COUNTIES, Commonwealth of Pennsylvania; on State Routes 10, 419, 562, 662, 1010, 1021, 1024, 2023, 2029, 2077, 3008, 3016, 3055, 4011, and 4026 in Berks County; State Route 93, 209, 895, 902, 940, 2001, 2002, and 4010 in Carbon County; State Routes 145, 309, 329, 1027, 2012, 2018, 4005, and 4024 in Lehigh County; State Routes 191, 390, 447, 715, 940, 1001, 3016, 3023, and 4004 in Monroe County; State Routes 329, 512, 987, 1016, 2006, 2025, and 3021 in Northampton County; and State Routes 25, 54, 125, 209, 501, 895, 901, 924, and 4007 in Schuylkill County. MBE 0%, WBE 0%, Anticipated Notice to Proceed 8-8-11, Required Completion 12-30-11. ______

ALLEGHENY COUNTY – SR 7467(LOC) #27742 PROPOSAL:$76.80 PLANS:$47.08 12X18:$57.78 24X36:$834.60 X-SEC:$9.90 12X18:$12.15 24X36:$175.50 EXSTRUCT:$3.30 12X18:$4.05 24X36:$58.50 The description and location of the project is as follows: This is a Design Build roadway project. Design activities are limited to: Retaining walls. For the bridge replacement, bituminous approaches, drainage, guide rail, curb and sidewalk, landscaping, highway lighting, signing and pavement marking, signals, retaining walls, railroad relocation, sewer relocation, utility installation, and other miscellaneous construction, all within a length of 1337.0 linear feet (0.253 miles) as indicated on the approved drawings included in the bid package for GREENSBURG PIKE BRIDGE in ALLEGHENY COUNTY, TURTLE CREEK BOROUGH, NORTH VERSAILLES TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From Penn Avenue at Station 100+00 to a point approximately 1215 feet north of Pitcairn Avenue at Station 114+00. DBE 8%, Anticipated Notice to Proceed 9-19-11, Required Completion 8-30-13. ______

6 MERCER COUNTY – SR 80(A15) #91568 PROPOSAL:$18.60 PLANS:$2.42 12X18:$2.97 24X36:$42.90 For the construction or improvement of a certain section of STATE HIGHWAY in MERCER COUNTY, LACKAWANNOCK TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0080, SECTION A15. This project being situated as follows: From approximately 880 feet east of the intersection with State Route 2007 at Segment 0210 Offset 1070(Station 369+29.00) then east to approximately 2420 feet east of the intersection with State Route 3013 at Segment 0104 Offset 0674 (Station 560+50.00). For the resurfacing of a 4-lane roadway with Stone Matrix Asphalt Mixture Design; also for bituminous milling, Superpave Asphalt mixture Designs, concrete patching, drainage, guiderail, signs, structure rehabilitation work, and pavement markings all within a project length of 18,924.00 feet (3.58 miles) as indicated on the approved Construction Drawings. MBE 3%, WBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 9-29-11. ______SULLIVAN COUNTY – SR 87(65M) #82195 PROPOSAL:$68.52 PLANS:$13.86 12X18:$17.01 24X36:$245.70 X-SEC:$42.46 12X18:$52.11 24X36:$752.70 The description and location of the project are as follows: For the design and construction of the rehabilitation of the existing bridge structures for bridge preservation, designs and implementations of the maintenance and protection of traffic during construction, superpave asphalt mixture design base, scratch, binder and wearing courses, guide rail upgrades, drainage, pavement markings, and other miscellaneous construction all as indicated on the approved drawings included in the bid package for STATE ROUTE 87, SECTION 65M in FORKSVILLE BOROUGH and FORKS TOWNSHIP, SULLIVAN COUNTY, from approximately 0.04 miles north east of the intersection with SR 4012 at Segment 0260 Offset 0613 to approximately 2.4 miles west of the intersection with SR 4017 at Segment 0370 Offset 0360. DBE 0%, Anticipated Notice to Proceed 8-8-11, Required Completion 9-28-12. ______

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated May 20, 2011 YORK COUNTY – SR 851(018) #87460 PROPOSAL:$28.92 PLANS:$8.58 12X18:$10.53 24X36:$152.10 This project consists of resurfacing the existing roadway using Superpave wearing, leveling, and scratch courses; guide rail updates; minor drainage improvements; base replacement; roadside development items; pavement markings; and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0851, SECTION 018, in YORK COUNTY, CODORUS and SHREWSBURY TOWNSHIPS, and NEW FREEDOM BOROUGH, from Segment 0002 Offset 0000 to Segment 0150 Offset 0249, for an overall project length of 38,611 linear feet (7.31 miles). MBE 4%, WBE 4%, Anticipated Notice to Proceed 8-8-11, Required Completion 8-20-12. ______SOMERSET COUNTY – SR 281(MC2) #92419 PROPOSAL:$16.32 PLANS:$1.54 12X18:$1.89 24X36:$27.30 The description and location of the project is as follows: This project is for the resurfacing of approximately 3.886 miles of bituminous roadway and miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0281, SECTION MC2, in SOMERSET COUNTY at the approximate locations: SR 0281 From Segment 0380, Offset 1261 to Segment 0450, Offset 0100. MBE 3%, WBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 10-24-11. ______

7 ERIE COUNTY – SR 955(B02) #84026 PROPOSAL:$43.20 PLANS:$4.62 12X18:$5.67 24X36:$81.90 X-SEC:$.88 12X18:$1.08 24X36:$15.60 For the design and construction of certain section of STATE HIGHWAY in ERIE COUNTY, HARBORCREEK TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0955 SECTION B02. This project being situated as follows: From approximately 3.4 miles north of the intersection with SR 0005 at Station 178+24.00 to approximately 0.4 mile south of the intersection with SR 0020 at Station 182+90.00. For design and construction of a Precast Reinforced Concrete Box Culvert over A to Seven Mile Creek having a clear span of 13 feet; design and construction of new approach roadways using Superpave Asphalt Mixture Designs; Design and Construction of Guide Rail, Paved Shoulders, Delineation, Pavement Markings, and Signing all within a project length of 366.00 feet (0.069 mile) as indicated on the approved conceptual drawings. MBE 2%, WBE 4%, Anticipated Notice to Proceed 8-8-11, Required Completion 8-24- 12. ______FAYETTE COUNTY – SR 2021(H10) #79323 PROPOSAL:$73.08 PLANS:$8.36 12X18:$10.26 24X36:$148.20 X-SEC:$0.88 12X18:$1.08 24X36:$15.60 The description and location of the project is as follows: The project will consist of design build bridge replacement to the structure on S.R. 2021 over Shutes Run, as indicated on the approved drawings included in the bid package for STATE ROUTE 2021, SECTION H10, in Fayette County, North Union Township from segment 0160 offset 2402 to approximately segment 0160 offset 2852. MBE 3%, WBE 3%, Anticipated Notice to Proceed 8-22-11, Required Completion 9-13-13. ______LACKAWANNA COUNTY – SR 4023(250) #8255 PROPOSAL:$19.56 PLANS:$3.08 12X18:$3.78 24X36:$54.60 EXSTRUCT:$3.52 12X18:$4.32 24X36:$62.40 This is a Partial Design/ Build Project. For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LACKAWANNA COUNTY, SOUTH ABINGTON TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 4023, SECTION 250. The project being situated as follows: From a point approximately ¼ mile southeast from the intersection with SR 4028 at Segment 0040/ Offset 1694 (Station 13+00.00) to a point approximately 1 1/2 miles northwest from the intersection with SR 1027 at Segment 0040/ Offset 2194 at Station 8+00.00 for a total length of 348.00 Ft. (0.066 Mi.), along SR 4023. The project is a partial Design\ Build Project that includes Design\ Build of Bridge Deck Replacement of the 4 span, 2 lane Bridge over I-81. The project will also include painting of existing structural steel, excavation, full depth bituminous pavement, temporary traffic control, pavement markings, guiderail, removal of portion of existing bridge, concrete repair and other miscellaneous construction as indicated on the approved plans included in the bid package. MBE 1%, WBE 1%, Anticipated Notice to Proceed 8-8-11, Required Completion 11-1-12. ______LUZERNE COUNTY – SR 1011(351) #8474 PROPOSAL:$17.40 PLANS:$4.62 12X18:$5.67 24X36:$81.90 EXSTRUCT:$13.86 12X18:$17.01 24X36:$245.70 This is a Partial Design/ Build Project. For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LUZERNE COUNTY, WILKES BARRE CITY and MUNICIPALITY OF KINGSTON, Commonwealth of Pennsylvania, STATE ROUTE 1011, SECTION 351. The project being situated as follows: From a point near the intersection with SR 2004 (River Street) at Segment 0030/ Offset 0153 (Station 16+25.00) to a point approximately 1 mile SOUTHEAST from the intersection with SR 0011 (Wyoming Ave) near Segment 0030/ Offset 1698 at Station 35+60.00 for a total length of 1683.00 Ft. (0.319 Mi.), along SR 1011, Pierce Street. The project is a partial Design\ Build Project that includes Design\ Build of Bridge Deck Replacement of the 12 span, 4 lanes Pierce Street Bridge. The project will also include excavation, full depth bituminous pavement, temporary traffic control, concrete median barrier, cement concrete curb & sidewalk, pavement markings, removal of portion of existing bridge, design\ build of traffic control beneath the Pierce Street bridge, concrete repair and other miscellaneous construction as indicated on the approved plans included in the bid package. MBE 2%, WBE 2%, Anticiapted Notice to Proceed 8-8-11, Required Completion 5-9-14. ______

8 LACKAWANNA COUNTY – SR 348(250) #67196 PROPOSAL:$61.92 PLANS:$9.24 12X18:$11.34 24X36:$163.80 X-SEC:$2.20 12X18:$2.70 24X36:$39.00 This is a Design/ Build Project. For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LACKAWANNA COUNTY, JEFFERSON TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0348, SECTION 250. The project being situated as follows: From a point approximately 0.2 miles EAST of the intersection with SR 2003 (Cortez Road) at Segment 0080, Offset 1932 (Station 309+40) along SR 0348 east to a point approximately 0.33 miles EAST of the intersection with SR 2003 (Cortez Road) at Segment 0090, Offset 0357 (Station 316+40) along SR 0348. This is a Design/ Build Project that includes replacement of the existing single span concrete encases I-Beam Bridge with a proposed precast reinforced concrete box culvert. The project will also include design/ build of Roadway, maintenance and protection of traffic, erosion control measures, bridge removal and other miscellaneous construction, all contained within an overall project length of 0.114 mile (600 linear feet) as indicated on the approved drawings included in the bid package. MBE 3%, WBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 10-24-12. ______LANCASTER COUNTY – SR 472(004) #63234 PROPOSAL:$27.96 PLANS:$3.30 12X18:$4.05 24X36:$58.50 X-SEC:$1.76 12X18:$2.16 24X36:$31.20 EXSTRUCT:$0.88 12X18:$1.08 24X36:$15.60 This project consists of the rehabilitation of a multi-span steel structure over the . Work involves a total superstructure replacement, minor approach roadway reconstruction, new guide rail, minor drainage, signs, and pavement markings. Traffic will be maintained during construction and/or detoured for limited durations, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0472, SECTION 004, in CHESTER & LANCASTER COUNTIES, COLERAIN and LOWER OXFORD TOWNSHIPS, from Segment 0200 Offset 1582 to Segment 0012 Offset 0136 in Chester County, and from Segment 0012 Offset 0136 to Segment 0022 Offset 0080 in Lancaster County, for an overall project length of 2471.00 linear feet (0.468 mile). MBE 2%, WBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 12-6-12. ______

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated May 18, 2011 BRADFORD COUNTY – SR 414(034) #92556 PROPOSAL:$16.32 PLANS:$2.20 12X18:$2.70 24X36:$39.00 The description and location of the project are as follows: For the deck repair of a two span steel I-beam bridge over including removal of portion of existing bridge, milling, fabricated structural steel, membrane waterproofing, superpave asphalt mixture design, HMA base, scratch, and wearing courses, pavement markings, and other related work within an overall length of 274.46 linear feet (0.052 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 414, SECTION 034 from approximately 4.35 miles northeast of the intersection with State Route 3019 at Segment 0290 Offset 3169 to approximately 3.09 miles west of the intersection with State Route 3015 at Segment 0300 Offset 0294 in FRANKLIN TOWNSHIP, BRADFORD COUNTY. MBE 0%, WBE 0%, Anticipated Notice to Proceed 8-8-11, Required Completion 9-16-11. ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated May 16, 2011 COLUMBIA COUNTY – SR 11(84M) #72290 PROPOSAL:$67.56 PLANS:$29.92 12X18:$36.72 24X36:$530.40 The description and location of the project are as follows: For the reconstruction of the existing roadway including flexible base replacement, milling, plain cement concrete curb, plain concrete mountable curb, cement concrete sidewalk, superpave asphalt mixture design, HMA base, binder, scratch, and wearing courses, plain cement concrete pavement, pavement markings and legends, and other related work within an overall length of 22,356.63 linear feet (4.234 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 11 SECTION 84M from approximately 0.5 miles east of the intersection with State Route 460 at Segment 0370 Offset 2362 to the Luzerne County line at Segment 0430 Offset 2852 and from approximately 0.05 miles east of State Route 93 at Segment 0421 Offset 0000 to the Luzerne County line at Segment 0431 Offset 1927 in BRIAR CREEK TOWNSHIP and the BOROUGH OF BERWICK, COLUMBIA COUNTY. DBE 1%, Anticipated Notice to Proceed 8-8-11, Required Completion 11-2-12. 9 ASSOCIATED PENNSYLVANIA CONSTRUCTORS ECMS PROJECTS - ADVANCED INFORMATION – LETTING JUNE 23, 2011 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated May 11, 2011 NORTHUMBERLAND COUNTY – SR 80(109) #90582 PROPOSAL:$24.96 PLANS:$18.92 12X18:$23.22 24X36:$335.40 X-SEC:$3.30 12X18:$4.05 24X36:$58.50 The description and location of the project are as follows: For the construction of an ITS system including excavation, drainage, guide rail, steel sign structures-centermount, demolition of existing DMS sign, related ITS system equipment, dynamic message sign (DMS) systems, epoxy pavement markings, and other related work all as indicated on the approved drawings included in the bid package for STATE ROUTE 80, SECTION 109 in TURBOT TOWNSHIP, NORTHUMBERLAND COUNTY, WHITE DEER TOWNSHIP, UNION COUNTY, and LIBERTY TOWNSHIP, MONTOUR COUNTY and STATE ROUTE 147, SECTION 109 in WEST CHILLISQUAQUE TOWNSHIP, NORTHUMBERLAND COUNTY, and STATE ROUTE 180, SECTION 109 in DELAWARE TOWNSHIP, NORTHUMBERLAND COUNTY. DBE 3%, Anticipated Notice to Proceed 8-8-11, Required Completion 2-15-14. ______

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION