REPUBLIC OF THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE IV-B MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE ,

C.Y. 2020 PROJECT DETAILED ENGINEERING DESIGN PLAN FOR CONSTRUCTION OF FLOOD CONTROL STRUCTURE MOMPONG RIVER MARABONG SECTION, , OCCIDENTAL MINDORO FLOOD CONTROL SECTION SABLAYAN, OCCIDENTAL MINDORO K0000+400 - K0000+975 0.575 KM

SUBMITTED: RECOMMENDED: APPROVED:

GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER DATE: DATE: DATE: DISTRICT ROAD MAP MINDORO OCCIDENTAL I DISTRICT ENGINEERING OFFICE Mamburao, Occidental Mindoro

Del Monte Pt.

S00142MR- JCT. MWCR Bagolayag Pt. (TIBAG) WAWA ROAD S00099MR- MINDORO WEST COASTAL ROAD Mananao Bario Pt. GuiguintoSto. Pt. Tomas Anolang Balang Talipanan Basil Bago Layag Agsigang Batotang Bato Lauan Calagian Lucutan Iba Apias Orilan Bantar 68 Cabignayan Amazona 67 Camurong Mt. Cabignayan Wawa Udalo Aluyan 65 66 Matabang Maduron 64 K0445+499 Calawagan 63 Lumangbayan Tibag Alipaoy Anduyanan 62 Lawaan K0439+65561 Lacbawan Visayan THE SITE 60 Magnot Tara 59 K0441+516 Mason R. 58 Tinabunan Pamutusin R. 57 Lutic 56 Pamutusin Cove Lumang Bayan 55 Talusungan Marikit 54 Balao Tugon P a l u a n B a y Binitin Ayasan San Vicente Mariil Cove Marikit 53 Buri Tuay 52 Camtas Pt. Mason PALUAN Baclaran 51 S00098MR- JCT. Culanguan 50 MWCR (BAGONG SILANG) CABACAO DIVERSION ROAD 49 Mason R. Baluguhan Cabacao

Tubili Balibago 48 98 Lanas Lake Mamara R. Esteban

Maslud 46 K0417+423 45

Igsuso Tangkalan Cabiguan 44 San Luis Ligang 43 42 Santol Mt. Micmic Tagawangawan MIMPING FLOOD CONTROL 41 Payompon Dapi K0408+149 40 Balansay A l i t u n g a n R. O R I E N T A L M I N D O R O MAMBURAO Mimping 39 38 37 Lagundian Sahing Calamintao O C C I D E N T A L M I N D O R O Maculbo 36 Bangayan Maculbo Pt. Baranggit Pitogo K0389+815 Cigaras Calumbayan Curtinganan Alacaak Lanas Talabaan P a g b a h a n R. 35 Culisan 97 96 Aribugan Kawayaanan S00167MR- CROSS. 34 95 Carumbac Oring 94 MWCR (POLA) CASAGUE- 33 93 San Vicente Kabungahan JCT. ALACAAK ROAD 92 Casague Kabanabahan . Mulawin 91 . 90 Lusacan SANTA CRUZ K0382+696 B o c a y a o R

BH2 32 . Lumangbayan 31 89 . Pola Banganay 30 . E a g l e P a s s 29 M a m a l i R Imera P i n t i n R Calanguan Anayasan A m n a y R Balatikan Amnay Dayap Barahan Bugtong Kawayan M t. F a c h e t R o v e n R. Pinagturilan

28 A m n a y R. Bahay Pari K0356+003 Patrick R. Celina R a y u s a n R .

El Dorado 27 Pagasa Paikot Victoria Pulong Gago C a t h e r i n e R. Cansaya Paitan Bangor Pass P a n d a n R. V i g a R San Agustin . 49.00 Tagumpay Pandan San Francisco

San Vicente . Ibud 25 26 M o m p o n g R Ibud R. 24 Sto. Nixo Tulaong R. 88 Buenavista Tabtaban Lake 49.00 K0321+441 23 87 22 Batong Buhay 21 86 SABLAYAN Tuburan S00100MR- JCT. MWCR (SAN ISIDRO) PENAL Arellano 84 85 COLONY- JCT. YAPANG ROAD Lula 82 Tuban SABLAYAN PENAL COLONY 18 83 20 8081 S00101MR- SABLAYAN-PENAL 79 COLONY ROAD Sta. Lucia 78

Malisbong S00095MR- MINDORO WEST 19 COASTAL ROAD

Pandanan E. Aguinaldo 17PASUGUI BR. Dongon Pt. Ligaya S00143MR- JCT. MWCR (LABANGAN)- MURTHA-JCT. IRIRON ROAD

D o n g o n P t . 16 K0287+684 Burgos

15

Concepcion 14 Malpalon Sapaton 77 76 I r i r o n B a y Bato Singit Poypoy Tabonac Iriron Piri 13 75 Patay Ilog Balagbagan K0256+004 Manoot 74 12 73 49.00 THIS SITE K0272+105 New Dagupan Niyayos Gutad Tanyag K0263+005 Malatikwang Aguas Monte Claro

49.00 Cahagnayon 72 71 BM#1 11 Rizal Batasan Malawaan Pitogo S00142MR- JCT. MWCR (LABANGAN)- BEG. OF EXISTING Magsikap MURTHA-JCT. IRIRON ROAD

BH3 GABIONS Salvacion Mangat 10 K0255+587 San Pedro Sto. NixR 09 K0250+657 RIZAL 08 S00141MR- -SAN JOSE Central Murtha Rumbang JCT. MAPAYA ROAD 49.00 Adela Canwaling Camburay Alitaytayan San Agustin La Curva Baulan

Bayotbot

Bubog Magbay Paclolo 69 Mabini 49.00 Bagong 70 Sikat 05 S00148MR- JCT. MWCR-SAN JOSE AIRPORT- 07 Labangan 04 Mapaya K0223+096 JCT. BUBOG ROAD Mangarin 06 Gapasan BH1 San Roque K0236+083 Lourdes SAN JOSE 03 C a g u r a y R. PROVINCIAL BOUNDARY Caminawit Gamot 49.00 MUNICIPAL BOUNDARY S00149MR- JCT. MWCR-SAN JOSE CAMINAWIT PORT ROAD Mangarin Bay CAPITAL MAGSAYSAY 02 Nicolas Manga Labangan Bulo Bamban Caguray 01 Bukad Bukad Pucatod I l i n S t r a i t Bagaas MUNICIPALITY Ansiray S00094MR- MINDORO ORIENTAL / Tikod Sibalat Bunuaga Lipat OCCIDENTAL EAST COASTAL ROAD Bunuaga Iling Proper Guiod 49.00 ILING IS. Laste Sta. Theresa Bankal Buluang Pt. Bungkalan SITIO Undaque Munturido Ambulong Batong Salamaga Alibog Manukan AMBULONG IS. Inasakan NATIONAL ROAD Catayungan Bagocog GARZA IS. 49.00 Dumalaga Natandol PROVINCIAL ROAD Pabugan Pt. BURI IS. Tabal S i l a n g B a y Cabaong Pawican Pt. Pawican NATIONAL BRIDGES 01 Magirom Bugias Mangaagui Pt.

SCALE : 200,000 Iling Pt. AIRPORT

BORE HOLE LOCATION LOCATION MAP Scale NTS

49.00 BH1ƒ 1ƒ (

BH2ƒ 1ƒ ( 49.00 BH3 ƒ 1ƒ ( THIS SITE TOPOGRAPHIC MAP

VICINITY MAP Scale NTS

INDEX OF SHEETS:

P1: PROJECT TITLE AND DESCRIPTION

P2: TOPOGRAPHIC MAP SUMMARY OF QUANTITIES LOCATION MAP VICINITY MAP INDEX OF SHEETS

P3: GENERAL NOTES DETAILS OF FRAMING FOR STANDARD SIGNBOARD/BILLBOARD

P4: TYPICAL SECTION DETAILS ISOMETRIC DETAILS

P5: BORING LGS

P6-7: PLAN AND PROFILE

P8-22: CROSS SECTIONS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TOPOGRAPHIC MAP JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, SUMMARY OF QUANTITIES DPWH JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO LOCATION MAP PREPARED: ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER CY-2020 ENGINEERING OFFICE VICINITY MAP DATE: DATE: DATE: R-IV-B 2 22 MAMBURAO, OCCIDENTAL MINDORO SABLAYAN, OCCIDENTAL MINDORO SECTION INDEX OF SHEETS STARLET S. SIBAYAN DATE: ENGINEER II GENERAL NOTES

SITE PREPARATION

ALL EXISTING PERMANENTWORKS (SUCH AS PAVEMENT CURBS, GUTTERS, RIPRAP, SLOPE PROTECTION WORKS AND ALL OTHER SIMILAR WORKS) WHICH WILL INTERFERE WITH THE WORK SHALL BE COMPLETELY REMOVED AND DISPOSED OFF SITE BY THE CONTRACTOR. ALL SALVAGEABLE MATERIALS SHALL BE PROPERLY AND CAREFULLY DISMANTLED AND DEPOSITED ON A CONVENIENT SITE AS INSTRUCTED BY THE ENGINEER. HOWEVER, IF SUCH PERMANENT WORKS ARE DESIGNATED TO REMAIN BUT IT WILL BE DEMOLISHED BY THE CONTRACTOR FOR THE NECESSARY PROSECUTION OF THE WORKS. THESE DEMOLISHED PERMANENT WORKS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION.

6. RECONSTRUCTION IF EXISTING PERMANENT WORKS OR PORTIONS THEREOF ARE DESIGNATED TO REMAIN, THE CONTRACTOR SHALL TAKE PRECAUTION NOT TO DAMAGED OR INJURE TO THESE WORKS CAUSED BY CONTRACTOR SHALL BE REPAIRED AT HIS OWN EXPENSE. 7. TRAFFIC MANAGEMENT THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING AND MAINTAINING AN EFFECTIVE TRAFFIC CONTROL PLAN IN ACCORDANCE WITH THE SPECIAL PROVISIONS SUBJECT TO THE APPROVAL OF THE ENGINEER AND CORRESPONDING LOCAL AUTHORITIES. 8. WASTE DUMPING AREA THE WASTE MOUNT AT THE DUMPING AREA SHALL BE TRIMMED TO THE SHAPE AS INDICATED IN THE PLANS AND THE EXCAVATED MATERIALS SHALL BE PROPERLY DISPOSED OR AS DIRECTED BY THE ENGINEER.

DESIGN CRITERIA REF. * DGCS 2015 VOLUME 3

DESIGN PARAMETERS:

DRAINAGE AREA NPð DESIGN DISCHARGE, QPñV MEAN VELOCITY, Vm : 2.96 m/s

2.40 0.80 0.80 0.80

2.40 4' X 8' X 3/16" MARINE PLYWOOD W/ 2.40 STANDARD DPWH SIGNBOARD DETAILS 2" X 2" X 10' COCOLUMBER FRAME 2.00 2.00

4' X 8' X 3/16" MARINE PLYWOOD W/ 2" X 2" X 10' COCOLUMBER FRAME STANDARD DPWH SIGNBOARD DETAILS 2" X 2" X 10' COCOLUMBER POST 2" X 2" X 10' COCOLUMBER POST 1.20 0.90 0.90

NGL

EMBEDMENT 0.30 0.30

DETAILS OF FRAMINGS FOR DPWH STANDARD SIGNBOARD/BILLBOARD SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, GENERAL NOTES DPWH JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO DETAILS OF FRAMING FOR PREPARED: ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER CY-2020 ENGINEERING OFFICE STANDARD SIGNBOARD/BILLBOARD DATE: DATE: DATE: 3 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 1.00M X 1.00M X 2.00M GABIONS TOP OF STRUCTURE (BANK PROTECTION) 55.16 ELEV. 55.16 1.0m FREEBOARD FILTER CLOTH 0.00, 0.50M X 1.00M X 6.00M GABIONS EMBANKMENT 3.00m (SCOUR PROTECTION) 52.66 5.00 51.66 6.00,

NATURAL RIVER BED 51.16 6.00m -8.50,

3.00, STRUCTURE EXCAVATION (CUT)

6.00m DETAILS OF BANK PROTECTION AT CUT SECTION SCALE N.T.S.

1.00 m

1.00 m

3.00 m 1.00 m

6.00 m 6.00 m 2.00 m 0.50m

ISOMETRIC VIEW 0.05M X 1.0M X 3.0M GABIONS 1.0M X 1.0M X 2.0M GABIONS SCALE N.T.S. SCALE N.T.S. SCALE N.T.S.

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH TYPICAL SECTION DETAILS JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI ISOMETRIC DETAILS ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER CY-2020 ENGINEERING OFFICE DATE: DATE: DATE: 4 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II RIGHT OF WAY LIMIT

TOP OF GABIONS BEG. OF PROJECT DESIGN FLOOD LEVEL MATCH LINE STA.0+720.00 STA.0+400.00 48.00 ORDINARY FLOOD LEVEL NATURAL GROUND RIVER BED

54.00

52.00 51.842 51.766 51.769 51.763 51.738 51.72 51.708 51.697 51.665 51.664 51.668 51.627 51.622 51.617 51.594 51.57 51.55

50.00

48.00 STATION 0+400 0+420 0+440 0+460 0+480 0+500 0+520 0+540 0+560 0+580 0+600 0+620 0+640 0+660 0+680 0+700 0+720

TOP OF GABIONS 55.42 55.26 55.18 55.38 55.21 55.28 55.23 55.33 55.40 55.25 55.35 55.16 55.37 55.20 55.32 55.30 55.44

DESIGN FLOOD LEVEL 54.21 54.18 54.42 54.30 54.32 54.38 54.40 54.44 54.20 54.16 54.26 54.37 54.23 54.25 54.28 54.33 54.35

ORDINARY FLOOD LEVEL 53.18 53.22 53.17 53.00 53.13 53.05 53.10 53.20 52.98 53.06 53.12 53.15 53.03 53.08 52.96 53.24 53.01

EXISTING BANKS ELEVATION 52.63 52.55 51.88 51.73 51.55 52.25 52.20 51.92 52.41 52.08 51.67 52.17 51.83 51.62 51.66 51.64 51.96

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH PLAN AND PROFILE JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI STA. 0+400 - STA. 0+720 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER CY-2020 ENGINEERING OFFICE DATE: DATE: DATE: 6 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II END OF PROJECT MATCH LINE TOP OF GABIONS STA.0+720.00 STA.0+975.00 DESIGN FLOOD LEVEL

ORDINARY FLOOD LEVEL NATURAL GROUND RIVER BED

54.00 52.611 52.547 52.408 52.25 52.201 52.17

52.00 52.077 51.955 51.925 51.881 51.832 51.726 51.642 51.55

50.00 STATION 0+720 0+740 0+760 0+780 0+800 0+820 0+840 0+860 0+880 0+900 0+920 0+940 0+960 0+980 1+000 1+020 1+040

TOP OF GABIONS 55.45 55.44 55.61 55.62 55.54 55.57 55.59 55.64 55.47 55.52 55.49 55.50 55.55 55.65

DESIGN FLOOD LEVEL 54.44 54.64 54.54 54.50 54.45 54.47 54.57 54.65 54.49 54.61 54.62 54.52 54.55 54.59

ORDINARY FLOOD LEVEL 53.25 53.41 53.44 53.32 53.34 53.24 53.42 53.45 53.39 53.27 53.35 53.30 53.29 53.37

EXISTING BANKS ELEVATION 51.74 51.59 51.81 51.62 51.66 51.72 51.63 51.71 51.77 51.57 51.70 51.66 51.76 51.77

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH PLAN AND PROFILE JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI STA. 0+720 - STA. 0+975 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER CY-2020 ENGINEERING OFFICE DATE: DATE: DATE: 7 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+420.00

57 57 TOP OF STRUCTURE 55.18 55.18 ELEV. 55.18 56 CUT = 12.61 56 1.0m FREEBOARD 54.18 FILL = 9.67 -1.00, 1.00, 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 51.803 51.762 53 51.753 53 51.68 51.18 6.00m

52 -11.70, 52 -6.92, 10.81, 8.50, -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+400.00

57 57 TOP OF STRUCTURE 55.16 55.16 56 ELEV. 55.16 CUT = 13.59 56 1.0m FREEBOARD 54.16 FILL = 9.05 -1.00, 1.00, 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 51.922

53 51.883 53 51.66 51.607 51.16 -12.00, 52 -6.78, 6.00m 52 8.50, 10.89, -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+400 - STA. 0+420 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 8 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+460.00

57 57 TOP OF STRUCTURE 55.21 55.21 ELEV. 55.21 56 CUT = 13.10 56 1.0m FREEBOARD 54.21 FILL = 7.77 -1.00, 1.00, 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 52.276 52.22

53 51.71 53 51.21 -10.54, -6.49, 52 6.00m 52 8.50, -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+440.00

57 57 TOP OF STRUCTURE 55.2 55.2 ELEV. 55.20 56 CUT = 13.80 56 1.0m FREEBOARD 54.2

-1.00, 1.00, FILL = 7.82 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 52.246 53 53 51.7 51.2 -6.45, 52 6.00m 52 8.50, -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+440 - STA. 0+460 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 9 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+500.00

57 57 TOP OF STRUCTURE 55.25 55.25 ELEV. 55.25 56 CUT = 12.21 56 1.0m FREEBOARD 54.25

-1.00, 1.00, FILL = 8.25 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 52.159

53 51.75 53 51.686 51.25 -6.59, 52 6.00m 52 8.50, 12.00, -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+480.00

57 57 TOP OF STRUCTURE 55.23 55.23 ELEV. 55.23 56 CUT = 12.10 56 1.0m FREEBOARD 54.23

-1.00, 1.00, FILL = 8.32 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 52.15 52.128

53 51.73 53 51.23 -10.00, 52 -6.60, 6.00m 52 8.50, -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+480 - STA. 0+500 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 10 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+540.00

57 57 TOP OF STRUCTURE 55.28 55.28 ELEV. 55.28 56 CUT = 10.99 56 1.0m FREEBOARD 54.28

-1.00, 1.00, FILL = 9.57 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 51.838 53 51.78 53 51.28 6.00m

52 -6.94, 52 8.50, -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+520.00

57 57 TOP OF STRUCTURE 55.26 55.26 ELEV. 55.26 56 CUT = 12.33 56 1.0m FREEBOARD 54.26

-1.00, 1.00, FILL = 8.00 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 52.251

53 51.76 53 51.26 -6.51, 52 6.00m 52 8.50, -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+520 - STA. 0+540 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 11 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+580.00

57 57 TOP OF STRUCTURE 55.32 55.32 ELEV. 55.32 56 CUT = 10.10 56 1.0m FREEBOARD 54.32 -1.00, 1.00, FILL = 9.32 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 51.976

53 51.82 53 51.32

-6.84, 6.00m

52 8.50, 52 -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+560.00

57 57 TOP OF STRUCTURE 55.3 55.3 ELEV. 55.30 56 CUT = 10.74 56 1.0m FREEBOARD 54.3 -1.00, 1.00, FILL = 8.76 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 52.176

53 51.8 53 51.3 -6.62, 52 6.00m 52 8.50, -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+560 - STA. 0+580 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 12 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+620.00

57 57 TOP OF STRUCTURE 55.35 55.35 ELEV. 55.35 56 CUT = 9.26 56 1.0m FREEBOARD 54.35 -1.00, 1.00, FILL = 9.87 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 51.874 53 51.85 53 51.35 6.00m -6.98, 52 8.50, 52 -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+600.00

57 57 TOP OF STRUCTURE 55.33 55.33 ELEV. 55.33 56 CUT = 10.09 56 1.0m FREEBOARD 54.33 -1.00, 1.00, FILL = 9.61 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 51.92 53 51.83 53 51.33 6.00m -6.91,

52 8.50, 52 -3.00, 51 51

50 50 6.00m 49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+600 - STA. 0+620 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 13 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+660.00

57 57 TOP OF STRUCTURE 55.38 55.38 ELEV. 55.38 56 CUT = 9.03 56 1.0m FREEBOARD 54.38 -1.00, 1.00, FILL = 10.78 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 52.252

53 51.88 53 51.38 -6.63, 6.00m

52 8.50, 52 -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+640.00

57 57 TOP OF STRUCTURE 55.37 55.37 ELEV. 55.37 56 CUT = 8.38 56 1.0m FREEBOARD 54.37 -1.00, 1.00, FILL = 9.29 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 52.046

53 51.87 53 51.37

-6.82, 6.00m

52 8.50, 52 -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+640 - STA. 0+660 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 14 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+700.00

57 TOP OF STRUCTURE 57 55.42 55.42 ELEV. 55.42 56 56 1.0m FREEBOARD CUT = 9.06 54.42 -1.00, 1.00, FILL = 9.12 55 55 3.00m

-4.50, 4 PñV 54 v = 2.96m/s 54 52.102 53 51.92 53 51.42

-6.82, 6.00m

52 8.50, 52 -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+680.00

57 57 TOP OF STRUCTURE 55.4 55.4 ELEV. 55.40 56 CUT = 8.89 56 1.0m FREEBOARD 54.4 -1.00, 1.00, FILL = 9.82 55 55 3.00m 4 PñV -4.50, 54 v = 2.96m/s 54 51.9 53 51.869 53 51.4 6.00m 8.50, 52 -7.00, 52 -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+680 - STA. 0+700 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 15 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+740.00

57 TOP OF STRUCTURE 57 55.45 55.45 ELEV. 55.45 56 56 1.0m FREEBOARD CUT = 8.28 54.45 -1.00, 1.00, FILL = 9.87 55 55 3.00m

-4.50, 4 PñV 54 v = 2.96m/s 54 51.982 53 51.95 53 51.45 6.00m -6.97, 52 8.50, 52 -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+720.00

57 TOP OF STRUCTURE 57 55.44 55.44 ELEV. 55.44 56 56 1.0m FREEBOARD FILL = 8.05 54.44 -1.00, 1.00, CUT = 9.74 55 55 3.00m

-4.50, 4 PñV 54 v = 2.96m/s 54 51.978 53 51.94 53 51.44 6.00m -6.96, 52 8.50, 52 -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+720 - STA. 0+740 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 16 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+780.00

57 TOP OF STRUCTURE 57 55.49 55.49 ELEV. 55.49 56 1.0m FREEBOARD CUT = 7.93 56 54.49 -1.00, 1.00, FILL = 9.90 55 55 3.00m

-4.50, 4 PñV 54 v = 2.96m/s 54 52.013 53 51.99 53 51.49 6.00m -6.98, 52 8.50, 52 -3.00, 51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+760.00

57 TOP OF STRUCTURE 57 55.47 55.47 ELEV. 55.47 56 1.0m FREEBOARD CUT = 7.98 56 54.47 -1.00, 1.00, FILL = 9.84 55 55 3.00m

-4.50, 4 PñV 54 v = 2.96m/s 54 51.981 53 51.97 53 51.47 6.00m -6.99, 52 8.50, 52 -3.00, 51 51

50 6.00m 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+760 - STA. 0+780 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 17 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+820.00

57 TOP OF STRUCTURE 57 55.52 55.52 ELEV. 55.52 56 1.0m FREEBOARD CUT = 7.72 56 54.52 -1.00, 1.00, FILL = 10.60 55 55 3.00m

-4.50, 4 PñV 54 v = 2.96m/s 54 52.02 53 51.874 53 51.52 6.00m 8.50,

52 -7.15, 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+800.00

57 TOP OF STRUCTURE 57 55.5 55.5 ELEV. 55.50 56 1.0m FREEBOARD CUT = 8.15 56 54.5 -1.00, 1.00, FILL = 10.89 55 55 3.00m

-4.50, 4 PñV 54 v = 2.96m/s 54 52

53 51.803 53 51.5 6.00m 8.50,

52 -7.20, 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+800 - STA. 0+820 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 18 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+860.00

57 TOP OF STRUCTURE 57 55.55 55.55 ELEV. 55.55 56 1.0m FREEBOARD CUT = 8.95 56 54.55 -1.00, 1.00, FILL = 9.76 55 3.00m 55 -4.50, 4 PñV 54 v = 2.96m/s 54 52.108 52.05 53 53 51.55 6.00m -6.94, 52 8.50, 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+840.00

57 TOP OF STRUCTURE 57 55.54 55.54 ELEV. 55.54 56 1.0m FREEBOARD CUT = 8.75 56 54.54 -1.00, 1.00, FILL = 10.36 55 3.00m 55 -4.50, 4 PñV 54 v = 2.96m/s 54 52.04 53 51.932 53 51.54 6.00m 8.50, 52 -7.11, 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+840 - STA. 0+860 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 19 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+900.00

57 TOP OF STRUCTURE 57 55.59 55.59 ELEV. 55.59 56 1.0m FREEBOARD CUT = 9.43 56 54.59 -1.00, 1.00, FILL = 9.49 55 3.00m 55 -4.50, 4 PñV 54 v = 2.96m/s 54 52.209 52.09 53 53 51.59 6.00m -6.88, 52 8.50, 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+880.00

57 TOP OF STRUCTURE 57 55.57 55.57 ELEV. 55.57 56 1.0m FREEBOARD CUT = 9.17 56 54.57 -1.00, 1.00, FILL = 9.43 55 3.00m 55 -4.50, 4 PñV 54 v = 2.96m/s 54 52.202 52.07 53 53 51.57

-6.87, 6.00m 52 8.50, 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+880 - STA. 0+900 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 20 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+940.00

57 TOP OF STRUCTURE 57 55.62 55.62 ELEV. 55.62 56 1.0m FREEBOARD CUT = 9.61 56 54.62 -1.00, 1.00, FILL = 8.84 55 3.00m 55 -4.50, 4 PñV 54 v = 2.96m/s 54 52.368 52.12 53 53 51.62

-6.75, 6.00m 52 8.50, 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+920.00

57 TOP OF STRUCTURE 57 55.61 55.61 ELEV. 55.61 56 1.0m FREEBOARD CUT = 9.06 56 54.61 -1.00, 1.00, FILL = 9.47 55 3.00m 55 -4.50, 4 PñV 54 v = 2.96m/s 54 52.221 52.11 53 53 51.61 6.00m -6.89, 52 8.50, 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+920 - STA. 0+940 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 21 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II 0+975.00

57 TOP OF STRUCTURE 57 55.65 55.65 ELEV. 55.65 56 1.0m FREEBOARD 56

54.65 CUT = 10.09 -1.00, 1.00, FILL = 7.84 55 3.00m 55 -4.50, 4 PñV 54 v = 2.96m/s 54 52.639 52.15 53 53 51.65 -6.51, 6.00m 8.50, 52 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0+960.00

57 TOP OF STRUCTURE 57 55.64 55.64 ELEV. 55.64 56 1.0m FREEBOARD 56

54.64 CUT = 9.76 -1.00, 1.00, FILL = 8.27 55 3.00m 55 -4.50, 4 PñV 54 v = 2.96m/s 54 52.524 52.14 53 53 51.64 -6.62, 6.00m 52 8.50, 52 -3.00,

51 51

6.00m 50 50

49 49

48 48 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JEFFERLYNE V. NOCEDA REGIONAL OFFICE IV-B CONSTRUCTION OF FLOOD CONTROL ENGINEER I STRUCTURE MOMPONG RIVER MARABONG SECTION, DPWH CROSS SECTION ALEXIS L. SARMIENTO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. F.C. MINDORO OCCIDENTAL DISTRICT SABLAYAN, OCCIDENTAL MINDORO PREPARED: CY-2020 STA. 0+960 - STA. 0+975 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ENGINEERING OFFICE DATE: DATE: DATE: 22 22 MAMBURAO, OCCIDENTAL MINDORO SECTION R-IV-B SABLAYAN, OCCIDENTAL MINDORO STARLET S. SIBAYAN DATE: ENGINEER II