D

AGRICULTURE & NATURAL RESOURCES

Country Projects:

 Institutional Strengthening and Project Management  Southwest Area Integrated Water Resources Planning Consultants under SAIWRPMP-AF (ADB Loan No. 3302 (SF) & and Management Project (ADB Funded, ADB Loan No. GON Grant No. 0441 (EF); (Jul’17 – Jul ‘22). 2200-BAN(SF) (Jan 2007 – Jun 2014).  Detailed Design, Construction Supervision and Project  Estuary Development Program (EDP), BWDB/GoB (Mar 2007- Management Support for Coastal Embankment Improvement Jul 2011). Project, Phase – I (CEIP-I); (Jan’15 – Dec’21).  Flood Damage Rehabilitation Project-Design and Construction  Detail Feasibility Study PRA & FS and Detail Design (DD) Supervision Consultants: Part D: Water Resources, BWDB/ under Small Scale Water Resources Development Project ADB; (Jan 2006 – Jun 2007). (Phase-2) Package SD-4; (May’19 - May’22).  District Water Resource Assessment, LGED/ADB; (May 2004  EIA Study under Southwest Area Integrated Water Resources –Dec 2007) Planning and Management Project under SAIWRPMP, (ADB  Feasibility Study on Second Small Scale Water Resource Loan No. 2200BAN(SF) and GoN Grant No.0036-BAN) Development Sector Project (SSWRSDP-2), LGED/ADB; (Apr (Apr’15 – Jul’15). 2003 – Jun 2007).  Financial and Institutional Strengthening of Water  Gorai River Restoration Project BWDB/DGIS/World Bank (Sep Management Organizations (WMGs/ WMAs) and practice 1999 – Mar 2003) for Sustainable O&M under SAIWRPMP; (ADB Loan Second Coastal Embankment Rehabilitation Project, BWDB/ No.2200BAN(SF) and GoN Grant No.0036-BAN); (Sept 2014  World Bank (Jul 1999 – Dec 2000). – Jun 2015).  Feasibility Study of Re-Excavation of Priority Rivers, BWDB/  Technical Feasibility Studies and Detail Design for Coastal GoB; (Jul 1999 – Feb 2000). Embankment Improvement Programme (CEIP) under ECRRP, BWDB; (Aug 2010 – Sept 2013)  Meghna Estuary Study-II, BWDB/Government of Netherlands (Oct 1998 – Dec 2002).  Detailed Design, Social and Environmental Studies for Construction of Urir Char - Noakhali Cross-Dam Project  Coastal Embankment Rehabilitation Project, BWDB/European (UCNCP) in the District of Noakhali, BWDB/WB; (Sep 2013 - Union (Sep 1996 – Jun 1999). Jun 2014).  Meghna Estuary Study, FAP-5B Socio Economic Study, BWDB/  Feasibility Study of Additional Sub Project and Institutional Government of Netherlands (Nov 1996 – Feb 1999) Strengthening and Project Management Supporting Water  Meghna Estuary Study, FAP-5B, BWDB/Government of Management Groups with Integrated Water Resources Netherlands/DANIDA (Nov 1995 – Sep 1998) MAJOR ACCOMPLISHMENTS OF Management under SAIWRPMP, BWDB/ADB; (Aug 2012 – Jul 2014).  Preparation of Feasibility Study of Additional Sub-Projects and supporting WMO’s with IWRM under SAIWRPMP (ADB Loan DevConsultants Limited No. 2200-BAN(SF) GoN Grant No 0036 BAN (Single Source Contract), (Mar 2012 – Jun 2012).  Feasibility Study of Capital Dredging and Sustainable River Management in ; BWDB/GOB; (Sep 2011 - Aug 2013)  Consultancy Services for Feasibility Studies and Detailed Design (FSDD) of Sub-projects under Participatory Small CONTACT US Scale Water Resources Sector Project (PSSWRSP), LGED/ ADB; (Jan 2010 – Jun 2016).  Feasibility Studies and Detailed Design (FSDD) of Subprojects House 69, Road 16, Block-A, Banani underSmall-Scale Water Resources Development Project (SSWRDP) in Greater Mymensingh, Sylhet and Faridpur Areas Dhaka - 1213, Bangladesh (Package No.: FSDD Package-8); LGED/JICA (Nov 2010 – Apr 2014). [email protected]  Institutional Improvement of BWDB (Contract Package No. www.devconbd.com BWDB: S-5) under Water Management Improvement Project Status as Dec’2020 (WMIP), (IDA Credit No.: 4359); (July 2010 – ongoing).  Improved Water Management in BWDB Schemes (Contract +88 02 5503 5214-6 Pkg. No. BWDB/S-1) under Water Management Improvement Project (WMIP), (IDA Credit No. 4359-BD), BWDB/WB; (Jan +88 02 5503 5217 2009 – Dec 2015)  Feasibility Study of Pilot Program of Land Reclamation from by Engineering and Biological Interventions, BWDB/GoB; (Mar 2007 – Apr 2009).

1-2-3-4 TRANSPORT INFRASTRUCTURE WATER & SAFEGUARDS Country Projects: Country Projects: Country Projects:

 Construction Supervision Consulting (CSC) Services for  Detailed Survey, Investigation, Design and Confirmation  Design & Supervision Consultancy Services for Urban  Emergency Flood Damage Rehabilitation Project (Part E-  Technical Support Unit and Related Services under  Global Study on the Expansion of Domestic Private Sector PADMA Multipurpose Bridge Project (PMBP), BBA/GOB; Supervision under “the Kanchpur Meghna and Gumti 2nd Infrastructure Improvement Project; LGED/KFAED; (Apr’20 - Municipal Infrastructure); (Jan’05 - Jul’07). Bangladesh Municipal Water Supply and Sanitation Project Participation in the Water and Sanitation market; (WB); (Oct’11 Bridges Construction and Existing Bridges Rehabilitation - Apr’12). (Nov’14 - Dec’23). Sep’22). Management and Supervision Consultancy Services under (BMWSSP) (Package No. SD-14); DPHE/WB; (Oct’20-Mar’ 23). Project, BBA/JICA, (Feb’14 – Oct’19).   Design Review and Construction Supervision of Multi-Lane  Supervision, Design Review & As-built Drawing Preparation Bangladesh Municipal Development Fund (BMDF), Phase-I and  Rapid Assessment for Establishing It & GIS Based Smart Solid  Developing a National Groundwater Database for Water Road Tunnel under the River Karnaphuli, Chittagong (Oct’16 -  Greater Dhaka Sustainable Urban Transport-Package 3: etc. for Improvement of Damaged Roads, Drainage, Footpath II, BMDF/ World Bank (Aug’04- Jun’09). Waste & Faecal Sludge Management Systems in 53 district Supply and Sanitation in Bangladesh ; DPHE/DANIDA (Jan’11 Sep’21). Operational Design and Business Model (ODBM), Project No. level Paurashavas & 8 City Corporations; DPHE/ Bill & Melinda – Mar’12). and Road Safety of Different Zones; DNCC/GoB; (Nov’19 - Design, Supervision and Monitoring Consultancy Services 42169-BAN, RHD/ADB; (Jul’13 – Jun’17).  Gates Foundation, U.S.A; (Jun’20 – Feb’21).  Detailed Design and Supervision of Access Road Construction Nov’21). (DSMC) under Post Flood Assistance Recovery Program for  Implementation of Water Safety Plan, WHO-DPHE/AusAID;  Conducting Feasibility Study for Multi-Lane Road Tunnel (Nov‘10 –Jun’11). Component of Matarbari Ultra Super Critical Coal-Fired Power Feasibility Study of Two Economic Zones: Barisal EZ Secondary Road Network under Rural Transport Improvement  Design Monitoring and Supervision Consulting Service of under the River Karnaphuli, Chittagong, Bangladesh; BBA/  Project; RHD/JICA; (Mar’ 16 - Dec’21). (Agoiljhora) & Maheshkhali SEZ (Ghatibanga-Sonadia); BEZA/ Project (RTIP) of LGED (Sub-Consultant to HIFAB), LGD/ DPHE Component, Cox’s Bazar Under Emergency Assistance  Socio-Economic Study, EIA and Detail Engineering Survey & CDA-CCCC-Arup (Sep’10 – Sep’13).  Construction Supervision Services (Phase-II) for Construction GOB; (Feb’19 - Ongoing) World Bank; (Mar’05-Jun’06). Project, DPHE/ADB; (Mar’20 - Feb’22). Investigation and Engineering Design in 148 towns; (Jan’10 -  Feasibility Study for Bekutia Bridge on Pirojpur-Jhalokati Jun ‘14). of 3rd & 4th Dual Gauge Railway Track between Dhaka-Tongi Technical Audit Services for Rural Roads and Markets  Engineering Design and Construction Supervision of Project Road over the River Kocha under Jhalokati District , BBA/GoB;  Prepare a Detailed Master Plan for “Sonadia Eco-Tourism  section;GoB/LOC; (Jul’19 - Jul’22). Improvement and Maintenance Project, LGED/World Bank; for Establishment of Sewerage System in Chattogram  Review and Revision of the Sector Development Programme (Apr’11 – Oct’13). Park”; BEZA; (Nov’18 - Jun’20).  First Dhaka Elevated Expressway (FDEE) Project; LBCPL, (Apr.’99 – Aug.’01). Metropolitan; Capacity – 100 MLD (Phase-1) Package No. (SDP) for the Water and Sanitation Sub-sector in Bangladesh, India; (Jan’20 - Nov’21).  Construction Supervision of Civil Works of 4-Laning of Dhaka-  Supervision, Design Review & As-built Drawing Preparation PESSCM-1/S1); CWASA; (Nov’19 -Oct’24). PSU under the Ministry of LGRDC; (Jan’09 – Mar’11).  Design, Supervision and monitoring of DUTP Infrastructure Chittagong Highway Project, RHD/GOB; (Nov ‘10 – Dec’14). for Improvement of Different Damaged Road Infrastructure  Monitoring and Supervision of Water Supply and Sanitation  Design & Supervision of the construction of Bridge (60 Components, Institutional Support and Training, Roads &  Private Sector Development Support Project (PSDPS) – including Drains and Footpath Construction under Dhaka Schemes including Update of Design, EIA and SIA under meter) & Approach Road (Gaynaghat Second Bridge)” under  Eastern Bangladesh Bridge Improvement Project (EBBIP), Highways Department/DCC/BRTA-World Bank; (Feb’99- Environmental and Social Impact Assessment; DFID; (Jul‘08 North City Corporation (Dec’16 – Nov’18). Emergency Multi­ Sector Rohinga Crisis Response Project; Ashuganj 400 MW CCPP (East) Project; APSC; (Nov’16 - (JICA L/A No. BD-P60); RHD/JICA, (Mar 2010 - Jun’15). Sep’05). - May’09). DPHE/WB; (Oct’19-Sep’22). Sep’21).  Conducting Feasibility Study for Multi-Lane Road Tunnel  Design & Supervision of Construction of Elevated Walkway at  Preparation of Master Plan for Pourashavas under Upazila Gulistan Area; DSCC/GoB; (May’16 – Oct’17).  Preparation of a Rural Infrastructure Project-Greater Noakhali  Design Review and Enhancement Consultancy (DRC) Services under the River Karnaphuli, Chittagong, Bangladesh; BBA/  City Wide Inclusive Sanitation Technical Assistance Hub in Towns Infrastructure Development Project (Package-03), District, LGED/World Bank (Apr.’96-Oct.’96). South Asia; Bill & Melinda Gates Foundation; (Jun’19 - Jun’22). for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a CDA-CCCC-Arup (Sep’10 – Sep’13).  Development of The Economic Zones and Capacity LGED/GOB; (Apr’08 – Mar’10). 4-Lane Highway RHD/AIIB; (Jul’19 - Jun’20).  Feasibility Study for Bekutia Bridge on Pirojpur-Jhalokati Enhancement of Economic Zone Authority in the People’s  Eastern Bangladesh Rural Infrastructure Development Project  Design, Management and Supervision (DMS): Dhaka Water  Developing a National Drinking Water Supply Implementation (EBRIDP), LGED/JBIC; (May.’06-Apr’10).  Detailed Survey, Investigation, Design and Confirmation Road over the River Kocha under Jhalokati District; BBA/GoB; Republic of Bangladesh (Apr’15 – Jun’16). Supply Network Improvement Project (DWSNIP), Loan No. Guideline; UNICEF; (Feb’08 – Jul’08). (Apr’11 – Oct’13). 3397 BAN; DWASA/ADB; (Mar’18 - Jan’22). Supervision of “the Kanchpur Meghna and Gumti 2nd Bridges  Transaction Advisory Services for Hi-Tech Parks under  Technical Assistance, Detailed Engineering Survey, Design  Preparation of Low Income Communities Water Supply and Construction and Existing Bridges Rehabilitation Project, BBA/  FS for the Construction of Flyover from Shantinagar to Dhaka- Contract Package No. BHTPA-S1, BHTPA/WB, (Sep’14 – Supervision and Monitoring under Rural Development Project:  Project Development Facility (PDF) Consultants (Package Sanitation Program (Package DS-7), Dhaka WASA/World JICA, (Feb’14 - Jan’20). Mawa Road (Jhilmil) via 4th (New) Bridge over Buriganga Jun’17). Greater Noakhali and , LGED/IDB; (Sep.’04- No. DWSNIP/PDF/03.5), (i.e. Rayer Bazar Sewerage project), Bank; (Apr’06-Dec’07). River (supporting large scale PPP), RAJUK/GoB; (Mar’11- Aug.’08). under (DWSNIP); DWASA/ADB; (Feb’19 - Jan’20).  Construction Supervision of the Remaining Civil Works of  Preparation of Project Implementation Manual (PIM) and Dec’13).  Supervision of 08 (eight) nos. of Bridges Construction work 4-Laning of Dhaka-Chittagong Highway Project , RHD/GOB under Package # BRS-5 of Purbachal New Town Project,  Good Urban Governance in South Asia (GUGSA) Project, TCGI-  Feasibility Studies and Preparation of Conceptual Designs & Process Action Plan (PAP) for HYSAWA Fund Company; (Jan’15 – Jun’17).  Road Network Improvement & Maintenance Project (RNIMP- RAJUK/GOB, (Jun’14 – Mar’17). India/USAID (Aug’04-Mar’07). Bidding Documents (i.e. Pagla Sewerage Project); DWASA/ Danida Dhaka; (Mar-May’06). WB; (Sep’18 - Sep’19).  Feasibility study of the Bangabandhu Sheikh Mujib II), RHD/ADB; (Sep’06-Jun’12). Feasibility of Private Sector Participation in the Water and  Regional Development Planning (RDP) under City Region  Design, Supervision, Implementation, Monitoring & Institutional  International Airport; CAAB/GoB; (Sep’16 - Mar’18).  Design Review and Finalization of Jatrabari-Gulistan Flyover Strengthening for Effect Evaluation and Monitoring for Greater  Feasibility Study and Development Project Preparation for Sanitation Sector in Bangladesh; Royal Netherlands Embassy, Development Project, Loan No.- 2695-BAN (SF); (Dec’12 - Water Supply Facilities for Cox’s Bazar Town; (Dec’17 - Dec’18).  Feasibility study for Construction of Fpir Bridges in Southern Project (GOB); (Mar’06 - Jan’12). Jun’16). Faridpur Rural Infrastructure Development Project (RIDP-24), Dhaka / DANIDA; (Mar – May’06). and Eastern Region of Bangladesh; BBA/GoB; (Aug’17 -  Third Road Rehabilitation and Maintenance Project (RRMP-III) GED /JICA; (Jul’02 – Jun’06).  Utility Modernization Umbrella Consultancy under the  Design of Water Treatment Plant, Reservoirs, Pipelines and Jun’19). Dhaka-Sylhet Road, RHD/WB; (Jun’99 - Mar’05).  Household Interview Survey (HIS) for the Project on Revision Chittagong Water Supply Improvement and Sanitation Project; Water Supply Structures under Kachua, Matlab, Chandina and and Updating of the Strategic Transport Plan (STP) for Dhaka; (Jun’15 - Mar’19). Barura Upazila Water Supply Project, DPHE/GoB; (Jun’2000-  Study on Road Safety Hazards Including Design of DTCA/JICA; (Aug’14 - Nov’14). Countermeasures at Intersections on National and Regional Overseas Projects:  Community Mobilization and Development of Action Plan Mar’02). Highways of Bangladesh; RHD/GoB. (Jul’18 - Aug’ 19).  Preparation of Master Plan for Pourashavas under Upazila for Rural Non Piped Water Supply Schemes and Community  18 District Towns Water Supply, Sanitation and Drainage  Basic Configuration Design of Grade Separated Intersection Towns Infrastructure Development Project (UTIDC), LGED- Awareness Building on Sanitation and Hygiene in Bangladesh Project (Phase-III), DPHE/Government of Netherlands (GoN);  Preparation of Development Plan for , Development at Major Five Junctions in Kathmandu, Dep’nt of Roads, GoB; (Apr’08 – Mar’10). (East Central Zone-184 Unions); DPHE/WB; (Apr’14 – Apr’17). (Jan’96 - Mar’2000). Chittagong District: Risk Sensitive Land Use Plan: Traffic and Nepal; (Jan’12 – Dec’12). Transport Surveys and Studies (Package-4); (Nov’17 – Jun’18).  Rural Enterprise Development (RED) of Market Infrastructure  Technical Assistance (TA) for Capacity Building support  Five District Water Supply and Sanitation Project; DPHE/  National Highways Development Project – Orissa State of NH-5 Development Porject in Charland Regions (MIDPCR), LGED/ to Bangladesh Rural Water Supply and Sanitation Project DANIDA; (Feb’97-Dec’01).  Greater Dhaka Sustainable Urban Transport-Package 3: (Contract Package OR-VI, VII and VIII), NHA, India; (Jul’01 - May’13). Operational Design and Business Model (ODBM), Project No. GOB; (Feb’10 – Dec’13). (BRWSSP) – Technical Preparation and Implementation; WB;  Road Maintenance and Development Project – SWRP and PIP, DoR/ (Jan’14 - Nov’15). Overseas Projects: 42169-BAN; RHD/ADB; (Jul’13 - Jun’17).  Socio-Economic Benchmark Survey under UGIIP (Phase-II 11 WB, Nepal; (Sep’05 – Dec’06).  Community Based Water Supply Project, Department of  Feasibility Study for Dhaka-Ashulia Elevated Expressway towns) LGED/ADB; (Feb’07 – Jun’07).  Socio-economic Study, Technical Survey and Investigation, Public Works of Nepal Government and funded by ADB; Project and East-West Elevated Expressway (Middle/Outer  Study on Sector-wide Road Program and Priority Investment Plan Detail Engineering Design and Construction Supervision  Greater Faridpur Rural Infrastructure Development Project (Jan’06 - Dec’10). Ring Road) Project; BBA/GoB; (Feb’16 - Mar’17). (WB), DoR, Nepal; (Sep’05-Dec’06). and Community Mobilization of Rural Piped Water Supply (RDP-24), LGED/JBIC; (Jul’06 – Jun’07). Schemes in Bangladesh, DPHE/WB; (Nov’13 - Jun’17).  Environmental Protection and Resources Conservation  Preparation of LAP, RAP & EMP for Multi-Lane Road Tunnel  Feasibility Study and Detail Engineering Design of Uttar Pradesh State Project, Pakistan; Provincial/ Fed. Govts. of Pakistan; (Dec’95 under the River Karnaphuli, Chittagong, Bangladesh (Jun’15 – Roads Projects, PWD-Uttar Pradesh, India, India/World Bank; (Sep’99-  Design, Supervision, Monitoring and Evaluation for Greater  The Development of the National Urban and Rural Water

Status as Dec’2020 Status as Dec’2020 - Jan’99). Status as Dec’2020 Sep’16). Dec’05). Faridpur Rural Infrastructure Development Project (RDP-24), Supply Water Supply and Sanitation Strategy; (Sep’13 – LGED/JBIC (July’06 – Jun’07). Feb’14).  Construction Supervision of Civil Works of 4-Laning of Dhaka- Chittagong Highway Project, RHD/GOB; (Nov ‘10 – Dec’14).  Design, Supervision, Implementation, Monitoring & Institutional  Selected Evaluation Studies for 2012, Phase 2 - Thematic Strengthening for Greater Faridpur Rural Infrastructure Evaluation Study on ADB’s Support for Climate Change  Household Interview Survey (HIS) for the Project on Revision Development Project (RDP-24), LGED/JBIC; (Jul’06-Jun’07). Management; ADB (Jul’13 – Aug’13). and Updating of the Strategic Transport Plan (STP) for Dhaka; DTCA/JICA ; (Aug’14 – Nov’14).  Socio-Economic Initial Benchmark Surveys under UGIIP  Water Operators Partnership (WOP) between Dhaka WASA and Vitens-Evidus International (VEI); (Oct’12 - Dec’16).  Due Diligence of SAPL’s River Terminal/Depot Project. (Phase-1 for 22 Towns); LGED/ADB; (Apr’04 – Aug’04).  Preparation of Water Supply Master Plan for Dhaka City, Haskoning DHV Project No: BD 1866-101-102; FMO; (May’14 – Urban Governance and Infrastructure Improvement Project  DWASA, (Jan’12 – Dec’12). Aug’14). (UGIIP-1) LGED/ADB; (Feb.’04- Jun.’10). 1-2-3-4 1-2-3-4 1-2-3-4