1. Name of work:- Stg weak & Ghat sites of Hassan Minor RD 0+000 to tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Borrowpit excavation & Transportation of earth all types when the total 1 distance. This rate will be paid inaddition to the including the lead 6869 %0 Cft covered in the item of work lead 1 mile dressed. Borrowpit excavation & Transportation of earth all types when the total 2 distance. This rate will be paid inaddition to the including the lead 2268 %0 Cft covered in the item of work lead 1.25 mile dressed. Borrowpit excavation & Transportation of earth all types when the total 3 distance. This rate will be paid inaddition to the including the lead 2480 %0 Cft covered in the item of work lead 1.5 mile dressed. Supply and dumping at site, without boat including handling of material 4 5400.3 % Cft within three chains (90m) Brick Bats.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 2. Name of work:- Strengthing of banks at RD 99+600 to 100+000 Kakowal disty. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures 1 Borrowpit excavation dressed lead upto 1/4 mile. 68567 %o Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 3. Name of work:-Resectioning of disty RD 61+000 to 105+310 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 2185 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Berm cutting upto 50 feet (15 meter) lead including dressing. 2 4898.8 %0 Cft Transportation of earth work all types including the lead upto 1.00 3 3086.1 %0 Cft mile for RD (62+000 to 71+000 and culverts).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 4. Name of work:-Resectioning of Sohawa disty RD 33+000 to 149+647 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 235795 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 5. Name of work:-Improving inner prism of Haria Minor RD 0+000 to 25+000 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 55085 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 6. Name of work:- Providing and fixing data Board, missing Gauges and RD Marks in Sohawa Sub Division UJC (Chhimon Section). Abstract of cost for new data boards BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with 1 5.48 %o Cft excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) ordinary soil. Pacca brick work other than building upto 10 ft. (3 m) height. Ratio 2 14.65 %Cft (1:3). 3 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" (20 mm) thick. 38.84 %Sft Providing and applying weather shield paint of approved quality on 4 external surface of building including preparation of surface, application 38.84 %Sft of primer complete in all respect, 1 coat. 5 Writing letters or figures, per letter, per inch height. 609 Per No. Abstract of cost for new data boards (Plaster & Painting). Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures 1 Removing cement or lime plaster. 38.84 %Sft 2 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" thick. 38.84 %Sft Providing and applying weather shield paint of approved quality on 3 external surface of building including preparation of surface, application 38.84 %Sft of primer complete in all respect, 1 coat. 4 Writing letters or figures, per letter, per inch height (2.5" height). 609 Per No. Abstract of cost for new RD Marks. Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Cement concrete plain including placing, compacting, finishing and curing 1 complete (including screening and washing of stone aggregate) : ratio 0.945 %Cft 1:2:4. 2 Placing boundary pillars in position including digging points. 1.00 1 Cft Painting distance marks for white ground and black lettering on both 3 1.00 1 No. faces. Carriage of consignment odd job Cart load for a distance exceeding 4 to 4 1.00 1 No. 10 mile. Abstract of Qty & cost for Old RD Marks. Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Painting distance marks for white ground and black lettering on both 1 1.00 1 No. faces.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 7. Name of work:- Providing and fixing data Board, missing Gauges and RD Marks in Sohawa Sub Division UJC (Chillianwala Section). Abstract of cost for new data boards BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with 1 5.48 %o Cft excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) ordinary soil. Pacca brick work other than building upto 10 ft. (3 m) height. Ratio 2 14.65 %Cft (1:3). 3 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" (20 mm) thick. 38.84 %Sft Providing and applying weather shield paint of approved quality on 4 external surface of building including preparation of surface, application 38.84 %Sft of primer complete in all respect, 1 coat. 5 Writing letters or figures, per letter, per inch height. 609 Per No. Abstract of cost for new RD Marks. Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Cement concrete plain including placing, compacting, finishing and curing 1 complete (including screening and washing of stone aggregate) : ratio 0.945 %Cft 1:2:4. 2 Placing boundary pillars in position including digging points. 1.00 1 Cft Painting distance marks for white ground and black lettering on both 3 1.00 1 No. faces. Carriage of consignment odd job Cart load for a distance exceeding 4 to 4 1.00 1 No. 10 mile. Abstract of Qty & cost for Old RD Marks. Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Painting distance marks for white ground and black lettering on both 1 1.00 1 No. faces.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 8. Name of work:- Providing and fixing data Board, missing Gauges and RD Marks in Sohawa Sub Division UJC (Wasu Section). Abstract of cost for new data boards BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with 1 5.48 %o Cft excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) ordinary soil. Pacca brick work other than building upto 10 ft. (3 m) height. Ratio 2 14.65 %Cft (1:3). 3 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" (20 mm) thick. 38.84 %Sft Providing and applying weather shield paint of approved quality on external 4 surface of building including preparation of surface, application of primer 38.84 %Sft complete in all respect, 1 coat. 5 Writing letters or figures, per letter, per inch height. 609 Per No. Abstract of cost for old data boards (Plaster & Painting). Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures 1 Removing cement or lime plaster. 38.84 %Sft 2 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" thick. 38.84 %Sft Providing and applying weather shield paint of approved quality on 3 external surface of building including preparation of surface, application 38.84 %Sft of primer complete in all respect, 1 coat. 4 Writing letters or figures, per letter, per inch height (2.5" height). 609 Per No. Abstract of cost for old data boards (4.00' x 3.00') (painting only) Rate quoted by Rate quoted by contractor S.# Description Quantity Unit contractor in in words figures Providing and applying weather shield paint of approved quality on 1 external surface of building including preparation of surface, application 51.82 %Sft of primer complete in all respect, 1 coat. 2 Writing letters or figures, per letter, per inch height. 609.00 Per No. Abstract of cost for new RD Marks. Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Cement concrete plain including placing, compacting, finishing and curing 1 complete (including screening and washing of stone aggregate) : ratio 0.945 %Cft 1:2:4. 2 Placing boundary pillars in position including digging points. 1.00 1 Cft Painting distance marks for white ground and black lettering on both 3 1.00 1 No. faces. Carriage of consignment odd job Cart load for a distance exceeding 4 to 4 1.00 1 No. 10 mile. Abstract of Qty & cost for Old RD Marks. Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Painting distance marks for white ground and black lettering on both 1 1.00 1 No. faces.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

9. Name of work:-STG weak & ghat sites of Sohawa disty RD 0+000 to 33+000 in Wasu Section. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Borrowpit excavation & Transportation of earth all types when the total 1 distance. This rate will be paid inaddition to the including the lead 4349 %0 Cft covered in the item of work lead 1 mile dressed. Borrowpit excavation & Transportation of earth all types when the total 2 distance. This rate will be paid inaddition to the including the lead 16785 %0 Cft covered in the item of work lead 1/2 mile dressed. Supply and dumping at site, without boat including handling of material 3 14157 % Cft within three chains (90m) Brick Bats.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 10. Name of work:- Repairing Defective / Tempered / Damaged outlets in Gujrat Sub Division (Kalupindi Section) BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork for outlets, excavation refilling, ramming and pudding 1 16 1 Job channels, discharge upto 50 cusecs. Dismantling outlets A.P.M. or O.F. "H" upto 2.0 ft. (600 mm) 18/2. 2 16 1 No. Extra labour in fixing A.P.M. and O.F. outlet blocks, channel depth of 2.0'. 3 32 1 No. (600 mm). Water allowance for constructing outlets or culverts, whencanal water is 4 16 1 No. not flowing. Pacca brick work other than building upto 10ft. (3m) height cement, sand 5 542.02 % Cft mortar Ratio 1:3 gullet portion. Fabrication of heavy steel work, with angle, tees, flat iron round iron and sheet iron for making trusses, girders tanks, etc. including 6 552.95 % Kg cutting, drilling, revitting, handling, assembling and fixing, but excluding erection in position.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 11. Name of work:- Providing & Fixing Distance marks on Channels in Kalupindi Section. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Cement concrete plain including placing, compacting, finishing and curing 1 complete (including screening and washing of stone aggregate) : ratio 558.600 % Cft 1:2:4. Carriage of consignment odd job Cart load for a distance exceeding 4 to 2 22.8 1 10 mile. 3 Placing boundary pillars in position including digging pits 228 1 Painting distance marks for white ground and black lettering on both 4 228 1 faces.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 12. Name of work:Closing of cattle ghat between RD 2-3/L of 6-R (Karariwala disty. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work excavation from outside borrowpits undressed. Transportation of earth all types when the total distance, including 1 15160.25 0%Cft the lead covered in the item of work, is more than 1000 ft. (300 m) averge lead 1/2 miles. 2 Cement Plaster 1-1/2" thick on level Ratio 1:6 (in top lip). 25.09 %Sft 3 Cement Plaster 1-1/2" thick on slope Ratio 1:6 (on slop L). 104.94 %Sft Cement concrete lining using washed screened graded stone 4 7.50 %Cft agrigate ratio 1:2:4 on level. Cement concrete lining using washed screened graded stone 5 34.46 %Cft agrigate ratio 1:2:4 on slope. 9.50 6 Bitumen coating to plastered or cement concrete surface 10 lbs. per 100 sft. %Sft Earth work excavation in irrigation channel, drains etc to design section, grades and profiles excavated material disposed off and undressed with 2.38 0 %Cft 7 in 50 ft ordinary soil.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 13. Name of work:-Resectioning of Haslanwala disty at RD 0+000 to 66+000 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 236235 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). Qty as per Sheet Attached.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 14. Name of work:-Desilting of Rasulpur disty RD 0+000-26+250 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Brick lining 9" x4½" x3" (225x113x75 mm), in 1:3 cement, The rates 1 are only for laying sand mortar on slope: Qty as per Sheet 791 %Cft Attached. Earthwork excavation in ashes, sand and soft soil or silt clearance, 2 58709 % 0Cft undressed lead upto 50 ft (15 metre). Qty as per Sheet attached.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 15. Name of work:-Desilting of Murad Minor RD 0+000 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Brick lining 9" x4½" x3" (225x113x75 mm), in 1:3 cement, The rates 1 are only for laying sand mortar on slope: Qty as per Sheet 265 %Cft Attached. Earthwork excavation in ashes, sand and soft soil or silt clearance, 2 41131 % 0Cft undressed lead upto 50 ft (15 metre). Qty as per Sheet attached.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 16. Name of work:-Resectioning of Chorund Minor RD 0+000 to 31+600 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 55099 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 17. Name of work:-Berm cutting of Chak Basawa Minor at 0+000 to 6+000. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 16965 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 18. Name of work:-Improving ineer prism of Sultanpur Minor RD 0+000 to 15+392 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 42033 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). 2 Uprooting Sarkanda growth and disposal within 100 ft. 103200 % Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 19. Name of work:-Resectioning of Shumari Minor RD 0+000 to 15+466 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 48964 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). 2 Uprooting Sarkanda growth and disposal within 100 ft. 50550 % Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 20. Name of work:-Improving ineer prism of Kuthiala Sub Minor RD 0+000 to 5+250 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 7315 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). 2 Uprooting Sarkanda growth and disposal within 100 ft. 63710 % Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 21. Name of work:-Improving ineer prism of Raib Minor RD 0+000 to tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 19849 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). 2 Uprooting Sarkanda growth and disposal within 100 ft. 43060 % Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 22. Name of work:-Desilting of Rasul Direct Minor RD 0+00 to 5+250 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 57669 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Earthwork excavation undressed lead upto a single throw of Kassi, 2 phaorah or shovel in ordinary soil. + Extra for slush or Daldal 2204 %0 Cft including dewatering. Transportation of earth all types when the total distance, including 3 59873 %0 Cft the lead 1/2 mile.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 23. Name of work:-Desilting of kot Islam Disty RD 0 to 8+480 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork excavation in ashes, sand and soft soil or silt clearance, 1 8178 %o Cft undressed lead upto 50 ft (15 metre). Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 2 16250 % Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 24. Name of work:-Resectioning of Chillianwala Disty RD 0+000 to 61+000. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 135452 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). 2 Uprooting Sarkanda growth and disposal within 100 ft. 97325 % Cft Earthwork excavation undressed lead upto a single throw of Kassi, 3 phaorah or shovel in ordinary soil. + Extra for slush or Daldal 2262 %o Cft including dewatering. Transportation of earth all types when the total distance, including 4 5340 %o Cft the lead 1 mile.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 25. Name of work:-Desilting of Minor RD 0+000 to 14+280 tail of Sub Division UJC . BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation in irrigation channel and Drains by the drag line / excavator in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 40248 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). 2 Uprooting Sarkanda growth and disposal within 100 ft. 29000 % Sft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 26. Name of work:-Improving ineer prism of Dhole minor RD 0+000 to 6+053 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 8890 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 27. Name of work:-Resectioning of Bhacher disty at RD 19+500 to 47+000 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 193100 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 28. Name of work:-Resectioning of Sohawa disty RD 0+000 to 33+000 in wasu Section. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 203783 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). 2 Uprooting Sarkanda growth and disposal within 100 ft (30m). 93500 % Sft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 29. Name of work:-Resectioning of Mangat disty RD 0+000 to 60+000 (Different Reaches) BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 183695 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). 2 Uprooting Sarkanda growth and disposal within 100 ft (30m). 22400 % Sft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 30. Name of work:-Shifting of Reserve Stock of Stone of Spur No. 10 from private land to Spur No. 10.

BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. 1 7917.75 % Cft (4.25 cu.m) of timber, by truck or by any other means owned by the contractor. 1.5 KM.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 31. Name of work:- Annual Repair to Executive Engineer Residence at Canal Colony Gujrat. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Providing and applying weather shield of approved quality on external 1 1558.0 % Sft surface of building including preparation of surface old surface. Laying floor of approved white glazed tile ¼" (6 mm) thick in white 2 637.8 % Sft cement 1:2 over ¾" (20mm) thick cement mortar 1:2, complete. White glazed tile (6" x6" x¼" ) (6 mm) thick dado jointed in white cement 3 and laid over 1:2 cement sand mortar 3/4" (20mm) thick, including 74.8 % Sft finishing.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 32. Name of work:-Desilting of Dhulian minor RD 0+000 to 8+800 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork excavation undressed lead upto a single throw of Kassi, 1 13830 %o Cft phoara or shawal in ashes, sand soft soil or silt clearance.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 33. Name of work:-Desilting of Dinga minor RD 0+000 to 6+516 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork excavation undressed lead upto a single throw of Kassi, 1 17086 %o Cft phoara or shawal in ashes, sand soft soil or silt clearance. Borrowpit excavation dressed lead upto 100 ft (30 metre). In ordinary 2 2880 %o Cft soil.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 34. Name of work:-Desilting of 6-R disty RD 0+000 to 35+580 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork excavation undressed lead upto a single throw of Kassi, 1 100128 %o Cft phoara or shawal in ashes, sand soft soil or silt clearance.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 35. Name of work:-Desilting of 3-R disty RD 0+000 to 33+894 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork excavation undressed lead upto a single throw of Kassi, 1 152312 %o Cft phoara or shawal in ashes, sand soft soil or silt clearance.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 36. Name of work:-Resectioning of 7-R disty RD 0+000 to 11+500 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 33053 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). Borrowpit excavation dressed lead upto 100 ft (30 metre). In ordinary 2 9116 %o Cft soil.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 37. Name of work:- Repairing Defective outlets in Sohawa Sub Division UJC (Chhimon Section) BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork for outlets, excavation refilling, ramming and pudding 1 16 1 Job channels, discharge upto 50 cusecs. Dismantling outlets A.P.M. or O.F. "H" upto 2.0 ft. (600 mm) 18/2. 2 16 1 No. Extra labour in fixing A.P.M. and O.F. outlet blocks, channel depth of 2.0'. 3 22 1 No. (600 mm). Water allowance for constructing outlets or culverts, whencanal water is 4 40 1 No. not flowing. Pacca brick work other than building upto 10ft. (3m) height cement, sand 5 99 % Cft mortar Ratio 1:3 gullet portion. Fabrication of heavy steel work, with angle, tees, flat iron round iron and sheet iron for making trusses, girders tanks, etc. including 6 256 % Kg cutting, drilling, revitting, handling, assembling and fixing, but excluding erection in position. Adjusting "Y" of an A.P.M. outlet including dismantling and 7 7 1 No. rebuilding.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

38. Name of work:- Repairing Defective outlets in Sohawa Sub Division UJC (Wasu Section) BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork for outlets, excavation refilling, ramming and pudding 1 9 1 Job channels, discharge upto 50 cusecs. Dismantling outlets A.P.M. or O.F. "H" upto 2.0 ft. (600 mm) 18/2. 2 9 1 No. Extra labour in fixing A.P.M. and O.F. outlet blocks, channel depth of 2.0'. 3 16 1 No. (600 mm). Water allowance for constructing outlets or culverts, whencanal water is 4 21 1 No. not flowing. Pacca brick work other than building upto 10ft. (3m) height cement, sand 5 51 % Cft mortar Ratio 1:3 gullet portion. Fabrication of heavy steel work, with angle, tees, flat iron round iron and sheet iron for making trusses, girders tanks, etc. including 6 249 % Kg cutting, drilling, revitting, handling, assembling and fixing, but excluding erection in position. Adjusting "Y" of an A.P.M. outlet including dismantling and 7 3 1 No. rebuilding.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

39. Name of work:- Repairing Defective outlets in Sohawa Sub Division UJC (Chillianwala Section)

BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork for outlets, excavation refilling, ramming and pudding 1 9 1 Job channels, discharge upto 50 cusecs. Dismantling outlets A.P.M. or O.F. "H" upto 2.0 ft. (600 mm) 18/2. 2 9 1 No. Extra labour in fixing A.P.M. and O.F. outlet blocks, channel depth of 2.0'. 3 16 1 No. (600 mm). Water allowance for constructing outlets or culverts, whencanal water is 4 21 1 No. not flowing. Pacca brick work other than building upto 10ft. (3m) height cement, sand 5 51 % Cft mortar Ratio 1:3 gullet portion. Fabrication of heavy steel work, with angle, tees, flat iron round iron and sheet iron for making trusses, girders tanks, etc. including 6 249 % Kg cutting, drilling, revitting, handling, assembling and fixing, but excluding erection in position. Adjusting "Y" of an A.P.M. outlet including dismantling and 7 3 1 No. rebuilding. Contractor Executive Engineer, Gujrat Division UJC Gujrat

40. Name of work:- Berm cutting and Desilting of minor at RD 0+000 to 64+352 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 190710 % 0Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). Berm cutting single through of Kassi, Thaora or shawal (without 2 35470 % 0Cft dressing).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 41. Name of work:-Resectioning of Khumb minor at RD 0+000 to 34+002. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 109896.04 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 42. Name of work:-Resectioning of minor at RD 0+000 to 11+710 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 36407 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 43. Name of work:-Resectioning of Mianwal disty at RD 71+500 to 117+901. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 104602.12 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). Berm cutting lead upto a single throw of Kassi, phaora or shovel 2 65710.00 %o Cft (without dressing).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 44. Name of work:-Resectioning of Bhikhi minor at RD 0+000 to 36+180 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 144853.3 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 45. Name of work:-Resectioning of Kakowal disty at RD 0+000 to 31+000. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 114723.1 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). Berm cutting lead upto a single throw of Kassi, phaora or shovel 51927.99 %o Cft 2 (without dressing).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 46. Name of work:-Resectioning of disty at RD 0+000 to 41+556 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 99220 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). 2 Uprooting Sarkanda growth and disposal within 100 ft (30m). 60114 % Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 47. Name of work:- Repairing Defective outlets of Bhacher section. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Construction watching and Removing Bund for outlets Built in running 1 21 1 No. water upto 3.00 ft depth. Adjusting y of A.P.M outltes including Dismantling and Rebuilding 2 21 1 No.

3 Iron Block for A.P.M and of outlets 10 1 No. 4 Extra labour for fixing of outlets including dressing of bricks. 21 1 No.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 48. Name of work:-Resectioning of Bagrianwala minor at RD 0+000 to 20+465 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 58732 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 49. Name of work:- Repairing Defective / Tempered / Damaged outlets in Gujrat Sub Division (Chakori Section) BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork for outlets, excavation refilling, ramming and pudding 1 10 1 Job channels, discharge upto 50 cusecs. Dismantling outlets A.P.M. or O.F. "H" upto 2.0 ft. (600 mm) 18/2. 2 10 1 No. Extra labour in fixing A.P.M. and O.F. outlet blocks, channel depth of 2.0'. 3 10 1 No. (600 mm). Water allowance for constructing outlets or culverts, whencanal water is 4 10 1 No. not flowing. Pacca brick work other than building upto 10ft. (3m) height cement, sand 5 188 % Cft mortar Ratio 1:3 gullet portion. Fabrication of heavy steel work, with angle, tees, flat iron round iron and sheet iron for making trusses, girders tanks, etc. including 6 216.88 % Kg cutting, drilling, revitting, handling, assembling and fixing, but excluding erection in position. Contractor Executive Engineer, Gujrat Division UJC Gujrat

50. Name of work:-Resectioning of 10-R Dhupsari disty at RD 0+000 to 33+980 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 134716 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 51. Name of work:-Desilting of Bukan minor at RD 0+000 to 14+950 tail.

BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Berm cutting lead upto a single throw of Kassi, phaora or shovel 1 37535 %o Cft (without dressing).

Contractor Executive Engineer, Gujrat Division UJC Gujrat