Local Recovery Plan

The Gold Coast is back in business. We are resilient and have a strong sense of community pride. We help our neighbours and look out for one another. We work together with our partners to rebuild our community. Our world-renowned beaches Mayor: and majestic hinterland areas are open for residents, tourists and visitors to enjoy. Preparations for the Gold Coast 2018 Cr Tom Tate Commonwealth Games are on track and when the eyes of the world are on us in 2018, we’ll be ready.

Values • Lifestyle is at the heart of what makes us tick. It’s the reason the city’s population continues to grow, and it CEO: influences the way we live, work and play. Our attitudes, environment, architecture and industry have combined Mr Dale Dickson to produce a city that is uniquely Gold Coast – a city unlike any other. We are “Inspired by lifestyle. Driven by opportunity”. The City of Gold Coast is actively working towards this City Vision by implementing the strategies and programs of work in our corporate plan, Gold Coast 2020. Local Recovery Group • Stood up on 30 March 2017. Local Recovery • Local Recovery Coordinator: Ms Alison Ewens. Coordinator: • Key Stakeholders: Community groups, local business, representatives from State and Federal Ms Alison Ewens government departments. • Recovery Themes: Human and Social • Economic • Environment • Infrastructure (Building, Roads and Transport) • Recovery Functions: Support for affected individuals and communities, reconstruction of physical infrastructure, the economy and environment. Local Recovery Coordinator:

RECOVERY NARRATIVE RECOVERY Mr Alton Twine

Human and Social • Free kerb-side collection for damaged activities were subsequently cancelled. • Impacted suburbs included Tallebudgera household goods and free tipping was • Emergence of high populations of mosquito Valley, Bonogin, Cedar Creek, Luscombe, provided. larvae throughout mangrove/saltmarsh areas Stapylton, Yatala, Mudgeeraba, Springbrook, • Donations (white goods, fuel, bottled water, of the city. Alberton, Currumbin Valley and . trade services) were provided through GIVIT to • Recreational waterways were contaminated by • Springbrook, South and affected residents. run-off from catchments. Cedar Creek communities were isolated. Economic • Water quality testing of beaches and canals required. • In excess of 300 properties were affected. A • Gold Coast tourism disrupted. There has number of residents were initially unable to • Parks, open space, reserves, and fire trails been a decline of 3.5 percentage points in damaged and not accessible. return to their homes. Libraries were utilised occupancy rates from 84.5% to 81.0%. • Over 400 flood clean up tasks identified. as ‘safe spaces’ for people unable to travel • A number of small/home businesses in the home. Five evacuation centres were activated. northern Gold Coast were severely impacted. Infrastructure (Building, Roads and • Although the number of directly impacted • Equipment, inventory and crops were Transport) properties was relatively small, the impact on damaged/lost. Community recovery outreach these properties has been significant. • In excess of 85 local and state roads were was also provided to assist with business closed due to flooding or major damage. • Rural residential properties lost water and continuity. wastewater services due to flooding of water • Impacted infrastructure includes 21 bridges, tanks and lack of electricity to operate pumps. Environment 18 road surfaces, and waterway infrastructure. • Community recovery outreach was undertaken • 3,000m3 of green, hard waste and hazardous • 23 landslips occurred affecting road traffic to identify local needs for 16 areas and to and community access. DAMAGE AND IMPACTS DAMAGE materials has been collected to date. advocate for support services. • 100 sporting sites were closed for four days. • Eight primary bridges were damaged • Gold Coast Health outpatient services and seven sites remained closed for 14 days impacting on community connectivity. surgeries disrupted. due to damage from storm water. Sporting

2 APRIL 2017 30 MARCH 2018 30 JUNE 2019

Post Impact & Early Intervention Recovery & Reconstruction Transition Lines of Recovery Endstate A more resilient community, as best prepared Human and Social 1 2 3 4 5 6 7 8 as it can be for future disasters and for hosting large events.

Small business rehabilitated and back on track. Economic 9 10 11 12 13 All business more disaster resilient. Parks and waterways restored and hazards 17 cleared. Environment 14 15 16 19 The community has greater understanding of 18 catchment behaviour. All transport infrastructure repaired and where 22 possible made more resilient to future disaster resilient Goldresilient Coast Infrastructure 20 21 events. and more A stronger LINES OF RECOVERY OF LINES Building Recovery 23 Greater community awareness of flood threats to 26 APRIL 2017 Commonwealth Games built infrastructure. Roads and Transport 4-15 April 2018

Human and Social Economic 16. Recreational waterways surveyed and opened. 1. Outreach teams deployed to reassure, to inform, and to 9. Business disaster preparation, response and recovery 17. Sports fields, public spaces and parks repaired and gain information from residents. initiative implemented. opened. 2. Personal hardship assistance scheme administered 10. Gold Coast 2018 Commonwealth Games planning and 18. Fire trails cleared and fire hazards reduced. across 16 impacted communities. testing program reviewed. 19. Catchment management strategy (incorporating more 3. Community hotlines staffed and community engagement 11. GOLDOC, whole of government, and inter-agency testing accurate flood modelling) developed and implemented. strategy commenced. of Gold Coast 2018 Commonwealth Games contingencies Infrastructure conducted. 4. Psycho-social needs understood and plans implemented 20. Impacted roads cleared of flood debris and made safe. to service these needs. 12. Gold Coast 2018 Commonwealth Games disaster management preparations completed. 21. Infrastructure project management team mobilised: 5. Effectiveness of emergency alert system reviewed and design, construction and procurement activities changes implemented as required. 13. Gold Coast 2018 Commonwealth Games successfully commenced. 6. Disaster management plans and procedures reviewed to delivered. OBJECTIVES 22. Local roads, culverts and bridges repaired and made incorporate lessons learned. Environment more resilient to future disasters. 7. Disaster management lessons captured and shared with LOCAL RECOVERY RECOVERY LOCAL 14. Green waste, hard waste, and hazardous materials 23. State owned transport infrastructure repaired and made neighbouring communities. removed. more resilient to future disasters. 8. Resilience of isolated communities (Springbrook, South 15. 1,800 hectares of mosquito breeding grounds treated. Stradbroke Island, Cedar Creek) reinforced.

This Plan has been endorsed for public release. This is a live document managed by the City of Gold Coast and is correct as at Wednesday 26 April 2017